Cities Index.
Twining Second Amendment to On-Call contract 121322 f

Redondo Beach City Council
December 13, 2022

Document
Twining Second Amendment to On-Call contract 121322 f
Meeting
December 13, 2022
Body
Redondo Beach City Council
Original file
404 KB
Text extracted from the city's file for reading and search. Open the original on redondo.legistar1.com. That file is the official record.

1 SECOND AMENDMENT TO THE AGREEMENT

FOR CONSULTING SERVICES BETWEEN
THE CITY OF REDONDO BEACH AND TWINING, INC.

THIS SECOND AMENDMENT TO THE AGREEMENT FOR CONSULTING SERVICES (“Second Amendment”) is made between the City of Redondo Beach, a chartered municipal corporation (“City”) and Twining, Inc., a California corporation (“Contractor” or “Consultant”).

WHEREAS, on December 18, 2018, the parties entered into the Agreement for Consulting Services between the City and Consultant (the "Agreement"); and WHERAS, on December 1, 2020, the parties entered into the First Amendment (the “First Amendment”) to increase the Consultant’s total compensation; and WHEREAS, the Agreement is set to expire December 31, 2022; and WHEREAS, the parties desire to extend the term of the Agreement and provide additional compensation for the increased term.

NOW THEREFORE, in consideration of the promises and mutual covenants contained herein, and intending to be legally bound, the parties hereby agree to make the following amendments to the Agreement:

1. SCHEDULE FOR COMPLETION. Exhibit “B” of the Agreement is hereby amended to add Exhibit “B-2”, which extends the Agreement to December 31, 2024. Exhibit “B2” is attached hereto and incorporated by reference. Consultant shall commence and complete all services described in Exhibit “A” in accordance with the schedule set forth in Exhibit “B-2”.

2. COMPENSATION. Exhibit “C” of the Agreement is hereby amended to add Exhibit “C-2” to increase the limit for the total compensation paid to Consultant by $100,000 for a total compensation limit of $300,000. Exhibit “C-2” is attached hereto and incorporated by reference. Consultant shall be compensated for the services described in Exhibit “A” of the Agreement.

3. NO OTHER AMENDMENTS. Except as expressly stated herein, the Agreement shall remain unchanged and in full force and effect. The Agreement, First Amendment, and this Second Amendment constitute the entire agreement between the parties and supersede any previous oral or written agreement with respect to the subject matter hereof. In the event of any inconsistency between the terms of the Agreement, First Amendment, and this Second Amendment, the terms of this Second Amendment shall govern.
2 IN WITNESS WHEREOF, the parties have executed this Second Amendment in Redondo Beach, California, as of this 13th day of December, 2022.

CITY OF REDONDO BEACH, TWINING, INC,
a chartered municipal corporation a California corporation ___________________________ By: _______________________ William C. Brand, Mayor Name: _______________________
Title: _______________________
ATTEST: APPROVED:
___________________________ ___________________________ Eleanor Manzano, City Clerk Diane Strickfaden, Risk Manager APPROVED AS TO FORM:
___________________________
Michael W. Webb, City Attorney
3 EXHIBIT “B-2”

SCHEDULE FOR COMPLETION
TERM. The term of the Agreement shall be extended to December 31, 2024 (“Term”), unless otherwise terminated as herein provided.
4 EXHIBIT “C-2”

COMPENSATION
Provided Consultant is not in default under this Agreement, Consultant shall be compensated as provided below.

I. AMOUNT. Consultant shall perform the work for all City approved Task Proposal(s) in accordance with the attached hourly rate schedule, which is hereby incorporated.

II. EXPENSES. Consultant shall be reimbursed for expenses in accordance with the attached schedule. If Consultant requires reimbursement for expenses not provided on the attached schedule, including but not limited to, mileage, reproduction costs, and subcontractor markup, Consultant shall not be reimbursed without a subsequent written amendment, which shall be at the sole discretion of the city.

III. NOT TO EXCEED AMOUNT. In no event shall the total amount paid to the Consultant, including reimbursable expenses, exceed $300,000 during the term of this Agreement.

IV. METHOD OF PAYMENT. Consultant shall provide monthly invoices to City for approval and payment for those services performed in the month prior to invoice submission. Invoices must include the following information.

A. Task number.

B. All personnel who performed work on the Task.

C. Description of the work performed.

D. Number of hours worked.

E. Hourly rate.

F. All city approved and documented subcontractor invoices.

G. If applicable, expenses incurred.

Invoice must be itemized, adequately detailed, based on accurate records, in a form reasonably satisfactory to the City. Invoices must attach the prior written authorization of the City and copies of receipts to substantiate expense requests. Consultant may be required to provide back-up material upon request. If no work is performed in a given month, no invoice is required.

Within the approved amount of each approved Task Proposal, and with the written approval of the City, a portion of the amount from the line item of the task may be allocated to another line item task so long as the total amount approved for the Task Proposal as described in Exhibit “A” in not exceeded.

V. SCHEDULE FOR PAYMENT. City agrees to pay Consultant within thirty (30) days after receipt of Consultant’s monthly invoice; provided, however, that services are completed to the City’s reasonable satisfaction and there is no dispute over the amount.
5 VI. NOTICE. Written notices to City and Consultant shall be given by registered or certified mail, postage prepaid and addressed to or personally served on the following parties.

