Jurisidiction Name
Reporting Calendar Year
First Name
Last Name
Title
Email
Phone
Street Address
City
Zipcode
415 Diamond St.
Redondo Beach
90277
Sean
Scully
Acting Community Development Director
[email protected]
3103180637
Mailing Address
Please Start Here
General Information
2023
Redondo Beach
Contact Information
Optional: Click here to import last year's data. This is best used when the workbook is new and empty. You will be prompted to pick an old workbook to import from. Project and program data will be copied exactly how it was entered in last year's form and must be updated. If a project is no longer has any reportable activity, you may delete the project by selecting a cell in the row and typing ctrl + d.
Click here to download APR Instructions
Annual Progress Report January 2020
Jurisdiction Redondo Beach
Reporting Year 2023
Housing Element Planning Period 6th Cycle
Current Year
Deed Restricted 0
Non-Deed
Restricted 8
Deed Restricted 0
Non-Deed
Restricted 21
Deed Restricted 0
Non-Deed
Restricted 3
123
155
Units by Structure Type Entitled Permitted Completed
Single-family Attached 50 37 13
Single-family Detached 18 69 26
2 to 4 units per structure 0 0 0
5+ units per structure 0 0 0
Accessory Dwelling Unit 0 47 1
Mobile/Manufactured Home 0 2 0
Total 68 155 40
Infill Housing Developments and Infill Units Permitted # of Projects Units 114 155
0 0
106
169
120
0 0
0 (Jan. 1 - Dec. 31)
10/15/2021 - 10/15/2029
Number of SB 35 Streamlining Applications Approved
Very Low
Low
Moderate
Total Housing Applications Submitted:
Number of Proposed Units in All Applications Received:
Total Housing Units Approved:
Total Housing Units Disapproved:
Total Units
Housing Applications Summary
Use of SB 35 Streamlining Provisions - Applications
Note: Units serving extremely low-income households are included in the very low-income permitted units totals Number of SB 35 Streamlining Applications
Above Moderate
Indicated as Infill
Not Indicated as Infill
Building Permits Issued by Affordability Summary
Income Level
Income Rental Ownership Total
Very Low 0 0 0
Low 0 0 0
Moderate 0 0 0
Above Moderate 0 0 0
Total 0 0 0
Streamlining Provisions Used - Permitted Units # of Projects Units SB 9 (2021) - Duplex in SF Zone 0 0
SB 9 (2021) - Residential Lot Split 0 0
AB 2011 (2022) 0 0
SB 6 (2022) 0 0
SB 35 (2017) 0 0
Ministerial and Discretionary Applications # of Applications Units Ministerial 83 85
Discretionary 23 84
Density Bonus Applications and Units Permitted
Number of Applications Submitted Requesting a Density Bonus 0 Number of Units in Applications Submitted Requesting a Density Bonus 0 Number of Projects Permitted with a Density Bonus 0
Number of Units in Projects Permitted with a Density Bonus 0 Housing Element Programs Implemented and Sites Rezoned Count 18 0
Programs Implemented
Sites Rezoned to Accommodate the RHNA
Units Constructed - SB 35 Streamlining Permits
Jurisdiction Redondo Beach ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Date
Application
Submitted
Total
Approved
Units by
Project
Total
Disapproved
Units by
Project
Streamlining Application
Status Project Type Notes
2 3 4 6 7 8 9 11 12 13
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Date
Application
Submitted
(see
instructions)
Very LowIncome Deed
Restricted
Very LowIncome Non
Deed
Restricted
Low-Income
Deed
Restricted
Low-Income
Non Deed
Restricted
ModerateIncome
Deed
Restricted
ModerateIncome
Non Deed
Restricted
Above
ModerateIncome
Total PROPOSED
Units by Project
Total
APPROVED
Units by project
Total
DISAPPROVED
Units by Project
Please select
streamlining
provision/s the
application was
submitted pursuant
to.
Did the housing
development
application seek
incentives or
concessions
pursuant to
Government Code
section 65915?
Were incentives
or concessions
reqested
pursuant to
Government
Code section
65915
approved?
Please indicate
the status of the
application.
Is the project
considered a
ministerial
project or
discretionary
project?
Notes+
Summary Row: Start Data Entry Below 0 8 4 20 0 3 134 169 120 0 7502003005 707 NORTH LUCIA AVE 20230091 SFD O 01/10/2023 2 2 2 NONE No N/A Approved Discretionary 4158001001 1107 MACKAY LN 20230421 SFA O 02/17/2023 2 2 2 NONE No N/A Pending Discretionary 4150008035 3401 VAIL AVE 20230422 SFA O 02/17/2023 2 2 2 NONE No N/A Pending Discretionary 4155012018 1904 GATES AVE 20230814 SFD O 04/04/2023 2 2 2 NONE No N/A Pending Discretionary 4155009011 2206 GATES AVE 20231078 SFD O 05/08/2023 2 2 2 NONE No N/A Pending Discretionary 4158016015 2511 190TH ST 20231081 SFD O 05/08/2023 2 2 2 NONE No N/A Pending Discretionary 4159002011 2102 MARSHALLFIELD LN 20231370 SFA O 06/13/2023 2 2 2 NONE No N/A Pending Discretionary 4082009014 2701 ROCKEFELLER LN 20231377 SFA O 06/13/2023 3 3 3 NONE No N/A Pending Discretionary 4153006015 2405 MATHEWS AVE 20231378 SFA O 06/13/2023 3 3 3 NONE No N/A Pending Discretionary 7502026005 607 NORTH LUCIA AVE 20231379 SFD O 06/13/2023 2 2 2 NONE No N/A Pending Discretionary 4153031006 2701 RUHLAND AVE 20232033 SFA O 08/31/2023 3 3 3 NONE No N/A Pending Discretionary 4150019003 2016 FARRELL AVE 20232106 SFA O 09/13/2023 2 2 NONE No N/A Pending Discretionary 7508009004 627 SOUTH BROADWAY 20232118 SFD O 09/14/2023 2 2 NONE No N/A Pending Discretionary 4160001011 1802 SPEYER LN 20232120 SFD O 09/14/2023 2 2 NONE No N/A Pending Discretionary 7502025005 520 NORTH LUCIA AVE 20232330 SFD O 10/10/2023 2 2 NONE No N/A Pending Discretionary 4153025001 2622 CURTIS AVE 20232637 SFA O 11/14/2023 3 3 NONE No N/A Pending Discretionary 4155030001 2022 MATHEWS AVE 20232841 SFA O 12/12/2023 3 3 NONE No N/A Pending Discretionary 7503022011 621 NORTH JUANITA AVE 20232847 SFD O 12/12/2023 2 2 NONE No N/A Pending Discretionary 4161003013 1800 MARSHALLFIELD LN 20232850 SFD O 12/12/2023 2 2 NONE No N/A Pending Discretionary 4153031024 2707 RUHLAND AVE 20231456 SFA O 06/21/2023 3 3 3 NONE No N/A Pending Discretionary 7509025029 1308 SOUTH IRENA AVE 20231137 SFD O 05/16/2023 2 2 2 SB 9 (2021) - Residential Lot
Split
No N/A Approved Discretionary
7505013035 303 GARNET ST 20231476 2 to 4 O 06/22/2023 4 4 4 NONE No N/A Pending Discretionary 7505005012 100 NORTH CATALINA AVE 20231929 5+ R 08/17/2023 4 28 32 32 NONE No N/A Approved Discretionary 7510026001 400 AVE E 20230561 SFD O 03/08/2023 1 1 1 NONE No N/A Pending Ministerial 4158013009 2406 ALVORD LN 20230736 SFD O 03/27/2023 1 1 1 NONE No N/A Pending Ministerial 7502022024 613 NORTH PAULINA AVE 20230747 SFD O 03/29/2023 1 1 1 NONE No N/A Pending Ministerial Table A
Cells in grey contain auto-calculation formulas
1 5
Project Identifier Unit Types Proposed Units - Affordability by Household Incomes Density Bonus Law Applications
10 Housing Development Applications Submitted
4158019010 2518 SPRECKELS LN 20230810 SFD
O 04/04/2023111 NONE No N/A Pending Ministerial
7510018004 508 AVE D 20230933 SFD
O 04/19/2023111 NONE No N/A Pending Ministerial
7511006016 204 AVE G 20230980 SFD
O 04/26/2023111 NONE No N/A Pending Ministerial
4162025013 1801 GOODMAN AVE 20231005 SFD
O 04/27/2023111 NONE No N/A Pending Ministerial
4162025013 1803 GOODMAN AVE 20231006 SFD
O 04/27/2023111 NONE No N/A Pending Ministerial
7509021018 705 AVE D 20231224 SFD
O 05/24/2023111 NONE No N/A Pending Ministerial
7510024008 1339 SOUTH GERTRUDA AVE 20231416 SFD
O 06/20/2023111 NONE No N/A Pending Ministerial
7502021007 516 NORTH PAULINA AVE 20231487 SFD
O 06/23/2023111 NONE No N/A Pending Ministerial
