Cities Index.
Pickleball Feasibility Study - Aviation Park Open Space

Redondo Beach City Council
April 4, 2023

Document
Pickleball Feasibility Study - Aviation Park Open Space
Meeting
April 4, 2023
Body
Redondo Beach City Council
Original file
697 KB
Text extracted from the city's file for reading and search. Open the original on redondo.legistar1.com. That file is the official record.

ESTIMATE OF PROBABLY COSTS:

New Stand-Alone Pickleball Court (per court):
concrete pad, court striping,fencing, 2 poles, 1 net, 2 benches, remove 5 trees, remove turf grass, grading
to level area, retaining wall or curb:
*$53,300 - $319,800 for 1-6 courts plus site work,
optional sports court surfacing: +$5,000/court. 18' high sports lights: up to $40,000/court plus $10,000 for
electrical improvements
*All estimated costs are for basic amenities only. A
survey would need to be conducted, along with a
CHILD
DEVELOPMENT conceptual design to determine more accurate costs CENTER E due to the extent of: grading, retaining curbs or low walls, tree removal, noise abatement structure,
PRIVATE PARKING- NO accessible path and other items that may need to be ACCESSIBLE STALLS addressed on a site specific basis.

FOR FIELD AREA
AVIATION PARK OPEN FIELD ANALYSIS:
• Open field is bounded by a public gymnasium, a
child development center, and parking lots for the
adjacent Northrup Grumman complex
• No existing permanent lighting within the field area
other than within parking lots and at buildings
• Parking directly adjacent to open field is privately
owned by Northrup Grumman
There is no accessible parking for open field access
Electrical and water is available at adjacent gym
Existing fitness center has agreement with Northrup
Gumman for parking in private parking lots

PUBLIC GYMASIUM, SITE CONSTRAINTS AND CONSIDERATIONS

EXISTING LOCKER
BUILDING ROOM / SHOWER • If no exterior lighting is provided, court use would BUILDING be limited to daylight hours.
• Accessible parking should be installed including
PRIVATE PARKING- ramp and necessary striping. Approval by Northrup

NO ACCESSIBLE
Grumman would be required

STALLS FOR FIELD
AREA Root damage to parking lot curbs and asphalt from
adjacent mature trees
• Accessible path to new courts would need to be
NEW PICKLEBALL COURT OPPORTUNITY added, but there is ample space for access to all courts, lighting, seating, and other park amenities
EXISTING TURF AREA, NORTH AND EAST OF EXISTING • Noise abatement may be needed near the child SCALE: 1"=60'-0" development center if the noise is distracting to the

BASEBALL FIELDS
Aviation Park Open Field children or they have nap times during the day.

Project Landscape
HIRSCH & ASSOCIATES, INC.

Architect
More To Sea" Pickleball Feasibility Study LS10
redondo City of Redondo Beach, CA
EACH 11/22/21

← All documents from this meeting