Consultant: Twining, Inc.
2883 East Spring Street, Suite 300
Long Beach, CA 90806
Attn: Paul Soltis
City: City of Redondo Beach
Public Works Department, Engineering Services Division
415 Diamond Street
Redondo Beach, CA 90277
Attn: Andrew Winje, City Engineer
All notices, including notices of address changes, provided under this Agreement are deemed received on the third day after mailing if sent by registered or certified mail. Changes in the respective address set forth above may be made from time to time by any party upon written notice to the other party. 1 Schedule of Fees 2022 - 2023 NOTE: Rates will be adjusted annually each July 1st to reflect increased costs.

Personnel Rates: Per Hour Unless Otherwise Noted
Task Equipment Usage (Daily Unless Otherwise Noted),
Code Continued Rate
95343 Nuclear Gauge (Per Hour) $ 20.00
95319 Sand Cone Density Test Equipment $ 64.00
95333 Pull Test Equipment $ 75.00
95348 Concrete/Asphalt Coring Equipment $ 669.00
95327 Pachometer $ 70.00
95336 Floor Flatness (Dipstick) $ 64.00
95330 Schmidt Hammer $ 42.00
95341 Vapor Emission Test Kits $ 42.00
95342 Relative Humidity Probe $ 75.00
95339 UPV (Ultrasonic Pulse Velocity) Meter $ 394.00
95351 Fireproofing Adhesion/Cohesion (Per Test) $ 47.00 95300 A Scan Ultrasonic Equipment and Consumables $ 92.00 95303 Magnetic Particle Equipment and Consumables $ 53.00 95306 Liquid Penetrant Consumables $ 48.00
95307 Phased Array Ultrasonic Equipment (Per Hour) $ 75.00 95347 Ground Penetrating Radar $ 339.00
95345 Impact Echo $ 394.00
95362 Ultrasonic Tomography $ 504.00
95349 Inertial Profiler (Per Hour) Quotation
95357 Project Dedicated Vehicle $ 159.00
95364 Roller Compacted Concrete Vibrating Hammer/Tampling Plate $ 86.00 95367 Half-Cell Potential Equipment Set $ 394.00
95368 Concrete Electrical Resistivity Meter $ 185.00
95369 Field Hardness (Steel) $ 119.00
95370 Coating Thickness Gauge $ 119.00
95373 Wood Curing Box (One-Time Fee/Per Box) $ 659.00
95371 Temperature Control Curing Box (Per Month) $ 509.00 95372 Temperature Matching Curing Box (Per Month) $ 579.00 Task
Code Engineering and Consulting Personnel Rate
10026 Senior Principal Advisor/Consultant $ 359.00
10001 Principal Engineer/Geologist $ 259.00
10017 Metallurgical Engineer $ 369.00
70000 Registered Geotechnical Engineer $ 254.00
10010 Technical Advisor $ 249.00
10011 Material Scientist, Welding/NDT Consultant $ 259.00 70003 Registered Geologist/Certified Engineering Geologist $ 254.00 10003 Senior Engineer/Geologist $ 229.00
10009 Registered Civil Engineer $ 224.00
60003 Roofing/Waterproofing Consultant $ 249.00
10013 Project Engineer/Manager $ 219.00
30000 Quality Control Manager $ 209.00
10005 Senior Staff Engineer/Geologist $ 204.00
10007 Staff Engineer/Geologist $ 199.00
10015 Quality Control Administrator $ 189.00
10019 Metallurgical Technician $ 164.00
90001 CADD Operator/Draftsperson $ 151.00
95103 Office Support/Clerical $ 109.00
70107 Field Supervisor $ 184.00
91030 Safety Supervisor $ 184.00
20000 Laboratory Manager $ 169.00
98000 Laboratory Technician $ 144.00
90005 Expert Witness Testimony $ 599.00
91010 Qualified SWPPP Developer $ 204.00
91000 Qualified SWPPP Practitioner $ 189.00
30001 Vibration Engineer $ 229.00
Task
Code Field Inspection Personnel Rate
10101 Concrete/Reinforced Steel Inspector $ 138.00
10103 Prestressed/Post Tensioned Inspector $ 138.00
10105 Concrete ICC Inspector $ 138.00
10109 Drilled-In-Anchor Inspector $ 138.00
10111 Gunite/Shotcrete Inspector $ 138.00
10113 Masonry Inspector $ 138.00
10201 Structural Steel/Welding Inspector $ 138.00
10203 AWS Certified Welding Inspector $ 138.00
10207 Fireproofing Inspector $ 138.00
10501 Lead Inspector $ 141.00
10115 Firestop Special Inspector - IFC Premier $ 155.00 10117 Firestop Special Inspector - IQP $ 200.00
70109 L.A. Deputy Grading Inspector $ 143.00
75001 Asphalt Field and Plant Inspector/Technician $ 138.00 70103 Pile Driving Inspector $ 138.00
70101 Soils Technician $ 138.00
10107 Concrete Quality Control (ACI/Caltrans Technician) $ 138.00 10122 Wood Framing Inspector $ 138.00
60001 Roofing/Waterproofing Inspector $ 145.00
10500 Public Works Inspector $ 155.00
10515 Mechanical Inspector $ 163.00
10519 Electrical Inspector $ 163.00
10521 Plumbing Inspector $ 163.00
10523 Building Inspector $ 163.00
30002 Vibration Monitoring Technician $ 158.00
50003 Field Engineering Technician $ 138.00
Task
Code Shop Inspection Personnel Rate
10301 Structural Steel Fabrication Inspector $ 138.00
10309 Batch Plant Quality Control Technician/Inspector $ 138.00 10325 Glue-Laminated Fabrication Inspector Quotation
10328 Pre-Cast Concrete/Pipe Fabrication Inspector $ 138.00 Task
Code Nondestructive Testing Personnel Rate
10401 NDE Ultrasonic Testing Technician $ 144.00
