750
H.18., File # 26-1138 Meeting Date: 9/15/2026
There is no fiscal impact associated with this item.
Submitted by:
Joy A. Ford, City Attorney
ATTACHMENTS
· Ord. No. 3317-26 Amending Title 4, Chapter 38 of the Redondo Beach Municipal Code · Ord. No. 3318-26 Amending Title 1, Chapter 2, Section 1-2.01 of the Redondo Beach Municipal Code
· Ord. No. 3319-26 Amending Title 1, Chapter 2, Section 1-2.03 of the Redondo Beach Municipal Code
751
ORDINANCE NO. 3317-26
HEDGE ORDINANCE
Page No. 1
ORDINANCE NO. 3317-26
AN ORDINANCE OF THE CITY OF REDONDO BEACH,
CALIFORNIA, ADDING TITLE 4, CHAPTER 38, TO THE
REDONDO BEACH MUNICIPAL CODE PERTAINING TO
HEDGES
WHEREAS, the City has the authority to regulate to ensure the public’s health, safety and general welfare; and
WHEREAS, the City has received multiple complaints about hedges as well as multiple questions about the enforcement of hedges; and WHEREAS, on July 21, 2026, the City Council of the City of Redondo Beach, California, held a discussion on the City’s hedge-related ordinances and directed staff to pursue a revised hedge ordinance;
WHEREAS, on July 22, 2026, Councilmember Behrendt submitted a proposed revised ordinance, which was distributed to City Departments for review and input; and WHEREAS, on September 1, 2026, the City Council held a second discussion on the City’s hedge-related ordinances and directed staff to finalize the ordinance and present to Council for Introduction and First Reading.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. AMENDMENT OF CODE. Title 4, Chapter 38 is hereby added to the Redondo Beach Municipal Code and shall read as follows:
CHAPTER 38 HEDGES AND VEGETATION
4-38.01 Intent and purposes of chapter. This chapter establishes supplemental definitions, maintenance requirements, public safety and nuisance standards, and enforcement procedures applicable to hedges and vegetation throughout all zones of the City of Redondo Beach. The purposes of this section are to:
(a) Provide for light, air, and privacy for residents and property owners throughout the City;
(b) Safeguard public welfare by preventing visual obstructions at street, highway, alley, and driveway intersections that may endanger persons in motor vehicles, pedestrians, or other members of the traveling public;
(c) Promote traffic safety and emergency access by maintaining clear sightlines at driveways and intersections;
752
ORDINANCE NO. 3317-26
HEDGE ORDINANCE
Page No. 2
(d) Promote crime prevention through natural surveillance by maintaining reasonable visibility of residential and commercial properties from the public right-of-way; (e) Protect the character and livability of Redondo Beach neighborhoods by preventing the creation of walled-off streetscapes that isolate properties from the public right of way;
(f) Ensure that hedges are kept free of overgrown, unsightly or hazardous conditions and do not encroach upon utilities or the public right-of-way; and (g) Establish a fair, efficient, and legally sound enforcement framework that prioritizes genuine neighbor impacts and public safety concerns, while minimizing unnecessary enforcement actions for minor, trivial, or inconsequential violations.
Nothing in this chapter supersedes, limits, or replaces any remedy or enforcement authority available under any other provision of this Code, including without limitation Chapter 10 of Title 4 (Nuisances), nor does anything in this chapter prevent enforcement of any violation that also constitutes a violation of another provision of this Code or of local, state, or federal law.
4-38.02 Definitions.
For purposes of this chapter, the following terms shall have the meanings set forth below.
“Bona Fide Complainant” shall mean an owner or occupant of record on a lot located within 100 feet of the lot with an alleged violation.
“Critical and/or Urgent Violation” shall mean a violation of this chapter that constitutes any of the following, as determined by the City Manager, or designees:
(a) Traffic safety — sight obstruction. Any hedge or vegetation so located with respect to a driveway, intersection, path, or street approach as to prevent a clear view of approaching vehicles or members of the traveling public in sufficient time for a driver traveling at a reasonable speed to come to a full stop, or any Visual Obstruction within a Sight Triangle that exceeds the height limits in sections 10-
2.1524 or 10-5.1524, as applicable.
(b) Traffic safety — traffic control devices. Any hedge or vegetation that obstructs the clear visibility from the public right-of-way of any traffic control device, including without limitation stop signs, speed limit signs, street name signs, and traffic signals.
(c) Address visibility. Any hedge or vegetation that obstructs the clear visibility of property address numbers from the public right-of-way, impeding the ability of emergency responders or the public to identify the property. 753
ORDINANCE NO. 3317-26
HEDGE ORDINANCE
Page No. 3
(d) Emergency access. Any hedge or vegetation that obstructs, conceals, or impedes access to gates, entryways, pathways, or any portion of the property by emergency responders, or that prevents emergency responders from clearly observing conditions at or around the property from the public right-of-way. (e) Crime prevention and natural surveillance. Any hedge or vegetation located within a required front setback that eliminates or substantially reduces the visibility of front doors, ground-floor windows, or the front yard of a residential or commercial property from the public right-of-way, in a manner that provides concealment for criminal activity as determined by the Chief of Police or designee.
(f) Nighttime safety. Any hedge or vegetation that substantially blocks the illumination of driveways, intersections, entryways, or sidewalks by streetlights, porch lights, or other required or customary lighting, in a manner that creates a safety hazard for pedestrians or motorists.
(g) Fire hazard and defensible space. Any hedge, tree, shrub, or other vegetation of flammable character maintained within twenty (20) feet of any dwelling or structure used for human habitation where the vegetation is dead, dying, or inadequately maintained, such that it presents a fire hazard. (h) Public right-of-way encroachment. Any hedge or vegetation that encroaches into, over, or upon any public sidewalk, parkway, alley, street, or other public right-ofway in a manner that obstructs pedestrian or vehicular traffic, impedes ADArequired pedestrian access, or poses a hazard to persons using the right-of-way, including without limitation vegetation higher than twenty-four (24) inches in a parkway, and toxic, sharp, spiky, or nuisance vegetation adjacent to or overhanging a public right-of-way.
(i) Walled-off streetscape. A continuous hedge exceeding six (6) feet in height, extending along a single street frontage for a cumulative linear distance of fifty (50) feet or more, whether on a single parcel or across two or more immediately adjacent parcels under common or related ownership or control. (j) Other public health or safety hazard. Any other condition involving a hedge or vegetation that the City Manager, or designees, determines presents a risk to public health, safety, or welfare based on objective, articulable conditions. “Hedge” shall mean a continuous living screen, barrier, or boundary marker formed by a row, series, or grouping of two (2) or more closely spaced woody shrubs, bushes, trees, or other vegetation planted, cultivated, or maintained in close proximity so as to form, or that has grown to form, a substantially continuous physical or visual obstruction to passage or view, having a height greater than twelve (12) inches. “Height” shall mean the vertical distance from the top of the hedge to the grade (ground) directly below. The height shall be measured from the side of the hedge with the 754
ORDINANCE NO. 3317-26
HEDGE ORDINANCE
Page No. 4
highest grade (ground) elevation. Grades (grounds) shall not be artificially altered for the purpose of circumventing the height limits set forth in this section. “Shrub” shall mean a woody plant, generally smaller than a tree, typically with multiple stems branching from or near the ground.
“Sight Triangle” shall mean a triangular area at the corner of a lot at any street intersection or street-alley intersection, maintained clear of visual obstructions for traffic safety purposes.
“Tree” shall mean a plant having at least one well defined stem or trunk and normally attaining a mature height of at least 15 feet, and having a trunk that shall be kept clear of leaves and branches at least six feet above grade at maturity. “Vegetation” shall mean all types of plants, bushes, hedges, shrubs, and trees. “Visual Obstruction” shall mean any fence, hedge, tree, shrub, wall, structure, or other physical obstruction that limits the visibility of persons in motor vehicles, pedestrians, or the traveling public approaching intersecting or intercepting streets, alleys, paths, driveways, or other public rights-of-way.
4-38.03 Safety, Nuisance, and Right-of-Way Violations
The following conditions constitute violations of this chapter and are enforceable by the City independently of, and without regard to, the Bona Fide Complainant requirement set forth in section 4-38.05 below. Each condition described in this section may also independently constitute a violation of RBMC §4-10.02 or other applicable provisions of this Code or state or federal law, and nothing in this section limits or supersedes that independent enforcement authority.
(a) Traffic sight obstructions. It shall be a violation of this section for any property owner or occupant to tolerate, allow, or permit:
(1) Any tree, hedge or vegetation to be so located with respect to a driveway or street intersection as to prevent a clear view of approaching motor vehicles, pedestrians, or the traveling public in sufficient time for a vehicle driven at a reasonable speed to come to a full stop before such intersection or driveway approach is reached; or
(2) Any Visual Obstruction within a Sight Triangle that exceeds the height limits established in sections 10-2.1524 or 10-5.1524, as applicable. (b) Obstructions over and upon streets, sidewalks, and public rights-of-way. It shall be a violation of this section for any property owner or occupant to tolerate, allow, or permit any hedge, or limbs, branches, or other vegetation to be so situated or located as to encroach upon, obstruct, or overhang any public street, alley, parkway, or sidewalk in a manner that:
755
ORDINANCE NO. 3317-26
HEDGE ORDINANCE
Page No. 5
(1) obstructs or may reasonably be expected to obstruct the free passage of vehicular or pedestrian traffic;
(2) impedes or may reasonably be expected to impede ADA-required pedestrian access; or
(3) poses a risk to persons traversing streets, paths, or sidewalks in the immediate area.
A violation under this section does not require proof of actual injury or endangerment; a reasonable likelihood of harm based on objective, observable conditions is sufficient.
(c) Fire and flammability hazard. It shall be a violation of this section for any property owner or occupant to tolerate, allow, or permit any hedge, tree, shrub, or other vegetation of flammable character to be maintained within twenty (20) feet of any dwelling or other structure used for human habitation where the vegetation is dead, dying, or inadequately maintained, such that it presents a fire hazard. (d) Obstruction of traffic control devices, address numbers, and emergency access.
It shall be a violation of this section for any property owner or occupant to tolerate, allow, or permit any hedge or vegetation to obstruct the clear visibility from the public right-of-way of any traffic control device, property address numbers, or fire hydrants, or to obstruct emergency responder access to the property.
4-38.04 Maintenance and Encroachment
(a) Maintenance required. All hedges on any property within the City, regardless of zone, shall remain free of overgrown, unsightly or hazardous conditions and be maintained at all times. Maintenance includes regular trimming to prevent overgrowth beyond permitted heights, repair or removal of damaged or structurally unsound sections, and removal of debris or dead vegetation.
