Planning Division
Administrative Design Review
Additions,TI Improvements, New ADU/JADU, NSFR Planning Yes 741.00 695.00 Each New Development Containing 2-15 Units on a Lot Planning Yes 2,518 Plus 734.00 Per Unit 2,360.00 Plus 688.00 Per Unit Each Multi-Family Residential Planning Yes 2,518 Plus 734.00 Per Unit 2,360.00 Plus 688.00 Per Unit Each Non-Residential Under 10,000 Square Foot Floor Area Planning Yes 5,761.00 5,400.00 Each Non-Residential Over 10,000 Square Foot Floor Area Planning Yes 14,468.00 13,560.00 Each Overlap Parking Planning Yes 1,222.00 1,145.00 Each
Appeals
Appeal of Decision by Director to Planning Commission 2 Planning Yes 587.00 550.00 Each Appeal of Administrative Design Review/Decision by Director to Planning Commission Planning Yes 587.00 550.00 Each Appeal of Administrative Design Review to Planning Commission for New Development Containing 2-3 Units on a Lot
Planning Yes 784.00 Plus 784.00 Per Unit (To be Paid
by Applicant)
735.00 Plus 735.00 Per Unit (To be Paid
by Applicant)
Each
Appeal of Planning Commission Decision to City Council Planning No 25% of Original Application Fee to a Max of 500.00
25% of Original Application Fee to a Max
of 500.00
Each
Business License Administrative Appeal Planning Yes 587.00 550.00 Each Change of Land Use District/Zoning Map Amendment
Property Outside City's Coastal Zone Planning Yes 5,876.00 5,507.00 Each Property Within City's Coastal Zone Planning Yes 8,579.00 8,040.00 Each Coastal Development Permit
Public Hearing Waiver 3 Planning Yes 363.00 340.00 Each Public Hearing Planning Yes 1,712.00 1,605.00 Each
Conditional Use Permit
Category 1 - All Uses Except Multi-Family Residential Planning Yes 3,422.94 3,208.00 Each Category 2 - Multi-Family Residential and Condominium Projects Planning Yes 3,422.00 Plus 1,435.00 Per Unit 3,208.00 Plus 1,345.00 Per Unit Each Category 3 - Condominium Conversion Planning Yes 3,422.00 Plus 1,435.00 Per Unit 3,208.00 Plus 1,345.00 Per Unit Each Development Agreement Planning Yes 2,208.00 Plus Contract Cost 2,069.00 plus Contract Cost Each Environmental Review Fees
Initial Study and Negative Declaration Planning Yes 2,208.00 Plus Contract Cost 2,069.00 plus Contract Cost Each Initial Study and Mitigated Negative Declaration Planning Yes 2,379.00 Plus Contract Cost 2,230.00 plus Contract Cost Each Environmental Impact Report (EIR) Planning No Actual Cost Actual Cost Each
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A
Contract Administration Charge for EIR Consultant Planning Yes 2,208.00 2,069.00 Each Supplemental Fee for Environmental Analysis Based on Prior EIR or Master/Program EIR Planning Yes 1,963.00 1,840.00 Each Plan Check Fees 4
New Development Planning No 50% of Building Permit Fee 50% of Building Permit Fee Each Additions of Floor Area to Existing Development Planning No 50% of Building Permit Fee 50% of Building Permit Fee Each Commercial Tenant Improvements Planning No 10% of Building Permit Fee 10% of Building Permit Fee Each Structures Other Than Buildings (ADR OTHER) (e.g., Fences, Walls, Signs) Planning Yes 122.00 115.00 Each Planned Development Review
In Conjunction With Establishment of Overlay Zone 5 Planning Yes 5,876.00 5,507.00 Each In Conjunction With Establishment of Overlay Zone Within the City's Coastal Zone5 Planning Yes 8,579.00 8,040.00 Each Addition/Substantial Alteration to an Existing Development 6 Planning Yes 1,712.00 1,605.00 Each Planning Commission Design Review
Review of New Construction
Multi-Family Residential Planning Yes 3,430.00 3,215.00 Each Non-Residential Under 10,000 Square Foot Floor Area Planning Yes 3,430.00 3,215.00 Each Non-Residential 10,000 - 49,999 Square Foot Floor Area Planning Yes 13,764.00 12,900.00 Each Non-Residential 50,000 Square Foot or More Floor Area Planning Yes 27,529.00 25,800.00 Each Planning Re-Inspection Fee Planning Yes 245.00 230.00 Each Prior Discretionary Approval