7502020009 614 NORTH PAULINA AVE 20231521 SFD
O 06/29/2023111 NONE No N/A Pending Ministerial
4162027024 1737 GOODMAN AVE 20231551 SFD
O 07/03/2023111 NONE No N/A Pending Ministerial
4162027024 1739 GOODMAN AVE 20231552 SFD
O 07/03/2023111 NONE No N/A Pending Ministerial
4159024010 2126 HAVEMEYER LN 20231628 SFD
O 07/13/2023111 NONE No N/A Pending Ministerial
7510012012 346 AVE E 20231692 SFD
O 07/20/2023111 NONE No N/A Pending Ministerial
4150019022 2021 ERNEST AVE 20231701 SFD
O 07/21/2023111 NONE No N/A Pending Ministerial
7503024014 524 NORTH HELBERTA AVE 20231772 SFD
O 08/01/2023111 NONE No N/A Pending Ministerial
7510017017 1204 SOUTH GERTRUDA AVE 20231864 SFD
O 08/10/2023111 NONE No N/A Pending Ministerial
7508025022 641 SOUTH GERTRUDA AVE 20231889 SFD
O 08/14/2023111 NONE No N/A Pending Ministerial
4159022022 524 CLUSTER LN 20232092 SFD
O 09/12/202311 NONE No N/A Pending Ministerial
7506014011 203 SOUTH JUANITA AVE 20232293 SFD
O 10/05/202311 NONE No N/A Pending Ministerial
7509021023 715 AVE D 20232297 SFD
O 10/05/202311 NONE No N/A Pending Ministerial
4184002022 1819 STANFORD AVE 20232394 SFD
O 10/18/202311 NONE No N/A Pending Ministerial
4184002022 1821 STANFORD AVE 20232395 SFD
O 10/18/202311 NONE No N/A Pending Ministerial
4158011002 2345 190TH ST 20232444 SFD
O 10/24/202311 NONE No N/A Pending Ministerial
7507001004 607 SAPPHIRE ST 20232464 SFD
O 10/26/202311 NONE No N/A Pending Ministerial
4151017004 2612 159TH ST 20232564 SFD
O 11/07/202311 NONE No N/A Pending Ministerial
7506022076 313 SOUTH PROSPECT AVE 20232606 SFD
O 11/09/202311 NONE No N/A Pending Ministerial
7506014012 201 SOUTH JUANITA AVE 20232618 SFD
O 11/13/202311 NONE No N/A Pending Ministerial
4158009006 2316 RALSTON LN 20232779 SFD
O 12/05/202311 NONE No N/A Pending Ministerial
7507016007 812 PEARL ST 20232848 SFD
O 12/12/202311 NONE No N/A Pending Ministerial
4153015010 2500 PHELAN LN 20232898 SFD
O 12/21/202311 NONE No N/A Pending Ministerial
4153015010 2501 CURTIS AVE 20232899 SFD
O 12/21/202311 NONE No N/A Pending Ministerial
4155028016 2106 AVIATION WAY 20232911 SFD
O 12/21/202311 NONE No N/A Pending Ministerial
4160009029 1733 ARMOUR LN 20232414 SFD
O 10/19/2023111 NONE No N/A Approved Ministerial
4160009030 1735 ARMOUR LN 20232415 SFD
O 10/19/2023111 NONE No N/A Approved Ministerial
4158011002 2345 190TH ST 20232445 MH
O 10/24/202311 NONE No N/A Approved Ministerial
7509028030 1064 AVE C 20230128 ADU
R 01/17/2023111 NONE No N/A Pending Ministerial
4083026010 2700 184TH ST 20230234 ADU
R 01/30/2023111 NONE No N/A Pending Ministerial
4153008023 2421 RUHLAND AVE 20230410 ADU
R 02/16/2023111 NONE No N/A Pending Ministerial
7502004037 835 NORTH MARIA AVE 20230458 ADU
R 02/23/2023111 NONE No N/A Pending Ministerial
4151017016 2609 160TH ST 20230466 ADU
R 02/27/2023111 NONE No N/A Pending Ministerial
4158032017 2607 183RD ST 20230511 ADU
R 03/01/2023111 NONE No N/A Pending Ministerial
7502021007 516 NORTH PAULINA AVE 20230665 ADU
R 03/20/2023111 NONE No N/A Pending Ministerial
4082016005 1813 FIRMONA AVE 20230671 ADU
R 03/21/2023111 NONE No N/A Pending Ministerial
7507024055 616 FAYE LN 20230753 ADU
R 03/29/2023111 NONE No N/A Pending Ministerial
4157004009 2201 VANDERBILT LN 20230821 ADU
R 04/05/2023111 NONE No N/A Pending Ministerial
4151003008 2842 MAY AVE 20230908 ADU
R 04/14/2023111 NONE No N/A Pending Ministerial
7502023021 521 NORTH PAULINA AVE 20231026 ADU
R 05/02/2023111 NONE No N/A Pending Ministerial
4159017024 705 GREEN LN A 20231177 ADU
R 05/22/2023111 NONE No N/A Pending Ministerial
4151009016 2401 HAWKINS AVE 20231229 ADU
R 05/25/2023111 NONE No N/A Pending Ministerial
7508008026 719 SOUTH BROADWAY 20231444 ADU
R 06/20/2023111 NONE No N/A Pending Ministerial
7510017011 1211 SOUTH HELBERTA AVE 20231490 ADU
R 06/26/2023111 NONE No N/A Pending Ministerial
7509021017 703 AVE D 20231549 ADU
R 07/03/2023111 NONE No N/A Pending Ministerial
7509026028 1438 SOUTH IRENA AVE 20231741 ADU
R 07/27/2023111 NONE No N/A Pending Ministerial
4082003010 2602 CARNEGIE LN 4 20231744 ADU
R 07/27/2023222 NONE No N/A Pending Ministerial
4151026019 2607 ROBINSON ST 20231751 ADU
R 07/27/2023111 NONE No N/A Pending Ministerial
4158023017 2507 FISK LN 20232011 ADU
R 08/29/2023111 NONE No N/A Pending Ministerial
4155001019 2205 GRAHAM AVE 20232029 ADU
R 08/30/2023111 NONE No N/A Pending Ministerial
7509021020 709 AVE D 20232193 ADU
R 09/21/202311 NONE No N/A Pending Ministerial
4158015009 506 PHELAN LN 20232400 ADU
R 10/18/202311 NONE No N/A Pending Ministerial
4162033005 1528 STANFORD AVE 20232558 ADU
R 11/07/202311 NONE No N/A Pending Ministerial
7509013028 721 AVE A 20232821 ADU
R 12/07/202311 NONE No N/A Pending Ministerial
4161021021 1105 STANFORD AVE A 20232831 ADU
R 12/08/202311 NONE No N/A Pending Ministerial
7509027011 1014 AVE D 20232910 ADU
R 12/21/202311 NONE No N/A Pending Ministerial
4155032010 2212 MATHEWS AVE 20230704 ADU
R 03/23/2023111 NONE No N/A Pending Ministerial
4153026026 2603 CURTIS AVE 20231711 ADU
R 07/24/2023111 NONE No N/A Pending Ministerial
4153026026 2603 CURTIS AVE 20231712 ADU
R 07/24/2023111 NONE No N/A Pending Ministerial
4153031024 2707 RUHLAND AVE 20232206 ADU
R 09/26/2023222 NONE No N/A Pending Ministerial
7509021018 705 AVE D 20231224 ADU
R 05/24/2023111 NONE No N/A Pending Ministerial
7506014011 203 SOUTH JUANITA AVE 20232293 ADU
R 10/05/202311 NONE No N/A Pending Ministerial
4158009006 2316 RALSTON LN 20232779 ADU
R 12/05/202311 NONE No N/A Pending Ministerial
4155028016 2106 AVIATION WAY 20232911 ADU
R 12/21/202311 NONE No N/A Pending Ministerial
4083021023 2721 ARMOUR LN 20230923 ADU
R 04/18/2023111 NONE No N/A Approved Ministerial
4160016020 1642 HAVEMEYER LN 20231173 ADU
R 05/18/2023111 NONE No N/A Pending Ministerial
4161020002 1120 STANFORD AVE 20232076 ADU
R 09/07/202311 NONE No N/A Pending Ministerial
4155004006 1924 ROBINSON ST 20232101 ADU
R 09/13/202311 NONE No N/A Pending Ministerial
4158020005 2508 FISK LN 20232244 ADU
R 09/29/202311 NONE No N/A Pending Ministerial
7509003022 910 SOUTH CATALINA AVE 20232671 ADU
R 11/16/202311 NONE No N/A Pending Ministerial
4157027025 2323 CLARK LN 20232859 ADU
R 12/14/202311 NONE No N/A Pending Ministerial
7508008018 703 SOUTH BROADWAY 20232879 ADU
R 12/19/202311 NONE No N/A Pending Ministerial
4158016013 2515 190TH ST 20230375 ADU
R 02/14/2023111 NONE No N/A Pending Ministerial
Jurisdiction Redondo Beach ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Table A2
Streamlining Infill
Housing without
Financial Assistance or
Deed Restrictions
Term of
Affordability or
Deed Restriction
Notes
2 3 5 6 8 9 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very LowIncome Deed
Restricted
Very LowIncome Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
ModerateIncome Deed
Restricted
ModerateIncome Non
Deed
Restricted
Above
ModerateIncome
Entitlement
Date Approved # of Units issued
Entitlements
Very LowIncome Deed
Restricted
Very LowIncome Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
ModerateIncome Deed
Restricted
ModerateIncome Non
Deed
Restricted
Above
ModerateIncome
Building Permits
Date Issued
# of Units Issued
Building Permits
Very LowIncome Deed
Restricted
Very LowIncome Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
ModerateIncome
Deed
Restricted
ModerateIncome Non
Deed
Restricted
Above
ModerateIncome
Certificates of
Occupancy or other
forms of readiness
(see instructions)
Date Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of
the units were
Extremely Low
Income?