10403 NDE Magnetic Particle Testing Technician $ 144.00 10405 NDE Dye Penetrant Testing Technician $ 144.00
10305 Combination NDE Technician/Welding Inspector $ 144.00 10409 Radiographic Testing (Crew of 2) $ 369.00
10020 NDE Engineer $ 239.00
Task
Code Equipment Usage (Daily Unless Otherwise Noted) Rate 95318 Skidmore $ 53.00
95309 Torque Wrench, Small $ 26.00
95312 Torque Wrench, Large $ 37.00
95315 Torque Multiplier $ 53.00
95321 Air Meter $ 31.00
95322 Unit Weight Bucket $ 42.00
95323 Field Concrete Scale $ 42.00
95324 Brass Mold $ 31.00
Task
Code Specimen Pick-Up Rate
20102 Standard Sample: Concrete Cylinders (Each) $ 39.00 20101 Standard Sample: Mortar/Grout Cubes and Cores, $ 39.00 Fireproofing, Rebar, and Epoxy Prisms (Each)
20103 Oversize Sample: Masonry Prisms and Shotcrete Panels (Each) $ 89.00 20104 Oversize Sample: Flexural Beams (Each)
20107 Technician for Specimen Pick-Up Not Listed Above $ 119.00 (Per Hour, 2-Hour Minimum)
20109 Technician for Specimen Pick-Up Before 5:00 a.m. $ 174.00 or After 5:00 p.m. Monday thru Friday, or All Day Saturday (Per Hour, 2-Hour Minimum Plus Mileage)
Task
Code Jobsite Trailer, Mobile or On-site Laboratory Rate 95360 Mobile Laboratory for Rapid Strength Concrete (Per Shift $ 609.00 Not Exceeding 12 Hours) All Others by Quotation
Task
Code Concrete Tests (Field Made Specimens) Rate
20201 6" x 12" Cylinder: Compression Strength (ASTM C39) $ 51.00 20202 4" x 8" Cylinder: Compression Strength (ASTM C39) $ 46.00 20203 Density of Structural Lightweight Concrete Equilibrium $ 99.00 Oven Dry Method (ASTM C567)
20205 Core Compression including Trimming (ASTM C42) $ 89.00 20207 6" x 6" x 18" Flexural Beams Not Exceeding Referenced $ 119.00 Size (ASTM C78, C293 or CTM 523)
20209 Splitting Tensile Strength (ASTM C496) $ 109.00
20211 Modulus of Elasticity Test (ASTM C469) $ 309.00
80003 Rapid Chloride Permeability Test: Cylinders or Cores $ 559.00 (ASTM C1202)
80006 Density, Absorption, and Voids in Hardened Concrete $ 559.00 (ASTM C642)
40005 Flexural Toughness (ASTM C1609, Formerly ASTM C1018) $ 859.00 40007 Flexural Toughness (ASTM C1550) $ 509.00
40006 Double Punch Strength of Fiber Reinforced Concrete $ 559.00 40009 Coefficient of Thermal Expansion of Concrete $ 609.00 (CRD 39, AASHTO T336)
40012 Bulk Electrical Resistivity (ASTM C1876) $ 159.00 Task
Code Concrete Specimen Preparation Rate
20151 Sawing of Specimens (Each) $ 54.00
20157 Coring of Specimens in Lab (Each) $ 54.00
20159 Grinding of Concrete Below 6000 psi Strength (Each) $ 74.00 20160 Grinding of Concrete 6000 psi Strength and Above (Each) $ 104.00 Task Laboratory Trial Batch: Concrete, Cement
Code and Mortar Rate
30216 Compression Test 4"x8" Cylinders Made and Tested in $ 64.00 Laboratory (ASTM C192, C35)
30217 Compression Test 6"x12" Cylinders Made and Tested in $ 64.00 Laboratory (ASTM C192, C35)
2 Task Laboratory Trial Batch: Concrete, Cement
Code and Mortar, Continued Rate
30219 6" x 6" x 18" Flexural Beams Made and Tested in Laboratory $ 134.00 (ASTM C192, C78)
30223 Splitting Tensile Strength Cylinders Made and Tested in $ 134.00 Laboratory (ASTM C192, C496)
30225 Modulus of Elasticity Test Cylinders Made and Tested in $ 324.00 Laboratory (ASTM C192, C469)
30227 Density of Structural Lightweight Concrete Made in the $ 119.00 Laboratory, Equilibrium or Oven Dry Method (ASTM C567)
30237 Bulk Electrical Resistivity (ASTM C1876) $ 174.00 30201 Laboratory Trial Batch (ASTM C192/Lab Procedure Performance) $ 534.00 30203 Concrete Mixture Design for Preconsruction Evaluation and $ 309.00 Backup Data Development
30205 Drying Shrinkage Up to 28 Days: Three 3" x 3" or 4" x 4" Bars, $ 509.00 Five Readings Up to 28 Dry Days (ASTM C157)
30230 Additional Reading, Per Set of Three Bars $ 59.00 30231 Storage over Ninety (90) Days, Per Set of $ 49.00 Three Bars, Per Month
30207 Setting Time Up to 7 Hours (ASTM C403) $ 189.00
30209 Bleeding (ASTM C232) $ 159.00
30229 Concrete Restrained Expansion (ASTM C878) $ 659.00 20263 Non-Shrink Grout: Height Change after Final Set (ASTM C1090) $ 559.00 20265 Non-Shrink Grout: Height Change at Early Age (ASTM C827) $ 809.00 30232 Cracking Resistance, Set of Three Rings, Laboratory Trial $ 5,759.00 Batching, Test Until Cracking or Up to 28 Days (ASTM 1581) 30233 Evaluation of Pre-Packaged Masonry Mortars (ASTM C270) $ 1,209.00 30234 Creep (ASTM C512) (One Age of Loading, 12 Months $ 8,009.00 Duration of Testing)
Task
Code Soils and Aggregate Tests, Continued Rate
70396 Compressive Strength of Molded Soil-Cement Cylinders $ 114.00 (ASTM D1633)
70309 Consolidation Test: Full Cycle (ASTM 2435, CTM 219) $ 204.00 70311 Consolidation Test: Time Rate per Load Increment $ 54.00 (ASTM D2435, CTM 219)
70313 Corrosivity Series: Sulfate, CI, pH, Resistivity (CTM 643, $ 254.00 417, and 422)