Amendment Planning Yes 1,712.00 1,605.00 Each
Extensions 7 Planning Yes 734.00 688.00 Each
Subdivisions
Parcel Map Planning Yes 1,712.00 1,605.00 Each
Tract Map Planning Yes 2,657.00 2,490.00 Each
Lot Line Adjustment Planning Yes 1,712.00 1,605.00 Each Other Planning Fees
Variance Planning Yes 3,414.00 3,200.00 Each
Modification Planning Yes 9,812.00 920.00 Each
Administrative Use Permit (AUP) Fee for Personal Improvement Services Planning Yes 1,712.00 1,605.00 Each Wireless Telecommunications Facilities Supplemental Application Planning Yes 3,425.00 Plus 1,424.00 Per Supplemental Application
3,210.00 Plus 1,335.00 Per Supplemental
Application
Each
Zoning Compliance Report Planning Yes 245.00 230.00 Each Planning/Zoning Code W/Cover Planning Yes 0.18 0.17 Each Planning/Zoning Code Yearly Supplements Planning Yes 0.18 0.17 Each
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A
General Plan Planning Yes 59.00 55.00 Each
Harbor/Civic Center Specific Plan Planning Yes 19.00 18.00 Each Temporary Use Permit Planning Yes 245.00 230.00 Each
Temporary Use Permit for Watersport Instruction and Equipment Rental Planning Yes 1,067.00 1,000.00 Each/Per Month Temporary Banners - Private Property (Temporary - Does Not Include Deposit) Planning Yes 75.00 70.00 Each Massage Permit Application Fee
Business Location Planning Yes 293.00 275.00 Each
Entertainment Permit
Level I Planning Yes 389.00 365.00 Each
Level II Planning Yes 859.00 805.00 Each
Renewal - Level I and Level II Planning Yes 219.00 205.00 Each Tobacco Retail Permits
Tobacco Retail Permit Planning Yes 277.00 260.00 Each
Preservation Fees
Landmark Designation or District Addition Planning No No charge No charge Each Certificate of Appropriateness- Restoration or Addition Planning No No charge No charge Each Mills Act Contracts Planning No No charge No charge Each Historic Variance Planning Yes 2,742.00 2,570.00 Each
Certificate of Appropriateness - Demolition or List Removal Planning Yes 5,522.00 5,175.00 Each Plan and Data Maintenance Fees
General Plan Planning No 100,000.00 Per Year - 1.70 Per 1,000.00 Valuation
100,000.00 Per Year - 1.70 Per 1,000.00
Valuation
Each
Building Division
Miscellaneous Fees/Charges
Address Change Building Yes 1,199.00 1,123.38 Each
Certificate of Occupancy Building No Included in Permit Fee Included in Permit Fee Each Certificate of Occupancy (Temporary) Building No Deposit Required as determined by Chief Building Official
Deposit Required as determined by
Chief Building Official
Each
Appeals of Administrative Decision Board of Appeals "Uniform Codes, Disabled Access Appeals Board"
Building Yes 700.00 655.75 Each
Deputy Inspector Certification Registration Building Yes 198.00 185.98 Each
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A
Grading Refundable Bond Building No Bond Amount Determined by Chief Building Official
Bond Amount Determined by Chief
Building Official
Each
Job Card Replacement Building Yes 126.00 118.25 Each
Report of Residential Building Yes 157.00 147.28 Each
Report of Residential - Expedited Additional Fee Building Yes 247.00 231.13 Each State Energy Plan Check Fee Building No 25% of Building Check Fee as Allowed by Section 25402.0 of Public Resources
Code
25% of Building Check Fee as Allowed by
Section 25402.0 of Public Resources
Code
Each
Construction Site Sign Building Yes 102.00 95.68 Each
Contractor Transfer Fee Building Yes 31.00 29.03 Each
Inspection Fees
Inspection Outside Normal Business Hours (Minimum 2 - Hour Charge) Building Yes 144.00 135.45 Per Hour Re-Inspection Fees Assessed Under Provisions of Section 305(G) Building Yes 229.00 215.00 Flat Rate Inspections for Which No Fee is Indicated (Minimum 1 - Hour Charge) Building Yes 211.00 197.80 Per Hour Plan Check/Review Fees 1
