Page i
Interim 2025 Sewer System
Management Plan Update (SSMP)
Prepared to Maintain Compliance with State Water Resources Control Board Order No.

WQ 2022-0103-DWQ Pending CompleƟon of the City’s Comprehensive SSMP and Sewer System EvaluaƟon Program
Sanitary Sewer CollecƟon System
Waste Discharge ID (WDID): # 4SSO10421
REVIEWED AND APPROVED BY:

GERALDINE TRIVEDI, P.E.

Legally Responsible Official
City of Redondo Beach
Sanitary Sewer CollecƟon System
(Element Development Plans & Schedules)
Date Signed

TABLE OF CONTENTS
Page iii

TABLE OF CONTENTS
INTRODUCTION .................................................................................................................................................. 1 SSMP OrganizaƟon ..................................................................................................................................................................... 3 AbbreviaƟons and Acronyms ...................................................................................................................................................... 4

1. GOAL AND INTRODUCTION ......................................................................................................................... 5

1.1. Regulatory Context ............................................................................................................................................................ 5

1.2. SSMP Update Schedule ...................................................................................................................................................... 6

1.3. Sewer System Asset Overview ........................................................................................................................................... 8 SpecificaƟons 5.2 – SSMP Development and ImplementaƟon ................................................................................................. 11 SpecificaƟons 5.7 – AllocaƟon of Resources ............................................................................................................................. 12 Provisions 6.1 - Enforcement Provisions ................................................................................................................................... 13 Provisions 6.3 Sewer System Management Plan Availability .................................................................................................... 14

2. ORGANIZATION .......................................................................................................................................... 15

2.1. OrganizaƟonal Chart ........................................................................................................................................................ 19

2.2. Chain of CommunicaƟon for ReporƟng Spills .................................................................................................................. 20

3. LEGAL AUTHORITY ..................................................................................................................................... 22

4. OPERATION AND MAINTENANCE PROGRAM .............................................................................................. 24

4.1. Updated Map of Sewer System ....................................................................................................................................... 24

4.2. PrevenƟve OperaƟon and Maintenance AcƟviƟes .......................................................................................................... 26

4.3. Training ............................................................................................................................................................................ 28

4.4. Equipment Inventory ....................................................................................................................................................... 30 SpecificaƟons 5.19 - OperaƟons and Maintenance .................................................................................................................. 32

5. DESIGN AND PERFORMANCE PROVISIONS ................................................................................................. 33

5.1. Updated Design Criteria/ConstrucƟon Standards/SpecificaƟons .................................................................................... 33

5.2. Procedures and Standards ............................................................................................................................................... 34

6. SPILL EMERGENCY RESPONSE PLAN ........................................................................................................... 35

7. SEWER PIPE BLOCKAGE PROGRAM ............................................................................................................ 37

8. SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS ................................................... 41

8.1. System EvaluaƟon and CondiƟon Assessment ................................................................................................................ 41

8.2. Capacity Assessment and Design Criteria ........................................................................................................................ 45

8.3. PrioriƟzaƟon of CorrecƟve AcƟon ................................................................................................................................... 48

8.4. Capital Improvement Plan ............................................................................................................................................... 50

9. MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS ............................................................. 53

10. INTERNAL AUDITS ...................................................................................................................................... 55

11. COMMUNICATION PROGRAM .................................................................................................................... 57 LIST OF APPENDICIES (NOT INCLUDED HEREIN) .................................................................................................. 59

TABLE OF CONTENTS
Page iv

LIST OF FIGURES
Figure 1 - CollecƟon System OperaƟonal Report – SWRCB CIWQS .............................................................................. 2 Figure 2 - City Vicinity Map and Sewer Service Area, available online ......................................................................... 9 Figure 3 – City OrganizaƟon Chart .............................................................................................................................. 19

LIST OF TABLES
Table 1 - AbbreviaƟons and Acronyms .......................................................................................................................... 4 Table 2 - City SSMP AcƟvity Reference Table .............................................................................................................. 16

OVERVIEW

Page 1 of 56 ends

IntroducƟon
This Sewer System Management Plan (SSMP) Update or “Plan” has been prepared for the CITY (City) with technical assistance from Fischer Compliance LLC for meeƟng and exceeding compliance with the State Water Resources Control Board’s 2022 General Waste Discharge Requirements, Order WQ 2022-0103-DWQ for Sanitary Sewer Systems (referred to throughout this document as the WDR). The City provided all details, informaƟon and insƟtuƟonal insights for preparaƟon of the SSMP. The document has been developed to meet the size, scale, and complexity, serving as a “living document” used as a tool for managing and operaƟng the City's sanitary sewer collecƟon system. AddiƟonally, the latest 2024 Sewer System Management Plan Guidance Manual published by the Bay Area Clean Water City (BACWA) was uƟlized as a model for development of the document to harmonize formaƫng/content and incorporate recommended suggested guidance wherever possible.

The City’s commitment to meeƟng or exceeding regulatory requirements, along with their proacƟve approach to operaƟon and management of the collecƟon system, has served them well, as evidenced by system performance relaƟve to other agencies in the region and the state.

This Interim SSMP Update reflects the ongoing day-to-day acƟviƟes of the City for the management, operaƟon, maintenance, and funding of the City’s sanitary collecƟon system. It is subject to review and revision as system condiƟons, regulatory requirements, operaƟonal needs, and supporƟng technical informaƟon change. The City has also iniƟated a separate comprehensive sewer system evaluaƟon and long-range planning effort, which will include CCTV, condiƟon assessment, hydraulic modeling, capacity evaluaƟon, O&M review, and capital improvement planning. Findings from that effort will be incorporated into future SSMP updates, amendments, or implementaƟon documents, as appropriate.

The City submiƩed interim compliance documentaƟon into CIWQS on August 4, 2025, as an interim update pending City Council adopƟon in order to meet applicable regulatory deadlines. Following City Council adopƟon, the City will upload the City Council-adopted version of the Interim 2025 SSMP Update into CIWQS and make it available for public review in accordance with the Order.

OVERVIEW

Page 2 of 56 ends

Figure 1 below (CollecƟon System OperaƟonal Report in CIWQS) provides key City spill metrics, including data comparing the City’s spill record with state and regional system data. The City consistently performs beƩer than the statewide and regional spill rate indices and net spill volumes for all categories of spills from its sanitary sewer collecƟon system.

Figure 1 - CollecƟon System OperaƟonal Report – SWRCB CIWQS

OVERVIEW

Page 3 of 56 ends

SSMP OrganizaƟon
This SSMP Update is organized into 11 core elements following AƩachment D of the WDR, with inclusion of applicable SpecificaƟons requirements.

Each updated individual element in the SSMP Update includes the following technical contents, if applicable. υ. Requirements – Provides the actual descripƟon of applicable requirements in the WDR. φ. Compliance – Describes the City’s approach to complying with the WDR requirements. χ. EffecƟveness – As measured by Key Performance Indicators. ψ. ImplementaƟon – Demonstrates how the City will ensure the SSMP will be carried out as described. ω. Resilience – Demonstrates the resilience that is addressed in the SSMP and built-in to the City’s collecƟon system and procedures.
ϊ. Appendix Inclusions – List the items included in the Appendix for each SSMP Element, if any, to be added in the final SSMP.

OVERVIEW

Page 4 of 56 ends

AbbreviaƟons and Acronyms1
BMP Best Management PracƟces
CCTV Closed Circuit Television
CIP Capital Improvement Program
CIPP Cured in Place Pipe
CIWQS California Integrated Water Quality System (State Water Board Online Spill Database) CMMS Computerized Maintenance Management System
EPA US Environmental ProtecƟon City
FOG Fats, Oils and Grease
FSE Food Service Establishment
GCD Grease Control Device
GIS Geographic InformaƟon System
I & I Inflow and InfiltraƟon
LRO Legally Responsible Official
MRP Monitoring and ReporƟng Program
NPDES NaƟonal Pollutant Discharge EliminaƟon System
RWQCB Regional Water Quality Control Board
SCADA Supervisory Control and Data AcquisiƟon
SERP Spill Emergency Response Plan
SOP Standard OperaƟng Procedure
SSMP Sewer System Management Plan
Spill Sanitary Sewer Spill
WDR Sanitary Sewer Systems General Wastewater Discharge Requirements Order issued by the State Water Board (Order No. 2022-0103-DWQ)
SWRCB State Water Resources Control Board
WDID Waste Discharge ID Number (CIWQS)
1 For a list of related WDR terms, see the W DR, Attachm ent A (page 32) Table 1 - AbbreviaƟons and Acronyms

Page 5 of 56 ends

1. Goal and IntroducƟon

WDR REQUIREMENTS
AƩ. D-1 (pg. D-2)
“The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to: (1) properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s), (2) reduce and prevent spills, and (3) contain and miƟgate spills that do occur.

The Plan must include a narraƟve IntroducƟon secƟon that discusses the following items:”

1.1. Regulatory Context

WDR REQUIREMENTS
AƩ. D-1.1 (pg. D-2)
“The Plan IntroducƟon secƟon must provide a general descripƟon of the local sewer system management program and discuss Plan implementaƟon and updates”.

COMPLIANCE
The City maintains the local sanitary sewer system and is commiƩed to protecƟng the public’s health and the environment. Federal and State Water Quality regulaƟons require agencies to maintain a comprehensive Sewer System Management Plan (SSMP) with the goal of prevenƟng sewage spills.

