MASTER FEE SCHEDULE
Exhibit A - Community Development
Fee Description Dept New Fee
Amount Prior Fee Amount Unit Year Fee
Last Modified Estimated Add'l Annual
Revenue

Planning Division Planning Planning

0. Administrative Design Review

1. Single-Family, Additions, Commercial Remodels, Signs, Etc. No Charge Each 2020

2. New Development Containing 2-3 Units on a Lot 2,360.00 Plus 688.00 Per Unit 2,185.00 Plus 655.00 Per Unit Each 2020

3. Multi-Family Residential 2,360.00 Plus 688.00 Per Unit 2,185.00 Plus 655.00 Per Unit Each 2020

4. Non-Residential Under 10,000 Square Foot Floor Area 5400 5140 Each 2020

5. Non-Residential Over 10,000 Square Foot Floor Area 13560 12915 Each 2020

6. Review of Additions, Overlap Parking and/or Signs1 1145 1090 Each 2020

Appeals

7. Appeal of Decision by Director to Planning Commission2 550 525 Each 2020

8. Appeal of Administrative Design Review/Decision by Director to Planning Commission 550 525 Each 2020

9. Appeal of Administrative Design Review to Planning Commission for New Development Containing 2-3 Units on a Lot 735.00 Plus 735.00 Per Unit (To be Paid by Applicant) 700.00 Plus 700.00 Per Unit (To be Paid by Applicant) Each 2020

10. Appeal of Planning Commission Decision to City Council 25% of Original Application Fee to a Max of 500.00 Each 2020

11. Business License Administrative Appeal 550 525 Each 2020

Change of Land Use District/Zoning Map Amendment

12. Property Outside City's Coastal Zone 5507 5245 Each 2020

13. Property Within City's Coastal Zone 8040 7655 Each 2020

Coastal Development Permit

14. Public Hearing Waiver3 340 325 Each 2020

15. Public Hearing 1605 1530 Each 2020

Conditional Use Permit

16. Category 1 - All Uses Except Multi-Family Residential 3208 3055 Each 2020

17. Category 2 - Multi-Family Residential and Condominium Projects 3,208.00 Plus 1,1345.00 Per Unit 3,055.00 Plus 1,280.00 Per Unit Each 2020