Plan Review Fee/Plan Review Revision Fee Building Yes 100% of Building Permit Fee and for Revisions 157.00 Per Hour
100% of Building Permit Fee and for
Revisions 147.00 Per Hour
Each
Plan and Permit Retention Fee Building Yes 1.40 1.29 Per Page Accelerated Plan Review Building No 50% of Plan Check Fee 50% of Plan Check Fee Each Disability Plan Review and Permit Fees Building No 10% of Building Permit Fee 10% of Building Permit Fee Each CalGreen Plan Review Building No 10% of Building Permit Fee 10% of Building Permit Fee Grading Plan Check/Review Fees
50 Cubic Yards or Less Building Yes 163.00 152.65 Each
51 to 100 Cubic Yards Building Yes 247.00 231.13 Each
101 to 1,000 Cubic Yards Building Yes 409.00 383.78 Each 1,001 to 10,000 Cubic Yards Building Yes 518.00 485.90 Each 10,001 to 100,000 Cubic Yards Building Yes 685.00 for the First 10,000 Cubic Yards Plus 163.00 for Each Addl 10,000 Cubic
Yards or Fraction Thereof
642.00 for the First 10,000 Cubic Yards
Plus 153.00 for Each Addl 10,000 Cubic
Yards or Fraction Thereof
Each
100,001 to 200,000 Cubic Yards Building Yes 2,151.00 for the First 100,000 Cubic Yards Plus 111.00 for Each Addl 10,000 Cubic
Yards or Fraction Thereof
2,016.00 for the First 100,000 Cubic
Yards Plus 104.00 for Each Addl 10,000
Cubic Yards or Fraction Thereof
Each
200,001 Cubic Yards or More Building Yes 3,097.00 for the First 200,000 Cubic Yards Plus 108.00 for Each Addl 10,000
Cubic Yards or Fraction Thereof
2,903.00 for the First 200,000 Cubic
Yards Plus 101.00 for Each Addl 10,000
Cubic Yards or Fraction Thereof
Each
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A
Plan Check Fees
Electrical Plan Check Fee (1 Hour Minimum) Building Yes 100% of Electrical Permit Fee or 157.00/Hour
100% of Electrical Permit Fee or
147.00/Hour
Each
Mechanical Plan Check Fee (1 Hour Minimum) Building Yes 100% of Mechanical Permit Fee or 157.00/Hour
100% of Mechanical Permit Fee or
147.00/Hour
Each
Plumbing Plan Check Fee (1 Hour Minimum) Building Yes 100% of Plumbing Permit Fee or 157.00/Hour
100% of Plumbing Permit Fee or
147.00/Hour
Each
Shoring Plan Check Fee (1 Hour Minimum) Building Yes 100% of Shoring Permit Fee or 157.00/Hour
100% of Shoring Permit fee or
147.00/Hour
Each
Permits
Permit Issuance Fee Building Yes 63.00 59.13 Each
Technology Surcharge Fee Building No $0.0025 per $1 dollar valuation $0.0025 per $1 dollar valuation Each After Hours Permit Building Yes 94.00 88.15 Each Day
Building Moving Permit (Within City, to City or From City) Building Yes 1080.00 1,012.65 Each Demolition Permit
Single Family Building Building Yes 163.00 152.65 Each
Accessory Building to Single Family Building Building Yes 132.00 123.63 Each All Other Buildings Building Yes 227.00 212.85 Each
Transfer Fee Permit (In Addition to Issuance Fee) Building Yes 31.00 29.03 Each Building Permits
Total Valuation
$ 1 to 500 Building Yes 63.00 59.13 Each
$ 501 to 2,000 Building Yes 74.00 for First 500 + 10.00 for Each Addl 100 or Fraction Thereof
69.00 for First 500 + 10.00 for Each Addl
100 or Fraction Thereof
Each
$ 2,001 to 25,000 Building Yes 245.00 for First 2,000 + 28.00 for Each Addl 1,000 or Fraction Thereof
230.00 for First 2,000 + 26.00 for Each
Addl 1,000 or Fraction Thereof
Each
$ 25,001 to 50,000 Building Yes 873.00 for First 25,000 + 21.00 for Each Addl 1,000 or Fraction Thereof
818.00 for First 25,000 + 20.00 for Each
Addl 1,000 or Fraction Thereof
Each
$ 50,001 to 100,000 Building Yes 1,412.00 for First 50,000 + 16.00 for Each Addl 1,000 or Fraction Thereof
1,323.00 for First 50,000 + 15.00 for Each
Addl 1,000 or Fraction Thereof
Each
