The same utility allowance schedule applies to both the tenant-based and project-based voucher programs.

PHA Policy
Upon written request by the owner, the PHA will consider using the FMR or utility allowances in effect during the 30-day period before the start date of the HAP, or redetermination of rent. The owner must explain the need to use the previous FMRs or utility allowances and include documentation in support of the request. The PHA will review and make a decision based on the circumstances and merit of each request.

In addition to considering a written request from an owner, the PHA may decide to use the FMR or utility allowances in effect during the 30-day period before the start date of the HAP, or redetermination of rent, if the PHA determines it is necessary due to PHA budgetary constraints.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-89
Use of Small Area FMRs (SAFMRs) [24 CFR 888.113(h) and 24 CFR 983.301(f)(3)] Unless one of the following exceptions apply, SAFMRs do not apply to PBV projects regardless of whether HUD designates the metropolitan area or the PHA notifies HUD and implements the SAFMRs under paragraph 883.113(c)(3).
• Where the proposal or project selection date was on or before the effective dates of either or both the SAFMR designation/implementation and the PHA administrative policy, the PHA and owner may mutually agree to apply the SAFMR. The application of the SAFMRs must be prospective and consistent with the PHA administrative plan. The owner and PHA may not subsequently choose to revert back to the use of the metropolitan-wide or county-wide FMRs for the PBV project. If the rent to owner will increase as a result of the mutual agreement to apply the SAFMRs to the PBV project, the rent increase must not be effective until the next annual anniversary of the HAP contract.
• Where the proposal or project selection date was after the effective dates of both the SAFMR designation/implementation and the PHA administrative policy, the SAFMR must apply to the PBV project if the PHA administrative plan provides that SAFMRs are used for all future PBV projects. If the PHA chooses to implement this administrative policy, the SAFMRs must apply to all future PBV projects located within the same metropolitan area or nonmetropolitan county where the SAFMRs are in effect for the PHA’s HCV program. An owner and the PHA may not subsequently choose to apply the metropolitan area or county FMR to the project, regardless of whether the PHA subsequently changes its administrative plan to revert to the use of metropolitan-wide or county-wide FMR for future PBV projects.

For purposes of this section, the term effective date of the Small Area FMR designation means:
• The date that HUD designated a metropolitan area as a SAFMR area; or • The date that HUD approved a PHA request to voluntarily opt to use Small Area FMRs for its HCV program, as applicable.

For purposes of this section, the term effective date of the PHA administrative policy means the date the administrative policy was formally adopted as part of the PHA administrative plan by the PHA Board of Commissioners or other authorized PHA officials.

PHA Policy
The PHA will apply SAFMRs to the PHA’s PBV program.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-90
17-VIII.C. REDETERMINATION OF RENT TO OWNER [24 CFR 983.302] The PHA must redetermine the rent to owner:
• When there is a 10 percent or greater decrease in the published FMR; • Upon the owner’s request consistent with requirements established in the PHA’s administrative plan; or
• At the time of the automatic adjustment by an operating cost adjustment factor (OCAF) in accordance with 24 CFR 983.302(b)(3).

Adjusted rent to owner amount applies for the period of 12 calendar months from the annual anniversary of the HAP contract.

Rent Increase [24 CFR 983.302(b)]
During the term of the HAP contract, any increase in rent to owner is effective on the annual anniversary of the HAP contract. A rent increase may occur either through automatic adjustment by an OCAF or as the result of an owner request for a rent increase. The owner does not need to request a rent adjust when a rent increase occurs through an OCAF since the PHA redetermines the rent automatically under that option.

OCAF [24 CFR 983.302(b)(3)]
If the PHA and owner agree, the HAP contract may provide for rent adjustments using an OCAF established by the HUD pursuant to Section 524(c) of the Multifamily Assisted Housing Reform and Affordability Act of 1997 (MAHRA) at each annual anniversary of the HAP contract and published annually in the Federal Register. Further, the HAP contract may require an additional increase up to an amount determined by the PHA (pursuant to 24 CFR 983.301(b) and (c)) if requested by the owner in writing, periodically during the term of the contract. The HAP contract must require an additional increase up to an amount determined by the PHA at the point of contract extension, pursuant to 24 CFR 983.301(b) and (c), if requested by the owner in writing.

PHA Policy
The PHA will not allow for rent increases via OCAF. All rent increases mut be requested by the owner as outlined below.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-91
Owner-Requested Rent Increases [24 CFR 983.302(b)(4)]
If the HAP contract does not provide for automatic adjustment by an OCAF, and if an owner wishes to request an increase in the rent to owner from the PHA, it must be requested at the annual anniversary of the HAP contract (see Section 17-V.E.). The request must be in writing and in the form and manner required by the PHA. The PHA may only make rent increases in accordance with the rent limits described previously. There are no provisions in the PBV program for special adjustments (e.g., adjustments that reflect increases in the actual and necessary expenses of owning and maintaining the units which have resulted from substantial general increases in real property taxes, utility rates, or similar costs). The administrative plan must specify any advance notice the owner must give the PHA and the form the request must take.

PHA Policy
An owner’s request for a rent increase must be submitted to the PHA in writing (or via email) 60 days prior to the anniversary date of the HAP contract and must include the new rent amount the owner is proposing.

The PHA may not approve, and the owner may not receive any increase of rent to owner, until and unless the owner has complied with requirements of the HAP contract, including compliance with housing quality standards, except that housing quality standards compliance is not required for units undergoing development activity that complies with 24 CFR 983.157 or substantial improvement that complies with 24 CFR 983.212. The owner may not receive any retroactive increase of rent for any period of noncompliance.

Rent Decrease [24 CFR 983.302(c)]
If the HAP contract does not provide for adjustment by an OCAF and there is a decrease in the rent to owner, as established in accordance with program requirements such as a change in the FMR or exception payment standard, or reasonable rent amount, the rent to owner must be decreased regardless of whether the owner requested a rent adjustment.

If the HAP contract provides for rent adjustments by an OCAF and there is a decrease in the fair market rent, tax credit rent, or reasonable rent that requires a decrease to the rent to owner, the rent to owner must be decreased.

However, at any time during the term of the HAP contract, the PHA may elect within the HAP contract to not reduce rents below the initial rent to owner. Where a PHA makes such an election, the rent to owner shall not be reduced below the initial rent to owner, except:
• To correct errors in calculations in accordance with HUD requirements; • If additional housing assistance has been combined with PBV assistance after the execution of the initial HAP contract and a rent decrease is required; or • If a decrease in rent to owner is required based on changes in the allocation of responsibility for utilities between the owner and the tenant.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-92
Notice of Rent Change to Owner [24 CFR 983.203(d)]
Whenever there is a change in rent to owner, the PHA must provide written notice to the owner specifying the amount of the new rent to owner. The PHA notice of rent adjustment constitutes an amendment of the rent to owner specified in the HAP contract. The adjusted amount of rent to owner applies for the period of 12 calendar months from the annual anniversary of the HAP contract.

PHA Policy
The PHA will provide the owner with at least 30 days written notice of any change in the amount of rent to owner.

PHA-Owned Units [24 CFR 983.301(g)]
For PHA-owned PBV units, the initial rent to owner and the annual redetermination of rent at the anniversary of the HAP contract are determined by the independent entity approved by HUD.

The PHA must use the rent to owner established by the independent entity.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-93
17-VIII.D. REASONABLE RENT [24 CFR 983.301(d) and 983.303] At the time the initial rent is established and all times during the term of the HAP contract, the rent to owner for a contract unit may not exceed the reasonable rent for the unit as determined by the PHA, except where the PHA has elected within the HAP contract to not reduce rents below the initial rent under the initial HAP contract.

When Rent Reasonable Determinations Are Required
The PHA must redetermine the reasonable rent for a unit receiving PBV assistance whenever any of the following occur:
• There is a 10 percent or greater decrease in the published FMR in effect 60 days before the contract anniversary (for the unit sizes specified in the HAP contract) as compared with the FMR that was in effect one year before the contract anniversary date; • The PHA approves a change in the allocation of responsibility for utilities between the owner and the tenant;
• The HAP contract is amended to add a contract unit or substitute a different contract unit in the same building or project;
• The PHA accepts a completed unit after development activity that is conducted after HAP contract execution in accordance with 24 CFR 983.156(b)(3); and • There is any other change that may substantially affect the reasonable rent.

The PHA must determine reasonable rent in accordance with 24 CFR 983.303.

Rent Floor
The rent to owner for each contract unit may at no time exceed the reasonable rent, except in cases where the PHA has elected within the HAP contract not to reduce rents below the initial rent to owner, and upon redetermination of the rent to owner, the reasonable rent would result in a rent below the initial rent. However, the rent to owner must be reduced in the following cases:
• To correct errors in calculations in accordance with HUD requirements; • If additional housing assistance has been combined with PBV assistance after the execution of the initial HAP contract and a rent decrease is required pursuant to 24 CFR 983.55; and • If a decrease in rent to owner is required based on changes in the allocation of the responsibility for utilities between owner and tenant.

If the PHA has not elected within the HAP contract to establish the initial rent to owner as the rent floor, the rent to owner shall not at any time exceed the reasonable rent.

PHA Policy
The PHA will elect within the HAP contract not to reduce rents below the initial level, with the exception of the circumstances listed in 24 CFR 983.302(c)(2). If, upon redetermination of the rent to owner, the reasonable rent would result in a rent below the initial rent, the PHA will use the higher initial rent to owner amount.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-94
How to Determine Reasonable Rent [24 CFR 983.303(c)]
The reasonable rent of a unit receiving PBV assistance must be determined by comparison to rent for other comparable unassisted units. When making this determination, the PHA must consider factors that affect market rent. Such factors include the location, quality, size, type and age of the unit, as well as the amenities, housing services maintenance, and utilities to be provided by the owner. The reasonable rent determination must be based on the condition of the assisted unit at the time of the determination and not on anticipated future unit conditions.

Comparability Analysis [24 CFR 983.303(d)]
For each unit, the comparability analysis must use at least three comparable units in the private unassisted market. This may include units in the premises or project that is receiving projectbased assistance. The analysis must show how the reasonable rent was determined, including major differences between the contract units and comparable unassisted units, and must be retained by the PHA. The comparability analysis may be performed by PHA staff or by another qualified person or entity. Those who conduct these analyses or are involved in determining the housing assistance payment based on the analyses may not have any direct or indirect interest in the property.

PHA-Owned Units [24 CFR 983.303(f)]
For PHA-owned units, the amount of the reasonable rent must be determined by an independent agency approved by HUD in accordance with PBV program requirements. The independent entity must provide a copy of the determination of reasonable rent for PHA-owned units to the PHA.

Owner Certification of Reasonable Rent [24 CFR 983.303(e)] By accepting each monthly housing assistance payment, the owner certifies that the rent to owner is not more than rent charged by the owner for other comparable unassisted units in the premises. At any time, the PHA may require the owner to submit information on rents charged by the owner for other units in the premises or elsewhere.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-95
17-VIII.E. EFFECT OF OTHER SUBSIDY AND RENT CONTROL
In addition to the rent limits discussed in Section 17-VIII.B above, other restrictions may limit the amount of rent to owner in a PBV unit. In addition, certain types of subsidized housing are not even eligible to receive PBV assistance (see Section 17-II.D).

Other Subsidy [24 CFR 983.304]
To comply with HUD subsidy layering requirements, at the discretion of HUD or its designee, a PHA shall reduce the rent to owner because of other governmental subsidies, including tax credits or tax exemptions, grants, or other subsidized funding.

For units receiving assistance under the HOME program, rents may not exceed rent limits as required by that program.

For units in any of the following types of federally subsidized projects, the rent to owner may not exceed the subsidized rent (basic rent) or tax credit rent as determined in accordance with requirements for the applicable federal program:
• An insured or non-insured Section 236 project;
• A formerly insured or non-insured Section 236 project that continues to receive Interest Reduction Payment following a decoupling action;
• A Section 221(d)(3) below market interest rate (BMIR) project; • A Section 515 project of the Rural Housing Service;
• Any other type of federally subsidized project specified by HUD.

Combining Subsidy
Rent to owner may not exceed any limitation required to comply with HUD subsidy layering requirements.

Rent Control [24 CFR 983.305]
In addition to the rent limits set by PBV program regulations, the amount of rent to owner may also be subject to rent control or other limits under local, state, or federal law.

Project
-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-96
Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-97
PART IX: PAYMENTS TO OWNER
17-IX.A. HOUSING ASSISTANCE PAYMENTS [24 CFR 983.351]
During the term of the HAP contract, the PHA must make housing assistance payments to the owner in accordance with the terms of the HAP contract. During the term of the HAP contract, payments must be made for each month that a contract unit complies with housing quality standards and is leased to and occupied by an eligible family. The housing assistance payment must be paid to the owner on or about the first day of the month for which payment is due, unless the owner and the PHA agree on a later date.

Except for discretionary vacancy payments, the PHA may not make any housing assistance payment to the owner for any month after the month when the family moves out of the unit (even if household goods or property are left in the unit).

The amount of the housing assistance payment by the PHA is the rent to owner minus the tenant rent (total tenant payment minus the utility allowance).

In order to receive housing assistance payments, the owner must comply with all provisions of the HAP contract. Unless the owner complies with all provisions of the HAP contract, the owner does not have a right to receive housing assistance payments.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-98
17-IX.B. VACANCY PAYMENTS [24 CFR 983.352]
Payment at Move-Out Month [24 CFR 983.352(a)]
If an assisted family moves out of the unit, the owner may keep the housing assistance payment for the calendar month when the family moves out. However, the owner may not keep the payment if the PHA determines that the vacancy is the owner’s fault.

PHA Policy
If the PHA determines that the owner is responsible for a vacancy and, as a result, is not entitled to the keep the housing assistance payment, the PHA will notify the owner of the amount of housing assistance payment that the owner must repay. The PHA will require the owner to repay the amount owed in accordance with the policies in Section 16-IV.B.

Vacancy Payments [24 CFR 983.352(b)]
At the discretion of the PHA, the HAP contract may provide for vacancy payments to the owner for a PHA-determined period of vacancy extending from the beginning of the first calendar month after the move-out month for a period not exceeding two full months following the moveout month. The PHA must include in its administrative plan the PHA’s policy on the conditions under which it will allow vacancy payments in a HAP contract, the duration of the payments, amount of vacancy payments it will make to an owner, and the required form and manner of requests for vacancy payments.

PHA Policy
If an owner’s HAP contract calls for vacancy payments to be made, and the owner wishes to receive vacancy payments, the owner must have properly notified the PHA of the vacancy in accordance with the policy in Section 17-VI.F. regarding filling vacancies.

In order for a vacancy payment request to be considered, it must be made within 10 business days of the end of the period for which the owner is requesting the vacancy payment. The request must include the required owner certifications and the PHA may require the owner to provide documentation to support the request. If the owner does not provide the information requested by the PHA within 10 business days of the PHA’s request, no vacancy payments will be made.

The PHA may only make vacancy payments if:
• The owner gives the PHA prompt, written notice certifying that the family has vacated the unit and identifies the date when the family moved out (to the best of the owner’s knowledge and belief);
• The owner certifies that the vacancy is not the fault of the owner and that the unit was vacant during the period for which payment is claimed;
• The owner certifies that it has taken every reasonable action to minimize the likelihood and length of vacancy; and
• The owner provides any additional information required and requested by the PHA to verify that the owner is entitled to the vacancy payment.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-99
The owner must submit a request for vacancy payments in the form and manner required by the PHA and must provide any information or substantiation required by the PHA to determine the amount of any vacancy payment.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-100
The vacancy payment to the owner for each month of the maximum two-month period is determined by the PHA, and cannot exceed the monthly rent to owner under the assisted lease, minus any portion of the rental payment received by the owner (including amounts available from the tenant’s security deposit). Any vacancy payment may cover only the period the unit remains vacant.

PHA Policy
If an owner’s HAP contract calls for vacancy payments to be made, and the owner wishes to receive vacancy payments, the owner must have properly notified the PHA of the vacancy in accordance with the policy in Section 17-VI.G. regarding filling vacancies.

In order for a vacancy payment request to be considered, it must be made in writing (including via email) within 10 business days of the end of the period for which the owner is requesting the vacancy payment. The request must include the required owner certifications and the PHA may require the owner to provide documentation to support the request. If the owner does not provide the information requested by the PHA within 10 business days of the PHA’s request, no vacancy payments will be made.

If vacancy payments are made, the PHA will make vacancy payments for the period of vacancy extending from the beginning of the first calendar month after the move-out month for a period not exceeding two full months following the move-out month. The amount of the vacancy payment will not exceed the monthly rent to owner under the assisted lease, minus any portion of the rental payment received by the owner (including amounts available from the tenant’s security deposit). Any vacancy payment will cover only the period the unit remains vacant.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-101
17-IX.C. TENANT RENT TO OWNER [24 CFR 983.353]
The tenant rent is the portion of the rent to owner paid by the family. The amount of tenant rent is determined by the PHA in accordance with HUD requirements. Any changes in the amount of tenant rent will be effective on the date stated in the PHA notice to the family and owner.

The family is responsible for paying the tenant rent (total tenant payment minus the utility allowance). The amount of the tenant rent determined by the PHA is the maximum amount the owner may charge the family for rental of a contract unit. The tenant rent covers all housing services, maintenance, equipment, and utilities to be provided by the owner. The owner may not demand or accept any rent payment from the tenant in excess of the tenant rent as determined by the PHA. The owner must immediately return any excess payment to the tenant.

Tenant and PHA Responsibilities
The family is not responsible for the portion of rent to owner that is covered by the housing assistance payment and the owner may not terminate the tenancy of an assisted family for nonpayment by the PHA.

Likewise, the PHA is responsible only for making the housing assistance payment to the owner in accordance with the HAP contract. The PHA is not responsible for paying tenant rent, or any other claim by the owner, including damage to the unit. The PHA may not use housing assistance payments or other program funds (including administrative fee reserves) to pay any part of the tenant rent or other claim by the owner.

Utility Reimbursements [24 CFR 983.353(d)]
If the amount of the utility allowance exceeds the total tenant payment, the PHA must pay the amount of such excess to the tenant as a reimbursement for tenant-paid utilities, and the tenant rent to the owner must be zero.

The PHA may pay the utility reimbursement directly to the family or to the utility supplier on behalf of the family. If the PHA chooses to pay the utility supplier directly, the PHA must notify the family of the amount paid to the utility supplier.

PHA Policy
The current PBV units have all utilities provided so there will not be any utility allowance nor utility reimbursement payments. However, if that should change, then the PHA will make utility reimbursements to the family.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-102
17-IX.D. OTHER FEES AND CHARGES [24 CFR 983.354]
Meals and Supportive Services
With the exception of PBV assistance in assisted living developments, the owner may not require the tenant to pay charges for meals or supportive services. Non-payment of such charges is not grounds for termination of tenancy.

In assisted living developments receiving PBV assistance, the owner may charge for meals or supportive services. These charges may not be included in the rent to owner, nor may the value of meals and supportive services be included in the calculation of the reasonable rent. However, non-payment of such charges is grounds for termination of the lease by the owner in an assisted living development.

Other Charges by Owner
The owner may not charge extra amounts for items customarily included in rent in the locality or provided at no additional cost to unsubsidized tenants in the premises. 17-IX.E. PROJECT RECORD RETENTION [24 CFR 983.12]
The regulation at 24 CFR 982.158 applies to both the PHA’s tenant-based and project-based programs. In addition, for each PBV project, the PHA must maintain the following records throughout the HAP contract term and for three years thereafter:
• Records to document the basis for PHA selection of the proposal, if selection is competitive, or project, if selection is noncompetitive, including records of the PHA’s site selection determination (see 24 CFR 983.55) and records to document the completion of the review of the selection process in the case of PHA-owned units, and copies of the written notice of proposal selection and response of the appropriate party; • The analysis of impact, if applicable;
• The subsidy layering determination, if applicable;
• The environmental review record, if applicable;
• The Agreement to enter into HAP contract (AHAP), if applicable; • Evidence of completion, if applicable;
• The HAP contract and any rider and/or amendments, including amendments to extend the term of the contract;
• Records to document the basis for PHA determination and redetermination of rent to owner; • Records to document HUD approval of the independent entity or entities, in the case of PHAowned units; • Records of the accessibility features of the project and each contract unit; and • Other records as HUD may require.

Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-103
EXHIBIT 17-1: PBV DEVELOPMENT INFORMATION
(Fill out one for each development)

DEVELOPMENT INFORMATION
Development Name: [Insert name of PBV development]
Address: [Insert full address of PBV development]
Owner Information: [Insert PBV development owner name and contact information. If development is PHA-owned, enter “PHA-owned.”]
Property Management Company: [Insert property management company name and contact information, or enter “None”]
PHA-Owned: [Enter “Yes” or “No.” If yes, enter name of independent entity] Mixed Finance Development: [Enter “Yes” or “No.” If yes, list other types of funding (i.e., LIHTC, HOME, etc.) and units to which other funding applies.]

HAP CONTRACT
Effective Date of Contract: [Enter start date of HAP contract] HOTMA Requirements: [If HAP contract was signed prior to April 18, 2017, enter “PreHOTMA.” If HAP contract was signed on or after April 18, 2017, enter “Post-HOTMA.”] Term of HAP Contract: [Enter term from HAP contract]
Expiration Date of Contract: [Enter expiration date from HAP contract]

PBV UNITS
0 BR 1 BR 2 BR 3 BR 4 BR 5 BR Total
# of
Units
Initial
Contract
Rent
$ $ $ $ $ $
Structure Type: [Identify the structure type, i.e. Single Family Detached, Duplex or Two Family, Row House or Town House, Low Rise (3,4 Stories, including Garden Apartment), Highrise (5 or more stories)
Housing Type: [Identify if the units are an Independent Group Residence or Single Room Occupancy]
Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-104

UTILITY RESPONSIBILITY
[Enter in Accordance with the HAP Exhibit C]
Utility Fuel Type
(Gas, Electric, Oil,
Coal, Other)
Paid By
(Tenant/Owner)
Provided By
(Tenant/Owner)
Heating Electric Tenant Owner
Cooking Electric Tenant Owner
Water Heating Electric Tenant Owner
Other Electric Tenant Owner
Water Owner Owner
Sewer Owner Owner
Trash Collection Owner Owner
Air Conditioning Tenant Owner
Refrigerator
Range/Microwave
Other (specify)
Accessible Units and Features: [Identify which units are accessible and describe accessibility features or enter “None”]
Target Population: [Describe targeted population in accordance with HAP contract or enter “None”]
Excepted Units: [Identify excepted unit types below or enter “None”] • Supportive Services: [Enter “Yes, see Exhibit D of HAP Contract” or enter “No”] • Elderly Units: [Enter “Yes” or “No.” If yes, identify which units are elderly units.] • Disabled Units (only for HAP contracts executed prior to April 18, 2017) [Enter “Yes” or “No.” If yes, identify which units are for persons with disabilities.] • FUPY/FYI Units: [Enter “Yes” or “No.” If yes, identify which units are FUP units] • Are units excepted because they are located in a low-poverty census tract area?:
[Enter “Yes” or “No”]
Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-105

WAITING LIST AND SELECTION
Waiting List Type: [ Enter “Site-based waiting list,” “Combined with HCV,” “Waiting list for entire PBV program,” or “Merged with another assisted housing program”] Preferences: [Enter “Same as HCV; see Chapter 4” or describe preferences offered. If different from HCV, also note in Section 17.1.B of this policy.]
Preference Verification: [Enter “Same as HCV; see Chapter 7” or describe for each preference listed above. If different from HCV, note in Section 17.1.B of this policy.] For the PBV program, is the income limit the same as the HCV program? (Note: In mixed finance developments, other income limits may also apply.) [Enter “Same as HCV; see Chapter 3” or clearly describe. If different from HCV, note in Section 17.1.B of this policy.]

OCCUPANCY
Subsidy Standards: [Enter “Same as HCV; see Chapter 5” or describe. If different from HCV, note in Section 17.1.B of this policy]
Vacancy Payments: [Enter in accordance with HAP contract Part 1, e, 2 and Section 17-V.F. within this chapter]
Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-106
EXHIBIT 17-2: Special Provisions Applying to TPVs Awarded as Part of a Voluntary Conversion of Public Housing Units in Projects that Include RAD PBV Units [24 CFR Part 972.200; Notice PIH 2019-05; Notice PIH 2019-23] Under certain circumstances, HUD allows small PHAs to reposition a public housing project (or portion of a project) by voluntarily converting units to tenant-based housing choice voucher assistance. In order to preserve affordable housing for residents of the project, the PHA is given priority to receive replacement tenant protection vouchers (TPVs). As part of the voluntary conversion, the PHA has the option to continue to operate it as rental housing. If so, the PHA or subsequent owner must allow existing families to remain in their units using the TPV in the form of tenant-based assistance. In this situation, however, the PHA may choose to project-base these TPVs in the former public housing project. Families must still be provided with the option to remain in their unit using tenant-based assistance. In order for the PHA to project-base the assistance and include these units on the PBV HAP contract, the family must voluntarily consent in writing to PBV assistance following the requirements in Appendix A of Notice PIH 2019-05.

If the family fails to consent to PBV assistance and chooses to remain using tenant-based assistance, the family’s unit is excluded from the PBV HAP contract until the family moves out or consents to switching to PBV assistance. In general, all applicable program regulations and guidance for the standard PBV program apply to these units.

The PHA may also convert units in the same former public housing project to the PBV program under the rental assistance demonstration (RAD) program. The RAD statute authorizes HUD to waive certain statutory and regulatory provisions governing the standard PBV program and specify alternative requirements. In order to facilitate the uniform treatment of residents and units at the project, Notice PIH 2019-23 extended some of the alternative requirements to nonRAD PBV units in the converted project (i.e., the TPV units in the project). As such, while PBV TPV units in the converted project generally follow the requirements for the standard PBV program listed in this chapter, where HUD has specified alternative requirements for non-RAD PBV units in the project, PBV TPV units will instead follow the requirements outlined in Chapter 18 of this policy for the RAD PBV program.

RAD Requirements Applicable to Non-RAD units in the Project Alternative Requirement
under RAD as Listed in
Notice PIH 2019-23
Standard PBV Policy
That Does Not Apply
Applicable Policy in Chapter 18

1.6.A.4. Site Selection –
Compliance with PBV Goals
17-II.G. SITE

SELECTION
STANDARDS applies
with the exception of
deconcentration of
poverty and expanding
housing and economic
opportunity
requirements.
18-II.F. SITE SELECTION

STANDARDS
Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-107

1.6.B.5.d. PBV Site-Specific
Utility Allowances
Alternative requirement
under RAD. No
corresponding policy in
Chapter 17.
18-VII.C. UTILITY

ALLOWANCES

1.6.C.1. No Rescreening of
Tenants upon Conversion
Policies contained in
Chapter 3 relating to
eligibility do not apply
to existing tenants who
receive TPVs.
18-V.B. PROHIBITED

RESCREENING OF EXISTING

TENANTS UPON

CONVERSION

1.6.C.2. Right to Return Alternative requirement
under RAD. No
corresponding policy in
Chapter 17.
18-I.D. RELOCATION

REQUIREMENTS

1.6.C.3. Phase-in of Tenant
Rent Increases
Alternative requirements
under RAD. No
corresponding policy in
Chapter 17.
18-VIII.D. PHASE-IN OF

TENANT RENT INCREASES

1.6.C.4. Family Self
Sufficiency (FSS) and
Resident Opportunities and
Self-Sufficiency Service
Coordinator (ROSS-SC)
Programs
Not covered in
administrative plan.
18-VI.C. PUBLIC HOUSING

FSS AND ROSS

PARTICIPANTS

1.6.C.5. Resident Participation
and Funding
Alternative requirement
under RAD. No
corresponding policy in
Chapter 17.
18-VI.D. RESIDENT

PARTICIPATION AND

FUNDING

1.6.C.6. Resident Procedural
Rights
Policies related to
hearings in Chapter 16
apply, with added
procedural rights and
notice requirements as
outlined in Chapter 18.
18-VI.H. RESIDENTS’

PROCEDURAL RIGHTS

1.6.C.7. Earned Income
Disregard (EID)
Alternative requirements
under RAD for in-place
residents.

