Public Works Division
Management
Hourly Rate 1/ Per person - Business Hours - (Two Hour Min.) PW No 0.00 190.12 Per/Hour Hourly Rate 1/ Per Person - Non Business Hours - (Two Hour Min.) PW No 0.00 212.83 Per/Hour Street Maintenance
Hourly Rate 1/ Per person - Business Hours - (Two Hour Min.) PW No 0.00 112.18 Per/Hour Hourly Rate 1/ Per Person - Non Business Hours - (Two Hour Min.) PW No 0.00 130.82 Per/Hour Sewer Maintenance
Hourly Rate 1/ Per person - Business Hours - (Two Hour Min.) PW No 0.00 128.62 Per/Hour Hourly Rate 1/ Per Person - Non Business Hours - (Two Hour Min.) PW No 0.00 149.27 Per/Hour Harbor/ Pier Maintenance
Hourly Rate 1/ Per person - Business Hours - (Two Hour Min.) PW No 0.00 106.59 Per/Hour Hourly Rate 1/ Per Person - Non Business Hours - (Two Hour Min.) PW No 0.00 123.19 Per/Hour Parks Maintenance
Hourly Rate 1/ Per person - Business Hours - (Two Hour Min.) PW No 0.00 94.39 Per/Hour Hourly Rate 1/ Per Person - Non Business Hours - (Two Hour Min.) PW No 0.00 112.68 Per/Hour Building Occupancy (Maintenance)
Hourly Rate 1/ Per person - Business Hours - (Two Hour Min.) PW No 0.00 95.52 Per/Hour Hourly Rate 1/ Per Person - Non Business Hours - (Two Hour Min.) PW No 0.00 114.35 Per/Hour Fleet Services
Hourly Rate 1/ Per person - Business Hours - (Two Hour Min.) PW No 0.00 172.84 Per/Hour Hourly Rate 1/ Per Person - Non Business Hours - (Two Hour Min.) PW No 0.00 193.48 Per/Hour Barricades
Deposit PW No 0.00 44.00 Each 10
Without Flashers PW No 0.00 3.00/ Per Hour Each
With Flashers PW No 0.00 4.50/ Per Hour Each
Delivery and Removal Rate - Business Hours - (Two Hour Min.) PW No 0.00 112.18 Per/Hour Delivery and Removal Rate - Non Business Hours - (Two Hour Min.) PW No 0.00 130.82 Per/Hour Asphalt Replacement
Hourly Rate 1/ Per person - Business Hours - (Two Hour Min.) PW No 0.00 Per Employee 2 Per/Hour Hourly Rate 1/ Per Person - Non Business Hours - (Two Hour Min.) PW No 0.00 Per Employee 2 Per/Hour Material PW No 0.00 Going Market Rate Sq. Foot
Curb/ Gutter Replacement
Hourly Rate 1/ Per person - Business Hours - (Two Hour Min.) PW No 0.00 Per Employee 2 Per/Hour Hourly Rate 1/ Per Person - Non Business Hours - (Two Hour Min.) PW No 0.00 Per Employee 2 Per/Hour Material PW No 0.00 Going Market Rate Sq. Foot
PUBLIC WORKS MASTER FEE SCHEDULE
EXHIBIT A
Resolution No: CC-2406-050
Effective Date: July 10, 2024
Description Dept Change New FY 2024-2025 FY 2023-2024 Unit
PUBLIC WORKS MASTER FEE SCHEDULE
EXHIBIT A
Resolution No: CC-2406-050
Effective Date: July 10, 2024
Description Dept Change New FY 2024-2025 FY 2023-2024 Unit Driveway Approach (Spandrel)
Hourly Rate 1/ Per person - Business Hours - (Two Hour Min.) PW No 0.00 Per Employee 2 Per/Hour Hourly Rate 1/ Per Person - Non Business Hours - (Two Hour Min.) PW No 0.00 Per Employee 2 Per/Hour Material PW No 0.00 Going Market Rate Sq. Foot
Sidewalk Construction/ Install/ Remove (4" & 6" Thick Cement) Hourly Rate 1/ Per person - Business Hours - (Two Hour Min.) PW No 0.00 Per Employee 2 Per/Hour Hourly Rate 1/ Per Person - Non Business Hours - (Two Hour Min.) PW No 0.00 Per Employee 2 Per/Hour Material PW No 0.00 Going Market Rate Lin. Foot
Solid Waste
Waste Management Plan Fee (Construction/ Demolition) PW No 0.00 117.00/ Plan Each Performance Deposit (Construction and Demolition) PW No 0.00 3000.00 - 50% of Recycling Each Solid Waste Permit (Private Solid Waste haulers) PW No 0.00 4 % Gross Receipts Each Miscellaneous Fees/Charges
Block Party Barbeque Use Fee PW No 0.00 100.00 Each
Electric Vehicle Charging Fees
Level 2 Charger PW No 0.00 0.30 Per KWh
DC Fast Charger PW No 0.00 0.40 Per KWh
Overstay Fee (After 4 hours) PW No 0.00 1.50 Per KWh
Engineering Division
Inspection Fees 1
Banner Inspection (Public Right Of Way) ENG Yes Fee Now Under Community Serivces
Street Block
Engineering Inspection (Minimum 2) ENG No 0.00 153.00 or 2.5% of Utility Cost (Use Highest) Each
Street Closure Inspection ENG No 0.00 121.00 Each
Transportation Inspection ENG No 0.00 114.00 Each
Inspection Outside Normal Business Hours (Minimum 2 - Hour Charge) ENG No 0.00 165.00 per hour Investigation Fee ENG No 0.00 153.00 per hour
