Cities Index.
National Auto Fleet Change Order DOC081622-08162022162536

Redondo Beach City Council
September 6, 2022

Document
National Auto Fleet Change Order DOC081622-08162022162536
Meeting
September 6, 2022
Body
Redondo Beach City Council
Original file
11.6 MB
Text extracted from the city's file for reading and search. Open the original on redondo.legistar1.com. That file is the official record.

CITY OF REDONDO
VEH.MO ORD OLD PO CONTRACT CEC NEW OLD SALES NEW
PO # UNIT # A1 QUOTE BODY CTEC TOTAL
DEL ER # AMOUNT PRICING PRICE TAX (9.5%) TAX (9.5%)
5279 F-450 323 556 $ 139,867.51 Ş 42,929.52 Ş 4,675.00 $ 65,555.00 $ 72,595.00 $ 11,769.02 $ 11,418.95 $ 131,778.97 5273 F-250 54,615.91 $ 32,263.38 $ 12,400.00 5,118.50 5,618.50 4,729.28 4,776.78 $ 55,162.41 5268 F-350 324 $ 106,633.65 $ 36,749.34 Ş 4,675.00 45,225.00 $ 54,370.00 9,250.56 9,100.46 $ 105,055.30 5271 F-250 $ 32,589.78 $ 12,400.00 4,760.29 4,807.79
$ 55,519.82
5272 F-250 54,973.32 $ 32,589.78 $ 12,400.00 4,760.29
$ 55,519.82
5274 F-250 $ 32,393.94 $ 12,400.00 $ 21,095.00 4,610.20 6,259.45 72,250.39 5275 F-250 202 549 62,659.19 $ 32,393.94 $ 12,400.00 12,335.00 $ 17,295.00 5,427.25 5,898.45 $ 68,089.39
5276 F-250 203 550 66,820.19 $ 32,393.94 $ 12,400.00 16,135.00 $ 21,095.00 5,788.25 6,259.45 $ 72,250.39 5278 F-350 211 551 71,823.88 $ 34,463.52 1,045.75 $ 16,135.00 $ 21,095.00 $ 6,222.36 5,377.41 $ 62,088.18
Final Revision $ 677,714.67
Note:

PO #5279,5268,5278 not converted to CNG, please refer attached new quote for fees. Thank you National Auto
Quote Date: 8/16/22
Fleet Group
A Division of Chevrolet of Watsorville
City of Redondo Beach
Andrea Delap
531 N Gertruda Avenue
Redondo, CA 90277
310-318-0686
[email protected]
National Auto Fleet Group is pleased to submit the following quotation for your consideration:

Line
Qty Item Option # Description Unit Price Extended
New/unused (2022 Ford Super Duty F-450 DRW
SuperCab 168 WB 60 $ : 42,929.52 $ 42,929.52
CTEC Model 10438-HCT-95(new body quote) $ 72,595.00 72,595.00 1 Flooring and storage fees $ 4,675.00 $ 4,675.00
Subtotal $ 120,199.52 $ 120,199.52
Sales Tax 9.5 % $ 11,418.95 $ 11,418.95
Revised Tire Fee
$ 10.50 $ 10.50
from
DMV Fees (approx.) $
PO#5279
Delivery charge $ 150.00 $ 150.00
TOTAL PURCHASE ORDER AMOUNT $ 131,778.97 $ 131,778.97
Notes:

Please refer to attached specifications
This price is available under the National Auto Fleet Group Contract Number 120716-NAF. Please reference this bid number on all purchase orders to National Auto Fleet Group.

Terms: Vet 30 Days, after receipt of vehicle
Delivery: Harke Cooler
Quoted by: Clarke Cooper, Fleet Manager (626) 457-5590
1247 W. Main St., Alhambra, CA. 91801
CALIFORNIA TRUCK EQUIPMENT CO. QUOTE
12351 Bellflower Blvd, Downey CA 90242
CUL Quote Date Quote#
PH - 562-803-4466 F - 562-803-8795
Sold To: End User ctec-truckbody.com 2/17/2022 13099
National Auto Fleet Group City of Redondo Beach Terms Net 10 Att: Neil / Jessie 531 N Gertruda Ave,
855-289-6572 Redondo Beach CA FOB Customer
NAFG Original Customer Chassis Quote 9027 Rep RA
Quote # 29967 R1 ATTN Jesse Reyes
Model Cab Fuel Truck Available Rear wheel Bed width Compartment depth CA 202022 F450 Reg Cab Gas no DRW 49" × 23" X 95" 60"
PROUDLY PRODUCED - 100% - IN CALIFORNIA - USA
Description Qty Total
UNIT 323
A white Regular/Extended Cab F-450 - 60 inch CA - Back up camera prep package - trailer tow package - OEM backup alarm
CTEC model 10438-HCT-95 1 104 series
Designed for 1-Ton Trucks with 60" Cab to Axle, DRW
Body is 104 inches long - horizontal configuration with closed tops - 38 inches tall - 95 inches wide - bed width 49 inches - compartment depth 23 inches Mounted and painted white unless custom color is ordered LED Legal lights
Step Bumper painted silver
Paint to match wheel well tubing
Stainless steel T - handle pockets
Flat key lock with 4 keys
Gas shocks on compartment doors
Tool basket over SS compartments 1
Internal locking system for 104 series body 1
Cab Protector 1
2 cone holders - Caltrans style - mounted on front tow hooks 2 QUOTE VALID FOR 30 DAYS Subtotal
Order accepted by: Date Tax (9.5%)
Print Name _PO# Total
ANY AND ALL WARRANTY WORK WILL BE DONE BY CTEC AT 12351 BELLFLOWER BLVD DOWNEY, CA - CTEC IS NOT RESPONSAEE FOR ANY WORK DONE BY 3RD PARTIES CALIFORNIA TRUCK EQUIPMENT CO. QUOTE
12351 Bellflower Blvd, Downey CA 90242
CTE C Quote Date Quote #
PH - 562-803-4466 F - 562-803-8795
Sold To: End User ctec-truckbody.com 2/17/2022 13099
National Auto Fleet Group City of Redondo Beach Terms Net 10 Att: Neil / Jessie 531 N Gertruda Ave,
855-289-6572 Redondo Beach CA FOB Customer
NAFG Original Customer Chassis Quote 9027 Rep RA
Quote # 29967 R1 ATTN Jesse Reyes
Model Cab Fuel Truck Available Rear wheel Bed width Compartment depth CA 202022 F450 Reg Cab Gas no DRW 49' × 23" X 95" 60"1
PROUDLY PRODUCED - 100% - IN CALIFORNIA - USA
Description Qty Total
Removable Jack leg for crane 1
Linex Bed floor - front bulkhead - CS and SS backwrapper - inside of tailgate 1 PDI & Delivery 1
QUOTE VALID FOR 30 DAYS Subtotal $72,595.00
Order accepted by: Date Tax (9.5%) $0.00
Print Name PO# Total $72,595.00
ANY AND ALL WARRANTY WORK WILL BE DONE BY CTEC AT 12351 BELLFLOWER BLYD DOWNEY, CA - CTEC IS NOT RESPONSABEE FOR ANY WORK DONE BY 3RD PARTIES National Auto Fleet Group
A Divialon of Chayrolet of Wataonville
490 Auto Center Drive, Watsonville, CA 95076
(855) 289-6572 • (831) 480•8497 Fax
FleetgNationalAutoFleetGroup.com
4/28/2021 Quote ID: 16832
310-318- Order Cut Off Date: TBA
Mr Jesse Reyes
City of Redondo Beach NOX/ 2286
531 N. Gertruda Ave
Redondo, California, 90277
Dear Jesse Reyes,
National Auto Fleet Group is pleased to quote the following vehicles) for your consideration.