18. Category 3 - Condominium Conversion 3,208.00 Plus 1,1345.00 Per Unit 3,055.00 Plus 1,280.00 Per Unit Each 2020

19. Development Agreement 2,069.00 plus Contract Cost Actual Cost Each 2020 Environmental Review Fees Planning

20. Initial Study and Negative Declaration 2,069.00 plus Contract Cost 1,970.00 plus Contract Cost Each 2020

21. Initial Study and Mitigated Negative Declaration 2,230.00 plus Contract Cost 2,190.00 plus Contract Cost Each 2020

22. Environmental Impact Report (EIR) Actual Cost Each 2020

23. Contract Administration Charge for EIR Consultant 2069 Actual Cost Each 2020

24. Supplemental Fee for Environmental Analysis Based on Prior EIR or Master/Program EIR 1840 1750 Each 2020

Plan Check Fees 4

25. New Development 50% of Building Permit Fee Each 2020

26. Additions of Floor Area to Existing Development 50% of Building Permit Fee Each 2020

27. Commercial Tenant Improvements 10% of Building Permit Fee Each 2022

28. Structures Other Than Buildings (e.g., Fences, Walls, Signs) 115 110 Each 2020

Planned Development Review

29. In Conjunction With Establishment of Overlay Zone5 5507 5245 Each 2020

30. In Conjunction With Establishment of Overlay Zone Within the City's Coastal Zone5 8040 7655 Each 2020

31. Addition/Substantial Alteration to an Existing Development6 1605 1530 Each 2020

Planning Commission Design Review
Review of New Construction

32. Multi-Family Residential 3215 3060 Each 2020

33. Non-Residential Under 10,000 Square Foot Floor Area 3215 3060 Each 2020

34. Non-Residential 10,000 - 49,999 Square Foot Floor Area 12900 12300 Each 2020

35. Non-Residential 50,000 Square Foot or More Floor Area 25800 24600 Each 2020

36. Planning Re-Inspection Fee 230 220 Each 2020

37. Pre-Application Fee 695 Each 2020

Prior Discretionary Approval

38. Amendment 1605 1530 Each 2020

39. Extensions7 688 655 Each 2020
Subdivisions Planning

40. Parcel Map 1605 1530 Each 2020

41. Tract Map 2490 2370 Each 2020

42. Lot Line Adjustment 1605 1530 Each 2020
Other Planning Fees

43. Variance 3200 3060 Each 2020

44. Modification 920 875 Each 2020

45. Administrative Use Permit (AUP) Fee for Personal Improvement Services 1605 1530 Each 2020

46. Wireless Telecommunications Facilities Supplemental Application 3,210.00 Plus 1,335.00 Per Supplemental Application 3,060.00 Plus 1,275.00 Per Supplemental Application Each 2020

47. Zoning Compliance Report 230 220 Each 2020

48. Planning/Zoning Code W/Cover 0.17 0.16 Each 2020

49. Planning/Zoning Code Yearly Supplements 0.17 0.16 Each 2020

50. General Plan 55 52 Each 2020

51. Harbor/Civic Center Specific Plan 18 16 Each 2020

52. Temporary Use Permit 230 220 Each 2020

53. Temporary Use Permit for Watersport Instruction and Equipment Rental 1000 Each/Per Month 2020

54. Temporary Banners - Private Property (Temporary - Does Not Include Deposit) 70 68.00 Plus 200.00 Refundable Deposit Each 2020

Massage Permit Application Fee

55. Business Location 275 265 Each 2020

Entertainment Permit

56. Level I 365 350 Each 2020

57. Level II 805 765 Each 2020

58. Renewal - Level I and Level II 205 195 Each 2020

Tobacco Retail Permits

59. Tobacco Retail Permit 260 250 Each 2020

Preservation Fees Planning

60. Landmark Designation or District Addition No charge Each 2020

61. Certificate of Appropriateness- Restoration or Addition No charge Each 2020

62. Mills Act Contracts No charge Each 2020

63. Historic Variance 2570 2445 Each 2020

64. Certificate of Appropriateness - Demolition or List Removal 5175 4930 Each 2020

Plan and Data Maintenance Fees

65. General Plan 100,000.00 Per Year - 1.70 Per 1,000.00 Valuation Each 2020 ADDITIONAL REVENUE PLANNING 17000

1. Building Division Building Building

Miscellaneous Fees/Charges

1. Address Change 1045 995 Each 2020

2. Certificate of Occupancy Included in Permit Fee Each 2020

3. Certificate of Occupancy (Temporary) Deposit Required as determined by Chief Building Official Included in Permit Fee Each 2020

4. Appeals of Administrative Decision Board of Appeals "Uniform Codes, Disabled Access Appeals Board" 610 580 Each 2020

5. Deputy Inspector Certification Registration 173 165 Each 2020

6. Grading Refundable Bond Each 2020

7. Job Card Replacement 110 105 Each 2020

8. Report of Residential 137 130 Each 2020

9. Report of Residential - Expedited Additional Fee 215 205 Each 2020

10. State Energy Plan Check Fee 25% of Building Check Fee as Allowed by Section 25402.0 of Public Resources Code Each 2020

11. Construction Site Sign 89 85 Each 2020

Inspection Fees

12. Inspection Outside Normal Business Hours (Minimum 2 - Hour Charge) 126 120 Per Hour 2020

13. Re-Inspection Fees Assessed Under Provisions of Section 305(G) 200 190 Flat Rate 2020

14. Inspections for Which No Fee is Indicated (Minimum 1 - Hour Charge) 184 175 Per Hour 2020 Plan Check/Review Fees1

15. Plan Review Fee/Plan Review Revision Fee 100% of Building Permit Fee and for Revisions 137.00 Per Hour 100% of Building Permit Fee and for Revisions 130.00 Per Hour Each 2020

