City of Redondo Beach
Community Development Department
415 Diamond Street, Redondo Beach, CA 90277
(310) 318-0637

Page 1 of 3 ends

January 23, 2023

EMERGENCY COASTAL DEVELOPMENT PERMIT
Please note the following City of Redondo Beach action on an extension to an emergency coastal permit was rendered on January 20, 2023 by the Redondo Beach Community Development Director.

Coastal Development Permit No.: CDP-2021-12
Applicant: County of Los Angeles / Department of Beaches and Harbors 13837 Fiji Way
Marina Del Rey, CA 90292
Applicant’s Representative: Porsche White
County of Los Angeles / Department of Beaches and Harbors 13837 Fiji Way
Marina Del Rey, CA 90292
Location: Esplanade at Avenue A, Redondo Beach
Original Permit Date: November 30, 2021
Original Expiration January 28, 2022 5th Extension Expiration November 20, 2022 2nd Extension Expiration March 29, 2022 6th Extension Expiration January 20, 2023 3rd Extension Expiration May 27, 2022 7th Extension Expiration March 21, 2023 4th Extension Expiration Sept. 22, 2022
Description of Request/Nature of Emergency:

Page 2 of 3 ends

On November 21, 2022, the City issued an eCDP extension for the access ramp closure, which is set to expire on January 20, 2023. DBH is requesting an additional extension of eCDP No.

CDP-2021-12 to allow for more time to complete construction drawings for the ramp repair project.

A subsequent Coastal Development Permit application will be submitted for the replacement of the access ramp.

DBH has begun the preparation of construction drawings for the repair project, and requests an additional extension of the emergency permit to allow further time for development of the plans and to secure project funding through the County’s annual budget process.

Cause of the Emergency:

Deterioration of access ramp, creating a public safety hazard. Extension is granted for additional time to prepare the construction drawings that will be submitted with a full Coastal Development Permit application.

Remedial, protective, or preventative work required to deal with the emergency:

The emergency condition requires that the access ramp be temporarily closed for public safety, which will temporarily affect public access to the beach at this location.

Los Angeles County Department of Beaches and Harbors will apply for a Coastal Development Permit to repair the damaged ramp.

Findings:

The Community Development Director hereby finds as follows:

1. An emergency exists within an area of the Coastal Zone, as defined in Section 10-5.2204 of the Redondo Beach Municipal Code.

2. The emergency requires action more quickly than allowed by the procedures for obtaining a Coastal Development Permit. A formal application for a Coastal Development Permit shall be submitted for repair work.

3. Notice of issuance of this Emergency Coastal Development Permit will be posted at the location on January 25, 2023.

4. Public comment on the emergency action will be reviewed, to the extent possible in the time available.

5. The action proposed is consistent with the requirements of the Certified Local Coastal Program. Although the request will temporarily reduce public access to the beach at the location, the action is necessary to ensure public safety.

6. The action proposed is the minimum necessary to address the emergency and, to the maximum extent feasible, is the least environmentally damaging temporary alternative for addressing the emergency.

Page 3 of 3 ends

Emergency Permit Extension Conditions:

1. The applicant is hereby authorized to temporarily close the access ramp located on Esplanade at Avenue A.

2. Within sixty (60) days of the issuance of this extension, or subsequent extension thereof, to an Emergency Coastal Development Permit, an application for a regular Coastal Development Permit shall be submitted to and properly filed with the City of Redondo Beach Planning Division.

3. Any development or structures constructed pursuant to this Emergency Coastal Development Permit shall be considered temporary until authorized by a follow-up regular Coastal Development Permit and that issuance of this Emergency Coastal Development Permit shall not constitute an entitlement to the erection of permanent development or structures.

4. Any installations authorized in this Emergency Coastal Development Permit must be removed unless a complete application for a regular Coastal Development Permit is filed within sixty (60) days of approval of this extension to an Emergency Permit and said regular permit is approved. If a regular Coastal Development Permit authorizing permanent retention of the development is denied, then the development that was authorized in the Emergency Permit, or the denied portion of the development, must be removed. Such removal, however, shall be pursuant to a separate permit.

5. This additional extension to an Emergency Coastal Development Permit shall be valid for sixty (60) days from the date of previous expiration, unless extended by submittal of a follow up application. Within sixty (60) days of issuance of an extension to the Emergency Permit, the permittee must submit a follow-up regular Coastal Development Permit application for the development even if only to remove the development undertaken pursuant to the Emergency Permit and restore the site to its previous condition.

Issued By:

Brandy Forbes, AICP
_____________________________
Brandy Forbes, AICP
Community Development Director