The City is commiƩed to fully implemenƟng the 2022 WDR which includes addressing all requirements by integraƟng a wide range of programs specifically designed for ensuring the integrity and efficiency of the City’s sanitary sewer collecƟon system. Moreover, the City is dedicated to maintaining its collecƟon system in a systemaƟc manner by implemenƟng various work programs, with a focus on criƟcal areas, to prevent spills, allowing for a comprehensive approach to maintenance. Work programs include CCTV inspecƟons, pipe cleaning, manhole inspecƟons, liŌ staƟon maintenance, root control, source control and pipe repair, just to name a few. Work programs are described in more detail in SecƟon 4.5 “SpecificaƟons 5.19 - OperaƟon and Maintenance” of this SSMP Update.

The City recognizes that addiƟonal technical evaluaƟon and long-range planning efforts are necessary to further support implementaƟon of the SSMP. Accordingly, the City has iniƟated a comprehensive sewer system evaluaƟon program that includes CCTV, hydraulic modeling, risk-based condiƟon assessment, operaƟons and maintenance evaluaƟon, flow monitoring, pump staƟon assessment, SCADA review, and development of a prioriƟzed 5-, 10-, and 20-year Capital Improvement Program. Results from these efforts will be incorporated into future SSMP updates and implementaƟon acƟviƟes.

By prioriƟzing proacƟve measures and taking a comprehensive approach, the City is well-equipped with a proven track record of effecƟvely operaƟng its sanitary sewer collecƟon system with the highest levels of service, complying with the WDR, and reducing/eliminaƟng sewage spills.

Page 6 of 56 ends

1.2. SSMP Update Schedule

WDR REQUIREMENTS
AƩ. D-1.2 (pg. D-3)
“The Plan IntroducƟon secƟon must include a schedule for the Enrollee to update the Plan, including the schedule for conducƟng internal audits. The schedule must include milestones for incorporaƟon of acƟviƟes addressing prevenƟon of sewer spills.”

COMPLIANCE
The City uƟlizes the State Water Board’s online lookup tool to ensure compliance with all required due dates for updaƟng its SSMP and compleƟng its required SSMP Audits.

The City’s most recent SSMP audit was completed for the period August 2021 through August 2024 (see Appendix 10.1).

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Are SSMP Updates being performed as scheduled?
 Has the SSMP been approved by the City Council on the required schedule?  Are specific internally established sewer program milestones being monitored?

Page 7 of 56 ends

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

1.2.1 Prepare for next SSMP Audit Begin 5/2/2027 X X X

1.2.2 Complete and Upload SSMP audit. By 11/2/2027 X X

1.2.3 Incorporate Audit Findings, update Change
Log and Update SSMP 5/2/2025 X

1.2.4 DraŌ 2025 Interim Compliance SSMP Update
SubmiƩed to CIWQS
8/4/2025 X X

1.2.5 Council Approval for 2025 Interim Compliance
SSMP Update By 6/30/2026 X X

1.2.6 Council Approval and LRO CerƟficaƟon of
SSMP By 8/2/2031 X X

Page 8 of 56 ends

1.3. Sewer System Asset Overview

WDR REQUIREMENTS
AƩ. D-1.3 (pg. D-3)
“The Plan IntroducƟon secƟon must provide a descripƟon of the Enrollee-owned assets and service area, including but not limited to:
 LocaƟon, including county(ies);
 Service area boundary;
 PopulaƟon and community served;
 System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump staƟons and siphons;
 Structures diverƟng stormwater to the sewer system;
 Data management systems;
 Sewer system ownership and operaƟon responsibiliƟes between Enrollee and private enƟƟes for upper and lower sewer laterals;
 EsƟmated number or percentage of residenƟal, commercial, and industrial service connecƟons; and
 Unique service boundary condiƟons and challenge(s).
 AddiƟonally, the Plan IntroducƟon secƟon must provide reference to the Enrollee’s up-to-date map of its sanitary sewer system, as required in secƟon 4.1 (Updated Map of Sanitary Sewer System) of this AƩachment.”

COMPLIANCE
The City is located in Los Angeles county and provides wastewater collecƟon services to the City of Redondo Beach (see Figure 3, Vicinity Map of sewer system below), with an approximate (total populaƟon of 69,000.

The City collecƟon system consists of 112 miles of gravity mains, 2 miles of force mains, 14 pump staƟons and 6 siphons.

Unique challenges include the following:
 Periodic inflow and infiltraƟon from Ɵdal flows into sewers.  Cleaning sewers in the City’s boardwalk approximately 6 Ɵmes per year, including cleanings during most major holidays.
 Some sewers and easements present maintenance challenges due to restricted access. All porƟons of these faciliƟes can be maintained, but the effort to do so is Ɵme-consuming, requiring addiƟonal staff and cooperaƟon and pre-planned coordinaƟon with property owners.  Boundary condiƟons and shared sewers maintained and serviced with adjacent ciƟes.

The collecƟon system has several low flow stormwater diversion structures installed and operated during dry weather (closed during wet weather). For addiƟonal details about the City’s collecƟon system, see the City’s most current Annual Report in the CIWQS database.

Page 9 of 56 ends

Figure 2 - City Vicinity Map and Sewer Service Area, available online

Page 10 of 56 ends

The City uƟlizes mulƟple data management system to operate and maintain its sanitary sewer collecƟon system:
(1) iWater Computerized Maintenance Management System (CMMS) for tracking work orders, maintenance acƟviƟes, and equipment records; (2) Geographic InformaƟon System (GIS) for maintaining up-to-date system maps and asset inventory; (3) SCADA (Supervisory Control and Data AcquisiƟon) for real-Ɵme monitoring and control of pump staƟons; and (4) SmartCover sensors at 47 sewer locaƟons for level and flow monitoring. Laterals are owned and maintained by the private property owners. Overall, the City is in a good posiƟon to maintain its collecƟon system and does not have operaƟon and maintenance challenges due the service area.

The City continues to maintain its up to date data system maps.

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Are asset staƟsƟcs periodically reviewed and updated as necessary?  Are omissions or errors addressed in a Ɵmely manner?
 Are system maps up to date?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

1.3.1 Review City-owned asset
staƟsƟcs and element
descripƟon; update as
necessary
At the beginning of the audit cycle
and when significant changes have
been made.

X X

RESILIENCE
Resilience is addressed in Element 1 by:
 Adhering to an SOP for collecƟng and managing asset data.  Redundancy: More than one member of staff is trained and able to retrieve and manage the data.  ImplemenƟng a QA/QC process to help ensure informaƟon is accurate.  Using Calendar Reminders to ensure compliance deadlines are met.

APPENDIX 1 INCLUSIONS:

1.1. City Council AdopƟon of Updated 2025 SSMP
The Interim 2025 SSMP Update is adopted for purposes of maintaining compliance with Order No. WQ 2022-0103- DWQ pending compleƟon of the City’s comprehensive sewer system evaluaƟon and long-range wastewater infrastructure planning effort.

Page 11 of 56 ends

SpecificaƟons 5.2 – SSMP Development and ImplementaƟon

WDR REQUIREMENTS
SpecificaƟon. 5.2 (pg. 18)
“To facilitate adequate local funding and management of its sanitary sewer system(s), the Enrollee shall develop and implement an updated Sewer System Management Plan. The scale and complexity of the Sewer System Management Plan, and specific elements of the Plan, must match the size, scale, and complexity of the Enrollee’s sanitary sewer system(s). The Sewer System Management Plan must address, at minimum, the required Plan elements in AƩachment D (Sewer System Management Plan – Required Elements) of this General Order. To be effecƟve, the Sewer System Management Plan must include procedures for the management, operaƟon, and maintenance of the sanitary sewer system(s). The procedures must: (1) incorporate the prioriƟzaƟon of system repairs and maintenance to proacƟvely prevent spills, and (2) address the implementaƟon of current standard industry pracƟces through available equipment, technologies, and strategies.”

COMPLIANCE
This SSMP Update has been completed updated to meet the requirements of Order WQ 2022-0103-DWQ and address all required Elements and SpecificaƟons required by the Order. The SSMP addresses management, operaƟons and maintenance procedures specific to the City’s collecƟon system. The City conƟnues to maintain and enhance its proacƟve O&M program to operate its system and idenƟfy defects, which are then prioriƟzed for repair, replacement, rehabilitaƟon, or placed on modified maintenance schedules.

The City conƟnues to keep up with current industry standards, technology and best pracƟces by reviewing industry periodicals, networking and aƩending industry conferences and workshops. The City also conƟnuously evaluates emerging pracƟces, equipment and technologies for possible implementaƟon to enhance operaƟons.

Page 12 of 56 ends

SpecificaƟons 5.7 – AllocaƟon of Resources

WDR REQUIREMENTS
SpecificaƟon. 5.7 (pg. 22)
“The Enrollee shall comply with the following requirements:
 Establish and maintain a means to manage all necessary revenues and expenditures related to the sanitary sewer system; and
 Allocate the necessary resources to its sewer system management program for:
o Compliance with this General Order,
o Full implementaƟon of its updated Sewer System Management Plan, o System operaƟon, maintenance, and repair, and
o Spill responses.”

COMPLIANCE
The City maintains various revenue sources to maintain financial stability, meet its operaƟonal needs and manage all necessary expenditures to operate its sewer system. The City equipment inventory and staffing levels are adequate to effecƟvely implement this SSMP, properly manage the collecƟon system, and respond to emergencies.