16. Plan and Permit Retention Fee 1.2 Per Page 2020

17. Accelerated Plan Review 50% of Plan Check Fee Each 2020

18. Disability Plan Review and Permit Fees 10% of Building Permit Fee Each 2020

19. 50 Cubic Yards or Less Building 142 135 Each 2020

20. 51 to 100 Cubic Yards 215 205 Each 2020

21. 101 to 1,000 Cubic Yards 357 340 Each 2020

22. 1,001 to 10,000 Cubic Yards 452 430 Each 2020

23. 10,001 to 100,000 Cubic Yards 452.00 for the First 10,000 Cubic Yards Plus 142.00 for Each Addl 10,000 Cubic Yards or Fraction Thereof 430.00 for the First 10,000 Cubic Yards Plus 135.00 for Each Addl 10,000 Cubic Yards or Fraction Thereof Each 2020

24. 100,001 to 200,000 Cubic Yards 1,730.00 for the First 100,000 Cubic Yards Plus 97.00 for Each Addl 10,000 Cubic Yards or Fraction Thereof 1,665.00 for the First 100,000 Cubic Yards Plus 92.00 for Each Addl 10,000 Cubic Yards or Fraction Thereof Each 2020

25. 200,001 Cubic Yards or More 2,700.00 for the First 200,000 Cubic Yards Plus 94.00 for Each Addl 10,000 Cubic Yards or Fraction Thereof 2,500.00 for the First 200,000 Cubic Yards Plus 90.00 for Each Addl 10,000 Cubic Yards or Fraction Thereof Each 2020 Plan Check Fees

26. Electrical Plan Check Fee (1 Hour Minimum) 100% of Electrical Permit Fee or 137.00/Hour 100% of Electrical Permit Fee or 130.00/Hour Each 2020

27. Mechanical Plan Check Fee (1 Hour Minimum) 100% of Mechanical Permit Fee or 137.00/Hour 100% of Electrical Permit Fee or 130.00/Hour Each 2020

28. Plumbing Plan Check Fee (1 Hour Minimum) 100% of Plumbing Permit Fee or 137.00/Hour 100% of Electrical Permit Fee or 130.00/Hour Each 2020

Permits

29. Permit Issuance Fee 11 55 52 Each 2020

30. After Hours Permit 82 78 Each Day 2020

31. Building Moving Permit (Within City, to City or From City) 942 897 Each 2020

Demolition Permit

32. Single Family Building 142 135 Each 2020

33. Accessory Building to Single Family Building 115 110 Each 2020

34. All Other Buildings 198 189 Each 2020

35. Transfer Fee Permit (In Addition to Issuance Fee) 27 26 Each 2020 Building Permits Building
Total Valuation

36. $ 1 to 500 55 52 Each 2020

37. $ 501 to 2,000 55.00 for First 500 + 8.40 for Each Addl 100 or Fraction Thereof 52.00 for First 500 + 8.00 for Each Addl 100 or Fraction Thereof Each 2020

38. $ 2,001 to 25,000 181.00 for First 2,000 + 24.00 for Each Addl 1,000 or Fraction Thereof 160.00 for First 2,000 + 23.00 for Each Addl 1,000 or Fraction Thereof Each 2020

39. $ 25,001 to 50,000 733.00 for First 25,000 + 19.00 for Each Addl 1,000 or Fraction Thereof 685.00 for First 25,000 + 18.00 for Each Addl 1,000 or Fraction Thereof Each 2020

40. $ 50,001 to 100,000 1,208.00 for First 50,000 + 13.65 for Each Addl 1,000 or Fraction Thereof 1,113.00 for First 50,000 + 13.00 for Each Addl 1,000 or Fraction Thereof Each 2020

41. $ 100,001 to 500,000 1,890.50 for First 100,000 + 11.55 for Each Addl 1,000 or Fraction Thereof 1,715.00 for First 100,000 + 11.00 for Each Addl 1,000 or Fraction Thereof Each 2020

42. $ 500,001 and Up 6,510.50 for First 500,000 + 8.40 for Each Addl 1,000 or Fraction Thereof 5,800.00 for First 500,000 + 8.00 for Each Addl 1,000 or Fraction Thereof Each 2020

43. Combination Permit for Residential Owner/Builder When Valuation Is Less Than $20,000.002 No Issuance Fee for Plumbing, Electrical and Mechanical Permits Permit 2020

Electrical Permits

System Fee Schedule
New Residential Buildings

44. Multi-Family (Apts and Condos) - If Building Has Three or More Living Units, Not Including Garage, Carports and Other Non-Commercial Auto Storage Areas Constructed at the Same Time. 0.19 0.18 Per Sq. Ft. 2020

