Quote # Q503559 - REDONDO BEACH-EL REDONDO 2025 Date: 8/1/2025 Page 1

STRESSCRETE

C/O SOUTH COAST LIGHTING & DESIGN
SOM
COa
Tighting C De 14503 WALLICK ROAD 800-268-7809 ph

ATCHISON, KS 66002 416-632-9301 fx
To: Justin Reynolds [Job/Project Name:

CITY OF REDONDO BEACH REDONDO BEACH-EL REDONDO 2025
531 N GERTRUDA AVENUE

PUBLIC WORKS DEPARTMENT REDONDO BEACH,
REDONDO BEACH, CA 90277
PH: 310-318-0686 Fax 374-4718
Remarks: CREDIT CARDS ARE ACCEPTED - VISA, MASTERCARD, AMEX Qty Type Mfg Description Unit Price Extd.Price

QUOTING CITY OF REDONDO BEACH ONLY
K56-S-T-SAR-V-(MOG)-120-#6-SM BILLIARD $1,505.00 $6,020.00 4 STCR
GREEN

MATCHES EXISTING LOOK
SUBTOTAL BEFORE TAX $6,020.00
TAX TOTAL TAX @ 9.75% $586.95
PLEASE MAKE PO OUT TO: STRESSCRETE C/O

SOUTH COAST LIGHTING & DESIGN
TOTAL: $6,606.95
MFG Code TERMS Lead Time

STCR STRESSCRETE FREIGHT IS INCLUDED
Prices firm for entry by: 30 Days Shipment by: PER QUOTE Lead Time: 15-17 Weeks ~ PLEASE SEND ORDERS TO: YOUR INSIDE SALES REPRESENTATIVE *ANCHOR BOLTS SHIPPED PRIOR MAY BE SUBJECT TO A FREIGHT CHARGE NOT TO EXCEED $250.00* *AT TIME OF ORDER WE WILL REQUIRE AN ADDITIONAL NOTE WHICH STATES THAT OUR MFG IS CLEARED TO DELIVER MATERIAL TO YOU - PLEASE INCLUDE THE SOUTH COAST LIGHTING QUOTE # ON YOUR PO

1. ANY CHANGES WILL REQUIRE A NEW QUOTE. IF THE COMPLETE QUOTE IS NOT USED THEN A NEW QUOTE WILL BE NEEDED CT LOS ANGELES PRECTS THAT ARE QUOTED WILL REQUIRE AT LEAST 25 WORKING DAYS FOR STRUCTURAL CALCS & SUBMITTALS 3 ALL PROJECTS WILL REQUIRE 10-25 DAYS OR LESS FOR STRUCTURAL CALCS & SUBMITTALS.

4. SOUTH COAST LIGHTING & DESIGN, INC (SCL) OR ITS MANUFACTURERS WILL NOT ASSUME RESPONSIBILITY IF YOU DO NOT VERIFY YOUR

WRITTEN REQUEST WITH THIS QUOTED BILL OF MATERIALS

5. SALES TAX IS NOT INCLUDED UNLESS STATED ON QUOTE. IF SALES TAX IS TO BE ADDED AT TIME OF THE ORDER THEN A NEW QUOTE WILL BE

6. THIS QUOTATION IS SUBJECT TO MANUFACTURER'S TERMS AND CONDITIONS.

7. THIS QUOTATION IS MADE WITHOUT BENEFIT OF COMPLETE PLANS AND SPECIFICATIONS. IT IS YOUR RESPONSIBILITY TO INSURE THIS QUOTE ACCURATELY REPRESENTS YOUR BILL OF MATERIAL. IF A SUBSTITUTION IS QUOTED, SCL WILL NOT GUARANTEE APPROVAL UNLESS STATED ON THE QUOTE. THE QUOTE IS BASED ON PART NUMBERS

8. ANY CHANGES WILL REQUIRE A NEW QUOTE. IF THE COMPLETE QUOTE IS NOT USED THEN A NEW QUOTE WILL BE NEEDED.

9. A SEPARATE P.O. MAY BE REQUIRED FOR EACH MANUFACTURER AT TIME OF THE ORDER. SOUTH COAST LIGHTING WILL COORDINATE ALL DELIVERIES TO OCCUR WITHIN A 30 DAY TIME FRAME

10. SOURCE INSPECTIONS OR OUT OF STATE INSPECTION CHARGES ARE NOT INCLUDED UNLESS SPECIFICALLY SPELLED OUT ON THIS QUOTE.