Page 13 of 56 ends

Provisions 6.1 - Enforcement Provisions

WDR REQUIREMENTS
Provisions 6.1 (pg. 27)
“The following enforcement provisions are based on exisƟng federal and state regulaƟons, laws and policies, including the federal Clean Water Act, the state Water Code and the State Water Board Enforcement Policy.”

COMPLIANCE
The City is aware of the consequences for noncompliance including associated penalƟes for violaƟons. The City maintains a proacƟve stance with full implementaƟon of its SSMP.

Noncompliance with requirements of this General Order or discharging sewage without enrolling in this General Order consƟtutes a violaƟon of the Water Code and a potenƟal violaƟon of the Clean Water Act and is grounds for an enforcement acƟon by the State Water Board or the applicable Regional Water Board.

Failure to comply with the noƟficaƟon, monitoring, inspecƟon, entry, reporƟng, and recordkeeping requirements may subject the City to administraƟve civil liabiliƟes of up to $10,000 a day per violaƟon pursuant to Water Code secƟon 13385; up to $1,000 a day per violaƟon pursuant to Water Code secƟon 13268; or referral to the AƩorney General for judicial civil enforcement. Discharging waste not in compliance with the requirements of this General Order or the Clean Water Act may subject the City to administraƟve civil liabiliƟes up to $10,000 a day per violaƟon and addiƟonal liability up to $10 per gallon of discharge not cleaned up aŌer the first 1,000 gallons of discharge; up to $5,000 a day per violaƟon pursuant to Water Code secƟon 13350 or up to $20 per gallon of waste discharged; or referral to the AƩorney General for judicial civil enforcement.

Page 14 of 56 ends

Provisions 6.3 Sewer System Management Plan Availability

WDR REQUIREMENTS
Provisions 6.3 (pg. 31)
“The Enrollee’s updated Sewer System Management Plan must be maintained for public inspecƟon at the Enrollee’s offices and faciliƟes and must be available to the public through CIWQS and/or on the Enrollee’s website, in accordance with secƟon 3.8 (Sewer System Management Plan ReporƟng Requirements) of AƩachment E1 (NoƟficaƟon, Monitoring, ReporƟng and Recordkeeping Requirements) of this General Order.”

COMPLIANCE
AŌer finalizing the SSMP Update and obtaining City Council approval, the City will upload the final document to the CIWQS database and will publish this document on the City website. In addiƟon, the SSMP is available for public review at City offices, by appointment, during regular business hours.

ORGANIZATION

Page 15 of 56 ends

2. OrganizaƟon

WDR REQUIREMENTS
AƩ. D-2 (pg. D-3)
“The Plan must idenƟfy organizaƟonal staffing responsible and integral for implemenƟng the local Sewer System Management Plan through an organizaƟon chart or similar narraƟve documentaƟon that includes:
 The name of the Legally Responsible Official as required in secƟon 5.1 (DesignaƟon of a Legally Responsible Official) of this General Order;
 The posiƟon Ɵtles, telephone numbers, and email addresses for management, administraƟve, and maintenance posiƟons responsible for implemenƟng specific Sewer System Management Plan Element;
 OrganizaƟonal lines of authority; and
 Chain of communicaƟon for reporƟng spills from receipt of complaint or other informaƟon, including the person responsible for reporƟng spills to the State and Regional Water Boards and other agencies, as applicable. (For example, county health officer, county environmental health City, and State Office of emergency Services.)

COMPLIANCE
The above items are addressed below:

City’s Legally Responsible Officials (LRO) are listed below:
 Geraldine Trivedi, P.E. (Civil Engineer)
The City’s LRO meets the requirements set forth in SpecificaƟons 5.1 of the WDR.

The City Departments with primary responsibility for the SSMP are the Engineering & Building Department and the Public Works Department. Table 3 below idenƟfies the posiƟon within these departments with corresponding SSMP acƟvity and responsibility. The responsibiliƟes included are “O” (Oversees), “P” (ParƟcipates), “D” (Develop & Update), and “I” (Implements). Specific SSMP responsibiliƟes for the core WDR requirements are presented in Table 4 below with direct responsible contact informaƟon for the SSMP presented in Table 5. Table 6 below summarizes appropriate SSMP organizaƟonal staffing responsibiliƟes for the City.

ORGANIZATION

Page 16 of 56 ends

Table 2 - City SSMP AcƟvity Reference Table

ORGANIZATION

Page 17 of 56 ends

IMPLEMENTATION RESPONSIBILITIES
Sewer System Management Plan Elements Responsible PosiƟon

1. SSMP Plan, Goal and IntroducƟon Engineering Dept.

1.1. Regulatory Context Engineering Dept.

1.2. SSMP Update Schedule Engineering Dept.

1.3. Sewer System Asset Overview Engineering Dept.

2. OrganizaƟon Engineering Dept.

3. Legal Authority Engineering Dept.

4. OperaƟons and Maintenance Program Public Works Manager

4.1. Updated maps of Sanitary Sewer System Public Works Manager

4.2. PrevenƟve OperaƟon & Maintenance Public Works Manager

4.3. Training Public Works Manager

4.4. Equipment Inventory Public Works Manager

5. Design/Performance Engineering Dept.

5.1. Updated Design Criteria & ConstrucƟon
Standards
Engineering Dept.

5.2. Procedures and Standards Engineering Dept.

6. Spill Emergency Response Plan Public Works Manager

7. Sewer Pipe Blockage Program Public Works Manager

8. System Eval, Capacity Assurance, Capital Imp. Engineering Dept.

8.1. System EvaluaƟon and CondiƟon Assessment Engineering Dept.

8.2. Capacity Assessment and Design Criteria Engineering Dept.

8.3. PrioriƟzaƟon of CorrecƟve AcƟon Engineering Dept.

8.4. Capital Improvement Plan Engineering Dept.

9. Monitoring, Measurement & Program ModificaƟons Engineering Dept.

10. Internal Audits Engineering Dept.

11. CommunicaƟon Program Engineering Dept.

Table 4 - City ImplementaƟon ResponsibiliƟes

ORGANIZATION

Page 18 of 56 ends

RESPONSIBLE POSITION CONTACT INFORMATION
Name Title Phone Email
Geraldine Trivedi, P.E. Civil Engineer 310.697.3195 [email protected] Saila Potukuchi, P.E. Civil Engineer 310.697.3201 [email protected] Mario Carranza Public Works Manager 310.318.0686
ext. 3259
Mario.Carranza@redondo,org

Table 5 – City SSMP Responsible PosiƟon Contact InformaƟon

ORGANIZATION

Page 19 of 56 ends

2.1. OrganizaƟonal Chart
Figure 3 – City OrganizaƟon Chart

ORGANIZATION

Page 20 of 56 ends

2.2. Chain of CommunicaƟon for ReporƟng Spills

ORGANIZATION

Page 21 of 56 ends

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Have there been any changes requiring updates to the OrganizaƟonal Chart?  Have there been instances when a service call for a spill was not properly routed to response personnel?
 Were all spill response acƟviƟes documented and forwarded to the LRO?  Have there been any changes in assigned responsibiliƟes for implemenƟng the SSMP?  Is there a process in place to ensure all contact informaƟon remains up to date?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

2.1 Review names, contact informaƟon and posiƟon
responsibiliƟes. Update as necessary.

Semi-Annually X X

2.2 Review Chain of CommunicaƟon outcomes for all
spill responses
Each Spill Event X X

2.3 Review OrganizaƟonal Chart for any changes. Update
as necessary.

Semi-Annually X X

RESILIENCE
Resilience is addressed in Element 2 by:
 Ensuring that more than one person is capable and responsible for specific duƟes for SSMP implementaƟon, e.g., back-up personnel.
 DesignaƟon of more than one LRO to help ensure full and conƟnuous coverage of duƟes.  TesƟng the phone noƟficaƟon system to ensure calls are received and routed to appropriate personnel.

APPENDIX 2 INCLUSIONS:
 None

OPERATIONS AND MAINTENANCE PROGRAM

Page 22 of 56 ends

3. Legal Authority

WDR REQUIREMENTS
AƩ. D-3 (pg. D-4)
“The Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority to:
 Prevent illicit discharges into its sanitary sewer system from inflow and infiltraƟon (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages;
 Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintenƟonal cross connecƟons of sanitary sewer infrastructure to storm sewer infrastructure;
 Require that sewer system components and connecƟons be properly designed and constructed;  Ensure access for maintenance, inspecƟon, and/or repairs for porƟons of the service lateral owned and/or operated by the Enrollee;
 Enforce any violaƟon of its sewer ordinances, service agreements, or other legally binding procedures; and
 Obtain easement accessibility agreements for locaƟons requiring sewer system operaƟons and maintenance, as applicable.