45. Single and Two-Family - If Building Has One or Two Living Units, Not Including Garage, Carport and Other Minor Accessory Constructed at the Same Time. 0.19 0.18 Per Sq. Ft. 2020

46. Others - Other Types of Residential Occupancies and Alterations, Additions and Modifications to Existing Residential Structures. 0.23 0.22 Per Sq. Ft. 2020 Private Swimming Pools Building

47. For New Private, Residential (Single and Multi-Family) In-Ground Pools, Including a Complete System of Necessary Branch Circuit Wiring, Bonding, Grounding, Underwater Lighting, Water Pumping and Related Electrical Equipment. 119 113 Each 2020

48. For Other Types of Swimming Pools, Therapeutic Whirlpools, Spas and Alterations to Existing Swimming Pools. See Unit Fee Schedule See Unit Fee Schedule 2020

49. Solar Electric Panel - Residential 300 286 Each 2020

50. Solar Electric Panel - Commercial 909 866 Each 2020 Carnivals and Circuses3 2020

51. Electric Generators and Electrically Driven Rides 74 70 Each 2020

52. Electrical Lighting for Mechanically Driven Rides and Walk - Through Attractions 17 16 Each 2020

53. Area and Booth Lighting System 17 16 Each 2020

Temporary Power Service

54. Temporary Power Service Pole or Pedestal, Including All Pole or Pedestal Mounted Receptacle Outlets and Appurtenances 47 45 Each 2020

55. Temporary Distribution System and Temporary Lighting and Receptacle Outlets for Construction Sites, Decorative Light, Christmas Tree Sale Lots, Firework Stands, Etc. 23 22 Each 2020

Electrical Permits (Continued)
Power Apparatus4
Items Rating in HP/ KW

56. Up to 1 17 16 Each 2020

57. Over 1 and Not Over 10 42 40 Each 2020

58. Over 11 and Not Over 50 71 68 Each 2020

59. Over 51 and Not Over 100 142 135 Each 2020

60. Over 101 210 200 Each 2020

Items Rating In KVA/KVAR

61. E53 Transformer < 75 KVA 42 40 Each 2020

62. E54 Transformer > 75 KVA 71 68 Each 2020

63. Busways - for Trolley and Plug-in Type Busways5 17 16 Each 2020

Signs, Outline Lighting and Marquees Building Building

64. Supplied From One Branch Circuit 46 44 Each 2020

65. Additional Branch Circuits W/I the Same Sign, Outline Lighting System or Marquee Services 17 16 Each 2020 Services 2020

66. 600 Volts or Less and Not Over 200 Amperes in Rating 55 52 Each 2020

67. 600 Volts or Less and Over 200 Amperes to 1,000 Amperes in Rating 158 150 Each 2020

68. Over 600 Volts or Over 1,000 Amperes in Rating 299 285 Each 2020

69. Miscellaneous Apparatus, Conduits and Conductors for Which a Permit is Required But No Fee is Set Forth. (This Fee is Not Applicable When a Fee is Paid for One or More Services, Outlets, Fixtures, Appliances, Power Apparatus, Busways, Signs or Other Equipment) 36 34 Each 2020

Elevator Permits
New Installations6
Passenger or Freight Elevator, Escalator, Moving Walk

70. Up to and Including $40,000 Valuation 551 525 Each 2020

71. Over $40,000 Valuation 551.00 Plus 9.45 for Each 1,000.00 or Fraction Thereof Over 40,000.00 525.00 Plus 9.00 for Each 1,000.00 or Fraction Thereof Over 40,000.00 Each 2020

Dumbwaiter or Private Residence Elevator

72. Up to and Including $10,000 of Valuation 71 68 Each 2020

73. Over $10,001 Valuation 70.00 Plus 9.50 for Each 1,000.00 or Fraction Thereof Over 10,000.00 68.00 Plus 9.00 for Each 1,000.00 or Fraction Thereof Over 10,000.00 Each 2020

Unit Fee Schedule (The Following Do Not Include Permit Issuance Fees) Lighting Fixtures, Sockets or Other Lamp-Holding Device