Please select the
streamlining
provision the
project was
APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select
multiple - see
instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/De
stroyed Units
Owner or
Renter
Total Density Bonus Applied
to the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Summary Row: Start Data Entry Below 3 0 0 0 1 0 64 68 0 8 0 21 0 3 123 155 0 0 0 0 0 0 40 40 0 53 7505005012 100 NORTH CATALINA AVE 20231929
SFA O 3 1 28 3/23/2023
32 0 0 0 NONE Y Other DB N/A 0 20.0%
1 Development
Standards
Modification
Yes
4158001001 1107 MACKAY LN 20231137 SFD O 2 6/28/2023 2 8/8/2023 0 0 0 NONE Y N/A 2 Demolished R 7509025029 1308 SOUTH IRENA AVE 20231137 SFD O 2 6/28/2023 2 0 0 0 SB 9 (2021) -
Residential Lot Split Y N/A
4155012018 1904 GATES AVE 20230814 SFD O 2 7/10/2023 2 0 0 0 NONE Y N/A 4159011013 2001 SPEYER LN 20230915 SFD O 2 11/15/2023 2 0 0 0 NONE Y N/A 4150019003 2016 FARRELL AVE 20232106 SFA O 2 11/20/2023 2 0 0 0 NONE Y N/A 4159002011 2102 MARSHALLFIELD LN 20231370 SFA O 2 9/3/2023 2 0 0 0 NONE Y N/A 4155009011 2206 GATES AVE 20231078 SFD O 3 3 0 0 0 NONE Y N/A 4153006015 2405 MATHEWS AVE 20231378 SFA O 3 9/10/2023 3 0 0 0 NONE Y N/A 4158016015 2511 190TH ST 20231081 SFD O 2 8/10/2023 2 0 0 0 NONE Y N/A 4082009014 2701 ROCKEFELLER LN 20231377 SFA O 3 8/29/2023 3 0 0 0 NONE Y N/A 4153031006 2701 RUHLAND AVE 20232033 SFA R 3 10/1/2023 3 0 0 0 NONE Y N/A 4150008035 3401 VAIL AVE 20230422 SFA O 2 5/1/2023 2 0 0 0 NONE Y N/A 7502025005 520 NORTH LUCIA AVE 20232330 SFD R 2 12/15/2023 2 0 0 0 NONE Y N/A 7502026005 607 NORTH LUCIA AVE 20231379 SFD O 2 9/1/2023 2 0 0 0 NONE Y N/A 7508009004 627 SOUTH BROADWAY 20232118 SFD O 2 11/20/2023 2 0 0 0 NONE Y N/A 7502003005 707 NORTH LUCIA AVE 20230091 SFD O 2 2/13/2023 2 0 0 0 NONE Y N/A 7506005027 601 GARNET ST 20210768 ADU R 0 1 02/09/23 1 0 0 NONE Y N/A 7503016032 301 CARNELIAN ST 20211244 ADU 0 1 05/22/23 1 0 0 NONE Y N/A 7503016032 301 CARNELIAN ST 20211245 ADU 0 1 05/22/23 1 0 0 NONE Y N/A 7511003003 228 AVE D 20211436 ADU 0 1 02/07/23 1 0 0 NONE Y N/A 4150022005 2016 ERNEST AVE 20211484 ADU 0 1 03/23/23 1 0 0 NONE Y N/A 4155013025 1909 VOORHEES AVE A 20211928 ADU 0 1 04/19/23 1 0 0 NONE Y N/A 7506008008 216 CAMINO REAL 20212493 ADU 0 1 07/10/23 1 0 0 NONE Y N/A 4151011006 2413 BURRITT AVE 20212571 ADU 0 1 03/03/23 1 0 0 NONE Y N/A 7509007013 210 AVE B 20220035 ADU 0 1 06/05/23 1 0 0 NONE Y N/A 7507008023 664 SOUTH IRENA AVE UNIT A 20220274 ADU O 0 1 01/17/23 1 0 0 NONE Y N/A 4153015015 2519 CURTIS AVE C 20220296 ADU O 0 1 01/12/23 1 0 0 NONE Y N/A 4153015015 2519 CURTIS AVE D 20220297 ADU O 0 1 01/12/23 1 0 0 NONE Y N/A 4153015015 2519 CURTIS AVE E 20220298 ADU O 0 1 01/12/23 1 0 0 NONE Y N/A 4156010020 2013 ROCKEFELLER LN A 20220402 ADU O 0 1 11/27/23 1 0 0 NONE Y N/A 7509020028 847 AVE C A 20220452 ADU O 0 1 06/08/23 1 0 0 NONE Y N/A 4155004012 1912 ROBINSON ST 20220480 ADU O 0 1 09/12/23 1 0 0 NONE Y N/A 7502021009 512 NORTH PAULINA AVE 20220646 ADU O 0 1 07/31/23 1 0 0 NONE Y N/A 4151025009 2909 PERKINS LN 20220775 ADU O 0 1 02/01/23 1 0 0 NONE Y N/A 4158026004 2607 RALSTON LN A 20220830 ADU O 0 1 05/09/23 1 0 0 NONE Y N/A 4151012026 3509 GIBSON PL A 20221061 ADU O 0 1 05/12/23 1 0 0 NONE Y N/A 7509030021 1019 AVE B A 20221068 ADU O 0 1 03/07/23 1 0 0 NONE Y N/A 7508010012 218 RUBY ST 20221112 ADU O 0 1 03/30/23 1 0 0 NONE Y N/A 4161017023 1600 CLARK LN 20222061 ADU O 0 1 06/22/23 1 0 0 NONE Y N/A 4158018021 2601 ARMOUR LN 20222080 ADU O 0 1 03/16/23 1 0 0 NONE Y N/A 4155028038 1935 MATHEWS AVE 20222108 ADU O 0 1 10/16/23 1 0 0 NONE Y N/A 7510013005 307 AVE F 20222244 ADU O 0 1 05/26/23 1 0 0 NONE Y N/A 7511004025 209 AVE F 20222585 ADU O 0 1 11/20/23 1 0 0 NONE Y N/A 7509028030 1064 AVE C 20230128 ADU O 0 1 04/10/23 1 0 0 NONE Y N/A 4083026010 2700 184TH ST 20230234 ADU O 0 1 06/08/23 1 0 0 NONE Y N/A 4153008023 2421 RUHLAND AVE 20230410 ADU O 0 1 06/06/23 1 0 0 NONE Y N/A 7509021002 862 AVE C 20230499 ADU O 0 1 10/03/23 1 0 0 NONE Y N/A 7502021007 516 NORTH PAULINA AVE 20230665 ADU O 0 1 05/25/23 1 0 0 NONE Y N/A 4151003008 2842 MAY AVE 20230908 ADU O 0 1 08/31/23 1 0 0 NONE Y N/A 4158015009 506 PHELAN LN 20232400 ADU O 0 1 11/16/23 1 0 0 NONE Y N/A 4153016002 2520 CURTIS AVE A 20202193 SFD O 0 2.00 02/21/23 2 0 0 NONE Y N/A 2 Demolished O 7503020026 617 NORTH IRENA AVE A 20212050 SFD O 0 3.00 09/15/23 3 0 0 NONE Y N/A 2 Demolished O 4157031005 2414 CLARK LN A 20220390 SFD O 0 2.00 03/06/23 2 0 0 NONE Y N/A 2 Demolished O 4153014006 2502 GRAHAM AVE 20220449 SFD O 0 2.00 01/26/23 2 2 11/21/2023 2 0 NONE Y N/A 2 Demolished O 4155022015 2007 NELSON AVE A 20220594 SFD O 0 2.00 07/25/23 2 0 0 NONE Y N/A 2 Demolished O 4082005023 2619 HUNTINGTON LN A 20220695 SFD O 0 2.00 11/16/23 2 0 0 NONE Y N/A 2 Demolished O 4150014012 2001 FARRELL AVE 20221116 SFD O 0 2.00 03/02/23 2 0 0 NONE Y N/A 2 Demolished O 4159016018 2004 MORGAN LN A 20221456 SFD O 0 2.00 06/01/23 2 0 0 NONE Y N/A 2 Demolished O 4156023021 2019 HARRIMAN LN A 20221459 SFD O 0 2.00 06/07/23 2 0 0 NONE Y N/A 2 Demolished O 4157030009 2306 CLARK LN A 20221520 SFD O 0 2.00 05/31/23 2 0 0 NONE Y N/A 2 Demolished O 4157027023 2321 CLARK LN A 20221611 SFD O 0 2.00 01/25/23 2 0 0 NONE Y N/A 2 Demolished O 4155006011 2004 GRAHAM AVE A 20221807 SFD O 0 2.00 06/08/23 2 0 0 NONE Y N/A 2 Demolished O 7502025027 507 NORTH MARIA AVE A 20221960 SFD O 0 2.00 01/18/23 2 0 0 NONE Y N/A 2 Demolished O 4156020013 1801 HUNTINGTON LN 20222133 SFD O 0 2.00 03/22/23 2 0 0 NONE Y N/A 2 Demolished O 4150016070 2206 BATAAN RD A 20222640 SFD O 0 2.00 07/26/23 2 0 0 NONE Y N/A 2 Demolished O 4158001001 2322 MARSHALLFIELD LN 20230701 SFD O 0 2.00 08/08/23 2 0 0 NONE Y N/A 4155009011 2206 GATES AVE 20231238 SFD O 0 2.00 12/04/23 2 0 0 NONE Y N/A 2 Demolished O 4083015010 2900 FOUNDRY CT 20211643 SFA O 0 2.00 05/23/23 2 0 0 NONE Y N/A 4083015010 2904 FOUNDRY CT 20211645 SFA O 0 2.00 05/23/23 2 0 0 NONE Y N/A 4083015010 2820 SPRECKELS LN 20211653 SFA O 0 3.00 05/23/23 3 0 0 NONE Y N/A 4083015010 2826 SPRECKELS LN 20211654 SFA O 0 3.00 05/23/23 3 0 0 NONE Y N/A 4083015010 2907 FISK LN 20211659 SFA O 0 3.00 10/13/23 3 0 0 NONE Y N/A 4155027013 2005 MATHEWS AVE 20220510 SFA O 0 3.00 09/12/23 3 0 0 NONE Y N/A 4156008013 2101 CARNEGIE LN 20220521 SFA O 0 3.00 11/28/23 3 0 0 NONE Y N/A 2 Demolished O 4156005010 1813 FLAGLER LN 20220527 SFA O 0 3.00 08/15/23 3 0 0 NONE Y N/A 2 Demolished O 4156009030 2100 CARNEGIE LN 20221122 SFA O 0 2.00 07/07/23 2 0 0 NONE Y N/A 2 Demolished O 4155014006 2012 CURTIS AVE 20221767 SFA O 0 2.00 01/12/23 2 0 0 NONE Y N/A 2 Demolished O 4157019010 2304 GRANT AVE 20222582 SFA O 0 3.00 05/11/23 3 0 0 NONE Y N/A 2 Demolished O 4150008035 3401 VAIL AVE 20230761 SFA O 0 2.00 06/14/23 2 0 0 NONE Y N/A 2 Demolished O 4153006015 2405 MATHEWS AVE 20231873 SFA O 0 3.00 10/26/23 3 0 0 NONE Y N/A 2 Demolished O 4082009014 2701 ROCKEFELLER LN 20231874 SFA O 0 3.00 11/06/23 3 0 0 NONE Y N/A 2 Demolished O 7508001001 739 