70315 Crushed/Fractured Particles (ASTM D5821, CTM 205) $ 184.00 70317 Direct Shear Test: Remolded and/or Residual (ASTM D3080) $ 254.00 70319 Direct Shear Test: Undisturbed - Slow [CD] (ASTM D3080) $ 234.00 70321 Direct Shear Test: Undisturbed - Fast [CU] (ASTM D3080) $ 204.00 70378 Durability Index: Per Method - A,B,C, or D (ASTM D3744, $ 219.00 CTM 229)
70325 Expansion Index (ASTM D4829, UBC 18-2) $ 179.00
75004 Fine Aggregate Angularity (ASTM C1252, CTM 234, $ 199.00 AASHTO T304)
30507 Flat and Elongated Particle (ASTM D4791) $ 249.00 30508 Flat or Elongated Particle (ASTM D4791) $ 219.00
70331 Maximum Density: Methods A/B/C (ASTM D1557, $ 199.00 D698, CTM 216)
70333 Maximum Density: Check Point (ASTM D1557, D698) $ 74.00 70335 Maximum Density: AASHTO C [Modified] (AASHTO T-180) $ 204.00 70336 Maximum Index Density: Vibratory Table (ASTM D4253) $ 354.00 70337 Moisture Content (ASTM D2216, CTM 226) $ 29.00
70339 Moisture and Density: Ring Sample (ASTM D2937) $ 39.00 70341 Moisture and Density: Shelby Tube Sample (ASTM D2937) $ 49.00 70340 Moisture-Density Relations of Soil-Cement Mixtures $ 284.00 Premixed in the Field (ASTM D558)
70342 Moisture-Density Relations of Soil-Cement Mixtures $ 359.00 Mixed in the Lab (ASTM D558)
30401 Organic Impurities (ASTM C40, CTM 213) $ 99.00
70343 Permeability (ASTM D5084) Quotation
80001 Potential Reactivity: Chemical Method (ASTM C289 - $ 659.00 Discontinued Method)
70394 Potential Reactivity: Mortar Bar Expansion Method, $ 909.00 14-Day Exposure (ASTM C1260)
70391 Potential Reactivity: Mortar Bar Expansion Method, $ 959.00 28-Day Exposure (ASTM C1260)
70398 Potential Reactivity: Concrete Bar Expansion Method $ 2,700.00 (ASTM C1293), 12 month
70399 Potential Reactivity: Concrete Bar Expansion Method $ 2,900.00 (ASTM C1293), 24 month
70397 Potential Reactivity of Aggregate Combination, Non-Standard $ 1,050.00 Method; 14-Day Exposure, Mortar (After ASTM C1567)
70392 Potential Reactivity of Aggregate Combination, Non-Standard $ 1,100.00 Method; 28-Day Exposure, Mortar (Sfter ASTM C1567)
70345 R-Value: Soil (ASTM 2844, CTM 301) $ 449.00
70347 R-Value: Aggregate Base (ASTM D2844, CTM 301) $ 499.00 70349 Sand Equivalent (ASTM D2419, CTM 217) $ 134.00
70351 Sieve #200 Wash Only (ASTM D1140, CTM 202) $ 99.00 70353 Sieve with Hydrometer: 3/4" Gravel to Clay (ASTM D422, $ 259.00 D7928, CTM 203)
70355 Sieve with Hydrometer: Sand to Clay (ASTM D422, $ 249.00 D7928, CTM 203)
70357 Sieve Analysis Including Wash (ASTM C136, CTM 202) $ 159.00 70359 Sieve Analysis Without Wash (ASTM C136, CTM 202) $ 129.00 70360 Sieve Analysis: Split Sieve (ASTM C136, CTM 202) $ 249.00 70361 Sieve Analysis Without Wash: With Cobbles (ASTM C136, $ 244.00 CTM 202)
70363 Soundness: Sodium or Magnesium Sulfate, 5 Cycles $ 459.00 (ASTM C88)
70365 Specific Gravity and Absorption: Coarse (ASTM C127, $ 109.00 CTM 206)
70367 Specific Gravity and Absorption: Fine (ASTM C128, $ 174.00 CTM 207)
70369 Swell/Settlement Potential: One Dimensional (ASTM D4546) $ 159.00 70371 Triaxial Quotation
70373 Unconfined Compression (ASTM D2166, CTM 221) $ 199.00 30317 Unit Weight Per Cubic Foot (ASTM C29, CTM 212) $ 134.00 30319 Voids in Aggregate with Known Specific Gravity (ASTM C29, $ 134.00 CTM 212)
30411 Lightweight Particles: Coarse, with Two Solutions (ASTM C123) $ 459.00 30412 Lightweight Particles: Fine, with One Solution (ASTM C123) $ 234.00 Task Chemical Analysis and Petrographic
Code Examination of Concrete Rate
80123 Chemical Analysis for Acid Soluble Chlorides $ 134.00 (ASTM C1152) (includes sample prep)
80126 Chemical Analysis for Water Soluble Chlorides $ 159.00 (ASTM C1218) (includes sample prep)
80193 Chloride Diffusion Coefficient of Cementitious $ 2,609.00 Mixtures by Bulk Diffusion (ASTM C1556)
80129 Petrographic Examination of Hardened Concrete, Level II (ASTM 856) (Comprehensive)
Each, One Sample $ 2,409.00
Each, Two or More Samples $ 2,109.00
Task
Code Physical and Chemical Analysis of Cement Rate
80195 Physical Testing and Chemical Analysis of Portland Cement $ 1,359.00 per Standard Requirements (ASTM C150)
80100 Chemical Analysis of Portland Cement per Standard $ 709.00 Requirements (ASTM C150)
80103 Physical Testing of Portland Cement per Standard $ 709.00 Requirements (ASTM C150)
80194 Physical Testing of Type K Cement, Mortar Expansion $ 709.00 (ASTM C806)
80106 Partial Analysis or Specific Physical Tests Quotation 80110 Sulfates Resistance of Hydraulic Cement (ASTM C1012), $ 2,709.00 6 Months
80111 Sulfates Resistance of Hydraulic Cement (ASTM C1012), $ 3,009.00 12 months
Task
Code Physical and Chemical Analysis of Fly Ash Rate
80140 Chemical Analysis of Fly Ash per Standard Requirements $ 709.00 (ASTM C618)
80143 Physical Testing of Fly Ash per Standard Requirements $ 709.00 (ASTM C618)
