Cities Index.
Exhibit A_Proposed Community Development Department Master Fee Schedule - June 2023

Redondo Beach City Council
June 20, 2023

Document
Exhibit A_Proposed Community Development Department Master Fee Schedule - June 2023
Meeting
June 20, 2023
Body
Redondo Beach City Council
Original file
524 KB
Text extracted from the city's file for reading and search. Open the original on redondo.legistar1.com. That file is the official record.

Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue
Planning Division Planning Planning
Administrative Design Review
Single-Family, Additions, Commercial Remodels, Signs, Etc. No Charge Each 2020 New Development Containing 2-3 Units on a Lot 2,360.00 Plus 688.00 Per Unit
2,185.00 Plus 655.00 Per
Unit Each 2020
Multi-Family Residential 2,360.00 Plus 688.00 Per
Unit
2,185.00 Plus 655.00 Per
Unit Each 2020
Non-Residential Under 10,000 Square Foot Floor Area 5,400.00 5,140.00 Each 2020 Non-Residential Over 10,000 Square Foot Floor Area 13,560.00 12,915.00 Each 2020 Review of Additions, Overlap Parking and/or Signs1 1,145.00 1,090.00 Each 2020 Appeals
Appeal of Decision by Director to Planning Commission2 550.00 525.00 Each 2020 Appeal of Administrative Design Review/Decision by Director to Planning Commission 550.00 525.00 Each 2020
Appeal of Administrative Design Review to Planning Commission for New Development Containing 2-3 Units on a Lot
735.00 Plus 735.00 Per Unit
(To be Paid by Applicant)
700.00 Plus 700.00 Per Unit
(To be Paid by Applicant) Each 2020
Appeal of Planning Commission Decision to City Council 25% of Original Application Fee to a Max of 500.00 Each 2020
Business License Administrative Appeal 550.00 525.00 Each 2020 Change of Land Use District/Zoning Map Amendment
Property Outside City's Coastal Zone 5,507.00 5,245.00 Each 2020 Property Within City's Coastal Zone 8,040.00 7,655.00 Each 2020 Coastal Development Permit
Public Hearing Waiver3 340.00 325.00 Each 2020
Public Hearing 1,605.00 1,530.00 Each 2020
Conditional Use Permit
Category 1 - All Uses Except Multi-Family Residential 3,208.00 3,055.00 Each 2020 Category 2 - Multi-Family Residential and Condominium Projects 3,208.00 Plus 1,1345.00 Per Unit
3,055.00 Plus 1,280.00 Per
Unit Each 2020
Category 3 - Condominium Conversion 3,208.00 Plus 1,1345.00 Per Unit
3,055.00 Plus 1,280.00 Per
Unit Each 2020