74. First 20 3.15 3 Each 2020

75. Additional Fixtures 1.6 1.5 Each 2020

76. Pole or Platform-Mounted Lighting Fixtures 3.15 3 Each 2020

77. Theatrical-Type Lighting Fixtures or Assemblies Each 2020 Receptacle, Switch and Lighting Outlets at Which Current is Used or Controlled- Except Service Feeders and Meters

78. First 20 3.15 3 Each 2020

79. Additional Outlets 7,8 1.6 1.5 Each 2020

80. Residential Appliances or Receptacle Outlets for Same, Including Wall-Mounted Electric Ovens, Ranges, Console or Through-Wall Air Conditioners, Space Heaters, Food Waste Grinders, Dishwashers, Washing Machines, Water Heaters, Clothes Dryers, Etc. (Includes Motor Operated Appliances Not Exceeding 1HP Rating) 17 16 Each 2020

81. Non-Residential Appliances and Self-Contained Factory-Wired, Non-Residential Appliances Not Exceeding 1HP, Kilowatt, or Kilovolt-Ampere in Rating (Includes Medical and Dental Devices; Food, Beverage, and Ice Cream Cabinets; Illuminated Showcases; Drinking Fountains; Vending Machines, Laundry Machines or Other Similar Types of Equipment) 17 16 Each 2020

Grading Permits9

82. 50 Cubic Yards or Less 147 140 Each 2020

83. 51 to 100 Cubic Yards 147 140 Each 2020

84. 101 to 1,000 Cubic Yards 147.00 for the First 100 Cubic Yards Plus 49.00 for Each Addl 100 Cubic Yards or Fraction Thereof 140.00 for the First 100 Cubic Yards Plus 47.00 for Each Addl 100 Cubic Yards or Fraction Thereof Each 2020

85. 1,001 to 10,000 Cubic Yards 588.00 for the First 1,000 Cubic Yards Plus 42.00 for Each Addl 1,000 Cubic Yards or Fraction Thereof 545.00 for the First 1,000 Cubic Yards Plus 40.00 for Each Addl 1,000 Cubic Yards or Fraction Thereof Each 2020

86. 10,001 to 100,000 Cubic Yards 966.00 for the First 10,000 Cubic Yards Plus 40.00 for Each Addl 10,000 Cubic Yards or Fraction Thereof 905.00 for the First 10,000 Cubic Yards Plus 38.00 for Each Addl 10,000 Cubic Yards for Fraction Thereof Each 2020

87. 100,001 or More Cubic Yards 1,326.00 for the first 100,000 cubic yards plus 37.00 for each addl 10,000 cubic yards or fraction thereof 1,247.00 for the first 100,000 cubic yards plus 35.00 for each addl 10,000 cubic yards or fraction thereof Each 2020 Mechanical Permits

System and Unit Schedule

88. Air-Handling Unit, Up to and Including 10,000 Cubic Feet Per Minute, Including Ducts Attached Thereto 10 27 26 Each 2020

89. Air-Handling Unit Over 10,000 CFM 10 36 34 Each 2020

90. Appliance Vent - Installation, Relocation or Replacement, Each and Not Included in an Appliance Permit 18 17 Each 2020

91. Mechanical Exhaust Hood (Type I) 77 73 Each 2020

92. Mechanical Exhaust Hood (Type II) 34 32 Each 2020

93. Miscellaneous Appliances/Equipment/Electric/Gas 18 17 Each 2020

Boiler

94. 400,000 BTU/Hour or More 110 105 Each 2020

95. Less Than 400,000 BTU/Hour 68 65 Each 2020

96. FAU 100,000 BTU or Over 43 41 Each 2020

97. From 3 to 15 HP - 100,000 to 500,000 BTU 100 95 Each 2020

98. Boiler or Compressor13 Over 100,000 BTU/Hour and Including 500,000 BTU/Hour 105 100 Each 2020

99. Boiler or Compressor13 Over 15 HP to and Including 30 HP or Each Absorption System Over 500,000 BTU/Hour Up to and Including 1 Million BTU/Hour 113 108 Each 2020 100. Boiler or Compressor13 Over 30 HP to and Including 50 HP or Each Absorption System Over 1 Million BTU/Hour Up to and Including 1.75 Million BTU/Hour 145 138 Each 2020 101. Boiler or Compressor13 Over 50 HP or Each Absorption System Over 1.75 million BTU 213 203 Each 2020