$ 100,001 to 500,000 Building Yes 2,213.00 for First 100,000 + 14.00 for Each Addl 1,000 or Fraction Thereof
2,074.00 for First 100,000 + 13.00 for Each
Addl 1,000 or Fraction Thereof
Each
$ 500,001 and Up Building Yes 7,714.00 for First 500,000 + 11.00 for Each Addl 1,000 or Fraction Thereof
7,230.00 for First 500,000 + 10.00 for
Each Addl 1,000 or Fraction Thereof
Each
Combination Permit for Residential Owner/Builder When Valuation Is Less Than $20,000.002
Building No
No Issuance Fee for Plumbing, Electrical
and Mechanical Permits
No Issuance Fee for Plumbing, Electrical
and Mechanical Permits
Permit
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A
Shoring Permits
Up to 500 Cubic Yards Building Yes 63.00 59.13 Each
500 Cubic Yards to 2,000 Cubic Yards Building Yes 72.00 for the first 500 Cubic Yards plus
10.00 for each additonal 100 cubic yards
or fraction thereof
68.00 for the first 500 Cubic Yards plus
9.00 for each additonal 100 cubic yards
or fraction thereof
Each
2,000 Cubic Yards to 25,000 Cubic Yards Building Yes 256.00 for the first 2,000 Cubic Yards plus 28.00 for each additonal 1,000
cubic yards or fraction thereof
240.00 for the first 2,000 Cubic Yards
plus 26.00 for each additonal 1,000
cubic yards or fraction thereof
Each
25,001 Cubic Yards to 50,000 Cubic Yards Building Yes 607.00 for the first 25,000 Cubic Yards plus 20.00 for each additonal 1,000
cubic yards or fraction thereof
569.00 for the first 25,000 Cubic Yards
plus 19.00 for each additonal 1,000
cubic yards or fraction thereof
Each
50,001 Cubic Yards to 100,000 Cubic Yards Building Yes 1,117.00 for the first 50,000 Cubic Yards plus 15.00 for each additonal 1,000
cubic yards or fraction thereof
1047.00 for the first 50,000 Cubic Yards
plus 14.00 for each additonal 1,000
cubic yards or fraction thereof
Each
100,001 Cubic Yards to 500,000 Cubic Yards Building Yes 1861.00 for the first 100,000 Cubic Yards plus 13.00 for each additonal 1,000
cubic yards or fraction thereof
1744.00 for the first 100,000 Cubic Yards
plus 12.00 for each additonal 1,000 cubic
yards or fraction thereof
Each
500,001 Cubic Yards or more Building Yes 6,903.00 for the first 500,000 Cubic Yards plus 10.00 for each additonal
1,000 cubic yards or fraction thereof
6,470.00 for the first 500,000 Cubic
Yards plus 9.00 for each additonal 1,000
cubic yards or fraction thereof
Each
Grading Permits9
50 Cubic Yards or Less Building Yes 169 158.03 Each
51 to 100 Cubic Yards Building Yes 169 158.03 Each
101 to 1,000 Cubic Yards Building Yes 225.00 for the First 100 Cubic Yards Plus
56.00 for Each Addl 100 Cubic Yards or
Fraction Thereof
211.00 for the First 100 Cubic Yards Plus
53.00 for Each Addl 100 Cubic Yards or
Fraction Thereof
Each
1,001 to 10,000 Cubic Yards Building Yes 722.00 for the First 1,000 Cubic Yards Plus 48.00 for Each Addl 1,000 Cubic
Yards or Fraction Thereof
677.00 for the First 1,000 Cubic Yards
Plus 45.00 for Each Addl 1,000 Cubic
Yards or Fraction Thereof
Each
10,001 to 100,000 Cubic Yards Building Yes 1,153.00 for the First 10,000 Cubic Yards Plus 46.00 for Each Addl 10,000 Cubic
Yards or Fraction Thereof
1,081.00 for the First 10,000 Cubic Yards
Plus 43.00 for Each Addl 10,000 Cubic
Yards or Fraction Thereof
Each
100,001 or More Cubic Yards Building Yes 1,563.00 for the first 100,000 cubic yards plus 43.00 for each addl 10,000 cubic
yards or fraction thereof
1,465.00 for the first 100,000 cubic yards
plus 40.00 for each addl 10,000 cubic
yards or fraction thereof
Each
Electrical Permits
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A
System Fee Schedule
New Residential Buildings
Multi-Family (Apts and Condos) - If Building Has Three or More Living Units, Not Including Garage, Carports and Other Non-Commercial Auto Storage Areas Constructed at the Same Time.