Maintenance violations that affect utilities or the public right-of-way are enforceable by a complaint submitted by a Bona Fide Complainant or by cityinitiated action where the condition constitutes a Critical and/or Urgent Violation. (b) No encroachment onto public right-of-way. No hedge shall encroach into, over, or upon any public sidewalk, parkway, alley, street, or other public right-of-way.
Encroachment onto the public right-of-way constitutes a Critical and/or Urgent Violation enforceable by the City without a complaint submitted by a Bona Fide Complainant.
4-38.05 Enforcement
(a) General. Enforcement of the height and location standards of this section shall be primarily complaint-driven for violations that are not Critical and/or Urgent Violations. Nothing in this subsection restricts any person's right to petition the City or submit information to City staff, nor does anything in this subsection limit 756
ORDINANCE NO. 3317-26
HEDGE ORDINANCE
Page No. 6
the City's enforcement authority for Critical and/or Urgent Violations as defined in section 4-38.02, for violations described in Section 4-38.03, or for violations of RBMC §4-10.02 or any other applicable provision of this Code or local, state, or federal law.
(b) Bona Fide Complainant requirement — non-Critical and/or Urgent Violations.
Absent a written complaint submitted by a Bona Fide Complainant as defined in section 4-38.02, the City has no duty to investigate a violation that is not a Critical and/or Urgent Violation. The submission of a complaint by a Bona Fide Complainant does not, standing alone, obligate the City to initiate enforcement action; the City retains full discretion, after an investigation, whether to initiate enforcement action under this section. Anonymous complaints and complaints from persons who do not qualify as Bona Fide Complainants may be logged for informational purposes but do not obligate the City to initiate an investigation or formal enforcement action.
(c) City discretion — Critical and/or Urgent Violations. The City retains full discretion whether to initiate enforcement action for Critical and/or Urgent Violations. (d) Good faith requirement. Complaints submitted under this section shall be made in good faith based on a genuine belief that a violation exists and that the complainant is materially affected by the alleged violation. The City reserves the right to decline to pursue enforcement where it determines that a complaint has been submitted for an improper purpose, including without limitation harassment of a property owner or an attempt to manipulate City enforcement resources for purposes unrelated to the welfare of the complaining party. A pattern of complaints by the same complainant targeting multiple unrelated properties in different parts of the City within a short period of time is a factor the City may consider in evaluating whether a complaint was submitted for an improper purpose.
4-38.06 Notice and Opportunity to Cure
(a) Standard notice procedure. Prior to initiating formal enforcement proceedings for a violation that is not a Critical and/or Urgent Violation, the City shall provide the property owner with written notice of the alleged violation. The notice shall:
(1) Identify the specific provision(s) of this chapter, Title 10, or other applicable provision of this Code alleged to be violated;
(2) Describe the condition constituting the alleged violation with reasonable specificity;
(3) State the corrective action required to achieve compliance; (4) Provide a minimum of sixty (60) days from the first date of notice to achieve voluntary compliance; and
757
ORDINANCE NO. 3317-26
HEDGE ORDINANCE
Page No. 7
(5) Advise the property owner of the right to contact the City to discuss the alleged violation and to submit information or evidence relevant to the enforcement determination.
(b) Critical and/or Urgent Violations. The notice and cure period in subsection (a) shall not apply to Critical and/or Urgent Violations. For such violations, the City may proceed to enforcement upon such notice as is reasonable under the circumstances.
(c) No waiver. The provision of notice under subsection (a) shall not be construed as a waiver of any enforcement right or remedy available to the City. 4-38.07 Penalties — Infractions and Misdemeanors
(a) Classification. Violations of this chapter are offenses that may be prosecuted as either an infraction or a misdemeanor, in the discretion of the City Attorney's Office, depending on the nature, severity, circumstances, and history of the violation, consistent with RBMC §1-2.01(b). Penalties shall be assessed consistent with RBMC §1-2.02.
(b) Cumulative violations. Each day that a violation of this chapter continues after the expiration of any applicable notice and cure period constitutes a separate offense.
(c) Preservation of remedies. Nothing in this chapter limits the authority of the City to pursue abatement, civil penalties, injunctive relief, or any other remedy available under this Code or applicable local, state, or federal law. Nothing in this chapter limits the rights of any person to pursue any civil or other remedy available under California law or any other applicable law. Enforcement under this chapter does not preclude concurrent or subsequent enforcement under RBMC §4-10.02 or any other applicable provision of this Code or local, state, or federal law.” SECTION 2. INCONSISTENT PROVISIONS. Any provisions of the Redondo Beach Municipal Code, or appendices thereto, or any other ordinances of the City inconsistent herewith, to the extent of such inconsistencies and no further, are hereby repealed.
SECTION 3. SEVERANCE. If any section, subsection, sentence, clause, or phrase of this ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of the ordinance. The City Council hereby declares that it would have passed this ordinance and each section, subsection, sentence, clause, and phrase thereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses, or phrases be declared invalid or unconstitutional.
SECTION 4. PUBLICATION AND EFFECTIVE DATE. This ordinance, or a summary of this ordinance, shall be published at least once in the City’s official newspaper within fifteen (15) days from and after the date of adoption; or published in conformance 758
ORDINANCE NO. 3317-26
HEDGE ORDINANCE
Page No. 8
with the alternative publication requirements pursuant to the Redondo Beach City Charter Section 9.15 by posting the ordinance in at least three public places in the City as designated by the Council and posted on the City’s online website or publicly available City-controlled internet site in lieu of publication if the ordinance solely pertains to the municipal affairs of the city, and same shall go into effect and be in full force and operation from thirty (30) days after its final passage and adoption.
759
ORDINANCE NO. 3317-26
HEDGE ORDINANCE
Page No. 9
PASSED, APPROVED AND ADOPTED this 15th day of September, 2026. __________________________
James A. Light, Mayor
APPROVED AS TO FORM: ATTEST:
_______________________________ ________________________________ Joy A. Ford, City Attorney Eleanor Manzano, CMC, City Clerk
760
ORDINANCE NO. 3317-26
HEDGE ORDINANCE
Page No. 10
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS
CITY OF REDONDO BEACH )
I, Eleanor Manzano, City Clerk of the City of Redondo Beach, California, do hereby certify that Ordinance No. 3317-26 was introduced at a regular meeting of the City Council of the City of Redondo Beach, California, held on the 8th of September, 2026, and approved and adopted by the City Council of the City of Redondo Beach, California, at a regular meeting of said City Council on the 15th of September, 2026, and thereafter signed and approved by the Mayor and attested by the City Clerk, and that said Ordinance was adopted by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
________________________________
Eleanor Manzano, CMC
City Clerk
761
ORDINANCE NO. 3318-26
AN ORDINANCE OF THE CITY OF REDONDO BEACH,
CALIFORNIA, AMENDING TITLE 1, CHAPTER 2, SECTION
1-2.01 OF THE REDONDO BEACH MUNICIPAL CODE
PERTAINING TO GENERAL PENALTIES: CONTINUING
VIOLATIONS
WHEREAS, on July 21, 2026, the City Council of the City of Redondo Beach, California, held a discussion on the City’s hedge-related ordinances and directed staff to pursue a revised hedge ordinance;
WHEREAS, on July 22, 2026, Councilmember Behrendt submitted a proposed revised ordinance, which was distributed to City Departments for review and input; and
WHEREAS, on September 1, 2026, the City Council held a second discussion on the City’s hedge-related ordinances and directed staff to finalize the ordinance and present to Council for Introduction and First Reading.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. AMENDMENT OF CODE. Title 1 General Provisions, Chapter 2 Penalty Provisions, Subsection (b) of Section 1-2.01, of the Redondo Beach Municipal Code is hereby amended to read as follows:
(b) A violation of any of the following provisions of this Code, may be charged by the City Attorney as either a misdemeanor or an infraction:
3-7.1402 Repairing Vehicles on Street,
3-7.2104 Utilities Connections Prohibited,
4-1.101 Distribution of Handbills Without a Permit,
4-1.201 Advertising Signs Prohibited,
4-9.201 Littering,
4-9.202 Maintenance of Litter,
4-10.02 Nuisance Conditions,
4-17.02 Live Entertainment: Permits Required,
4-22.02 Fencing of Construction Sites,
4-22.03 Storage of Construction Materials,
4-22.04 Removal of Litter,
4-22.05 Trash Receptacles,
4-22.06 Access to Construction Site,
4-22.07 Maintenance of Public Ways,
4-22.08 Protection of Pedestrians,
4-22.09 Blocking Driveways,
4-22.10 Portable Toilets,
4-22.11 Construction Information,
762
2 4-22.12 Protection from Sandblasting,
4-22.13 Disruption of Traffic,
4-23.01 Restrictions on the Sale of Personal Property,
4-23.02 Garage and Similar Sales,
4-33.03 Distribution of Handbills and Solicitation Where Property is Posted, 4-35.04 Presence in Parks or Recreation Facilities During Non-Designated Hours of Use,
4-35.06 Vehicles in Parks,
4-35.07(a) Dogs in Parks,
4-35.08(b) and (c) Animals in Parks,
4-35.10 Littering in Parks,
“
4-35.12 Storage of Personal Property in Parks,
4-35.18 Damaging Vegetation in Parks,
4-35.19 Fire Hazards in Parks,
4-35.20(a) Weapons and Explosives in Parks,
4-35.21 Organized Play; Permits Required,
4-35.22 Commercial Activities; Permits Required,
4-35.23 Other Activities; Permits Required,
4-35.24(d) Issuance of Permits,
4-35.25 Interference with Permit Holders,
4-38.03 Safety, Nuisance, and Right-of-Way Violations
4-38.04 Maintenance and Encroachment
5-2.105(e) Placement and Removal of Trash Containers,
5-2.201 Premises to Be Kept Clean,
5-2.202 Unlawful Accumulation,
5-2.203 Maintenance of Stagnant Water,
5-2.204 Abatement of Weeds,
10-2.1532 Metal, Unorthodox, and Unusual Buildings,
10-2.1806 Signs,
10-2.1818 Signs Not Permitted,
12-1.503 Soliciting.
763
ORDINANCE NO. 3318-26
AMENDING RBMC SECTION 1-2.01
Page No. 3
SECTION 2. INCONSISTENT PROVISIONS. Any provisions of the Redondo Beach Municipal Code, or appendices thereto, or any other ordinances of the City inconsistent herewith, to the extent of such inconsistencies and no further, are hereby repealed.
SECTION 3. SEVERANCE. If any section, subsection, sentence, clause, or phrase of this ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of the ordinance. The City Council hereby declares that it would have passed this ordinance and each section, subsection, sentence, clause, and phrase thereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses, or phrases be declared invalid or unconstitutional.