COMPLIANCE
The above items are addressed by the City below in order.  The City has established authority to prevent illicit discharges into City’s Wastewater CollecƟon System through its exisƟng authority provided under City Municipal Code, ArƟcle 2 (ProhibiƟons).  The City has established pre-planned collaboraƟon and coordinaƟon with storm water assets since the City owns and operates these faciliƟes.
 The City with its Design Standards and SpecificaƟons has established requirements requiring all sewer system components and connecƟons are properly designed and constructed with its exisƟng authority provided under City Municipal Code, ArƟcle 3 (Wastewater Facility/General Requirements).  District faciliƟes are located within legal easements for ensuring maintenance. NoƟces are sent to property owners with easements on their property annually to help facilitate communicaƟon and ensure access for maintenance, inspecƟon and repair acƟviƟes. ArƟcle IV, SecƟon 404 requires all public faciliƟes within a public right-of-way or dedicated sewer easement.  The City does not own or maintain sewer service laterals.  The City has established legal authority to enforce violaƟons of its sewer ordinances, service agreements, or other legally binding procedures with its exisƟng authority provided under City Municipal Code, ArƟcle 4 (Enforcement).
 NoƟces can be sent to property owners with easements on their property to help facilitate communicaƟon and ensure access for maintenance, inspecƟon and repair acƟviƟes. ArƟcle IV, SecƟon 404 requires all public faciliƟes within a public right-of-way or dedicated sewer PorƟon of City sewer assets are located within easements; however, some noƟces are periodically sent to property owners

OPERATIONS AND MAINTENANCE PROGRAM

Page 23 of 56 ends

with easements as necessary to help facilitate communicaƟon and ensure access for maintenance, inspecƟon and repair acƟviƟes.
 Obtain easement accessibility agreements for locaƟons requiring sewer system operaƟons and maintenance, as applicable.
 Prior to finalizing this SSMP Update, the City anƟcipates updaƟng this element to include addiƟonal informaƟon and details to address all requirements specified in this secƟon above.

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Are the City ordinances and standards adequate for fulfilling the SSMP Plan legal requirements?  Does the City have a process in place for periodic review and evaluaƟon of ordinances?  Have there been instances when the code or ordinance did not address a need or circumstance?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

3.1 Review Ordinance(s) to confirm all documents
provide necessary required legal authority.

Once per 6-year SSMP
Update Cycle X X

3.2 Confer with storm drain owners to ensure current
pracƟces and contact informaƟon are up to date.

Annually X

3.3 Monitor and document occasions when Ordinance(s)
failed to address issues as intended.

ConƟnuously X X X

RESILIENCE
Resilience is addressed in Element 3 by:
 Keeping abreast of industry trends and local ordinances that may affect operaƟons.

APPENDIX 3 INCLUSIONS:
 None

OPERATIONS AND MAINTENANCE PROGRAM

Page 24 of 56 ends

4. OperaƟon and Maintenance Program

WDR REQUIREMENTS
AƩ. D-4 (pg. D-4)
“The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.”

4.1. Updated Map of Sewer System

WDR REQUIREMENTS
AƩ. D-4.1 (pg. D-4)
“An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping faciliƟes, pressure pipes and valves, and applicable stormwater conveyance faciliƟes within the sewer system service area boundaries.”

COMPLIANCE
System maps shall include gravity mains, force mains, manholes, pump staƟons, property boundaries and addresses, creek locaƟons, and storm drain mapping, and pipe asset informaƟon (ID number, diameter, flow direcƟon, segment length, material type, and age).

The City maintains current sewer maps for all City-owned sewers with iWATER and has process in place to update maps. The City can make its sewer maps available to Water Board staff upon request.

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Were all map updates completed in a Ɵmely manner?
 Are all staff trained in the procedure for providing map update informaƟon?  Are newly installed sewer assets incorporated into the system maps?  Are there terrain features or assets that should be incorporated in future map updates (e.g. exposed pipe, siphons, ARVs, surface water, etc.)

OPERATIONS AND MAINTENANCE PROGRAM

Page 25 of 56 ends

IMPLEMENTATION PLAN/SCHEDULE
No Plan Schedule Responsible Party
CC Eng Mgr

4.1.1 Review map update procedures with all affected staff. Annually X X

4.1.2 Review/ensure all newly installed faciliƟes have been updated and included in the system maps Annually X X

OPERATIONS AND MAINTENANCE PROGRAM

Page 26 of 56 ends

4.2. PrevenƟve OperaƟon and Maintenance AcƟviƟes

WDR REQUIREMENTS
AƩ. D-4.2 (pgs. D-4/D-5)
”A scheduling system and a data collecƟon system for prevenƟve operaƟon and maintenance acƟviƟes conducted by staff and contractors. The scheduling system must include:
 InspecƟon and maintenance acƟviƟes;
 Higher-frequency inspecƟons and maintenance of known problem areas, including areas with tree root problems;
 Regular visual and closed-circuit television (CCTV) inspecƟons of manholes and sewer pipes.

The data collecƟon system must document data from system inspecƟon and maintenance acƟviƟes, including system areas/components prone to root-intrusion potenƟally resulƟng in system backup and/or failure.”

COMPLIANCE
The purpose of a work order system is to program and track all required inspecƟon and maintenance acƟviƟes within the collecƟon system to help proacƟvely prevent blockages/operaƟonal problems or spills.

The City uses OPRA for its Computerized Maintenance Management System (CMMS), which allows the City to make informed decisions regarding its assets and infrastructure by using the collected data from field work orders and documented inspecƟons.

The City’s CMMS (OPRA) maintains historical data for all maintenance acƟviƟes and provides a basis for criƟcal analysis and data-driven planning and decision-making today and into the future. This allows for prioriƟzing and planning rouƟne acƟviƟes such as CCTV inspecƟons, pipe cleaning and pump staƟon maintenance acƟviƟes.

In addiƟon, the CMMS (OPRA) is used to plan and schedule higher-frequency inspecƟon and maintenance acƟviƟes such as Hot Spot cleanings (approximately 100 locaƟons) and selecƟve root control acƟviƟes.

Emergency and other reacƟve acƟviƟes are documented in work orders as well.

The scheduling system allows staff to put certain acƟviƟes on a prevenƟve schedule where the CMMS (OPRA) automaƟcally create work orders on a prescribed interval. Work orders for other acƟviƟes are generated by supervisory personnel on an as-needed basis.

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Are the City’s maintenance, operaƟons, engineering work orders periodically audited for accuracy and completeness?
 Does the City monitor “open,” “overdue,” or “not yet completed” work orders to ensure compleƟon of tasks?
 Are inspecƟon and maintenance acƟviƟes reducing the number and volume of spills?  Is maintenance work being completed as scheduled?

OPERATIONS AND MAINTENANCE PROGRAM

Page 27 of 56 ends

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

4.2.1 Monitor “Past Due” work orders to ensure criƟcal work is being completed Quarterly X X

4.2.2 Review scheduled PMs to ensure the prescribed
schedule remains appropriate. Annually X X

OPERATIONS AND MAINTENANCE PROGRAM

Page 28 of 56 ends

4.3. Training

WDR REQUIREMENTS
AƩ. D-4.3 (pg. D-5)
“In-house and external training provided on a regular basis for sanitary sewer system operaƟons and maintenance staff and contractors. The training must cover:
 The requirements of this General Order;
 The Enrollee’s Spill Emergency Response Plan procedures and pracƟce drills;  Skilled esƟmaƟon of spill volume for field operators; and  Electronic CIWQS reporƟng procedures for staff submiƫng data.”

COMPLIANCE
The City’s training program covers numerous areas involving or associated with wastewater collecƟon systems and serves to develop and maintain highly qualified, knowledgeable, and capable staff. This training is provided through a variety of modes (self-study, seminars, conferences, on-the-job, etc.) and begins from the first day on the job and conƟnues regularly thereaŌer.

Staff involved in responding to customer service calls, including sewage spills, receive annual training on the City’s Spill Emergency Response Plan completed by Fischer Compliance LLC. This training is part classroom and part hands-on exercises and drills for responding to spill events and includes containment, restoring flow, spill volume, volume recovered, spill start Ɵme esƟmaƟons, clean up and compleƟng the spill event data collecƟon forms.

The City uƟlizes Fischer Compliance for providing spill response training and is developing spill response procedures for Contract Service personnel who perform work for the City to:
 Immediately noƟfy the City of any sewage spill they encounter;  Make aƩempts to contain the spill;
 Cordon off the area to keep the public safe; and
 Remain onsite unƟl City staff arrives and relieves them.

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Has all training been completed as scheduled?
 Have records of training and aƩendance been documented and maintained?  Have all staff demonstrated ability and knowledge aŌer each training event?  Have contractors received, at a minimum, direcƟon for reporƟng and responding to spills?

OPERATIONS AND MAINTENANCE PROGRAM

Page 29 of 56 ends

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

4.3.1 Review training documentaƟon to ensure all staff have received required training Quarterly X X

4.3.2 Review agreements with contractors and/or pre-job meeƟng minutes to ensure contract personnel have
received instrucƟon for responding to sewage spills
Each Contract X X

OPERATIONS AND MAINTENANCE PROGRAM

Page 30 of 56 ends

4.4. Equipment Inventory

WDR REQUIREMENTS
AƩ. D-4.4 (pg. D-5)
“An inventory of sewer system equipment, including the idenƟficaƟon of criƟcal replacement and spare parts.”