Building Yes 0.22 0.20 Per Sq. Ft.
Single and Two-Family - If Building Has One or Two Living Units, Not Including Garage, Carport and Other Minor Accessory Constructed at the Same Time.
Building Yes 0.22 0.20 Per Sq. Ft.
Others - Other Types of Residential Occupancies and Alterations, Additions and Modifications to Existing Residential Structures.
Building Yes 0.26 0.25 Per Sq. Ft.
Private Swimming Pools
For New Private, Residential (Single and Multi-Family) In-Ground Pools, Including a Complete System of Necessary Branch Circuit Wiring, Bonding, Grounding, Underwater Lighting, Water Pumping and Related Electrical Equipment.
Building Yes 136.00 127.93 Each
For Other Types of Swimming Pools, Therapeutic Whirlpools, Spas and Alterations to Existing Swimming Pools.
Building No See Unit Fee Schedule See Unit Fee Schedule See Unit Fee
Schedule
Solar Electric Panel - Residential Building Yes 344.00 322.50 Each Solar Electric Panel - Commercial Building Yes 1,043.00 977.18 Each Carnivals and Circuses 3
Electric Generators and Electrically Driven Rides Building Yes 85.00 79.55 Each Electrical Lighting for Mechanically Driven Rides and Walk - Through Attractions Building Yes 19.00 18.28 Each Area and Booth Lighting System Building Yes 19.00 18.28 Each Temporary Power Service
Temporary Power Service Pole or Pedestal, Including All Pole or Pedestal Mounted Receptacle Outlets and Appurtenances
Building Yes 54.00 50.53 Each
Temporary Distribution System and Temporary Lighting and Receptacle Outlets for Construction Sites, Decorative Light, Christmas Tree Sale Lots, Firework Stands, Etc.
Building Yes 26.00 24.73 Each
Electrical Permits (Continued)
Power Apparatus4
Items Rating in HP/ KW
Up to 1 Building Yes 19.00 18.28 Each
Over 1 and Not Over 10 Building Yes 48.00 45.15 Each
Over 11 and Not Over 50 Building Yes 81.00 76.33 Each
Over 51 and Not Over 100 Building Yes 163.00 152.65 Each Over 101 Building Yes 241.00 225.75 Each
Items Rating In KVA/KVAR
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A
E53 Transformer < 75 KVA Building Yes 48.00 45.15 Each
E54 Transformer > 75 KVA Building Yes 81.00 76.33 Each
Busways - for Trolley and Plug-in Type Busways 5 Building Yes 19.00 18.28 Each Signs, Outline Lighting and Marquees
Supplied From One Branch Circuit Building Yes 53.00 49.45 Each Additional Branch Circuits W/I the Same Sign, Outline Lighting System or Marquee Services Building Yes 19.00 18.28 Each Services
600 Volts or Less and Not Over 200 Amperes in Rating Building Yes 63.00 59.13 Each 600 Volts or Less and Over 200 Amperes to 1,000 Amperes in Rating Building Yes 181.00 169.85 Each Over 600 Volts or Over 1,000 Amperes in Rating Building Yes 343.00 321.43 Each Miscellaneous Apparatus, Conduits and Conductors for Which a Permit is Required But No Fee is Set Forth. (This Fee is Not Applicable When a Fee is Paid for One or More Services, Outlets, Fixtures, Appliances, Power Apparatus, Busways, Signs or Other Equipment) Building Yes 41.00 38.70 Each
Elevator Permits
New Installations 6
Passenger or Freight Elevator, Escalator, Moving Walk
Up to and Including $40,000 Valuation Building Yes 632.00 592.33 Each Over $40,000 Valuation Building Yes 588.00 Plus 9.45 for Each 1,00 or Fraction Thereof Over 40,00
592.00 Plus 10.00 for Each 1,000.00 or
Fraction Thereof Over 40,000.00
Each
Dumbwaiter or Private Residence Elevator
Up to and Including $10,000 of Valuation Building Yes 81.44 76.33 Each Over $10,001 Valuation
Building Yes
71.00 Plus 10.00 for Each 1,00 or Fraction
Thereof Over 10,00
75.00 Plus 10.00 for Each 1,000.00 or
