TRANSMITTAL MEMO
DATE: March 3, 2023
FROM: Lauren Sablan, Public Works & Sustainability Commission Liaison TO: Brandy Forbes, Community Development Director
SUBJECT: RECOMMENDATIONS FOR COMMENTS ON METRO C LINE

EXTENSION DRAFT ENVIRONMENTAL IMPACT REPORT
Per the request of City Council, the Public Works & Sustainability Commission reviewed the Metro C Line Extension Draft Environmental Impact Report (DEIR) and provided input on the DEIR during the February 27, 2023 Public Works & Sustainability Commission Meeting. Attached are the recommendations as approved by the Public Works & Sustainability Commission.

ATTACHMENT:
• Recommendations to City Council for Comments Metro C Line Extension Draft Environmental Impact Report February 27, 2023
Public Works Department
Engineering Services Division
415 Diamond Street
Redondo Beach, California 90277
www.redondo.org
tel: 310 318-0661
fax: 310 374-4828
City of Redondo Beach
Public Works & Sustainability Commission
Recommendations to City Council for Comments
Metro C Line Extension Draft Environmental Impact Report February 27, 2023

1. The PWC prefers the Hawthorne option for the following reasons:

A. Noise and Vibrations
• For the Proposed Project (right of way at grade) and the Trench Option, the projected noise levels are in excess of City’s noise ordinance during construction and during operation (RBMC 4-

24.301)
• For the Proposed Project (right of way at grade) and the Trench Option, the projected noise levels during operation occur prior to 7 AM and after 10 PM and so are in violation of City’s noise ordinance (RBMC 4-24.301, 4-24.503)
• For the Proposed Project (right of way at grade) and the Trench Option, the projected vibration levels listed to have significant impact violates City ordinance (RBMC 4-24.504)
B. Geology
• DEIR 3.8-3.12 Subsidence and settlement - The Draft EIR identifies less than significant issues with subsidence that may be in conflict with other known reports.

C. Air quality
• For the Trench Option, air quality risk is listed as significant and unavoidable.

D. Safety
• For the Proposed Project (right of way at grade) and the Trench Option, Commission did not observe adequate discussion of safety issues related to brittle buried pipelines in the right of way. • Commission did not observe adequate discussion of safety issues related to derailment.

E. Biological
• For the Hawthorne Option and the Trench Option, significant substantial adverse effects are projected either directly or through habitat modifications on local wildlife. Metro should provide better mitigation requirements to protect local wildlife.

F. Transportation
• Metro should provide First / Last Mile improvements to the scope of the project.
• Metro should elaborate on bus connectivity from the proposed Hawthorne Light Rail Station to the to the new Redondo Beach Transit Center. Explore partnership with SBSD to make
connection.
• Provide some discussion of dedicated connectivity from the proposed C Line extension to the Del Amo Mall.
• Discuss parking options for Hawthorne Light Rail Station and explore partnership with SBSD.

2. In the absence of selection of a light rail option, or if the no build option is selected, discuss how funds will remain invested into South Bay transit needs.