COMPLIANCE
The City maintains a host of equipment for both rouƟne maintenance and for conƟngency or emergency operaƟons. The City maintains a spare part inventory and has idenƟfied “criƟcal” parts allowing the City to respond and resolve issues in a Ɵmely manner. AddiƟonal new equipment planned for purchase include the following items:
 New backup pump for Basin 3
 2 addiƟonal new bypass pumps for inventory

OPERATIONS AND MAINTENANCE PROGRAM

Page 31 of 56 ends

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Have inventory lists been audited as scheduled?
 Have any inventory deficiencies or omissions been discovered and recƟfied?  Has the City experienced any equipment failure that inhibited a spill response?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

4.4.1 Audit inventory lists to ensure stock is adequate Annually X X

4.4.2 Check with vendors to ensure lead Ɵmes for
criƟcal parts are as expected. Annually X X

4.2.3 Ensure contracts with emergency support
services are current Annually X

RESILIENCE
Resilience is addressed in Element 4 by:
 Developing an SOP for updaƟng maps when errors are discovered.  Developing and using forms (paper or electronic) for data collecƟon to help ensure all perƟnent informaƟon is consistently collected.
 Periodically evaluaƟng inspecƟon cycle intervals to help ensure they are opƟmized.  Requiring staff to demonstrate ability and/or knowledge for all training acƟviƟes.  Monitoring equipment and criƟcal spare parts usage for and trends.  Performing periodic audits of the vehicle and equipment inventory List.

APPENDIX 4 INCLUSIONS:
 None

OPERATIONS AND MAINTENANCE PROGRAM

Page 32 of 56 ends

SpecificaƟons 5.19 - OperaƟons and Maintenance

WDR REQUIREMENTS
SpecificaƟon. 5.19 (pg. 27)
“To prevent discharges to the environment, the Enrollee shall maintain in good working order, and operate as designed, any facility or treatment and control system designed to contain sewage and convey it to a treatment plant.”

COMPLIANCE
To comply with these requirements, the City has the established work programs for operaƟng and maintaining its sanitary sewer collecƟon system.
 Gravity Main Cleaning – the target is to clean the enƟre system every 2 years; the City uƟlizes Empire Pipe Cleaning and has its internal crews focus on areas of concern for these acƟviƟes.  Gravity Main InspecƟon (CCTV) – the target is to CCTV secƟons of the conveyance system that have a high risk factor every 5 years.
 Manhole InspecƟons – completed as part of ongoing outline maintenance acƟviƟes and expanded as necessary.
 Pump StaƟon InspecƟons/Maintenance – completed as part of ongoing outline maintenance acƟviƟes and expanded as necessary.
 Easement Maintenance – completed as part of ongoing outline maintenance acƟviƟes and expanded as necessary.
 Pipe Repair/RehabilitaƟon – completed as part of ongoing outline maintenance acƟviƟes and expanded as necessary (see Element 8 below for more details).  Root Control – completed as part of ongoing outline maintenance acƟviƟes and expanded as necessary.

DESIGN AND PERFORMANCE PROVISIONS

Page 33 of 56 ends

5. Design and Performance Provisions

5.1. Updated Design Criteria/ConstrucƟon Standards/SpecificaƟons

WDR REQUIREMENTS
AƩachment D-5.1 (pg. D-5)
“Updated design criteria, and construcƟon standards and specificaƟons, for the construcƟon, installaƟon, repair, and rehabilitaƟon of exisƟng and proposed system infrastructure components, including but not limited to pipelines, pump staƟons, and other system appurtenances. If exisƟng design criteria and construcƟon standards are deficient to address the necessary component-specific hydraulic capacity as specified in secƟon 8 (System EvaluaƟon, Capacity Assurance and Capital Improvements) of this AƩachment, the procedures must include component-specific evaluaƟon of the design criteria.”

COMPLIANCE
City Standard Plans and Details available online addresses design criteria sewers.

The City also relies on GREENBOOK standards for enhancing its available design criteria for sewers.

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Are plan checking QA/QC processes helping to ensure adherence to the standards?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

5.1.1 Ensure all project plans are approved in accordance with the City’s Standard SpecificaƟons and Details. Each Project X

5.1.2 Verify design standards and hydraulic model previously completed are adequate and consistent with current
standards of pracƟce.
2027 X X
Prior to finalizing this SSMP Update, the City anƟcipates updaƟng this secƟon to include addiƟonal informaƟon and details that fully address all specified requirements.

DESIGN AND PERFORMANCE PROVISIONS

Page 34 of 56 ends

5.2. Procedures and Standards

WDR REQUIREMENTS
AƩachment D-5.2 (pg. D-5)
“Procedures, and standards for the inspecƟon and tesƟng of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.”

COMPLIANCE
 ArƟcle 3 of the City’s Municipal Code, (Wastewater Facility/General Requirements) is uƟlized to address these requirements.

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Were any design or installaƟon deficiencies found during warranty inspecƟons?  Are deviaƟons from standard procedures and/or specs, tesƟng, etc., jusƟfied and documented?  Does the City stay abreast of industry design standards and technical advances in the industry?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

5.2.1 Verify inspecƟon procedures are adequate and
consistent with current standards of pracƟce 2017 (10-year cycle) X

5.2.2 Verify design standards and hydraulic model
previously completed are adequate and
consistent with current standards of pracƟce.
2027 (10-year cycle) X X

RESILIENCE
Resilience is addressed in Element 5 by:
 Staying abreast of industry trends and standards.
 Performing warranty inspecƟons of newly installed or repaired assets to evaluate design and installaƟon pracƟces.
 EvaluaƟng as-built changes for trends and areas for design and performance improvements.

APPENDIX 5 INCLUSIONS:
 5.1. City Pipeline Franchise ApplicaƟon (2011)

SPILL EMERGENCY RESPONSE PLAN

Page 35 of 56 ends

6. Spill Emergency Response Plan

WDR REQUIREMENTS
AƩachment D-6 (pg. D-6)
“The Plan must include an up-to-date Spill Emergency Response Plan to ensure prompt detecƟon and response to spills to reduce spill volumes and collect informaƟon for prevenƟon of future spills. The Spill Emergency Response Plan must include procedures to:
 NoƟfy primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a Ɵmely manner;
 NoƟfy other potenƟally affected enƟƟes (for example, health agencies, water suppliers, etc.) of spills that potenƟally affect public health or reach waters of the State;  Comply with the noƟficaƟon, monitoring and reporƟng requirements of this General Order, State law and regulaƟons, and applicable Regional Water Board Orders;  Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
 Address emergency system operaƟons, traffic control and other necessary response acƟviƟes;  Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
 Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
 Remove sewage from the drainage conveyance system;
 Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters;
 Implement technologies, pracƟces, equipment, and inter-City coordinaƟon to expedite spill containment and recovery;
 Implement pre-planned coordinaƟon and collaboraƟon with storm drain agencies and other uƟlity agencies/departments prior, during, and aŌer a spill event;  Conduct post-spill assessments of spill response acƟviƟes;  Document and report spill events as required in this General Order; and  Annually, review and assess effecƟveness of the Spill Emergency Response Plan, and update the Plan as needed.”

COMPLIANCE
The City’s Spill Emergency Response Plan (SERP) is a stand-alone document that contains all the key elements necessary for an appropriate spill response: noƟficaƟon, emergency incident response, reporƟng, and impact miƟgaƟon. The current plan, prepared by Fischer Compliance (see Appendix 6.1) meets the requirements of the WDR, which became effecƟve on June 5, 2023. IniƟal training has been provided to affected staff and refresher training is conducted annually. A copy of the SERP is available for viewing at the City office upon request.

Add any addiƟonal informaƟon/procedures/pracƟces the City might implement outside of the SERP.

SPILL EMERGENCY RESPONSE PLAN

Page 36 of 56 ends

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Have staff’s spill response efforts helped to prevent the discharge of sewage to surface waters?  Do post-spill assessments indicate staff are following the procedures outlined in the SERP?  Is SERP training effecƟve and are trainees demonstraƟng adequate knowledge and abiliƟes?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

6.1 Perform SERP training including pracƟce drills. Annually X X

6.2 Review Post Spill Assessments to ensure adherence with the SERP and to idenƟfy any trends that should be
addressed.

Annually X X

RESILIENCE
Resilience is addressed in Element 6 by:
 MulƟple staff are trained to respond to spill events.  Post-spill assessments are conducted to evaluate staff’s adherence to the SERP and to idenƟfy areas for improvement.
 Data collecƟon forms are used to direct staff to collect all the required data to be submiƩed to CIWQS and are designed as a guide to a proper spill event response.  The City employees several different spill volume esƟmaƟon methods to account for different circumstances.

APPENDIX 6 INCLUSIONS:
 6.1. Spill Emergency Response Plan (SERP)

SEWER PIPE BLOCKAGE PROGRAM

Page 37 of 56 ends

7. Sewer Pipe Blockage Program

WDR REQUIREMENTS
AƩachment D-7 (pg. D-7)
“The Sewer System Management Plan must include procedures for the evaluaƟon of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide jusƟficaƟon in its Plan for why a program is not needed.

The procedures must include, at minimum:
 An implementaƟon plan and schedule for a public educaƟon and outreach program that promotes proper disposal of pipe-blocking substances;
 A plan and schedule for the disposal of pipe-blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal faciliƟes and/or addiƟonal faciliƟes needed to adequately dispose of substances generated within a sanitary sewer system service area;
 The legal authority to prohibit discharges to the system and idenƟfy measures to prevent spills and blockages.
 Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management pracƟces requirements, recordkeeping and reporƟng requirements;
 Authority to inspect grease producing faciliƟes, enforcement authoriƟes, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance;  An idenƟficaƟon of sanitary sewer system secƟons subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each secƟon; and  ImplementaƟon of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each secƟon idenƟfied above.”