MASTER FEE SCHEDULE
Exhibit A - Community Development
Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Development Agreement 2,069.00 plus Contract Cost Actual Cost Each 2020 Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Environmental Review Fees Planning
Initial Study and Negative Declaration 2,069.00 plus Contract Cost 1,970.00 plus Contract Cost Each 2020 Initial Study and Mitigated Negative Declaration 2,230.00 plus Contract Cost 2,190.00 plus Contract Cost Each 2020 Environmental Impact Report (EIR) Actual Cost Each 2020 Contract Administration Charge for EIR Consultant 2,069.00 Actual Cost Each 2020 Supplemental Fee for Environmental Analysis Based on Prior EIR or Master/Program EIR 1,840.00 1,750.00 Each 2020
Plan Check Fees 4
New Development 50% of Building Permit Fee Each 2020
Additions of Floor Area to Existing Development 50% of Building Permit Fee Each 2020 Commercial Tenant Improvements 10% of Building Permit Fee Each 2022 Structures Other Than Buildings (e.g., Fences, Walls, Signs) 115.00 110.00 Each 2020 Planned Development Review
In Conjunction With Establishment of Overlay Zone5 5,507.00 5,245.00 Each 2020 In Conjunction With Establishment of Overlay Zone Within the City's Coastal Zone5 8,040.00 7,655.00 Each 2020
Addition/Substantial Alteration to an Existing Development6 1,605.00 1,530.00 Each 2020 Planning Commission Design Review
Review of New Construction
Multi-Family Residential 3,215.00 3,060.00 Each 2020
Non-Residential Under 10,000 Square Foot Floor Area 3,215.00 3,060.00 Each 2020 Non-Residential 10,000 - 49,999 Square Foot Floor Area 12,900.00 12,300.00 Each 2020 Non-Residential 50,000 Square Foot or More Floor Area 25,800.00 24,600.00 Each 2020 Planning Re-Inspection Fee 230.00 220.00 Each 2020
Pre-Application Fee 695.00 Each 2020
Prior Discretionary Approval
Amendment 1,605.00 1,530.00 Each 2020
Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Extensions7 688.00 655.00 Each 2020
Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Subdivisions Planning
Parcel Map 1,605.00 1,530.00 Each 2020
Tract Map 2,490.00 2,370.00 Each 2020
Lot Line Adjustment 1,605.00 1,530.00 Each 2020
Other Planning Fees
Variance 3,200.00 3,060.00 Each 2020
Modification 920.00 875.00 Each 2020
Administrative Use Permit (AUP) Fee for Personal Improvement Services 1,605.00 1,530.00 Each 2020 Wireless Telecommunications Facilities Supplemental Application 3,210.00 Plus 1,335.00 Per Supplemental Application
3,060.00 Plus 1,275.00 Per
Supplemental Application Each 2020
Zoning Compliance Report 230.00 220.00 Each 2020
Planning/Zoning Code W/Cover 0.17 0.16 Each 2020
Planning/Zoning Code Yearly Supplements 0.17 0.16 Each 2020 General Plan 55.00 52.00 Each 2020
Harbor/Civic Center Specific Plan 18.00 16.00 Each 2020 Temporary Use Permit 230.00 220.00 Each 2020
Temporary Use Permit for Watersport Instruction and Equipment Rental 1,000.00 Each/Per Month 2020
Temporary Banners - Private Property (Temporary - Does Not Include Deposit) 70.00 68.00 Plus 200.00 Refundable Deposit Each 2020 Massage Permit Application Fee
Business Location 275.00 265.00 Each 2020
Entertainment Permit
Level I 365.00 350.00 Each 2020
Level II 805.00 765.00 Each 2020
Renewal - Level I and Level II 205.00 195.00 Each 2020
Tobacco Retail Permits
Tobacco Retail Permit 260.00 250.00 Each 2020
Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Preservation Fees Planning
Landmark Designation or District Addition No charge Each 2020 Certificate of Appropriateness- Restoration or Addition No charge Each 2020 Mills Act Contracts No charge Each 2020
Historic Variance 2,570.00 2,445.00 Each 2020
Certificate of Appropriateness - Demolition or List Removal 5,175.00 4,930.00 Each 2020 Plan and Data Maintenance Fees
General Plan 100,000.00 Per Year - 1.70
Per 1,000.00 Valuation Each 2020
Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
$ 17,000
Building Division Building Building
Miscellaneous Fees/Charges
Address Change 1,045.00 995.00 Each 2020
Certificate of Occupancy Included in Permit Fee Each 2020 Certificate of Occupancy (Temporary)
Deposit Required as
determined by Chief Building
Official
Included in Permit Fee Each 2020
Appeals of Administrative Decision Board of Appeals "Uniform Codes, Disabled Access Appeals Board" 610.00 580.00 Each 2020
Deputy Inspector Certification Registration 173.00 165.00 Each 2020 Grading Refundable Bond Each 2020
Job Card Replacement 110.00 105.00 Each 2020
Report of Residential 137.00 130.00 Each 2020
Report of Residential - Expedited Additional Fee 215.00 205.00 Each 2020 State Energy Plan Check Fee
25% of Building Check Fee
as Allowed by Section
25402.0 of Public Resources
Code
Each 2020
Construction Site Sign 89.00 85.00 Each 2020
Inspection Fees
Inspection Outside Normal Business Hours (Minimum 2 - Hour Charge) 126.00 120.00 Per Hour 2020 Re-Inspection Fees Assessed Under Provisions of Section 305(G) 200.00 190.00 Flat Rate 2020 Inspections for Which No Fee is Indicated (Minimum 1 - Hour Charge) 184.00 175.00 Per Hour 2020 Plan Check/Review Fees1
Plan Review Fee/Plan Review Revision Fee
100% of Building Permit Fee
and for Revisions 137.00
Per Hour
100% of Building Permit Fee
and for Revisions 130.00
Per Hour
Each 2020
Plan and Permit Retention Fee 1.20 Per Page 2020
Accelerated Plan Review 50% of Plan Check Fee Each 2020 Disability Plan Review and Permit Fees 10% of Building Permit Fee Each 2020