One (1) New/Unused (2022 Ford Super Duty F-450 DRW (X4G) XL 2WD SuperCab 168" WB 60" CA, CTEC Model 10438-HCT-95 Unit #323) and delivered to your specified location, each for One Unit One Unit Total % Total Savings
(MSRP) Savings
Contract Price $48,755.00 $42,929.52 11.948% $5,825.48
CTEC Model 10438-HCT-95 $65,555.00
Unit #323
Tax (9.5000 %) $10,306.03
Tire fee $10.50
Total $118,801.05
- per the attached specifications.

This vehicles) is available under the Sourcewell (Formerly Known as NJPA) Contract 120716-NAF. Please reference this Contract number on all purchase orders to National Auto Fleet Group. Payment terms are Net 20 days after receipt of vehicle.

Thank you in advance for your consideration. Should you have any questions, please do not hesitate to call.

Sincerely,
Jesse Cooper Quoting Department
Account Manager Account Manager
Email: [email protected] [email protected] Office: (855) 289-6572 (855) 289-6572
Fax: (831) 480-8497
(NISSAN, GME

CHEVROLET TOYOTA
Vehicle Configuration Options
ENGINE
Code Description
99N ENGINE: 7.3L 2V DEVCT NA PFI V8 GAS, (STD)

TRANSMISSION
Code Description
44G TRANSMISSION: TORQSHIFT 10-SPEED AUTOMATIC, -inc: 10R140 w/neutral idle and selectable drive modes: normal, tow/haul, eco, deep sand/snow and slippery (STD) TIRES
Code Description
TGJ TIRES: 225/70RX19.5G BSW A/P, (STD)

PRIMARY PAINT
Code Description
Z1 OXFORD WHITE

PAINT SCHEME
Code Description

STANDARD PAINT

SEAT TYPE
Code Description
AS MEDIUM EARTH GRAY, HD VINYL 40/20/40 SPLIT BENCH SEAT, -inc: center armrest, cupholder, storage and driver's side manual lumbar

AXLE RATIO
Code Description
X8L LIMITED SLIP W/4.88 AXLE RATIO

ADDITIONAL EQUIPMENT
Code Description
POWER EQUIPMENT GROUP, -inc: Deletes passenger side lock cylinder, upgraded door-trim panel, Accessory Delay, Advanced Security Pack, SecuriLock Passive Anti-Theft System (PATS) and inclination/intrusion sensors, MyKey, owner controls feature, Power Locks, Remote Keyless 90L
Entry, Folding Trailer Tow Mirrors w/Power Heated Glass, manual telescoping, heated convex spotter mirror and integrated clearance lamps/turn signals, Power Front & Rear Side Windows, 1- touch up/down driver/passenger window
62R TRANSMISSION POWER TAKE-OFF PROVISION, -inc: mobile and stationary PTO modes 67B 397 AMP ALTERNATORS
86M DUAL 78 AH BATTERY
52B TRAILER BRAKE CONTROLLER, -inc: smart trailer tow connector, Verified to be compatible 2022 Fleet/Non-Retail Ford Super Duty F-450 DRW XL 2WD
SuperCab 168" WB 60" CA

WINDOW STICKER
2022 Ford Super Duty F-450 DRW XL 2WD SuperCab 168" WB 60" CA

CODE MODEL MSRP
X4G 2022 Ford Super Duty F-450 DRW XL 2WD SuperCab 168" WB 60" CA $42,555.00

OPTIONS
99N ENGINE: 7.3L 2V DEVCT NA PFI V8 GAS, (STD) $0.00
44G TRANSMISSION: TORQSHIFT 10-SPEED AUTOMATIC, -inc: 10R140 w/neutral idle and selectable drive $0.00 modes: normal, tow/haul, eco, deep sand/snow and slippery (STD) TGJ TIRES: 225/70RX19.5G BSW A/P, (STD) $0.00
Z1 OXFORD WHITE $0.00
STANDARD PAINT $0.00
AS MEDIUM EARTH GRAY, HD VINYL 40/20/40 SPLIT BENCH SEAT, -inc: center armrest, cupholder, $0.00 storage and driver's side manual lumbar
X&L LIMITED SLIP W/4.88 AXLE RATIO $360.00
90L POWER EQUIPMENT GROUP, -inc: Deletes passenger side lock cylinder, upgraded door-trim panel, $915.00 Accessory Delay, Advanced Security Pack, SecuriLock Passive Anti-Theft System (PATS) and inclination/intrusion sensors, MyKey, owner controls feature, Power Locks, Remote Keyless Entry, Folding Trailer Tow Mirrors w/Power Heated Glass, manual telescoping, heated convex spotter mirror and integrated clearance lamps/turn signals, Power Front & Rear Side Windows, 1-touch up/down driver/passenger window
62R TRANSMISSION POWER TAKE-OFF PROVISION, -inc: mobile and stationary PTO modes $280.00 67B 397 AMP ALTERNATORS $115.00
86M DUAL 78 AH BATTERY $0.00
52B TRAILER BRAKE CONTROLLER, -inc: smart trailer tow connector, Verified to be compatible w/electronic $270.00 actuated drum brakes only
67X EXTRA HEAVY-SERVICE SUSPENSION PACKAGE, -inc: pre-selected extra heavy-service front springs $125.00 (see Order Guide Supplemental Reference for springs/FAWR of specific vehicle configurations), Recommended only on vehicles which will permanently utilize aftermarket equipment such as heavy-duty winches, brush guards or other apparatus which loads the front axle to the specified Gross Axle Weight Rating (GAWR), Note 1: May result in a deterioration of ride quality, Note 2: Vehicle ride height will increase w/the addition of this package
512 SPARE TIRE, WHEEL & JACK, -inc: Excludes carrier, 6-Ton Hydraulic Jack $350.00 63A UTILITY LIGHTING SYSTEM, -inc: LED side-mirror spotlights $160.00 18B PLATFORM RUNNING BOARDS $445.00
942 DAYTIME RUNNING LAMPS (DRL), -inc: The non-controllable 942 Daytime Running Lamps (DRL) $45.00 replace the standard Daytime Running Lamps (DRL) on/off cluster controllable 61J 6-TON HYDRAULIC JACK INC
61L FRONT WHEEL WELL LINERS (PRE-INSTALLED) $180.00
525 STEERING WHEEL-MOUNTED CRUISE CONTROL $235.00
872 REAR VIEW CAMERA & PREP KIT, -inc: Pre-installed content includes cab wiring and frame wiring to the $415.00 rear most cross member, Upfitters kit includes camera w/mounting bracket, 20' jumper wire and camera mounting/aiming instructions
Standard Equipment