New admissions follow
policies in Chapter 6.
18-VI.G. EARNED INCOME

DISALLOWANCE

1.6.C.8. Jobs Plus Not covered in
administrative plan.

No corresponding policy.

1.6.C.9. When Total Tenant Alternative requirements 18-VI.B. LEASE, Continuation Project-Based Vouchers Redondo Beach Housing Authority
December 2025 Page 17-108
Payment Exceeds Gross Rent under RAD for in-place
residents.

New admissions follow
policies in 17-VII.B.

LEASE, Continuation of
Housing Assistance
Payments.
of Housing Assistance Payments

1.6.C.10. Under-Occupied
Unit
Alternative requirements
under RAD for in-place
residents.

New admissions follow
17-VII.C. MOVES,
Overcrowded, UnderOccupied, and
Accessible Units
18-VI.E. MOVES, Overcrowded,
Under-Occupied, and Accessible
Units

1.6.D.4. Establishment of
Waiting List
Alternative requirements
under RAD for initial
establishment of the
waiting list.

Once waiting list is
established, follow 17-
VI.E. SELECTION

FROM THE WAITING
LIST
18-V.D. ORGANIZATION OF

THE WAITING LIST

1.6.D.10. Initial Certifications
and Tenant Rent Calculations
Alternative requirements
under RAD for in-place
residents. No
corresponding policy in
Chapter 17.
18-VIII.C. TENANT RENT TO
OWNER, Initial Certifications
Note, while Notice PIH 2019-05 states that the PHA must screen families for eligibility for a tenant protection voucher and that families must be below the low-income limit (80 percent of AMI), Notice PIH 2019-23 waives these requirements for residents in projects that include RAD PBV units.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-1 Chapter 18

PROJECT BASED VOUCHERS (PBV) UNDER THE RENTAL ASSISTANCE

DEMONSTRATION (RAD) PROGRAM

INTRODUCTION
This chapter describes HUD regulations and PHA policies related to the Project-Based Voucher (PBV) program under the Rental Assistance Demonstration (RAD) program in eight parts:

Part I: General Requirements. This part describes general provisions of the PBV program, including maximum budget authority requirements, relocation requirements, and equal opportunity requirements.

Part II: PBV Project Selection. This part describes the cap on assistance at projects receiving PBV assistance, ownership and control, and site selection standards.

Part III: Dwelling Units. This part describes requirements related to housing quality standards, the type and frequency of inspections, and housing accessibility for persons with disabilities.

Part IV: Housing Assistance Payments Contract. This part discusses HAP contract requirements and policies including the execution and term of the HAP contract.

Part V: Selection of PBV Program Participants. This part describes the requirements and policies governing how the PHA and the owner will select a family to receive PBV assistance.

Part VI: Occupancy. This part discusses occupancy requirements related to the lease and describes under what conditions families are allowed or required to move.

Part VII: Determining Contract Rent. This part describes how the initial rent to owner is determined, and how rent will be redetermined throughout the life of the HAP contract.

Part VIII: Payments to Owner. This part describes the types of payments owners may receive under this program.

Project
-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-2 Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-3 PART I: GENERAL REQUIREMENTS
18-I.A. OVERVIEW AND HISTORY OF THE RAD PROGRAM
The Rental Assistance Demonstration (RAD) program was authorized in 2012 in order to assess the effectiveness of converting public housing, moderate rehabilitation properties, and units under the rent supplement and rental assistance payments programs to long-term, project-based Section 8 rental assistance. The program’s four primary objectives are to:
• Preserve and improve public and other assisted housing. • Standardize the administration of the plethora of federally subsidized housing programs and rules. The conversions are intended to promote operating efficiency by using a Section 8 project-based assistance model that has proven successful and effective for over 30 years.

In other words, RAD aligns eligible properties more closely with other affordable housing programs.
• Attract private market capital for property renovations. Through the use of this model, properties may be able to leverage private debt and equity to make capital repairs. • Increase tenant mobility opportunities.

Under the first component, a PHA with public housing units may submit an application to HUD to convert some or all of their public housing units to long-term, project-based Section 8 HAP contracts under either:
• Project-based rental assistance (PBRA) under HUD’s Office of Multifamily Housing Programs.
• Project-based vouchers (PBVs) under HUD’s Office of Public and Indian Housing (PIH).

A RAD/Section 18 blend is a public housing conversion that combines RAD and Section 18 activities and that includes both converting public housing assistance to RAD PBV and converting tenant protection voucher (TPV) assistance to PBV in the same project. All assistance converting under a RAD/Section 18 blend is placed under a single RAD HAP contract upon conversion, is subject to a single RAD Use Agreement, and is governed by the terms of Notice PIH 2019-23 (as amended by Supplemental Notice 4B and 4C).

This chapter will focus on public housing conversions to the PBV program under RAD as well as RAD/Section 18 blends. In order to distinguish between requirements for public housing conversion under RAD and PBV units under the standard PBV program, we will refer to the standard PBV program and the RAD PBV program.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-4 18-I.B. APPLICABLE REGULATIONS
On the whole, the regulations for both the standard and RAD PBV programs generally follow the regulations for the tenant-based HCV program found at 24 CFR Part 982. However, important parts of the tenant-based regulations do not apply to the project-based program. 24 CFR Part 983 outlines the sections of 24 CFR Part 982 that are not applicable to the project-based program.

For the RAD PBV program, Congress authorized HUD to waive certain statutory and regulatory provisions or establish alternative requirements from the standard PBV program. Additionally, the RAD Statute imposes certain unique requirements and authorizes HUD to establish requirements for converted assistance under the Demonstration. Conversions of public housing properties through RAD, including conversions through a RAD/Section 18 Blend, will be subject to the requirements in Notice PIH 2019-23 (as amended by Supplemental Notice 4B and 4C), and as reflected in the RAD PBV HAP Contract.

Non-RAD PBV units in a project are also subject to the requirements of Notice PIH 2019-23 (as amended by Supplemental Notice 4B and 4C) in the following circumstances:
• Any legacy non-RAD PBV units located in the covered project are subject to the same waivers and alternative requirements where noted in Notice PIH 2019-23 (as amended by Supplemental Notice 4B and 4C) and in this policy. Legacy non-RAD PBV units are defined as PBV assistance in a project that prior to December 31, 2024, replaced public housing at the time of conversion and that are subject to a non-RAD PBV HAP contract. • When a PHA undertakes a RAD/Section 18 blend, all units are placed under a single RAD HAP contract upon conversion and are governed by the terms of Notice PIH 2019-23 (as amended by Supplemental Notice 4B and 4C).

Otherwise, all regulatory and statutory requirements for the standard PBV program in 24 CFR Part 983 and Section 8(o)(13) of the Housing Act of 1937, and all applicable standing and subsequent Office of Public and Indian Housing (PIH) notices and guidance, including related handbooks, apply to RAD PBV. This includes environmental review, Davis-Bacon, and fair housing requirements.

RAD is authorized by the Consolidated and Further Continuing Appropriations Act of 2012 (Public Law 112-55, approved November 18, 2011), as amended by the Consolidated Appropriations Act of 2014 (Public Law 113-76, approved January 17, 2014), the Consolidated and Further Continuing Appropriations Act of 2015 (Public Law 113-235, approved December 6, 2014), the Consolidated Appropriations Act of 2016 (Public Law 114-113, approved December 18, 2015), the Consolidated Appropriations Act, 2017 (Public Law 115-31, approved May 5, 2017), and section 237 of Title II, Division L, Transportation, Housing and Urban Development, and Related Agencies, of the Consolidated Appropriations Act, 2018 (Public Law 115-141, approved March 23, 2018) collectively, the “RAD Statute.” Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-5 Requirements specific to the RAD program may be found in the following:
• Generally, public housing projects converting assistance under RAD are bound by the terms of the notice in effect at the time of closing. For all conversion types, HUD reserves the right, in its sole discretion and upon request from the applicant, to apply provisions from previous versions of this notice to program participants that are near conversion. - Notice PIH 2025-03 (Supplemental Notice 4C) amended Notice PIH 2019-23 (as amended by Notice 2023-19) and was effective January 16, 2025. - Notice PIH 2023-19 (Supplemental Notice 4B) amended Notice PIH 2019-23 and Notice PIH 2021-07 and was effective July 27, 2023.
- Notice PIH 2019-23 was immediately applicable at the time of closing to all projects converting assistance (notwithstanding execution of a commitment for conversion).

Notice PIH 2019-23 was published on September 5, 2019.
 Except with respect to changes in the project eligibility and selection criteria, not included in this policy, which were effective after a 30-day comment period. - Notice PIH 2012-32, REV-3 was applicable to projects that were seeking conversion of assistance through RAD, including those where a CHAP had already been issued when it was published January 12, 2017.
 Except with respect to changes in the project eligibility and selection criteria, not included in this policy, which were effective after a 30-day comment period. - Notice PIH 2012-32, REV-2 was applicable to projects that were seeking conversion of assistance through RAD, including those where a CHAP had already been issued when it was published June 15, 2015.
 Except with respect to changes in the project eligibility and selection criteria, not included in this policy, which are effective after a 30-day comment period. • RAD Quick Reference Guide for Public Housing Converting to PBV Assistance (2/22) • RAD Welcome Guide for New Awardees: RAD 1st Component (3/15) • Notice PIH 2016-17, Rental Assistance Demonstration (RAD) Notice Regarding Fair Housing and Civil Rights Requirements and Relocation Requirements Applicable to RAD First Component – Public Housing Conversions.
- This Notice applies to all projects that have applied for RAD conversion but have not yet converted as of November 10, 2016.
• Notice PIH 2014-17, Relocation Requirements under the RAD Program, Public Housing in the First Component.
- This notice may apply to projects that have converted to RAD prior to November 10, 2016, AND who have requested and received approval from HUD to be governed by this notice. See PIH Notice 2016-17, Section 1, Paragraph 1.3 for applicability. • RAD FAQs (http://www.radresource.net/search.cfm)
Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-6 NOTE: The policies in this chapter follow Notice PIH 2019-23 (REV-4) as amended by RAD Supplemental Notice 4B and 4C.

PHA Policy
Project Closing Date RAD Notice
In other words, the standard PBV program follows many of the same regulations as the tenantbased HCV program, but not all of them, and the RAD PBV program follows many of the same regulations as the standard PBV program, but not all of them.

MTW agencies are able to apply activities impacting the PBV program that are approved in the MTW Plan to properties converting under RAD, provided they do not conflict with RAD requirements.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-7 18-I.C. TENANT-BASED VS. PROJECT-BASED VOUCHER ASSISTANCE [24 CFR 983.2]
Much of the tenant-based voucher program regulations also apply to the PBV program.

Consequently, many of the PHA policies related to tenant-based assistance also apply to RAD PBV assistance. The provisions of the tenant-based voucher regulations that do not apply to the PBV program are listed at 24 CFR 983.2.

PHA Policy
Except as otherwise noted in this chapter, or unless specifically prohibited by PBV program regulations, the PHA policies for the tenant-based voucher program contained in this administrative plan also apply to the RAD PBV program and its participants. This chapter is intended to address requirements specific to the RAD PBV program only.

See Exhibit 18-1 for information on projects to which the PHA has attached RAD PBV assistance.
18-I.D. RELOCATION REQUIREMENTS
For projects that apply for conversion of assistance under the First Component of RAD and will convert November 10, 2016, or later, the following applies [Notice PIH 2016-17]:
• In some developments, in-place residents may need to be relocated as a result of properties undergoing repairs, being demolished and rebuilt, or when assistance is transferred from one site to another. RAD program rules prohibit the permanent, involuntary relocation of residents as a result of conversion. Residents that are temporarily relocated retain the right to return to the project once it has been completed. Any legacy non-RAD PBV units located in the same project are also subject to the right to return. • Relocation assistance provided to residents will vary depending on the length of time relocation is required. Residents must be properly notified in advance of relocation requirements in accordance with RAD program rules and Uniform Relocation Act (URA) requirements, and other requirements which may be applicable such as Section 104(d) of the Housing and Community Development Act of 1974, as amended. Sample informing notices are provided in Appendices 2–5 of Notice PIH 2014-17. A written relocation plan is required if the RAD conversion involves permanent relocation (including a move in connection with a transfer of assistance) or temporary relocation anticipated to last longer than a year. While the PHA is not required to have a written relocation plan for temporary relocation lasting one year or less, HUD strongly encourages PHAs to prepare one. Appendix II of Notice PIH 2016-17 contains recommended contents for a relocation plan. • In addition, PHAs must undertake a planning process that complies with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended (URA), although not all relocations under RAD will trigger requirements under URA. URA statute and implementing regulations may be found at 49 CFR Part 24. The obligation due to relocating residents under RAD are broader than URA relocation assistance and payments.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-8 • Any residents that may need to be temporarily relocated to facilitate rehabilitation or construction will have a right to return to either: a) a unit at the development once rehabilitation or construction is completed, provided the resident’s household is not underhoused; or b) a unit in the development which provides the same major features as the resident’s unit in the development prior to the implementation of the RAD conversion. • Where the transfer of assistance to a new site is warranted and approved, residents of the converting development will have the right to reside in an assisted unit at the new site once rehabilitation or construction is complete.
• If the PHA’s proposed plans for conversion would preclude a resident from returning to the development, the resident must be given an opportunity to comment and/or object to such plans. PHAs must alter the project plans to accommodate the resident’s right to return to the development if the resident would be precluded from returning to the development. • Examples of project plans that may preclude a resident from returning to the development include, but are not limited to:
- Changes in the development’s bedroom distribution that decrease the size of the units, resulting in the resident being under-housed;
- The resident cannot be accommodated in the remaining assisted units due to a reduction in the number of assisted units at the development;
- Income limit eligibility requirements associated with the LIHTC program or another program; and
- Failure to provide a reasonable accommodation, in violation of applicable law, where reasonable accommodation may include installation of accessibility features that are needed by the resident.
• Residents of a development undergoing conversion that would be precluded from returning to the development may voluntarily accept a PHA or owner’s offer to permanently relocate to alternative housing, and thereby waive their right to return to the development after rehabilitation or construction is completed. In this event, the PHA must secure the resident’s written consent to a voluntary permanent relocation in lieu of returning to the development.

PHAs are prohibited from employing any tactics to pressure residents into relinquishing their right to return or accepting other housing options. Additionally, a PHA may not terminate a resident’s lease if the PHA fails to obtain the resident’s consent and the resident seeks to exercise the right to return.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-9 • In the case of multi-phase RAD transactions, the resident has a right to return to the development or to other converted phases of the development that are available for occupancy at the time the resident is eligible to exercise their right of return. Generally, the resident’s right to return must be accommodated within the development associated with the resident’s original unit, however, the PHA may treat multiple converted developments on the same site as one for purposes of right to return. Should the PHA seek to have the resident exercise the right to return at a future phase, the PHA must secure the resident’s consent in writing.
• Alternative housing options may involve a variety of housing options, including but not limited to:
- Transfers to public housing
- Admission to other affordable housing properties subject to the applicable program rules - Housing choice voucher (HCV) assistance
- Homeownership programs subject to the applicable program rules - Other options identified by the PHA
However, for projects that applied for conversion prior to November 10, 2016, the following applies [Notice PIH 2014-17]:
• In some developments, in-place residents may need to be relocated as a result of properties undergoing repairs, being demolished and rebuilt, or when assistance is transferred from one site to another. RAD program rules prohibit the permanent, involuntary relocation of residents as a result of conversion. Residents that are temporarily relocated retain the right to return to the project once it has been completed.
• Relocation assistance provided to residents will vary depending on the length of time relocation is required. Residents must be properly notified in advance of relocation requirements in accordance with RAD program rules and Uniform Relocation Act (URA) requirements. Sample informing notices are provided in Appendices 2–5 of Notice PIH 2014-17. While the PHA is not required to have a written relocation plan, HUD strongly encourages PHAs to prepare one. Appendix I of Notice PIH 2014-17 contains recommended contents for a relocation plan.
• In addition, PHAs must undertake a planning process that complies with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended (URA), although not all relocations under RAD will trigger requirements under URA. URA statute and implementing regulations may be found at 49 CFR Part 24.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-10 • Any residents that may need to be temporarily relocated to facilitate rehabilitation or construction will have a right to return to an assisted unit at the development once rehabilitation or construction is completed. Where the transfer of assistance to a new site is warranted and approved, residents of the converting development will have the right to reside in an assisted unit at the new site once rehabilitation or construction is complete. Residents of a development undergoing conversion of assistance may voluntarily accept a PHA or owner’s offer to permanently relocate to another assisted unit, and thereby waive their right to return to the development after rehabilitation or construction is completed. • For RAD/Section 18 blends, all RAD relocation requirements (such as the resident notice and meeting requirements, the right to return, and relocation assistance and payments) as described in Notice PIH 2016-17 or successor notices apply to residents of the units subject to a Section 18 action in lieu of the relocation requirements under 24 CFR 970.21. The PHA must provide the same relocation rights and benefits to all residents of the converting project [Notice PIH 2025-03].

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-11 18-I.E. EQUAL OPPORTUNITY REQUIREMENTS [24 CFR 983.8; 24 CFR 5.105; Notice PIH 2016-17]
RAD conversions are governed by the same civil rights authorities that govern HUD-assisted activities in general. These authorities prohibit discrimination and impose affirmative obligations on HUD program participants. PHAs must comply with all applicable fair housing and civil rights laws, including but not limited to the Fair Housing Act, Title VI of the Civil Rights Act of 1964, and Section 504 of the Rehabilitation Act of 1973, when conducting relocation planning and providing relocation assistance. For example, persons with disabilities returning to the RAD project may not be turned away or placed on a waiting list due to a lack of accessible units. Their need for an accessible unit must be accommodated. See the RAD Fair Housing, Civil Rights, and Relocation Notice [Notice PIH 2016-17] for more information.

Project
-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-12 Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-13 PART II: PBV PROJECT SELECTION
18-II.A. OVERVIEW
Unlike in the standard PBV program where the PHA typically selects the property through an owner proposal selection process, projects selected for assistance under RAD PBV are selected in accordance with the provisions in Notice PIH 2019-23. Therefore, 24 CFR 983.51 does not apply since HUD selects RAD properties through a competitive selection process. 18-II.B. OWNERSHIP AND CONTROL [Notice PIH 2019-23]
For projects governed by Notice PIH 2019-23, the following language applies:
• Under the PBV program, the contract administrator and the owner listed on the contract cannot be the same legal entity (i.e., the PHA cannot execute a contract with itself). To avoid this situation, the PHA may either: 1) Transfer the ownership of the project to a nonprofit affiliate or instrumentality of the PHA (including to a “single-purpose entity” that owns nothing other than the property, which will typically be a requirement of a lender or investor), or 2) The PHA can form a related entity that is responsible for management and leasing and can serve as the owner for purposes of the Section 8 HAP contract; in this scenario, the HAP is then executed between the PHA (as the contract administrator) and the PHA’s related entity (as the owner for HAP contract purposes). Note that in the second scenario, both the PHA and the entity serving as the owner for HAP contract purposes will be required to sign the RAD Use Agreement [RAD Resource Desk FAQ 01/24/19]. • Except where permitted to facilitate the use of low-income housing tax credits, during both the initial term and renewal terms of the HAP contract, ownership must be by a public or nonprofit entity. HUD may also allow ownership of the project to be transferred to a tax credit entity controlled by a for-profit entity to facilitate the use of tax credits for the project, but only if HUD determines that the PHA or a nonprofit entity preserves an interest in the profit. The requirement for a public or nonprofit entity, or preservation of an interest by a PHA or nonprofit in a property owned by a tax credit entity controlled by a for-profit entity, is satisfied if a public or nonprofit entity (or entities), directly or through a wholly owned affiliate (1) holds a fee simple interest in the property; (2) is the lessor under a ground lease with the property owner; (3) has the direct or indirect legal authority to direct the financial and legal interest of the property owner with respect to the RAD units, (4) owns 51 percent or more of the general partner interests in a limited partnership or 51 percent or more of the managing member interests in a limited liability company with all powers of a general partner or managing member, as applicable; (5) owns a lesser percentage of the general partner or managing member interests and holds certain control rights as approved by HUD; (6) owns 51 percent or more of all ownership interests in a limited partnership or limited liability company and holds certain control rights as approved by HUD; or (7) demonstrates other ownership and control arrangements approved by HUD.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-14 • Control may be established through the terms of the project owner’s governing documents or through a Control Agreement, provided that in either case amendment of the terms of control requires consent from HUD.

For projects subject to the requirements of Notice PIH 2012-32, REV-3, the following language applies:
• Except where permitted to facilitate the use of low-income housing tax credits, during both the initial term and renewal terms of the HAP contract, ownership must be by a public or nonprofit entity. The requirement for a public or nonprofit entity is satisfied if a public or nonprofit entity (or entities), directly or through a wholly owned affiliate (1) holds a fee simple interest in the property; (2) is the lessor under a ground lease with the property owner; (3) has the direct or indirect legal authority to direct the financial and legal interest of the property owner with respect to the RAD units, (4) owns 51 percent or more of the general partner interests in a limited partnership or 51 percent or more of the managing member interests in a limited liability company with all powers of a general partner or managing member, as applicable; (5) owns a lesser percentage of the general partner or managing member interests and holds certain control rights as approved by HUD; (6) owns 51 percent or more of all ownership interests in a limited partnership or limited liability company and holds certain control rights as approved by HUD; or (7) other ownership and control arrangements approved by HUD.
• If low-income housing tax credits will be used, HUD may allow ownership of the property to be transferred to a tax credit entity controlled by a for-profit entity if HUD determines that the PHA preserves its interest in the property. Preservation of PHA interest in the property includes but is not limited to the following:
- The PHA, or an affiliate under its sole control, is the general partner or managing member;
- The PHA retains fee ownership and leases the real estate to the tax credit entity pursuant to a long-term ground lease;
- The PHA retains control over leasing the property and determining program eligibility; - The PHA enters into a control agreement by which the PHA retains consent rights over certain acts of the project owner and retains certain rights over the project; - Other means that HUD finds acceptable
For projects that converted assistance prior to the implementation of Notice PIH 2012-32, REV-3, the following language applies:
• During both the initial term and renewal terms of the HAP contract, ownership must be either of the following:
- A public or nonprofit entity that has legal title to the property. The entity must have the legal authority to direct the financial, legal, beneficial, and other interests of the property; or
- A private entity, if the property has low-income tax credits. The PHA must maintain control via a ground lease.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-15 18-II.C. PHA-OWNED UNITS [24 CFR 983.57, FR Notice 1/18/17, and Notice PIH 2017-21]
If the project is PHA-owned, rent-setting (including redetermination of rent and determination of rent reasonableness) and inspection functions described in 24 CFR 983.57 must be conducted by an independent entity approved by HUD.

The definition of ownership or control provided under Notice PIH 2019-23 (listed above) is used specifically to determine whether a PHA retains control over a project for purposes of HUD’s requirement for ownership or control of the covered project under RAD. For purposes of determining whether an independent entity will perform certain functions for the project, the definition of PHA-owned under 24 CFR 982.4 is used. This is the same definition used for standard PBV units. In some cases, a project may meet the RAD definition of ownership or control but may not be considered PHA-owned for purposes of requiring an independent entity.

The independent entity that performs the program services may be the unit of general local government for the PHA jurisdiction (unless the PHA is itself the unit of general local government or an agency of such government), or another HUD-approved public or private independent entity.

The PHA may compensate the independent entity from PHA ongoing administrative fee income (including amounts credited to the administrative fee reserve). The PHA may not use other program receipts to compensate the independent entity for its services. The PHA and the independent entity may not charge the family any fee for the services provided by the independent entity.

PHA Policy
If units converted to PBV under RAD are PHA-owned housing, the PHA will use [insert name of the entity] as the HUD-approved independent entity.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-16 18-II.D. SUBSIDY LAYERING REQUIREMENTS [Notice PIH 2019-23; Notice PIH 2012-32, REV-3; Notice PIH 2012-32, REV-2]
For projects governed by Notice PIH 2019-23, REV-4, the following language applies:
• In the case of a PHA that will no longer have ACC units as a result of the pending or simultaneous closing or have less than 50 units remaining and have initiated procedures to dispose of their final ACC units, there is no restriction on the amount of public housing funds that may be contributed to the covered project or projects though the conversion. However, the PHA must estimate and plan for outstanding liabilities and costs and must follow Notice PIH 2016-23 or successor notice regarding the administrative activities required to terminate the ACC if it has no plans to develop additional public housing. • In the case where the PHA will continue to maintain other units in its inventory under a public housing ACC, a contribution of operating funds to the covered project that exceeds the average amount the project has held in operating reserves over the past three years will trigger a subsidy layering review under 24 CFR 4.13. Similarly, any contribution of capital funds, including Replacement Housing Factor (RHF) or Demolition Disposition Transitional Funding (DDTF), will trigger a subsidy layering review. Notwithstanding the subsidy layering review, PHAs should be mindful of how the capital funds or operating reserves used in the financing of its RAD properties may impact the physical and financial health of properties that will remain in its public housing inventory. • Following execution of the HAP contract, PHAs are authorized to use operating and capital funds to make HAP payments for the remainder of the first calendar year in which the HAP contract is effective. Otherwise, a PHA may not contribute public housing program funds to the covered project unless those funds have been identified in the RCC and converted at closing for Section 8 RAD purposes.

For projects governed by Notice PIH 2012-32, REV-3, the following language applies:
• In the case of a PHA that is converting all of its ACC units, there is no restriction on the amount of public housing funds that may be contributed to the covered project at closing; the PHA may convey all program funds to the covered projects. In order to cover the cost of administrative activities required to terminate the ACC, once it no longer has units under the ACC and has no plans to develop additional public housing, the PHA may:
- Designate that a reserve associated with the project be available to fund any public housing closeout costs (such as an operating deficit reserve or a specific PHA closeout reserve). Any funds not needed for public housing closeout costs would remain in such reserve or may be transferred to another reserve associated with the project (such as the replacement reserve). Thereafter, these funds may be used at the project pursuant to the authorized use of the applicable reserve; or
- Retain funds under the public housing program for this purpose. However, HUD will recapture any public housing funds that a PHA does not expend for closeout costs.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-17 • In the case where the PHA will continue to maintain other units in its inventory under a public housing ACC, a contribution of operating funds to the covered project that exceeds the average amount the project has held in operating reserves over the past three years will trigger a subsidy layering review under 24 CFR 4.13. Similarly, any contribution of capital funds, including Replacement Housing Factor (RHF) or Demolition Disposition Transitional Funding (DDTF), will trigger a subsidy layering review. Notwithstanding the subsidy layering review, PHAs should be mindful of how the capital funds or operating reserves used in the financing of its RAD properties may impact the physical and financial health of properties that will remain in its public housing inventory. • In addition, following execution of the HAP contract, PHAs are authorized to use operating and capital funds to make HAP payments for the remainder of the first calendar year in which the HAP contract is effective. Otherwise, a PHA may not contribute public housing program funds to the covered project unless such funding has been identified in the approved financing plan and included in the approved “sources and uses” attached to the RCC.

For projects governed by the requirements of Notice PIH 2012-32, REV-2, the following language applies:
• In the case of a PHA that is converting all of its ACC units, there is no restriction on the amount of public housing funds that may be contributed to the covered project at closing; the PHA may convey all program funds to the covered project. HUD will recapture any public housing funds that a PHA has not expended once it no longer has units under ACC. In the case where the PHA will continue to maintain other units in its inventory under a public housing ACC, a contribution of operating funds to the covered project that exceeds the average amount the project has held in operating reserves over the past three years will trigger a subsidy layering review under 24 CFR 4.13. Similarly, any contribution of capital funds, including Replacement Housing Factor (RHF) or Demolition Disposition Transitional Funding (DDTF), will trigger a subsidy layering review. Notwithstanding the subsidy layering review, PHAs should be mindful of how the capital funds or operating reserves used in the financing of its RAD properties may impact the physical and financial health of properties that will remain in its public housing inventory.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-18 18-II.E. PBV PERCENTAGE LIMITATION AND UNIT CAP [Notice PIH 2025-03, Supplemental Notice 4C]
PBV Percentage Limitation
RAD PBV units in a covered projects do not count against the maximum amount of assistance a PHA may utilize for the PBV program (program cap), which under the standard PBV program is set at 20 percent of the authorized units allocated to a PHA under the HCV program with the ability to project-base an additional 10 percent of units that meet certain requirements. The number of PBV units excluded from the PHA’s PBV program cap cannot exceed the number of former public housing units that those PBV units are replacing through the course of the RAD conversion. All PBV units in a covered project that replace former public housing units at the time of conversion are excluded from both the numerator and the denominator when calculating the percent of vouchers that may be project-based by a PHA. To implement this provision, HUD is waiving section 8(o)(13)(B) of the 1937 Act as well as 24 CFR 983.6.

