Cities Index.
Proposal from John Pugh

Redondo Beach City Council
March 19, 2024

Document
Proposal from John Pugh
Meeting
March 19, 2024
Body
Redondo Beach City Council
Original file
459 KB
Text extracted from the city's file for reading and search. Open the original on redondo.legistar1.com. That file is the official record.

Redondo Beach Mural Proposal
Warranty, Maintenance and Touch up
Warranty
I warrantee that this work Will been free defects for the first eight years, This does not include ask of God or vandalism
Maintenance
Besides the later application of B-72, the murals are protected with 2 coats acrylic exterior varnish (Nova Color) in order to create a safe shield for moderate cleaning. All acrylic products - including the non-wovenmedia - are from Nova Color. You can visit their site for all spec sheets: http://www.novacolorpaint.com .

Warm water and even mild detergent may be used with a soft rag to clean off surface of murals. No alcohol Products should ever be used as this might result in damage to acrylic paint. I suggest that the mural be rubbed down with a damp rag at least every 6 months.

Regularly scheduled maintenance cleanings also provide and opportunity to inspect the murals closer for specific cleaning needs.

Touch-Up
Hopefully this will not become necessary, but in the event touch-up painting is needed – or you have any questions regarding the mural -- please contact me. Contact information is below. I will leave an archived box of the murals main colors with a mural representative as can be arranged.

John Pugh Cell: 408 835-4341 Email: [email protected] Address: 143 Van Ness Ave, Ashland, OR 97520
Redondo Beach Mural Project - John Pugh
Budget Estimate
Itemized Budget Estimate
The mural project budget of $100,000 will include all contracted labor, materials, studio expenses, travel expenses, and general liability insurance. This project will be fabricated and partly painted in the studio, with about 33% of the process saved for the on location installation, painting and integration.

Paint and Materials
Nova Color Paints, Varnishes, and Gels for installation: $5,000 Prepared PolyTab (outdoor mural canvas): $1,000
Architectural Foam Elements and Coatings: $1,000
Wall Prep and Skim Coating
Pressure Washing (included with skim coat) $1,000
Skim Coating (estimate / not included): $2,000
Prime Wall (estimate / not included): $1,000
Travel and Lodging (months on location)
Gas, and Food (one month): $5,000
Lodging for 2-3 People (if needed): $3,000
On Site Expenses
$2,000,000 General Liability Insurance (pro-rated): $1,000 Scaffolding / Lifts: $0
Safety, Rental Equipment, and Misc. $2,000
Artist Fees and Studio Overhead
Artist Fee / ARTIST TIME (includes Designing, Model Making, Painting, Managing, Research and Materials, Photography): $60,000
Studio Overhead (based on three months studio time): $8,000 Other Professional Artist (studio and on location) $7,000 Two Artist / Assistants (in studio & on location): $3,000 0 Estimated Total(s): $100,000

← All documents from this meeting