MECHANICAL
Engine: 7.3L 2V DEVCT NA PFI V8 Gas
Transmission: TorqShift 10-Speed Automatic -inc: 10R140 w/neutral idle and selectable drive modes: normal, tow/haul, eco, deep sand/snow and slippery

4.88 Axle Ratio
GVWR: 16,500 Ib Payload Package
50-State Emissions System
Transmission w/Oil Cooler
Rear-Wheel Drive
78-Amp/Hr 750CCA Maintenance-Free Battery w/Run Down Protection HD 240 Amp Alternator
Towing Equipment -inc: Trailer Sway Control
Trailer Wiring Harness
9550# Maximum Payload
HD Shock Absorbers
Front And Rear Anti-Roll Bars
Firm Suspension
Hydraulic Power-Assist Steering
40 Gal. Fuel Tank
Single Stainless Steel Exhaust
Dual Rear Wheels
Front Suspension w/Coil Springs
Leaf Rear Suspension w/Leaf Springs
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs and Brake Assist Upfitter Switches

EXTERIOR
Wheels: 19.5" × 6" Argent Painted Steel -inc: Hub covers/center ornaments not included Tires: 225/70Rx19.5G BSW A/P
Clearcoat Paint
Black Front Bumper w/Black Rub Strip/Fascia Accent and 2 Tow Hooks Black Fender Flares
Black Side Windows Trim and Black Front Windshield Trim Black Door Handles
Black Manual Side Mirrors w/Manual Folding
Manual Extendable Trailer Style Mirrors
Fixed Rear Window
Light Tinted Glass
Variable Intermittent Wipers
Instrument Panel Covered Bin and Dashboard Storage
Manual 1st Row Windows
Systems Monitor
Trip Computer
Outside Temp Gauge
Analog Appearance
Seats w/Vinyl Back Material
Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints Air Filtration
SAFETY
Driveline Traction Control
Side Impact Beams
Dual Stage Driver And Passenger Seat-Mounted Side Airbags Dual Stage Driver And Passenger Front Airbags w/Passenger Off Switch Outboard Front Lap And Shoulder Safety Belts -inc: Height Adjusters Safety Canopy System Curtain 1st And 2nd Row Airbags
National Auto
Quote Date: 8/16/22 Fleet Group
& Division of Chevrolet of Watsonville
City of Redondo Beach
Andrea Delap
531 N Gertruda Avenue
Redondo, CA 90277
310-318-0686
[email protected]
National Auto Fleet Group is pleased to submit the following quotation for your consideration:

Line
Qty Item Option # Description Unit Price Extended
$
1 1 New/unused (2022 Ford Super Duty F-350 SRW(X3) $ 36,749.34 $ 36,749.34 XL 2WD SuperCab 8' Box 164" WB,unit 211
1 CEC new body quote attached $ 54,370.00 54,370.00
1 Flooring and storage fees $ 4,675.00 4,675.00
$
$
Subtotal 95,794.34 $ 95,794.34
Sales Tax 9.5 % $ 9,100.46 $ 9,100.46
Tire Fee $ 10.50 $ 10.50
Revised
DMV Fees (approx.) $
Quote from
PO#5268 Delivery charge $ 150.00 $ 150.00
TOTAL PURCHASE ORDER AMOUNT $ 105,055.30 $ 105,055.30
Notes:

Please refer to attached specifications
PO#5268, REVISED QUOTE
This price is available under the National Auto Fleet Group Contract Number 120716-NAF. Please reference this bid number on all purchase orders to National Auto Fleet Group.

Terms: Net 30 Days, after receipt of vehicle.

Delivery:

Clarke Cooper
Quoted by: Clarke Cooper, Fleet Manager (626) 457-5590
1247 W. Main St., Alhambra, CA. 91801
National Auto Fleet Group
A Divialon of Chayrolet of Watsonyilla
490 Auto Center Drive, Watsonville, CA 95076
(855) 289-6572 • (831) 480-8497 Fax
[email protected]
4/28/2021
Quote ID: 16834 R2
5/5/2021 Re-Configured
Order Cut Off Date: TBA
Mr Jesse Reyes
City of Redondo Beach
531 N. Gertruda Ave
Redondo, California, 90277
Dear Jesse Reyes,
National Auto Fleet Group is pleased to quote the following vehicles) for your consideration.

One (1) New/Unused (2022 Ford Super Duty F-350 SRW (X3A) XL 2WD SuperCab 8' Box 164" WB, CTEC Model 9838- HCT-79 & CNG Conversion Unit #324) and delivered to your specified location, each for One Unit One Unit Total % Total Savings
(MSRP) Savings
Contract Price $44,680.00 $36,749.34 17.750% $7,930.66
$60,625.00 675.00
CTEC Model 9838-HCT-79 $60,625.00
& CNG Conversion Unit #324 Ann 61la 14
Tax (9.5000 %) $9,250.56
105,40. 4679
Tire fee $8.75
Total $106,633.65
- per the attached specifications.

This vehicle(s) is available under the Sourcewell (Formerly Known as NJPA) Contract 120716-NAF. Please reference this Contract number on all purchase orders to National Auto Fleet Group. Payment terms are Net 20 days after receipt of vehicle.

Thank you in advance for your consideration. Should you have any questions, please do not hesitate to call.