ADDITIONAL REVENUE PLANNING
Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
50 Cubic Yards or Less Building 142.00 135.00 Each 2020 51 to 100 Cubic Yards 215.00 205.00 Each 2020
101 to 1,000 Cubic Yards 357.00 340.00 Each 2020
1,001 to 10,000 Cubic Yards 452.00 430.00 Each 2020
10,001 to 100,000 Cubic Yards
452.00 for the First 10,000
Cubic Yards Plus 142.00 for
Each Addl 10,000 Cubic
Yards or Fraction Thereof
430.00 for the First 10,000
Cubic Yards Plus 135.00 for
Each Addl 10,000 Cubic
Yards or Fraction Thereof
Each 2020
100,001 to 200,000 Cubic Yards
1,730.00 for the First
100,000 Cubic Yards Plus

97.00 for Each Addl 10,000
Cubic Yards or Fraction
Thereof
1,665.00 for the First
100,000 Cubic Yards Plus

92.00 for Each Addl 10,000
Cubic Yards or Fraction
Thereof
Each 2020
200,001 Cubic Yards or More
2,700.00 for the First
200,000 Cubic Yards Plus

94.00 for Each Addl 10,000
Cubic Yards or Fraction
Thereof
2,500.00 for the First
200,000 Cubic Yards Plus

90.00 for Each Addl 10,000
Cubic Yards or Fraction
Thereof
Each 2020
Plan Check Fees
Electrical Plan Check Fee (1 Hour Minimum) 100% of Electrical Permit Fee or 137.00/Hour
100% of Electrical Permit
Fee or 130.00/Hour Each 2020
Mechanical Plan Check Fee (1 Hour Minimum) 100% of Mechanical Permit Fee or 137.00/Hour
100% of Electrical Permit
Fee or 130.00/Hour Each 2020
Plumbing Plan Check Fee (1 Hour Minimum) 100% of Plumbing Permit Fee or 137.00/Hour
100% of Electrical Permit
Fee or 130.00/Hour Each 2020
Permits
Permit Issuance Fee 11 55.00 52.00 Each 2020
After Hours Permit 82.00 78.00 Each Day 2020
Building Moving Permit (Within City, to City or From City) 942.00 897.00 Each 2020 Demolition Permit
Single Family Building 142.00 135.00 Each 2020
Accessory Building to Single Family Building 115.00 110.00 Each 2020 All Other Buildings 198.00 189.00 Each 2020
Transfer Fee Permit (In Addition to Issuance Fee) 27.00 26.00 Each 2020 Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Building Permits Building
Total Valuation
$ 1 to 500 55.00 52.00 Each 2020
$ 501 to 2,000

55.00 for First 500 + 8.40 for
Each Addl 100 or Fraction
Thereof

52.00 for First 500 + 8.00 for
Each Addl 100 or Fraction
Thereof
Each 2020
$ 2,001 to 25,000
181.00 for First 2,000 +