Site Visit Fee ENG No 0.00 153.00 per hour
Miscellaneous Fees/Charges
License Agreement Administrative Fee Each
Bond Service Fee ENG No 0.00 120.00 Each
PUBLIC WORKS MASTER FEE SCHEDULE
EXHIBIT A
Resolution No: CC-2406-050
Effective Date: July 10, 2024
Description Dept Change New FY 2024-2025 FY 2023-2024 Unit Permits
Banner Permit (Public Right Of Way) ENG Yes Remove Fee Now Under Community Serivces
Location
Engineering Permit ENG No 0.00 120.00 Location
News Rack Permit ENG No 0.00 0.00 Location
Street Closure Permit ENG No 0.00 120.00 Location
Street Closure Permit (Filming) ENG No 0.00 380.00 Location Transportation Permit ENG No 0.00 120.00 Location
Sandblasting Permit ENG No 0.00 120.00 Location
Storage Unit Permit ENG No 0.00 120.00 Location
Permit Reissuance ENG No 0.00 88.00 Each
SB 1473 Green Building Standards 2
$1 - 25,000 of Permit Valuation ENG Remove Fee Now Under Community Development Location
$25,001 - 50,000 of Permit Valuation ENG Remove Fee Now Under Community Development Location
$50,001 - 75,000 of Permit Valuation ENG Remove Fee Now Under Community Development Location
$75,001 - 100,000 of Permit Valuation ENG Remove Fee Now Under Community Development Location
Every $25,000 or Fraction Thereof Above $100,000 ENG Remove Fee Now Under Community Development Location
Engineering Deposits
Cleaning ENG No 0.00 325.00 Location
Engineering Plan Check ENG No 0.00 3 times plan check fee Location Engineering Plan Check (Wireless Siting) ENG No 0.00 3,247.50 Location License Agreement Review ENG No 0.00 5,500.00 Location
Excavation ENG No 0.00 5.00/Sq. Ft. (Min. 1,500.00) Location Technical Report Review ENG No 0.00 3 times review fee Report Sidewalk Dining
Tier 1: Serve alcohol and put in guard rail/separation with furniture that will occupy the space 24 hrs/day ENG No 0.00 2.00 SF per month Tier 2: No alcohol service, guard rail/separation with furniture being removed when business is closed ENG No 0.00 2.00 SF per month Maps
Subdivision
Subdivision Transaction Fee ENG No 0.00 2,357.00 Each
Right-Of-Way Vacation Fee ENG No 0.00 3,534.00 Each
Parcel Map ENG 33% 710.00 534.00 Each
Accelerated Parcel Map (Within 48 Business Hours) ENG No 0.00 50% of Parcel Map Fee Each Tract Map ENG 31% 1,350.00 1,032.00 Each
Parcel Map Deposit ENG No 0.00 3,245.00 Each
Tract Map Deposit ENG No 0.00 6,490.00 Each
PUBLIC WORKS MASTER FEE SCHEDULE
EXHIBIT A
Resolution No: CC-2406-050
Effective Date: July 10, 2024
Description Dept Change New FY 2024-2025 FY 2023-2024 Unit Aerial Photo Maps (4 Days Advance Notice Required)
Blueline Copy 24" X 36" ENG No 0.00 6.49 Each
20 Lb Bond Paper 24" X 36" ENG No 0.00 77.88 Each
20 Lb Bond Paper 36" X 60" ENG No 0.00 194.70 Each
Glossy Paper 24" X 36" ENG No 0.00 93.48 Each
Glossy Paper 36" X 60" ENG No 0.00 233.64 Each
Other Maps
City Map - Small (18" X 24") ENG No 0.00 2.60 Each
City Map - Medium (24" X 36") ENG No 0.00 5.19 Each
City Map - Large (36" X 36") ENG No 0.00 6.49 Each
Facility Map (32" X 42") ENG No 0.00 6.49 Each
Sewer Map (24" X 36") ENG No 0.00 6.49 Each
Plan Check Fees
Engineering Plan Check Fee (R-1 to R-3 Projects) ENG No 0.00 260.00 Each Engineering Plan Check Fee (Wireless Siting Project) ENG No 0.00 Actual Cost per/hour Engineering Plan Check Fee (Other, 2 Hour Minimum) ENG No 0.00 130.00 per/hour Accelerated Plan Check Fee ENG No 0.00 50% of Engineering Plan Check Fee
Each
Scanning Fee ENG No 0.00 11.00 Location
Project Evaluation Fee ENG No 0.00 99.00 Each
Technical Report Review (LID, Traffic, Sewer, SWPPP, etc.) ENG No 0.00 130.00 per/hour Public works Division
1) Includes Personnel, Materials & Equipment, Administration & Overhead Costs 2) Hourly Rate Depends on Personnel Performing Task. Personnel Rates are Reflected in Categories 1-6.
Engineering Division
1) Minimum 2 Inspections Per Permit
2) All Monies Collected By These Fees Will Be submiƩed to the State of California Except For 10 Percent retained by the City of Redondo Beach for AdministraƟve Charges and For Code Enforcement EducaƟon.
Notes