Sincerely,
Jesse Cooper Quoting Department
Account Manager Account Manager
Email: [email protected] [email protected] Office: (855) 289-6572 (855) 289-6572
Fax: (831) 480-8497
(NISSAN GMC

CHEVROLET TOYOTA
CALIFORNIA TRUCK EQUIPMENT CO. QUOTE
L 12351 Bellflower Blvd, Downey CA 90242
C Quote Date Quote #
PH - 562-803-4466 F - 562-803-8795
Sold To: End User ctec-truckbody.com 2/17/2022 13098
National Auto Fleet Group City of Redondo Beach Terms Net 10 Att: Neil / Jessie 531 N Gertruda Ave,
855-289-6572 Redondo Beach CA FOB Customer
NAFG Original Customer Chassis Quote 9027 Rep RA
Quote # 29967 R1 ATTN Jesse Reyes
Model Cab Fuel Truck Available Rear wheel Bed width Compartment depth CA 2022 F350 Ext Cab Gas no SRW 49" x 15" X 79" 56"
PROUDLY PRODUCED - 100% - IN CALIFORNIA - USA
Description Qty Total
UNIT 324
CTEC model 9838-HCT-79 1/98 series
Designed for 3/4 Ton or 1-Ton Trucks with 56" Cab to Axle SRW Body is 98 inches long - horizontal configuration with closed tops - 38 inches tall - 79 inches wide - bed width 49 inches - compartment depth 15 inches Mounted and painted white unless custom color is ordered LED Legal lights
Step Bumper painted silver
Paint to match wheel well tubing
Stainless steel T - handle pockets
Flat key lock with 4 keys
Gas shocks on compartment doors
Rear work deck 20 inches deep X 79 inches wide with crane reinforcement 1 2 cone holders - Caltrans style - mounted on front tow hooks 2 Tool basket over SS and CS compartments 2
Internal locking system for 98 series body
Cab Protector
D rings mounted in bed 3 SS and 3 CS 1
QUOTE VALID FOR 30 DAYS Subtotal
Order accepted by: Date Tax (9.5%)
Print Name PO#. Total
ANY AND ALL WARRANTY WORK WILL BE DONE BY TEC AT 12351 BELLFLOWER BLVD DOWNEY, CA-CTEC IS NOT RESPONSA BEE'FOR ANY WORK DONE BY 3RD PARTIES CALIFORNIA TRUCK EQUIPMENT CO. QUOTE
anEC 12351 Bellflower Blvd, Downey CA 90242
Quote Date Quote #
PH - 562-803-4466 F - 562-803-8795
Sold To: End User ctec-truckbody.com 2/17/2022 13098
National Auto Fleet Group City of Redondo Beach Terms Net 10 Att: Neil / Jessie 531 N Gertruda Ave,
855-289-6572 Redondo Beach CA FOB Customer
NAFG Original Customer Chassis Quote 9027 Rep RA
Quote # 29967 R1 ATTN Jesse Reyes
Model Cab Fuel Truck Available Rear wheel Bed width Compartment depth CA 2022 F350 Ext Cab Gas no SRW 49" X 15" X 79" 56"
PROUDLY PRODUCED - 100% - IN CALIFORNIA - USA
Description Qty Total
PDI & Delivery 1
QUOTE VALID FOR 30 DAYS Subtotal $54,370.00
Order accepted by: Date Tax (9.5%) $0.00
Print Name PO # Total $54,370.00
ANY AND ALL WARRANTY WORK WILL BE DONE BY CTEC AT 12351 BELLFLOWER BLVD DOWNEY, CA- CTEC IS NOT RESPONSABER FOR ANY WORK DONE BY 3RD PARTIES Vehicle Configuration Options
ENGINE
Code Description
996 ENGINE: 6.2L 2-VALVE SOHC EFI NA V8 FLEX-FUEL, (STD)

TRANSMISSION
Code Description
44G TRANSMISSION: TORQSHIFT 10-SPEED AUTOMATIC, -inc: SelectShift and selectable drive modes: normal, tow/haul, eco, deep sand/snow and slippery (STD) WHEELS
Code Description
64A WHEELS: 17" ARGENT PAINTED STEEL, -inc: painted hub covers/center ornaments (STD) TIRES
Code Description
TD8 TIRES: LT245/75RX17E BSW A/S (4), -inc: Spare may not be the same as road tire (STD)

PRIMARY PAINT
Code Description
Z1 OXFORD WHITE

PAINT SCHEME
Code Description

STANDARD PAINT

SEAT TYPE
Code Description
MEDIUM EARTH GRAY, HD VINYL 40/20/40 SPLIT BENCH SEAT, -inc: center armrest, AS
cupholder, storage and driver's side manual lumbar

AXLE RATIO
Code Description
X4M ELECTRONIC-LOCKING W/4.30 AXLE RATIO

ADDITIONAL EQUIPMENT
Code Description
POWER EQUIPMENT GROUP, -inc: Deletes passenger-side lock cylinder, upgraded door trim panel, Accessory Delay, Advanced Security Pack, SecuriLock Passive Anti-Theft System (PATS) 90L and inclination/intrusion sensors, Power Locks, Remote Keyless Entry, Trailer Tow Mirrors w/Power Heated Glass, manual folding, manually telescoping, heated convex spotter mirror and integrated clearance lamps/turn signals, Power Front & Rear Seat Windows, 1-touch up/down driver/passenger window, Power Tailgate Lock
2022 Fleet/Non-Retail Ford Super Duty F-350 SRW XL 2WD
SuperCab 8' Box 164" WB

WINDOW STICKER
2022 Ford Super Duty F-350 SRW XL 2WD SuperCab 8' Box 164" WB

CODE MODEL MSRP
ХЗА 2022F ord Super Duty F-3ß0 SRW XL'ZWO superCab & Box 164" WB $39,005.00