Cap on the Number of PBV Units in Each Project [Notice PIH 2025-03, Supplemental Notice 4C]
There is no cap on the number of units that may receive RAD PBV assistance in each project. Under 24 CFR 983.54(c)(3), units excluded under 24 CFR 983.59 that were previously subject to federally required rent restrictions or received one of the listed forms of HUD assistance do not count toward the project cap. For any RAD PBV and legacy Non-RAD PBV units in projects not already excluded under 24 CFR 983.59, including transfers of assistance to a new location, HUD waived section 8(o)(13)(D) of the Act, as well as related provisions of 24 CFR 983.54. Accordingly, units under a RAD PBV HAP contract may not be “excepted” for a specified purpose.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-19 18-II.F. SITE SELECTION STANDARDS [Notice PIH 2019-23; Notice PIH 2016-17] Site selection requirements set forth in 24 CFR 983.55 apply to RAD PBV, with the exception of the provisions regarding deconcentration of poverty and expanding housing and economic opportunity for existing housing sites.

To facilitate the uniform treatment of residents and units, any legacy non-RAD PBV units located in the same project are subject to the terms of this provision.

HUD will conduct a front-end civil rights review of the PHA’s proposed site in certain circumstances. For RAD PBV conversions that involve new construction located in an area of minority concentration (whether on the existing public housing site or on a new site) HUD will determine whether it meets one of the exceptions that would allow for new construction in an area of minority concentration.

The PHA must ensure that its RAD PBV conversion, including any associated new construction, is consistent with its certification to affirmatively further fair housing and complies with civil rights laws.
18-II.G. ENVIRONMENTAL REVIEW [Notice PIH 2019-23; Environmental Review Requirements for RAD Conversions, March 2019]
HUD cannot approve an applicant’s financing plan submission unless and until the required environmental review has been completed for the applicant’s proposed conversion project and found to meet environmental review requirements. Environmental documents must be submitted no later than the applicant’s financing plan. HUD will not issue a RAD Conversion Commitment (RCC) if the project plan does not meet the environmental review requirements described in Attachment 1A of Notice PIH 2019-23. Once an awardee has submitted an application for a specific project, they may not make any choice limiting actions before the completion of the environmental review.

Project
-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-20 Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-21 PART III: DWELLING UNITS
18-III.A. OVERVIEW
This part identifies the special housing quality standards that apply to the RAD PBV program, housing accessibility for persons with disabilities, and special procedures for NSPIRE inspections.
18-III.B. HOUSING QUALITY STANDARDS [24 CFR 983.101 and 24 CFR 5.703] Housing quality standards for the tenant-based program generally apply to the PBV program.

Housing quality standards requirements for shared housing, manufactured home space rental, and the homeownership option do not apply because these housing types are not assisted under the PBV program.

Lead-based Paint [24 CFR 983.101(c); Notice PIH 2019-23] The lead-based paint requirements for the tenant-based voucher program do not apply to the PBV program. Instead, the Lead-based Paint Poisoning Prevention Act (42 U.S.C. 4821-4846), the Residential Lead-based Paint Hazard Reduction Act of 1992 (42 U.S.C. 4851-4856), and implementing regulations at 24 CFR part 35, subparts A, B, H, and R, and 40 CFR 745.227, apply to the PBV program.
18-III.C. HOUSING ACCESSIBILITY FOR PERSONS WITH DISABILITIES [Notice PIH 2016-17]
Federal accessibility requirements apply to all conversions, whether they entail new construction, alternations, or existing facilities. The housing must comply with program accessibility requirements of section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and implementing regulations at 24 CFR part 8. The PHA must ensure that the percentage of accessible dwelling units complies with the requirements of section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794), as implemented by HUD’s regulations at 24 CFR 8, subpart C.

Housing first occupied after March 13, 1991, must comply with design and construction requirements of the Fair Housing Amendments Act of 1988 and implementing regulations at 24 CFR 100.205, as applicable. (24 CFR 983.102)
Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-22 18-III.D. INSPECTING UNITS [24 CFR 983.103]
Initial Inspection [RAD Quick Reference Guide, Notice PIH 2019-23, and Notice PIH 2023-19]
Under standard PBV regulations at 24 CFR 983.103(c), the PHA must inspect and determine that all of the proposed PBV units fully comply with housing quality standards before entering the HAP contract, unless the PHA has adopted a policy to enter into a HAP contract for units that fail the initial inspection as a result of only non-life-threatening conditions (NLT option), or if the unit passed an alternative inspection, or both. It is the responsibility of the contract administrator to perform this initial inspection (unless units are PHA-owned). In order to accommodate projects in which repairs are conducted, however, HUD has waived this requirement when units are undergoing rehabilitation. In this case, units must meet housing quality standards by the date indicated in the RAD Conversion Commitment (RCC). To place the unit under HAP contract and commence making payments, the PHA may rely on the owner’s certification that the owner has no reasonable basis to have knowledge that life-threatening conditions exist in the unit or units to be added to the HAP contract instead of conducting an initial inspection. During the period of the work, housing quality standards requirements apply.

The PHA must enforce the project owner’s obligations and conduct inspections when needed, (for example in response to tenant complaints or other information coming to its attention), and the owner must correct any deficiencies in accordance with NSPIRE requirements (i.e., no more than 24 hours for a life-threatening deficiency, and within no more than 30 calendar days or any PHA-approved extension for other defects, but no later than the date of the completion of the work as indicated in the RCC).

Turnover Inspections [24 CFR 983.103(d), FR Notice 1/18/17, and Notice PIH 2017-20] Before providing assistance to a new family in a contract unit, the PHA must inspect the unit.

The PHA may not provide assistance on behalf of the family until the unit fully complies with housing quality standards.

Periodic Inspections [24 CFR 983.103(e); FR Notice 6/25/14] At least once every 24 months (or once every 36 months for small rural PHAs) during the term of the HAP contract, the PHA must inspect a random sample consisting of at least 20 percent of the contract units in each building, to determine if the contract units and the premises are maintained in accordance with housing quality standards. Turnover inspections are not counted toward meeting this inspection requirement.

PHA Policy
The PHA will inspect on an annual basis a random sample consisting of at least 20 percent of the contract units in each building to determine if the contract units and the premises are maintained in accordance with applicable housing quality standards.

If more than 20 percent of the sample of inspected contract units in a building fail the initial inspection, the PHA must reinspect 100 percent of the contract units in the building.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-23 Alternative Inspections [24 CFR 983.103(i); Notice PIH 2016-05] In the case of a PBV project financed under a federal, state, or local housing program that is subject to alternative inspections, the PHA may rely upon an alternative inspection conducted at least triennially to demonstrate compliance with inspection requirements.

PHA Policy
The PHA will not rely on alternative inspection standards.

Interim Inspections [24 CFR 983.103(f)]
If a participant or government official notifies the PHA of a potential deficiency, the following applies:
• If the reported deficiency is life-threatening, the PHA must, within 24 hours of notification, both inspect the housing unit and notify the owner if the life-threatening deficiency is confirmed. The owner must then make the repairs within 24 hours of PHA notification. • If the reported deficiency is non-life-threatening, the PHA must, within 15 days of notification, both inspect the unit and notify the owner if the deficiency is confirmed. The owner must then make the repairs within 30 days of notification from the PHA or within any PHA-approved extension.

PHA Policy
During an interim inspection, the PHA generally will inspect only those deficiencies that were reported. However, the inspector will record any additional deficiencies that are observed and will require the responsible party to make the necessary repairs.

If the periodic inspection has been scheduled or is due within 90 days of the date the special inspection is scheduled the PHA may elect to conduct a full inspection.

Follow Up Inspections [24 CFR 983103(f)(2)]
The PHA must conduct follow-up inspections needed to determine if the owner (or, if applicable, the family) has corrected a housing quality standards violation and must conduct inspections to determine the basis for exercise of contractual and other remedies for owner or family violation of housing quality standards.

Supervisory Quality Control Inspections [24 CFR 983.103(f)(3)] In conducting PHA supervisory quality control inspections, the PHA should include a representative sample of both tenant-based and project-based units.

Inspecting PHA-Owned Units [24 CFR 983.103(g); Notice PIH 2017-21] In the case of PHA-owned units, all required inspections must be performed by an independent entity designated by the PHA and approved by HUD. The independent entity must furnish a copy of each inspection report to the PHA. The PHA must take all necessary actions in response to inspection reports from the independent agency, including exercise of contractual remedies for violation of the HAP contract by the PHA-owner.

Project
-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-24 Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-25 PART IV: HOUSING ASSISTANCE PAYMENTS (HAP) CONTRACT
18-IV.A. OVERVIEW [RAD PBV Quick Reference Guide 6/20]
Public housing projects converting under RAD do not employ the PBV Agreement to Enter into a Housing Assistance Payments (AHAP) contract. Instead, following the execution of all requirements contained in the Commitment to Enter into a HAP (CHAP) contract and the RAD Conversion Commitment (RCC), a project is converted immediately to the RAD PBV HAP contract following the closing of any construction financing. Except for transfers of assistance, the RAD PBV HAP contract takes effect before any work begins. Owners of public housing projects converted to PBV assistance via RAD enter into a HAP contract with the PHA that will administer the PBV assistance. Units assisted under a RAD PBV HAP contract must be subject to long-term, renewable use and affordability restrictions. 18-IV.B. HAP CONTRACT REQUIREMENTS
Contract Information [RAD PBV Quick Reference Guide 6/20; Notice PIH 2019-23] The RAD PBV program uses the PBV HAP contract for new construction or rehabilitated housing (Form HUD-52530A), as modified by the RAD rider (Form HUD-52621). For closings on or after January 1, 2018, HUD incorporated the RAD rider directly into the standard PBV HAP contract. For closing that occurred prior to January 1, 2018, the RAD rider must be attached to the PBV HAP contract.

The distinction between “existing housing” and “rehabilitated and newly constructed housing” is overridden by RAD requirements. The project must also have an initial RAD use agreement. All public housing RAD conversion properties financed with LIHTC are also required to include an LIHTC rider.

Execution and Effective date of the HAP Contract [RADBlast! 7/11/16] RAD PBV projects do not employ an Agreement to Enter into a Housing Assistance Payments (AHAP) contract like in the standard PBV program. Rather, when the conditions of the CHAP and the RCC are met and the conversion has closed, the PHA executes the HAP contract. Project owners may select the effective date of the HAP contract as the first day of either of the two months following the completed closing.

Term of HAP Contract [Notice PIH 2019-23]
The initial term of the HAP contract may not be for less than 15 years and may be for a term of up to 20 years upon request of the owner and with approval of the administering voucher agency.

Upon expiration of the initial term of the contract, and upon each renewal term of the contract, the owner must accept each offer to renew the contract, for the prescribed number and mix of units, either on the site of the project subject to the expiring contract or, upon request of the project owner and subject to PHA and HUD approval, at another site through a future transfer of assistance. Contracts are subject to the terms and conditions applicable at the time of each offer and further subject to the availability of appropriations for each year of each such renewal. To implement this provision, HUD is waiving section 8(o)(13)(F) of The United States Housing Act of 1937, which permits a minimum term of one year, as well as 24 CFR 983.205(a), which governs the contract term.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-26 After the expiration of a 20-year initial term of the HAP contract, the HAP contract must be renewed on a form approved by HUD, which must include language that requires rents to be redetermined in accordance with 24 CFR 983.301 and 983.302. If the RAD PBV HAP contract was renewed or extended prior to the 20th year after conversion, then starting with the 20th year after execution of the original RAD PBV HAP contract, contract rents shall be redetermined in accordance with 24 CFR 983.302 or successor regulation [Notice PIH 2025-03].

Agreement to Enter into a HAP (AHAP) Contract [Notice PIH 2019-23] For public housing conversions to PBV, there will be no agreement to enter into a Housing Assistance Payments (AHAP) contract. Therefore, all regulatory references to the Agreement (AHAP), including regulations under 24 CFR Part 983 Subpart D, are waived. The definitions for proposal selection date, new construction, rehabilitation, and existing housing are not applicable.

Mandatory Contract Renewal [Notice PIH 2019-23]
By statue, upon contact expiration, the agency administering the vouchers will offer, and the PHA will accept, renewal of the contract for the prescribed number and mix of units, either on the site of the project subject to the expiring contract or, upon request of the project owner and subject to PHA and HUD approval, at another site through a future transfer of assistance. The contract is subject to the terms and conditions applicable at the time of renewal and the availability of appropriations each year for such renewal. Consequently 24 CFR 983.205(b), governing the PHA discretion to renew the contract, will not apply.

In the event that the HAP contract is removed due to breach, non-compliance or insufficiency of appropriations, for all units previously covered under the HAP contract, new tenants must have incomes at or below 80 percent of the area median income at the time of admission and rents may not exceed 30 percent of 80 percent of median income for an appropriate size unit for the remainder of the term of the RAD use agreement.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-27 Remedies for Housing Quality Standards Deficiencies [24 CFR 983.208] The following is applicable to HAP contracts executed or renewed before June 6, 2024.

The PHA may not make any HAP payment to the owner for a contract unit during any period in which the unit does not comply with housing quality standards. If the PHA determines that a contract unit does not comply with housing quality standards, the PHA may exercise any of its remedies under the HAP contract, for any or all of the contract units. Available remedies include termination of housing assistance payments, abatement or withholding of housing assistance payments, reduction of contract units, and termination of the HAP contract.

PHA Policy
The PHA will abate contracts for noncompliance with housing quality standards in accordance with the policies used in the tenant-based voucher program. These policies are contained in Section 8-II.G., Enforcing Owner Compliance.

The following is applicable to HAP contracts executed or renewed June 6, 2024, or later.

Enforcement of Housing Quality Standards [24 CFR 983.208(b)] The PHA must vigorously enforce the owner’s obligation to maintain contract units in accordance with housing quality standards. If the owner fails to maintain the dwelling unit in accordance with housing quality standards, the PHA must take enforcement action. The unit is in noncompliance with housing quality standards if:
• The PHA or other inspector authorized by the state or local government determines the unit has housing quality standards deficiencies based upon an inspection; • The agency or inspector notifies the owner in writing of the unit housing quality standards deficiencies; and
• The deficiencies are not remedied within the following timeframes:
− For life-threatening deficiencies, the owner must correct the deficiency within 24 hours of notification;
− For other deficiencies, the owner must correct the deficiency within 30 calendar days of notification (or any reasonable PHA-approved extension).

In the case of an HQS deficiency that the PHA determines is caused by the tenant, any member of the household, or any guest or other person under the tenant’s control, other than any damage resulting from ordinary use, the PHA may waive the owner’s responsibility to remedy the violation. Housing assistance payments to the owner may not be withheld or abated if the owner responsibility has been waived. However, the PHA may terminate assistance to a family because of a housing quality standards breach beyond damage resulting from ordinary use caused by any member of the household or any guest or other person under the tenant’s control, which may result in removing the unit from the HAP contract.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-28 PHA Policy
The PHA will waive the owner’s responsibility for housing quality standards deficiencies that have been determined to have been caused by the tenant, any member of the household, or any guest or other person under the tenant’s control, to the extent the tenant can be held responsible for ensuring that the deficiencies are corrected: the tenant must take all necessary steps permissible under the lease and state and local law to remedy the deficiency. This may include paying the owner for the cost of the necessary repairs in accordance with the lease.

In the case of a housing quality standards deficiency that is caused by fire, natural disaster, or similar extraordinary circumstances, the PHA may permit the owner to undertake substantial improvement in accordance with 24 CFR 983.212. However, so long as the contract unit with deficiencies is occupied, the PHA must withhold or abate housing assistance payments and remove units from or terminate the HAP contract as described in this section.

In the case of a project that is undergoing development activity after HAP contract execution, the remedies of 24 CFR 983.208(d) do not apply to units designated as unavailable for occupancy during the period of development activity in accordance with the rider. However, in the case of any contract unit with deficiencies that is occupied, the PHA must withhold or abate housing assistance payments and remove units from or terminate the HAP contract as described in this section.

Family Obligation [24 CFR 983.208(c)]
The family may be held responsible for a breach of housing quality standards caused by any of the following:
• Tenant-paid utilities not in service;
• Failure to provide or maintain appliances owned by the family; and • Damage to the dwelling unit or premises caused by a household member or guest beyond ordinary wear and tear.

PHA Policy
Damages beyond ordinary wear and tear will be considered to be damages which could be assessed against the security deposit under state law or in court practice.

If the PHA has waived the owner’s responsibility to remedy the violation, the following applies:
• If the housing quality standards breach caused by the family is life-threatening, the family must take all steps permissible under the lease and state and local law to ensure the deficiency is corrected within 24 hours of notification. • For other family-caused deficiencies, the family must take all steps permissible under the lease and state and local law to ensure the deficiency is corrected within 30 calendar days of notification (or any PHA-approved extension).

If the family has caused a breach of the HQS, the PHA must take prompt and vigorous action to enforce the family obligations. The PHA may terminate assistance for the family in accordance with 24 CFR 982.552.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-29 PHA Remedies [24 CFR 983.208(d)]
The remedies listed below apply when housing quality standards deficiencies are identified as the result of an inspection other than a pre-selection, initial, or turnover inspection. The PHA must identify in its administrative plan the conditions under which it will withhold HAP and the conditions under which it will abate HAP or terminate the HAP contract for units other than the unit with housing quality standards deficiencies.

PHA Policy
The owner and the family will be notified in writing of the results of all inspections.

When an inspection identifies housing quality standards failures, the PHA will determine (1) whether or not the failure is a life-threatening condition and (2) whether the family or owner is responsible.

The PHA will not withhold assistance payments upon notification to the owner of the deficiencies.

When life-threatening conditions are identified, the PHA will immediately notify both parties by telephone or email. The notice will specify who is responsible for correcting the violation. The corrective actions must be taken within 24 hours of the PHA’s notice.

When failures that are not life-threatening are identified, the PHA will send the owner and the family a written notification of the inspection results within five business days of the inspection. The written notice will specify who is responsible for correcting the violation, and the time frame within which the failure must be corrected. Generally, not more than 30 days will be allowed for the correction.

If the owner is responsible for correcting the deficiency, the notice of inspection results will inform the owner that if life-threatening conditions are not corrected within 24 hours, and non-life-threatening conditions are not corrected within the specified time frame (or any PHA-approved extension), the owner’s HAP will be abated.

Likewise, if the family is responsible for correcting the deficiency, the notice will inform the family that if corrections are not made within the specified time frame (or any PHAapproved extension, if applicable) the family’s assistance will be terminated in accordance with PHA policy (see Chapter 12).

HAP Withholding [24 CFR 983.208(d)(1)
A PHA may withhold assistance payments for units that have housing quality standards deficiencies once the PHA has notified the owner in writing of the deficiencies. The PHA’s administrative plan must identify the conditions under which the PHA will withhold HAP. In this case, if the unit is brought into compliance during the applicable cure period, the PHA resumes assistance payments and provide assistance payments to cover the time period for which the payments were withheld.

PHA Policy
The PHA will not withhold assistance payments upon notification to the owner of the deficiencies.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-30 HAP Abatement [24 CFR 983.208(d)(2)]
The PHA must abate the HAP, including amounts that had been withheld, if the owner fails to make the repairs within the applicable cure period. The PHA may choose to abate payments for all units covered by the HAP contract due to a contract unit’s noncompliance with the housing quality standards, even if some of the contract units continue to meet housing quality standards.

In this case, the PHA must notify the family and the owner that it is abating payments and, if the unit does not meet housing quality standards within 60 days (or a reasonable longer period established by the PHA), the PHA will either terminate the HAP contract or remove the unit with deficiencies from the HAP contract, and any family residing in a unit that does not comply with housing quality standards will have to move if the family wishes to receive continued assistance.

The owner may not terminate the tenancy of any family due to the withholding or abatement of assistance.

PHA Policy
The PHA will make all HAP abatements effective the first of the month following the expiration of the PHA-specified correction period (including any extension).

The PHA will abate payments only for those contract units that do not meet housing quality standards.

The PHA will inspect abated units within five business days of the owner’s notification that the work has been completed. Payment will resume effective on the day the unit passes inspection.

During any abatement period, the family continues to be responsible for its share of the rent.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-31 Failure to Make Repairs
If an owner fails to make required repairs within 60 days (or a reasonable longer period established by the PHA) of the notice of abatement, the PHA must either remove the unit from the HAP contract or terminate the HAP contract in its entirety. The PHA must issue the family whose unit will be removed or all families residing in contract units, if the PHA is terminating the HAP contract, a tenant-based voucher to move at least 30 days prior to the removal of the unit from the HAP contract or termination of the HAP contract. A family may elect to remain in the project if the project contains a unit that meets the requirements of that section, with priority given to families who will remain in the same unit if there are insufficient units available to accommodate all families that wish to remain. The PHA must give any family residing in a unit that is either removed from the HAP contract or for which the HAP contract is terminated due to a failure to correct housing quality standards deficiencies at least 90 days or a longer period as the PHA determines is reasonably necessary following the termination of the HAP contract or removal of the unit from the HAP contract to lease a unit with tenant-based assistance.

PHA Policy
The PHA will issue a family whose HAP contract is being terminated due to an owner failing to make required repairs within the required time frame a voucher no later than 30 days prior to the termination of the HAP contract. The initial term of the voucher will be 120 calendar days. No briefing is required for these families.

In order to receive tenant-based assistance under the HCV program, the family must submit a Request for Tenancy Approval and proposed lease within the 120-day period, unless the PHA grants an extension. The PHA will follow the policies set forth in Chapter 5 on voucher extension and expiration.

Offer of Public Housing [24 CFR 983.208(d)(6)(ii)]
If the family is unable to lease a new unit within the term of the voucher, and the PHA owns or operates public housing, the PHA must offer, and, if accepted, provide the family a selection preference for an appropriate-sized public housing unit that first becomes available for occupancy after the time period expires.

PHA Policy
The PHA does not operate any public housing units.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-32 Relocation Assistance [24 CFR 983.208(d)(6)(iii)]
PHAs may assist families relocating due to the HAP contract being terminated as a result of the owner failing to make required repairs within the required time frame in finding a new unit, including using up to two months of the withheld and abated assistance payments for costs directly associated with relocating to a new unit, including security deposits, temporary housing costs, or other reasonable moving costs as determined by the PHA based on their locality.

If the PHA uses withheld and abated payments to assist with relocation costs, the PHA must provide security deposit assistance to the family as necessary. The PHA must assist families with disabilities with locating available accessible units in accordance with 24 CFR 8.28(a)(3). If the family receives security deposit assistance from the PHA for the new unit, the PHA may require the family to remit the security deposit returned by the owner of the new unit at such time that the lease is terminated, up to the amount of security deposit provided by the PHA for that unit.

PHA Policy
The PHA will assist families with disabilities with locating available accessible units in accordance with program requirements.

The PHA will use up to two months of withheld and abated payment to assist with any required security deposit at the new unit. Funds will not be used for any other relocation assistance.

If the family receives a refund of a security deposit for the new unit, the PHA will not require any amount to be remitted to the PHA.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-33 18-IV.C. AMENDMENTS TO THE HAP CONTRACT
Floating Units [Notice PIH 2019-23]
Upon request of the owner to the voucher agency that will administer the project, HUD will permit assistance to float among units within the project that are the same bedroom size. The unit to which assistance is floated must be comparable to the unit being replaced in quality and amenities.

If the PHA chooses to float units, units are not specifically identified on the HAP contract, rather the HAP contract must specify the number and type of units in the property that are RAD PBV units. The property must maintain the same number and type of RAD units from the time of the initial HAP contract execution forward.

PHA Policy
The PHA will add units to the contract on a case-by-case basis to ensure the availability of affordable housing as long as the addition of units does not exceed allowable project caps.

Reduction in HAP Contract Units [Notice PIH 2019-23]
Project owners are required to make available for occupancy by eligible tenants the number of assisted units under the terms of the HAP contract.

The PHA may not reduce the number of assisted units without written HUD approval. Any HUD approval of a PHA’s request to reduce the number of assisted units under contract is subject to conditions that HUD may impose. MTW agencies may not alter this requirement.

If units are removed from the HAP contract because a new admission’s TTP comes to equal or exceed the gross rent for the unit and if the project is fully assisted, the PHA must reinstate the unit after the family has vacated the property. If the project is partially assisted, the PHA may substitute a different unit for the unit on the HAP contract in accordance with 24 CFR 983.207, or where the development has “floating” units.
18-IV.D. HAP CONTRACT YEAR AND ANNIVERSARY DATES [24 CFR 983.207(b)(2) and (g), and 24 CFR 983.302(e)]
The HAP contract year is the period of 12 calendar months preceding each annual anniversary of the HAP contract during the HAP contract term. The initial contract year is calculated from the first day of the first calendar month of the HAP contract term.

The annual anniversary of the HAP contract is the first day of the first calendar month after the end of the preceding contract year. There is a single annual anniversary date for all units under a particular HAP contract.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-34 18-IV.E. OWNER RESPONSIBILITIES UNDER THE HAP CONTRACT
[24 CFR 983.210]
When the owner executes the HAP contract, they certify that at such execution and at all times during the term of the HAP contract:
• The owner is maintaining the premises and contract units in accordance with housing quality standards;
• The owner is providing all services, maintenance, equipment, and utilities as agreed to under the HAP contract and the leases;
• Each contract unit for which the owner is receiving HAP is leased to an eligible family referred by the PHA or selected from the owner-maintained waiting list, and the lease is in accordance with the HAP contract and HUD requirements;
• To the best of the owner’s knowledge, the family resides in the contract unit for which the owner is receiving HAP, and the unit is the family’s only residence; • The owner (including a principal or other interested party) is not the spouse, parent, child, grandparent, grandchild, sister, or brother of any member of a family residing in a contract unit (unless needed as a reasonable accommodation);
• The amount of the HAP the owner is receiving is correct under the HAP contract; • The rent for contract units does not exceed rents charged by the owner for comparable unassisted units;
• Except for HAP and tenant rent, the owner has not received and will not receive any other payment or consideration for rental of the contract unit; • The family does not own or have any interest in the contract unit (this does not apply to the family’s membership in a cooperative); and
• Repair work on the project selected as an existing project that is performed after HAP contract execution within such post-execution period as specified by HUD may constitute development activity, and if determined to be development activity, the repair work undertaken shall be in compliance with Davis-Bacon wage requirements.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-35 PART V: SELECTION OF PBV PROGRAM PARTICIPANTS
18-V.A. OVERVIEW
Many of the provisions of the tenant-based voucher regulations [24 CFR 982] also apply to the PBV program. This includes requirements related to determining eligibility and selecting applicants from the waiting list. Even with these similarities, there are requirements that are unique to the PBV program. This part describes the requirements and policies related to eligibility and admission to the PBV program.
18-V.B. PROHIBITED RESCREENING OF EXISTING TENANTS UPON CONVERSION [Notice PIH 2019-23]
Current households cannot be excluded from occupancy at the covered project based on any rescreening, income eligibility, or income targeting provisions. Consequently, current households will be grandfathered for application of any eligibility criteria to conditions that occurred prior to conversion but will be subject to any ongoing eligibility requirements for actions that occur after conversion. Post-conversion, the tenure of all residents of the covered project is protected pursuant to PBV requirements regarding continued occupancy unless explicitly modified by Notice PIH 2019-23 (e.g., rent phase-in provisions). For example, a unit with a household that was over-income at time of conversion would continue to be treated as an assisted unit. Thus, 24 CFR 982.201, concerning eligibility and targeting, will not apply for current households. Once that remaining household moves out, the unit must be leased to an eligible family. Existing residents at the time of conversion may not be rescreened for citizenship status or have their social security numbers reverified.

Further, so as to facilitate the right to return to the assisted property, this provision must apply to current public housing residents of the converting project that will reside in legacy non-RAD PBV units placed in a project that contain RAD PBV units. Such families and such contract units will otherwise be subject to all requirements of the applicable program, specifically 24 CFR 983 for legacy non-RAD PBV. Any legacy non-RAD PBV units located in the same project are also subject to the right to return.

