Redondo Beach Mural Proposal
Warranty, Maintenance and Touch up
Warranty
I warrantee that this work Will been free defects for the first eight years, This does not include ask of God or vandalism
Maintenance
Besides the later application of B-72, the murals are protected with 2 coats acrylic exterior varnish (Nova Color) in order to create a safe shield for moderate cleaning. All acrylic products - including the non-wovenmedia - are from Nova Color. You can visit their site for all spec sheets: http://www.novacolorpaint.com .
Warm water and even mild detergent may be used with a soft rag to clean off surface of murals. No alcohol Products should ever be used as this might result in damage to acrylic paint. I suggest that the mural be rubbed down with a damp rag at least every 6 months.
Regularly scheduled maintenance cleanings also provide and opportunity to inspect the murals closer for specific cleaning needs.
Touch-Up
Hopefully this will not become necessary, but in the event touch-up painting is needed – or you have any questions regarding the mural -- please contact me. Contact information is below. I will leave an archived box of the murals main colors with a mural representative as can be arranged.
John Pugh Cell: 408 835-4341 Email: [email protected] Address: 143 Van Ness Ave, Ashland, OR 97520
Redondo Beach Mural Project - John Pugh
Budget Estimate
Itemized Budget Estimate
The mural project budget of $100,000 will include all contracted labor, materials, studio expenses, travel expenses, and general liability insurance. This project will be fabricated and partly painted in the studio, with about 33% of the process saved for the on location installation, painting and integration.
Paint and Materials
Nova Color Paints, Varnishes, and Gels for installation: $5,000 Prepared PolyTab (outdoor mural canvas): $1,000
Architectural Foam Elements and Coatings: $1,000
Wall Prep and Skim Coating
Pressure Washing (included with skim coat) $1,000
Skim Coating (estimate / not included): $2,000
Prime Wall (estimate / not included): $1,000
Travel and Lodging (months on location)
Gas, and Food (one month): $5,000
Lodging for 2-3 People (if needed): $3,000
On Site Expenses
$2,000,000 General Liability Insurance (pro-rated): $1,000 Scaffolding / Lifts: $0
Safety, Rental Equipment, and Misc. $2,000
Artist Fees and Studio Overhead
Artist Fee / ARTIST TIME (includes Designing, Model Making, Painting, Managing, Research and Materials, Photography): $60,000
Studio Overhead (based on three months studio time): $8,000 Other Professional Artist (studio and on location) $7,000 Two Artist / Assistants (in studio & on location): $3,000 0 Estimated Total(s): $100,000