Fraction Thereof Over 10,000.00
Each
Unit Fee Schedule (The Following Do Not Include Permit Issuance Fees) Lighting Fixtures, Sockets or Other Lamp-Holding Device First 20 Building Yes 3.61 3.39 Each
Additional Fixtures Building Yes 1.84 1.72 Each
Pole or Platform-Mounted Lighting Fixtures Building Yes 3.61 3.39 Each Theatrical-Type Lighting Fixtures or Assemblies Building Yes 3.38 3.17 Each Receptacle, Switch and Lighting Outlets at Which Current is Used or Controlled- Except Service Feeders and Meters
First 20 Building Yes 3.61 3.39 Each
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A
Additional Outlets 7,8 Building Yes 1.84 1.72 Each
Residential Appliances or Receptacle Outlets for Same, Including Wall-Mounted Electric Ovens, Ranges, Console or Through-Wall Air Conditioners, Space Heaters, Food Waste Grinders, Dishwashers, Washing Machines, Water Heaters, Clothes Dryers, Etc. (Includes Motor Operated Appliances Not Exceeding 1HP Rating)
Building Yes 19.00 18.28 Each
Non-Residential Appliances and Self-Contained Factory-Wired, Non-Residential Appliances Not Exceeding 1HP, Kilowatt, or Kilovolt-Ampere in Rating (Includes Medical and Dental Devices; Food, Beverage, and Ice Cream Cabinets; Illuminated Showcases; Drinking Fountains; Vending Machines, Laundry Machines or Other Similar Types of Equipment) Building Yes 19.00 18.28 Each
Mechanical Permits
System and Unit Schedule
Air-Handling Unit, Up to and Including 10,000 Cubic Feet Per Minute, Including Ducts Attached Thereto 10 Building Yes 31.00 29.03 Each
Air-Handling Unit Over 10,000 CFM 10 Building Yes 41.00 38.70 Each Appliance Vent - Installation, Relocation or Replacement, Each and Not Included in an Appliance Permit
Building Yes 21.00 19.35 Each
Mechanical Exhaust Hood (Type I) Building Yes 88.00 82.78 Each Mechanical Exhaust Hood (Type II) Building Yes 39.00 36.55 Each Miscellaneous Appliances/Equipment/Electric/Gas Building Yes 21.00 19.35 Each Boiler
400,000 BTU/Hour or More Building Yes 126.00 118.25 Each Less Than 400,000 BTU/Hour Building Yes 78.00 73.10 Each FAU 100,000 BTU or Over Building Yes 49.00 46.23 Each
From 3 to 15 HP - 100,000 to 500,000 BTU Building Yes 115.00 107.50 Each Boiler or Compressor13 Over 100,000 BTU/Hour and Including 500,000 BTU/Hour Building Yes 120.00 112.88 Each Boiler or Compressor13 Over 15 HP to and Including 30 HP or Each Absorption System Over 500,000 BTU/Hour Up to and Including 1 Million BTU/Hour Building Yes 130.00 121.48 Each
Boiler or Compressor13 Over 30 HP to and Including 50 HP or Each Absorption System Over 1 Million BTU/Hour Up to and Including 1.75 Million BTU/Hour Building Yes 166.00 155.88 Each
Boiler or Compressor13 Over 50 HP or Each Absorption System Over 1.75 million BTU Building Yes 244.00 228.98 Each Evaporation Cooler Other Than Portable Type Building Yes 30.00 27.95 Each Furnace (Forced-Air or Gravity-Type)* Including Ducts and Vents Attached to Such Appliance, Up to and Including 100,000 BTU/Hour
Building Yes 56.00 52.68 Each
Furnace (As Above) Over 100,000 BTU/Hour Building Yes 78.00 73.10 Each Furnace - Including Vent Building Yes 39.00 36.55 Each
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A
Heater (Suspended, Recessed Wall or Floor-Mounted Units) Building Yes 39.00 36.55 Each Incinerator - Industrial Type Building Yes 247.00 231.13 Each Repair of, or Alteration or Addition to Each Heating Appliance, Refrigeration Unit, Cooling Unit, Absorption Unit or Evaporative Cooling System, Including Installation of Controls Regulated by This Code
Building Yes 39.00 36.55 Each