COMPLIANCE
In many sanitary sewer collecƟon systems, Fats, Oils, and Grease (FOG) is known to be a significant cause, and or contributor, of sewer blockages in pipe and the cause of operaƟonal disrupƟons and damage to sewage pump staƟons. Although service areas that include commercial and insƟtuƟonal food service establishments (FSEs) are obvious sources of FOG, residenƟal communiƟes, especially those of medium and high-density mulƟ-family residences, can also be a significant source of FOG. It is the purpose of the FOG Control Program to ensure all customers in our service area are following the City Ordinance, and state and federal requirements, to prevent sewage overflows caused by FOG related blockages in our sewer collecƟon system.

The City complies with the above requirements through the following measures:
 Public Outreach: Public educaƟon is implemented for this effort primarily through restaurant inspecƟons. The City inspects approximately 300 food service establishments (FSEs) twice per year to conduct educaƟon, determine compliance with the code, and take any necessary enforcement acƟons to gain compliance. AddiƟonal public outreach takes place throughout the year which includes presentaƟons to various local commiƩee and/or working groups, public presentaƟons to City Council

SEWER PIPE BLOCKAGE PROGRAM

Page 38 of 56 ends

& the Public Works Commission, informaƟon included on the City’s web site, and various distributed brochures posters and handouts.
 Pipe Blocking Substances: The City is working with the State of California in achieving hauler compliance with the “Licensed waste haulers” requirement (registered to do so by the State in accordance with California Code of RegulaƟons, Title 23, Waters, Chapter 3, and Subchapter 1). The City also uƟlizes the California Fats Oils and Grease Workgroups Grease Hauling and Rendering Companies List for acceptable disposal and hauling providers of FOG generated within its service area.

Further, the City disposes rouƟne wastes accumulated from maintenance acƟviƟes at its corporaƟon yard.
 Legal Authority: The City through its City Municipal Code, ArƟcle 5 (ProhibiƟons). includes provisions and provides the legal authority to implement a FOG Control Program including prohibiƟon of certain discharges and measures to prevent spills.
 Grease Control Devices: The City Municipal Code, Title 5, ArƟcle 3, 5.4305, Wastewater Facility/General Requirements) provides the City with authority to require grease control devices.  InspecƟons: The current Municipal Code Title 5, Chapter 4 Wastewater System (5-403.5) includes a requirement for semi-annual on-site inspecƟons. The revised code will maintain this requirement. The Clean Bay Restaurant CerƟficaƟon Program also includes inspecƟons of Food Service Establishments (FSE) for minimum compliance with FOG and water quality regulaƟons.  PorƟons of Sewers Subject to FOG: The City maintains an “Areas of Interest” list and map which includes Hot Spot cleaning program (approximately 100 locaƟons) including secƟons subject to FOG build-up and blockages. The “Areas of Interest” or Hot Spots are scheduled for more frequent cleanings and monitoring which occur two to four Ɵmes per year.  Source Control Measures: In 2002 the City Council modified its wastewater regulaƟons to require that the City Engineer conduct semi-annual inspecƟons of Food Service Establishments (FSEs) to ensure that the required grease removal device installaƟons are being properly maintained. In 2006, following the adopƟon of the State Water Board’s Order, the City reviewed the exisƟng FOG Control Program and begun the process of establishing a FOG inspecƟon fee in order to enhance the exisƟng program.

The City Council approved FOG Control Ordinance No. 2999-07 on April 17, 2007, to establish a fee that would apply to FSEs that generate FOG. The fee is used to pay for the inspecƟons and administraƟon of the FOG Control program for the FSE inspecƟons. The City also inspects approximately 300 food service establishments (FSEs) twice per year to conduct educaƟon, determine compliance with the code, and take any necessary enforcement acƟons to gain compliance. One addiƟonal source control measure includes the Clean Bay Restaurant CerƟficaƟon Program, which improves FOG Control awareness and improves facility compliance.

SEWER PIPE BLOCKAGE PROGRAM

Page 39 of 56 ends

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Have there been any blockages/spills from any idenƟfied problem area?  Is the City receiving feedback on public outreach efforts?  Are the debris and other sewage solids collected during cleaning acƟviƟes being disposed of appropriately?
 Have there been spills due to excessive fats, oil, grease, roots, or non-disposable wipes discovered in the sewer system during the audit period?
 Are there repeat offenders among FSEs?
 Are enforcement trends decreasing?
 Are Source Control and CollecƟon staff included in the plan check process?

IMPLEMENTATION PLAN/SCHEDULE
No Plan Schedule Responsible Party
CC Eng Mgr

7.1 Review/evaluate enforcement and inspecƟon findings and implement changes as necessary. Annually X X

7.2 Review spill rates and causes and make changes to
maintenance programs, as necessary. Annually X X

SEWER PIPE BLOCKAGE PROGRAM

Page 40 of 56 ends

RESILIENCE
Resilience is addressed in Element 7 by:
 InspecƟon of select assets directly downstream of grease producing businesses to ensure source control is effecƟve.
 ResidenƟal FOG outreach and educaƟon program.
 Performance of regular assessments of system assets to monitor performance.  QA/QA process for evaluaƟng pipe cleaning effecƟveness.  Daily disposal of pipe blocking materials retrieved during maintenance acƟviƟes.

APPENDIX 7 INCLUSIONS:
 None

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS

Page 41 of 56 ends

8. System EvaluaƟon, Capacity Assurance, Capital Improvements

WDR REQUIREMENTS
AƩachment D-8 (pg. D-)
“The Plan must include procedures and acƟviƟes for:
 RouƟne evaluaƟon and assessment of system condiƟons;
 Capacity assessment and design criteria;
 PrioriƟzaƟon of correcƟve acƟons; and
 A capital improvement plan.”

8.1. System EvaluaƟon and CondiƟon Assessment

WDR REQUIREMENTS
AƩachment D-8.1 (pgs. D-7/D-8)
“The Plan must include procedures to:
 Evaluate the sanitary sewer system assets uƟlizing the best pracƟces and technologies available;  IdenƟfy and jusƟfy the amount (percentage) of its system for its condiƟon to be assessed each year;  PrioriƟze the condiƟon assessment of system areas that:
 Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies;
 Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevaƟons, and environmentally sensiƟve areas;
 Are within the vicinity of a receiving water with a bacterial-related impairment on the most current Clean Water Act secƟon 303(d) List.
 Assess the system condiƟons using visual observaƟons, video surveillance and/or other comparable system inspecƟon method;.
 UƟlize observaƟons/evidence of system condiƟons that may contribute to exiƟng of sewage from the system which can reasonably be expected to discharge into a water of the State;  Maintain documents and recordkeeping of system evaluaƟon and condiƟon assessment inspecƟons and acƟviƟes; and
 IdenƟfy system assets vulnerable to direct and indirect impacts of climate change, including but not limited to: sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disrupƟons.”

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS

Page 42 of 56 ends

COMPLIANCE
The system evaluaƟon, condiƟon assessment, capacity assurance, and CIP components contained in this Interim SSMP are preliminary and will be supplemented and refined through the City’s comprehensive sewer system evaluaƟon and technical planning program starƟng in 2026.

The City addresses the above requirements as outlined below. Further, prior to finalizing this SSMP, the City anƟcipates updaƟng this element to include addiƟonal informaƟon and details to address all requirements specified in this secƟon above.
 The assessment of a collecƟon system involves every component of the City collecƟon system, including pipelines, manholes, and pump staƟons. The assessment of pipeline condiƟon is the most significant condiƟon assessment responsibility the City has. It is of key importance to regularly perform pipeline condiƟon assessments to iniƟally establish a condiƟon baseline and to monitor condiƟon changes over Ɵme. The City uƟlizes various technologies, pracƟces, strategies for these assessments to maintain the sewer system such as the use of 47 individual sewer Smart Covers and closed-circuit television (CCTV) equipment.
 The City’s jusƟficaƟon for their condiƟon assessment schedules/intervals is provided by inspecƟon history (how many Ɵmes has the system been inspected), (2) pipe performance (number of blockages or spills), (3) maintenance intervals (how oŌen are the lines cleaned between inspecƟons), and (4) Repair and rehabilitaƟon programs (defects being recƟfied).  The City prioriƟzes condiƟon assessment acƟviƟes using a risk-based approach that considers: (1) pipeline CCTV defect coding per NASSCO PACP standards (structural and O&M defect grades), (2) CIP project prioriƟzaƟon based on hydraulic deficiency, structural condiƟon, SSO risk, and consequence of failure, and (3) sewer asset risk ranking incorporaƟng pipe age, material, diameter, maintenance history, and proximity to sensiƟve receiving waters..
 The City assesses system condiƟons using a combinaƟon of methods including: (1) CCTV video inspecƟon of gravity mains using NASSCO PACP coding, (2) visual manhole inspecƟons, (3) SmartCover sensor monitoring at 47 locaƟons for real-Ɵme level and flow data, and (4) pump staƟon SCADA monitoring..
 The City uses CCTV inspecƟon findings, SmartCover level data, maintenance records, and spill history to idenƟfy system condiƟons (such as significant structural defects, root intrusion, or capacity constraints) that may contribute to sewage exfiltraƟon that could reasonably be expected to reach a water of the State. High-priority defects are escalated to the CIP for correcƟve acƟon..  The City maintains inspecƟon and condiƟon assessment records electronically using iWater CMMS and GIS. Records include CCTV inspecƟon reports, PACP-coded defect data, manhole inspecƟon logs, pump staƟon maintenance records, and SmartCover event logs. CCTV video files and condiƟon data are stored and linked to the City’s GIS asset inventory. The City has iniƟated a process to idenƟfy its assets vulnerable to direct and indirect impacts of climate change, including but not limited to: (a) sea level rise, (b) flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; (c) wildfires; and (d) increased power disrupƟons. This includes a commiƩed to providing a more livable, equitable, and economically vibrant community and sub-region. As a part of this effort, the City of Redondo Beach, in cooperaƟon with the South Bay CiƟes Council of Governments, has developed a Climate AcƟon Plan (CAP) to reduce Greenhouse Gas (GHG) emissions within the city. The City’s CAP serves as a guide for acƟon by seƫng GHG emission reducƟon goals and establishing strategies and policies to achieve desired outcomes over the next 20 years.  Prior to finalizing this SSMP, the City anƟcipates updaƟng this element to include addiƟonal informaƟon and details to address all requirements specified in this secƟon above.