102. Evaporation Cooler Other Than Portable Type 26 25 Each 2020

103. Furnace (Forced-Air or Gravity-Type)* Including Ducts and Vents Attached to Such Appliance, Up to and Including 100,000 BTU/Hour 49 47 Each 2020 104. Furnace (As Above) Over 100,000 BTU/Hour 68 65 Each 2020 105. Furnace - Including Vent 34 32 Each 2020
106. Heater (Suspended, Recessed Wall or Floor-Mounted Units) 34 32 Each 2020

107. Incinerator - Industrial Type 215 205 Each 2020
108. Repair of, or Alteration or Addition to Each Heating Appliance, Refrigeration Unit, Cooling Unit, Absorption Unit or Evaporative Cooling System, Including Installation of Controls Regulated by This Code 34 32 Each 2020

109. Ventilation Fan Connected to a Single Duct 26 25 Each 2020 110. Ventilation System Which is Not a Portion of Any Heating or Air-Conditioning System Authorized by a Permit 26 25 Each 2020

111. Appliance or Equipment Not Regulated by This Code, But Not Classed in Other Appliance Categories, or for Which no Other Fee is Listed in This Code Building 26 25 Each 2020 Building 112. New Multi-Family 0.2 0.19 Sq. Ft 2020
113. New One or Two Family 0.2 0.19 Sq. Ft 2020
114. Other Residential Addition, Alteration, Etc. 0.26 0.25 Sq. Ft 2020

Plumbing Permits
115. Abandoned Cesspool / Cap Sewer 158 150 Each 2020
116. Automatic Washer 23 22 Each 2020
117. Bar Sink 23 22 Each 2020
118. Bathtub 23 22 Each 2020
119. Bidet 23 22 Each 2020
120. Cesspool (Where Permitted) 119 113 Each 2020
121. Dishwasher (No Permit Required for Repair or Replacement) 23 22 Each 2020 122. Dishwasher - Commercial / Garbage Disposal 32 30 Each 2020 123. Drinking Fountain 23 22 Each 2020
124. Fixture/Trap/Set of Fixtures on One Trap (Including Water, Drainage Piping, and Backflow Protection) 26 25 Each 2020 125. Floor Drain / Floor Sink 23 22 Each 2020
126. Gas Piping System of One to Four Outlets 17 16 Per Outlet 2020 127. Gas Piping System of Five or More Outlets 15 14 Per Outlet 2020 128. Grease Trap / Interceptor / Clarifier 55 52 Each 2020 129. Kitchen Sink / Kitchen Sink With Garbage Disposal 23 22 Each 2020 130. Laundry Tub or Tray 23 22 Each 2020
131. Lavatory 23 22 Each 2020
132. Miscellaneous 23 22 Each 2020
133. Miscellaneous Electric 17 16 Each 2020
134. Pool / Spa / Heater / Filter System 63 60 Each 2020 135. Private Sewer Disposal System 156 149 Each 2020
136. Rainwater Systems (Inside Building) 28 27 Per Drain 2020 137. Repair / Alter Vent Drain Sewer 23 22 Per Drain 2020 138. Repipe Per Fixture - First 10 (Each) 3.15 3 Per Drain 2020 139. Repipe Per Fixture - 11 and Over 1.6 1.5 Per Drain 2020

Sewer Building Building
140. Building and Trailer Park - Each 94 90 Per Drain 2020 141. Disposal System 213 203 Per Drain 2020
142. Ejector 59 56 Per Drain 2020
143. Capping 193 184 Per Drain 2020
144. Shower 23 22 Per Drain 2020
145. Solar Plumbing Fee 71 68 Per Drain 2020
146. Shower Pan Replacement 30 29 Per Drain 2020
147. Sink - Commercial 42 40 Per Drain 2020
148. Sprinkler (Lawn) on Any One Meter, Including Backflow Protection Devices 31 30 Per Drain 2020 149. Urinal 31 30 Per Drain 2020
Vac Breakers
150. Atmospheric - First 10 (Each) 3 2.9 Per Drain 2020 151. Atmospheric - 11 and Over (Each) 1.6 1.5 Per Drain 2020 152. Pressure Type - First 10 (Each) 8 7.5 Per Drain 2020 153. Pressure Type - 11 and Over (Each) 4.75 4.5 Per Drain 2020 154. Reduce Pressure Prin - First 10 (Each) 23 22 Per Drain 2020 155. Reduce Pressure Prin - 11 and Over (Each) 13.5 13 Per Drain 2020 156. Vent Piping and Drainage Repair or Alteration 17 16 Per Fixture 2020 157. Water Closet 23 22 Each 2020
158. Water Heater Replacement 23 22 Each 2020
159. Water Heater (New) 42 40 Each 2020
160. Water Piping and / or Water-Treating Equipment (Installation / Alteration / Repair) 23 22 Each 2020