ESPLANADE 20162933 SFD O 0 1.00 03/09/23 1 0 0 NONE Y N/A 3 Demolished O 7506008008 216 CAMINO REAL 20212491 SFD O 0 1.00 07/10/23 1 0 0 NONE Y N/A 4150031007 2110 PLANT AVE 20220874 SFD O 0 1.00 11/02/23 1 0 0 NONE Y N/A 4153010031 2423 CURTIS AVE 20220904 SFD O 0 1.00 03/06/23 1 0 0 NONE Y N/A 7509028030 1064 AVE C 20221063 SFD O 0 1.00 04/10/23 1 0 0 NONE Y N/A 4158024013 2517 ALVORD LN 20221096 SFD O 0 1.00 03/16/23 1 0 0 NONE Y N/A 4161006022 1723 HAYNES LN 20221554 SFD O 0 1.00 03/09/23 1 0 0 NONE Y N/A 4161006022 1725 HAYNES LN 20221556 SFD O 0 1.00 03/09/23 1 0 0 NONE Y N/A 7504009039 810 EL REDONDO AVE 20221741 SFD O 0 1.00 09/19/23 1 0 0 NONE Y N/A 7509019008 738 AVE B 20221746 SFD O 0 1.00 04/14/23 1 0 0 NONE Y N/A 7508026001 600 SAPPHIRE ST 20221805 SFD O 0 1.00 06/08/23 1 0 0 NONE Y N/A 4158032006 2610 182ND PL 20221823 SFD O 0 1.00 08/02/23 1 0 0 NONE Y N/A 4158027001 2601 185TH ST 20221970 SFD O 0 1.00 11/09/23 1 0 0 NONE Y N/A 7502023025 513 NORTH PAULINA AVE 20222064 SFD O 0 1.00 04/26/23 1 0 0 NONE Y N/A 7509020001 1003 SOUTH PROSPECT AVE 20222096 SFD O 0 1.00 07/24/23 1 0 0 NONE Y N/A 7509020002 1007 SOUTH PROSPECT AVE 20222098 SFD O 0 1.00 08/08/23 1 0 0 NONE Y N/A 7509020003 1011 SOUTH PROSPECT AVE 20222100 SFD O 0 1.00 08/14/23 1 0 0 NONE Y N/A 4083028006 2710 182ND PL 20222116 SFD O 0 1.00 07/31/23 1 0 0 NONE Y N/A 7502021012 506 NORTH PAULINA AVE 20222129 SFD O 0 1.00 06/13/23 1 0 0 NONE Y N/A 7509018001 662 AVE B 20222192 SFD O 0 1.00 05/01/23 1 0 0 NONE Y N/A 4159009005 2220 BELMONT LN 20222369 SFD O 0 1.00 05/12/23 1 0 0 NONE Y N/A 4151011023 2420 SEBALD AVE 20222409 SFD O 0 1.00 09/05/23 1 0 0 NONE Y N/A 7508021018 412 SOUTH FRANCISCA AVE 20222447 SFD O 0 1.00 07/25/23 1 0 0 NONE Y N/A 4153001002 2609 MACKAY LN 20222538 SFD O 0 1.00 09/12/23 1 0 0 NONE Y N/A 7511003008 218 AVE D 20222591 SFD O 0 1.00 09/27/23 1 0 0 NONE Y N/A 4158019010 2518 SPRECKELS LN 20230810 SFD O 0 1.00 09/07/23 1 0 0 NONE Y N/A 7510018004 508 AVE D 20230933 SFD O 0 1.00 11/14/23 1 0 0 NONE Y N/A 4162025013 1801 GOODMAN AVE 20231005 SFD O 0 1.00 12/11/23 1 0 0 NONE Y N/A 4162025013 1803 GOODMAN AVE 20231006 SFD O 0 1.00 12/11/23 1 0 0 NONE Y N/A 7502021007 516 NORTH PAULINA AVE 20231487 SFD O 0 1.00 12/05/23 1 0 0 NONE Y N/A 7502020009 614 NORTH PAULINA AVE 20231521 SFD O 0 1.00 11/30/23 1 0 0 NONE Y N/A 4162027024 1737 GOODMAN AVE 20231551 SFD O 0 1.00 10/23/23 1 0 0 NONE Y N/A 4162027024 1739 GOODMAN AVE 20231552 SFD O 0 1.00 10/23/23 1 0 0 NONE Y N/A 7508025022 641 SOUTH GERTRUDA AVE 20231889 SFD O 0 1.00 10/09/23 1 0 0 NONE Y N/A 4158011002 2345 190TH ST 20232444 MH O 0 1.00 10/24/23 1 0 0 NONE Y N/A 4158011002 2345 190TH ST 20232445 MH O 0 1.00 10/24/23 1 0 0 NONE Y N/A 4153010031 2423 CURTIS AVE 20220904 ADU R 0 1 3/6/2023 1 0 0 NONE Y N/A 7509020001 1003 SOUTH PROSPECT AVE 20222096 ADU R 0 1 7/24/2023 1 0 0 NONE Y N/A 7509020002 1007 SOUTH PROSPECT AVE 20222098 ADU R 0 1 8/8/2023 1 0 0 NONE Y N/A 7509020003 1011 SOUTH PROSPECT AVE 20222100 ADU R 0 1 8/14/2023 1 0 0 NONE Y N/A 7507010014 542 SOUTH HELBERTA AVE 20190816 SFD O 0 0 1 04/25/2023 1 0 NONE Y N/A 4150030021 2019 ROBINSON ST 20192582 SFD O 0 0 1 03/30/2023 1 0 NONE Y N/A 7509028029 1062 AVE C 20210613 SFD O 0 0 1 05/12/2023 1 0 NONE Y N/A 4151001009 2813 TIMOTHY AVE 20211215 SFD O 0 0 1 07/10/2023 1 0 NONE Y N/A 7507003009 509 CAMINO REAL 20211880 SFD O 0 0 1 05/01/2023 1 0 NONE Y N/A 7507002024 518 SOUTH GERTRUDA AVE 20212406 SFD O 0 0 1 05/08/2023 1 0 NONE Y N/A 4160011020 1703 CARLSON LN 20212527 SFD O 0 0 1 06/01/2023 1 0 NONE Y N/A 4158007017 2403 RALSTON LN 20220405 SFD O 0 0 1 08/10/2023 1 0 NONE Y N/A 4160009029 1733 ARMOUR LN 20232414 SFD O 0 0 1 11/13/2023 1 0 NONE Y N/A 4160009030 1735 ARMOUR LN 20232415 SFD O 0 0 1 11/13/2023 1 0 NONE Y N/A 7503005023 712 NORTH GUADALUPE AVE 20221230 ADU R 0 2 06/01/23 2 0 0 NONE Y N/A 4155032010 2212 MATHEWS AVE 20230704 ADU R 0 1 05/25/23 1 0 0 NONE Y N/A 7502032003 424 NORTH PAULINA AVE A 20220813 ADU R 0 1 04/26/23 1 0 0 NONE Y N/A 4083025012 2700 185TH ST A 20220842 ADU R 0 1 05/31/23 1 0 0 NONE Y N/A 4158014011 2402 RALSTON LN 20221845 ADU R 0 1 06/28/23 1 0 0 NONE Y N/A 4083021023 2721 ARMOUR LN 20230923 ADU R 0 1 06/22/23 1 1 12/21/2023 1 0 NONE Y N/A 4158020005 2508 FISK LN 20232244 ADU R 0 1 12/12/23 1 0 0 NONE Y N/A 7508021018 412 SOUTH FRANCISCA AVE 20222447 ADU R 0 1 7/25/2023 1 0 0 NONE Y N/A 4150028006 1908 PERRY AVE A 20200438 SFD O 0 0 2 05/25/2023 2 0 NONE Y N/A 4157019022 2319 HUNTINGTON LN A 20211241 SFD O 0 0 2 07/26/2023 2 0 NONE Y N/A 4153011012 2400 GRAHAM AVE A 20211334 SFD O 0 0 2 01/24/2023 2 0 NONE Y N/A 4161011030 1725 CLARK LN 20212001 SFD O 0 0 2 04/10/2023 2 0 NONE Y N/A 4155008026 2221 GATES AVE A 20212015 SFD O 0 0 2 06/13/2023 2 0 NONE Y N/A 4150030007 2010 PLANT AVE A 20212048 SFD O 0 0 2 05/01/2023 2 0 NONE Y N/A 4155016032 2227 VOORHEES AVE A 20221009 SFD O 0 0 2 09/10/2023 2 0 NONE Y N/A 4153027022 2621 GATES AVE 20192665 SFA O 0 0 3 05/03/2023 3 0 NONE Y N/A 7506019007 217 SOUTH PROSPECT AVE 20192819 SFA O 0 0 3 05/12/2023 3 0 NONE Y N/A 4082015012 1900 FIRMONA AVE 20201008 SFA O 0 0 4 02/23/2023 4 0 NONE Y N/A 7503016006 411 NORTH ELENA AVE 20211155 SFA O 0 0 2 02/13/2023 2 0 NONE Y N/A 4153006015 2405 MATHEWS AVE 20231378 SFA O 3 9/10/2023 3 0 1 3/10/2023 1 0 NONE Y N/A 0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Density Bonus
1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building Permits Affordability by Household Incomes - Certificates of Occupancy 4 7 10
Note: "+" indicates an optional field
Housing with Financial Assistance
and/or Deed Restrictions Project Identifier Demolished/Destroyed Units Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units Jurisdiction Redondo Beach ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 10/15/2021 - 10/15/2029
1 Projection Period 3 4
RHNA Allocation by
Income Level
Projection Period -
06/30/2021-
10/14/2021
2021 2022 2023 2024 2025 2026 2027 2028 2029 Total Units to Date (all years)
Total Remaining
RHNA by Income
Level
Deed Restricted - - - - - - - - - -
Non-Deed Restricted - - 6 8 - - - - - -
Deed Restricted - - - - - - - - - -
Non-Deed Restricted 7 3 15 21 - - - - - -
Deed Restricted - - - - - - - - - -
Non-Deed Restricted - - 2 3 - - - - - -
Above Moderate 556 31 15 220 123 - - - - - - 389 167
2,490
38 18 243 155 - - - - - - 454 2,036
5 6 7
Extremely low-Income
Need 2021 2022 2023 2024 2025 2026 2027 2028 2029
Total Units to
Date
Total Units
Remaining
468 - - - - - - - - - - 468
VLI Deed Restricted
VLI Non Deed Restricted
Please note: The APR form can only display data for one planning period. To view progress for a different planning period, you may login to HCD's online APR system, or contact HCD staff at [email protected].
485
14 This table is auto-populated once you enter your jurisdiction name and current year data. Past year information comes from previous APRs.
5 Moderate
936
508
490