24.00 for Each Addl 1,000 or
Fraction Thereof
160.00 for First 2,000 +

23.00 for Each Addl 1,000 or
Fraction Thereof
Each 2020
$ 25,001 to 50,000
733.00 for First 25,000 +

19.00 for Each Addl 1,000 or
Fraction Thereof
685.00 for First 25,000 +

18.00 for Each Addl 1,000 or
Fraction Thereof
Each 2020
$ 50,001 to 100,000
1,208.00 for First 50,000 +

13.65 for Each Addl 1,000 or
Fraction Thereof
1,113.00 for First 50,000 +

13.00 for Each Addl 1,000 or
Fraction Thereof
Each 2020
$ 100,001 to 500,000
1,890.50 for First 100,000 +

11.55 for Each Addl 1,000 or
Fraction Thereof
1,715.00 for First 100,000 +

11.00 for Each Addl 1,000 or
Fraction Thereof
Each 2020
$ 500,001 and Up
6,510.50 for First 500,000 +

8.40 for Each Addl 1,000 or
Fraction Thereof
5,800.00 for First 500,000 +

8.00 for Each Addl 1,000 or
Fraction Thereof
Each 2020
Combination Permit for Residential Owner/Builder When Valuation Is Less Than
$20,000.002
No Issuance Fee for
Plumbing, Electrical and
Mechanical Permits
Permit 2020
Electrical Permits
System Fee Schedule
New Residential Buildings
Multi-Family (Apts and Condos) - If Building Has Three or More Living Units, Not Including Garage, Carports and Other Non-Commercial Auto Storage Areas Constructed at the Same Time.

0.19 0.18 Per Sq. Ft. 2020
Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Single and Two-Family - If Building Has One or Two Living Units, Not Including Garage, Carport and Other Minor Accessory Constructed at the Same Time.

0.19 0.18 Per Sq. Ft. 2020
Others - Other Types of Residential Occupancies and Alterations, Additions and Modifications to Existing Residential Structures. 0.23 0.22 Per Sq. Ft. 2020 Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Private Swimming Pools Building
For New Private, Residential (Single and Multi-Family) In-Ground Pools, Including a Complete System of Necessary Branch Circuit Wiring, Bonding, Grounding, Underwater Lighting, Water Pumping and Related Electrical Equipment.
119.00 113.00 Each 2020
For Other Types of Swimming Pools, Therapeutic Whirlpools, Spas and Alterations to Existing Swimming Pools. See Unit Fee Schedule See Unit
Fee
Schedule
2020
Solar Electric Panel - Residential 300.00 286.00 Each 2020 Solar Electric Panel - Commercial 909.00 866.00 Each 2020 Carnivals and Circuses3 2020
Electric Generators and Electrically Driven Rides 74.00 70.00 Each 2020 Electrical Lighting for Mechanically Driven Rides and Walk - Through Attractions 17.00 16.00 Each 2020
Area and Booth Lighting System 17.00 16.00 Each 2020
Temporary Power Service
Temporary Power Service Pole or Pedestal, Including All Pole or Pedestal Mounted Receptacle Outlets and Appurtenances 47.00 45.00 Each 2020 Temporary Distribution System and Temporary Lighting and Receptacle Outlets for Construction Sites, Decorative Light, Christmas Tree Sale Lots, Firework Stands, Etc.