Ventilation Fan Connected to a Single Duct Building Yes 30.00 27.95 Each Ventilation System Which is Not a Portion of Any Heating or Air-Conditioning System Authorized by a Permit
Building Yes 30.00 27.95 Each
Appliance or Equipment Not Regulated by This Code, But Not Classed in Other Appliance Categories, or for Which no Other Fee is Listed in This Code Building Yes 30.00 27.95 Each
New Multi-Family Building Yes 0.23 0.22 Sq. Ft
New One or Two Family Building Yes 0.23 0.22 Sq. Ft
Other Residential Addition, Alteration, Etc. Building Yes 0.30 0.28 Sq. Ft Plumbing Permits
Abandoned Cesspool / Cap Sewer Building Yes 181.00 169.85 Each Automatic Washer Building Yes 26.00 24.73 Each
Bar Sink Building Yes 26.00 24.73 Each
Bathtub Building Yes 26.00 24.73 Each
Bidet Building Yes 26.00 24.73 Each
Cesspool (Where Permitted) Building Yes 136.00 127.93 Each Dishwasher (No Permit Required for Repair or Replacement) Building Yes 26.00 24.73 Each Dishwasher - Commercial / Garbage Disposal Building Yes 37.00 34.40 Each Drinking Fountain Building Yes 26.00 24.73 Each
Fixture/Trap/Set of Fixtures on One Trap (Including Water, Drainage Piping, and Backflow Protection)
Building Yes 30.00 27.95 Each
Floor Drain / Floor Sink Building Yes 26.00 24.73 Each
Gas Piping System of One to Four Outlets Building Yes 19.00 18.28 Per Outlet Gas Piping System of Five or More Outlets Building Yes 17.00 16.13 Per Outlet Grease Trap / Interceptor / Clarifier Building Yes 64.00 59.13 Each Kitchen Sink / Kitchen Sink With Garbage Disposal Building Yes 26.00 24.73 Each Laundry Tub or Tray Building Yes 26.00 24.73 Each
Lavatory Building Yes 26.00 24.73 Each
Miscellaneous Building Yes 26.00 24.73 Each
Miscellaneous Electric Building Yes 19.00 18.28 Each
Pool / Spa / Heater / Filter System Building Yes 72.00 67.73 Each Private Sewer Disposal System Building Yes 179.00 167.70 Each Rainwater Systems (Inside Building) Building Yes 32.00 30.10 Per Drain Repair / Alter Vent Drain Sewer Building Yes 26.00 24.73 Per Drain
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A
Repipe Per Fixture - First 10 (Each) Building Yes 4.00 3.39 Per Drain Repipe Per Fixture - 11 and Over Building Yes 2.00 1.72 Per Drain Sewer
Building and Trailer Park - Each Building Yes 108.00 101.05 Per Drain Disposal System Building Yes 244.00 228.98 Per Drain
Ejector Building Yes 68.00 63.43 Per Drain
Capping Building Yes 221.00 207.48 Per Drain
Shower Building Yes 26.00 24.73 Per Drain
Solar Plumbing Fee Building Yes 81.00 76.33 Per Drain
Shower Pan Replacement Building Yes 34.00 32.25 Per Drain Sink - Commercial Building Yes 48.00 45.15 Per Drain
Sprinkler (Lawn) on Any One Meter, Including Backflow Protection Devices Building Yes 35.00 33.33 Per Drain Urinal Building Yes 35.00 33.33 Per Drain
Vac Breakers
Atmospheric - First 10 (Each) Building Yes 3.00 3.23 Per Drain Atmospheric - 11 and Over (Each) Building Yes 2.00 1.72 Per Drain Pressure Type - First 10 (Each) Building Yes 9.00 8.60 Per Drain Pressure Type - 11 and Over (Each) Building Yes 5.00 5.11 Per Drain Reduce Pressure Prin - First 10 (Each) Building Yes 26.00 24.73 Per Drain Reduce Pressure Prin - 11 and Over (Each) Building Yes 15.00 14.51 Per Drain Vent Piping and Drainage Repair or Alteration Building Yes 19.00 18.28 Per Fixture Water Closet Building Yes 26.00 24.73 Each
Water Heater Replacement Building Yes 26.00 24.73 Each
Water Heater (New) Building Yes 48.00 45.15 Each
Water Piping and / or Water-Treating Equipment (Installation / Alteration / Repair) Building Yes 26.00 24.73 Each New Residential Building
Multi-Family Building Yes 0.22 0.20 Sq. Ft.