SECTION 4. PUBLICATION AND EFFECTIVE DATE. This ordinance, or a summary of this ordinance, shall be published at least once in the City’s official newspaper within fifteen (15) days from and after the date of adoption; or published in conformance with the alternative publication requirements pursuant to the Redondo Beach City Charter Section 9.15 by posting the ordinance in at least three public places in the City as designated by the Council and posted on the City’s online website or publicly available City-controlled internet site in lieu of publication if the ordinance solely pertains to the municipal affairs of the city, and same shall go into effect and be in full force and operation from thirty (30) days after its final passage and adoption.
764
ORDINANCE NO. 3318-26
AMENDING RBMC SECTION 1-2.01
Page No. 4
PASSED, APPROVED AND ADOPTED this 15th day of September, 2026. __________________________
James A. Light, Mayor
APPROVED AS TO FORM: ATTEST:
_______________________________ ________________________________ Joy A. Ford, City Attorney Eleanor Manzano, CMC, City Clerk
765
ORDINANCE NO. 3318-26
AMENDING RBMC SECTION 1-2.01
Page No. 5
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS
CITY OF REDONDO BEACH )
I, Eleanor Manzano, City Clerk of the City of Redondo Beach, California, do hereby certify that Ordinance No. 3318-26 was introduced at a regular meeting of the City Council of the City of Redondo Beach, California, held on the 8th of September, 2026, and approved and adopted by the City Council of the City of Redondo Beach, California, at a regular meeting of said City Council on the 15th of September, 2026, and thereafter signed and approved by the Mayor and attested by the City Clerk, and that said Ordinance was adopted by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
________________________________
Eleanor Manzano, CMC
City Clerk
766
ORDINANCE NO. 3319-26
AMENDING RBMC SECTION 1-2.03
Page No. 1
ORDINANCE NO. 3319-26
AN ORDINANCE OF THE CITY OF REDONDO BEACH,
CALIFORNIA, AMENDING TITLE 1, CHAPTER 2, SECTION 1-
2.03 OF THE REDONDO BEACH MUNICIPAL CODE
PERTAINING TO INFRACTIONS
WHEREAS, on July 21, 2026, the City Council of the City of Redondo Beach, California, held a discussion on the City’s hedge-related ordinances and directed staff to pursue a revised hedge ordinance;
WHEREAS, on July 22, 2026, Councilmember Behrendt submitted a proposed revised ordinance, which was distributed to City Departments for review and input; and WHEREAS, on September 1, 2026, the City Council held a second discussion on the City’s hedge-related ordinances and directed staff to finalize the ordinance and present to Council for Introduction and First Reading.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. AMENDMENT OF CODE. Title 1 General Provisions, Chapter 2 Penalty Provisions, Section 1-2.03, of the Redondo Beach Municipal Code is hereby amended to delete Section 10-2.1524(d) from this Section as follows:
A violation of any of the following provisions of this Code shall constitute an infraction and not a misdemeanor:
Title 3
Section Description
3-1.01 Bicycles: Licenses Required
3-1.04 Skateboards/Roller Skates: Riding on Sidewalks Prohibited 3-1.05 Bicycles, Skateboards, and Wheeled Toys: Parking Restricted 3-1.06 Skateboards/Roller Skates on Streets or Alleys
3-1.07 Skateboards/Roller Skates on Bicycle Paths
3-1.08 Blocking Bicycle Paths
3-4.105 Fireworks: Possession, Use, and the Like Without a Permit 3-6.05 Overtime Parking
3-6.06 Parking Position in Space
3-6.07 Limitation on Number of Vehicles per Marked Parking Space 3-6.12 Restriction of Parking by Signs
3-7.303 Persons Other Than Police Officers or Firemen Directing Traffic 3-7.406 Obedience to Traffic Control Devices
3-7.501 Signal Controlled Intersections: Right Turns
3-7.505 Left and Right Turns: Prohibited Where Signed
3-7.507 U Turns
3-7.801 Stops Required at Designated Intersections
767
ORDINANCE NO. 3319-26
AMENDING RBMC SECTION 1-2.03
Page No. 2
Title 3
Section Description
3-7.802 Emerging from Alleys and Private Driveways
3-7.803 Following Emergency Vehicles
3-7.804 Driving Through Funeral Processions
3-7.805 Motorcycles and Bicycles on Vacant Lots/Acreage: Noise/Dust 3-7.806 Clinging to Moving Vehicles
3-7.807 Driving Vehicles on Sidewalks
3-7.808 Driving on New Pavement
3-7.810 Trains Blocking Streets
3-7.811 Boarding and Alighting from Vehicles
3-7.812 Unlawful Riding on Vehicles
3-7.813 Railway Gates
3-7.902 Commercial Vehicles: Driving on Prohibited Streets 3-7.903 Commercial Vehicles on Certain Streets (Truck Routes) 3-7.1002 Crossing Streets in the Central Traffic District 3-7.1003 Crossing Streets at Right Angles
3-7.1004 Standing in Streets
3-7.1005 Pedestrians Standing on Sidewalks
3-7.1006 Places Closed to Pedestrian Travel
3-7.1101 Curb Parking: Exceptions
3-7.1103 Parking on Left Side of Street
3-7.1202 Parkways
3-7.1203 No Parking Zones: Designated
3-7.1204 No Parking Zones: Authorization to Establish
3-7.1205 Curb Zones: Time Limits: Markings
3-7.1208 Alley Parking
3-7.1209 Bus Zones
3-7.1210 Taxicab Stands
3-7.1301 Prohibited Outside Central Traffic District
3-7.1304 Authority of Signs
3-7.1305 Prohibited Between 7:00 a.m. and 9:00 a.m.
3-7.1306 Prohibited Between 7:00 a.m. and 6:00 p.m.
3-7.1307 Prohibited
3-7.1308 Prohibited During Various Hours
3-7.1309 Parking on Public and Private Property
3-7.1310 All Night Parking
3-7.1311 All Night Parking: Central Traffic District
3-7.1313 Storage of Vehicles on Streets and Alleys
3-7.1314 Temporary Parking
3-7.1315(c) Obedience to Emergency Rules and Signs
3-7.1318 Parking of Trailers, Semitrailers, Motor Homes, Campers and Recreational Trailers 3-7.1319 No Overnight Parking or Storage
768
ORDINANCE NO. 3319-26
AMENDING RBMC SECTION 1-2.03
Page No. 3
Title 3
Section Description
3-7.1320 Restricted Parking Due to Weight
3-7.1321 Restricted Parking Due to Height
3-7.1403 Removal of Debris
3-7.1404 Damaging Traffic Signs
3-7.1503 Permits Required to Operate Advertising Vehicles 3-7.1506 Searchlights, Generators, and Floodlights
3-7.1705 Parking in a Preferential Parking Zone Prohibited Except by Permit 3-7.2102 Overnight Parking Prohibited
3-7.2114 Overnight Parking Permit in City Parking Lots
3-10.03 Parking in Designated Stalls
3-10.04 Speed Control
Title 4
Section Description
4-7.02(b) Alcoholic Beverages: Possession of Open Container in Public Places and on Beaches 4-8.02 Curfew Detention: Loitering After 10:00 p.m.
4-9.701 Hang Gliders Prohibited
4-9.703 Flying Powered Model Aircraft and Gliders
4-9.707 Reckless Operation of Model Aircraft
4-9.802 Prohibited Activities on Piers
4-10.10 — 4-10.14 Commercial Exploitation of Sexual and Lewd Conduct 4-24.502 — 4-24.512 Noise Regulation
4-25.01 Ball Games and Hunting
4-35.05 Stopping or Parking Vehicles During Non-Designated Hours of Use 4-35.07(c)(1) — (4),
(c)(6) — (9)
Dogs in Parks
4-35.08(a) Animals in Parks
4-35.09(c) Alcoholic Beverages: Possession of Open Container in Parks 4-35.13 Skateboard Riding in Parks
4-35.14 Roller Skating, In-Line Skating and Bicycle Riding in Parks 4-35.15 Golfing in Parks
4-35.16 Operating Powered Model Aircraft and Boats in Parks 4-35.17 Erecting Barriers in Parks
769
ORDINANCE NO. 3319-26
AMENDING RBMC SECTION 1-2.03
Page No. 4
Title 5
Section Description
5-1.103 Dogs at Large (Dogs on Beaches)
5-1.501 Defecation by Dogs/Animals
5-1.711 Violation—Beekeeping Penalties
Title 10
Section Description
10-2.1700—10-2.1708 Parking Regulations
10-2.1524(d) Visibility at Intersections
10-2.1641 Smoke Shops and Tobacco Sales
10-5.1639 Smoke Shops and Tobacco Sales
Title 12
Section Description
12-1.203 Boat Races and Special Events
12-1.204 Vessels: Reverse Gears
12-1.302 Launching, Recovering, and Mooring of Vessels
12-1.305 Damages to Harbor, Waterways, Maritime Facilities, or Other Property 12-1.307 Obstruction of Harbor Facilities
12-1.308 Places of Abode
12-1.310 Obedience to Authorized Signs, Notices, Signals, and Buoys 12-1.311 Securing Permission for Debarkation
12-1.312 Protected Swimming Areas
12-1.314 Underwater Diving
12-1.315 Prohibitions: Swimming, Fishing, Surfboarding, and the Like 12-1.401 Mooring to Navigation Aids
12-1.402 Placement and Care of Private Buoys and Moorings 12-1.405 Making Vessels Fast
12-1.411 Obstructions to Fairways, Channels, or Berthing Spaces and Removal of Sunken Vessels
12-1.412 Dangerous or Disabled Vessels
12-1.413 Unseaworthy Vessels
12-1.506 Transfer of Bait
12-1.507 Sale of Live Bait
12-1.508 Commercial Vessels: Permits
12-1.513 Bait Disposal
12-1.702 Walkways to Be Kept Clear
12-1.703 Boarding Steps and Stairs
12-1.705 Hazardous Lights
12-1.706 Welding, Burning, and Cutting
12-1.707 Access Service Routes to Be Kept Clear
12-2.04 Tampering with Lighting Systems on Piers and Wharves 770
ORDINANCE NO. 3319-26
AMENDING RBMC SECTION 1-2.03
Page No. 5
Title 12
Section Description
12-2.05 Sale of Merchandise on Piers and Wharves
12-2.09 Fishing from Piers and Wharves
12-3.01 Beach Tents and Umbrellas
12-3.02 Beach Fires
12-3.05 Removal of Stones, Gravel, and Sand from Beaches 12-3.06 Littering Beaches
12-3.07 Littering Waters
12-3.08 Littering Public Places
12-3.09 Littering from Vehicles
SECTION 2. INCONSISTENT PROVISIONS. Any provisions of the Redondo Beach Municipal Code, or appendices thereto, or any other ordinances of the City inconsistent herewith, to the extent of such inconsistencies and no further, are hereby repealed.