23.00 22.00 Each 2020
Electrical Permits (Continued)
Power Apparatus4
Items Rating in HP/ KW
Up to 1 17.00 16.00 Each 2020
Over 1 and Not Over 10 42.00 40.00 Each 2020
Over 11 and Not Over 50 71.00 68.00 Each 2020
Over 51 and Not Over 100 142.00 135.00 Each 2020
Over 101 210.00 200.00 Each 2020
Items Rating In KVA/KVAR
E53 Transformer < 75 KVA 42.00 40.00 Each 2020
E54 Transformer > 75 KVA 71.00 68.00 Each 2020
Busways - for Trolley and Plug-in Type Busways5 17.00 16.00 Each 2020 Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Signs, Outline Lighting and Marquees Building Building
Supplied From One Branch Circuit 46.00 44.00 Each 2020
Additional Branch Circuits W/I the Same Sign, Outline Lighting System or Marquee Services 17.00 16.00 Each 2020
Services 2020
600 Volts or Less and Not Over 200 Amperes in Rating 55.00 52.00 Each 2020 600 Volts or Less and Over 200 Amperes to 1,000 Amperes in Rating 158.00 150.00 Each 2020 Over 600 Volts or Over 1,000 Amperes in Rating 299.00 285.00 Each 2020 Miscellaneous Apparatus, Conduits and Conductors for Which a Permit is Required But No Fee is Set Forth. (This Fee is Not Applicable When a Fee is Paid for One or More Services, Outlets, Fixtures, Appliances, Power Apparatus, Busways, Signs or Other Equipment)

36.00 34.00 Each 2020
Elevator Permits
New Installations6
Passenger or Freight Elevator, Escalator, Moving Walk
Up to and Including $40,000 Valuation 551.00 525.00 Each 2020 Over $40,000 Valuation
551.00 Plus 9.45 for Each
1,000.00 or Fraction Thereof
Over 40,000.00
525.00 Plus 9.00 for Each
1,000.00 or Fraction Thereof
Over 40,000.00
Each 2020
Dumbwaiter or Private Residence Elevator
Up to and Including $10,000 of Valuation 71.00 68.00 Each 2020 Over $10,001 Valuation

70.00 Plus 9.50 for Each
1,000.00 or Fraction Thereof
Over 10,000.00

68.00 Plus 9.00 for Each
1,000.00 or Fraction Thereof
Over 10,000.00
Each 2020
Unit Fee Schedule (The Following Do Not Include Permit Issuance Fees)
Lighting Fixtures, Sockets or Other Lamp-Holding Device First 20 3.15 3.00 Each 2020
Additional Fixtures 1.60 1.50 Each 2020
Pole or Platform-Mounted Lighting Fixtures 3.15 3.00 Each 2020 Theatrical-Type Lighting Fixtures or Assemblies Each 2020 Receptacle, Switch and Lighting Outlets at Which Current is Used or Controlled- Except Service Feeders and Meters
Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
First 20 3.15 3.00 Each 2020
Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Additional Outlets 7,8 1.60 1.50 Each 2020
Residential Appliances or Receptacle Outlets for Same, Including WallMounted Electric Ovens, Ranges, Console or Through-Wall Air Conditioners, Space Heaters, Food Waste Grinders, Dishwashers, Washing Machines, Water Heaters, Clothes Dryers, Etc. (Includes Motor Operated Appliances Not Exceeding 1HP Rating)

17.00 16.00 Each 2020
Non-Residential Appliances and Self-Contained Factory-Wired, NonResidential Appliances Not Exceeding 1HP, Kilowatt, or Kilovolt-Ampere in Rating (Includes Medical and Dental Devices; Food, Beverage, and Ice Cream Cabinets; Illuminated Showcases; Drinking Fountains; Vending Machines, Laundry Machines or Other Similar Types of Equipment)