Please contact HCD if your data is different than the material supplied here 46 2
Table B
Regional Housing Needs Allocation Progress
Permitted Units Issued by Affordability
922
462
Please note: For the last year of the 5th cycle, Table B will only include units that were permitted during the portion of the year that was in the 5th cycle. For the first year of the 6th cycle, Table B will only include units that were permitted since the start of the planning period. Projection Period units are in a separate column.
Total RHNA
Total Units
Income Level
Very Low
Low
Extremely Low-Income Units*
Note: units serving extremely low-income households are included in the very low-income RHNA progress and must be reported as very low-income units in section 7 of Table A2. They must also be reported in the extremely low-income category (section 13) in Table A2 to be counted as progress toward meeting the extremely low-income housing need determined pursuant to Government Code 65583(a)(1). *Extremely low-income houisng need determined pursuant to Government Code 65583(a)(1). Value in Section 5 is default value, assumed to be half of the very low-income RHNA. May be overwritten.
Progress toward extremely low-income housing need, as determined pursuant to Government Code 65583(a)(1).
Please Note: Table B does not currently contain data from Table F or Table F2 for prior years. You may login to the APR system to see Table B that contains this data.
Jurisdiction Redondo Beach ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Date of Rezone Rezone Type
2 4 5 6 7 9 10 11
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Date of Rezone Very LowIncome Low-Income Moderate-Income Above ModerateIncome Rezone Type Parcel Size
(Acres)
General Plan
Designation Zoning Minimum Density Allowed
Maximum
Density Allowed
Realistic
Capacity Vacant/Nonvacant Description of Existing Uses
Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
Summary Row: Start Data Entry Below
3 8
Project Identifier RHNA Shortfall by Household Income Category Sites Description 1 Sites Identified or Rezoned to Accommodate Shortfall Housing Need and No Net-Loss Law Table C
Jurisdiction Redondo Beach
Reporting Year 2023 (Jan. 1 - Dec. 31)
1 2 3 4
Name of Program Objective Timeframe in H.E Status of Program Implementation Program 1: Mobility
Access/Emergency Repair
Program
The Mobility
Access/Emergency Repair
Program provides a grant
up to $2,500 for special
mobility access repairs for
lower income disabled
Redondo Beach
homeowners (including
those with developmental
disabilities). Eligible
repairs are those
necessary to correct
health and safety hazards.
Repairs are restricted to
electrical repairs,
plumbing repairs,
replacement of hot water
heaters, and heating
repair. Under the Mobility
Access component, the
program provides special
repairs for disabled
homeowners such as
installation of grab bars
and access ramps.
Provide services to 10 lower income
(including extremely low income)
Redondo Beach homeowners each year
for a total of 80 households.
Promote program to residents through
brochures at public counters and
information on City website, and
proactively through City’s quarterly
newsletters.
Pursue State funds available for housing
rehabilitation programs, including
acquisition/rehabilitation.
2021-2029 Ongoing
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element.
Table D
Program Implementation Status pursuant to GC Section 65583 Program 2: Preservation of
Affordable Housing
California Government
Code Section 65583(a)(8)
requires the Housing
Element to include an
analysis of existing
assisted housing
developments that are “at
risk” (eligible to change
from low-income housing
to market-rate housing
during the next ten years
due to termination of
subsidy contracts,
mortgage prepayment, or
expiration of restrictions
on use). Assisted housing
developments are defined
as multi-family rental
housing that receives
government assistance
under federal, state and
local funding programs.
Assisted housing also
includes multifamily rental
units developed pursuant
to a local inclusionary
housing program, used to
qualify for a density
bonus, or other conditions
Proactively engage the property owner
and property manager of the Seasons
Senior Apartments in 2022 (three year
prior to potential eligibility for
conversion) to provide education and
ensure their understanding of their
obligations under preservation law.
Monitor the status of Seaside Villa and
Seasons Senior Apartments annually.
Ensure residents are notified by the
property owner once a Notice of Intent
to opt out of low income use is filed.
Pursuant to new State law, notices must
be sent out by property owners three
years, one year, and six months prior to
opting out.
Contact nonprofit affordable housing
providers with capacity to acquire and
manage at-risk projects in Redondo
Beach to explore preservation options if
a Notice of Intent to opt out of low
income use is filed.
Support funding applications by
qualified nonprofit affordable housing
providers to pursue funding at the State
and federal levels for preserving
existing affordable housing.
2021-2029 Ongoing
Program 3: Inclusionary
Housing
During the discussion of
the General Plan and
Housing Element Annual
Report in 2020, the
Redondo Beach City
Council expressed interest
in preparation of an
Inclusionary Housing
Ordinance. This type of
ordinance requires a
percentage of units to be
restricted to certain levels
of affordability in housing
development projects
meeting a set size
threshold. There are
several parameters that
the City Council must
decide upon, and once
selected it is necessary to
conduct a financial
feasibility analysis to
determine that the
ordinance with those
parameters would not
preclude or deter market
rate housing from being
built. This is a necessary
step to ensure that the
Pursue adoption of an inclusionary
housing program by 2022. 2022 Ongoing. Public hearings have been held by both the Planning Commission and the City Council. Anticipated adoption is expected in 2024/2025.
Program 4: Housing
Choice Voucher (Section
8) Program
This program assists
extremely low and very
low income persons in
securing decent, safe and
sanitary, privately owned
housing. Tenants select
their own rental housing,
within the program
guidelines. The housing
may be an apartment, a
house, or a mobile home.
In all instances, the unit
must be clean, in good
condition and safe. Also,
the rent must not exceed
the program limits (which
vary based on unit size
and type), and must be
appropriately priced for
the size, condition and
location of the unit. The
program is open to
families and individuals;
however, preference is
given to families, elderly
persons, and persons with
disabilities. Eligible
tenants pay 30 to 40
Continue to provide Housing Choice
Voucher to extremely low and very low
income households with the goal of
increasing assistance to 633
households annually, consistent with
the Housing Authority Five-Year Plan.