SECTION 3. SEVERANCE. If any section, subsection, sentence, clause, or phrase of this ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of the ordinance. The City Council hereby declares that it would have passed this ordinance and each section, subsection, sentence, clause, and phrase thereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses, or phrases be declared invalid or unconstitutional.
SECTION 4. PUBLICATION AND EFFECTIVE DATE. This ordinance, or a summary of this ordinance, shall be published at least once in the City’s official newspaper within fifteen (15) days from and after the date of adoption; or published in conformance with the alternative publication requirements pursuant to the Redondo Beach City Charter Section 9.15 by posting the ordinance in at least three public places in the City as designated by the Council and posted on the City’s online website or publicly available City-controlled internet site in lieu of publication if the ordinance solely pertains to the municipal affairs of the city, and same shall go into effect and be in full force and operation from thirty (30) days after its final passage and adoption. 771
ORDINANCE NO. 3319-26
AMENDING RBMC SECTION 1-2.03
Page No. 6
PASSED, APPROVED AND ADOPTED this 15th day of September, 2026. __________________________
James A. Light, Mayor
APPROVED AS TO FORM: ATTEST:
_______________________________ ________________________________ Joy A. Ford, City Attorney Eleanor Manzano, CMC, City Clerk
772
ORDINANCE NO. 3319-26
AMENDING RBMC SECTION 1-2.03
Page No. 7
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS
CITY OF REDONDO BEACH )
I, Eleanor Manzano, City Clerk of the City of Redondo Beach, California, do hereby certify that Ordinance No. 3319-26 was introduced at a regular meeting of the City Council of the City of Redondo Beach, California, held on the 8th of September, 2026, and approved and adopted by the City Council of the City of Redondo Beach, California, at a regular meeting of said City Council on the 15th of September, 2026, and thereafter signed and approved by the Mayor and attested by the City Clerk, and that said Ordinance was adopted by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
________________________________
Eleanor Manzano, CMC
City Clerk
773
Administrative
Report
H.19., File # 26-1141 Meeting Date: 9/15/2026
To: MAYOR AND CITY COUNCIL
From: DIANE STRICKFADEN, HUMAN RESOURCES DIRECTOR
TITLE
AMEND THE REDONDO BEACH MUNICIPAL CODE RELATING TO COMPENSATION FOR THE
POSITIONS OF MAYOR, CITY COUNCILMEMBER, CITY CLERK AND CITY TREASURER INTRODUCE BY TITLE ONLY ORDINANCE NO. 3320-26, AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, AMENDING TITLE 2, CHAPTER 3, ARTICLE 9, SECTION 2-3.905 OF THE REDONDO BEACH MUNICIPAL CODE, ESTABLISHING
THE SALARY AND BENEFITS OF THE MAYOR FOR INTRODUCTION AND FIRST READING INTRODUCE BY TITLE ONLY ORDINANCE NO. 3321-26, AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, AMENDING TITLE 2, CHAPTER 3, ARTICLE 9, SECTION 2-3.906 OF THE REDONDO BEACH MUNICIPAL CODE, ESTABLISHING
THE SALARY AND BENEFITS OF THE CITY COUNCIL FOR INTRODUCTION AND FIRST
READING
INTRODUCE BY TITLE ONLY ORDINANCE NO. 3322-26, AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, AMENDING TITLE 2, CHAPTER 3, ARTICLE 9, SECTION 2-3.902 OF THE REDONDO BEACH MUNICIPAL CODE, ESTABLISHING
THE SALARY AND BENEFITS OF THE CITY CLERK FOR INTRODUCTION AND FIRST READING INTRODUCE BY TITLE ONLY ORDINANCE NO. 3323-26 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, AMENDING TITLE 2, CHAPTER 3, ARTICLE 9, SECTION 2-3.903 OF THE REDONDO BEACH MUNICIPAL CODE, ESTABLISHING THE
SALARY AND BENEFITS OF THE CITY TREASURER FOR INTRODUCTION AND FIRST
READING
EXECUTIVE SUMMARY
Under the City Charter, the salary for elected officials must be set at least 30 days prior to the nomination period for a new four-year term. It cannot be increased or decreased from that point until the completion of the subsequent four-year term. The filing period for the March 2027 election will open on November 9, 2026. Therefore, adjustments to salaries, if any, must be codified in an adopted ordinance no later than October 6, 2026.
At their meeting on September 8, 2026, the City Council reviewed the salary of the Mayor, City Council, City Clerk, and City Treasurer positions and considered recommendations from the Budget and Finance Commission. During the meeting, the City Council discussed the need to ensure the
774
H.19., File # 26-1141 Meeting Date: 9/15/2026
and Finance Commission. During the meeting, the City Council discussed the need to ensure the salaries are appropriately set to attract a broad and competitive candidate pool for the positions and that they do not discourage prospective candidates given the time commitment that is required to effectively perform the duties of each elected role. At the conclusion of the discussion, the City Council directed ordinances be prepared to adjust the salaries of the identified positions at the beginning of their next term. For the District 3 and 5 City Councilmember positions, as well as the City Clerk and City Treasurer positions, new terms start in April 2027. For the Mayor and District 1, 2, and 4 Councilmember positions, the new terms start in April 2029.
The various position’s initial salary adjustments are clarified in the chart below:
Position From To Percentage
Change
Effective Date
Mayor $1669.16/mo $2003.00/mo 20% April 1, 2029
City Council
(District 3 & 5)
$1669.16/mo $2003.00/mo 20% April 1, 2027
City Council
(District 1, 2 & 4)
$1669.16/mo $2003.00/mo 20% April 1, 2029
City Clerk $11,540.35/mo $12,694.40/mo 10% April 1, 2027 City Treasurer $2083.33/mo $2291.68/mo 10% April 1, 2027 As was noted during the September 8 discussion, adjustments of Mayor and Councilmember salaries are regulated statewide by SB 329 and Government Code Section 36516. A question was raised regarding specific language in the Government Code that states “No ordinance shall be enacted or amended to provide automatic future increases in salary.” After reviewing this language, the City Attorney’s Office has determined that the 3% adjustments proposed in years 2, 3 and 4 for the future Mayor and City Councilmember terms are not allowed. Accordingly, these adjustments have been removed from the Ordinances prepared for Introduction and first reading. The Ordinances pertaining to City Clerk and Treasurer salaries are unaffected and remain as directed on September 8.
Attached for consideration of introduction and first reading are four proposed ordinances that, if approved, would codify salary adjustments for the City’s elected Mayor, Councilmember, Clerk, and Treasurer positions beginning with each new four-year term.
BACKGROUND
Mayor and City Council Positions:
The compensation and benefits for the Mayor and City Councilmembers is specified in the Municipal Code and established by the City Council via ordinance. Previously, the pay for the Mayor and City Councilmembers had not increased since 2007 and was set at $927.31 per month ($11,127.72 per year). The compensation was reviewed by the City Council biannually between 2008 and 2022 with adjustments last being made in 2022 to $1669.16 per month ($20,030/year). The Mayor and City Council also receive deferred compensation in the amount of 12% of their salary, and the same fringe benefits provided to Management and Confidential employees.
The City Charter requires that any changes to the Mayor or City Council’s salary must be made at least 30 days prior to the nomination period for a new four-year term. Government Code Section 36516 lays out regulations for general law cities regarding how Councilmember salaries may be
775
H.19., File # 26-1141 Meeting Date: 9/15/2026
36516 lays out regulations for general law cities regarding how Councilmember salaries may be adjusted. Also, the Redondo Beach City Charter states that Mayor and Council salaries shall be set by ordinance in conformance with the above Government Code section.
Previously, Government Code section 36516 outlined a formula for increases based on population size and limited them to 5% per year based on the date of the last increase. In 2024, the State Legislature amended the Government Code via Senate Bill 329 in order to increase diversity on City Councils statewide, by allowing the Consumer Price Index to be used as an option for making adjustments, in order to keep up with inflation.
As there is an automatic four-year gap between salary adjustments due to the City’s process, the Mayor and Councilmember salaries are eligible to be increased by 20% for the next respective term.
At their meeting of September 8, 2026, the City Council directed staff to prepare ordinances to implement increases of 20% for the Mayor and City Council positions as follows:
City Council Districts 3 and 5: 20% increase effective April 1, 2027 Mayor and City Council Districts 1, 2 and 4: 20% increase effective April 1, 2029 The City Council also voted to provide a subsequent 3% increase to the Mayor and Councilmember positions effective years two through four of the upcoming new term. However, as noted above, due to language in Section 5 of Government Code Section 36516, the City Council will have to consider those increases at a future date.
City Clerk Position: The compensation and benefits for the City Clerk was last set via Ordinance 3246-22, which was adopted in 2022. The Ordinance established the City Clerk salary with yearly adjustments from 2023 through 2026. Effective April 1, 2026, the salary has been set at $11,540.35 per month.
The City Charter requires that any changes to the City Clerk’s salary must also be made at least 30 days prior to the nomination period for a new four-year term. It cannot be increased or decreased from that point until the completion of a subsequent four-year term.
The elected City Clerk position is considered a full-time department head position, oversees four full time employees, and is responsible for stand-alone elections, records management, City Council and agency agendas and minutes, administering the Commission appointment process, maintaining the City’s legislative history and several other functions.
At their meeting of September 8, 2026, the City Council directed staff to prepare an ordinance to increase the City Clerk salary by 10% effective April 1 2027 (to $12,694.40/month) with additional 3% increases each year in 2028, 2029, and 2030. Per ordinance, the City Clerk position receives the same benefits as the Management and Confidential Employee Unit. No changes to these benefits are currently being proposed.
City Treasurer Position: On June 3, 2014, the City Council reduced the salary for the City Treasurer position from $9,746 per month ($116,952 annually) to $2083.33 per month ($25,000 annually) in conjunction with a City Charter amendment that removed the full-time status of the City Treasurer position and made it a part-time position. The salary has been reviewed each four-year cycle since 2014, but has not been adjusted since that date.
776
H.19., File # 26-1141 Meeting Date: 9/15/2026
The elected City Treasurer position is considered a part time department head position, oversees one full-time employee, with the primary responsibility for managing City investments along with the audit of tax-based revenue sources.
At their meeting of September 8, 2026, the City Council directed staff to prepare an ordinance to increase the City Treasurer salary by 10% effective April 1 2027 (to $2291.68/month) with additional 3% increases each year in 2028, 2029 and 2030. Per ordinance, the City Treasurer position receives the same benefits as the Management and Confidential Employee Unit. No changes to these benefits are currently being proposed.
COORDINATION
The Human Resources Department coordinated this report with the Finance Department and the City Attorney’s Office
FISCAL IMPACT
The first of the proposed increases will take place on April 1, 2027, with three months remaining in the fiscal year. The estimated fiscal impact in FY 2026-2027 is roughly $7,500 for the four seats being adjusted April 1, 2027. Compensation changes affecting future fiscal years will be included in future operating budgets.