New Residential Building
161. Multi-Family 0.19 0.18 Sq. Ft. 2020
162. Single Family and Two Family 0.19 0.18 Sq. Ft. 2020 163. Other Residential Alterations, Additions, Etc. 0.22 0.21 Sq. Ft. 2020 SB 1473 Green Building Standards 12
164. $1 - 25,000 of Permit Valuation 1.18 Location 2018 165. $25,001 - 50,000 of Permit Valuation 2.36 Location 2018 166. $50,001 - 75,000 of Permit Valuation 3.54 Location 2018 167. $75,001 - 100,000 of Permit Valuation 4.72 Location 2018 168. Every $25,000 or Fraction Thereof Above $100,000 Add $1 Location 2009 ADDITIONAL REVENUE BUILDING 143000
Total Additional Revenue Community Development 160000
Planning Division
1 Fee Waived for Signs When in Conjunction With a Cup Application - No Longer Needs Planning Commission Review 2 Not Applicable to Appeal of New 2-3 Unit Residential Development 3 If a Public Hearing is Requested, Applicant Must Pay the Balance of the Public Hearing Fee 4 Fee Waived for Zoning Map Amendment and for Planning Commission Design Review 5 Fee Waived for Planning Commission Design Review
6 Fee Credited Toward Other Application Fees If Project Application is Submitted. 7 No Additional Fee Charged for Extensions of Multiple Approvals in Conjunction With the Same Project.

Building Division
1 Additional Plan Review Required By Changes, Additions and/or Revisions to Approved Plans (1/2 Hour Minimum) 2 No Combination Permit Will Be Issued If Construction Starts Without Proper Permit 3 Applies to Carnivals, Circuses or Other Traveling Shows or Exhibitions Using Transportable-Type Rides, Booths, and/or Attractions. 4 Includes Motors Generators, Transformers, Rectifiers, Synchronous Converters, Capacitors, Industrial Heating, Air Conditioning and Heat Pumps, Cooking or Baking Equipment. • for Equipment or Appliances Having More Than One Motor, Transformer, Heater, Etc., the Sum of the Combined Ratings May Be Used. Fees Include Switches, Circuit Breakers Contacts, Thermostats, Relays and Other Directly Related Controls 5 An Additional Fee Will Be Charged for Lighting Fixtures, Motors and Other Appliances That are Connected to Trolley and Plug-In Type Busways. No Fee is Required for Portable Tools. 6 Installation Fees Include the First Year's Annual Inspection Fee and Charges for Electrical Equipment or Conveyance Side of Disconnect Switch 7 For Multi-Outlet Assemblies, Each 5 Feet or Fraction Thereof is Considered as One Outlet 8 For Other Types of Air Conditioners and Other Motor-Driven Appliances With Larger Electrical Ratings, See "Power Apparatus" 9 The Fee for a Grading Permit Authorizing Addional Work to That Under a Valid Permit Shall Be:
• The Difference Between the Fee Paid for the Original Permit and the Fee Shown for the Entire Project or • The Total Cost to the Jurisdiction, Whichever is Greater. • The Cost Shall Include Supervision, Overhead , Equipment, Hourly Wages and Fringe Benefits of the Employees Involved 10 This Fee Shall Not Apply to an Air Handling Unit Which is a Portion of a Factory-Assembled Appliance for Which a Permit is Required Elsewhere in This Code. 11 Permit Issuance Fee charged for each Reactivation of an expired permit 12 Monies Collected By These Fees Will Be submitted to the State of California Except For 10% retained by the City of Redondo Beach for Administrative Charges and For Code Enforcement Education.