For the RAD PBV program, in-place family means a family who lived in a pre-conversion property at the time assistance was converted from public housing to PBV under RAD.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-36 18-V.C. ELIGIBILITY FOR PBV ASSISTANCE [24 CFR 983.251(a) and (b)] Applicants for PBV assistance must meet the same eligibility requirements as applicants for the tenant-based voucher program using information received and verified by the PHA within a period of 60 days before commencement of PBV assistance. For all families, the PHA must determine if the total tenant payment for the family is less than the gross rent, such that the unit will be eligible for a monthly HAP. Applicants must qualify as a family as defined by HUD and the PHA, have income at or below HUD-specified income limits, and qualify on the basis of citizenship or the eligible immigration status of family members [24 CFR 982.201(a) and 24 CFR 983.2(a)]. In addition, an applicant family must provide social security information for family members [24 CFR 5.216 and 5.218] and consent to the PHA’s collection and use of family information regarding income, expenses, and family composition [24 CFR 5.230]. The PHA may also not approve a tenancy if the owner (including a principal or other interested party) of the unit is the parent, child, grandparent, grandchild, sister, or brother of any member of the family, unless needed as a reasonable accommodation. An applicant family must also meet HUD requirements related to current or past criminal activity.

PHA Policy
The PHA will determine an applicant family’s eligibility for the RAD PBV program in accordance with the policies in Chapter 3.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-37 18-V.D. ORGANIZATION OF THE WAITING LIST [24 CFR 983.251(c); Notice PIH 2019-23]
The standard PBV regulations at 24 CFR 983.251 set out program requirements related to establishing and maintaining a waiting list from which residents will be admitted. These provisions will apply unless the project is covered by a remedial order or agreement that specifies the type of waiting list and other waiting list policies. Any legacy non-RAD PBV units located in the same project are also subject to these requirements.

Applicants who will occupy units with PBV assistance must be selected from the waiting list for the PBV program. The PHA or owner (as applicable) may establish selection criteria or preferences for occupancy of particular PBV units. The PHA may place families referred by the PBV owner on its PBV waiting list.

The PHA must establish in the administrative plan the options it will use to structure the PBV waiting list. The PHA may:
• Use a separate, central, waiting list comprised of more than one or or all PBV projects; • Use the same waiting list for both tenant-based and some or all PBV projects; • Use a separate waiting list for PBV units in individual projects or buildings (or for sets of such units) (which may be used in combination with either of the above options and may be maintained by the owner); or
• Merge the PBV waiting list with a waiting list for other assisted housing programs offered by the PHA.

If the PHA chooses to offer a separate waiting list for PBV assistance, the PHA must offer to place applicants who are listed on the tenant-based waiting list on the waiting list for PBV assistance. The PHA must specify the name of the PBV projects in its administrative plan.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-38 PHA Policy
The PHA will establish and manage separate waiting lists for individual projects or buildings that are receiving RAD PBV assistance. The PHA currently has waiting lists for the RAD PBV projects.

For any applicants on the public housing waiting list that are likely to be ineligible for admission to a covered project converting to PBV because the household’s TTP is likely to exceed the RAD gross rent, the PHA will consider transferring such household, consistent with program requirements for administration of waiting lists, to the PHA’s remaining public housing waiting lists or to another voucher waiting list, in addition to transferring such household to the waiting list for the covered project.

To the extent any wait list relies on the date and time of application, the applicants shall have priority on the wait lists to which their application was transferred in accordance with the date and time of their application to the original waiting list.

The PHA will maintain the project-specific waiting list in accordance with all applicable civil rights and fair housing regulations found at 24 CFR 903.7(b)(2)(ii)-(iv). The PHA will provide applicants full information about each development, including an estimate of the wait time, location, occupancy, number and size of accessible units, and amenities like day care, security, transportation, and training programs at each development with a site-based waiting list. The system for selection will be consistent with all applicable civil rights and fair housing laws and regulations and may not be in conflict with any imposed or pending court order, settlement agreement, or complaint brought by HUD.

The PHA will give priority to participants moving under a VAWA emergency transfer from one PBV development to another in accordance with Section 18-VI.E. 18-V.E. SELECTION FROM THE WAITING LIST [24 CFR 983.251(c)] After conversion to RAD PBV, applicants who will occupy units with RAD PBV assistance must be selected from the waiting list. The PHA may establish selection criteria or preferences for occupancy of particular PBV units.

Income Targeting [24 CFR 983.251(c)(9); Notice PIH 2019-23] At least 75 percent of the families admitted to the PHA’s tenant-based and project-based voucher programs during the PHA fiscal year from the waiting list must be extremely-low income families. The income targeting requirement applies to the total of admissions to both programs.

Families in place at the time of the conversion are exempt from income targeting requirements.

New admissions follow standard PBV requirements. Any legacy non-RAD PBV units located in the same project are also subject to these requirements.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-39 Units with Accessibility Features [24 CFR 983.251(c)(9)] Families who require particular accessibility features for persons with disabilities must be selected first to occupy PBV units with such accessibility features. The PHA must have some mechanism for referring to accessible PBV units a family that includes a person with a mobility or sensory impairment.

Preferences [24 CFR 983.251(d); FR Notice 11/24/08; Notice PIH 2019-23] The PHA may establish in its administrative plan any preferences for occupancy of particular units, including the name of the projects and the specific preferences that are to be used by projects. Criteria for occupancy of units (e.g., elderly families) may also be established, however, selection of families must be done through admission preference. The PHA may use the same selection preferences that are used for the tenant-based voucher program, establish selection criteria or preferences for the PBV program as a whole, or for occupancy of particular PBV developments or units.

PHA Policy
The PHA will not offer any preferences for the RAD PBV program. However, the PHA will give priority to participants moving under a VAWA emergency transfer from one PBV development to another in accordance with Section 18-VI.E.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-40 18-V.F. OFFER OF PBV ASSISTANCE
Refusal of Offer [24 CFR 983.251(e)]
If a family refuses the PHA’s offer of PBV assistance or the owner rejects a family for admission to the owner’s PBV units, the family’s position on the PHA waiting list for tenant-based assistance is not affected regardless of the type of PBV waiting list used by the PHA. The impact (of a family’s rejection of the offer or the owner’s rejection of the family) on a family’s position on the PBV waiting list will be determined as follows:
• If a central PBV waiting list is used, the PHA’s administrative plan must address the number of offers a family may reject without good cause before the family is removed from the PBV waiting list and whether the owner’s rejection will impact the family’s place on the PBV waiting list.
• If a project-specific PBV waiting list is used, the family’s name is removed from the project’s waiting list connected to the family’s rejection of the offer without good cause or the owner’s rejection of the family. The family’s position on any other project-specific PBV waiting list is not affected.
• The PHA must define good cause in its administrative plan. The PHA’s definition of good cause must include, at minimum, that:
− The family determines the unit is not accessible to a household member with a disability or otherwise does not meet the member’s disability-related needs; − The unit has housing quality standards deficiencies;
− The family is unable to accept the offer due to circumstances beyond the family’s control (such as hospitalization, temporary economic hardship, or natural disaster); and − The family determines the unit presents a health or safety risk to a household member who is or has been a victim of domestic violence, dating violence, sexual assault, or stalking.

PHA Policy
The PHA will define good cause for rejection of a unit offer as any of the factors listed above.

The PHA is prohibited from taking any of the following actions against a family who has applied for, received, or refused an offer of PBV assistance:
• Refusing to list the applicant on the waiting list for tenant-based voucher assistance − However, the PHA is not required to open a closed waiting list to place the family on that waiting list.
• Denying any admission preference for which the applicant qualifies • Changing the applicant’s place on the waiting list based on preference, date, and time of application, or other factors affecting selection under the PHA’s selection policy • Removing the applicant from the tenant-based voucher waiting list Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-41 Acceptance of Offer [24 CFR 983.252(a) and (b)]
Family Briefing
When a family accepts an offer for PBV assistance, the PHA must give the family an oral briefing. The briefing must include information on how the program works, the responsibilities of the family and owner, and the family’s right to move.

In addition to the oral briefing, the PHA must provide a briefing packet that contains the following information:
• How the PHA determines the total tenant payment for a family; • The family obligations under the program;
• Information on federal, state, and local equal opportunity laws, the contact information for the Section 504 coordinator, a copy of the housing discrimination complaint form, and information on how to request a reasonable accommodation or modification under Section 504, the Fair Housing Act, and the Americans with Disabilities Act; • PHA subsidy standards, including when the PHA will consider granting exceptions to the standards, and when exceptions are required as a reasonable accommodation for a person with disabilities under Section 504, the Fair Housing Act, or the Americans with Disabilities Act; and
• The family’s right to move.

The PHA and family must sign the statement of family responsibility.

Persons with Disabilities
The PHA must take appropriate steps to ensure effective communication, in accordance with 24 CFR 8.6 and 28 CFR part 35, subpart E, and must provide information on the reasonable accommodation process, in conducting the oral briefing and in providing the written information packet. This may include making alternative formats available (see Chapter 2). In addition, the PHA must have a mechanism for referring a family that includes a member with a mobility impairment to an appropriate accessible PBV unit.

Persons with Limited English Proficiency [24 CFR 983.252(d)] The PHA must take reasonable steps to ensure meaningful access by persons with limited English proficiency in accordance with Title VI of the Civil Rights Act of 1964, HUD’s implementing regulation at 24 CFR Part 1, Executive Order 13166 (see Chapter 2), and HUD’s Final Guidance to Federal Financial Assistance Recipients Regarding Title VI Prohibition Against National Origin Discrimination Affecting Limited English Proficient Persons (72 FR 2732) or successor authority.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-42 18-V.G. LEASING OF CONTRACT UNITS [24 CFR 983.252]
The owner is responsible for developing written tenant selection procedures that are consistent with the purpose of improving housing opportunities for very low-income families and reasonably related to program eligibility and an applicant’s ability to fulfill their obligations under the lease. An owner must promptly notify in writing any rejected applicant of the grounds for any rejection [24 CFR 983.253(a)(2) and (a)(3)]. The owner must provide a copy of the rejection notice to the PHA. During the term of the HAP contract, the owner must lease contract units to eligible families that are selected from the waiting list for the PBV program. The contract unit leased to the family must be the appropriate size unit for the size of the family, based on the PHA’s subsidy standards.

Leasing [24 CFR 983.253(a)]
During the term of the HAP contract, the owner must lease contract units to eligible families that are selected and referred by the PHA from the waiting list. The contract unit leased to the family must be the appropriate size unit for the size of the family, based on the PHA’s subsidy standards.

Filling Vacancies [24 CFR 983.254(a)]
The owner must promptly notify the PHA of any vacancy or expected vacancy in a contract unit.

After receiving such notice, the PHA must make every reasonable effort to promptly refer a sufficient number of families for the owner to fill such vacancies within 30 calendar days. The PHA and the owner must make reasonable efforts to minimize the likelihood and length of any vacancy.

PHA Policy
The owner must notify the PHA in writing (mail, fax, or email) within five business days of learning about any vacancy or expected vacancy.

The PHA will make every reasonable effort to refer families to the owner within 10 business days of receiving such notice from the owner
18-V.H. TENANT SCREENING [24 CFR 983.255]
PHA Option
The PHA is not responsible or liable to the owner or any other person for the family’s behavior or suitability for tenancy. However, the PHA may opt to screen applicants for family behavior or suitability for tenancy and may deny applicants based on such screening.

PHA Policy
The PHA will not conduct screening to determine a PBV applicant family’s suitability for tenancy.

The PHA must provide the owner with an applicant family’s current and prior address (as shown in PHA records) and the name and address (if known by the PHA) of the family’s current landlord and any prior landlords.

In addition, the PHA may offer the owner other information the PHA may have about a family, including information about the tenancy history of family members or about drug trafficking and Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-43 criminal activity by family members. The PHA must provide applicant families a description of the PHA policy on providing information to owners, and the PHA must give the same types of information to all owners.

The protections for victims of domestic violence, dating violence, sexual assault, stalking, or human trafficking in 24 CFR part 5, subpart L, apply to tenant screening. The PHA may not disclose to the owner any confidential information provided in response to a request for documentation of domestic violence, dating violence, sexual assault, stalking, or human trafficking except at the written request or with the written consent of the individual providing the documentation [24 CFR 5.2007(c)].

PHA Policy
The PHA will inform owners of their responsibility to screen prospective tenants, and will provide owners with the required known name and address information, at the time of the turnover inspection or before. The PHA will not provide any additional information to the owner, such as tenancy history, criminal history, etc.

Owner Responsibility
The owner is responsible for screening and selection of the family to occupy the owner’s unit.

When screening families the owner may consider a family’s background with respect to the following factors:
• Payment of rent and utility bills
• Caring for a unit and premises
• Respecting the rights of other residents to the peaceful enjoyment of their housing • Drug-related criminal activity or other criminal activity that is a threat to the health, safety, or property of others
• Compliance with other essential conditions of tenancy Project
-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-44 Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-45 PART VI: OCCUPANCY
18-VI.A. OVERVIEW
After an applicant has been selected from the waiting list, determined eligible by the PHA, referred to an owner, and determined suitable by the owner, the family will sign the lease and occupancy of the unit will begin.
18-VI.B. LEASE [24 CFR 983.256]
The tenant must have legal capacity to enter into a lease under state and local law. Legal capacity means that the tenant is bound by the terms of the lease and may enforce the terms of the lease against the owner.

The tenant and the owner must enter into a written lease agreement that is signed by both parties.

The tenancy addendum must include, word-for-word, all provisions required by HUD.

Lease Requirements [24 CFR 983.256(c); Notice PIH 2019-23; Notice PIH 2025-03, Supplemental Notice 4C]
The lease for a PBV unit must specify all of the following information:
• The names of the owner and the tenant;
• The unit rented (address, apartment number, if any, and any other information needed to identify the leased contract unit);
• The term of the lease (initial term and any provision for renewal); • The amount of the tenant rent to owner, which is subject to change during the term of the lease in accordance with HUD requirements;
• A specification of the services, maintenance, equipment, and utilities that will be provided by the owner;
• The amount of any charges for food, furniture, or supportive services; and • For any family admitted following conversion, the lease must specify what will happen if the family elects to remain in its unit after increasing its income such that it requires zero HAP.

Specifically, the lease must make clear how the tenant rent will be calculated, and it must address the transition to a new lease. The PHA must include resident procedural rights for termination notification and grievance procedures in the owner’s lease. These requirements are not part of the regular PBV program but are required under RAD.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-46 The lease terms and provisions, including all addenda and referenced documents such as House Rules, must:
• Be reasonable, use plain language, and must not contain provisions that conflict with resident rights described in Notice PIH 2025-03 or requirements of the PBV program. • Be available in multiple languages as needed and written in a manner accessible to people with disabilities.
• For any residences that qualify as “target housing” under 42 U.S.C. 4851b, comply with the Lead Disclosure Rule, as codified in 24 CFR part 35, subpart A.

The lease must not:
• Require a new security deposit for residents in-place at the time of conversion, • Prohibit residents’ pets in-place at the time of conversion. • Be onerous or difficult for residents to understand and should not impose overly restrictive rules about what residents may or may not do in their homes.

Tenancy Addendum [24 CFR 983.256(d)]
The tenancy addendum in the lease must state:
• The program tenancy requirements
• The composition of the household as approved by the PHA (the names of family members and any PHA-approved live-in aide)
All provisions in the HUD-required tenancy addendum must be included in the lease. The terms of the tenancy addendum prevail over other provisions of the lease.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-47 Initial Term and Lease Renewal [24 CFR 983.256(f); RAD PBV Quick Reference Guide 6/20]
Leases for residents who will remain in place (i.e., who will not be relocated solely as a result of conversion) must have an effective date that coincides with—and must be signed on or before— the effective date of the RAD PBV HAP contract.

The initial lease term must be for at least one year. The lease must provide for automatic renewal after the initial term of the lease in either successive definitive terms (e.g., month-to-month or year-to-year) or an automatic indefinite extension of the lease term. For automatic indefinite extension of the lease term, the lease terminates if any of the following occur:
• The owner terminates the lease for good cause
• The tenant terminates the lease
• The owner and tenant agree to terminate the lease
• The PHA terminates the HAP contract
• The PHA terminates assistance for the family
Changes in the Lease [24 CFR 983.256(e)]
If the tenant and owner agree to any change in the lease, the change must be in writing, and the owner must immediately give the PHA a copy of all changes.

The owner must notify the PHA in advance of any proposed change in the lease regarding the allocation of tenant and owner responsibilities for utilities. Such changes may only be made if approved by the PHA and in accordance with the terms of the lease relating to its amendment.

The PHA must redetermine reasonable rent, in accordance with program requirements, based on any change in the allocation of the responsibility for utilities between the owner and the tenant.

The redetermined reasonable rent will be used in calculation of the rent to owner from the effective date of the change.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-48 Owner Termination of Tenancy [24 CFR 983.257; Notice PIH 2019-23] With two exceptions, the owner of a PBV unit may terminate tenancy for the same reasons an owner may in the tenant-based voucher program (see Section 12-III.B. and 24 CFR 982.310). In the PBV program, terminating tenancy for “good cause” does not include doing so for a business or economic reason, or a desire to use the unit for personal or family use or other non-residential purpose. The regulations at 24 CFR 5.858 through 5.861 on eviction for drug and alcohol abuse and 24 CFR part 5, subpart L (Protection for Victims of Domestic Violence, Dating Violence, Sexual Assault, or Stalking) apply to the PBV program.

Projects converting from public housing to PBV under RAD have additional procedural rights that do not apply to the standard PBV program. These procedural rights must be included in the owner’s lease as well as the PHA’s administrative plan. In addition to the regulations at 24 CFR 983.257 related to project owner termination of tenancy and eviction (which MTW agencies may not alter) the termination procedure for RAD conversions to PBV will require that PHAs provide adequate written notice of termination of the lease, which may not be less than:
• A reasonable period of time, but not to exceed 30 days:
- If the health or safety of other tenants, PHA employees, or persons residing in the immediate vicinity of the premises is threatened; or
- In the event of any drug-related or violent criminal activity or any felony conviction • Not less than 30 days in the case of nonpayment of rent • Not less than 30 days in any other case, except that if a state or local law provides for a shorter period of time, such shorter period will apply
These provisions apply to legacy non-RAD PBV units located in the project as well.

Tenant Absence from the Unit [24 CFR 983.256(g) and 982.312(a)] The lease may specify a maximum period of family absence from the unit that may be shorter than the maximum period permitted by PHA policy. According to program requirements, the family’s assistance must be terminated if they are absent from the unit for more than 180 consecutive days. PHA termination of assistance actions due to family absence from the unit are subject to 24 CFR 982.312, except that the unit is not terminated from the HAP contract if the family is absent for longer than the maximum period permitted.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-49 Continuation of Housing Assistance Payments [24 CFR 983.258; Notice PIH 2019-23; Notice PIH 2023-19; RAD Supplemental Notice 4B; RAD PBV Quick Reference Guide 6/20] Pre-Conversion Residents
The unit for a family with a TTP that equals or exceeds the gross rent (which is defined as the contract rent plus any utility allowance for the unit) must be placed on the PBV HAP contract and the family must be admitted to the PBV program. In this case, and until such time as the family’s TTP falls below the gross rent, the family will pay the owner the alternate rent which is defined as the lesser of:
• The family’s TTP minus the utility allowance (subject to any required phase-in); or • The Zero HAP Rent Cap, which is the lower of:
- 110 percent fo the applicable FMR minus the utility allowance; or - In the event the units are subject to more restrictive rent setting requirement under the LIHTC or HOME programs (or other programs approved by HUD on a project-specific basis, the rent to owner set to comply with such requirements.

The family will continue to pay this amount until/if circumstances change, and HAP is paid on their behalf. In other words, assistance may subsequently be reinstated if the tenant becomes eligible for assistance in which case normal PBV rent requirements will apply to the family. In such cases, the resident is still considered a program participant. All of the family obligations and protections under RAD and standard PBV apply to the resident. Likewise, all requirements with respect to the unit, such as compliance with the NSPIRE standards, apply as long as the unit is under HAP contract or added back to the HAP Contract. Any legacy non-RAD PBV units located in the same project are also subject to these requirements.

After a family has paid the Zero HAP Rent Cap for a period of 180 days, the PHA must remove the unit from the HAP Contract and the family’s participating in the PBV program ends. If the Covered Project is fully assisted and the family subsequently leaves the property, the PHA must reinstate the unit back onto the HAP contract and admit an eligible family. If the Covered Project is partially assisted and the family subsequently leaves the property, the unit must be reinstated back onto the HAP contract unless the PHA previously substituted a different unit on the HAP contract in accordance with 24 CFR § 983.207 or, where “floating units” have been permitted.

Additionally, if the family continues to reside in the project after the family’s unit was removed from the HAP contract, the family may request to return to the PBV program if the family’s income subsequently decreases to the extent that the family’s TTP is less than the Zero-HAP Rent Cap, and the family is otherwise eligible for PBV assistance. The PHA must, at the earliest opportunity, reinstate the family’s unit back onto the HAP contract to provide rental assistance to the family. If the project was partially assisted and the PHA previously substituted a different unit on the HAP contract, the PHA must substitute the family’s unit for a vacant unit on the HAP contract if there is a vacant unit at the time of the request, or by doing so as soon as a unit on the HAP contract becomes vacant if there are no vacant units on the HAP contract at the time of the family request
Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-50 New Admission Families
Unless a waiver is requested and approved, following conversion, 24 CFR 983.53(d) applies, and any new admission referred to the RAD PBV project must be initially eligible for a HAP payment at admission to the program. This means a family’s TTP may not equal or exceed the gross rent for the unit at admission.

Further, for any new families admitted after the conversion, assistance will be terminated 180 days after the last housing assistance payment on their behalf. If the project is fully assisted and the family subsequently leaves the property, the PHA must reinstate the unit after the family has vacated the property and admit an eligible family. If the project is partially assisted, the PHA may substitute a different unit for the unit on the HAP contract in accordance with 24 CFR 983.207 or where floating units have been permitted.

In circumstances where low RAD PBV rents may prohibit a significant number of otherwise eligible families on the waiting list from being admitted to the project because they do not require subsidy, and which could consequently create an undue concentration of poverty at the project compared to legacy non-RAD PBV projects, a PHA may request a waiver from HUD for the covered project in order to admit otherwise eligible families whose TTP exceeds gross rent and to allow the units those families occupy to remain under the HAP contract even if the PHA has not paid HAP for the family in 180 days. The waiver will apply the alternative requirements applicable to the pre-conversion residents to new admission families.

PHA Policy
The PHA will not request waivers from HUD to apply the alternative requirements applicable to pre-conversion residents to new admission families.

If a participating family who was admitted after the RAD conversion receive zero assistance and subsequently experiences a change in circumstances that would result in a HAP payment to the owner, the family must notify the PHA of the change and request an interim reexamination before the expiration of the 180-day period.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-51 Security Deposits [24 CFR 983.259; RAD PBV Quick Reference Guide 6/20] Owners are permitted to recognize security deposit amounts that have been previously provided by tenants who are in-place at the time of the RAD conversion. If a tenant residing in a converting project has not previously provided a security deposit, then the owner may collect a security deposit at the time of initial lease execution. Otherwise, the security deposit requirements for standard PBV apply.

The owner may collect a security deposit from the tenant. The PHA may prohibit security deposits in excess of private market practice, or in excess of amounts charged by the owner to unassisted tenants.

PHA Policy
The PHA will allow the owner to collect a security deposit amount the owner determines is appropriate.

When the tenant moves out of a contract unit, the owner, subject to state and local law, may use the security deposit, including any interest on the deposit, in accordance with the lease, as reimbursement for any unpaid tenant rent, damages to the unit, or other amounts owed by the tenant under the lease.

The owner must give the tenant a written list of all items charged against the security deposit and the amount of each item. After deducting the amount used to reimburse the owner, the owner must promptly refund the full amount of the balance to the tenant.

If the security deposit does not cover the amount owed by the tenant under the lease, the owner may seek to collect the balance from the tenant. The PHA has no liability or responsibility for payment of any amount owed by the family to the owner.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-52 18-VI.C. PUBLIC HOUSING FSS AND ROSS PARTICIPANTS [Notice PIH 2019-23 and Notice PIH 2025-03, Supplemental Notice 4C]
Current public housing FSS participants must be allowed to continue to participate in the PHA’s FSS program for the duration of the grant’s period of performance, and PHAs will be allowed to use any PH FSS funds granted previously or pursuant to the current fiscal year (FY) PH FSS notice of funding opportunity (NOFO) to serve those FSS participants who live in units converted to RAD and who will as a result be moving to the HCV FSS program.

A PHA must convert the PH FSS program participants at the covered project to their HCV FSS program. No special provisions are required to continue serving FSS participants that live in public housing units converting to PBV through RAD.

Residents who were converted from the PH FSS program to the HCV FSS program through RAD may not be terminated from the HCV FSS program or have HCV assistance withheld due to the participant’s failure to comply with the contract of participation. Consequently, 24 CFR 984.303(b)(5)(iii) does not apply to FSS participants in converted properties.

At the completion of the FSS grant, PHAs should follow the normal closeout procedures outlined in the grant agreement and any applicable 24 CFR part 200 requirements. If the PHA continues to run an FSS program that serves public housing and/or HCV (including PBV) participants, the PHA will continue to be eligible (subject to NOFO requirements) to apply for FSS funding.

Current Resident Opportunities and Self-Sufficiency–Service Coordinators (ROSS–SC) program grantees will be able to finish out their current ROSS–SC grants once their housing is converted under RAD and the PHAs or the new Project Owners may apply for their ROSS-SC grant to be renewed, subject to requirements of the ROSS-SC NOFO. In addition, projects where the project previously received a ROSS-SC grant prior to conversion but was ineligible to renew the grant after conversion are eligible to apply for a ROSS-SC grant, subject to requirements of the ROSSSC NOFO.

At the completion of the ROSS-SC grant, PHAs should follow the normal closeout procedures outlined in the grant agreement. To facilitate the uniform treatment of residents and units at a project previously served by a ROSS-SC grant, any legacy non-RAD PBV units in a project that replace former public housing at the time of conversion are also subject to the terms of this provision.
18-VI.D. RESIDENT PARTICIPATION AND FUNDING [Notice PIH 2019-23] Residents of covered projects converting assistance to PBVs will have the right to establish and operate a resident organization for the purpose of addressing issues related to their living environment and be eligible for resident participation funding.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-53 18-VI.E. MOVES
Overcrowded, Under-Occupied, and Accessible Units [24 CFR 983.260; Notice PIH 2019-23]
All in-place tenants at the time of conversion are eligible to remain in the project. Over-housed families should be moved into appropriately sized units if such units are available in the new or rehabbed project. If appropriately sized units are not available, the existing tenants may continue to be over-housed until an appropriately sized unit becomes available or until the tenant leaves the project. Once the unit turns over, it must be leased to an appropriately sized family. Any legacy non-RAD PBV units located in the same project are also subject to these requirements.

Following conversion, the standard PBV regulations apply. If the PHA determines that a family is occupying a wrong-size unit, based on the PHA’s subsidy standards, or a unit with accessibility features that the family does not require, and the unit is needed by a family that does require the features, the PHA must promptly notify the family and the owner of this determination, and within 60 days of the determination, the PHA must offer the family the opportunity to receive continued housing assistance in another unit.

PHA Policy
The PHA will notify the family and the owner of the family’s need to move based on the occupancy of a wrong-size or accessible unit within 60 days of the PHA’s determination.

The PHA will offer the family the following types of continued assistance in the following order, based on the availability of assistance:

PBV assistance in an appropriately sized unit in the same building or project PBV assistance an appropriately sized unit in in another project Tenant-based voucher assistance
If no continued housing assistance is available, the PHA must remove the wrong-sized or accessible unit from the HAP contract to make voucher assistance available to issue the family a tenant-based voucher.