Increase outreach and education on the
State’s new Source of Income
protections as required by SB 329 and
SB 222. Both bills require all landlords
to accept Housing Choice Vouchers,
Veterans Affairs Supportive Housing
(VASH), and other forms of public
assistance as legitimate sources of
income for rent payments.
By 2023, develop a fact sheet on Source
of Income Protection to be included in
ADU application packet, with the goal of
facilitating the use of HCVs for 20 ADU
units over eight years.
Annually, evaluate payment standards to
ensure that consideration is given
regarding local market conditions and
rent reasonableness in an effort to
increase voucher utilization.
2021-2029 Ongoing
Program 5: Response to
Homelessness
The City of Redondo
Beach started a Response
to Homelessness Pilot
Program, approved by the
Mayor and City Council, in
June of 2019 as an
enhanced response to the
impact of homelessness,
not only on people
experiencing homeless,
but also on residents and
the community.
In 2020 the City decided to
continue and expanded
the Response to
Homelessness Program.
One new branch of the
Response to
Homelessness Program is
the Housing Initiative
Court. Another branch of
the Response to
Homelessness Program
has been bridge housing.
Bridge housing brings
stabilization to people
experiencing
homelessness and helps
Continue to provide CDBG funding to
agencies that operate emergency
shelters, transitional housing, and
supportive services for the homeless
and persons with special needs.
Before April 2024, evaluate the need and
financial feasibility of continuing the
Responses to Homelessness program.
Ongoing
April 2024
The City has officially and continuously supported the development of permanent supportive housing. The State of California established a program for funding various housing projects through the Project Homekey program. On November 9, 2021, the Redondo Beach City Council voted unanimously to support the Homekey Round 2 application from the joint applicants of Century Housing Corporation and Los Angeles County to provide housing for those who are experiencing homelessness or at risk of becoming homeless. Century Housing Corporation, a nonprofit housing development organization, with Los Angeles County as a co-applicant received funding and acquired and renovated a hotel site at 716 South Pacific Coast Highway in Redondo Beach which has since been converted to permanent supportive housing. The Homekey project resulted in the development of 20 units of affordable housing in the form of permanent supportive housing. The Homekey project is nearly complete and anticipates full occupancy in Spring of 2024.
Additionally, the City has entered into an agreement with the County and installed 20 pallet shelter trasitional homes with 25 more proposed at the City's Transit Center location.
Program 6: Affordable
Housing Development
The City utilizes a variety
of incentives to facilitate
affordable housing
development, including:
• Density bonuses;
• Deferral of development
fees until the issuance of
Certificates of Occupancy;
• Waiver of Quimby fees
for affordable housing
development;
• Additional fee subsidies,
as funding permits; •
Expedited review; and
• Senior Housing
Ordinance.
Continue to promote the availability of
incentives for affordable housing
development on the City website with
the goal of facilitating the development
of 100 lower income units over eight
years.
At least every other year, conduct an
affordable housing meeting with
affordable housing developers and
invite proposals from interested
developers. Coordinate discussions
between affordable housing developers
and church properties to promote
affordable housing onsite.
Pursue additional State (e.g. State funds
for transit-oriented development and
infrastructure improvements) and
federal funding for affordable
development. Annually check the
websites of HUD, State HCD, and Los
Angeles County Development Authority
(LACDA) for potential funding sources
and apply for eligible programs.
Facilitate the development of 300
housing units affordable to lower
income households through incentives,
project conditions, development
agreements, and/or other mechanisms.
Annually
This program is ongoing with many of the identified components/objectives underway. The City is in the public hearing phase of the implementation of an inclusionary housing ordinance. Additionally, the City has already approved a project converting an existing motel to transitional housing (permanent supportive housing) for the homeless. The City continues to work on the multiple initiatives within this program.
The South Bay Galleria Revitalization project submitted a 300 residential unit project with affordable housing (either 30 very low or 60 low income) in 2023 which has now been approved in plan check with building permits to be issued later in 2024. Additionally, the owner of the South Bay Galleria Revitalization project submitted discretionary entitlement applications (conditional use permit, planning commission design review, and vesting parcel map for the purpose of merging lots) for the development of another residential mixed use project with 350 residential units (70 lower income) in early 2024 with a public hearing planned for later in 2024.
Program 7: Green Task
Force
The Green Task Force's
Sustainable City Plan
includes the following
housing and building
related recommendations:
• Green Building
Incentives: Develop a set
of incentives in the form of
rebates, space offset
programs, and recognition
programs for
green/sustainable building
practices.
• Fee Structure: Balance
fee structure to
accommodate rebate
incentives given for green
homeowners, and
builders.
• LEED Standards: Adopt
LEED standards for all city
buildings.
• Ordinance Update:
Review and update
ordinances to support
LEED compliant measures.
• Staff Training: Train
appropriate city staff and
acquire LEED certification
Continue to promote and implement the
policies outlined in the Sustainable City
Plan, particularly those policies
applicable to residential and mixed use
developments
Ongoing
The Planning Division of the Community Development Department is coordinating with the City's Buildiing Official concerning the inclusion of these elements for sustainable development into the Building Divisions implementation of the "City's Sustainable Paln".
Program 8: Residential
Sites Inventory and
Monitoring of No Net Loss
For the 6th cycle Housing
Element, the City has been
assigned a Regional
Housing Needs
Assessment (RHNA) of
2,490 units (936 very low
income, 508 low income,
490 moderate income, and
556 above moderate
income units). The City is
updating its General Plan,
with an anticipated
adoption by November
2022 and put on the ballot
for Measure DD public
vote in 2023.
As of January 2022, the
City has entitled 471 units
and anticipates permitting
240 ADUs over eight years.
The City’s progress in
residential development
leaves a remaining RHNA
of 1,779 units (845 very
low income, 405 low
income, 476 moderate
income, and 53 above
Adopt the Recommended Land Use Plan
that provides increased residential
development capacity by November
2022. Specifically, ensure that the
updated General Plan offer adequate
capacity for at least 1,924 units, with
1,395 lower income units to be
accommodated through the Residential
Overlays that establish a minimum
density of 20 units per acre and a
maximum density of 55 units per acre.
Update the Zoning Ordinance by
November 2023 to implement the
updated General Plan. Specifically for
the North Tech, South of Transit Center,
South Bay Marketplace Residential, and
FedEx Overlays establish development
standards and regulations that would
facilitate a combination of different
scenarios to allow achievement of the
anticipated number of units.
Specifically, policies and zoning
development standards will be
developed to facilitate:
• Subdividing, if necessary, of the
parking areas as developable parcels
• Clustering of densities on portions of
the parking areas
• Shared access to existing structures
Ongoing
The Planning Division monitors each new residential development and if the proposed development is an identified "housing site" per the 6th Cycle HE, an accounting will be conducted to confirm capacity remains for meeting the City's RHNA and a finding is required to be made with the approval of the project confirming capacity remains or if capacity is not maintained sites for rezoning for additional housing to meet the City's RHNA will be identified and processed prior to and/or concurrent with the approval of the subject property.
Program 9: By-Right
Approval for Projects with
20 Percent Affordable
Units
Pursuant to AB 1397
passed in 2017, the City
will amend the Zoning
Ordinance to require byright approval of housing
development that includes
20 percent of the units as
housing affordable to
lower income households,
on sites being used to
meet the 6th cycle RHNA
that meet the following:
• Reusing of nonvacant
sites previously identified
in the 5th cycle Housing
Element (see Appendix B).
• Rezoning of sites where
the rezoning occurs pass
the October 15, 2021
statutory deadline.
By-right means that the
City review must not
require conditional use
permit, planned unit
development permit, or
other discretionary review
or approval.
Amend Zoning Ordinance to provide byright approval pursuant to AB 1397 within one year of Housing Element
adoption.
Ongoing
The City is preparing to include this subject ordinance amendment with the zoning ordinance consistency program required with the adoption of the City's General Plan Update that includes the amendment of the City's General Plan Land Use Map for the purposes of meeting the City's RHNA. A contract with the City's General Plan Update consultant was recently amended and approved, March 12, 2024, that will include this specific ordinance. The draft ordinance is being prepared. A public workshop with the proposed ordinance is planned for April/May 2024 with public hearings before the Planning Commission and City Council in the summer of 2024. Adoption anticipated in the fall of 2024.
Program 10: Replacement
Housing
Development on
nonvacant sites with
existing residential units is
subject to replacement
requirement, pursuant to
AB 1397. The City will
amend the Zoning Code to
require the replacement of
units affordable to the
same or lower income
level as a condition of any
development on a
nonvacant site consistent
with those requirements
set forth in State Density
Bonus Law.
Amend Zoning Ordinance to address
replacement requirement pursuant to AB
1397 within one year of Housing
Element adoption.
Ongoing
The City is preparing to include this subject ordinance amendment with the zoning ordinance consistency program required with the adoption of the City's General Plan Update that includes the amendment of the City's General Plan Land Use Map for the purposes of meeting the City's RHNA. A contract with the City's General Plan Update consultant was recently amended and approved, March 12, 2024, that will include this specific ordinance. The draft ordinance is being prepared. A public workshop with the proposed ordinance is planned for April/May 2024 with public hearings before the Planning Commission and City Council in the summer of 2024. Adoption anticipated in the fall of 2024.
Program 11: Small Lot
Development/Lot
Consolidation
This residential sites
inventory for the 6th cycle
RHNA focuses primarily
on sites that are larger
than 0.5 acres (see
Appendix B). However,
some parcels are small
and owned by individual
owners. Given the City’s
highly urbanized
character, small infill
projects would be an
appropriate and feasible
development pattern to
accommodate these
housing units in the
community, as
demonstrated by the City’s
current trend. The City will
develop appropriate
incentives and
development standards to
facilitate lot consolidation
for affordable housing
development.
