Cities Index.
Fact Sheet - CAPM EA 32580

Redondo Beach City Council
February 7, 2023

Document
Fact Sheet - CAPM EA 32580
Meeting
February 7, 2023
Body
Redondo Beach City Council
Original file
886 KB
Text extracted from the city's file for reading and search. Open the original on redondo.legistar1.com. That file is the official record.

5/6/22, 10:46 AM External Factsheet
Fact Sheet For EA 32580

COLD PLANE AND OVERLAY ASPHALT CONCRETE PAVEMENT, INSTALL CURB RAMPS LA-001-18/33.3
Project Description:
• Location and Limits:

IN THE CITIES OF TORRANCE, REDONDO BEACH, HERMOSA BEACH, MANHATTAN BEACH, EL

SEGUNDO, AND LOS ANGELES, FROM PASEO DE LAS DELICIAS TO MACHADO

DRIVE/COMMONWEALTH AVENUE
• Background:

This Capital Preventative Maintenance Project (CAPM) is located on Pacific Coast Highway (State Route 001 [SR-001]) from Paseo De Las Delicias in Redondo Beach to Dewey Street in Santa Monica. This section of SR-001 characterizes the road as having minor pavement distress and acceptable to bad ride. If this condition is left uncorrected, pavement deterioration will continue. This project is to preserve and extend the life of the existing pavement and improve ride quality. This is G13 Funded Project. ***The project is currently in PS&E.***
• What The Work Involves:

The scope of work involves upgrading Americans with Disabilities Act (ADA) curb ramps, repairing concrete pavement, reconstructing bus pads, replacing asphalt concrete pavement with Portland Cement Concrete (PCC) at major intersections, cold planing, installing pedestrian hybrid beacons (PHBs), and overlaying to rehabilitate pavement.
• Benefits:

Restore the facility to a state of good repair as well as improve pedestrian accessibility, and improve traffic safety and operations. The performance measures for this project are 79.9 lane miles, which also includes 245 linear feet of two culverts installed and replaced, 45 linear feet of one cure in place line culvert, 1,450 linear feet of guardrail, 35 upgraded traffic signals, 397 ADA Deficient Elements (397 ADA curb ramps, 18,618 linear feet of modified ADA crosswalks), 2.2 linear miles of Class Ill Bike Route, 50 transit stop improvements, five pedestrian hybrid beacons (PHBs), and 7603.200 linear feet of Complete Streets Fix Existing.

Concerned Communities:

Cities of Santa Monica, Torrance, Redondo Beach, Hermosa Beach, Manhattan Beach, El Segundo, and Los Angeles in Los Angeles County.

State And Federal Officials:

Assembly District(s): Autumn R. Burke (62), Al Muratsuchi (66) Senate Districts): Benjamin Allen (26)
U.S. Congressional Districts): Ted Lieu (33), Karen Bass (37), Maxine Waters (43) City/Community:

El Segundo (028), Hermosa Beach (034), Los Angeles (049), Manhattan Beach (052), Redondo Beach (065) LA County Supervisor:

Holly Mitchell (2), Sheila Kuehl (3), Janice Hahn (4)
LA Council of Governments :

South Bay Cities (2), Westside Cities (5)
Other Interested Parties:

10.56.12.86/pirs/fs/external.cfm?EA=32580 1/2
5/6/22, 10:46 AM External Factsheet
Federal Highway Administration (FHWA)
Schedules:

Construction Phase Begins: Winter 2023/2024
Construction Phase Ends: Winter 2025/2026
Total Programmed Project Costs: $ 69.953 Million
Project Contacts:

Project Manager: Allen J. Shim, 213-266-6740
Area Manager: Osama Megalla, 213-792-2999
Map:

UCLAN PARK
SQUARE
Venice Beach

CULVER - WEST
Edward
Westfield Culver City SOUTH LUO
Ladera Heights Vincent ANGELES
VENICE Jr Park
Marina ®- The Home Depot
Del Rey
Los Angeles Inglewood MORNINGSIDE
PARK
Playa Del •A International
Rey Beach Airport Hilton Los
Angeles Airport

VERMONT VIST
The Zimmerman Westmont
Automobile Driving...

Dockweiler 32580
Beach
West Athens

LOS ANGELES
El Segundo AFB
Hawthorne
Costco Wholesale
Larry Flynt's
Bruce's Beach Lucky Lady Casino
HUSTLER® Casino C West F
Domit
Manhattan Lawndale Gardena
Beach Alondra Park
Sam's Club 8
NORTH

REDONDO
Google
Map data ©2022

10.56.12.86/pirs/fs/external.cfm?EA=32580 2/2

← All documents from this meeting