If the PHA offers the family a tenant-based voucher, the PHA must terminate the housing assistance payments for a wrong-size or accessible unit at the earlier of the expiration of the term of the family’s voucher, including any extension granted by the PHA, or the date upon which the family vacates the unit. If the family does not move out of the wrong-size unit or accessible unit by the expiration of the term of the family’s voucher, the PHA must remove the unit from the HAP contract.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-54 If the PHA offers the family another form of assistance that is not a tenant-based voucher, the PHA must terminate the housing assistance payments for the wrong-sized or accessible unit and remove the unit from the HAP contract when:
• The PHA has offered PBV assistance or other project-based assistance in an appropriately sized unit, and the family does not accept the offer, does not move out of the PBV unit within a reasonable time as determined by the PHA (not to exceed 90 days); or • The PHA has offered other comparable tenant-based rental assistance, the family either accepts or does not accept the offer but does not move out of the PBV unit within a reasonable time as determined by the PHA (not to exceed 90 days). • In either of the above situations, the family may request, and the PHA may grant, one extension not to exceed up to an additional 90 days to accommodate the family’s efforts to locate affordable, safe, and geographically proximate replacement housing. • The PHA must terminate the housing assistance payments for the wrong-sized or accessible unit and remove the unit from the HAP contract when the PHA has offered PBV assistance or other project-based assistance in an appropriately sized unit, and the family accepts the offer but does not move out of the PBV unit within a reasonable time as determined by the PHA (not to exceed 90 days). No extensions may be granted in this case. The PHA may reinstate a unit removed unit to the HAP contract after the family vacates the property, in accordance with 24 CFR 983.207(b).

PHA Policy
When the PHA offers a family another form of assistance that is not a tenant-based voucher, the family will be given 30 days from the date of the offer to accept the offer and move out of the PBV unit. If the family does not move out within this 30-day time frame, the PHA will terminate the housing assistance payments at the expiration of this 30-day period.

The PHA may make exceptions to this 30-day period if needed for reasons beyond the family’s control such as death, serious illness, or other medical emergency of a family member.

Family Right to Move [24 CFR 983.261]
The family may terminate the lease at any time after one year of PBV assistance. The family must give advance written notice to the owner in accordance with the lease and provide a copy of such notice to the PHA. The right to request a move with tenant-based assistance does not expire, and the family may request a move at any time after the one-year period has expired.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-55 Choice Mobility [Notice PIH 2019-23; PRRAC Choice Mobility Implementation Guidance, 8/20]
Family’s Right to Choice Mobility
Under RAD PBV, the choice mobility option provides families with the opportunity to move with continued assistance any time after 12 months of occupancy. All residents in converted properties should be aware of their housing mobility rights and of their options in a range of neighborhoods.

PHA Policy
To ensure that residents are fully aware of and understand their rights under choice mobility, the PHA will inform families of their rights under the choice mobility option and the benefits to moving to lower poverty areas and provide a summary of the steps necessary to exercise this option, at the time the family signs the lease for the RAD PBV unit and during their annual recertification.

Information on choice mobility will be made be accessible to persons with disabilities, ensuring any information, electronic or otherwise, is accessible for persons with vision, hearing, and other disabilities. This information will also be made available in accordance with Limited English Proficiency (LEP) requirements, including document translation and user of interpretation services. See Chapter 2 for a more thorough discussion of accessibility and LEP requirements.

Moving with Continued Assistance under Choice Mobility
If the family wishes to move with continued tenant-based assistance under choice mobility, the family must contact the PHA to request the rental assistance prior to providing notice to terminate the lease. If the family terminates the lease in accordance with lease requirements, the PHA is required to offer the family the opportunity for continued tenant-based assistance, in the form of a voucher or other comparable tenant-based rental assistance. The PHA must specify in the administrative plan whether it will offer families assistance under the voucher program or other comparable tenant-based rental assistance. If voucher assistance is offered to the family and the search term expires, the PHA must issue the voucher to the next eligible family before issuing another voucher to the family that requested to move. If a voucher or other comparable tenant-based assistance is not immediately available at the time of the family’s request to the PHA, the PHA must give the family priority to receive the next available opportunity for continued tenant-based assistance. The PHA must describe in its administrative plan its policies and procedures for how the family must contact the PHA and how the PHA documents families waiting for continued tenant-based rental assistance.

Families are eligible to move with continued assistance under choice mobility after 12 months of occupancy. If the family terminates the assisted lease before one year of PBV assistance, the family relinquishes the opportunity for continued tenant-based assistance.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-56 PHA Policy
Prior to providing notice to the owner to terminate the lease, the family may submit a written request to the PHA for a choice mobility voucher at any time after completing the 12-month occupancy requirement.

The family will remain eligible to request a choice mobility voucher as long as they continue living at the same covered project. If a family moves from one covered project to another covered project prior to completing their 12-month occupancy requirement, their 12-month clock will reset. The family must wait 12 months from the date of move at the new property before they may request another choice mobility voucher. If a family transfers to a different unit within the same covered project, the 12-month clock does not reset.

The PHA will maintain a combined, agency-wide waiting list for all standard PBV and RAD PBV families wishing to exercise mobility after one year of tenancy. This list will be maintained separately from the tenant-based HCV list. Families on the choice mobility waiting list will be given priority over families on the tenant-based waiting list. The choice mobility waiting list will be organized by date and time of the family’s written request to exercise choice mobility. The list will also identify whether families live in standard or RAD PBV units.

The PHA will not subject RAD PBV families applying for choice mobility vouchers to any additional rescreening requirements in order to receive a tenant-based voucher.

Families exercising choice mobility will not be required to vacate their units before a lease has been entered into using their tenant-based voucher. At the time the PHA issues a choice mobility voucher, the PHA will notify the family of their right to remain in their unit if they are unable find a rental unit using the tenant-based voucher.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-57 Turnover Cap
If as a result of RAD, the total number of PBV units (including RAD PBV units) administered by the PHA exceeds 20 percent of the PHA’s authorized units under its HCV ACC with HUD, the PHA may establish a turnover cap. The PHA is not required to provide more than three-quarters of its turnover vouchers in any single year to the residents of covered projects. If the PHA chooses to establish a turnover cap and the cap is implemented, the PHA must create and maintain a waiting list in the order requests from eligible households were received.

PHA Policy
As a result of RAD, the total number of PBV units (including RAD PBV units) administered by the PHA exceeds 20 percent of the PHA’s authorized units under its HCV ACC with HUD. Therefore, the PHA will establish a choice mobility cap. The PHA will not provide more than three-quarters of its turnover vouchers in a single year to residents of covered projects.

Families who requested a choice mobility voucher and are denied due to the cap will be given priority the following year when choice mobility vouchers are again issued since the choice mobility list will be organized by the date and time of the family’s request.

Emergency Transfers under VAWA [24 CFR 983.261(f) and (g)] In the case of a move due to domestic violence, dating violence, sexual assault, stalking, or human trafficking, PHAs must describe policies for facilitating emergency transfers for families with PBV assistance in their Emergency Transfer Plan, including when a victim has been living in a unit for less than a year or when a victim seeks to move sooner than a tenant-based voucher is available.

When the family or a member of the family is or has been the victim of domestic violence, dating violence, sexual assault, stalking, or human trafficking, and the move is needed to protect the health or safety of the family or family member, the family is not required to give the owner advance written notice or contact the PHA before moving from the unit. Additionally, when any family member has been the victim of a sexual assault that occurred on the premises during the 90-calendar-day period preceding the family’s request to move, the family is not required to give the owner advance written notice or contact the PHA before moving from the unit. A PHA may not terminate the assistance of a family due to a move occurring under these circumstances and must offer the family the opportunity for continued tenant-based assistance if the family had received at least one year of PBV assistance prior to moving.

If a family break-up results from an occurrence of domestic violence, dating violence, sexual assault, stalking, or human trafficking, the PHA must ensure that the victim retains assistance.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-58 PHA Policy
When the victim of domestic violence, dating violence, sexual assault, or stalking has lived in the unit for less than one year, the PHA will provide several options for continued assistance.

The PHA will first try to transfer the participant to another PBV unit in the same development or transfer to a different development where the PHA has PBV units. The PHA will expedite the administrative processes in this case in an effort to conduct the transfer as quickly as possible. If assistance is transferred to another development, the PHA will give priority to the participant on the other development’s waiting list.

If no units are available for an internal transfer to a PBV development or if there is reasonable cause to believe that such a transfer would put the victim in jeopardy, the participant may receive continued assistance through an external transfer to either tenantbased rental assistance (HCV) or assistance in the PHA’s public housing program. Such a decision will be made by the PHA based on the availability of tenant-based vouchers and/or vacancies in public housing units. Such families must be selected from the waiting list for the applicable program. The PHA has adopted a waiting list preference for victims of domestic violence, dating violence, sexual assault, and stalking in both its HCV and public housing programs in order to expedite this process. See Section 4-III.C. of this administrative plan.

If a victim wishes to move after a year of occupancy in the unit, but no tenant-based vouchers are available, the PHA will offer the participant an internal transfer to another PBV unit in the same development or a transfer to a different development where the PHA has PBV units. The PHA will expedite the administrative processes in this case in an effort to conduct the transfer as quickly as possible.

If no units are available for an internal transfer, or if there is reasonable cause to believe that such a transfer would put the victim in jeopardy, the participant may receive continued assistance through an external transfer to the PHA’s public housing program.

The PHA has adopted a waiting list preference for victims of domestic violence, dating violence, sexual assault, and stalking as part of the public housing ACOP in order to expedite this process.
18-VI.F. REEXAMINATIONS [RAD PBV Quick Reference Guide 6/20] A family living in a unit converted from public housing to RAD PBV may retain its certification date. Unless a family’s annual reexamination is due at the same time as the effective date of the RAD PBV HAP contract, the PHA does not need to recertify tenants at the point of conversion.

For each family residing in a unit undergoing conversion of assistance under RAD, the administering PHA will have to submit a form HUD-50058 reflecting the family’s admission to the voucher program. The effective date of the new admission will be the same as the effective date of the RAD PBV HAP contract. The form should include the same information previously found on the public housing form 50058, including the next annual reexamination date.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-59 18-VI.G. RESIDENTS’ PROCEDURAL RIGHTS [Notice PIH 2019-23] HUD is incorporating additional termination notification requirements for public housing projects that convert assistance under RAD to PBV and to legacy non-RAD PBV units located in the same project beyond those for the standard PBV program. In addition to the regulations at 24 CFR 983.257 related to owner termination of tenancy and eviction (which MTW agencies may not alter), the termination procedure for RAD conversions to PBV requires that PHAs provide adequate written notice of termination of the lease, which is:
• A reasonable period of time, but not to exceed 30 days:
- If the health or safety of other tenants, project owner employees, or persons residing in the immediate vicinity of the premises is threatened; or - In the event of any drug-related or violent criminal activity or any felony conviction. • Not less than 30 days in the case of nonpayment of rent • Not less than 30 days in any other case, except that if a state or local law provides for a shorter period of time, such shorter period will apply
Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-60 18-VI.H. INFORMAL REVIEWS AND HEARINGS [Notice PIH 2019-23] In addition to reasons for an informal hearing listed at 24 CFR 982.555(a)(1)(i)–(v) (See 16-III.C. Informal Hearings for Participants), an opportunity for an informal hearing must be given to residents for any dispute that a resident may have with respect to an owner action in accordance with the individual’s lease or the contract administrator in accordance with RAD PBV requirements that adversely affect the resident’s rights, obligations, welfare, or status. • For any hearing required under 24 CFR 982.555(a)(1)(i)–(v), the contract administrator will perform the hearing in accordance with Chapter 16 Part III: Informal Reviews and Hearings, as is the current standard in the program.
• For any additional hearings required under RAD, the PHA (as owner) will perform the hearing.

An informal hearing will not be required for class grievances or for disputes between residents not involving the PHA (as owner) or contract administrator. This hearing requirement does not apply to and is not intended as a forum for initiating or negotiating policy changes between a group or groups of residents and the PHA (as owner) or contract administrator.

The owner must give residents notice of their ability to request an informal hearing as outlined in 24 CFR 982.555(c)(1) for informal hearings that will address circumstances that fall outside of the scope of 24 CFR 982.555(a)(1)(i)–(v). (See Chapter 16) The owner must provide an opportunity for an informal hearing before an eviction.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-61 PART VII: DETERMINING CONTRACT RENT
18-VII.A. INITIAL CONTRACT RENTS [Notice PIH 2019-23]
RAD conversions are intended to be cost-neutral, and therefore, should not exceed current public housing funding as adjusted for unit size. Since public housing units do not currently have contract rents, HUD provides an estimate of current contract rents for each PHA’s public housing units based on current funding as adjusted by bedroom size. Current funding includes operating subsidy, tenant rents, capital funds, replacement housing factor funds (RHF), and demolition disposition transitional funding (DDTF). The funding may limit the amount of initial rent for a property. A detailed explanation of the determination of current funding may be found in Attachment 1C of Notice PIH 2019-23. Once the current funding amount is calculated, the amount is adjusted by bedroom size to determine the current funding rent. HUD uses the same bedroom adjustment factors as in the metropolitan FMR schedules where the project is located.

For RAD/Section 18 blends, HUD produces a single, blended rent schedule for all units.

PHAs may adjust subsidy (and contract rents) across multiple projects as long as the PHA does not exceed the aggregate subsidy for all of the projects the PHA has submitted for conversion under RAD.

Notwithstanding HUD’s calculation of the initial contract rent based on the project’s subsidy under the public housing program and any modifications made to the initial contact rent, the initial rents are set at the lower of:
• An amount determined by the PHA in accordance with the administrative plan, not to exceed 110 percent of the fair market rent (FMR) (or amount of any applicable exception payment standard), or the alternate rent cap in a PHA’s MTW agreement minus any utility allowance • The reasonable rent
• The rent requested by the owner
Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-62 18-VII.B. ADJUSTING CONTRACT RENTS [Notice PIH 2019-23; RAD PBV Quick Reference Guide 6/20; PHA Asset Repositioning “How to Apply OCAF for RAD PBV” Webinar]
RAD PBV contract rents are adjusted differently than contract rents in the standard PBV program. At each annual anniversary of the HAP contract, contract rents will be adjusted only by HUD’s operating cost adjustment factor (OCAF) that is applied to the current contract rent, less the portion of the rent paid for debt service, subject to the availability of appropriations for each year of the contract term. As such, section 8(o)(13)(I) of the 1937 Act, and 24 CFR 983.301 and 983.302, concerning rent determinations, do not apply when adjusting rents. The rent to owner may at no time exceed the reasonable rent charged for comparable unassisted units in the private market, as determined by the contract administrator in accordance with 24 CFR 983.303.

Contract rents may not exceed the reasonable rent (as determined by the PHA that administers the contract or the independent entity, as applicable), with the exception that the contract rent for each unit may not be reduced below the initial contract rent under the initial HAP contract.

However, the rent to owner may fall below the initial contract rent in the following situations:
• To correct errors in calculations in accordance with HUD requirements • If additional housing assistance has been combined with PBV assistance after the execution of the initial HAP contract and a rent decrease is required pursuant to 983.55 (prohibition of excess public assistance)
• If a decrease in rent to owner is required based on changes in the allocation of responsibility for utilities between the owner and the tenant
The contract rent adjustment will be the lesser of:
• The current contract rent increased by the operating cost adjustment factor (OCAF), which is published annually in the Federal Register; or
• The reasonable rent
The administering PHA (or independent entity, if the project is PHA-owned) is responsible for processing rent adjustments at each contract anniversary date in accordance with the prevailing OCAF. The PHA who administers the contract (directly or via an independent entity) must maintain records to demonstrate how OCAF amounts were determined and how rent adjustments were calculated. HUD approval of rent adjustments is not required.

Properties are eligible to receive prior years’ OCAF adjustments for years in which the OCAF was not taken. The OCAF must be applied retroactively if it was missed. The PHA administering the contract (or the independent entity) must make sure that all OCAFs have been applied correctly since the RAD closing and calculate the current rents accordingly, including making sure that the RAD PBV contract rents do not exceed the PBV program caps.

In extraordinary circumstances, a project owner may request a waiver of the rental adjustment by OCAF and receive a rental adjustment by an alternative operating cost factor. The waiver request with documentation demonstrating the need for an alternative operating cost factor rental adjustment must be submission to the Office of Recapitalization in accordance with Supplemental Notice 4C.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-63 PHA Policy
The owner will request a contract rent adjustment from the PHA who administers the contract within 120 days, but no less than 60 days, prior to the HAP contract anniversary date by submitting a completed OCAF rent adjustment worksheet (Form HUD-9624).

The independent entity will validate the data on the form and determine whether the rent exceeds the reasonable rent charged for comparable unassisted units in the private market, in accordance with 24 CFR 983.303. If rents would be unreasonable following application of the requested OCAF, then the rent will only be increased up to the reasonable rent. The independent entity will notify the PHA who administers the contract in writing of the results of its review of the rent adjustment request. The PHA who administers the contract will retain a copy of the worksheet and any other records necessary to demonstrate how the OCAF was used to make rent adjustments for audit purposes. The approved rent adjustment will go into effect via written notice from the PHA that administers the project to the owner. This notice will constitute an amendment to the rents specified on Exhibit A of the RAD PBV HAP contract. The new rents to owner will take effect on the date of the contract anniversary.

Rent Decrease
Rents must not be reduced below the initial rent except to correct errors, for additional subsidy to the property, or to realign utility responsibilities.
18-VII.C. UTILITY ALLOWANCES [Notice PIH 2019-23; RAD PBV Quick Reference Guide 6/20]
When contract rent amounts are set initially, the amount does not include a utility allowance. In general, the utility allowances that are used on the initial HAP contract at closing are the public housing utility allowances that are in effect prior to conversion. The CHAP must be updated prior to conversion to reflect current public housing utility allowances. At its discretion, a PHA may use the FMRs and utility allowances in effect during the 30-day period immediately before the beginning date of the HAP contract.

After conversion, the PHA that administers the contract must maintain the utility allowance schedule. The PHA may either maintain a utility allowance schedule for tenant-paid utilities in accordance with standard PBV and HCV utility allowance regulations at 24 CFR 983.301(f)(2)(ii) and 24 CFR 982.517, respectively, or the PHA may instead apply site-specific utility allowances. HUD waived the requirement for the standard PBV program that the HCV utility allowance be used. If a site-specific utility allowance is used, the utility allowance is applicable to legacy non-RAD PBV units in the project and is calculated consistent with Notice H 2015-04.

Each family transitions to the new utility allowance at their first recertification following conversion.

PHA Policy
The PHA will use the HCV utility allowance schedule for the RAD PBV developments.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-64 18-VII.D. REASONABLE RENT [983.301(d) and 24 CFR 983.303] At the time the initial rent is established and all times during the term of the HAP contract, the rent to owner for a contract unit may not exceed the reasonable rent for the unit as determined by the PHA, except rents must not be reduced below the initial rent except to correct errors, for additional subsidy to the property, or to realign utility responsibilities.

How to Determine Reasonable Rent [24 CFR 983.303(c)]
The reasonable rent of a unit receiving PBV assistance must be determined by comparison to rent for other comparable unassisted units. When making this determination, the PHA must consider factors that affect market rent. Such factors include the location, quality, size, type and age of the unit, as well as the amenities, housing services maintenance, and utilities to be provided by the owner. The reasonable rent determination must be based on the condition of the assisted unit at the time of the determination and not on anticipated future unit conditions.

Comparability Analysis [24 CFR 983.303(d)]
For each unit, the comparability analysis must use at least three comparable units in the private unassisted market. This may include units in the premises or project that is receiving projectbased assistance. The analysis must show how the reasonable rent was determined, including major differences between the contract units and comparable unassisted units, and must be retained by the PHA. The comparability analysis may be performed by PHA staff or by another qualified person or entity. Those who conduct these analyses or are involved in determining the housing assistance payment based on the analyses may not have any direct or indirect interest in the property.

PHA-Owned Units [24 CFR 983.303(f)]
For PHA-owned units, the amount of the reasonable rent must be determined by an independent entity approved by HUD in accordance with PBV program requirements. The independent entity must provide a copy of the determination of reasonable rent for PHA-owned units to the PHA.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-65 PART VIII: PAYMENTS TO OWNER
18-VIII.A. HOUSING ASSISTANCE PAYMENTS
During the term of the HAP contract, the PHA must make housing assistance payments to the owner in accordance with the terms of the HAP contract. During the term of the HAP contract, payments must be made for each month that a contract unit complies with NSPIRE and is leased to and occupied by an eligible family. The housing assistance payment must be paid to the owner on or about the first day of the month for which payment is due, unless the owner and the PHA agree on a later date.

Except for discretionary vacancy payments, the PHA may not make any housing assistance payment to the owner for any month after the month when the family moves out of the unit (even if household goods or property are left in the unit).

The amount of the housing assistance payment by the PHA is the rent to owner minus the tenant rent (total tenant payment minus the utility allowance).

In order to receive housing assistance payments, the owner must comply with all provisions of the HAP contract. Unless the owner complies with all provisions of the HAP contract, the owner does not have a right to receive housing assistance payments.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-66 18-VIII.B. VACANCY PAYMENTS [24 CFR 983.352]
Payment at Move-Out Month [24 CFR 983.352(a)]
If an assisted family moves out of the unit, the owner may keep the housing assistance payment for the calendar month when the family moves out. However, the owner may not keep the payment if the PHA determines that the vacancy is the owner’s fault.

PHA Policy
If the PHA determines that the owner is responsible for a vacancy and as a result is not entitled to the keep the housing assistance payment, the PHA will notify the owner of the amount of housing assistance payment that the owner must repay. The PHA will require the owner to repay the amount owed in accordance with the policies in Section 16-IV.B.

Vacancy Payments
At the discretion of the PHA, the HAP contract may provide for vacancy payments to the owner for a PHA-determined period of vacancy extending from the beginning of the first calendar month after the move-out month for a period not exceeding two full months following the moveout month. The PHA must include in its administrative plan the PHA’s policy on the conditions under which it will allow vacancy payments in a HAP contract, the duration of the payments, amount of vacancy payments it will make to an owner, and the required form and manner of requests for vacancy payments.

PHA Policy
If an owner’s HAP contract calls for vacancy payments to be made, and the owner wishes to receive vacancy payments, the owner must have properly notified the PHA of the vacancy in accordance with the policy in Section 18-V.G. regarding filling vacancies.

In order for a vacancy payment request to be considered, it must be made within 10 business days of the end of the period for which the owner is requesting the vacancy payment. The request must include the required owner certifications and the PHA may require the owner to provide documentation to support the request. If the owner does not provide the information requested by the PHA within 10 business days of the PHA’s request, no vacancy payments will be made.

The PHA may only make vacancy payments if:
• The owner gives the PHA prompt, written notice certifying that the family has vacated the unit and identifies the date when the family moved out (to the best of the owner’s knowledge and belief);
• The owner certifies that the vacancy is not the fault of the owner and that the unit was vacant during the period for which payment is claimed;
• The owner certifies that it has taken every reasonable action to minimize the likelihood and length of vacancy; and
• The owner provides any additional information required and requested by the PHA to verify that the owner is entitled to the vacancy payment.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-67 The owner must submit a request for vacancy payments in the form and manner required by the PHA and must provide any information or substantiation required by the PHA to determine the amount of any vacancy payment.

The vacancy payment to the owner for each month of the maximum two-month period is determined by the PHA and cannot exceed the monthly rent to owner under the assisted lease, minus any portion of the rental payment received by the owner (including amounts available from the tenant’s security deposit). Any vacancy payment may cover only the period the unit remains vacant.

PHA Policy
If an owner’s HAP contract calls for vacancy payments to be made, and the owner wishes to receive vacancy payments, the owner must have properly notified the PHA of the vacancy in accordance with the policy in Section 17-VI.G. regarding filling vacancies.

In order for a vacancy payment request to be considered, it must be made in writing (including via email) within 10 business days of the end of the period for which the owner is requesting the vacancy payment. The request must include the required owner certifications and the PHA may require the owner to provide documentation to support the request. If the owner does not provide the information requested by the PHA within 10 business days of the PHA’s request, no vacancy payments will be made.

If vacancy payments are made, the PHA will make vacancy payments for the period of vacancy extending from the beginning of the first calendar month after the move-out month for a period not exceeding two full months following the move-out month. The amount of the vacancy payment will not exceed the monthly rent to owner under the assisted lease, minus any portion of the rental payment received by the owner (including amounts available from the tenant’s security deposit). Any vacancy payment will cover only the period the unit remains vacant.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-68 18-VIII.C. TENANT RENT TO OWNER [24 CFR 983.353; Notice PIH 2019-23] The tenant rent is the portion of the rent to owner paid by the family. The amount of tenant rent is determined by the PHA in accordance with HUD requirements. Any changes in the amount of tenant rent will be effective on the date stated in the PHA notice to the family and owner.

The family is responsible for paying the tenant rent (total tenant payment minus the utility allowance). The amount of the tenant rent determined by the PHA is the maximum amount the owner may charge the family for rental of a contract unit. The tenant rent covers all housing services, maintenance, equipment, and utilities to be provided by the owner. The owner may not demand or accept any rent payment from the tenant in excess of the tenant rent as determined by the PHA. The owner must immediately return any excess payment to the tenant.

Initial Certifications [Notice PIH 2019-23]
For the initial certification, the PHA will use the family’s public housing tenant rent (reflected on line 10f of the family’s most recent 50058) at the date of conversion to calculate HAP and tenant rent for the PBV program. The PHA will use this amount until the effective date of the earlier of the family’s first regular or interim recertification following the conversion. At that point, the PHA will use the family’s TTP based on the recertification and the applicable utility allowance (HCV or RAD PBV site-based, as applicable) to determine PBV HAP and tenant rent. Any legacy non-RAD PBV units located in the same project are subject to the same requirements.

Tenant and PHA Responsibilities
The family is not responsible for the portion of rent to owner that is covered by the housing assistance payment and the owner may not terminate the tenancy of an assisted family for nonpayment by the PHA.

Likewise, the PHA is responsible only for making the housing assistance payment to the owner in accordance with the HAP contract. The PHA is not responsible for paying tenant rent, or any other claim by the owner, including damage to the unit. The PHA may not use housing assistance payments or other program funds (including administrative fee reserves) to pay any part of the tenant rent or other claim by the owner.

Utility Reimbursements [24 CFR 983.353(d)]
If the amount of the utility allowance exceeds the total tenant payment, the PHA must pay the amount of such excess to the tenant as a reimbursement for tenant-paid utilities, and the tenant rent to the owner must be zero.

The PHA must describe in its administrative plan its policies on paying the utility reimbursement directly to the family or directly to the utility supplier. The PHA may pay the utility reimbursement directly to the family or to the utility supplier on behalf of the family. If the PHA chooses to pay the utility supplier directly, the PHA must notify the family of the amount paid to the utility supplier.

PHA Policy
The PHA will make utility reimbursements directly to the family.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-69 18-VIII.D. PHASE-IN OF TENANT RENT INCREASES [Notice PIH 2019-23; PHA Asset Repositioning “Phase-in of Tenant Rents” Webinar]
For in-place tenants, if the amount the tenant would pay for rent and utilities (TTP) would increase by more than the greater of 10 percent or $25 purely as a result of conversion, the rent increase will be phased in over three years. To implement this provision, HUD is waiving section 3(a)(1) of the 1937 Act, as well as 24 CFR 983.3 (definition of total tenant payment (TTP)) only to the extent necessary to allow for the phase-in of tenant rent increases. For families who were on EID at the time of conversion to RAD PBV, upon the expiration of the EID, the rent adjustment is not subject to rent phase-in.

The PHA must communicate this policy in writing to affected residents. Any legacy non-RAD PBV units located in the same covered project are subject to the terms of the phase-in provisions.

PHA Policy
The PHA will use the family’s public housing tenant rent (reflected on line 10f of the family’s most recent 50058) at the date of conversion to calculate the family’s tenant rent in PBV. The PHA will implement a three-year phase-in for in-place families whose TTP increases by more than the greater of 10 percent or $25 purely as a result of the conversion as follows:

Year 1: Any recertification (interim or annual) performed prior to the second annual recertification after conversion: 33 percent of the difference between the most recently paid TTP and the currently calculated PBV TTP. (If the family was paying flat rent immediately prior to conversion, the PHA will use the flat rent amount to calculate the phase-in for Year 1.)
Year 2: Year 2 annual recertification and any interim recertification: 50 percent of the difference between the most recently paid TTP and the currently calculated

PBV TTP
Year 3: Year 3 annual recertification and all subsequent recertifications: Full calculated TTP
Once the standard TTP is equal to or less than the previous TTP, the phase-in ends, and tenants will pay full TTP from that point forward.