17.00 16.00 Each 2020
Grading Permits9
50 Cubic Yards or Less 147.00 140.00 Each 2020
51 to 100 Cubic Yards 147.00 140.00 Each 2020
101 to 1,000 Cubic Yards
147.00 for the First 100
Cubic Yards Plus 49.00 for
Each Addl 100 Cubic Yards
or Fraction Thereof
140.00 for the First 100
Cubic Yards Plus 47.00 for
Each Addl 100 Cubic Yards
or Fraction Thereof
Each 2020
1,001 to 10,000 Cubic Yards
588.00 for the First 1,000
Cubic Yards Plus 42.00 for
Each Addl 1,000 Cubic
Yards or Fraction Thereof
545.00 for the First 1,000
Cubic Yards Plus 40.00 for
Each Addl 1,000 Cubic
Yards or Fraction Thereof
Each 2020
10,001 to 100,000 Cubic Yards
966.00 for the First 10,000
Cubic Yards Plus 40.00 for
Each Addl 10,000 Cubic
Yards or Fraction Thereof
905.00 for the First 10,000
Cubic Yards Plus 38.00 for
Each Addl 10,000 Cubic
Yards for Fraction Thereof
Each 2020
100,001 or More Cubic Yards
1,326.00 for the first 100,000
cubic yards plus 37.00 for
each addl 10,000 cubic
yards or fraction thereof
1,247.00 for the first 100,000
cubic yards plus 35.00 for
each addl 10,000 cubic
yards or fraction thereof
Each 2020
Mechanical Permits
System and Unit Schedule
Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Air-Handling Unit, Up to and Including 10,000 Cubic Feet Per Minute, Including Ducts Attached Thereto 10 27.00 26.00 Each 2020 Air-Handling Unit Over 10,000 CFM 10 36.00 34.00 Each 2020 Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Appliance Vent - Installation, Relocation or Replacement, Each and Not Included in an Appliance Permit 18.00 17.00 Each 2020
Mechanical Exhaust Hood (Type I) 77.00 73.00 Each 2020
Mechanical Exhaust Hood (Type II) 34.00 32.00 Each 2020 Miscellaneous Appliances/Equipment/Electric/Gas 18.00 17.00 Each 2020 Boiler
400,000 BTU/Hour or More 110.00 105.00 Each 2020
Less Than 400,000 BTU/Hour 68.00 65.00 Each 2020
FAU 100,000 BTU or Over 43.00 41.00 Each 2020
From 3 to 15 HP - 100,000 to 500,000 BTU 100.00 95.00 Each 2020 Boiler or Compressor13 Over 100,000 BTU/Hour and Including 500,000 BTU/Hour 105.00 100.00 Each 2020
Boiler or Compressor13 Over 15 HP to and Including 30 HP or Each Absorption System Over 500,000 BTU/Hour Up to and Including 1 Million BTU/Hour
113.00 108.00 Each 2020
Boiler or Compressor13 Over 30 HP to and Including 50 HP or Each Absorption System Over 1 Million BTU/Hour Up to and Including 1.75 Million BTU/Hour
145.00 138.00 Each 2020
Boiler or Compressor13 Over 50 HP or Each Absorption System Over 1.75 million BTU 213.00 203.00 Each 2020
Evaporation Cooler Other Than Portable Type 26.00 25.00 Each 2020 Furnace (Forced-Air or Gravity-Type)* Including Ducts and Vents Attached to Such Appliance, Up to and Including 100,000 BTU/Hour 49.00 47.00 Each 2020 Furnace (As Above) Over 100,000 BTU/Hour 68.00 65.00 Each 2020 Furnace - Including Vent 34.00 32.00 Each 2020
Heater (Suspended, Recessed Wall or Floor-Mounted Units) 34.00 32.00 Each 2020 Incinerator - Industrial Type 215.00 205.00 Each 2020
Repair of, or Alteration or Addition to Each Heating Appliance, Refrigeration Unit, Cooling Unit, Absorption Unit or Evaporative Cooling System, Including Installation of Controls Regulated by This Code