APPROVED BY:
Mike Witzansky, City Manager
ATTACHMENTS
· Ordinance No.3320-26 Mayor Salary Adjustment
· Ordinance No.3321-26 City Council Salary Adjustment
· Ordinance No.3322-26 City Clerk Salary Adjustment
· Ordinance No.3323-26 City Treasurer Salary Adjustment · Government Code 36516
777
ORDINANCE NO.3320-26
AMENDING RBMC SECTION 2-3.905
ESTABLISHING SALARY &
BENEFITS OF THE MAYOR
ORDINANCE NO. 3320-26
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
REDONDO BEACH, CALIFORNIA, AMENDING TITLE 2, CHAPTER
3, ARTICLE 9, SECTION 2-3.905 OF THE REDONDO BEACH
MUNICIPAL CODE, ESTABLISHING THE SALARY AND BENEFITS
OF THE MAYOR
WHEREAS, Council and Mayoral service requires Councilmembers and the Mayor to maintain direct channels of communication with constituents — including newsletters, digital outreach tools, and other means of public engagement — reflecting an expansion in the practical scope and personal financial cost of the office since compensation was last adjusted in 2022; and
WHEREAS, rather than establishing a separate stipend or reimbursement mechanism for such costs, which would require additional administrative oversight and costs, the City Council finds it more transparent and warranted to reflect these costs of service within overall compensation, consistent with ensuring that compensation reasonably reflects the full scope of duties and expenses associated with the office; and WHEREAS, this salary adjustment may also help our City Council and Mayoral positions become more diverse because increased compensation can help individuals from across different income levels receive sufficient income from their service to help ensure that they can continue to serve the public and support their families.
THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Title 2, Chapter 3, Article 9, Section 2-3.905 of the Redondo Beach Municipal Code, is hereby amended to read as follows:
Sec. 2-3.905. Salary of Mayor: Entitlement to Fringe Benefits “Effective April 1, 2029, the salary of the Mayor shall be, and the same is hereby determined fixed and established at the sum of Two Thousand and Three and 00/100ths ($2,003.00) Dollars per month. The Mayor shall receive in addition, deferred compensation in the amount of twelve (12%) percent of salary, and shall be entitled to receive those other fringe benefits applicable to the position and similar to which the Management and Confidential employees, from time to time, may be entitled.” SECTION 2. INCONSISTENT PROVISIONS. Any provisions of the Redondo Beach Municipal Code, or appendices thereto, or any other ordinances of the City inconsistent herewith, to the extent of such inconsistencies and no further, are hereby repealed.
778
ORDINANCE NO.3320-26
AMENDING RBMC SECTION 2-3.905
ESTABLISHING SALARY &
BENEFITS OF THE MAYOR
SECTION 3. SEVERANCE. If any section, subsection, sentence, clause, or phrase of this ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this ordinance. The City Council hereby declares that it would have passed this ordinance and each section, subsection, sentence, clause, and phrase thereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses, or phrases be declared invalid or unconstitutional.
SECTION 4. PUBLICATION AND EFFECTIVE DATE. This ordinance shall be published by one insertion in the official newspaper of said city, and same shall go into effect and be in full force and operation from and after thirty (30) days after its final passage and adoption.
PASSED, APPROVED AND ADOPTED this 6th day of October, 2026. ________________________
James A. Light, Mayor
APPROVED AS TO FORM: ATTEST:
__________________________ ________________________________ Joy A. Ford, City Attorney Eleanor Manzano, CMC, City Clerk 779
ORDINANCE NO.3320-26
AMENDING RBMC SECTION 2-3.905
ESTABLISHING SALARY &
BENEFITS OF THE MAYOR
ATTEST:
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS
CITY OF REDONDO BEACH)
I, Eleanor Manzano, City Clerk of the City of Redondo Beach, California, do hereby certify that the foregoing Ordinance No.3320-26 duly introduced at a regular meeting of the City Council held on the 15th day of September, 2026, and was duly approved and adopted by the City Council at a regular meeting of said City Council held on the 6th day of October, 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
_______________________
Eleanor Manzano, City Clerk
780
ORDINANCE NO. 3321-26
AMENDING RBMC SECTION 2-3.906
ESTABLISHING SALARY &
BENEFITS OF CITY COUNCILMEMBERS
ORDINANCE NO. 3321-26
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
REDONDO BEACH, CALIFORNIA, AMENDING TITLE 2, CHAPTER
3, ARTICLE 9, SECTION 2-3.906 OF THE REDONDO BEACH
MUNICIPAL CODE, ESTABLISHING THE SALARY AND BENEFITS
OF THE CITY COUNCIL
WHEREAS, Council and Mayoral service requires Councilmembers and the Mayor to maintain direct channels of communication with constituents — including newsletters, digital outreach tools, and other means of public engagement — reflecting an expansion in the practical scope and personal financial cost of the office since compensation was last adjusted in 2022; and
WHEREAS, rather than establishing a separate stipend or reimbursement mechanism for such costs, which would require additional administrative oversight and costs, the City Council finds it more transparent and warranted to reflect these costs of service within overall compensation, consistent with ensuring that compensation reasonably reflects the full scope of duties and expenses associated with the office; and WHEREAS, this salary adjustment may also help our City Council and Mayoral positions become more diverse because increased compensation can help individuals from across different income levels receive sufficient income from their service to help ensure that they can continue to serve the public and support their families.
THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Title 2, Chapter 3, Article 9, Section 2-3.906 of the Redondo Beach Municipal Code, is hereby amended to read as follows:
Sec. 2-3.906. Salary of Councilmembers: Entitlement to Fringe Benefits “Effective April 1, 2027, the salary of the District 3 and District 5 City Councilmembers shall be, and the same is hereby determined fixed and established at the sum of Two Thousand and Three and 00/100ths ($2,003.00) Dollars per month. The Councilmembers shall receive in addition, deferred compensation in the amount of twelve (12%) percent of salary, and shall be entitled to receive those other fringe benefits applicable to the position and similar to which the Management and Confidential employees, from time to time, may be entitled.”
“Effective April 1, 2029, the salary of the District 1, District 2 and District 4 City Councilmembers shall be, and the same is hereby determined fixed and established at the sum of Two Thousand and Three and 00/100ths ($2,003.00) Dollars per month. The 781
ORDINANCE NO. 3321-26
AMENDING RBMC SECTION 2-3.906
ESTABLISHING SALARY &
BENEFITS OF CITY COUNCILMEMBERS
Councilmembers shall receive in addition, deferred compensation in the amount of twelve (12%) percent of salary, and shall be entitled to receive those other fringe benefits applicable to the position and similar to which the Management and Confidential employees, from time to time, may be entitled.”
SECTION 2. INCONSISTENT PROVISIONS. Any provisions of the Redondo Beach Municipal Code, or appendices thereto, or any other ordinances of the City inconsistent herewith, to the extent of such inconsistencies and no further, are hereby repealed.
SECTION 3. SEVERANCE. If any section, subsection, sentence, clause, or phrase of this ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this ordinance. The City Council hereby declares that it would have passed this ordinance and each section, subsection, sentence, clause, and phrase thereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses, or phrases be declared invalid or unconstitutional.
SECTION 4. PUBLICATION AND EFFECTIVE DATE. This ordinance shall be published by one insertion in the official newspaper of said city, and same shall go into effect and be in full force and operation from and after thirty (30) days after its final passage and adoption.
PASSED, APPROVED AND ADOPTED this 6th day of October, 2026. ________________________
James A. Light, Mayor
APPROVED AS TO FORM: ATTEST:
__________________________ ________________________________ Joy A. Ford, City Attorney Eleanor Manzano, CMC, City Clerk 782
ORDINANCE NO. 3321-26
AMENDING RBMC SECTION 2-3.906
ESTABLISHING SALARY &
BENEFITS OF CITY COUNCILMEMBERS
ATTEST:
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS
CITY OF REDONDO BEACH)
I, Eleanor Manzano, City Clerk of the City of Redondo Beach, California, do hereby certify that the foregoing Ordinance No.3321-26 duly introduced at a regular meeting of the City Council held on the 15th day of September, 2026, and was duly approved and adopted by the City Council at a regular meeting of said City Council held on the 6th day of October, 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
_______________________
Eleanor Manzano, City Clerk
783
ORDINANCE NO. 3322-26
AMENDING RBMC SECTION 2-3.902
ESTABLISHING SALARY &
BENEFITS OF THE CITY CLERK
ORDINANCE NO. 3322-26
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
REDONDO BEACH, CALIFORNIA, AMENDING TITLE 2, CHAPTER
3, ARTICLE 9, SECTION 2-3.902 OF THE REDONDO BEACH
MUNICIPAL CODE, ESTABLISHING THE SALARY AND BENEFITS
OF THE CITY CLERK
THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Title 2, Chapter 3, Article 9, Section 2-3.902 of the Redondo Beach Municipal Code, is hereby amended to read as follows:
Sec. 2-3.902. Salary of City Clerk: Entitlement to Fringe Benefits “Effective April 1, 2027, the salary of the City Clerk shall be, and the same is hereby determined fixed and established at the sum of Twelve Thousand Six Hundred Ninety-Four and 39/100ths ($12,694.39) Dollars per month. Such salary shall be increased by three (3%) percent on April 1, 2028; three (3%) percent on April 1, 2029; and three (3%) percent on April 1, 2030. The City Clerk shall receive those fringe benefits to which the Management and Confidential Unit, from time to time, may be entitled.”
SECTION 2. INCONSISTENT PROVISIONS. Any provisions of the Redondo Beach Municipal Code, or appendices thereto, or any other ordinances of the City inconsistent herewith, to the extent of such inconsistencies and no further, are hereby repealed.
SECTION 3. SEVERANCE. If any section, subsection, sentence, clause, or phrase of this ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this ordinance. The City Council hereby declares that it would have passed this ordinance and each section, subsection, sentence, clause, and phrase thereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses, or phrases be declared invalid or unconstitutional.
SECTION 4. PUBLICATION AND EFFECTIVE DATE. This ordinance shall be published by one insertion in the official newspaper of said city, and same shall go into effect and be in full force and operation from and after thirty (30) days after its final passage and adoption.