OPTIONS
996 ENGINE: 6.2L 2-VALVE SOHC EFI NA V8 FLEX-FUEL, (STD) $0.00 44G TRANSMISSION: TORQSHIFT 10-SPEED AUTOMATIC, -inc: SelectShift and selectable drive modes: $0.00 normal, tow/haul, eco, deep sand/snow and slippery (STD) 64A WHEELS: 17" ARGENT PAINTED STEEL, -inc: painted hub covers/center ornaments (STD) $0.00 TD8 TIRES: LT245/75RX17E BSW A/S (4), -inc: Spare may not be the same as road tire (STD) $0.00 Z1 OXFORD WHITE $0.00
STANDARD PAINT $0.00
AS MEDIUM EARTH GRAY, HD VINYL 40/20/40 SPLIT BENCH SEAT, -inc: center armrest, cupholder, $0.00 storage and driver's side manual lumbar
X4M ELECTRONIC-LOCKING W/4.30 AXLE RATIO $390.00
90L POWER EQUIPMENT GROUP, -inc: Deletes passenger-side lock cylinder, upgraded door trim panel, $915.00 Accessory Delay, Advanced Security Pack, SecuriLock Passive Anti-Theft System (PATS) and inclination/intrusion sensors, Power Locks, Remote Keyless Entry, Trailer Tow Mirrors w/Power Heated Glass, manual folding, manually telescoping, heated convex spotter mirror and integrated clearance lamps/turn signals, Power Front & Rear Seat Windows, 1-touch up/down driver/passenger window, Power Tailgate Lock
62R TRANSMISSION POWER TAKE-OFF PROVISION, -inc: transmission mounted live drive and stationary $280.00 mode PTO
67E 240 AMP ALTERNATOR $85.00
86M DUAL 78 AH BATTERY $210.00
52B TRAILER BRAKE CONTROLLER, -inc: Verified to be compatible w/select electric over hydraulic brakes, $270.00 smart trailer tow connector
66D PICKUP BOX DELETE, -inc: Deletes tie-down hooks, tailgate, rearview camera, 7/4 pin connector and ($625.00) center high-mounted stop lamp (CHMSL) (only on vehicles over 10,000 Ibs, GVWR), Incomplete vehicle package - requires further manufacture and certification by a final stage manufacturer, In addition, Ford urges manufacturers to follow the recommendations of the Ford Incomplete Vehicle Manual and the Ford Truck Body Builder's Layout Book (and applicable supplements), Rear Bumper Delete, Spare Wheel, Tire, Carrier & Jack Delete
512 SPARE TIRE, WHEEL, CARRIER & JACK $295.00
18B PLATFORM RUNNING BOARDS $445.00
59H CENTER HIGH-MOUNTED STOP LAMP (CHMSL), -inc: CHMSL is deleted from vehicles over 10,000 Ibs $0.00 GVWR w/66D Pickup Box Delete; replaced w/a black cover; to add CHMSL w/66D Pickup Box Delete select 59H, CHMSL is standard under all other conditions 942 DAYTIME RUNNING LAMPS (DRL), -inc: The non-controllable 942 Daytime Running Lamps (DRL) $45.00 replace the standard Daytime Running Lamps (DRL) on/off cluster controllable 98F CNG/PROPANE GASEOUS ENGINE PREP PACKAGE, -inc: hardened engine intake valves, valve seats $315.00 and bi-fuel manifold, Note: This package does not include CNG/propane fuel tanks, lines, etc, Vehicle will be equipped w/the standard factory gasoline fuel system, Additional equipment combined w/certified calibration reflash is required, from an external upfitter, to convert the vehicle to a CNG/propane fueled Standard Equipment

MECHANICAL
Engine: 6.2L 2-Valve SOHC EFI NA V8 Flex-Fuel
Transmission: TorqShift 10-Speed Automatic -inc: SelectShift and selectable drive modes: normal, tow/haul, eco, deep sand/snow and slippery

3.73 Axle Ratio
GVWR: 10,400 b Payload Package
50-State Emissions System
Transmission w/Oil Cooler
Rear-Wheel Drive
72-Amp/Hr 650CCA Maintenance-Free Battery w/Run Down Protection 157 Amp Alternator
Class V Towing Equipment -inc: Hitch and Trailer Sway Control Trailer Wiring Harness
4090# Maximum Payload
HD Shock Absorbers
Front Anti-Roll Bar
Firm Suspension
Hydraulic Power-Assist Steering
34 Gal. Fuel Tank
Single Stainless Steel Exhaust
Front Suspension w/Coil Springs
Leaf Rear Suspension w/Leaf Springs
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist and Hill Hold Control

EXTERIOR
Wheels: 17" Argent Painted Steel -inc: painted hub covers/center ornaments Tires: LT245/75Rx17E BSW A/S (4) -inc: Spare may not be the same as road tire Regular Box Style
Steel Spare Wheel
Spare Tire Stored Underbody w/Crankdown
Clearcoat Paint
Black Front Bumper w/Black Rub Strip/Fascia Accent and 2 Tow Hooks Black Rear Step Bumper
Black Side Windows Trim and Black Front Windshield Trim Black Door Handles
Black Manual Side Mirrors w/Manual Folding
Manual Extendable Trailer Style Mirrors
Fixed Rear Window
Light Tinted Glass
Pickup Cargo Box Lights
Smart Device Remote Engine Start
Instrument Panel Covered Bin and Dashboard Storage
Manual 1st Row Windows
Systems Monitor
Trip Computer
Outside Temp Gauge
Analog Appearance
Seats w/Vinyl Back Material
Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints Securilock Anti-Theft Ignition (pats) Engine Immobilizer Air Filtration
SAFETY
AdvanceTrac w/Roll Stability Control Electronic Stability Control (ESC) And Roll Stability Control (RSC) ABS And Driveline Traction Control
Side Impact Beams
Dual Stage Driver And Passenger Seat-Mounted Side Airbags Tire Specific Low Tire Pressure Warning
Dual Stage Driver And Passenger Front Airbags w/Passenger Off Switch Mykey System -inc: Top Speed Limiter, Audio Volume Limiter, Early Low Fuel Warning, Programmable Sound Chimes and Beltminder w/Audio Mute
Safety Canopy System Curtain 1st And 2nd Row Airbags
Outboard Front Lap And Shoulder Safety Belts -inc: Rear Center 3 Point and Height Adjusters Back-Up Camera
National Auto
8/16/22 Fleet Group
Quote Date: A Division of Chevrolet of Watsonville
City of Redondo Beach
Andrea Delap
531 N Gertruda Avenue
Redondo, CA 90277
310-318-0686
[email protected]
National Auto Fleet Group is pleased to submit the following quotation for your consideration:

Line
Qty Item | Option # Description Unit Price Extended
$
1 1 New/unused (2022 Ford Super Duty F-350 SRW(X3) $ 34,463.52 $ 34,463.52 XL 2WD SuperCab 8' Box 164" WB,unit 211
1 CTEC new body quote attached $ 21,095.00 Ş 21,095.00
1 Flooring and storage fees $ 1,045.75 $ 1,045.75
$
$
Subtotal $ 56,604.27 $ 56,604.27
Sales Tax 9.5 % $ 5,377.41 $ 5,377.41
Tire Fee $ 10.50 $ 10.50
Revised
DMV Fees (approx.) $
from
PO#5278 Delivery charge $ 96.00 $ 96.00
TOTAL PURCHASE ORDER AMOUNT $ 62,088.18 $ 62,088.18
Notes:

Please refer to attached specifications
PO#5278, REVISED QUOTE
This price is available under the National Auto Fleet Group Contract Number 120716-NAF. Please reference this bid number on all purchase orders to National Auto Fleet Group.

Terms: Net 30 Days, after receipt of vehicle.