THESE CHARGES ARE THE RESPONSIBILITY OF OTHERS

11. CAL-TRANS PROJECTS WILL REQUIRE DESIGN YEAR, LUMINAIRE MAST ARM LENGTH, SIGNAL MAST ARM LENGTH, TENON LOCATIONS, ETC., ETC., PRIOR TO ORDER. ORDERS CANNOT BE RELEASED WITHOUT THIS INFORMATION. 8.3 REQUIREMENTS ARE NOT INCLUDED UNLESS STATED ON THIS

12. LAMPS, PHOTOCELLS, FUSES, SPARE PARTS, OR SPECIAL PRODUCT REQUIREMENTS, ARE NOT INCLUDED UNLESS STATED ON QUOTE.

13. ACCEPTANCE OF ORDER IS CONTINGENT UPON CREDIT APPROVAL.

14. THE RESPONSIBILITY OF SETTING UP ANY AND ALL INSPECTIONS WITH THE CITY OF LA OR ANY OTHER CITIES REQUIRING INSPECTIONS, IS UP TO THE ELECTRICAL OR GENERAL CONTRACTOR AND IS NOT THE RESPONSIBILITY OF SCL & MFG. IF THE CONTRACTOR WOULD LIKE SCL TO HELF ARRANGE THESE INSPECTIONS, SCL WILL NEED A WRITTEN LETTER AUTHORIZING US TO DO SO. ANY AND ALL COSTS ABOVE ANY ALLOWANCE GIVEN IN A QUOTE ARE THE RESPONSIBILITY OF THE CONTRACTOR.

15. FREIGHT ALLOWED QUOTES INCLUDE TWO HOURS OF OFFLOADING TIME. ADDITIONAL CHARGES AT $200 PER HOUR APPLY IF DELIVERY OFFLOADING TIME EXCEEDS THE MAXIMUM TWO HOUR LIMIT.

Page 1 of 2 ends

Quote # Q503559 - REDONDO BEACH-EL REDONDO 2025 Date: 8/1/2025 Page 2

16. IF ANY TEMPORARY LIGHTING IS REQUIRED DUE TO A DELAY, IT WILL NEED TO BE DISCUSSED PRIOR. SOUTH COAST OR ANY OF ITS MANUFACTURERS WILL NOT PAY FOR ANY LABOR OR THE COST OF MATERIAL WITHOUT PRIOR APPROVAL.

17. IF A DETAIL-U IS REQUIRED, THERE MAY BE AN ADDER FOR IT; PLEASE INQUIRE WITH YOUR SALESMAN OR INSIDE ASSOCIATE FOR THE ADDER

18. BY REQUEST, UP TO 3 PAINT CHIPS MAY BE SENT OUT TO THE END-USER AT NO EXTRA CHARGE: ANY ADDITIONAL PAINT CHIPS (FOR SAMPLING OR FOR RECORDS, ETC) REQUESTED MAY INCUR A CHARGE CONTINGENT ON SHIP-TO LOCATION.

19. SUPPLIER'S OBLIGAITION TO REPAIR OR REPLACE ANY DEFECTIVE PRODUCT SHALL NOT INCLUDE ANY OBLIGATION TO REIMBURSE THE

PURCHASER FOR TRANSPORTATION, INSTALLATION, REMOVAL, UNAUTHORIZED REPAIRS, OR ANY OTHER EXPENSES THAT MAY BE INCURRED BY THE PURCHASER OR OTHERS IN RELATION TO ANY PRODUCT DEFECT. ANY CHARGES ASSOCIATED WITH A REPAIR MUST BE JUSTIFIED, DOCUMENTED AND SUBMITTED FOR WRITTEN APPROVAL BY THE MANUFACTURER.

20. ALL POLES TO BE UNWRAPPED ON DELIVERY; ALL POLES SHOULD BE UNWRAPPED AND REVIEWED UPON DELIVERY

21. IF A PURCHASE ORDER IS RELEASED IN MULTIPLE PHASES, IT WILL BE SUBJECT TO A $100 CHARGE ON SMALLER PROJECTS.

22. SHIPPING DATE IS AN ESTIMATION AT TIME OF QUOTE, EXACT SHIPPING DATE AND TIME MAY CHANGE AT ORDER ENTRY.

23. SEND NEW ORDERS TO [email protected] AND COPY PERSON WHO ORIGINALLY SENT OUT QUOTE Printed: 08/01/25 12:21:11 Per: Julie Poncy Email: [email protected]