If the family’s income falls during the phase-in period such that the currently calculated PBV TTP falls below the amount that would otherwise be the phased-in rent, the family pays the currently calculated PBV TTP and the phase-in ends.

The PHA will communicate the PHA’s phase-in policy in writing to the family at the time the PHA first determines that the family qualifies for a rent phase-in.

Any legacy non-RAD PBV units located in the same project are also subject to rent phase-in requirements.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-70

18.VIII.E. OTHER FEES AND CHARGES [24 CFR 983.354]
Meals and Supportive Services
With the exception of PBV assistance in assisted living developments, the owner may not require the tenant to pay charges for meals or supportive services. Non-payment of such charges is not grounds for termination of tenancy.

In assisted living developments receiving PBV assistance, the owner may charge for meals or supportive services. These charges may not be included in the rent to owner, nor may the value of meals and supportive services be included in the calculation of the reasonable rent. However, non-payment of such charges is grounds for termination of the lease by the owner in an assisted living development.

Other Charges by Owner
The owner may not charge extra amounts for items customarily included in rent in the locality or provided at no additional cost to unsubsidized tenants in the premises.

Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-71 EXHIBIT 18-1: PBV DEVELOPMENT INFORMATION
(Fill out one for each development)
Date: [Enter the date on which this form was completed]

DEVELOPMENT INFORMATION
Development Name: [Insert name of PBV development]
Address: [Insert full address of PBV development]
Owner Information: [Insert PBV development owner name and contact information. If development is PHA-owned, enter “PHA-owned.”]
Property Management Company: [Insert property management company name and contact information, or enter “None”]
PHA-Owned: [Enter “Yes” or “No.” If yes, enter name of independent entity.] Mixed-Finance Development: [Enter “Yes” or “No.” If yes, list other types of funding and units to which other funding applies.]

HAP CONTRACT
Closing Date: [Enter closing date of RAD conversion]
List Which RAD Notice Applies to the Project: [Enter “PIH 2012-32, REV-2,” “PIH 2012-32, REV-3,” or “PIH 2019-23”]
Effective Date of Contract: [Enter start date of HAP contract] HOTMA Requirements: [If HAP contract was signed prior to April 18, 2017, enter “PreHOTMA.” If HAP contract was signed on or after April 18, 2017, enter “Post-HOTMA.”] Term of HAP Contract: [Enter term from HAP contract]
Expiration Date of Contract: [Enter expiration date from HAP contract]

PBV UNITS
0 BR 1 BR 2 BR 3 BR 4 BR 5 BR Total
# of
Units
Initial
Contract
Rent
$ $ $ $ $ $
Unit Designation: [Enter “Fixed” or “Floating”]
Accessible Units and Features: [Identify which units are accessible and describe accessibility features or enter “None”]
Project-Based Vouchers Under the Redondo Beach Housing Authority Rental Assistance Demonstration Program December 2025 Page 18-72 Target Population: [Describe targeted population in accordance with HAP contract or enter “None”]
Supportive Services: [Enter “Yes, see Exhibit D of HAP contract” or enter “No”] Elderly Units: [Enter “Yes” or “No.” If yes, identify which units are elderly units.] Disabled Units [Enter “Yes” or “No.” If yes, identify which units are for persons with disabilities.]

WAITING LIST AND SELECTION
Waiting List Type: [Enter “Site-based waiting list,” “Combined with HCV,” “Waiting list for entire PBV program,” or “Merged with another assisted housing program”] Preferences: [Enter “Same as HCV; see Chapter 4” or describe preferences offered. If different from HCV, note in Section 18.1.C. of this policy.]
Preference Verification: [Enter “Same as HCV; see Chapter 7” or describe for each preference listed above. If different from HCV, note in Section 18.1.C. of this policy.] For the PBV program, is the income limit the same as the HCV program? (Note: In mixedfinance developments, other income limits may also apply.) [Enter “Same as HCV; see Chapter 3” or clearly describe]

OCCUPANCY
Subsidy Standards: [Enter “Same as HCV; see Chapter 5” or describe. If different from HCV, note in Section 18.1.C. of this policy.]
Utilities: [Enter in accordance with HAP contract Exhibit C] Vacancy Payments: [Enter in accordance with HAP contract Part 1, e, 2 and Section 18-IV.F. within this chapter]
Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-1
Chapter 19

SPECIAL PURPOSE VOUCHERS

INTRODUCTION
Special purpose vouchers are specifically funded by Congress in separate appropriations from regular HCV program funding in order to target specific populations. Special purpose vouchers include vouchers for the following programs:
• Family Unification Program (FUP)
• Foster Youth to Independence (FYI) program
• Veterans Affairs Supportive Housing (VASH)
• Mainstream
• Non-Elderly Disabled (NED)
• Stability Voucher program
PHA Policy
The PHA will administer the following types of special purpose vouchers:

Veterans Affairs Supportive Housing (VASH) and Foster Youth to Independence (FYI) program.

This chapter describes HUD regulations and PHA policies for administering special purpose vouchers. The policies outlined in this chapter are organized into five sections, as follows:

Part I: Foster Youth to Independence (FYI) program
Part II: Veterans Affairs Supportive Housing (VASH)
Except as addressed by this chapter and as required under federal statute and HUD requirements, the general requirements of the HCV program apply to special purpose vouchers.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-2
PART I: FOSTER YOUTH TO INDEPENDENCE INITIATIVE
19-I.A. PROGRAM OVERVIEW [Notice PIH 2020-28; Notice PIH 2023-04; FR Notice 1/24/22]
The Foster Youth to Independence (FYI) initiative was announced in 2019. The FYI initiative allows PHAs who partner with a Public Child Welfare Agency (PCWA) to request targeted HCVs to serve eligible youth with a history of child welfare involvement that are homeless or at risk of being homeless. Rental assistance and supportive services are provided to qualified youth for a period of between 36 and 60 months. The PHA must have an existing ACC with HUD for HCVs.

Funding is available either competitively though an FYI NOFA or noncompetitively on a rolling basis in accordance with the application requirements outlined in Notice PIH 2020-28, Notice PIH 2021-26, or Notice PIH 2023-04, as applicable. Under the noncompetitive process, PHAs are limited to 25 vouchers in a fiscal year with the ability to request additional vouchers. Where the PHA has a combined FYI and/or FUP size of no more than 10 vouchers, the PHA may request FYI vouchers with at least 50 percent utilization of its FUP and/or FYI vouchers. Where the PHA has a combined FYI and/or FUP size of 11 or more vouchers, the PHA may request FYI vouchers with 90 percent or greater utilization of its FUP and/or FYI vouchers. PHAs may be eligible for an exception to the utilization criteria with the submission to HUD of a narrative that explains why the PHA does not meet the utilization criteria and requires the award of FYI vouchers.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-3
19-I.B. PARTNERING AGENCIES [Notice PIH 2023-04; FYI Updates and Partnering Opportunities Webinar]
Public Child Welfare Agency (PCWA)
The PHA must enter into a partnership agreement with a PCWA in the PHA’s jurisdiction in the form of a Memorandum of Understanding (MOU) or letter of intent. The minimum contents of the partnership agreement are outlined in Notice PIH 2023-04. The PCWA is responsible for identifying and referring eligible youth to the PHA and providing or securing a commitment for the provision of supportive services once youth are admitted to the program.

PHA Policy
The PHA will implement a Foster Youth to Independence (FYI) program in partnership with Los Angeles County Department of Children and Family Services.

The PCWA is responsible for:
• Identifying FYI-eligible youth;
• Developing a system of prioritization based on the level of need of the youth and the appropriateness of intervention;
• Providing a written certification to the PHA that the youth is eligible; and • The PCWA must provide or secure a commitment for the provision of supportive services that are required to be offered.

Continuum of Care (CoC) and Other Partners
HUD strongly encourages PHAs to add other partners into the partnership agreement with the PCWA such as state, local, philanthropic, faith-based organizations, and the CoC, or a CoC recipient it designates. The CoC plays a role in identifying eligible youth in the community at risk of or experiencing homelessness that are no longer part of the child welfare system.

Through the CoC’s coordinated entry process, referrals of eligible youth to the PCWA are made based on prioritization of need and appropriateness of the intervention. Further, CoC recipients may provide supportive services using CoC program funds to youth who qualify for CoC program assistance. Youth who are part of the PCWA’s active caseload do not have to be added to the CoC’s coordinated entry process.

PHA Policy
In addition to the Los Angeles County Department of Children and Family Services, the PHA will implement the FYI program in partnership with local service providers to expand access to additional supportive services.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-4
19-I.C. YOUTH ELIGIBILITY CRITERIA [Notice PIH 2023-04; FYI Q&As; FYI FAQs] The PCWA is responsible for certifying that the youth has prior qualifying foster care involvement. As determined by the PCWA, eligible youth:
• Are at least 18 years of age and not more than 24 years of age (have not yet reached their 25th birthday);
- Youth must be no more than 24 years of age at the time the PCWA certifies them as eligible and at the time of HAP contract execution.
• Have left foster care or will leave foster care within 90 days, in accordance with a transition plan described in section 475(5)(H) of the Social Security Act; and - Placements can include, but are not limited to, placements in foster family homes, foster homes of relatives, group homes, emergency shelters, residential facilities, childcare institutions, and pre-adoptive homes in accordance with 24 CFR 5.576; • Are homeless or at risk of becoming homeless at age 16 and older. - At risk of being homeless is fully defined at 24 CFR 576.2. o This includes a person that is exiting a publicly funded institution, or system of care (such as a healthcare facility, a mental health facility, foster care or other youth facility, or correction program or institution). Therefore, youth being discharged from an institution may be eligible for an FYI voucher [FYI FAQs].

Eligibility is not limited to single persons. For example, pregnant and/or parenting youth are eligible to receive assistance assuming they otherwise meet eligibility requirements. PHAs may not exclude pregnant or parenting youth from service.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-5
19-I.D. SUPPORTIVE SERVICES [Notice PIH 2023-04; FYI Updates and Partnering Opportunities Webinar; FYI Q&As]
Supportive services may be provided by the PHA, PCWA, or a third party. The PCWA must provide or secure a commitment to provide supportive services for participating youth for the period of time defined in the NOFA/O for which the funding was made available. At a minimum, the following supportive services must be offered:
• Basic life skills information/counseling on money management, use of credit, housekeeping, proper nutrition/meal preparation, and access to health care (e.g., doctors, medication, and mental and behavioral health services);
• Counseling on compliance with rental lease requirements and with HCV program participant requirements, including assistance/referrals for assistance on security deposits, utility hookup fees, and utility deposits; • Providing such assurances to owners of rental property as are reasonable and necessary to assist eligible youth to rent a unit with a voucher;
• Job preparation and attainment counseling (where to look/how to apply, dress, grooming, relationships with supervisory personnel, etc.); and
• Educational and career advancement counseling regarding attainment of general equivalency diploma (GED) or attendance/financing of education at a technical school, trade school, or college, including successful work ethic and attitude models.

PHA Policy
Additional supportive services will not be offered.

Since participation in supportive services is optional, but strongly encouraged, an FYI participant may decline supportive services.

Administrative fee reserves may be used to cover costs for the supportive services listed above with HUD approval in accordance with Notice PIH 2022-14 and Notice PIH 2022-18.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-6
19-I.E. REFERRALS AND WAITING LIST MANAGEMENT [Notice PIH 2023-04; FYI Updates and Partnering Opportunities Webinar FYI FAQs] Referrals
The PCWA is responsible for certifying that the youth has prior qualifying foster care involvement. Once the PCWA sends the PHA the referral certifying the youth is programeligible, the PHA determines HCV eligibility.

The PCWA must have a system for identifying eligible youth within the agency’s caseload and reviewing referrals from other partners, as applicable. The PCWA must also have a system for prioritization of referrals to ensure that youth are prioritized for an FYI voucher based upon their level of need and appropriateness of the intervention. For youth still involved in the child welfare system, the permanency goals of the young person should be taken into account. Prioritization must be designed in a way that is consistent with fair housing and civil rights requirements.

Referrals may come from other organizations in the community who work with the population, but the PCWA must certify that the youth meets eligibility requirements, unless the PCWA has vested another organization with this authority.

The PHA is not required to maintain full documentation that demonstrates the youth’s eligibility as determined by the PCWA but should keep the referral or certification from the PCWA. The PCWA is not required to provide the PHA with HCV eligibility documents.

PHA Policy
The PHA and Los Angeles County Department of Children and Family Services have identified staff positions to serve as lead FYI liaisons. These positions will be responsible for transmission and acceptance of referrals. The Los Angeles County Department of Children and Family Services must commit sufficient staff and resources to ensure eligible youths are identified, prioritized, and determined eligible in a timely manner.

When vouchers are available, the PHA liaison responsible for acceptance of referrals will contact the Los Angeles County Department of Children and Family Services liaison via email indicating the number of vouchers available and requesting an appropriate number of referrals. No more than 10 business days from the date the Los Angeles County Department of Children and Family Services receives this notification, the Los Angeles County Department of Children and Family Services liaison must provide the PHA with a list of eligible referrals, a completed release form, and a written certification for each referral indicating the referral is eligible. The list will include the name, address, and contact phone number for each adult individual who is being referred.

The PHA will maintain a copy of each certification from the Los Angeles County Department of Children and Family Services in the participant’s file along with other eligibility paperwork.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-7
Waiting List Placement [Notice PIH 2023-04 and FYI FAQs] The PHA must use the HCV waiting list for the FYI program. Youth already on the HCV program may not be transferred to an FYI voucher since they are not homeless or at-risk of homelessness.

Once a referral is made, the PHA must compare the list of PCWA referrals to its HCV waiting list to determine if any applicants on the PCWA’s referral list are already on the PHA’s HCV waiting list. Applicants already on the PHA’s HCV waiting list retain the order of their position on the list. Applicants not already on the PHA’s HCV waiting list must be placed on the HCV waiting list.

If the PHA’s HCV waiting list is closed, the PHA must open its HCV waiting list in order to accept new referrals. The PHA may reopen the waiting list to accept an FYI eligible youth without opening the waiting list for other applicants; however, the requirements at 24 CFR 982.206 for giving public notice when opening and closing the waiting list apply (see section 4- II.C., Opening and Closing the Waiting List of this administrative plan).

PHA Policy
Within 10 business days of receiving the referral from the Los Angeles County Department of Children and Family Services, the PHA will review the HCV waiting list and will send the Los Angeles County Department of Children and Family Services a list confirming whether or not referrals are on the waiting list.

Referrals who are already on the list will retain their position and the list will be notated to indicate the applicant is FYI-eligible.

For those referrals not already on the waiting list, the PHA will work with the Los Angeles County Department of Children and Family Services to ensure they receive and successfully complete a pre-application or application, as applicable.

Once the pre-application or application has been completed, the PHA will place the referral on the HCV waiting list with the date and time of the original referral and an indication that the referral is FYI-eligible.

Waiting List Selection
The PHA selects eligible youths based on the PHA’s regular HCV waiting list selection policies in Chapter 4, including any preferences that may apply.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-8
19-I.F. PHA HCV ELIGIBILITY DETERMINATION [FYI FAQs]
Once an eligible youth is selected from the HCV waiting list, the PHA must determine whether the youth meets HCV program eligibility requirements. Applicants must be eligible under both FYI eligibility requirements and HCV eligibility requirements as outlined in Chapter 3 of this policy.

The Los Angeles County Department of Children and Family Services may, but is not obligated to, provide information to the PHA on the youth’s criminal history.

PHA Policy
Subject to privacy laws, the Los Angeles County Department of Children and Family Services will provide any available information regarding the applicant’s criminal history to the PHA.

The PHA will consider the information in making its eligibility determination in accordance with the PHA’s policies in Chapter 3, Part III.

Additional Eligibility Factors
Youth must be no more than 24 years old both at the time of Los Angeles County Department of Children and Family Services certification and at the time of the HAP execution. If a youth is 24 at the time of Los Angeles County Department of Children and Family Services certification but will turn 25 before the HAP contract is executed, the youth is no longer eligible for a FYI voucher.

PHA Policy
Any applicant that does not meet the eligibility criteria for the HCV program listed in Chapter 3 or any eligibility criteria listed in this section will be notified by the PHA in writing following policies in Section 3-III.F, including stating the reasons the applicant was found ineligible and providing an opportunity for an informal review.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-9
19-I.G. LEASE UP [FR Notice 1/24/22]
Once the PHA determines that the family or youth meets HCV eligibility requirements, the youth will be issued an FYI voucher in accordance with PHA policies.

During the family briefing, PHAs must inform the FYI voucher holder of:
• The extension of assistance provisions and requirements; • The availability of the FSS program and offer them an FSS slot, if available, or offer to place them on the FSS waiting list (provided the PHA has an FSS program); and • The supportive services available to them, the existence of any other programs or services, and their eligibility for such programs and services. However, participation in supportive services cannot be required as a condition of receiving FYI assistance.

PHA Policy
Eligible applicants will be notified by the PHA in writing following policies in Section 3- III.F. of this policy. FYI youth will be briefed individually. The PHA will provide all aspects of the written and oral briefing as outlined in Part I of Chapter 5.

Vouchers will be issued in accordance with PHA policies in Chapter 5, Part II, except that the PHA will consider one additional 30-day extension beyond the first automatic extension for any reason, not just those listed in the policy in Section 5-II.E.

Once the youth locates a unit, the PHA conducts all other processes relating to voucher issuance and administration per HCV program regulations and the PHA policy in Chapter 9.

Should a youth fail to use the voucher, the PHA may issue the voucher to another eligible youth if one has been identified [Notice PIH 2023-04].

When providing education or counseling on renting housing that may include pre-1978 housing, the PHA must inform participating youth of their rights under the Lead Disclosure Rule (24 CFR part 35, subpart A) and the Lead Safe Housing Rule (subparts B, R, and, as applicable, F-M).

Turnover
Awards of FYI Tenant Protection Vouchers (TPVs) continue to be administered under the requirements of Notice PIH 2019-20. This includes turnover requirements and the requirement to inform HUD should a youth not use a voucher or leave the program. For example, FYI TPVs awarded under Notice PIH 2019-20 “sunset” when a youth leaves the program. This means that the PHA cannot reissue FYI TPV assistance issued under that notice to another youth when an initial youth exits the HCV program. HUD does not have the authority to allow the voucher to be used for a youth other than the one identified in the request.

For awards under Notice PIH 2023-04, if another eligible youth is not available, the PHA must notify HUD before the end of the calendar year, and HUD will reduce the PHA’s HCV assistance to account for the removal of the FYI assistance from the PHA’s HCV baseline.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-10
19-I.H. MAXIMUM ASSISTANCE PERIOD [Notice PIH 2023-04 and FYI FAQs; FR Notice 1/24/22]
Vouchers are limited by statute to a total of between 36 months and 60 months of housing assistance. At the end of the statutory time period, assistance must be terminated. However, any period of time for which no subsidy (HAP) is being paid on behalf of the youth does not count toward the limitation. It is not permissible to reissue another FYI TPV to the same youth upon expiration of their FYI assistance.

Participants do not “age out” of the program. A participant may continue with the program until they have received the period of assistance for which they are eligible. Age limits are only applied for entry into the program.

Extension of Assistance
FYI voucher holders who first leased or lease a unit after December 27, 2020, may be eligible for an extension of assistance up to 24 months beyond the 36-month time limit (for a total of 60 months of assistance).

While FYI voucher holders cannot be required to participate in the Family Self-Sufficiency (FSS) program as a condition of receipt of assistance, an eligible youth who participates in the FSS program and is in compliance with the applicable terms and conditions of the program is entitled to receive assistance for up to an additional 24 months. A FYI voucher holders must accept an FSS slot if it is offered to them prior to the 36-month mark in order to receive an extension of assistance (unless the youth meets one of the statutory exceptions described below).

Statutory Exceptions
FYI voucher holders will be entitled to receive an extension of assistance for up to 24 months beyond the 36-month time limit without participating in the PHA’s FSS program if they certify that they meet one of the exceptions below:
• The FYI voucher holder is a parent or other household member responsible for the care of a dependent child under the age of six or for the care of an incapacitated person.

PHA Policy
The PHA defines incapacitated person as a person that as a result of a physical or mental condition lacks the ability to provide for their own well-being or manage their finances.

The PHA will apply this exception in a manner that provides extensions of FYI assistance to the broadest population possible consistent with the statutory requirements.

The FYI voucher holder will be required to self-certify that they meet this exception on a PHA-provided form. This certification is the only documentation that the FYI voucher holder must submit.

The child or incapacitated person is not required to reside in the household in order for the FYI voucher holder to certify they meet this exception. For example, a child in a joint custody arrangement under the age of six who resides in the household only part time may qualify the FYI voucher holder for this exception.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-11
• The FYI voucher holder is a person who is regularly and actively participating in a drug addiction or alcohol treatment and rehabilitation program.

PHA Policy
The PHA will define regular and active participation in a manner that provides extensions of FYI voucher holder assistance to the broadest population possible consistent with the statutory requirements.

The FYI voucher holder will be required to self-certify that they meet this exception on a PHA-provided form. This certification is the only documentation that the FYI voucher holder must submit.
• The FYI voucher holder is a person who is incapable of complying with the requirement to participate in a FSS program as described above or engage in education, workforce development, or employment activities as described below, as applicable, due to a documented medical condition.

PHA Policy
The PHA will apply this requirement in a manner that provides extensions of FYI voucher holder assistance to the broadest population possible consistent with statutory requirements.

The FYI voucher holder will be required to self-certify that they meet this exception on a PHA-provided form. This certification is the only documentation that the FYI voucher holder must submit.

An FYI voucher holder that meets one of the above exceptions must still be offered an opportunity to enroll in the PHA’s FSS program (if it is available to them) and receive any supportive services available to FYI voucher holders. An FYI voucher holder may choose to participate in an FSS program or engage in education, workforce development, or employment activities, even if they meet one of the above statutory exceptions.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-12
Education, Workforce Development, or Employment Activities If a PHA that carries out an FSS program is unable to offer a FYI voucher holder an FSS slot during their first 36 months of receiving FYI assistance, the FYI voucher holder is considered to have been “unable to enroll” in the program and may have their voucher extended by meeting the education, workforce development, or employment criteria described below:
• The FYI voucher holder was engaged in obtaining a recognized postsecondary credential or a secondary school diploma or its recognized equivalent.

PHA Policy
The PHA will use the definitions of recognized postsecondary credential and secondary school diploma or its recognized equivalent under the Workforce Innovation and Opportunity Act (WIOA). WIOA defines a recognized postsecondary credential as a credential consisting of an industry-recognized certificate or certification, a certificate of completion of an apprenticeship, a license recognized by the state involved or federal government, or an associate or baccalaureate degree (29 U.S.C. 3102). Examples of a recognized postsecondary credential include, but are not limited to, an associate’s degree, bachelor’s degree, occupational licensure, or occupational certification (see U.S.

Department of Labor, Training and Employment Guidance Letter No. 10–16, Change 1).

For the purpose of WIOA, the U.S. Department of Labor defines a secondary school diploma or its recognized equivalent as a secondary school diploma (or alternate diploma) that is recognized by a state and that is included for accountability purposes under the Elementary and Secondary Education Act of 1965 (ESEA), as amended by the Every Student Succeeds Act (ESSA). A secondary school equivalency certification signifies that a student has completed the requirement for a high school education.

Examples of a secondary school diploma or its recognized equivalent include, but are not limited to, obtaining certification of attaining passing scores on a state-recognized high school equivalency test, earning a secondary school diploma or state-recognized equivalent, or obtaining certification of passing a state-recognized competency-based assessment.
• The FYI voucher holder was enrolled in an institution of higher education, as such term is defined in section 101(a) of the Higher Education Act of 1965 (20 U.S.C. 1001(a)) or an institution that meets the definition of a proprietary institution of higher education or a postsecondary vocational institution under sections 102(b)(1) and (c)(1) of the Higher Education Act of 1965 (20 U.S.C. 1002(b)(1) and (c)(1)), respectively.

PHA Policy
The FYI voucher holder must be enrolled in education activities on at least a half-time basis, as defined by the institution which they attend. However, the PHA may make exceptions to this requirement if the FYI voucher holder is unable to enroll in a sufficient number of classes due to a lack of course offerings by the educational institution where they are enrolled.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-13
• The FYI voucher holder was participating in a career pathway, as such term is defined in Section 3 of the Workforce Innovation and Opportunity Act (29 U.S.C. 3102). • The FYI voucher holder was employed.

PHA Policy
The PHA will consider the FYI voucher holder to be employed if they work a minimum of 20 hours per week. The PHA may make exceptions to this requirement if the FYI voucher holder’s hours are reduced due to circumstances beyond their control or the FYI voucher holder must temporarily reduce their work hours due to a verified family emergency.

FSS Enrollment at 24 Months
If the FYI voucher holder has not been provided an opportunity to enroll in the FSS program during the first 24 months of FYI assistance, HUD encourages the PHA to remind the FYI voucher holder at the 24-month reexamination of the education, workforce development, and employment requirements described above so that they have enough time to meet these requirements prior to the expiration of the 36-month time period for FYI assistance.

PHA Policy
If the FYI voucher holder has not been provided an opportunity to enroll in the FSS program during the first 24 months of FYI assistance, the PHA will remind the FYI voucher holder at their second regular reexamination of the education, workforce development, and employment requirements described above.

FSS Enrollment Between 36 and 48 Months
If an FSS slot becomes available between the 36-month and 48-month mark:
• The PHA must offer the slot to an FYI voucher holder who had their voucher extended based on meeting the education, workforce development, or employment requirement listed above, or one of the statutory exceptions listed above (even if the FYI voucher holder previously declined an FSS slot because they met one of the statutory exceptions). • The PHA must work with the FYI voucher holder to determine whether enrollment in FSS is feasible and in their best interest given any education, workforce development, or employment activities that the FYI voucher holder is engaged in and any statutory exceptions that apply to the FYI voucher holder, as well as the remaining time on their voucher. • If the FYI voucher holder accepts the FSS slot, the PHA must work with them to establish Contract of Participation goals and an Individual Training and Services Plan (ITSP) that can be accomplished within the time period left on the voucher.

If the FYI voucher holder is offered an FSS slot prior to the 36-month mark, the FYI voucher holder:
• Will be required to enroll in the FSS program in order to receive an extension of assistance at the end of the 36-month time period (unless they meet one of the statutory exceptions described above).

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-14
• Will not be considered to have been “unable to enroll” in the FSS program, and as a result, will not be eligible to receive an extension of assistance based on meeting the education, workforce development, or employment requirements described above.

FSS Enrollment After 48 Months
The PHA may, but is not required, to offer an FYI voucher holder an FSS slot that becomes available between the 48-month mark and the 60-month mark, since the FYI voucher holder will have already received their second and final extension.

PHA Policy
If an FSS slot becomes available between the 48 and 60-month marks, the PHA will not offer the FSS slot to an FYI voucher holder.

Extensions of Assistance
At the 36-month and 48-month reexamination, the PHA must extend FYI assistance if the FYI voucher holder is participating in and in compliance with the FSS program as long as the FYI voucher holder is still eligible for the HCV program.

In any case, the FYI voucher holder cannot receive more than a total of 60 months of FYI assistance even if the FSS Contract of Participation time period extends beyond the voucher 60- month mark.

No FSS Program or Unable to Enroll in FSS
If a PHA does not carry out an FSS program or the FYI voucher holder has been unable to enroll in the program during the first 36 months of receiving FYI assistance, the FYI voucher holder is entitled to receive an extension of assistance for up to two successive 12-month periods beyond the 36-month time limit provided that the FYI voucher holder engaged in at least one of the education, workforce development, or employment activities described above for not less than nine months of the 12-month period preceding each extension. In order to meet the nine months out of the preceding 12 months requirement, the FYI voucher holder may have engaged in one of the education, workforce development, or employment activities described above or a combination of these activities.

Verification Prior to Annual Reexam
In order to provide an extension of assistance, the PHA must verify compliance with the above requirements at the end of the 36-month time period and the 48-month time periods. The PHA does not need to verify compliance with these requirements at the end of the 60-month time period since the maximum length of assistance is 60 months.