80146 Partial Analysis or Specific Physical Tests Quotation 80147 Chemical Analysis and Physical Testing of Fly Ash per $ 1,350.00 Standard Requirements (ASTM C1618)
80149 Type 1L Cement (ASTM C595; Excludes Special Properties) $ 1,350.00 Task Physical Testing of Chemical Admixtures for
Code Concrete Rate
80196 Qualification of Admixture (ASTM C494) Quotation
Task
Code Soils and Aggregate Tests Rate
30503 Abrasion: LA Rattler (ASTM C131) $ 209.00
30505 Abrasion: LA Rattler (ASTM C535) $ 219.00
70301 Atterberg Limits/Plasticity Index (ASTM D4318, CTM 204) $ 169.00 70303 California Bearing Ratio Excluding Maximum Density $ 559.00 (ASTM D1883): Soil
70304 California Bearing Ratio Excluding Maximum Density $ 659.00 (ASTM D1883): Cement-Treated Soil
70344 Cement-Treated Soil/Base Mix Design: Includes Three Trial $ 3,509.00 Cement Contents with Three Unconfined Compressive Strength Specimens per Cement Content
70305 Chloride and Sulfate Content (CTM 417, CTM 422) $ 184.00 30403 Clay Lumps and Friable Particles (ASTM C142) $ 209.00 30321 Cleanness Value: 1" x #4 (CTM 227) $ 184.00
30322 Cleanness Value: 1.5" x .75" (CTM 227) $ 284.00
70393 Collapse Potential/Index (ASTM D5333) $ 234.00
Task
Code Asphalt Concrete Tests Rate
75031 HMA Mixing and Preparation $ 138.00
75032 HMA Mixing and Preparation with Aggregate Treatment $ 190.00 75033 Bulk Specific Gravity of Compacted Sample or Core: SSD $ 66.00 (ASTM D2726, CTM 308C)
75036 Bulk Specific Gravity of Compacted Sample or Core: Parafin $ 92.00 Coated (ASTM D1188 and CTM 308A)
75040 Emulsion Residue, Evaporation (ASTM D244) $ 174.00 75024 Extraction: % Bitumen (ASTM D6307, CTM 382) $ 174.00 75027 Extraction: % Bitumen and Gradation (ASTM D5444, D6307, $ 231.00 CTM 202, 382)
75028 Extraction: % Bitumen, Correction Factor (ASTM D6307, $ 370.00 CTM 382)
3 Task
Code Asphalt Concrete Tests, Continued Rate
75030 Chemical Extraction: % Bitumen and Sieve Analysis (ASTM D2172 $ 262.00 Method A or B, ASTM D5444)
75042 Lab Tested Maximum Density: Hveem, 3 briquettes (ASTM D1561, $ 231.00 D1188, CTM 304, 308)
75057 Hveem Stabilometer Test, Premixed, 3 briquettes (ASTM D1560, $ 231.00 D1561, CTM 304, 366)
75048 Lab Tested Maximum Density: Marshall, 3 Briquettes $ 226.00 (ASTM D6926, D2726)
75049 Lab Tested Maximum Density: Marshall 6'' Specimen, $ 231.00 3 Briquettes (ASTM D5581, D2726)
75050 Lab Tested Maximum Density: Superpave Gyratory Compacted $ 92.00 Briquette, SSD, 1 Briquette (ASTM D6925, D2726)
75052 Lab Tested Maximum Density: Superpave Gyratory Compacted $ 102.00 Briquette, Parafin, 1 Briquette (ASTM D1188, D6925)
75051 Maximum Theoretical Specific Gravity [RICE] (ASTM D2041, $ 174.00 CTM 309)
75066 Marshall Stability and Flow, Cored Sample, Each (ASTM D6927) $ 92.00 75069 Marshall Stability and Flow, Premixed, 3 Briquettes (ASTM D6926, $ 246.00 D6927)
75106 Marshall Stability and Flow, Gyratory Compacted Specimen $ 246.00 Pre-Mixed, 3 Briquettes (ASTM D5581, D6925)
75107 Marshall Stability and Flow 6'' Specimen, Premixed, 3 Briquettes $ 246.00 (ASTM D5581)
75063 Moisture Content (CTM 370) $ 97.00
75005 Wet Track Abrasion Test (ASTM D3910) $ 179.00
75093 Hveem Mix Design (Excluding Aggregate Quality Tests) $ 5,356.00 75096 Hveem Mix Design, with RAP (Excluding Aggregate Quality $ 5,815.00 Tests, RAP Qualification)
75099 Hveem Mix Design, with Lime (Excluding Aggregate Quality $ 9,180.00 Tests)
75094 Hveem Mix Design Caltrans Untreated Mix (Including Aggregate $ 6,386.00 Quality Tests)
75095 Hveem Mix Design Caltrans Lime Treated Mix (Including $ 7,416.00 Aggregate Quality Tests)
75084 Marshall Mix Design (Excluding Aggregate Quality Tests) $ 5,356.00 75087 Marshall Mix Design with RAP (Excluding Aggregate Quality $ 5,815.00 Tests)
75090 Marshall Mix Design with Lime (Excluding Aggregate Quality $ 6,386.00 Tests)
75083 Open Grade Asphalt Concrete Mix Design (ASTM D7064, $ 3,090.00 CTM 368)
75109 Superpave Mix Design (Excluding Aggregate Quality Tests) $ 10,918.00 75113 Superpave Mix Design, with RAP (Excluding Aggregate $ 11,536.00 Quality Tests)
75114 Superpave Mix Design, with Rubber (Excluding Aggregate $ 11,536.00 Quality Tests)
75115 Superpave Mix Design, with Additives (Excluding Aggregate $ 11,845.00 Quality Tests)
75075 Effect of Moisture on Asphalt Paving Mixtures, Pre-Mixed $ 1,030.00 (ASTM D4867, AASHTO T283)
75111 Hamburg Wheel Track Test, 20,000 Passes, 4 Briquettes $ 1,133.00 (AASHTO T324)
75039 Raveling Test of Cold Mixed Emulsified Asphalt (ASTM D7196) $ 215.00 75067 Marshall Stability, Wet Set, 3 Replicates (AASHTO T245) $ 370.00 75068 Marshall Stability, Dry Set, 3 Replicates (AASHTO T245) $ 318.00 75070 Cold Recycled Asphalt Mix Design: 2 Gradings Each, $ 10,815.00 3 Emulsion Content (Caltrans LP-8)
Task
Code Brick Masonry Tests, ASTM C67 Rate