Delivery:

Quoted by: Clarke Cooper, Fleet Manager (626) 457-5590
1247 W. Main St., Alhambra, CA. 91801
CALIFORNIA TRUCK EQUIPMENT CO. QUOTE
12351 Bellflower Blvd, Downey CA 90242
CZEC Quote Date Quote #
PH - 562-803-4466 F - 562-803-8795
Sold To: End User ctec-truckbody.com 5/12/2021 12561
Bob Wondries Ford Redondo Beach Terms Net 10
Att: Kevin Buzzard 531 N Gertruda Ave
[email protected] Redondo Beach CA FOB CTEC
Rep RA
Model Cab Fuel Truck Available Rear wheel Bed width Compartment depth CA F250 Extended CNG no SRW 49"X 15" 56"
PROUDLY PRODUCED - 100% - IN CALIFORNIA - USA
Description Qty Total
OEM camera package required - back up alarm
Redondo Beach unit 211
CTEC model 9838-VFT-79 1
Designed for 3/4 Ton or 1-Ton Trucks with 56" Cab to Axle SRW Body is 98 inches long - vertical configuration with flip tops - 38 inches tall - 79 inches wide - bed width 49 inches - compartment depth 15 inches
Mounted and painted white unless custom color is ordered Paint to match wheel well tubing
Stainless steel T - handle pockets
Flat key lock with 4 keys
Gas shocks on compartment doors
Full width ladder rack 98 series - swing away rear bar 1 Internal locking system for 98 series body 1
Install OEM camera package 1
Tommy Gate Model G2 60-1342 TP38 - 55" x 38" Treadplate two piece platform, 1,300 lb. 1 capacity
QUOTE VALID FOR 30 DAYS Subtotal $21,095.00
Order accepted by: Date Tax (10.0%) $0.00
Print Name PO# Total $21,095.00
ANY AND ALL WARRANTY WORK WILL BE DONE BY CTEC AT 12351 BELLFLOWER BLVD DOWNEY, CA - CTEC IS NOT RESPONSABLE FOR ANY WORK DONE BY 3RD PARTIES National Auto
Fleet Group
Quote Date: 5/14/21 A Division of Chevrolet of Watsonvilla City of Redondo Beach
Jesse Reyes
531 N Gertruda Avenue
Redondo, CA 90277
(310) 318-0686
[email protected]
National Auto Fleet Group is pleased to submit the following quotation for your consideration:

Line
Qty Item Option # Description Unit Price Extended
New/Used 2022 Ford Super Duty F-350 SRW (X3A)
1 XL 2WD Supercab 8' Box 164" WB, Unit 211 $ 34,463.52 Ş 34,463.52 CNG Quote From A-1 See Attached - 14,900.00
501490500
1 CTEC Body Quote See Attached 16,135,00 16,135.00
$
10452%
$
Subtotal 65,498.52 $ 65,498.52
Sales Tax 9.5 % 6,222.36 $ 6,222.36
Tire Fee 10$5 7.00 $ 7.00
DMV Fees (approx) $
Delivery (non taxable) $ 96.00 $ 96.00
TOTAL PURCHASE ORDER AMOUNT $ 71,823.88 $ 71,823.88
Notes:

This vehicle(s) is available under the Sourcewell (Formerly Known as NJPA) Contract 120716-NAF Terms: Net 30
Quoted by: Clarke Cooper, Fleet Manager (626) 457-5590
1601 W Main St. Alhambra, CA 91801
2022 Fleet/Non-Retail Ford Super Duty F-350 SRW XL 2WD
SuperCab 8' Box 164" WB

WINDOW STICKER
2022 Ford Super Duty F-350 SRW XL 2WD SuperCab 8' Box 164" WB

CODE MODEL MSRP
ХЗА 2022 Ford Super Duty F-350 SRW XL 2WD SuperCab 8' Box 164" WB $38,755.00

OPTIONS
996 ENGINE: 6.2L 2-VALVE SOHC EFI NA V8 FLEX-FUEL, (STD) $0.00 44G TRANSMISSION: TORQSHIFT 10-SPEED AUTOMATIC, -inc: SelectShift and selectable drive modes: $0.00 normal, tow/haul, eco, deep sand/snow and slippery (STD) 64A WHEELS: 17" ARGENT PAINTED STEEL, -inc: painted hub covers/center ornaments (STD) $0.00 TD8 TIRES: LT245/75RX17E BSW A/S (4), -inc: Spare may not be the same as road tire (STD) $0.00 Z1 OXFORD WHITE $0.00
STANDARD PAINT $0.00
AS MEDIUM EARTH GRAY, HD VINYL 40/20/40 SPLIT BENCH SEAT, -inc: center armrest, cupholder, $0.00 storage and driver's side manual lumbar
X37 3.73 AXLE RATIO, (STD) $0.00
90L POWER EQUIPMENT GROUP, -inc: Deletes passenger-side lock cylinder, upgraded door trim panel, $915.00 Accessory Delay, Advanced Security Pack, SecuriLock Passive Anti-Theft System (PATS) and inclination/intrusion sensors, Power Locks, Remote Keyless Entry, Trailer Tow Mirrors w/Power Heated Glass, manual folding, manually telescoping, heated convex spotter mirror and integrated clearance lamps/turn signals, Power Front & Rear Seat Windows, 1-touch up/down driver/passenger window, Power Tailgate Lock
52B TRAILER BRAKE CONTROLLER, -inc: Verified to be compatible w/select electric over hydraulic brakes, $270.00 smart trailer tow connector
66D PICKUP BOX DELETE, -inc: Deletes tie-down hooks, tailgate, rearview camera, 7/4 pin connector and ($625.00) center high-mounted stop lamp (CHMSL) (only on vehicles over 10,000 Ibs, GVWR), Incomplete vehicle package - requires further manufacture and certification by a final stage manufacturer, In addition, Ford urges manufacturers to follow the recommendations of the Ford Incomplete Vehicle Manual and the Ford Truck Body Builder's Layout Book (and applicable supplements), Rear Bumper Delete, Spare Wheel, Tire, Carrier & Jack Delete
98F V CNG/PROPANE GASEOUS ENGINE PREP PACKAGE, -inc: hardened engine intake valves, valve seats $315.00 and bi-fuel manifold, Note: This package does not include CNG/propane fuel tanks, lines, etc, Vehicle will be equipped w/the standard factory gasoline fuel system, Additional equipment combined w/certified calibration reflash is required, from an external upfitter, to convert the vehicle to a CNG/propane fueled vehicle, See Alternative Fuel Buyers Guide: www.ford.com/altfuelbuyersguide, Ford Motor Company does not provide an exhaust or evaporative emissions certificate w/this option when converted to use CNG or propane fuel, Ford does not represent that a vehicle converted to use CNG or propane will comply w/all applicable U.S, or Canadian safety standards, It is the responsibility of the final stage manufacturer (body- builder, installer, alterer or subsequent stage manufacturer) to determine that any vehicle converted to use CNG or propane complies w/U.S, Federal, California or Canadian exhaust and evaporative emission requirements, Federal fuel economy standards, U.S, and Canadian safety standards, labeling and any other requirements
66S UPFITTER SWITCHES (6), -inc: Located in overhead console $165.00 76C EXTERIOR BACKUP ALARM (PRE-INSTALLED) $140.00
872 REAR VIEW CAMERA & PREP KIT, -inc: Pre-installed content includes cab wiring, frame wiring to the $415.00 rear most cross member and video display w/4" display, Upfitters kit includes camera w/mounting bracket, 14' jumper wire and camera mounting, aiming instructions and electrochromic mirror | 430 • 110V/400W OUTLET, inc: 1 in-dash mounted outta
$175.00
610A ORDER CODE 610A $0.00
Please note selected options override standard equipment SUBTOTAL $40,525.00
Advert/ Adjustments $0.00
Manufacturer Destination Charge $1,695.00
TOTAL PRICE $42,220.00
Est City: N/A MPG
Est Highway: N/A MPG
Est Highway Cruising Range: N/A mi
Any performance-related calculations are offered solely as guidelines. Actual unit performance will depend on your operating conditions.

