EXHIBIT A
Pier Plaza Parking Structure – Use of up to 200 stalls within the garage Surface Parking Lot and Vacant Building at old Joe’s Crab Shack site – 230 Portofino Way Portion of Marina Surface Parking Lot Impacted by Portofino Pump Station Replacement Project.
Area highlighted in yellow is the active construction site, which will be fenced-off and secured during the Festival and during load-in/load-out. Area highlighted in green is the material stockpile area, which will be cleared and made available for use by the BeachLife Festival.