34.00 32.00 Each 2020
Ventilation Fan Connected to a Single Duct 26.00 25.00 Each 2020 Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Ventilation System Which is Not a Portion of Any Heating or Air-Conditioning System Authorized by a Permit 26.00 25.00 Each 2020
Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Appliance or Equipment Not Regulated by This Code, But Not Classed in Other Appliance Categories, or for Which no Other Fee is Listed in This Code
Building 26.00 25.00 Each 2020 Building
New Multi-Family 0.20 0.19 Sq. Ft 2020
New One or Two Family 0.20 0.19 Sq. Ft 2020
Other Residential Addition, Alteration, Etc. 0.26 0.25 Sq. Ft 2020 Plumbing Permits
Abandoned Cesspool / Cap Sewer 158.00 150.00 Each 2020
Automatic Washer 23.00 22.00 Each 2020
Bar Sink 23.00 22.00 Each 2020
Bathtub 23.00 22.00 Each 2020
Bidet 23.00 22.00 Each 2020
Cesspool (Where Permitted) 119.00 113.00 Each 2020
Dishwasher (No Permit Required for Repair or Replacement) 23.00 22.00 Each 2020 Dishwasher - Commercial / Garbage Disposal 32.00 30.00 Each 2020 Drinking Fountain 23.00 22.00 Each 2020
Fixture/Trap/Set of Fixtures on One Trap (Including Water, Drainage Piping, and Backflow Protection) 26.00 25.00 Each 2020
Floor Drain / Floor Sink 23.00 22.00 Each 2020
Gas Piping System of One to Four Outlets 17.00 16.00 Per Outlet 2020 Gas Piping System of Five or More Outlets 15.00 14.00 Per Outlet 2020 Grease Trap / Interceptor / Clarifier 55.00 52.00 Each 2020 Kitchen Sink / Kitchen Sink With Garbage Disposal 23.00 22.00 Each 2020 Laundry Tub or Tray 23.00 22.00 Each 2020
Lavatory 23.00 22.00 Each 2020
Miscellaneous 23.00 22.00 Each 2020
Miscellaneous Electric 17.00 16.00 Each 2020
Pool / Spa / Heater / Filter System 63.00 60.00 Each 2020 Private Sewer Disposal System 156.00 149.00 Each 2020
Rainwater Systems (Inside Building) 28.00 27.00 Per Drain 2020 Repair / Alter Vent Drain Sewer 23.00 22.00 Per Drain 2020 Repipe Per Fixture - First 10 (Each) 3.15 3.00 Per Drain 2020 Repipe Per Fixture - 11 and Over 1.60 1.50 Per Drain 2020 Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
Sewer Building Building
Building and Trailer Park - Each 94.00 90.00 Per Drain 2020 Disposal System 213.00 203.00 Per Drain 2020
Ejector 59.00 56.00 Per Drain 2020
Capping 193.00 184.00 Per Drain 2020
Shower 23.00 22.00 Per Drain 2020
Solar Plumbing Fee 71.00 68.00 Per Drain 2020
Shower Pan Replacement 30.00 29.00 Per Drain 2020
Sink - Commercial 42.00 40.00 Per Drain 2020
Sprinkler (Lawn) on Any One Meter, Including Backflow Protection Devices 31.00 30.00 Per Drain 2020 Urinal 31.00 30.00 Per Drain 2020
Vac Breakers
Atmospheric - First 10 (Each) 3.00 2.90 Per Drain 2020
Atmospheric - 11 and Over (Each) 1.60 1.50 Per Drain 2020 Pressure Type - First 10 (Each) 8.00 7.50 Per Drain 2020 Pressure Type - 11 and Over (Each) 4.75 4.50 Per Drain 2020 Reduce Pressure Prin - First 10 (Each) 23.00 22.00 Per Drain 2020 Reduce Pressure Prin - 11 and Over (Each) 13.50 13.00 Per Drain 2020 Vent Piping and Drainage Repair or Alteration 17.00 16.00 Per Fixture 2020 Water Closet 23.00 22.00 Each 2020
Water Heater Replacement 23.00 22.00 Each 2020
Water Heater (New) 42.00 40.00 Each 2020
Water Piping and / or Water-Treating Equipment (Installation / Alteration / Repair) 23.00 22.00 Each 2020
New Residential Building
Multi-Family 0.19 0.18 Sq. Ft. 2020
Single Family and Two Family 0.19 0.18 Sq. Ft. 2020
Other Residential Alterations, Additions, Etc. 0.22 0.21 Sq. Ft. 2020 SB 1473 Green Building Standards 12
$1 - 25,000 of Permit Valuation 1.18 Location 2018
$25,001 - 50,000 of Permit Valuation 2.36 Location 2018 $50,001 - 75,000 of Permit Valuation 3.54 Location 2018 $75,001 - 100,000 of Permit Valuation 4.72 Location 2018 Every $25,000 or Fraction Thereof Above $100,000 Add $1 Location 2009 Fee Description Dept New Fee
Amount
Prior Fee Amount Unit Year Fee
Last
Modified
Estimated Add'l
Annual
Revenue