Vehicle Configuration Options
ENGINE
Code Description
996 ENGINE: 6.2L 2-VALVE SOHC EFI NA V8 FLEX-FUEL, (STD)

TRANSMISSION
Code Description
44G TRANSMISSION: TORQSHIFT 10-SPEED AUTOMATIC, -inc: SelectShift and selectable drive modes: normal, tow/haul, eco, deep sand/snow and slippery (STD) WHEELS
Code Description
64A WHEELS: 17" ARGENT PAINTED STEEL, -inc: painted hub covers/center ornaments (STD) TIRES
Code Description
TD8 TIRES: LT245/75RX17E BSW A/S (4), -inc: Spare may not be the same as road tire (STD)

PRIMARY PAINT
Code Description
Z1 OXFORD WHITE

PAINT SCHEME
Code Description

STANDARD PAINT

SEAT TYPE
Code Description
AS MEDIUM EARTH GRAY, HD VINYL 40/20/40 SPLIT BENCH SEAT, -inc: center armrest, cupholder, storage and driver's side manual lumbar

AXLE RATIO
Code Description
X37 3.73 AXLE RATIO, (STD)

ADDITIONAL EQUIPMENT
Code Description
POWER EQUIPMENT GROUP, -inc: Deletes passenger-side lock cylinder, upgraded door trim panel, Accessory Delay, Advanced Security Pack, SecuriLock Passive Anti-Theft System (PATS) and inclination/intrusion sensors, Power Locks, Remote Keyless Entry, Trailer Tow Mirrors 90L
w/Power Heated Glass, manual folding, manually telescoping, heated convex spotter mirror and integrated clearance lamps/turn signals, Power Front & Rear Seat Windows, 1-touch up/down driver/passenger window, Power Tailgate Lock
52B TRAILER BRAKE CONTROLLER, -inc: Verified to be compatible w/select electric over hydraulic brakes, smart trailer tow connector
PICKUP BOX DELETE, -inc: Deletes tie-down hooks, tailgate, rearview camera, 7/4 pin connector and center high-mounted stop lamp (CHMSL) (only on vehicles over 10,000 Ibs, 66D GVWR), Incomplete vehicle package - requires further manufacture and certification by a final stage manufacturer, In addition, Ford urges manufacturers to follow the recommendations of the Ford Incomplete Vehicle Manual and the Ford Truck Body Builder's Layout Book (and applicable supplements), Rear Bumper Delete, Spare Wheel, Tire, Carrier & Jack Delete CNG/PROPANE GASEOUS ENGINE PREP PACKAGE, -inc: hardened engine intake valves, valve seats and bi-fuel manifold, Note: This package does not include CNG/propane fuel tanks, lines, etc, Vehicle will be equipped w/the standard factory gasoline fuel system, Additional equipment combined w/certified calibration reflash is required, from an external upfitter, to convert the vehicle to a CNG/propane fueled vehicle, See Alternative Fuel Buyers Guide:
www.ford.com/altfuelbuyersguide, Ford Motor Company does not provide an exhaust or 98F evaporative emissions certificate w/this option when converted to use CNG or propane fuel, Ford does not represent that a vehicle converted to use CNG or propane will comply w/all applicable U.S, or Canadian safety standards, It is the responsibility of the final stage manufacturer (body- builder, installer, alterer or subsequent stage manufacturer) to determine that any vehicle converted to use CNG or propane complies w/U.S, Federal, California or Canadian exhaust and evaporative emission requirements, Federal fuel economy standards, U.S, and Canadian safety standards, labeling and any other requirements
66S UPFITTER SWITCHES (6), -inc: Located in overhead console 76C EXTERIOR BACKUP ALARM (PRE-INSTALLED)
REAR VIEW CAMERA & PREP KIT, -inc: Pre-installed content includes cab wiring, frame wiring 872 to the rear most cross member and video display w/4" display, Upfitters kit includes camera w/mounting bracket, 14' jumper wire and camera mounting, aiming instructions and electrochromic mirror
43C 110V/400W OUTLET, -inc: 1 in-dash mounted outlet

OPTION PACKAGE
Code Description
610A ORDER CODE 610A
Standard Equipment

MECHANICAL
Engine: 6.2L 2-Valve SOHC EFI NA V8 Flex-Fuel
Transmission: TorqShift 10-Speed Automatic -inc: SelectShift and selectable drive modes: normal, tow/haul, eco, deep sand/snow and slippery

3.73 Axle Ratio
GVWR: 10,400 Ib Payload Package
50-State Emissions System
Transmission w/Oil Cooler
Rear-Wheel Drive
72-Amp/Hr 650CCA Maintenance-Free Battery w/Run Down Protection 157 Amp Alternator
Class V Towing Equipment -inc: Hitch and Trailer Sway Control Trailer Wiring Harness
4090# Maximum Payload
HD Shock Absorbers
Front Anti-Roll Bar
Firm Suspension
Hydraulic Power-Assist Steering
34 Gal. Fuel Tank
Single Stainless Steel Exhaust
Front Suspension w/Coil Springs
Leaf Rear Suspension w/Leaf Springs
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist and Hill Hold Control

EXTERIOR
Wheels: 17" Argent Painted Steel -inc: painted hub covers/center ornaments Tires: LT245/75Rx17E BSW A/S (4) -inc: Spare may not be the same as road tire Regular Box Style
Steel Spare Wheel
Spare Tire Stored Underbody w/Crankdown
Clearcoat Paint
Black Front Bumper w/Black Rub Strip/Fascia Accent and 2 Tow Hooks Black Rear Step Bumper
Black Side Windows Trim and Black Front Windshield Trim Black Door Handles
Black Manual Side Mirrors w/Manual Folding
Manual Extendable Trailer Style Mirrors
Fixed Rear Window
Light Tinted Glass
Variable Intermittent Wipers
Aluminum Panels
Black Grille
Tailgate Rear Cargo Access
Reverse Opening Rear Doors
Manual Tailgate/Rear Door Lock
Autolamp Auto On/Off Aero-Composite Halogen Daytime Running Lights Preference Setting Headlamps w/Delay-Off
Cargo Lamp w/High Mount Stop Light