By October 2022, develop appropriate
incentives, development standards
(such as reduced minimum lot size), and
review procedures to facilitate small lot
development and lot consolidation for
affordable housing development.
Incentives for lot consolidation may
include:
• Over the counter lot line adjustments if
not combined with other applications;
concurrent review if combined with
other applications
• Expedited review process
• Deferral or waiver of fees for affordable
housing project
• Lot consolidation bonus (potentially in
density, setbacks, or other incentives)
• Ongoing outreach to property owners
regarding lot consolidation incentives.
Engage the Waterfront and Economic
Development Department to facilitate
communications among property
owners and interested developers for lot
consolidation potential and/or
packaging parcels for redevelopment.
Ongoing
The City is preparing to include this subject ordinance amendment with the zoning ordinance consistency program required with the adoption of the City's General Plan Update that includes the amendment of the City's General Plan Land Use Map for the purposes of meeting the City's RHNA. A contract with the City's General Plan Update consultant was recently amended and approved, March 12, 2024, that will include this specific ordinance. The draft ordinance is being prepared. A public workshop with the proposed ordinance is planned for April/May 2024 with public hearings before the Planning Commission and City Council in the summer of 2024. Adoption anticipated in the fall of 2024.
Program 12: Accessory
Dwelling Units (ADUs)
The City is in the process
of updating the existing
Residential Design
Guidelines to include
Accessory Dwelling Units.
The guidelines were
adopted by the City of
Redondo Beach on
October 7, 2003. The
design guidelines are
intended to inform the
public about development
opportunities within the
residential zones,
including both single and
multi-family structures.
The update will also
include the R-1A
residential zone which
was not included in the
original document.
With the addition of ADUs
and the R-1A Zone to the
guidelines, the document
will span the breadth of
residential infill
opportunities available
within the City. With this
• Facilitate the development of 240 ADUs
over eight years.
• Update the Residential Design
Guidelines (with ADU pre-approved
plans) and develop handout materials
and application form for ADU by
December 2022.
• In 2023, develop mechanisms to
facilitate ADUs, especially ADUs that
may be deed restricted as affordable
housing. These may include reduced
fees, rehabilitation assistance, or
relaxed development standards as
feasible and appropriate in exchange for
affordability. • In 2023, develop a fact
sheet on fair housing rights (including
Source of Income protection) to
facilitate the use of HCVs for ADUs, with
the goal of placing 20 HCV holders in 20
ADUs over eight years. • In 2025,
monitor the ADU development trend to
ensure the City is meeting its projection
goal. If necessary, the City will make
adjustment to its incentives for ADU
construction.
Ongoing Fourty Seven (47) ADUs were issued buildiing permits in calendar year 2023.
Program 13: Amendments
to the Zoning Ordinance
The City will be updating
its Zoning Ordinance to
implement the new
General Plan. As part of
that Zoning Ordinance
update, the following
topics will be addressed:
Density Bonus;
Transitional and
Supportive Housing (SB 2,
SB 745, and AB 2162);
Emergency Shelters (AB
139);
Low Barrier Navigation
Center (AB 101);
Affordable Housing
Streamlined Approval (SB
35);
Single Room Occupancy
(SRO) Housing;
Employee Housing;
Reasonable
• Complete Zoning Ordinance
amendments outlined above to expand
the variety of housing types and remove
governmental constraints according to
the following priority:
• By the end of 2022:
- Density Bonus
- Transitional and Supportive Housing
- Emergency Shelter
- Low Barrier Navigation Center
- Employee Housing
- Reasonable Accommodation
- Definition of Family
• By November 2023 as part of the
Zoning Ordinance update to implement
the updated General Plan.
- Affordable Housing Streamlined
Approval
- Single Room Occupancy Housing
- Parking Requirements
- Unlicensed Group Homes
- Conditional Use Permit
- Annually review the Zoning Ordinance
for compliance with State law and to
identify potential constraints and amend
the Zoning Ordinance as necessary.
Ongoing
All identified "Program 13" Zoning Ordinance amendments are planned to be included with the zoning ordinance consistency program required with the adoption of the City's General Plan Update. A contract with the City's General Plan Update consultant was recently amended and approved, March 12, 2024, that will include updating the City's zoning ordinance to ensure consistency with these noted program amendments. The draft ordinances are being prepared. A public workshop with the proposed ordinances is planned for April/May 2024 with public hearings before the Planning Commission and City Council in the summer of 2024. Adoption anticipated in the fall of 2024.
Program 14: Objective
Design Standards
The City is in the process
of updating the existing
Residential Design
Guidelines with objective
design standards and to
inform the public about
development opportunities
within the residential
zones, including both
single and multi-family
structures.
Develop objective design standards
through the Residential Design
Guidelines update by the end of 2022.
Develop objective design standards for
the four Residential Overlay districts
(North Kingsdale, North Tech, 190th
Street, and Industrial Flex-South of
Transit Center, South Bay Marketplace,
and FedEx) by October 15, 2024. The
standards must accommodate
development at the maximum densities
allowed in each district without
assuming the use of concessions,
incentives, or waivers allowed pursuant
to State Density Bonus Law.
Ongoing
The update/revisions/conversion of the City's Residential Design Guidelines into "Objective Residential Standards" was completed and adopted by the City Council at their public hearing on August 15, 2023.
The identified "Program 15" Residential Overlay Districts will require the development of objective design standards and Zoning Ordinance amendments.
These are planned to be included with the zoning ordinance consistency program required with the adoption of the City's General Plan Update. A contract with the City's General Plan Update consultant was recently amended and approved, March 12, 2024, that will include updating the City's zoning ordinance to ensure consistency with this noted program.
Program 15: Monitoring
the Effect of Article 27 of
the City Charter (Measure
DD)
The voter-initiated
Measure DD requires
voters’ approval for any
major change in land use.
The Recommended Land
Use Plan of the General
Plan Update proposes new
land use designations that
represent significant
changes in land use, and
therefore requires voters’
approval. The General Plan
Update will be placed on
the ballot by March 2023.
Article 27 of the City
Charter (Measure DD) is
considered by the State
Department of Housing
and Community
Development (HCD) as a
potential constraint to the
supply of land for
residential development. In
the event that the
electorate rejects the
ballot measure for the
Preferred Land use Plan,
Given the statutory requirement to
encourage a variety of housing types,
the City will continue its outreach and
education to help the community
understand the importance of the
General Plan update in compliance with
State law and the consequence of
noncompliance.
Ongoing
As the City completes the General Plan update and associated updates to the City's Zoning Ordinance for consistency purposes, including consistency with the Housing Element and all noted "Programs" herein, the education program to support the General Plan and Housing Element will include comprehensive information citing the importance of housing and the State law provisions/consequences of noncompliance.
Program 16: Fee Schedule
Currently, the City’s
residential development
fee schedule (including
building permit and
planning fees) results in
higher per-unit fees for
multi-family housing than
single-family housing.
Amend the City’s fee schedule in FY
2022/2023 to waive fees for affordable
units being developed as part of a
project. (Currently, the City already
waives the Quimby fees for affordable
housing units.) The goal is to facilitate
the development of 100 lower income
units with fee waivers over eight years.
Ongoing This program amendment to the City's fee schedule will be incorporated with the FY 2024/2025 fee schedule.
Program 17: Redondo
Beach Unified School
District (RBUSD)
Coordination
The City’s Land Use Plan
update, which includes the
introduction of the various
Residential Overlays as a
strategy for facilitating
future residential growth,
will result in additional
student enrollment.
In May 2022, the City
outreached to the School
District. In 2007 the school
district had over 8,000
student population that
grew to 10,000 by 2018.
Between 2010 and 2018
through general obligation
bonds the School District
incorporated more
classrooms throughout
the District. Since then,
the student population has
actually decreased to
9,450 in the primary
grades. The RBUSD is
challenged with decreased
enrollment, so efforts to
increase housing may help
Ongoing coordination with the RBUSD
to facilitate communications concerning
updates to the City’s Land Use Plan and
the matching of school facilities with
student populations. Annual
coordination with RBUSD regarding
enrollment status and safe routes to
school.
Ongoing
The City continues to coordinate with the developers of the South Bay Galleria concerning the funding for a study to provide pedestrian and bicycle connections to nearby schools west of this property.
Additionally, as new residential projects located on any identified "housing sites" are submitted they will be routed to RBUSD for their review, comments, and planning purposes.
Program 18: Fair Housing
Program
The City contracts with the
Housing Rights Center to
educate the public about
fair housing laws and to
investigate reported cases
of housing discrimination.
The Housing Rights
Center (HRC) is a longestablished organization,
dedicated to promoting
fair housing for all
persons. HRC provides
telephone and in-person
counseling to both tenants
and landlords regarding
their respective rights and
responsibilities under
California and federal
laws, as well as City
ordinances. HRC has also
established an effective
and comprehensive
outreach and education
program. The organization
develops and distributes
written materials that
describe the applicable
laws that protect against
housing discrimination
Continue to contract with a fair housing
service provider to provide fair housing
and tenant/landlord services. Promote
fair housing awareness in City’s
quarterly newsletter and website.
Ongoing
The City continues to contract with a fair housing service provider and continues to advertise those services and other housing support services in the City's quarterly newsletter and on the City's website.