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS

Page 43 of 56 ends

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS

Page 44 of 56 ends

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Has the City maintained its schedule for (information needed) and is data being reviewed in a Ɵmely manner?
 CCTV Gravity Mains
 Laterals
 Manholes
 Pump StaƟons
 Are inspecƟon efforts discovering deficiencies in a Ɵmely manner?  Are maintenance and inspecƟon acƟviƟes being properly documented?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

8.1.1 Review/evaluate enforcement and inspecƟon findings and implement changes as necessary. Annually X X

8.1.2 Review spill rates and causes and make changes to maintenance programs, as necessary. Annually X X

8.1.3 Hold meeƟng to discuss any issues that may result from climate changes. Annually X X X

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS

Page 45 of 56 ends

8.2. Capacity Assessment and Design Criteria

WDR REQUIREMENTS
AƩachment D-8.2 (pgs. D-8/D-9)
“The Plan must include procedures to idenƟfy system components that are experiencing or contribuƟng to spills caused by hydraulic deficiency and/or limited capacity, including procedures to idenƟfy the appropriate hydraulic capacity of key system elements for:
 Dry-weather peak flow condiƟons that cause or contributes to spill events;  The appropriate design storm(s) or wet weather events that causes or contributes to spill events.  The capacity of key system components; and
 IdenƟfy the major sources that contribute to the peak flows associated with sewer spills.

The capacity assessment must consider:
 Data from exisƟng system condiƟon assessments, system inspecƟons, system audits, spill history, and other available informaƟon;
 Capacity of flood-prone systems subject to increased infiltraƟon and inflow, under normal local and regional storm condiƟons;
 Capacity of systems subject to increased infiltraƟon and inflow due to larger and/or higherintensity storm events as a result of climate change;  Increases of erosive forces in canyons and streams near underground and above-ground system components due to larger and/or higher-intensity storm events;  Capacity of major system elements to accommodate dry weather peak flow condiƟons, and updated design storm and wet weather events; and
 Necessary redundancy in pumping and storage capaciƟes.”

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS

Page 46 of 56 ends

COMPLIANCE
A capacity evaluaƟon of the sewer system was conducted in 1994 during the preparaƟon of the City’s latest Wastewater System Master Plan. All sewer pump staƟons were evaluated on a case-by-case basis, using the flow informaƟon from the hydraulic model. The City is currently (2026) updaƟng the SSMP A hydraulic model was developed for the following system elements:
 All collecƟon lines greater than 8-inches in diameter  Sewers observed to have operaƟonal problems
 Sewers projected to be over capacity by the City’s previous wastewater planning  reports
 Sewers that serve large tributary areas
 Sewers with a slope of 0.004 or less that serve 300 or more residenƟal units  Prior to finalizing this SSMP Update, the City anƟcipates updaƟng this element to include addiƟonal informaƟon and details to address all requirements specified in this secƟon above.

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Number of capacity-related spills or surcharge condiƟon during the audit period.  Has the system responded to rain events as indicated by the hydraulic model?  Has there been any changes to zoning designaƟons (residenƟal, commercial, industrial)?

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS

Page 47 of 56 ends

IMPLEMENTATION PLAN/SCHEDULE
No Plan Schedule Responsible Party
CC Eng Mgr

8.2.1 Monitor/evaluate significant rain
events to see if they exceed the
design storm in the hydraulic model.

Each significant rain event
X X

8.2.2 IdenƟfy and monitor flood-prone
areas suscepƟble to erosion from rain
events
AŌer each significant rain event
X X

8.2.3 Monitor flows in each basin and
update the hydraulic model
Per Engineering Department
schedule X

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS

Page 48 of 56 ends

8.3. PrioriƟzaƟon of CorrecƟve AcƟon

WDR REQUIREMENTS
AƩachment D-8.3 (pg. D-9)
“The findings of the condiƟon assessments and capacity assessments must be used to prioriƟze correcƟve acƟons. PrioriƟzaƟon must consider the severity of the consequences of potenƟal spills.”

COMPLIANCE
The City is currently updaƟng its Wastewater System Master Plan. The scope of work includes the development of a hydraulic model of the enƟre wastewater system. Capacity evaluaƟon of the collecƟon system as well as the pump staƟons will be conducted.
 The 1994 Wastewater System Master Plan established the City’s current wastewater criteria. The criteria will be reevaluated as a part of the update to the Wastewater System Master Plan.  The 1994 Wastewater System Master Plan idenƟfied the porƟons of the wastewater system with hydraulic deficiencies. Capital Improvement Project recommendaƟons were formulated and prioriƟzed. The total priority pump staƟon and collecƟon system capacity related project costs were esƟmated at $7,020,000 (January 1994 dollars). The update of the Wastewater System Master Plan will include the development of a comprehensive Capital Improvement Program that will include projects to address any capacity related system deficiencies. Project costs will be developed.  The City funds sewer related acƟviƟes through its Wastewater Enterprise Fund. In 2003, the City approved Ordinance No. 2924-03 that established a Wastewater Sewer User Fee based on a Wastewater Rate and Financial Plan Study report. In 2004, the City issued revenue bonds totaling $10,335,000 which included a rate covenant that requires, in any Fiscal Year, the Wastewater Enterprise to produce Rate-Based Net Revenues equal to at least 1.20 Ɵmes the Installment Payments coming due and payable during such Fiscal Year. In 2008, the City approved Ordinance 3018-08 that raised the Wastewater Sewer User fees to its current levels. The new fees help to fully support the compleƟon of sewer collecƟon system rehabilitaƟon projects, the operaƟon and maintenance of the system, meet bond rate covenant requirements, and comply with regulatory requirements. The established fees also include an annual increase to account for inflaƟon.  The update to the Wastewater System Master Plan will include a schedule for implemenƟng the developed Capital Improvement Program project recommendaƟons. AddiƟonal ongoing details of projects and funding are available online (see Element 8.4 below for more details).  Prior to finalizing this SSMP, the City anƟcipates updaƟng this element to include addiƟonal informaƟon and details to address all requirements specified in this secƟon above.

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS

Page 49 of 56 ends

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Has the City adhered to its system evaluaƟon/condiƟon assessment schedule?  Has the City adhered to its prioriƟzaƟon/correcƟve procedures for sewer repair and capacity improvement projects?
 Have projects been completed before deficiencies caused failures?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

8.3.1 UƟlize all available data for prioriƟzing correcƟve acƟons considering severity and consequences of
potenƟal spills.

Each CIP Update X X

8.3.2 Maintain documents and recordkeeping of system
evaluaƟon and condiƟon assessment inspecƟons
and acƟviƟes.

ConƟnuously X X

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS

Page 50 of 56 ends

8.4. Capital Improvement Plan

WDR REQUIREMENTS
AƩachment D-8.4 (pg. D-9)
“The capital improvement plan must include the following items:
 Project schedules include compleƟon dates for all porƟons of the capital improvement program;  Internal and external project funding sources for each project; and  Joint coordinaƟon between operaƟon and maintenance staff, and engineering staff/consultants during planning, design, and construcƟon of capital improvement projects; and InterCity coordinaƟon with other impacted uƟlity agencies.”

COMPLIANCE
The City of Redondo Beach Budget and Capital Improvement Program (CIP) online website provides detailed informaƟon including historical projects and funding for all City assets including sewers. For added transparency, the City has posted its 2025-2030 Capital Improvement Program on its website.

City engineering and operaƟons rouƟnely meet to coordinate on projects to ensure input from all parƟes.

The City is currently updaƟng its Wastewater System Master Plan, which includes the development of a hydraulic model for the enƟre wastewater system. As part of this effort, the City will conduct a capacity evaluaƟon of both the collecƟon system and the pump staƟons. Prior to finalizing this SSMP, the City anƟcipates updaƟng the future Capital Improvement Plan (CIP) to incorporate addiƟonal informaƟon and details to fully address the requirements specified in this secƟon.

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS

Page 51 of 56 ends

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Has the City’s capital improvement plan schedule been adhered to?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Engr Mgr

8.4.1 Hold regular coordinaƟon meeƟngs, with all
parƟes, to help keep the projects on track and
resolve issues that may arise in a Ɵmely manner.