784
ORDINANCE NO. 3322-26
AMENDING RBMC SECTION 2-3.902
ESTABLISHING SALARY &
BENEFITS OF THE CITY CLERK
PASSED, APPROVED AND ADOPTED this 6th day of October, 2026. ________________________
James A. Light, Mayor
APPROVED AS TO FORM: ATTEST:
__________________________ ________________________________ Joy A. Ford, City Attorney Eleanor Manzano, CMC, City Clerk 785
ORDINANCE NO. 3322-26
AMENDING RBMC SECTION 2-3.902
ESTABLISHING SALARY &
BENEFITS OF THE CITY CLERK
ATTEST:
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS
CITY OF REDONDO BEACH)
I, Eleanor Manzano, City Clerk of the City of Redondo Beach, California, do hereby certify that the foregoing Ordinance No.3322-26 duly introduced at a regular meeting of the City Council held on the 15th day of September, 2026, and was duly approved and adopted by the City Council at a regular meeting of said City Council held on the 6th day of October, 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
_______________________
Eleanor Manzano, City Clerk
786
ORDINANCE NO.3323-26
AMENDING RBMC SECTION 2-3.903
ESTABLISHING SALARY &
BENEFITS OF THE CITY TREASURER
ORDINANCE NO. 3323-26
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
REDONDO BEACH, CALIFORNIA, AMENDING TITLE 2, CHAPTER
3, ARTICLE 9, SECTION 2-3.903 OF THE REDONDO BEACH
MUNICIPAL CODE, ESTABLISHING THE SALARY AND BENEFITS
OF THE CITY TREASURER
THE CITY COUNCIL OF THE CITY OF REDONDO BEACH, CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS:
SECTION 1. Title 2, Chapter 3, Article 9, Section 2-3.903 of the Redondo Beach Municipal Code, is hereby amended to read as follows:
Sec. 2-3.903. Salary of City Treasurer: Entitlement to Fringe Benefits “Effective April 1, 2027, the salary of the City Treasurer shall be, and the same is hereby determined fixed and established at the sum of Two Thousand Two Hundred Ninety-Two and 66/100ths ($2,291.66) Dollars per month. Such salary shall be increased by three (3%) percent on April 1, 2028; three (3%) percent on April 1, 2029; and three (3%) percent on April 1, 2030. The City Treasurer shall receive those fringe benefits to which the Management and Confidential Unit, from time to time, may be entitled.”
SECTION 2. INCONSISTENT PROVISIONS. Any provisions of the Redondo Beach Municipal Code, or appendices thereto, or any other ordinances of the City inconsistent herewith, to the extent of such inconsistencies and no further, are hereby repealed.
SECTION 3. SEVERANCE. If any section, subsection, sentence, clause, or phrase of this ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this ordinance. The City Council hereby declares that it would have passed this ordinance and each section, subsection, sentence, clause, and phrase thereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses, or phrases be declared invalid or unconstitutional.
SECTION 4. PUBLICATION AND EFFECTIVE DATE. This ordinance shall be published by one insertion in the official newspaper of said city, and same shall go into effect and be in full force and operation from and after thirty (30) days after its final passage and adoption.
787
ORDINANCE NO.3323-26
AMENDING RBMC SECTION 2-3.903
ESTABLISHING SALARY &
BENEFITS OF THE CITY TREASURER
PASSED, APPROVED AND ADOPTED this 6th day of October, 2026. ________________________
James A. Light, Mayor
APPROVED AS TO FORM: ATTEST:
__________________________ ________________________________ Joy A. Ford, City Attorney Eleanor Manzano, CMC, City Clerk 788
ORDINANCE NO.3323-26
AMENDING RBMC SECTION 2-3.903
ESTABLISHING SALARY &
BENEFITS OF THE CITY TREASURER
ATTEST:
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS
CITY OF REDONDO BEACH)
I, Eleanor Manzano, City Clerk of the City of Redondo Beach, California, do hereby certify that the foregoing Ordinance No.3323-26 duly introduced at a regular meeting of the City Council held on the 15th day of September, 2026, and was duly approved and adopted by the City Council at a regular meeting of said City Council held on the 6th day of October, 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
_______________________
Eleanor Manzano, City Clerk
789
TITLE 4. GOVERNMENT OF CITIES [34000 - 45345] ( Title 4 added by Stats. 1949, Ch. 79. ) DIVISION 3. OFFICERS [36501 - 41805] ( Division 3 added by Stats. 1949, Ch. 79. ) PART 1. GENERAL [36501 - 36525] ( Part 1 added by Stats. 1949, Ch. 79. ) 36516.
GOVERNMENT CODE - GOV
(a) (1) A city council may enact an ordinance providing that each member of the city council shall receive a salary based on the population of the city as set forth in paragraph (2).
(2) The salaries approved by ordinance under paragraph (1) shall be as follows:
(A) In cities up to and including 35,000 in population, up to and including nine hundred fifty dollars ($950) per month. (B) In cities over 35,000 up to and including 50,000 in population, up to and including one thousand two hundred seventy-five dollars ($1,275) per month.
(C) In cities over 50,000 up to and including 75,000 in population, up to and including one thousand six hundred dollars ($1,600) per month.
(D) In cities over 75,000 up to and including 150,000 in population, up to and including one thousand nine hundred dollars ($1,900) per month.
(E) In cities over 150,000 up to and including 250,000 in population, up to and including two thousand five hundred fifty dollars ($2,550) per month.
(F) In cities over 250,000 population, up to and including three thousand two hundred dollars ($3,200) per month. (3) For the purposes of this subdivision, the population of a city shall be determined by the last preceding federal census, or a subsequent census, or estimate validated by the Department of Finance. (4) The salary of council members may be increased beyond the amount provided in this subdivision by an ordinance or by an amendment to an ordinance, but the amount of the increase shall not exceed the greater of either of the following:
(A) An amount equal to 5 percent for each calendar year from the operative date of the last adjustment of the salary in effect when the ordinance or amendment is enacted.
(B) An amount equal to inflation since January 1, 2024, based upon the California Consumer Price Index, which shall not exceed 10 percent for each calendar year.
(5) No ordinance shall be enacted or amended to provide automatic future increases in salary. (b) Notwithstanding subdivision (a), at any municipal election, the question of whether city council members shall receive a salary for services, and the amount of that salary, may be submitted to the electors. If a majority of the electors voting at the election favor it, all of the council members shall receive the salary specified in the election call. The salary of council members may be increased beyond the amount provided in this section or decreased below the amount in the same manner. (c) Unless specifically authorized by another statute, a city council may not enact an ordinance providing for compensation to city council members in excess of that authorized by the procedures described in subdivisions (a) and (b). For the purposes of this section, compensation includes payment for service by a city council member on a commission, committee, board, authority, or similar body on which the city council member serves. If the other statute that authorizes the compensation does not specify the amount of compensation, the maximum amount shall be one hundred fifty dollars ($150) per month for each commission, committee, board, authority, or similar body. (d) Any amounts paid by a city for retirement, health and welfare, and federal social security benefits shall not be included for purposes of determining salary under this section, provided that the same benefits are available and paid by the city for its employees. (e) Any amounts paid by a city to reimburse a council member for actual and necessary expenses pursuant to Section 36514.5 shall not be included for purposes of determining salary pursuant to this section. (f) A city council member may waive any or all of the compensation permitted by this section. (g) (1) For the purposes of this section, a city council shall consider the adoption of an ordinance to increase compensation in open session during at least two regular meetings of the city council. (2) At the first meeting, the city council shall present the proposed ordinance, which shall include findings demonstrating the need for the increased compensation. The ordinance shall not be adopted at the first meeting. (3) At least seven days after the first meeting, the city council shall hold a second meeting to consider whether to adopt the ordinance. (Amended by Stats. 2023, Ch. 27, Sec. 2. (SB 329) Effective January 1, 2024.) 790
Administrative
Report
H.20., File # 26-1151 Meeting Date: 9/15/2026
To: MAYOR AND CITY COUNCIL
From: LUKE SMUDE, ASSISTANT TO THE CITY MANAGER
TITLE
RECEIVE AND FILE THE MONTHLY UPDATE TO THE STRATEGIC PLAN OBJECTIVES ADOPTED BY THE CITY COUNCIL ON MAY 5, 2026
EXECUTIVE SUMMARY
On March 31, 2026, the City Council held a strategic planning session to discuss and update the City’s Strategic Plan. At the session, the Mayor and City Council considered recent accomplishments, identified new strengths, weaknesses, opportunities, and threats (SWOT), evaluated and adjusted the previously established three-year priority areas, and listed specific goals and objectives for the upcoming 12-month period. On May 5, 2026, the City Council reviewed the draft objectives, added additional items that are incorporated in the attached matrix, and adopted the Plan. This report provides the fourth update to the current Strategic Plan.
BACKGROUND
The City has been committed to a strategic planning process since 1998, a process that focuses staff resources on achievable policy goals and objectives set by the City Council. On February 17, 2026, the Council directed staff to pursue an abbreviated strategic planning process facilitated internally rather than through an outside consultant. The strategic planning session was hosted in the secondfloor meeting room of the Main Library on March 31, 2026.
During the session, the Mayor and City Council discussed the City’s prior accomplishments (recognizing 125 completed objectives and projects), evaluated and adjusted the previously established three-year goals, and identified the objectives for the upcoming 12-month period.
The three-year goals (2026-2029), which serve as the overarching framework for the Strategic Plan, were reviewed and updated. Items that were edited, or added, are identified below with asterisks:
Priority Area 1: Economic Vitality
· Goal 1.1 Enhance the Waterfront
· Goal 1.2: Revitalize Artesia Boulevard
· Goal 1.3: Position Redondo Beach as a Destination for Businesses Investment · *Goal 1.4: Enhance the City’s Fiscal Sustainability
· Future Goal 1.5: Revitalize the Pacific Coast Highway Corridor · *Future Goal 1.6: Identify Efforts to Enhance Business Retention · *Future Goal 1.7: Identify Programs that have Shown Success on Artesia Blvd. and
791
H.20., File # 26-1151 Meeting Date: 9/15/2026
· *Future Goal 1.7: Identify Programs that have Shown Success on Artesia Blvd. and Report on Steps to Implement them on PCH
Priority Area 2: Public Safety and Community Well-Being · Goal 2.1 Implement Measure FP (Reconstruct City Fire and Police Facilities) · Goal 2.2: Strengthen the City’s Mental Health Response and Community Support Systems
· Goal 2.3: Further Enhance the City’s Approach to Addressing Homelessness · *Goal 2.4: Continue to Enhance Public Safety, Emergency Response, and Community Resilience
Priority Area 3: Infrastructure and Public Spaces
· *Goal 3.1: Rehabilitate City Roads, Critical Public Facilities, and Infrastructure · Goal 3.2: Expand and Enhance Public Spaces, Amenities, and Programs · Goal 3.3: Enhance Alternative Transportation Options
· Future Goal 3.4: Develop Long-Range Plans to Modernize City Facilities, Including the Public Works Yard and City Hall
Priority Area 4: Customer-Centered Service Delivery
· Goal 4.1: Improve Customer Service by Expanding the City’s Use of Digital Tools and Online Services
Priority Area 5: Community Stewardship
· Goal 5.1: Advance Environmental Sustainability and Climate Resilience · Goal 5.2: Preserve and Promote the City’s Historic Resources and Neighborhood Character
The objectives have been drafted to ensure that they are specific and quantifiable, identify the various Departments that will be responsible for their completion, and establish target execution dates.