20301 Modulus of Rupture: Flexural $ 109.00
20303 Compression Strength $ 74.00
20305 Absorption: 5 Hour or 24 Hour $ 79.00
20307 Absorption (Boil): 1, 2 or 5 Hours $ 109.00
20309 Initial Rate of Absorption $ 69.00
20311 Efflorescence $ 89.00
20313 Cores: Compression $ 84.00
20315 Shear Test on Brick Cores: 2 Faces $ 109.00
Task
Code Concrete Block, ASTM C140 Rate
20321 Compression $ 99.00
20323 Absorption/Moisture Content/Oven Dry Density $ 99.00 20327 Linear Shrinkage (ASTM C426) $ 259.00
20335 Web and Face Shell Measurements $ 59.00
20329 Tension Test $ 169.00
20331 Core Compression $ 89.00
20333 Shear Test of Masonry Cores: 2 Faces $ 104.00
20339 Efflorescence Tests $ 84.00
Task
Code Masonry Prisms, ASTM C1314 Rate
20341 Compression Test: Composite Masonry Prisms Up to 8" x 16" $ 204.00 20343 Compression Test: Composite Masonry Prisms Up to 8" x 16" $ 269.00 20346 Prism Cord Modulus of Elasticity $ 609.00
20347 Prism Cord Modulus of Elasticity with Transverse Strain $ 694.00 (for Double-Wythe Specimen)
Task
Code Mortar and Grout Rate
20351 Compression: 2" x 4" Mortar Cylinders (ASTM C780) $ 66.00 20353 Compression: 3" x 3" x 6" Grout Prisms, Includes Trimming $ 51.00 (ASTM C1019)
20355 Compression: 2" Cubes (ASTM C109) $ 66.00
20357 Compression: Cores Includes Trimming (ASTM C42) $ 86.00 Task
Code Masonry Specimen Preparation Rate
20155 Cutting of Cubes or Prisms $ 89.00
Task
Code Fireproofing Tests Rate
20401 Oven Dry Density (ASTM E605) $ 81.00
Task
Code Gunite and Shotcrete Tests Rate
20361 Core Compression Including Trimming (ASTM C42) $ 89.00 20365 Compression: Cubes (Includes Saw Cutting) $ 107.00 Task Concrete Roof Fill: Gypsum, Vermiculite, Perlite,
Code Lightweight Insulating Concrete, Etc. Rate
20371 Compression Test (ASTM C495 and C472) $ 79.00
20373 Air Dry Density (ASTM C472) $ 64.00
20379 Oven Dry Density (ASTM C495) $ 89.00
Task
Code Reinforcing Steel, ASTM A615, A706 Rate
20501 Tensile Test: # 11 or Smaller $ 79.00
20503 Bend Test: # 11 or Smaller $ 74.00
20504 Bend Test #14 or #18 $ 394.00
20505 Tensile Test: # 14 $ 279.00
20507 Tensile Test: # 18 $ 379.00
Task
Code Reinforcing Steel - Welded or Coupled Specimens Rate 20521 Tensile Test: Welded/Coupled #11 and Smaller $ 89.00 20523 Tensile Test: Welded/Coupled #14 $ 289.00
20525 Tensile Test: Welded/Coupled #18 $ 404.00
20529 Weld: Macroetch $ 99.00
20531 Slippage Test - Caltrans (CTM 670) $ 209.00
20532 Tensile Test: Welded Hoops #11 and Smaller $ 159.00 Task
Code Metal and Steel Testing Rate
20601 Tensile Strength: Up to 100K Pounds (Each) $ 84.00 20603 Tensile Strength: Up to 200K Pounds (Each) $ 94.00 20605 Tensile Strength: Up to 300K Pounds (Each) $ 119.00 20607 Tensile Strength: Up to 400K Pounds (Each) $ 169.00 20609 Tensile Strength: 400K to 600K Pounds (Each) $ 394.00 20611 Tensile Strength: Stress-Strain Percent Offset $ 234.00 20545 Weld: Macroetch $ 99.00
20547 Weld: Fracture $ 54.00
20615 Bend Test $ 79.00
20617 Flattening Test $ 79.00
20619 Hardness Test (ASTM E18) $ 89.00
20630 Bolt: Axial Tensile Test (Up to 7/8" diameter) $ 74.00 20631 Bolt: Wedge Tensile Test (Up to 7/8" diameter) $ 89.00 20632 Bolt: Axial Tensile Test (Greater than 7/8" Up to 1" diameter) $ 94.00 20633 Bolt: Wedge Tensile Test (Greater than 7/8" Up to 1" diameter) $ 114.00 20634 Bolt: Axial Tensile Test (Greater than 1" diameter) $ 134.00 20635 Bolt: Wedge Tensile Test (Greater than 1" diameter) $ 144.00 20636 Bolt: Proof Load Test (Up to 7/8") $ 99.00
20637 Bolt: Proof Load Test (Greater than 7/8" Up to 1" diameter) $ 119.00 20638 Bolt: Proof Load Test (Greater than 1") $ 139.00
20639 Nut: Proof Load Test (Up to 7/8") $ 79.00
20640 Nut: Proof Load Test (Greater than 7/8" Up to 1" diameter) $ 99.00 20641 Nut: Proof Load Test (Greater than 1") $ 109.00
Task
Code Chemical Testing of Metal and Steel Rate
80170 Steel Chemical Analysis Quotation
80173 Weight of Galvanized Coating (ASTM A90) $ 94.00
80176 Epoxy Coating Thickness $ 104.00
80177 Coating Thickness $ 99.00
Task Machining and Preparation of Tensile and Bend
Code Sample: Carbon Steel Rate
20751 Machinist: Initial Preparation from Mock-Up, Etc. (Per Hour) $ 134.00 20753 Sawcut to Overall Width (Per 0.5" Thickness or Fraction $ 69.00 Thereof)
20755 Machine to Test Configuration: Milled Specimens $ 94.00 20757 Machine to Test Configuration: Turned Specimens (Per 0.5" $ 164.00 Thickness or Fraction Thereof)
20759 Prepare Subsize Specimens (Per 0.5" Thickness or Fraction $ 114.00 Thereof)
4 Ceramic Tile Testing Division Rate
The Ceramic Tile Institute of America (CTIOA) and Twining worked together to advance and develop technology designed to enhance the quality of materials and workmanship in the ceramic tile industry. A separate schedule of fees for these services is available upon request.