ENTERTAINMENT
Radio: AM/FM Stereo w/MP3 Player -inc: 4 speakers
Radio w/Seek-Scan and Clock
Fixed Antenna
SYNC Communications & Entertainment System -inc: enhanced voice recognition w/911 Assist, 4.2" LCD center stack screen, AppLink and 1 smart-charging USB-C port

INTERIOR
4-Way Driver Seat -inc: Manual Recline and Fore/Aft Movement 4-Way Passenger Seat -inc: Manual Recline and Fore/Aft Movement 60-40 Folding Split-Bench Front Facing Fold-Up Cushion Rear Seat Manual Tilt/Telescoping Steering Column
Gauges -inc: Speedometer, Odometer, Oil Pressure, Engine Coolant Temp, Tachometer, Transmission Fluid Temp, Engine Hour Meter, Trip Odometer and Trip Computer Fixed Rear Windows
FordPass Connect 4G Mobile Hotspot Internet Access
Rear Cupholder
Manual Air Conditioning
HVAC -inc: Underseat Ducts
Illuminated Locking Glove Box
Interior Trim -inc: Chrome Interior Accents
Full Cloth Headliner
Urethane Gear Shifter Material
HD Vinyl 40/20/40 Split Bench Seat -inc: center armrest, cupholder, storage and driver's side manual lumbar Day-Night Rearview Mirror
Passenger Visor Vanity Mirror
2 12V DC Power Outlets
Full Overhead Console w/Storage and 2 12V DC Power Outlets Front Map Lights
Fade-To-Off Interior Lighting
Full Vinyl/Rubber Floor Covering
Pickup Cargo Box Lights
Smart Device Remote Engine Start
Instrument Panel Covered Bin and Dashboard Storage
Manual 1st Row Windows
Systems Monitor
Trip Computer
Outside Temp Gauge
Analog Appearance
Seats w/Vinyl Back Material
Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints Securilock Anti-Theft Ignition (pats) Engine Immobilizer Air Filtration
SAFETY
Advance Trac w/Roll Stability Control Electronic Stability Control (ESC) And Roll Stability Control (RSC) ABS And Driveline Traction Control
Side Impact Beams
Dual Stage Driver And Passenger Seat-Mounted Side Airbags Tire Specific Low Tire Pressure Warning
Dual Stage Driver And Passenger Front Airbags w/Passenger Off Switch Mykey System -inc: Top Speed Limiter, Audio Volume Limiter, Early Low Fuel Warning, Programmable Sound Chimes and Beltminder w/Audio Mute
Safety Canopy System Curtain 1st And 2nd Row Airbags
Outboard Front Lap And Shoulder Safety Belts -inc: Rear Center 3 Point and Height Adjusters Back-Up Camera
CALIFORNIA TRUCK EQUIPMENT CO. QUOTE
CHEE 12351 Bellflower Blvd, Downey CA 90242
Quote Date Quote #
PH - 562-803-4466 F - 562-803-8795
Sold To: End User ctec-truckbody.com 5/12/2021 12561
Wondries Fleet Redondo Beach Terms Net 10
Att: Joshua Jerome 531 N Gertruda Ave
626-457-5590 Redondo Beach CA FOB CTEC
Rep RA
Model Cab Fuel Truck Available Rear wheel Bed width Compartment depth CA F250 Extended CNG no 49" X 15" 56"
PROUDLY PRODUCED - 100% - IN CALIFORNIA - USA
Description Qty Total
OEM camera package required - back up alarm
Redondo Beach unit 211
CTEC model 9838-VFT-79 1
Designed for 3/4 Ton or 1-Ton Trucks with 56" Cab to Axle SRW Body is 98 inches long - vertical configuration with flip tops - 38 inches tall - 79 inches wide - bed width 49 inches - compartment depth 15 inches
Mounted and painted white unless custom color is ordered Paint to match wheel well tubing
Stainless steel T - handle pockets
Flat key lock with 4 keys
Gas shocks on compartment doors
Full width ladder rack 98 series - swing away rear bar 1 Internal locking system for 98 series body 1
Install OEM camera package
Tommy Gate Model G2 60-1342 TP38 - 55" x 38" Treadplate two piece platform, 1,300 Ib. capacity
QUOTE VALID FOR 30 DAYS Subtotal $16,135.00
Order accepted by: Date_ Tax (10.0%) $0.00
Print Name PO# Total $16,135.00
ANY AND ALL WARRANTY WORK WILL BE DONE BY CTEC AT 12351 BELLFLOWER BLVD DOWNEY, CA - CTEC IS NOT RESPONSABLE FOR ANY WORK DONE BY 3RD PARTIES

DATE QUOTE
A-1
Alternative ( NAME / ADDRESS
Fuel Systems
Josh Jerome
Fresno, CA * Elkhart, IN
Taylor Patterson Frank Goldsmith PEACHE
[email protected] [email protected] MODIFIER
(559) 779-7815 (209) 568-3223
P.O. NO. TERMS DROP SHIP REP END USER FOB
Due on Completion 88WMP1 TP Alhambra, CA
ITEM DESCRIPTION QTY PRICE EA.

F350-L16-UB CARB Certified Dedicated 16 GGE CNG System $14,900.00 2021/22 Ford F-250 6.2L Pickup or Cab/Chassis Per Unit
Three tanks mounted underbody
• Fuel Tank Capacity - maximum available is 16 GGE*
Note: Vehicles) must be ordered with Ford's Gaseous Fuel Prep Engine option.

Note: Quote is good 60 days.

Note: Quote is contingent on CARB certification. 2021 MY CARB certification has been issued. 2022MY has NOT.

Note: Please allow 30 working days for parts to be ordered and received upon issuance of purchase order. After parts and vehicle(s) arrive, please allow 40 working days for completion or delivery of first vehicle and 5 working days for each additional pair of units.

Note: For cab/chassis units, CNG fill receptacle and hose will be tied to frame of vehicle for body company to install.

Customer to provide A-1 with desired hose length at time of order.

Note: Tank package is subject to engineering confirmation. See A-1 drawing: 110121.

BUYER AUTHORIZATION : Buyer's signature below is acceptance to purchase the product identified above and acceptance of A-1's Standard Terms and Conditions.

Signature Date: -

← All documents from this meeting