The City Manager’s Office provides monthly updates on the adopted 12-month objectives to enable the Mayor and Council to monitor the City’s progress on the Strategic Plan. The attached matrix includes updates and notations provided by the Department(s) responsible for each objective. This is the fourth update for this iteration of the Strategic Plan.
COORDINATION
The City Manager’s Office coordinated updates to the Strategic Planning Matrix with each assigned City Department.
FISCAL IMPACT
Funding for completion of the objectives in the Strategic Plan is included in the City’s annual budget.
APPROVED BY:
Mike Witzansky, City Manager
792
H.20., File # 26-1151 Meeting Date: 9/15/2026
ATTACHMENTS
· September 15, 2026 Strategic Plan Update
793
City of Redondo Beach Strategic Plan 2026-2027 | Page 1 of 11 City of Redondo Beach Strategic Plan
DRAFT Three-Year Priority Areas & 12-Month Objectives
March 2026 –March 2027
CM= City Manager ATCM=Assistant to City Manager CD=Community Development CS=Community Services FD=Fire Department FS=Financial Services HR=Human Resources IT=Information Technology LIB=Library PD=Police Department PW=Public Works WED=Waterfront and Economic Development CA=City Attorney CC=City Clerk CT=City Treasurer Priority Area 1: Economic Vitality
Goal 1.1 Enhance the Waterfront
# When Who Objectives Done On Target Revised Notes
1 By January 1,
2027
WED Discuss options to attract a new tenant for the former Gold Gym’s site and explore a potential land swap agreement to move the property out of the Tidelands Trust. X A prospective Children’s Museum operator has
expressed interest in the former Gold Gym’s
site. Staff have explained the State Lands
requirements and connected the group with the
current lease holder.
2 By September
1, 2026 WED Advance lease negotiations for the former Fun Factory site and identify a prospective leaseholder/operator for a Waterfront Market Hall.
X
Staff completed the Surplus Lands Act process
for the former Fun Factory site and has
prepared/transmitted an Exclusive Negotiating
Agreement for consideration by the prospective
tenant.
3 By January 1,
2027
WED
Provide Boat Launch application coordination with DBW as required, advance designs, consider Coastal Commission and CDP requirements, and report back to City Council the results of the City’s funding request.
X
Staff worked with the City’s consultant to
revise the design and cost estimate as
directed by the Department of Boating and
Waterways. The revised design reduces the
total project cost from the original $16.8
million estimate to approximately $8.7
million, primarily by eliminating the wall
replacement and combined Basin 3/public
restroom building, and modifying the boat
launch to meet the grantor’s required 20-
year lifespan rather than the originally
planned 50 years. The revised estimate
includes $6.23 million in construction costs
and $2.43 million for engineering,
escalation, contingency, inspection, and
permits.
4 By September
1, 2026 CS, PW
Finalize the design for Phase One of the Seaside Lagoon Reconstruction Project, complete the Coastal Development Permit application, submit it to the CA Coastal Commission, and advance construction drawings.
X
Staff continues working with NUVIS to
finalize the entitlement package for the CDP
application. The Harbor Commission
reviewed and provided their
recommendation on the updated design at a
Special Meeting held on August 25, 2026.
The Council will provide direction to staff
on the preparation and submittal of a
coastal development permit application to
794
City of Redondo Beach Strategic Plan 2026-2027 | Page 2 of 11 the CA Coastal Commission at the
September 15, 2026 CC meeting.
5 By January 1,
2027
WED, CD Complete the parking study related to adjusting the Local Coastal Program requirements for King Harbor Marina parking and present the results to the City Council.
X
The parking study kicked-off on May 19,
2026 with data collection occurring in June
2026. Staff anticipates a final study report
will be provided in September 2026.
6 By March 1,
2027
FD, WED Review and present to the City Council suggested updates to the City’s Municipal Code pertaining to Harbor/Marine safety regulations. X
7 By January 1,
2027
WED Advance lease negotiations for possible reinvestment in businesses on the Monstad Pier. X Discussions are underway with the lessee and
the Community Development Department to
advance new plans for the ground floor space
previously occupied by Maison Riz.
8 By January 1,
2027
PW Explore opportunities to demolish the existing structure on the Joe’s Crab Shack site. X 9 By January 1,
2027
WED, CS Provide a status report on efforts to enhance internal and external communications for Waterfront activities and events. X
10 By October 1,
2026 WED, CS
Work with the Harbor and Pier Associations to develop and improve Holiday Events in the Waterfront. X
City representatives participate in Harbor
and Pier Association monthly meetings to
continue discussions about upcoming
events. Staff has met with holiday event
coordinators for the boat parade, craft
market and community viewing area.
11 By May 1, 2027 WED, FD
Present a report to the City Council comparing the City’s harbor/marine management operating model/organizational structure to other municipal waterfront organizations. X Goal 1.2: Revitalize Artesia Boulevard
# When Who Objectives Done On Target Revised Notes
12 By January 1,
2027
CS, PW Continue implementation of the ARTesia Strategic Plan including selection of artists and artworks for eventual installation. X
The Community Panel met in August 2026.
They selected three-to-four artists for each
identified art location. Selected artists will
be presented to the Cultural Arts
Commission, then to the City Council for
approval before releasing the RFP for art
designs.
13 By August 1,
2026 CD
Prepare a Land Use Element and Zoning Ordinance related to adjusting the FAR Ratio and implementing rooftop dining and property investment incentives along the Artesia/Aviation Corridor, complete the related Article XVII analysis, and prepare the item for inclusion as part of a fall election.
X The items were approved on August 4, 2026.
14 By May 1, 2027 CD Evaluate the effectiveness of eliminating commercial parking requirements along Artesia and Aviation Blvd. and present the results to the City Council. X 15 By May 1, 2027 CD Utilize information from the AREAS Report to proactively seek investment on Artesia Blvd. by communicating vacancies to the business community. X
795
City of Redondo Beach Strategic Plan 2026-2027 | Page 3 of 11 Goal 1.3: Position Redondo Beach as a Destination for Business Investment # When Who Objectives Done On Target Revised Notes
16 By May 1, 2027 CD
Prepare updates to the Municipal Code to improve the design and appearance of commercial signs and present them to the City Council for consideration along with options for a maintenance (blight prevention) ordinance to regulate storefront conditions.
X
A City Council review and policy discussion is
scheduled for September 15, 2026.
17 By May 1, 2027
MAYOR, CS,
ATCM, Youth
Commission
Continue developing plans and activities for the 2026 World Cup and LA28 Olympics. X The Large Events/Olympics Subcommittee
reviewed an internal strategic plan outlining
community activation and economic
development ideas for the LA28 Olympics.
18 By November 1,
2026
CD, ATCM,
MAYOR+
COUNCIL
SUBCOMM.
Present the findings from the AREAS study on identifying/recruiting new development and businesses to the Artesia and Aviation corridors to the City Council. X AREAS provided an initial report to staff on
June 24, 2026, and staff has requested followup information that will assist with the presentation scheduled for Council in October
2026.
19 By March 1,
2027
CD, ATCM,
MAYOR+
COUNCIL
SUBCOMM.
Work to identify restaurant and hotel operators in the South Bay that could utilize vacant sites along the Artesia and Aviation corridors to develop new business ventures. X 20 By May 1, 2027 CD Evaluate the current Land Use Tables and business permitting requirements in the Municipal Code and present options to the City Council to make the City more business friendly.
X
A City Council review and policy discussion is
scheduled for October 6, 2026.
Goal 1.4 Enhance the City’s Fiscal Sustainability
21 By November 1,
2026 FS, CA, CT Prepare a Ballot Measure for the March 2027 election to consider increasing the City’s Transient Occupancy Rate. X Staff prepared a draft ordinance revision and
ballot question and shared the drafts with
Council February 3, 2026. Staff will incorporate
Council feedback from that meeting in a
revised report to present to Council in October.
22 By November 1,
2026 CT, FS, CA Review the City’s UUT Ordinance and suggest possible updates in recognition of the outcome of the Disney vs. Santa Barbara case. X 23 By November 1,
2026 HR, FS, CA Review and provide options to the City Council on possible adjustments to the City’s General Liability Coverage and level of Self-Insured Retention. X Staff evaluated the City’s claims, litigation and
insurance utilization history and made
appropriate adjustments to the City’s
coverages. The changes were detailed in a FY
26-27 Budget Response Report.
24 By February 1,
2027
PW Review and provide updates to the City’s Vehicle Replacement Policy/Program. X Staff developed a project scope, identified
key stakeholders, and established timelines
at its September 1 kickoff meeting.
25 By January 1,
2027
FS, CT Develop a streamlined process and structure to assess/collect business licenses fees from periodic special event vendors. X
Staff presented recommendations for a
consistent, more effective special event vendor
licensing at the August 18, 2026 CC Meeting,
along with a proposal for process
improvements and a technology-based solution
to improve efficiency and customer service.
Staff will return to Council with proposed
ordinance recommendations reflecting Council
direction in November 2026.
796
City of Redondo Beach Strategic Plan 2026-2027 | Page 4 of 11 Staff is in the process of reviewing technology
solutions and will return to Council with a
recommendation.
26 By January 1,
2027
CD
Complete a DIF Study to establish a nexus between the cost of future facilities, vehicles, and equipment required by new growth and fees charged by the City.
X
Council approved an agreement with Revenue
& Cost Specialists LLC (RCS) on June 9, 2026
to perform a comprehensive Development
Impact Fee Study and Nexus Report. RCS has
completed the kickoff meeting and the study is
underway.
27 By May 1, 2027 FIN, CD
Review and enhance collection procedures to establish and enforce penalties for late payments to the City.
X
Staff is in the process of reviewing options to
engage a collection agency, including
piggybacking through a recently competitivelybid contract or issuing an RFP. Staff is also reviewing potential options in coordination with
the revenue audit.
Future Goal 1.5: Revitalize the Pacific Coast Highway Corridor Future Goal 1.6: Identify efforts to enhance business retention Future Goal 1.7: Identify programs that have shown success on Artesia and report on steps to implement them on PCH 797
City of Redondo Beach Strategic Plan 2026-2027 | Page 5 of 11 Priority Area 2: Public Safety and Community Well-Being Goal 2.1 Implement Measure FP (Reconstruct City Fire and Police Facilities) # When Who Objectives Done On Target Revised Notes
28 By September
1, 2026 ATCM Continue Measure FP implementation, including securing a Design-Build Entity for both Fire and Police Facility replacement. X Staff from both the Police and Fire
Departments have been working to refine
elements of the required program (i.e.
functions and spaces within the stations)
for each facility. Fire has completed their
programming exercise and has advanced to
the Conceptual Design Phase. The Police
Department is nearing completion of their
programming and will be advancing to
Conceptual design in the next week.