To verify compliance with the education, workforce development, or employment requirement or one of the statutory exceptions, the PHA must provide the FYI voucher holder written notification informing them that they may receive an extension of their FYI assistance and providing instructions on how the FYI voucher holder may demonstrate that they meet one of these conditions. This notification must be provided sufficiently in advance of the end of the 36- month or 48-month time periods, as applicable, to allow the FYI voucher holder to demonstrate that they meet the education, workforce development, or employment requirement, or one of the statutory exceptions, and for the PHA to conduct an annual reexamination prior to the expiration of the FYI assistance.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-15
PHA Policy
The PHA will verify compliance with the education, workforce development, or employment requirement, or one of the statutory exceptions, at the end of the 36-month and 48-month time periods prior to the FYI voucher holder’s scheduled annual reexamination. The PHA will not verify compliance at the end of the 60-month time period.

The PHA will provide each FYI voucher holder on the PHA’s program with a written notification informing them that they may receive an extension of their FYI assistance if they meet conditions outlined in this chapter and providing them with instructions on how they may demonstrate compliance at least 60 days prior to their scheduled annual reexamination date. When necessary, the PHA will provide this notification in a format accessible to FYI voucher holders with disabilities and in a translated format for FYI voucher holders with limited English proficiency in accordance with Chapter 2.

The PHA will use the following verification methods to verify an FYI voucher holder’s eligibility for voucher extensions:

To verify compliance with the FSS requirement, the PHA will examine its records to confirm, or obtain confirmation from the PHA’s FSS program staff, that the FYI participant is in compliance with FSS program requirements and has not been terminated from the FSS program.

To meet the education, workforce development, or employment requirement, the PHA will verify that the FYI voucher holder was engaged in at least one education, workforce development, or employment activity for at least nine months of the 12-month period immediately preceding the end of the 36-month or 48-month time period, as applicable.

Due to the timing of when the PHA verifies compliance and conducts the annual reexamination, the FYI voucher holder may have not yet met the nine-month requirement but may be able to demonstrate that they will meet the nine-month requirement as of the end of the 36-month or 48- month time period. In such cases, the FYI voucher holder will still be considered to have met the requirements.

In order for the FYI voucher holder to meet one of the statutory exceptions described above, the FYI voucher holder must submit a certification to the PHA that they meet one of these exceptions. This certification is the only documentation that the FYI voucher holder must submit in order to demonstrate that they meet one of the statutory exceptions.

An FYI voucher holder who received an extension of voucher assistance at the end of the 36- month time period based on meeting one of the conditions described in this chapter does not have to meet the same conditions when they reach the end of the 48-month time period. The FYI voucher holder may demonstrate that they meet a different condition in order to receive an extension of their assistance.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-16
If the PHA determines that the FYI voucher holder meets one of the statutory conditions, the PHA would then conduct an annual reexamination. If the annual reexamination determines that the FYI voucher holder is still eligible for the HCV program, the PHA must provide the FYI voucher holder the extension of voucher assistance.

Termination of Assistance for Failure to Meet Conditions Failure of the FYI voucher holder to meet one of the above conditions will only impact their ability to receive subsequent extensions of assistance. It will not serve as a basis for terminating the FYI assistance prior to the annual reexam.

If the FYI voucher holder does not meet any of the statutory conditions described in in this chapter, the youth is subject to the statutory time limit of 36 months or the time limit of any extension that the youth has already received, and the FYI voucher must be terminated once they reach this time limit. The calculation of the time limit begins from the date the first HAP contract is signed (for tenant-based vouchers) or from the date the FYI voucher holder entered into the initial lease agreement (for project-based vouchers). The number of months is calculated based on the number of months that HAP subsidy is being paid on behalf of the FYI voucher holder, not the number of months that they are in the FYI program. Prior to termination, the PHA must offer the FYI voucher holder the opportunity to request an informal hearing, in accordance with Chapter 16.
19-I.I. TERMINATION OF ASSISTANCE [FYI FAQs]
Termination of a FYI voucher is handled in the same way as with any HCV; therefore, termination of a FYI voucher must be consistent with HCV regulations at 24 CFR Part 982, Subpart L and PHA policies in Chapter 12. Given the statutory time limit that requires FYI vouchers to sunset, a PHA must terminate the youth’s assistance once the limit on assistance has expired.

A PHA cannot terminate a FYI youth’s assistance for noncompliance with PCWA case management, nor may the PHA terminate assistance for a FYI youth for not accepting services from the PCWA.

The PHA may not transfer the assistance of FYI voucher holders to regular HCV assistance upon the expiration of the limit on assistance. However, the PHA may issue a regular HCV to FYI voucher holders if they were selected from the waiting list in accordance with PHA policies. The PHA may also adopt a waiting list preference for FYI voucher holders who are being terminated for this reason.

PHA Policy
The PHA will not provide a selection preference on the PHA’s HCV waiting list for FYI voucher holders who are terminated due to the time limit on assistance.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-17
19-I.J. PORTABILITY [FYI FAQs]
Portability for an FYI youth is handled in the same way as for a regular HCV family. A PHA may not restrict or deny portability for an FYI youth for reasons other than those specified in the HCV program regulations, as reflected in Chapter 10 of the administrative plan.

An FYI youth does not have to port to a jurisdiction that administers FYI vouchers.

If the receiving PHA absorbs the voucher, the PHA may absorb the youth into its regular HCV program if it has vouchers available to do so. If the receiving PHA absorbs the youth into its regular HCV program, that youth becomes a regular HCV participant with none of the limitations of an FYI voucher.

The initial and receiving PHA must work together to initiate termination of assistance upon expiration of the time limit on assistance.
19-I.K. PROJECT-BASING FYI VOUCHERS [FYI FAQs; FR Notice 1/24/22; Notice PIH 2024-03]
PHAs that have initiated the selection process to project-base FYI and/or FUP vouchers may be eligible to project-base FYI and FUP units formally identified for project basing in accordance with all applicable PBV regulations and PHA policies in Chapter 17. This includes FYI vouchers awarded under Notices PIH 2020-28, PIH 2021-26, and PIH 2023-04. Assistance awarded under Notice PIH 2019-20 is prohibited from being project-based.

PHA Policy
The PHA will not project-base FYI vouchers. All FYI vouchers will be used to provide tenant-based assistance.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-18
PART II: VETERANS AFFAIRS SUPPORTIVE HOUSING (VASH) PROGRAM 19-II.A. PROGRAM OVERVIEW
Since 2008, HCV program funding has provided rental assistance under a supportive housing program for homeless veterans. The Veterans Affairs Supportive Housing (VASH) program combines HCV rental assistance with case management and clinical services provided by the Department of Veterans Affairs (VA) at VA medical centers (VAMCs) and Community-Based Outpatient Clinics (CBOCs), or through a designated service provider (DSP) as approved by the VA Secretary. Eligible families are homeless veterans and their families that agree to participate in VA case management and are referred to the VAMC’s partner PHA for HCV assistance. The VAMC or DSP’s responsibilities include:
• Screening homeless veterans to determine whether they meet VASH program participation criteria;
• Referring homeless veterans to the PHA;
- The term homeless veteran means a veteran who is homeless (as that term is defined in subsection (a) or (b) of Section 103 of the McKinney-Vento Homeless Assistance Act (42 U.S.C. 11302)). See 38 U.S.C. 2002.
• Providing appropriate treatment and supportive services to potential VASH participants, if needed, prior to PHA issuance of a voucher;
• Providing housing search assistance to VASH participants; • Identifying the social service and medical needs of VASH participants, and providing or ensuring the provision of regular ongoing case management, outpatient health services, hospitalization, and other supportive services as needed throughout the veterans’ participation period; and
• Maintaining records and providing information for evaluation purposes, as required by HUD and the VA.

VASH vouchers are awarded noncompetitively based on geographic need and PHA administrative performance. Eligible PHAs must be located within the jurisdiction of a VAMC and in an area of high need based on data compiled by HUD and the VA. When Congress funds a new allocation of VASH vouchers, HUD invites eligible PHAs to apply for a specified number of vouchers.

Generally, the HUD-VASH program is administered in accordance with regular HCV program requirements. However, HUD is authorized to waive or specify alternative requirements to allow PHAs to effectively deliver and administer VASH assistance. Alternative requirements are established in the HUD-VASH Operating Requirements, which were originally published in the Federal Register on May 6, 2008, and updated September 27, 2021, and then again in 2024.

Unless expressly waived by HUD, all regulatory requirements and HUD directives regarding the HCV program requirements are applicable to VASH vouchers, including the use of all HUDrequired contracts and other forms, and all civil rights and fair housing requirements. In addition, the PHA may request additional statutory or regulatory waivers that it determines are necessary for the effective delivery and administration of the program.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-19
The VASH program is administered in accordance with applicable Fair Housing requirements since civil rights requirements cannot be waived under the program. These include applicable authorities under 24 CFR 5.105(a) and 24 CFR 982.53 including, but not limited to, the Fair Housing Act, Section 504 of the Rehabilitation Act of 1973, Title VI of the Civil Rights Act of 1964, the Americans with Disabilities Act, and the Age Discrimination Act and all PHA policies as outlined in Chapter 2 of this document.

When HUD-VASH recipients include veterans with disabilities or family members with disabilities, reasonable accommodation requirements in Part II of Chapter 2 of this policy apply. 19-II.B. REFERRALS [FR Notice 8/13/24 and HUD-VASH Qs and As] VAMC case managers will screen all families in accordance with VA screening criteria and refer eligible families to the PHA for determination of program eligibility and voucher issuance. The PHA has no role in determining or verifying the veteran’s eligibility under VA screening criteria, including determining the veteran’s homelessness status. The PHA must accept referrals from the partnering VAMC and must maintain written documentation of referrals in VASH tenant files. Upon turnover, VASH vouchers must be issued to eligible veteran families as identified by the VAMC.

PHA Policy
In order to expedite the screening process, the PHA will provide all forms and a list of documents required for the VASH application to the VAMC. Case managers will work with veterans to fill out the forms and compile all documents prior to meeting with the PHA and submitting an application. When feasible, the VAMC case manager should email or fax copies of all documents to the PHA prior to the meeting in order to allow the PHA time to review them and start a file for the veteran.

Referrals received from agencies outside of the VAMC will need to be verified by the VAMC before a VASH voucher is issued
Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-20
19-II.C. HCV PROGRAM ELIGIBILITY [FR Notice 8/13/24]
Eligible participants are homeless veterans and their families who agree to participate in case management from the VAMC.
• A VASH Veteran or veteran family refers to either a single veteran or a veteran with a household composed of two or more related persons. It also includes one or more eligible persons living with the veteran who are determined to be important to the veteran’s care or well-being.
• A veteran for the purpose of VASH is a person whose length of service meets statutory requirements, and who served in the active military, naval, or air service, was discharged or released under conditions other than dishonorable, and is eligible for VA health care.

Under VASH, PHAs do not have authority to determine family eligibility in accordance with HCV program rules and PHA policies. The only reasons for denial of assistance by the PHA are failure to meet the income eligibility requirements and/or that a family member is subject to a lifetime registration requirement under a state sex offender registration program. Under portability, the receiving PHA must also comply with these VASH screening requirements.

Social Security Numbers
When verifying Social Security numbers (SSNs) for homeless veterans and their family members, PHAs must use available flexibilities in accordance with 24 CFR 5.216(g)(1)(iii) to accept self-certification of SSNs and at least one third-party document, such as a bank statement, utility or cell phone bill, or benefit letter that contains the name of the individual in the absence of other documentation.

In the case of the homeless veteran, the PHA must accept the Certificate of Release or Discharge from Active Duty (DD-214) or the VA-verified Application for Health Benefits (10-10EZ) as verification of SSN if these forms are available and cannot require the veteran to provide a Social Security card. A VA-issued identification card may also be used to verify the SSN of a homeless veteran.

Proof of Age
The DD-214 or 10-10EZ must be accepted as proof of age in lieu of birth certificates or other PHA-required documentation as outlined in Section 7-II.C. of this policy. A VA-issued identification card may also be used to verify the age of a homeless veteran.

Photo Identification
A VA-issued identification card must be accepted in lieu of another type of government-issued photo identification. These cards also serve as verification of SSNs and date of birth.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-21
Income Eligibility [FR Notice 8/13/24]
With some exceptions, the PHA must determine income eligibility for VASH families in accordance with 24 CFR 982.201 and policies in Section 3-II.A. Low-income families (80 percent of AMI) are eligible for assistance under VASH, and PHAs may not condition eligibility based on additional eligibility criteria specified in its administrative plan. If the family is overincome based on the most recently published income limits for the family size, the family will be ineligible for assistance.

The following alternative requirements related to income apply to VASH families:
• The PHA must determine the applicant’s annual income for purposes of income eligibility by excluding all VA service-connected benefits received by the applicant. This special income exclusion only applies to the definition of annual income for purposes of determining income eligibility. If the HUD-VASH applicant qualifies as a low-income family under the alternative requirement, the VA service-connected benefits (with the exception of the normally excluded deferred VA disability payments under 24 CFR 5.609(b)(16) and the payments related to aid and attendance under 24 CFR 5.609(b)(17)) must still be included as annual income when calculating the family’s adjusted income. In other words, the VA service-connected disability benefits are excluded for purposes of determining income eligibility but included for purposes of calculating the family’s total tenant payment (TTP), housing assistance payment (HAP), and family share.
• When a veteran family reports that they have zero income, the PHA must accept a selfcertification of zero income from the family at admission and at reexamination without taking any additional steps to verify the family is indeed zero income. The self-certification does not need to be notarized. The PHA must verify families’ income in the Enterprise Income Verification (EIV) system within 120 days after admission. The PHA may not deny zero income families.
• Regardless of PHA policy, in determining compliance with the asset limitation at admission, for the VASH program, the PHA must accept a self-certification by the family that the family’s total assets are equal to or less than the HUD-published asset limitation amount (adjusted annually) and that the family does not have any present ownership interest in real property, without taking additional steps to verify the accuracy of the declaration. • The PHA must not enforce the asset limitation for VASH families at reexamination. • In addition, because there needs to be a monthly housing assistance payment (HAP) in order to enter into a HAP contract on behalf of a tenant-based voucher family, the utilization of tenant-based VASH assistance by families determined income-eligible is limited to those areas where the family’s (TTP) is less than the applicable payment standard or exception payment standard (including any VASH-specific exception payment standard established by the PHA). The family must select a unit with a gross rent that is above the family’s TTP in order to lease a unit with the tenant-based VASH voucher.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-22
While income-targeting does not apply to VASH vouchers, the PHA may include the admission of extremely low-income VASH families in its income targeting numbers for the fiscal year in which these families are admitted.

PHA Policy
While income-targeting requirements will not be considered by the PHA when families are referred by the partnering VAMC, the PHA will include any extremely low-income VASH families that are admitted in its income targeting numbers for the fiscal year in which these families are admitted.

Minimum Rent [FR Notice 8/13/24]
PHAs must consider hardship circumstances before charging a minimum rent in accordance with 24 CFR 5.630(b). The PHA may choose to charge a lower minimum rent (including a minimum rent of $0) specifically for their VASH program regardless of the minimum rent policies established in their administrative plan for other HCV families.

PHA Policy
The PHA will establish a minimum rent of $0 for VASH families.

Screening [FR Notice 8/13/24]
The PHA may not screen any potentially eligible family members or deny assistance for any grounds permitted under 24 CFR 982.552 and 982.553 with one exception: the PHAs is still required to prohibit admission if any member of the household is subject to a lifetime registration requirement under a state sex offender registration program. Accordingly, with the exception of denial for registration as a lifetime sex offender under state law and PHA policies on how sex offender screenings will be conducted, PHA policy in Sections 3-III.B. through 3-III.E. do not apply to VASH. The prohibition against screening families for anything other than lifetime sex offender status applies to all family members, not just the veteran.

If a family member is subject to lifetime registration under a state sex offender registration program, the remaining family members may be served if the family agrees to remove the sex offender from its family composition. This is true unless the family member subject to lifetime registration under a state sex offender registration program is the homeless veteran, in which case the family would be denied admission to the program [FR Notice 8/13/24].

Denial of Assistance [Notice PIH 2008-37]
Once a veteran is referred by the VAMC, the PHA must either issue a voucher or deny assistance. If the PHA denies assistance, it must provide the family with prompt notice of the decision and a brief statement of the reason for denial in accordance with Section 3-III.F. Like in the standard HCV program, the family must be provided with the opportunity for an informal review in accordance with policies in Section 3-III.F. In addition, a copy of the denial notice must be sent to the VAMC case manager.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-23
19-II.D. CHANGES IN FAMILY COMPOSITION
Adding Family Members [FR Notice 8/13/24]
When adding a family member after the family has been admitted to the program, PHA policies in Section 3-II.B. apply. Other than the birth, adoption, or court-awarded custody of a child, the PHA must approve additional family members and will apply its regular screening criteria in doing so.

Remaining Family Members [HUD-VASH Qs and As]
If the homeless veteran dies while the family is being assisted, the voucher would remain with the remaining members of the tenant family. The PHA may use one of its own regular vouchers, if available, to continue assisting this family and free up a VASH voucher for another VASHeligible family. If a regular voucher is not available, the family would continue utilizing the VASH voucher. Once the VASH voucher turns over, however, it must go to a homeless veteran family.

Family Break Up [HUD-VASH Qs and As]
In the case of divorce or separation, since the set-aside of VASH vouchers is for veterans, the voucher must remain with the veteran. This overrides the PHA’s policies in Section 3-I.C. on how to determine who remains in the program if a family breaks up.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-24
19-II.E. LEASING [FR Notice 8/13/24]
Waiting List
The PHA does not have the authority to maintain a waiting list or apply local preferences for HUD–VASH vouchers. Policies in Chapter 4 relating to applicant selection from the waiting list, local preferences, special admissions, cross-listing, and opening and closing the waiting list do not apply to VASH vouchers.

Exception Payment Standards [FR Notice 8/13/24]
To assist VASH participants in finding affordable housing, especially in competitive markets, HUD allows PHAs to establish a HUD-VASH exception payment standard. PHAs may go up to but no higher than 120 percent of the published metropolitan area-wide fair market rent (FMR) or small area fair market rent (SAFMR) specifically for VASH families. PHAs who want to establish a VASH exception payment standard over 120 percent are allowed but must still request a waiver from HUD through the regular waiver process outlined in Notice PIH 2018-16, or any successor notices.

Exception payment standards implemented by the PHA under this section also apply in determining rents under 24 CFR 983.301(b) for PBV projects only when the project is comprised solely of units exclusively made available to VASH families.

The PHA may also establish an exception payment standard up to 140 percent of the published FMR or SAFMR only to be applied if required as a reasonable accommodation for a family that includes a person with a disability. Any unit approved under an exception payment standard must still meet reasonable rent requirements. The PHA may use a payment standard that is greater than 140 percent of FMR as a reasonable accommodation for a person with a disability, but only with HUD approval.

Voucher Issuance [FR Notice 8/13/24]
Unlike the standard HCV program which requires an initial voucher term of at least 60 days, VASH vouchers must have a search term of at least 120 days. This applies both to the initial search term and moves. PHA policies on extensions as outlined in Section 5-II.E. will apply.

PHA Policy
All VASH vouchers will have an initial term of 60 calendar days followed by two 30 calendar day extensions by request.

The family must submit a Request for Tenancy Approval before the voucher expiration date unless the PHA grants an extension.

The PHA must track issuance of HCVs for families referred by the VAMC or DSP in HUD systems as required in FR Notice 8/13/24.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-25
Special Housing Types [FR Notice 8/13/24]
The PHA must permit VASH clients to use the following special housing types for tenant-based VASH assistance, regardless of whether these types are permitted in their administrative plan for other families:
• Single room occupancy (SRO);
• Congregate housing;
• Group home;
• Shared housing; and
• Cooperative housing.

Initial Lease Term [FR Notice 8/13/24]
Unlike in the standard the HCV program, VASH voucher holders may enter into an initial lease that is for less than 12 months. Accordingly, PHA policy in Section 9-I.E., Term of Assisted Tenancy, does not apply.

Ineligible Housing [FR Notice 8/13/24]
Unlike in the standard HCV program, VASH families are permitted to live on the grounds of a VA facility in units developed to house homeless veterans. This applies to both tenant-based assistance and PBV. Therefore, 24 CFR 982.352(a)(5) and 983.53(a)(2), which prohibit units on the physical grounds of a medical, mental, or similar public or private institution, do not apply to VASH for this purpose only. Accordingly, PHA policy in 9-I.D., Ineligible Units, does not apply for this purpose only.

Pre-Inspections [FR Notice 8/13/24]
To expedite the leasing process, PHAs may pre-inspect available units that veterans may be interested in leasing in order to maintain a pool of eligible units. If a VASH family selects a unit that passed inspection (without intervening occupancy) within 90 days of the date of the Request for Tenancy Approval (Form HUD-52517), the unit may be approved if it meets all other conditions under 24 CFR 982.305. However, the veteran must be free to select their unit and cannot be steered to these units. All regulatory requirements pertaining to housing quality standards found at 24 CFR 5.703 apply to HUD-VASH.

PHA Policy
To expedite the leasing process, the PHA may pre-inspect available units that veterans may be interested in leasing to maintain a pool of eligible units.

When a pre-inspected unit is not selected, the PHA will make every effort to fast-track the inspection process, including adjusting the normal inspection schedule for both initial and any required reinspection.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-26
19-II.F. PORTABILITY [Notice PIH 2011-53 and FR Notice 8/13/24] General Requirements
Portability policies under VASH depend on whether the family wants to move within or outside of the initial VA facility’s catchment area (the area in which the VAMC or DSP operates). In all cases, the initial VA facility must be consulted prior to the move and provide written confirmation that case management will continue to be provided in the family’s new location.

VASH participant families may only reside in jurisdictions that are accessible to case management services, as determined by case managers at the partnering VAMC or DSP.

Under VASH, applicant families may move under portability even if the family did not have legal residency in the jurisdiction of the initial PHA when they applied. As a result, PHA policies in Section 10-II.B. about nonresident applicants do not apply. A family that moves under the portability procedures must not be subject to rescreening by the receiving PHA.

If the family no longer requires case management, there are no portability restrictions. Normal portability rules apply.

Portability within the Initial VAMC or DSP’s Catchment Area A VASH family can move within the VAMC’s catchment area as long as case management can still be provided, as determined by the VA. If the initial PHA’s partnering VAMC will still provide the case management services, the receiving PHA must process the move in accordance with portability procedures:
• If the receiving PHA has been awarded VASH vouchers, it can choose to either bill the initial PHA or absorb the family if it has a VASH voucher available to do so. - If the PHA absorbs the family, the VAMC or DSP providing the initial case management must agree to the absorption and the transfer of case management. • If the receiving PHA does not administer a VASH program, it must always bill the initial PHA.

Portability Outside of the Initial VAMC or DSP’s Catchment Area If a family wants to move to another jurisdiction where it will not be possible for the initial PHA’s partnering VAMC or DSP to provide case management services, the initial VAMC or DSP must first determine that the VASH family could be served by another VAMC or DSP that is participating in the VASH program, and the receiving PHA has an available VASH voucher.

In these cases, the family must be absorbed by the receiving PHA either as a new admission or as a portability move-in, as applicable. Upon absorption, the initial PHA’s VASH voucher will be available to lease to a new VASH-eligible family, and the absorbed family will count toward the number of VASH slots awarded to the receiving PHA.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-27
Portability Outside of the Initial VAMC or DSP’s Catchment Area under VAWA Veterans who request to port beyond the catchment area of the VAMC or DSP where they are receiving case management to protect the health or safety of a person who is or has been the victim of domestic violence, dating violence, sexual assault, stalking, or human trafficking, and who reasonably believes they are threatened with imminent harm from further violence by remaining in the unit may port prior to receiving approval from the receiving VAMC or DSP.

The initial PHA must follow its emergency transfer plan (see Exhibit 16-3). PHAs may require verbal self-certification or a written request from a participant seeking a move beyond the catchment area of the VAMC or DSP.

The verbal self-certification or written request must include either a statement expressing why the participant reasonably believes that there is a threat of imminent harm from further violence if they were to remain in the same unit or a statement that the tenant was a sexual assault victim and that the sexual assault occurred on the premises during the 90-day period preceding the participants request for the move.

The participant must still port to a PHA that has a VASH program. If the receiving PHA does not have a VASH voucher available to lease, they may bill the initial PHA until a VASH voucher is available, at which point the porting veteran must be absorbed into the receiving PHA’s program.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-28
19-II.G. TERMINATION OF ASSISTANCE [FR Notice 8/13/24]
Prior to terminating VASH participants, HUD strongly encourages PHAs to exercise their discretion under 24 CFR 982.552(c)(2) as outlined in Section 12-II.D. of this policy and consider all relevant circumstances of the specific case. This includes granting reasonable accommodations for persons with disabilities, as well as considering the role of the case manager and the impact that ongoing case management services can have on mitigating the conditions that led to the potential termination.

VASH participant families may not be terminated after admission for a circumstance or activities that occurred prior to admission and were known to the PHA but could not be considered at the time of admission due to VASH program requirements. The PHA may terminate the family’s assistance only for program violations that occur after the family’s admission to the program.

There are two alternative requirements for termination of assistance for VASH participants.

Cessation of Case Management
As a condition of receiving HCV rental assistance, a HUD-VASH-eligible family must receive case management services from the VAMC or DSP. A VASH participant family’s assistance must be terminated for failure to participate, without good cause, in case management as verified by the VAMC or DSP. However, the PHA may offer the family continued assistance through one of its regular vouchers or a PBV unit not exclusively made available for HUD-VASH.

However, a VAMC or DSP determination that the participant family no longer requires case management is not grounds for termination of voucher or PBV assistance. In such a case, at its option, the PHA may offer the family continued assistance through one of its regular vouchers.

The decision to transfer assistance to a regular voucher must consider veteran preference and must be communicated to the VA prior to occurring. If the PHA has no voucher to offer, the family will retain its VASH voucher, or PBV unit, until such time as the PHA has an available voucher (or PBV unit not exclusively made available for VASH) for the family. If the PHA has no voucher to offer, the family will retain its VASH voucher or PBV unit until such time as the PHA has an available voucher for the family.

Serious Violation of the Lease
The regulation at 24 CFR 982.552(b)(2) states that the PHA must terminate program assistance for a family evicted from housing assisted under the program for serious violation of the lease.

HUD waived this provision, and establishing the alternative requirement that the PHA may terminate program assistance in this case. Prior to terminating VASH participants for this reason, HUD strongly encourages PHAs to exercise their discretion under 24 CFR 982.552(c)(2) and consider all relevant circumstances of the specific case, as well as including the role of the case manager and the impact that ongoing case management services can have on mitigating the conditions that led to the potential termination, prior to determining whether to terminate assistance.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-29
VAWA [FR Notice 8/13/24]
When a veteran’s family member is receiving protection under VAWA because the veteran is the perpetrator of domestic violence, dating violence, sexual assault, stalking, or human trafficking, the victim must continue to be assisted. Upon termination of the perpetrator’s VASH assistance, the victim must be given a regular HCV if one is available, and the perpetrator’s VASH voucher must be used to serve another eligible veteran family. If a regular HCV is not available, the perpetrator must be terminated from assistance and the victim will continue to use the VASH voucher.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-30
19-II.H. PROJECT-BASING VASH VOUCHERS
General Requirements [Notice PIH 2017-21 and FR Notice 8/13/24] PHAs are authorized to project-base their tenant-based VASH vouchers without additional HUD review or approval in accordance with Notice PIH 2017-21 and all PBV program requirements provided that the VAMC will continue to make supportive services available. In addition, since 2010, HUD has awarded VASH vouchers specifically for project-based assistance in the form of PBV HUD-VASH set-aside vouchers. While these vouchers are excluded from the PBV program cap as long as they remain under PBV HAP contract at the designated project, all other VASH vouchers are subject to the PBV program percentage limitation discussed in Section 17-I.A. Note that VASH supportive services only need to be provided to VASH families receiving PBV assistance in the project, not all families receiving PBV assistance in the project. If a VASH family does not require or no longer requires case management, the unit continues to count as an excepted PBV unit as long as the family resides in the unit. In the description of units in Exhibit A of the HAP contract, PHAs must indicate the number of units that will be exclusively made available to VASH families. The PHA must refer only VASH families to PBV units exclusively made available to VASH families and to PBV units funded through a VASH PBV set-aside award.