Quotation
Quotation
Quotation
Quotation
Quotation
Quotation
Quotation
Quotation
General Conditions
NOTE: Field inspection work conditions are established by contract with Operating Engineers, Local 12.

NOTE: A minimum of 24 hours notice is required for testing and inspection services.

NOTE: For projects subject to a Project Labor Agreement (PLA), if the terms and conditions of the PLA are more restrictive than those listed below, PLA terms and conditions will apply.

NOTE: Rates will be adjusted annually each July 1st to reflect increased costs.

Minimum Charges (Inspection and Technician Personnel Only - Other Personnel Charged on Portal to Portal Basis) 2-Hour Minimum: Inspector arrives at jobsite, no work to perform. 4-Hour Minimum: 1 to 4 hours of inspection
8-Hour Minimum: Over 4 to 8 hours of inspection
Regular Time (All Types of Inspection and also All Non-Exempt Employees) The first 8 hours worked Monday through Friday between 5:00 a.m. and 5:00 p.m. except as noted otherwise below.

Time and One-Half (All Types of Inspection and also All Non-Exempt Employees) All shifts will be billed based on the time and date of their start. Any increment past 8 hours through 12 hours worked Monday through Friday and the first 12 hours on Saturday. Time and one-half will also be charged for the first four hours before 5:00 a.m. and after 5:00 p.m.

Double Time (All Types of Inspection and also All Non-Exempt Employees) All shifts will be billed based on the time and date of their start. After the first 12 hours worked Monday through Saturday, all day Sunday, and holidays. After the first four hours worked before 5:00 a.m. and after 5:00 p.m. Holidays are New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving, the day after Thanksgiving, and Christmas Day.

Meal Period
When personnel are required by their duties to work more than five consecutive hours without a one-half hour uninterrupted meal period, one half hour at double time rate will be charged in addition to any applicable overtime for actual hours worked.