Single Family and Two Family Building Yes 0.22 0.20 Sq. Ft.
Other Residential Alterations, Additions, Etc. Building Yes 0.25 0.24 Sq. Ft.
SB 1473 Green Building Standards 12
State mandated fee applied to each Building Permit application. Fee amount is based on valuation. Building Yes
$1 per each $25,000 of valuation or
fraction thereof with a minimum of $1
1.18 Location
Location
CA Strong Motion Instrumentation Program Fees (SMIP)13 Location Residential up to 3-stories Building No 0.00013 of Valuation 0.00013 of Valuation Location Residential over 3-stories & Commercial Building No 0.00028 of Valuation 0.00028 of Valuation Location
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A
Other Development Impact Fees
Park In-Lieu Fees (Quimby Fees) Building No $25,000 per additional unit built in conjunction with a Tentative Parcel or
Tract Map
$25,000 per additional unit built in
conjunction with a Tentative Parcel or
Tract Map
Each
Parks and Recreation Facility Fee Building Yes 459.00 430.00 Each Public Art Fee (collected under RBMC 10-6.05) Planning No 1% of Building Evaluation above $250,000
1% of Building Evaluation above
$250,000
Planning Division
1 Fee Waived for Signs When in Conjunction With a Cup Application - No Longer Needs Planning Commission Review 2 Not Applicable to Appeal of New 2-3 Unit Residential Development 3 If a Public Hearing is Requested, Applicant Must Pay the Balance of the Public Hearing Fee 4 Fee Waived for Zoning Map Amendment and for Planning Commission Design Review 5 Fee Waived for Planning Commission Design Review
6 Fee Credited Toward Other Application Fees If Project Application is Submitted. 7 No Additional Fee Charged for Extensions of Multiple Approvals in Conjunction With the Same Project.
Building Division
1 Additional Plan Review Required By Changes, Additions and/or Revisions to Approved Plans (1/2 Hour Minimum) 2 No Combination Permit Will Be Issued If Construction Starts Without Proper Permit 3 Applies to Carnivals, Circuses or Other Traveling Shows or Exhibitions Using Transportable-Type Rides, Booths, and/or Attractions. 4 Includes Motors Generators, Transformers, Rectifiers, Synchronous Converters, Capacitors, Industrial Heating, Air Conditioning and Heat Pumps, Cooking or Baking Equipment. • for Equipment or Appliances Having More Than One Motor, Transformer, Heater, Etc., the Sum of the Combined Ratings May Be Used. Fees Include Switches, Circuit Breakers Contacts, Thermostats, Relays and Other Directly Related Controls. 5 An Additional Fee Will Be Charged for Lighting Fixtures, Motors and Other Appliances That are Connected to Trolley and Plug-In Type Busways. No Fee is Required for Portable Tools. 6 Installation Fees Include the First Year's Annual Inspection Fee and Charges for Electrical Equipment or Conveyance Side of Disconnect Switch 7 For Multi-Outlet Assemblies, Each 5 Feet or Fraction Thereof is Considered as One Outlet 8 For Other Types of Air Conditioners and Other Motor-Driven Appliances With Larger Electrical Ratings, See "Power Apparatus" 9 The Fee for a Grading Permit Authorizing Addional Work to That Under a Valid Permit Shall Be:
• The Difference Between the Fee Paid for the Original Permit and the Fee Shown for the Entire Project or • The Total Cost to the Jurisdiction, Whichever is Greater. • The Cost Shall Include Supervision, Overhead , Equipment, Hourly Wages and Fringe Benefits of the Employees Involved 10 This Fee Shall Not Apply to an Air Handling Unit Which is a Portion of a Factory-Assembled Appliance for Which a Permit is Required Elsewhere in This Code. 11 Permit Issuance Fee charged for each Reactivation of an expired permit 12 Monies Collected By These Fees Will Be submitted to the State of California Except For 10% retained by the City of Redondo Beach for Administrative Charges and For Code Enforcement Education.
COMMUNITY DEVELOPMENT MASTER FEE SCHEDULE
Resolution No: x
Effective Date: July 1, 2025
Description Dept Change NEW FY 2025-2026 FY 2024-2025 Unit
EXHIBIT A