If the PHA project-bases VASH vouchers, the PHA must consult with the partnering VAMC or DSP to ensure approval of the project or projects. PHAs may project-base VASH vouchers in projects alongside other PBV units and may execute a single HAP contract covering both the VASH PBVs and the other PBVs. The PHA must refer only VASH families to PBV units exclusively made available to VASH families and to PBV units funded through a HUD set-aside award.

If a VASH family is referred to the PHA and there is an available PBV unit that is not exclusively made available to VASH families, the PHA may offer to refer the family to the owner if allowable under the selection policy for that project, and the owner and PHA may amend the HAP contract to designate the PBV unit as a VASH PBV unit.

The PHA and owner may agree to amend a PBV HAP contract to redesignate a regular PBV unit as a unit specifically designated for VASH families so long as the PHA first consults with the VAMC or DSP. Additionally, the PHA and owner may agree to amend a PBV HAP contract to redesignate a unit specifically designated for VASH families as a regular PBV unit, so long as the unit is not funded through a VASH PBV set-aside award and is eligible for regular PBV (i.e., the unit is not on the grounds of a medical facility and the unit is eligible under the PHA’s program and project caps). Policies for VASH PBV units will generally follow PHA policies for the standard PBV program as listed in Chapter 17, with the exception of the policies listed below.

Ineligible Units
Unlike in the regular PBV program, the PHA may opt to select an occupied unit or admit a family to a unit if such unit is made exclusively available to VASH families if the PBV project is either on the grounds of a VA facility or there are VASH supportive services provided on-site at the project.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-31
Termination of Assistance
A VASH family’s PBV assistance must be terminated for failure to participate in case management when required by the VA. However, the PHA may allow the veteran family to receive a regular (non-VASH) tenant-based voucher or PBV unit instead of the family’s assistance being terminated. In this case, the PHA may:
• Substitute the family’s unit on the PBV HAP contract for another unit (the PHA may, in conjunction with such substitution, add the original unit to the PBV HAP contract with a non-VASH voucher if it is possible to do so;
• Remove the unit from the PBV HAP contract so the family may remain with tenant-based assistance, if the family and the owner agree to use the tenant-based voucher in the unit; or • Change the unit’s status in the PBV HAP contract from a unit exclusively made available for VASH to a regular PBV unit, if doing so is allowable under program rules.

If the PHA will not allow the veteran to receive a regular (non-VASH) tenant-based voucher or PBV unit instead of the family’s assistance being terminated, then upon notification by the VA of the family’s failure to participate in VA-required case management, the PHA must provide the family a reasonable period of time (as established by the PHA) to vacate the unit.

PHA Policy
If the family fails to participate in case management when required by the VA, the PHA will terminate the family’s assistance. The family will have 60 days to vacate the unit.

The PHA will terminate assistance to the family at the earlier of (1) the time the family vacates or (2) the expiration of the 60-day period. If the family fails to vacate the unit within the established time, the owner may evict the family. If the owner does not evict the family, the PHA will remove the unit from the HAP contract or amend the HAP contract to substitute a different unit in the project if the project is partially assisted. The PHA may add the removed unit back onto the HAP contract after the ineligible family vacates the property.

Moves
If a VASH family is eligible to move from its PBV unit after a year of PBV assistance, the PHA will generally follow policies in Chapter 17. However, if there is no VASH tenant-based voucher available at the time the family requests to move, the PHA’s actions depend on whether the family still requires case management.
• The PHA may require a family that still requires case management to wait for a VASH tenant-based voucher for a period not to exceed 180 days. If a HUD-VASH tenant-based voucher is still not available after 180 days, the family must be allowed to move using its VASH voucher as tenant-based assistance. Alternatively, the PHA may allow the family to move using its VASH voucher as tenant-based assistance without having to meet this 180- day waiting period. In either case, the PHA may either amend the PBV HAP contract to replace the assistance in the PBV unit with one of its regular vouchers if the unit is eligible for a regular PBV or the PHA and owner may agree to temporarily remove the unit from the HAP contract.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-32
• If a VASH veteran has been determined to no longer require case management, the PHA must allow the family to move with the first available tenant-based voucher. If no VASH voucher is immediately available, the PHA may not require the family to wait for a VASH voucher to become available.

Wrong-Sized or Accessible Units
If the PHA determines that a VASH family is occupying a wrong-size PBV unit or a PBV unit with accessibility features that the family does not require and the PBV unit is needed by a family that requires the accessibility features, the PHA must notify the family and the owner within 30 days of the PHA’s determination. The PHA’s offer of continued housing assistance (that must be made within 60 days of the PHA’s determination) must be in the form of either a VASH tenant-based voucher or another VASH PBV unit. If no VASH assistance is available for the PHA to offer within 60 days of the PHA’s determination, the PHA must remove the wrongsized or accessible unit from the HAP contract to make VASH voucher assistance available to the family.

Contract Terminations
The regulation at 24 CFR 983.206(b), which covers the required provision of tenant-based assistance and requires that the family may elect to use its tenant-based assistance to remain in the same project when a PBV HAP contract terminates or expires, does not apply to families issued a HUD-VASH tenant-based voucher under this circumstance. The PHA may use another voucher to add the unit removed under this alternative requirement to the HAP contract after the family vacates the property, in accordance with 24 CFR 983.207(b).

Rents
Contract rents may not be different based on whether the unit is a VASH PBV unit or a nonVASH PBV unit. In determining the rent to owner for the PBV project, if the cap on the amount of rent to owner under 24 CFR 983.301(b)(1) is lower for non-HUD-VASH units than it is for the HUD-VASH units (e.g., the PHA has established a HUD-VASH exception payment standard and there is either no exception payment standard or a lower exception payment standard for the regular HCV program for the area in question), that lower cap is applicable when setting the rent to owner for the PBV units in the project, including the HUD-VASH units.

Removing Units from the HAP Contract for Ineligible Families The PHA and owner may also agree to temporarily remove a unit from the HAP contract in cases where a HUDVASH eligible veteran has been identified by the VA as appropriate for a VASH PBV unit, but the veteran is not income eligible to receive voucher assistance or may not be selected for the PBV unit because the family’s TTP exceeds the gross rent of the unit. Although the family would not be a program participant in the housing portion of the VASH program in such a case, the family would still benefit from the project’s location on the grounds of a VA facility or from the VASH supportive services on-site at the project, while the VASH voucher would be available to assist another VASH family. The PHA and owner may agree to add a VASH voucher back onto the PBV HAP contract if the family’s income subsequently decreased to the point that there would be a HAP or when the family vacates the unit.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-33
Zero HAP Families
Under normal PBV requirements, the PHA may select an occupied unit to be included under a PBV HAP contract only if the unit’s occupants are eligible for assistance under 24 CFR 982.201, and the TTP for the family is less than the gross rent for the unit. Furthermore, in selecting a family for an available PBV unit, typically the PHA must determine the TTP for the family is less than the gross rent, meaning that the unit will be eligible for a monthly HAP. However, if the PBV project is either on the grounds of a VA facility or there are HUD-VASH supportive services provided onsite at the project, the PHA may opt to select a unit occupied by a zero HAP VASH eligible family or admit a zero HAP VASH family to a unit if such unit is made exclusively available to VASH families. Until such time that the VASH family’s TTP falls below the gross rent, the family is responsible for paying the entire rent to owner in addition to being responsible for paying all tenant-supplied utilities. During any period that the family’s TTP falls below the gross rent, normal PBV requirements apply.

Further, under normally applicable rules, units occupied by families whose incomes have increased during their tenancy resulting in their TTP equaling the gross rent (zero HAP) must be removed from the HAP contract 180 days following the last housing assistance payment to the owner on the family’s behalf. These regulations do not apply to zero HAP families admitted to the PBV project under this waiver and alternative requirement because there is no last housing assistance payment that would trigger the unit removal date of 180 days. As an alternative requirement, PHAs have the option of removing the unit in which the zero HAP family resides from the HAP contract, but no earlier than 180 days from the start of the family PBV tenancy. If the PHA exercises this option, the family may not be required to move from the unit as a consequence and continues to receive the VASH supportive services. If the project is fully assisted, the PHA may reinstate the unit removed to the HAP contract after the family either vacates the unit or their income decreases to the point that there would be a HAP. If the project is partially assisted, the PHA may substitute a different unit for the unit removed from the HAP contact when the first eligible substitute unit becomes available. Alternatively, the PHA may choose to simply leave the unit on the HAP contract while the zero HAP family continues to reside there.

Proposal/Project Selection
PBV proposal and/or project selection for VASH must follow all regular proposal and/or project selection regulations, with one exception. HUD permits noncompetitive selection of one or more PBV projects with units made exclusively available to VASH families on the site of a VA facility. Note that the method of project selection must comply with all other requirements under 24 CFR 983.51, including that the PHA must notify the public of its intent to noncompetitively select one or more projects for PBV assistance through its 5-Year Plan and to ensure any project selection is consistent with the PHA administrative plan.

Special Purpose Vouchers Redondo Beach Housing Authority December 2025 Page 19-34
Failure to Participate in Case Management [FR Notice 8/13/24] Upon notification by the VAMC or DSP of the family’s failure to participate, without good cause, in case management, the PHA must provide the family a reasonable time period to vacate the unit. The PHA must terminate assistance to the family at the earlier of either the time the family vacates or the expiration of the reasonable time period given to vacate.

PHA Policy
Upon notification by the VAMC or DSP that a VASH PBV family has failed to participate in case management without good cause, the PHA will provide written notice of termination of assistance to the family and the owner within 10 business days. The family will be given 60 days from the date of the notice to move out of the unit.

The PHA may make exceptions to this 60-day period if needed for reasons beyond the family’s control such as death, serious illness, or other medical emergency of a family member.

If the family fails to vacate the unit within the established time, the owner may evict the family.

If the owner does not evict the family, the PHA must remove the unit from the HAP contract or amend the HAP contract to substitute a different unit in the project if the project is partially assisted. The PHA may add the removed unit to the HAP contract after the ineligible family vacates the property.

Moves [HUD-VASH Qs and As, FR Notice 8/13/24]
When a VASH PBV family is eligible to move from its PBV unit in accordance with Section 17- VIII.C. of this policy, but there is no other comparable tenant-based rental assistance, the following procedures must be implemented:
• If a VASH tenant-based voucher is not available at the time the family wants (and is eligible) to move, the PHA may require a family who still requires case management to wait for a VASH tenant-based voucher for a period not to exceed 180 days; • If a VASH tenant-based voucher is still not available after that period, the family must be allowed to move with its VASH voucher. Alternatively, the PHA may allow the family to move with its VASH voucher without having to meet this 180-day period. In either case, the PHA is required to replace the assistance in the PBV unit with one of its regular vouchers, unless the PHA and owner agree to temporarily remove the unit from the HAP contract; and • If a VASH veteran is determined to no longer require case management, the PHA must allow the family to move with the first available tenant-based voucher if no VASH voucher is immediately available and cannot require the family to wait for a VASH voucher to become available.

RESOLUTION NO. HA-2025-89

A RESOLUTION OF THE HOUSING AUTHORITY OF THE CITY OF REDONDO

BEACH, CALIFORNIA, APPROVING THE ADMINISTRATIVE PLAN FOR THE HOUSING CHOICE VOUCHER (SECTION 8) PROGRAM
WHEREAS, the Housing Authority of the City of Redondo Beach (“Housing Authority”) administers the Housing Choice Voucher (Section 8) rental assistance program in accordance with the regulations of the U.S. Department of Housing and Urban Development (“HUD”); and WHEREAS, HUD regulations required each Public Housing Agency to adopt an Administrative Plan setting forth the policies and procedures governing the day to day operation of the Section 8 rental assistance program;
WHEREAS, the Housing Authority conducted a duly noticed public hearing on December 2, 2025, to receive public comments regarding the adoption of the Administrative Plan; and

NOW, THEREFORE, THE HOUSING AUTHORITY OF THE CITY OF REDONDO BEACH, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. That the Housing Authority of the City of Redondo Beach has prepared the Administrative Plan in accordance with the HUD guidelines.

SECTION 2. That the Board of Commissioners of the Housing Authority of the City of Redondo Beach hereby approves the Administrative Plan for the Housing Choice Voucher Program.

SECTION 3. That the Housing Authority of the City of Redondo Beach is authorized and directed to submit the Administrative Plan to HUD upon adoption of this Resolution.

SECTION 4. That the Clerk-Controller of the Housing Authority shall certify the passage and adoption of this resolution and shall enter the same in the Book of Original Resolutions.

PASSED, APPROVED AND ADOPTED this 2nd day of December, 2025. _______________________________
James A Light, Chairman
APPROVED AS TO FORM: ATTEST:
________________________________ ________________________________ Joy A. Ford, Legal Counsel of the Eleanor Manzano, Clerk-Controller Housing Authority of the Housing Authority

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss

CITY OF REDONDO BEACH )
I, Eleanor Manzano, Clerk-Controller of the Housing Authority of the City of Redondo Beach, California, do hereby certify that Resolution No. HA-2025-89 was passed and adopted by the Housing Authority of the City of Redondo Beach, California, at a regular meeting of said Housing Authority held on the 2nd day of December, 2025, and thereafter signed and approved by the Chairperson and attested by the Clerk-Controller of the Housing Authority, and that said resolution was adopted by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
_______________________
Eleanor Manzano, CMC
Clerk-Controller
Administrative Report
Authority Action Date: December 2, 2025
To: CHAIRMAN AND MEMBERS OF THE HOUSING AUTHORITY
From: ELIZABETH HAUSE, HOUSING ADMINISTRATOR
Subject: PUBLIC HEARING TO CONSIDER THE AGENCY ANNUAL PLAN FOR FISCAL YEAR 2025-2026 AND AGENCY FIVE-YEAR PLAN FOR
FISCAL YEARS 2026-2030 SIGNIFICANT AMENDMENTS; AND
RESOLUTION NO. HA-2025-88, A RESOLUTION OF THE HOUSING

AUTHORITY OF THE CITY OF REDONDO BEACH, CALIFORNIA,

APPROVING THE SIGNIFICANT AMENDMENDED PLANS AND
AUTHORIZE THE SUBMISSION TO THE U.S. DEPARTMENT OF
HOUSING AND URBAN DEVELOPMENT.

URECOMMENDATION
Staff recommends the Board conduct a public hearing for public comments on the significant amendments to the Annual Public Housing Agency (PHA) Plan for Fiscal Year 2025-2026 and the Five Year PHA Plan for Fiscal Years 2026-2030, approve the significant amendments to the Annual PHA Plan for FY2025-2026 and the Five-Year PHA Plan for FYs 2026-2030, and adopt the attached Resolution approving the Plans.

UEXECUTIVE SUMMARY
The U.S. Department of Housing and Urban Development (HUD) requires Public Housing Authorities (PHAs) to maintain an Annual and 5-Year PHA Plan. The Board approved the current Annual for FY 2025-2026 and 5-Year for FYs 2026-2030 plans earlier this year.

New Housing Opportunity Through Modernization Act of 2016 (HOTMA) provisions changed regulations that require PHAs to implement in 2025. As a result, the Redondo Beach Housing Authority (RBHA) drafted an update of the Administrative Plan to include HOTMA requirements.

The update to the Administrative Plan results in drastic changes that require an amendment to the Annual PHA Plan for FY2025-2026 and the 5-Year PHA Plan for FYs 2026-2030 to include the updated policies and procedures. The RBHA must repeat the required approval steps before submitting to HUD. Staff recommends the Board open the public hearing for public comment, adopt the resolution, and approve the amended PHA plans.

Administrative Report December 2, 2025
Public Hearing Agency Plans

Page 2 ends

BACKGROUND
In 1998, HUD published Section 511 of the Quality Housing and Work Responsibility Act of 1998 (QHWRA), creating significant changes and new requirements for administration of the Section 8 Program. One requirement of QHWRA mandates that PHAs prepare an Agency Annual PHA Plan and Five-Year PHA Plan. It was HUD’s intent that the Annual Plan would provide detailed information about the annual status of the Housing Choice Voucher (Section 8) program and that the Five-Year portion of the Plan would describe the Housing Authority’s overall mission and long term goals.

On March 11, 2025, the Housing Authority Board approved the Annual PHA Plan for FY 2025-2026, the 5-Year PHA Plan for FYs Ending 2026-2030, and executed HUD required forms and certifications. The Plans and related documents were submitted to HUD.

HOTMA, which was finalized in 2023, revised HUD regulations and required the implementation of these revision by 2025. To comply with HOTMA, the RBHA requires revision of the administrative plan to reflect compliance with the new federal regulations, updates, and to set or revise policy on matters for which HUD allows discretion.

Section B.1 of the Annual PHA Plan identifies PHA Plan elements revised since the last Annual Plan submission. Section C.1 of the 5-Year PHA Plan identifies a significant amendment or modification to the plan should there be drastic changes or extenuating circumstances that will prohibit the Housing Authority from fulfilling the goals set forth in the agency plan. The revision to the administrative plan changed the Housing Authority’s goals, plans, and objectives and that resulted in a significant amendment to the Annual PHA Plan for FY 2025-2026 and the 5-Year PHA Plan for FYs 2026-2030.

The Resident Advisory Board (RAB) consisting of program participants were invited to review, discuss, and comment regarding the changes. The RAB met on November 7, 2025, however, no comments were made.

A significant amendment requires formal approval of the Board of Commissioners and a full public hearing process before the revised PHA Plans are submitted to HUD for approval. It is recommended for the Board to open the public hearing, accept public comments, and approve the revised plans.

Administrative Report December 2, 2025
Public Hearing Agency Plans

Page 3 ends

COORDINATION
This report was prepared by the Housing Division of the Community Services Department.

FISCAL IMPACT
The Housing Choice Voucher (Section 8) rental assistance program is funded by the U.S.

Department of Housing and Urban Development (HUD). Preparation of this report is part of the Department’s annual work plan and operating budget. There is no additional fiscal impact.

Submitted by: Approved for forwarding by:

Elizabeth Hause, Housing Administrator Mike Witzansky, City Manager Attachments:
 Streamlined Annual PHA Plan (form HUD-50075-
HCV)
 5-Year PHA Plan (form HUD-50075-5Y)
 Proof of Publication
 Resolution No. HA2025-88
 Public Comment Received
Streamlined Annual
PHA Plan
(HCV Only PHAs)
U.S. Department of Housing and Urban Development
Office of Public and Indian Housing
OMB No. 2577-0226
Expires 03/31/2024

Page 1 of 6 ends

Purpose. The 5-Year and Annual PHA Plans provide a ready source for interested parties to locate basic PHA policies, rules, and requirements concerning the PHA’s operations, programs, and services, including changes to these policies, and informs HUD, families served by the PHA, and members of the public of the PHA’s mission, goals and objectives for serving the needs of low- income, very low- income, and extremely low- income families Applicability. The Form HUD-50075-HCV is to be completed annually by HCV-Only PHAs. PHAs that meet the definition of a Standard PHA, Troubled PHA, High Performer PHA, Small PHA, or Qualified PHA do not need to submit this form. Where applicable, separate Annual PHA Plan forms are available for each of these types of PHAs.

Definitions.
(1) High-Performer PHA – A PHA that owns or manages more than 550 combined public housing units and housing choice vouchers, and was designated as a high performer on both the most recent Public Housing Assessment System (PHAS) and Section Eight Management Assessment Program (SEMAP) assessments if administering both programs, or PHAS if only administering public housing. (2) Small PHA - A PHA that is not designated as PHAS or SEMAP troubled, that owns or manages less than 250 public housing units and any number of vouchers where the total combined units exceed 550.
(3) Housing Choice Voucher (HCV) Only PHA - A PHA that administers more than 550 HCVs, was not designated as troubled in its most recent SEMAP assessment and does not own or manage public housing.
(4) Standard PHA - A PHA that owns or manages 250 or more public housing units and any number of vouchers where the total combined units exceed 550, and that was designated as a standard performer in the most recent PHAS and SEMAP assessments. (5) Troubled PHA - A PHA that achieves an overall PHAS or SEMAP score of less than 60 percent. (6) Qualified PHA - A PHA with 550 or fewer public housing dwelling units and/or housing choice vouchers combined and is not PHAS or SEMAP troubled.

A. PHA Information.

A.1 PHA Name: _Housing Authority of the City of Redondo Beach _________________ PHA Code: __CA103________ PHA Plan for Fiscal Year Beginning: (MM/YYYY): __07/2025_____ PHA Inventory (Based on Annual Contributions Contract (ACC) units at time of FY beginning, above) Number of Housing Choice Vouchers (HCVs) __648____________ PHA Plan Submission Type: Annual Submission Revised Annual Submission Availability of Information. In addition to the items listed in this form, PHAs must have the elements listed below readily available to the public.

A PHA must identify the specific location(s) where the proposed PHA Plan, PHA Plan Elements, and all information relevant to the public hearing and proposed PHA Plan are available for inspection by the public. Additionally, the PHA must provide information on how the public may reasonably obtain additional information of the PHA policies contained in the standard Annual Plan but excluded from their streamlined submissions. At a minimum, PHAs must post PHA Plans, including updates, at the main office or central office of the PHA. PHAs are strongly encouraged to post complete PHA Plans on their official website.

The proposed PHA Plan for FY 2025-2026 is available to view at the Housing Authority’s website: www.redondo.org/housing or at the Housing Authority Office located at 1922 Artesia Boulevard, Redondo Beach, CA 90278. The Notice of Public Hearing was posted on the City’s website, City offices and in the Redondo Beach Easy Reader.

PHA Consortia: (Check box if submitting a joint Plan and complete table below) Participating PHAs PHA Code Program(s) in the Consortia Program(s) not in the Consortia No. of Units in Each Program
Lead HA:

Page 2 of 6 ends

B. Plan Elements.

B.1
Revision of Existing PHA Plan Elements.
a) Have the following PHA Plan elements been revised by the PHA since its last Annual Plan submission? Y N
Statement of Housing Needs and Strategy for Addressing Housing Needs.

Deconcentration and Other Policies that Govern Eligibility, Selection, and Admissions.

Financial Resources.

Rent Determination.

Operation and Management.

Informal Review and Hearing Procedures.

Homeownership Programs.

Self Sufficiency Programs and Treatment of Income Changes Resulting from Welfare Program Requirements.

Substantial Deviation.

Significant Amendment/Modification.
(b) If the PHA answered yes for any element, describe the revisions for each element(s):

The Redondo Beach Housing Authority modified its goals and objectives with the following “Significant Amendment or Modification” to its administrative plan that resulted in “Significant Amendments or Modifications” to the 5-Year and Annual Plan:
-Modify the agency subsidy standards, increase the agency’s minimum rent, implement the reduction of payment standards, implement asset limitation for all program participants, and revise the administrative plan to incorporate all of the significant amendments.

B.2 New Activities. – Not Applicable
B.3 Progress Report.

Provide a description of the PHA’s progress in meeting its Mission and Goals described in its 5-Year PHA Plan.

The City of Redondo Beach Housing Authority (RBHA) strives to provide affordable, safe and habitable housing to income eligible residents in the private market. We continue to do so by monitoring the Fair Market Rents as set forth by the Department of Housing and Urban Development (HUD).

The payment standards for the HCV and the EHV program are at or above 93% of the Federal Fiscal Year (FFY) 2025 Small Area Fair Market Rents.

The VASH payment standards for are set at 129% of the Federal Fiscal Year (FFY) 2025 Fair Market Rents for Los Angeles County.

The RBHA strives to maintain a ‘High Performer’ Section 8 Management Assessment Program (SEMAP) status with HUD. All 50058s and required inspections are submitted timely, MTCS errors are immediately corrected, and EIV reports are monitored regularly. The RBHA’s final SEMAP score for the fiscal year ended 6/30/2024 was 96%.

The RBHA is dedicated to the professional development of staff. The RBHA is preparing all staff with the training necessary for the implementation of HOTMA and NSPIRE effective 7/01/2025. All staff participated in Fair Housing training, NSPIRE for HCV training and HOTMA HCV Specialist training. Additionally, all staff participated in the following live webinars, Working with Difficult People, How to Deal with Hoarding Residents, Unauthorized Pets, Tenant Drugs and Noise Complaints and One Dog, Two Dogs, Three Dogs, Peacock? Assistive Animals and You!
Last year the RBHA was able to batch 200 families from the waiting list and will continue to select from the current waiting list as many applicants as our funding permits. Our waiting list is down to less than 1,000 applicants. Later this year, the Housing Authority may open the waiting list.

In July of 2024, the Redondo Beach Housing Authority was able to implement a Project-Based Voucher program. The RBHA allocated 20 projectbased vouchers to a Homekey site known as the Moonstone. Preference for participation in the PBV program is being given to the homeless families of Redondo Beach currently residing in the City’s transitional pellet shelter.

The Redondo Beach Housing Authority was able to add 12 new participating owners to the Section 8 program and is diligently working towards maintaining positive relationships with our current owners. We continue to partner with the Housing Rights Center (HRC) to promote fair housing and equal opportunity to all members of the community.

RBHA staff works closely with owners and tenants to help deescalate and resolve conflict. The Housing Authority has solicited the services of Choice
Mediation for situations of high tension amongst program participants and/or landlords.

B.4 Capital Improvements. – Not Applicable

Page 3 of 6 ends

B.5 Most Recent Fiscal Year Audit.
(a) Were there any findings in the most recent FY Audit?

Y N N/A

(b) If yes, please describe:

C. Other Document and/or Certification Requirements.

C.1 Resident Advisory Board (RAB) Comments.
(a) Did the RAB(s) have comments to the PHA Plan?
Y N

(b) If yes, comments must be submitted by the PHA as an attachment to the PHA Plan. PHAs must also include a narrative describing their analysis of the RAB recommendations and the decisions made on these recommendations.

C.2 Certification by State or Local Officials.

Form HUD 50077-SL, Certification by State or Local Officials of PHA Plans Consistency with the Consolidated Plan, must be submitted by the PHA as an electronic attachment to the PHA Plan.

C.3 Civil Rights Certification/ Certification Listing Policies and Programs that the PHA has Revised since Submission of its Last Annual Plan.

Form HUD-50077-ST-HCV-HP, PHA Certifications of Compliance with PHA Plan, Civil Rights, and Related Laws and Regulations Including PHA Plan Elements that Have Changed, must be submitted by the PHA as an electronic attachment to the PHA Plan.

C.4
Challenged Elements. If any element of the PHA Plan is challenged, a PHA must include such information as an attachment with a description of any challenges to Plan elements, the source of the challenge, and the PHA’s response to the public. (a) Did the public challenge any elements of the Plan?
Y N

If yes, include Challenged Elements.

D. Affirmatively Furthering Fair Housing (AFFH).

D.1 Affirmatively Furthering Fair Housing (AFFH).

Provide a statement of the PHA’s strategies and actions to achieve fair housing goals outlined in an accepted Assessment of Fair Housing (AFH) consistent with 24 CFR § 5.154(d)(5). Use the chart provided below. (PHAs should add as many goals as necessary to overcome fair housing issues and contributing factors.) Until such time as the PHA is required to submit an AFH, the PHA is not obligated to complete this chart. The PHA will fulfill, nevertheless, the requirements at 24 CFR § 903.7(o) enacted prior to August 17, 2015. See Instructions for further detail on completing this item.

Fair Housing Goal:

Describe fair housing strategies and actions to achieve the goal One of the main focuses of the RBHA is to assist families secure housing without regard to their race, color, religion, gender, sexual orientation, national origin or familial status. We do so through Fair Housing education and advocacy. The RBHA works closely with the Housing Rights Center (HRC) to ensure proper Fair Housing information distribution to program applicants, participants and landlords. As part of the voucher briefing process, the RBHA provides program applicants with pertinent information and informational brochures about fair housing. Fair Housing posters are visible in prominent areas at our offices. Furthermore, the RBHA consults with the Housing Rights Center, the City Attorney’s office, and the HUD field office for guidance and/or clarity on difficult issues. At least once a year, all RBHA staff participates in Fair Housing trainings provided by the Housing Rights Center to ensure that fair housing efforts continue to be implemented. A similar workshop is then offered to all Redondo Beach residents.

Fair Housing Goal:

Page 4 of 6 ends