Shift Differential (Applies to Regularly Scheduled Shifts Only) A $1.00 per hour shift differential premium will be charged for all inspection hours that fall outside of the 5:00 a.m. to 5:00 p.m. time period. Twining will require 48-hour notice along with the General Contractors approved shift letter prior to beginning a shift that will include hours falling outside this time period. Should this notice not be provided, all work performed on that shift will be billed at the applicable overtime or double time rate.

If three shifts per day are required, the first shift will be billed at the standard rate. The second shift shall be billed in accordance with the previous paragraph. The third shift shall be billed at 8 hours for the first 6 1/2 hours worked and appropriate overtime or double time for all hours thereafter.

Travel Time and Mileage
Weekend Sample Pick-Ups
In order to be in strict conformance with testing standards, it may be required that weekend pick-ups be performed (e.g. concrete specimens cast on Friday must be picked up on weekend in order to be in conformance with ASTM C31 requiring specimens to be moved to their final curing location within 48 hours of casting.) Applicable charges for weekend work will apply when this is required. Should these charges not be authorized, Twining will not be liable for any negative consequences.

General Conditions, Continued
Project Specific Documents
Costs presented assume that client will provide project specific documents (plans, specifications, submittals, RFIs, etc.) for all inspection personnel. Should project specific documents be provided electronically through a "for fee" service, the client will be responsible for providing access and paying any fees for the service.

Project Site Facilities
Prices quoted assume that initial curing facilities for test samples that comply with relevant test standards and project requirements are provided by others. In addition, prices quoted assume that work/desk space for inspection staff are provided by others. Additional costs, provided by quotation, will apply should Twining be required to provide such facilities.

Subsistence
Subsistence on remote jobs will be charged per quotation.

Laboratory Testing Hours and Expedited Testing
Please note that laboratory testing will be billed on an hourly basis for non-standard tests. If testing is required to be performed on Saturdays, Sundays, holidays, or before 5:30 a.m. or after Task
Code Charpy Impact Rate
20621 Charpy Impact Ambient Temperature $ 104.00
20623 Charpy Impact Reduced Temperature $ 134.00
Task
Code Machining of Charpy Samples: Carbon Steel Rate
20780 Cutting and Milling (Per 0.5" or Fraction Thereof) $ 64.00 20783 Final Machining to Sample Configuration $ 114.00
Task
Code Prestressing Wires and Tendons, (ASTM A416) Rate
20701 Stress-Strain Analysis: Wire or Strands (Including Chart and $ 249.00 Percent Offset)
20703 Tensile Test Only $ 189.00
20705 Tendons Quotation
Task
Code Polymer Matrix Composite Materials (Fiberwrap) Rate 20706 Tensile Strength – Set of 5 Specimens/Batch/Direction $ 1,350.00 (ASTM D3039)
20707 Tensile Strength – Additional Specimens (ASTM D3039) $ 259.00 (ASTM D3039)
20708 Heating Chamber Time – Per 24 hr period $ 104.00
Task
Code Calibration Services and Universal Machine Usage Rate 20801 Calibration/Verification Services Quotation
20803 Universal Test Machine Usage (Per Hour) $ 459.00
Cylic and Fatigue Testing Programs on Special Products/Parts Engineering and Technical supports/Design of Prototypes and Special Test Set-Up Fastener/Coupling Full Testing Program Per New Regulations: Tension, Tension/Bend, Shear, Double Shear, 8 Compressions Fiberglass/Composite Materials Field Testing Program (ASTM D1143 D1242, D2584, D4065, D4476, D4923, D7901, D7921, and D732) Field Testing of Structures and Structural Elements
In-Place Shear Testing
Materials and/or Product Evaluation Per Specifications
Structural Dynamic Testing and Durability Analysis
5 4:00 p.m. on weekdays, an additional hourly charge, at the applicable regular, overtime or doubletime rate, with a minimum of one hour will be applied for the laboratory technician. For rush testing a 50% surcharge in addition to the regular test rate will apply.

Certified Payroll
Certified payroll will be provided, upon request
Final Reports Required by Jurisdiction
If a final report or affidavit is required, we must first review all inspection and testing reports and clear up any unresolved issues on these reports. These issues will typically require approval by the engineer or architect of record. This process can take several weeks or just a day, depending on the number and complexity of the issues. Cost for final reports will be billed hourly.

Hold Specimens
All "hold" specimens are charged at the applicable test rate whether tested or not.

Specimen Sampling and Disposal
Twining samples materials used in construction in accordance with standard practices, methods, codes, and relevant project requirements. Representativeness of sampling and same accuracy of testing are subject to the same probabilistic and precision limitations as governing standards, codes and project technical provisions.

Should samples be provided by others Twining cannot warrant or guarantee that material is representative of material that is or will be used in actual construction of the project.

Specimens will be discarded after testing unless Twining has been notified prior to testing that the customer wishes to retrieve the specimens or storage arrangements are made. Costs for storage will be by quotation.

Oversize Specimens
An extra charge will be made when test specimens require more than one person to handle because of size or weight.

Elevated Work Platforms
In the event an elevated work platform is required to safely complete our work, the City will provide safe access for Twining personnel for all required inspection, testing, sampling, etc. including a trained and certified operator or qualified inspector as applicable. Should City request Twining to supply an elevated work platform, Twining shall contract with a qualified vendor and the markups shown above will apply.

Charges for Subcontracted Services
Material sent to outside laboratory for testing:

Material sent to outside fabricator or machine shop:

Glu-Lam beam inspection:

Other subcontractors:

Project exclusive equipment purchase:

Cost plus 20%
Cost plus 20%
Cost plus 20%
Cost plus 20%
Cost plus 20%

← All documents from this meeting