Jurisdiction Redondo Beach ANNUAL ELEMENT PROGRESS REPORT Reporting Period 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
3 4
APN Street Address Project Name+ Local Jurisdiction
Tracking ID+
Very Low
Income
Low
Income
Moderate
Income
Above Moderate
Income
Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
Summary Row: Start Data Entry Below
Units Constructed as Part of Agreement
Commercial Development Bonus Approved pursuant to GC Section 65915.7 Table E
Note: "+" indicates an optional field
Project Identifier
1 2
Cells in grey contain auto-calculation
formulas
(CCR Title 25 §6202)
Annual Progress Report January 2020
Jurisdiction Redondo Beach ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Period 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 10/15/2021 - 10/15/2029
The description should adequately document how each
unit complies with subsection (c) of Government Code
Section 65583.1+.
For detailed reporting requirements, see the chcklist
here:
Extremely LowIncome+ Very Low-Income+ Low-Income+ TOTAL UNITS+Extremely LowIncome+Very LowIncome+ Low-Income+ TOTAL UNITS+ https://www.hcd.ca.gov/communitydevelopment/docs/adequate-sites-checklist.pdf Rehabilitation Activity
Preservation of Units At-Risk
Acquisition of Units
Mobilehome Park Preservation
Total Units by Income
Table F
Please note this table is optional: The jurisdiction can use this table to report units that have been substantially rehabilitated, converted from non-affordable to affordable by acquisition, and preserved, including mobilehome park preservation, consistent with the standards set forth in Government Code section 65583.1, subdivision (c). Please note, motel, hotel, hostel rooms or other structures that are converted from non-residential to residential units pursuant to Government Code section 65583.1(c)(1)(D) are considered net-new housing units and must be reported in Table A2 and not reported in Table F.
Activity Type
Units that Do Not Count Towards RHNA+
Listed for Informational Purposes Only
Units that Count Towards RHNA +
Note - Because the statutory requirements severely limit what can be counted, please contact HCD at [email protected] and we will unlock the form which enable you to populate these fields.
Units Rehabilitated, Preserved and Acquired for Alternative Adequate Sites pursuant to Government Code section 65583.1(c) Annual Progress Report January 2020
Jurisdiction Redondo Beach ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates
an optional field
Reporting Period 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Notes
2 3 6
Prior APN+ Current APN Street Address Project Name+
Local
Jurisdiction
Tracking ID
Unit Category
(2 to 4,5+)
Tenure
R=Renter
Very LowIncome Deed
Restricted
Very LowIncome Non
Deed
Restricted
Low- Income Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate- Income
Deed Restricted
ModerateIncome Non Deed
Restricted
Above
ModerateIncome
Total Moderate Income Units
Converted from Above
Moderate
Date Converted Notes
Summary Row: Start Data Entry Below 0 0 0 0 0 0 0 0
Table F2
Above Moderate Income Units Converted to Moderate Income Pursuant to Government Code section 65400.2 For up to 25 percent of a jurisdiction’s moderate-income regional housing need allocation, the planning agency may include the number of units in an existing multifamily building that were converted to deed-restricted rental housing for moderate-income households by the imposition of affordability covenants and restrictions for the unit. Before adding information to this table, please ensure housing developments meet the requirements described in Government Code 65400.2(b). 5 Project Identifier Unit Types
1 4
Affordability by Household Incomes After Conversion Units credited toward Moderate Income RHNA
Jurisdiction Redondo Beach
Reporting Period 2023 (Jan. 1 - Dec. 31)
Planning Period 6th Cycle 10/15/2021 - 10/15/2029 ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation
2 3 4
APN Street Address Project Name+ Local Jurisdiction
Tracking ID+
Realistic Capacity
Identified in the
Housing Element
Entity to whom the site
transferred Intended Use for Site
1 Summary Row: Start Data Entry Below
Note: "+" indicates an optional field
Cells in grey contain auto-calculation
formulas
Table G
Locally Owned Lands Included in the Housing Element Sites Inventory that have been sold, leased, or otherwise disposed of Project Identifier
NOTE: This table must only be filled out if the housing element sites inventory contains a site which is or was owned by the reporting jurisdiction, and has been sold, leased, or otherwise disposed of during the reporting year.
Jurisdiction Redondo Beach Note: "+" indicates an optional field Reporting Period 2023
(Jan. 1 - Dec.
31)
Cells in grey contain auto-calculation
formulas
Designation Size Notes
1 2 3 4 5 6 7
APN Street Address/Intersection Existing Use Number of
Units
Surplus
Designation
Parcel Size (in
acres) Notes
NOTE: This table must contain an invenory of ALL
surplus/excess lands the reporting jurisdiction owns
Summary Row: Start Data Entry Below
Parcel Identifier
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Table H
Locally Owned Surplus Sites
For Los Angeles County jurisdictions, please format the APN's as follows:9999-999-999 Jurisdiction Redondo Beach ANNUAL ELEMENT PROGRESS REPORT Reporting Period 2023 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Project Type Date
Units (Beds/Student
Capacity) Granted
Density Bonus
Notes
2 3 5 6
APN Street Address Project Name+ Local Jurisdiction
Tracking ID+
Unit Category
(SH - Student Housing) Date Very Low- Income
Deed Restricted
Very Low- Income
Non Deed
Restricted
Low- Income Deed
Restricted
Low- Income Non
Deed Restricted
Moderate- Income
Deed Restricted
Moderate- Income
Non Deed
Restricted
Above
ModerateIncome
Total Additional Beds
Created Due to Density
Bonus
Notes
Summary Row: Start Data Entry Below
Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
Table J
Student housing development for lower income students for which was granted a density bonus pursuant to subparagraph (F) of paragraph (1) of subdivision (b) of Section 65915 Project Identifier Units (Beds/Student Capacity) Approved 1 4
NOTE: STUDENT HOUSING WITH DENSITY BONUS ONLY. This
table only needs to be completed if there were student housing projects WITH a density bonus approved pursuant to Government Code65915(b)(1)(F)
Annual Progress Report January 2020
Jurisdiction Redondo Beach ANNUAL ELEMENT PROGRESS REPORT Reporting Period 2023 (Jan. 1 - Dec. 31)
Planning Period 6th Cycle 10/15/2021 - 10/15/2029
Table K
Tenent Preference Policy
Local governments are required to inform HCD about any local tenant preference ordinance the local government maintains when the jurisdiction submits their annual progress report on housing approvals and production, per Government Code 7061 (SB 649, 2022, Cortese). Effective January 1, 2023, local governments adopting a tenant preference are required to create a webpage on their internet website containing authorizing local ordinance and supporting materials, no more than 90 days after the ordinance becomes operational.
Does the Jurisdiction have a local tenant preference policy? If the jurisdiction has a local tenant preference policy, provide a link to the jurisdiction's webpage on their internet website containing authorizing local ordinance and supporting materials.
Notes
Jurisdiction Redondo Beach
Reporting Year 2023 (Jan. 1 - Dec. 31)
Total Award Amount Total award amount is auto-populated based on amounts entered in rows 15-26.
Task $ Amount Awarded $ Cumulative Reimbursement
Requested
Other
Funding Notes
Updating General Plan and Zoning
Ordinance related to housing,
SB330, RHNA Allocation
$47,080.00 $0.00 Local General
Fund
New sewer pipe infrastructure
improvement for Legado 115-unit
Mixed Use Project at Pacific Coast
Hwy and Palos Verdes Blvd
$179,599.00 $0.00 Other
ADU Ordinance Update $40,000.00 $40,000.00 Local General Fund
New ADU ordinances adopted by City Council on
1/12/2021
General Plan Environmental Impact
Report $18,321.00 $0.00 Local General Fund
Administrative Costs $15,000.00 $2,115.00 None
Updating General Plan and Zoning
Ordinance related to housing,
SB330, RHNA Allocation
$0.00 $0.00 Other
The City is submitting a revised LEAP form for the
reallocation of funds that were awarded to the "New
sewer pipe infrastructure improvement for Legado
115-unit Mixed Use Project at Pacific Coast Hwy and
Palos Verdes Blvd" to support the ongoing update to
the City's General Plan and Zoning Ordinance in
support of housing, SB330, RHNA Allocation.
Summary of entitlements, building permits, and certificates of occupancy (auto-populated from Table A2) Current Year
Deed Restricted 3
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 1
Non-Deed Restricted 0
64 68
Current Year
Deed Restricted 0
Non-Deed Restricted 8
Deed Restricted 0
Non-Deed Restricted 21
Deed Restricted 0
Non-Deed Restricted 3
123
155
Current Year
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
Deed Restricted 0
Non-Deed Restricted 0
40 40
ANNUAL ELEMENT PROGRESS REPORT
Local Early Action Planning (LEAP) Reporting
(CCR Title 25 §6202)
Completed
Please update the status of the proposed uses listed in the entity’s application for funding and the corresponding impact on housing within the region or jurisdiction, as applicable, categorized based on the eligible uses specified in Section 50515.02 or 50515.03, as applicable.
$ 300,000.00
Task Status
In Progress
Completed
In Progress
In Progress
Other (Please Specify in Notes)
Total Units
Certificate of Occupancy Issued by Affordability Summary Income Level
Very Low
Low
Moderate
Above Moderate
Moderate
Above Moderate
Total Units
Completed Entitlement Issued by Affordability Summary
Income Level
Very Low
Low
Moderate
Above Moderate
Total Units
Building Permits Issued by Affordability Summary
Income Level
Very Low
Low