Annually X X

8.4.2 For schedules that are not followed, jusƟfy and
document the reason.

Each Delayed
Project X

RESILIENCE
Resilience is addressed in Element 7 by:
 Is there an annual review of the Capital Improvement Plan by all appropriate individuals including both Engineering and OperaƟons?
APPENDIX 8 INCLUSIONS
 8.1 2025-2030 Budget and Capital improvement Program (CIP)  8.2. Sewer Project 23-5656 - AdministraƟve Report

MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS

Page 53 of 56 ends

9. Monitoring, Measurement, and Program ModificaƟons

WDR REQUIREMENTS
AƩachment D-9 (pg. D-9)
“The Plan must include an AdapƟve Management secƟon that addresses Plan-implementaƟon effecƟveness and the steps for necessary Plan improvement, including:
 Maintaining relevant informaƟon, including audit findings, to establish and prioriƟze appropriate Plan acƟviƟes;
 Monitoring the implementaƟon and measuring the effecƟveness of each Plan element;  Assessing the success of the prevenƟve operaƟon and maintenance acƟviƟes:
 UpdaƟng Plan procedures and acƟviƟes, as appropriate, based on results of monitoring and performance evaluaƟons; and
 IdenƟfying and illustraƟng spill trends, including spill frequency, locaƟons, and esƟmated volumes.”

COMPLIANCE
The above requirements are addressed below. Further, prior to finalizing this SSMP Update, the City anƟcipates updaƟng this element to include addiƟonal informaƟon and details to address all requirements specified in this secƟon above.
 The City maintains accurate and relevant inspecƟon and maintenance records for the collecƟon system. Much of the documentaƟon today is maintained electronically, which allows for ease of access and analysis. This helps City staff to make sound decisions and prioriƟze acƟviƟes when dealing with the rouƟne and the unexpected.
 Monitoring of the City’s SSMP focuses on each element in terms of its implementaƟon and effecƟveness. The SSMP has been designed to include key performance indicators for each element, which are used to measure effecƟveness. In addiƟon, implementaƟon responsibiliƟes are included for each element to help ensure the SSMP is being implemented as intended.  The City assesses the success of maintenance and operaƟon acƟviƟes by ensuing acƟviƟes are being performed as expected, by monitoring actual outcomes compared to intended outcomes, as well as monitoring spill trends.
 The City is commiƩed to conƟnuous improvement and monitors and evaluates performance of work programs and SSMP elements to ensure intended outcomes are achieved while looking for areas for improvement. Although the SWRCB requires that the SSMP be updated every six years, the SSMP should be considered as a dynamic document and may require updaƟng on a more frequent basis.

RouƟne changes to administraƟve informaƟon, notwithstanding, minor changes will likely be required to address improvements idenƟfied through the SSMP Audit or through modificaƟons required as condiƟons change.
 The City monitors spill trends, at a minimum every three years during required audits, uƟlizing the CMMS database, inspecƟon records and CIWQS data. These resources are helpful in planning and programing work, and adjusƟng as needed, enabling the City to be adapƟve and capitalize on lessons learned.

MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS

Page 54 of 56 ends

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Are SSMP Elements being periodically evaluated for effecƟveness?  Are work acƟviƟes and spill events being documented?
 Has a plan and schedule been established to address audit findings/deficiencies from the last audit?  Is Trend Analysis being performed on spill causes?
 Have work programs been assessed and updated as necessary?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

9.1 Assess work programs to ensure
outcomes are as intended. Annually X X

9.2 Prepare updates to work programs
and the SSMP based on assessments. As Needed X X

9.3 Monitor and evaluate spill trends.

Document efforts. Annually X X

RESILIENCE
Resilience is addressed in Element 9 by:
 Development of key performance indicators to measure effecƟveness of the SSMP.  Performing periodic reviews of the SSMP to help ensure it is being properly implemented.  Developing and adhering to a Ɵmeline to correct deficiencies found during the audit process.  Periodically evaluaƟng work programs to help ensure effecƟveness.

APPENDIX 9 INCLUSIONS:
 None

INTERNAL AUDITS

Page 55 of 56 ends

10. Internal Audits

WDR REQUIREMENTS
AƩachment D-10 (pg. D-10)
“The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with secƟon 5.4 (Sewer System Management Plan Audits) of this General Order.”

COMPLIANCE
The City completed its last audit in January 2025 (see Appendix 10.1) and will complete audits every three (3) years moving forward. The objecƟve of the audit is to evaluate compliance, implementaƟon and effecƟveness of the SSMP. AddiƟonally, the SSMP includes a descripƟon of how the City will comply with the requirements of each Element. The audit review includes an evaluaƟon to determine if compliance has been met.

ImplementaƟon is evaluated by determining if the City is execuƟng the SSMP as stated.

EffecƟveness is evaluated by using key performance indicators, which have been developed specifically for each element.

An addiƟonal evaluaƟon is performed to comply with SpecificaƟons 5.6 addressing resilience.

Resilience is addressed for each Element and is built-in to the Agencies collecƟon systems procedures and pracƟces.

Any deficiencies discovered through the audit process are noted and a plan and schedule to implement correcƟve measures are established.

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Have audits been performed as required?
 Have the audits assessed compliance, implementaƟon, and effecƟveness?  Have deficiencies been idenƟfied?
 Has a plan and schedule to recƟfy the deficiencies been established?

INTERNAL AUDITS

Page 56 of 56 ends

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party

CC ENG MGR

10.1 Schedule audits in advance of due dates to
ensure adequate Ɵme to complete. City has 6
months to complete the audit from the end of
the audit period.

Beginning at end of
audit period X X

10.2 Ensure a plan and schedule is developed to
address deficiencies.

Once the Audit is
completed X X

RESILIENCE
Resilience is addressed in Element 10 by:
 Periodically evaluaƟng key performance indicators during the audit period to assess effecƟveness and make correcƟons, if necessary, prior to the audit.
 EvaluaƟng previous audits to ensure deficiencies have been recƟfied.  Scheduling the audit due dates and compleƟng the audit on Ɵme.

APPENDIX 10 INCLUSIONS:
 10.1. 2021-2024 SSMP Audit

COMMUNICATION PROGRAM

Page 57 of 56 ends

11. CommunicaƟon Program

WDR REQUIREMENTS
AƩachment D-11 (pg. D-10)
“The Plan must include procedures for the Enrollee to communicate with:
 The public for:
o Spills and discharges resulƟng in closures of public areas, or that enter a source of drinking water; and
o The development, implementaƟon, and update of its Plan, including opportuniƟes for public input to Plan implementaƟon and updates.
 Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for:
o System operaƟon, maintenance, and capital improvement-related acƟviƟes.”

COMPLIANCE
 When the City experiences a spill, it is standard procedure to secure the affected area and keep the public away. This is generally done using barricades, cones and cauƟon tape. Should the City experience a spill that may require closure of public areas or enter a source drinking of water, signs will be immediately placed indicaƟng the issue and providing contact informaƟon. Staff will remain on site to provide an addiƟonal safety factor unƟl appropriate authoriƟes respond and direct otherwise.

In all cases, the City will follow the advice of higher authoriƟes, such as the local environmental health department and other regulatory authoriƟes.
 There are several opportuniƟes for stakeholders and the public to parƟcipate and provide input into the development and update of the City SSMP. During its iniƟal development stage, as with each SSMP Audit and update of the SSMP, the SSMP and related documents are presented to the City Council for review and acceptance. As previously noted, SSMP Audits are now performed every three years and re-cerƟficaƟon and acceptance of updated SSMPs is now required every six years. In addiƟon to the extensive iniƟal development process, re-cerƟficaƟons of the SSMP that have been presented to the Council on 8/2/2022.
 Prior to each Council MeeƟng, these documents are included in Council Agenda packet which are readily available for review on the City’s website. The SSMP is posted on the City’s website, which provides the public several ways to contact the City, via the “Contact Us” feature.  The SSMP is also available for public viewing on the City’s website or by appointment at the City office.  The City does not currently have satellite systems.
 Prior to finalizing this SSMP Update, the City anƟcipates updaƟng this element to include addiƟonal informaƟon and details to address all requirements specified in this secƟon above.

COMMUNICATION PROGRAM

Page 58 of 56 ends

EFFECTIVENESS
The City uƟlizes the following Key Performance Indicators for measuring effecƟveness of this Element:
 Does the City place all SSMP acƟon items on the agenda for regular counsel meeƟngs?  Does the City have signage, or other means, readily available to noƟfy the public of environmental or public risk factors related to a sewage spill?
 Does the City perform outreach to residenƟal customers?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
CC Eng Mgr

11.1 Ensure the City Council approves the
SSMP per schedule. Every 6 years X X

11.2 Ensure the SSMP is posted on the City
website and the link funcƟons
properly.

Annually X X

11.3 Ensure Sewage Spill Warning signs are
readily available to communicate with
the public when necessary
Annually X

RESILIENCE
Resilience is addressed in Element 11 by:
 Use the SSMP as a tool to communicate to the public how the City is managing the system.  Maintain a consistent presence in the service area by aƩending community events or issuing periodic newsleƩers or other communicaƟons to the public.
 Make it clear and easy for the public to contact the City.

APPENDIX 11 INCLUSIONS
 None

APPENDICIES

Page 59 of 56 ends

LIST OF APPENDICIES (not included herein)
APPENDIX 1  1.1. 2022 City Council ResoluƟon for AdopƟon of Updated 2022 SSMP APPENDIX 2  None
APPENDIX 3  None
APPENDIX 4  None
APPENDIX 5 
APPENDIX 6  6.1 Spill Emergency Response Plan (SERP)
APPENDIX 7  None
APPENDIX 8  8.1 2025-2030 Budget and Capital improvement Program (CIP)  8.2. Sewer Project 23-5656 - AdministraƟve Report
APPENDIX 9  None
APPENDIX 10  None
APPENDIX 11  None
APPENDIX 12  None