MASTER FEE SCHEDULE
Exhibit A - Community Development
$ 143,000
$ 160,000
Planning Division
1 Fee Waived for Signs When in Conjunction With a Cup Application - No Longer Needs Planning Commission Review 2 Not Applicable to Appeal of New 2-3 Unit Residential Development 3 If a Public Hearing is Requested, Applicant Must Pay the Balance of the Public Hearing Fee 4 Fee Waived for Zoning Map Amendment and for Planning Commission Design Review 5 Fee Waived for Planning Commission Design Review
6 Fee Credited Toward Other Application Fees If Project Application is Submitted. 7 No Additional Fee Charged for Extensions of Multiple Approvals in Conjunction With the Same Project.

Building Division
1 Additional Plan Review Required By Changes, Additions and/or Revisions to Approved Plans (1/2 Hour Minimum) 2 No Combination Permit Will Be Issued If Construction Starts Without Proper Permit 3 Applies to Carnivals, Circuses or Other Traveling Shows or Exhibitions Using Transportable-Type Rides, Booths, and/or Attractions. 4 Includes Motors Generators, Transformers, Rectifiers, Synchronous Converters, Capacitors, Industrial Heating, Air Conditioning and Heat Pumps, Cooking or Baking Equipment. • for Equipment or Appliances Having More Than One Motor, Transformer, Heater, Etc., the Sum of the Combined Ratings May Be Used. Fees Include Switches, Circuit Breakers Contacts, Thermostats, Relays and Other Directly Related Controls 5 An Additional Fee Will Be Charged for Lighting Fixtures, Motors and Other Appliances That are Connected to Trolley and Plug-In Type Busways. No Fee is Required for Portable Tools. 6 Installation Fees Include the First Year's Annual Inspection Fee and Charges for Electrical Equipment or Conveyance Side of Disconnect Switch 7 For Multi-Outlet Assemblies, Each 5 Feet or Fraction Thereof is Considered as One Outlet 8 For Other Types of Air Conditioners and Other Motor-Driven Appliances With Larger Electrical Ratings, See "Power Apparatus" 9 The Fee for a Grading Permit Authorizing Addional Work to That Under a Valid Permit Shall Be:
• The Difference Between the Fee Paid for the Original Permit and the Fee Shown for the Entire Project or • The Total Cost to the Jurisdiction, Whichever is Greater. • The Cost Shall Include Supervision, Overhead , Equipment, Hourly Wages and Fringe Benefits of the Employees Involved 10 This Fee Shall Not Apply to an Air Handling Unit Which is a Portion of a Factory-Assembled Appliance for Which a Permit is Required Elsewhere in This Code. 11 Permit Issuance Fee charged for each Reactivation of an expired permit 12 Monies Collected By These Fees Will Be submitted to the State of California Except For 10% retained by the City of Redondo Beach for Administrative Charges and For Code Enforcement Education.

Total Additional Revenue Community Development

ADDITIONAL REVENUE BUILDING

1.

← All documents from this meeting