29 By January 1,
2027
FS, ATCM, PW,
IT, PD, FD, CT
Work with the City’s Municipal Financial Advisor to issue bonds to design and construct the projects included in Measure FP.
X
PRAG, the City’s Municipal Advisor, is
assisting the City in preparation of
materials to submit to the Rating Agencies
in late September. Staff still anticipates
offering the bonds for sale in late October
2026.
30 By January 1,
2027
ATCM, CA Prepare the selection guidelines and resolution to form a Citizens Oversight Committee to review bond-related expenditures. X
The City Council approved creation of the
Measure FP Citizen’s Oversight Committee
on August 18. Official recruitment will
begin through the City Clerk’s Office and
the City website in late September.
31 By June 25,
2026 PW, PD, ATCM Advance conceptual schematic designs for the Police Shooting Range to enhance construction readiness and prepare/submit the application for the 2026 DCIP funding cycle.
X
The City’s grant application has been
submitted, and receipt has been confirmed by
the Grantor agency. The Award
announcement is expected in September 2026.
Goal 2.2: Strengthen the City’s Mental Health Response and Community Support Systems # When Who Objectives Done On Target Revised Notes
32 By January 1,
2027
CA, FD, PD Explore grant funding opportunities to continue deployment of a mental health clinician to provide targeted response to mental health-related incidents in the City. X The CA Commission for Behavioral Health did
not grant the Innovation Partnership Fund to
the City. The City Attorney’s Office continues
to explore other grant opportunities. Opioid
Settlement Funds are a potential backup.
Goal 2.3: Further Enhance the City’s Approach to Addressing Homelessness # When Who Objectives Done On Target Revised Notes
33 By September
1, 2026
PW, CA Pursue funding to complete construction of the pallet shelter expansion project and revise plans to fit the project scope within available budget. X
Staff plans to advertise the project on
September 17, open bids on October 8, and
plans to present a recommendation of
award to the City Council at the October 20
City Council meeting. Current funding
tracks with the latest engineer’s estimate of
$800,000.
798
City of Redondo Beach Strategic Plan 2026-2027 | Page 6 of 11 34 By May 1, 2027 CS
Administer the updated Administrative Plan for family supportive housing as approved, update the waiting list process as directed by Council, and continue working with the County to identify familyand youth-supportive services and programs.X 35 By May 1, 2027 CS Administer the Foster Youth voucher program in partnership with the County. X 36 By May 1, 2027 CA Pursue grant funding opportunities to procure permanent family housing to expand the City’s supportive housing options. X
On April 28, 2026, the City received an official
award letter from HUD for $250,000 for the
Affordable Housing Acquisition to Lease
program. On August 11, 2026, Congressman
Ted Lieu presented a check to the City.
Goal 2.4: Continue to Enhance Public Safety, Emergency Response, and Community Resilience # When Who Objectives Done On Target Revised Notes
37 By August 1,
2026 PD Update the City’s Drone First Responder agreement with Aerodome after the company obtains the FAA certificate waiver for autonomous drone use. X Fully autonomous flight was achieved in April
2026 and PD has updated the agreement with
Aerodome.
38 By July 1, 2026 FD, ACTM Complete and transmit the quote for the provision of Fire, Paramedic and Emergency Response Services for the City of Hermosa Beach. X
The draft quote was submitted to HB for review
and initial feedback on June 5.
39 By November 1,
2026 PD Provide a report on the City traffic enforcement efforts, including E-Bikes, Truck Routes, Speeding/Stop Signs and Loud Vehicles. X The Police Department is conducting regular
targeted enforcement and will report to the City
Council on these efforts in November.
799
City of Redondo Beach Strategic Plan 2026-2027 | Page 7 of 11 Priority Area 3: Infrastructure and Public Spaces
Goal 3.1: Rehabilitate City Roads, Critical Public Facilities, and Infrastructure # When Who Objectives Done On Target Revised Notes
40 By January 1,
2027
PW Procure and implement a facilities management software system and prepare an RFP to complete a facilities inventory and assessment.
X
An agreement with Brightly Software Inc.
was approved on September 1, 2026. The
implementation process will begin as
contracts are executed. An RFP for a
Facilities Assessment is being crafted for
City Council review and approval.
41 By January 1,
2027
PW Prepare a report to consider lane repurposing and corridor improvements for Catalina Ave., north of Pearl Street, as part of the City’s Street Rehabilitation Program. X Conceptual plans are nearing completion,
and staff anticipates presenting the plans to
City leadership, and the community,
through Council District meetings and the
PWSSC in the Fall of 2026. Technical
memorandum and conceptual drawings are
being circulated internally for
comment/correction prior to public
outreach.
42 By May 1, 2027 PW, CD Identify options to improve utility line maintenance and encourage undergrounding as part of new development. X
Staff is reaching out to SCE and looking at
neighboring Cities’ policies.
43 By December 1,
2027
ATCM
Provide a status report on internal efforts to improve contract development and review the City’s template RFP&B docs to identify opportunities to enhance (statement of work) expectations of vendors.
X
A total of six contract development and project
management trainings will be provided to City
staff by the end of 2026. An internal task force
of City staff from multiple departments is
actively working to update and improve the
City’s procurement process, including updating
the Public Works Department’s traditional
RFP&B documents. These efforts will be
detailed in the staff report, which will be ready
for City Council presentation in November.
Goal 3.2: Expand and Enhance Public Spaces, Amenities, and Programs # When Who Objectives Done On Target Revised Notes
44 By January 1,
2027
CS, PW
Execute the Wilderness Park Master Plan according to available funding and identify goals for the next phase of project improvements and evaluate how regulations, signage, staffing, and hours of operations can be implemented or adjusted to sustainably protect and preserve the park.
X
The next phase of implementation involves
the installation of a shade structure over the
amphitheater. Staff is beginning work on
developing estimates and determining the
most appropriate procurement pathway.
45 By October 1,
2026 CS, PW Complete procurement and installation of the Franklin Park all-abilities playground equipment. X Installation of the new equipment began on
August 27, with completion anticipated in
early October.
46 By January 1,
2027
CS, PW
Complete the layout design and procure three historic information signs for installation at Ito Park and provide a report to the Public Amenities Commission to develop a Plan for the next phase of improvements to Ito Park.
X
Three historic signs have been designed and
will be produced/installed by Fall 2026.
800
City of Redondo Beach Strategic Plan 2026-2027 | Page 8 of 11 47 By May 1, 2027 CS Continue to develop programming for the Perry Park Teen Center in conjunction with the Youth Commission and teen facility users. X
The Youth Commission has appointed a
subcommittee to assist staff with
programming at the Teen Center, including
events specifically for high school students.
Staff’s goal is to increase engagement with
high school students in the second year of
Teen Center programming.
48 By October 1,
2026 CM, ATCM, FS Work with RBUSD to prepare property descriptions and subdivision map applications for new Anderson Park Senior Center and Alta Vista Park parcels. X An engineer/survey firm has been retained by
Public Works to complete the required work.
49 By October 1,
2026 ATCM Prepare a Request for Information to solicit local businesses to evaluate possible logo use, the costs for marketing and production, and the potential for design proficiency. X Staff continues to explore potential retail
spaces where City logo merchandise could
be sold.
50 By May 1, 2027 CS, ATCM, PW Seek future funding opportunities for further improvements to the Herondo Open Space area and Seaside Lagoon.
X
Staff has identified, and will pursue, grant
funding through the Statewide Park
Development and Community Revitalization
(SPP) Program for the Seaside Lagoon
Rehabilitation Project. Staff submitted a
concept proposal for the California Natural
Resource Agency’s Urban Greening
Program Grant and is awaiting a decision.
51 By December 1,
2026 CS, PW Advance efforts to develop the Aviation Park Pickleball facility and explore potential time-efficient procurement/construction methods along with opportunities to cultivate public/private partnerships. X Geotechnical and survey field work is
complete. The Landscape architect is
working on preliminary plans and a designbuild RFP with an estimated completion at the end of September 2026. Presentation
on the preliminary plans will be presented
to the PWSSC on October 26, 2026. A
Priority Project Status Update was provided
on August 11.
Goal 3.3: Enhance Alternative Transportation Options
# When Who Objectives Done On Target Revised Notes
52 By January 1,
2027
PW Complete construction and hold a ribbon cutting for the City’s Local Travel Network (LTN) Project. X Installation is underway with anticipated project
completion in Fall 2026.
53 By January 1,
2027
PW Prepare conceptual design alternatives for bike lane repainting to enhance bicycle safety on Redondo Beach/Vail Avenues and present a report to the City Council.
X
The Funding Agreement with Metro has
been approved. An RFP is currently out to
bid with proposals due September 17, 2026.
54 By January 1,
2027
PW
Continue design development of plans for the Metro Active Transportation (MAT) Project (Redondo Beach Blvd Corridor) and present the 60% design for the active transportation and micro-mobility projects to the PWSS Commission.
X
The 60% Design has been delivered for
comment to the City. A meeting with
Torrance Public Works staff was held on
August 24 to address boundary issues and
project enhancements. All but minor topics
are resolved for this stage of design. The
installation of a Temporary Fire Station at
Grant and Inglewood may delay
construction of the project in that area.
801
City of Redondo Beach Strategic Plan 2026-2027 | Page 9 of 11 55 By January 1,
2027
PW
Present conceptual design alternatives for Catalina Ave, through Riviera Village, to the PWSS Commission and City Council, including the possible addition of structured parking in the Riviera Village and the implementation of a longer-term outdoor dining program.
X
Proposals for design services have been
received. Staff is preparing the recommended
contracts for consideration by the City Council
in October 2026.
56 By May 1, 2027 PW Collaborate with Hermosa Beach on a Parking Study and the potential for new Bike Lanes on Aviation Blvd. X
Staff has engaged the City of Hermosa
Beach in preliminary conversations.
Hermosa has opted not to participate at this
time. Staff is reviewing proposals to
conduct the parking study in the City’s
portion of Aviation Blvd. A contract award
is expected in Fall 2026.
57 By November 1,
2026 PW Provide a progress report on Bicycle Master Plan implementation and continue to pursue collaboration with surrounding cities. X Several new projects have been completed
over the summer, and staff plans to provide
a report to the City Council in October 2026.
Future Goal 3.4: Develop Long-Range Plans to Modernize City Facilities, Including the Public Works Yard and City Hall Priority Area 4: Customer-Centered Service Delivery
Goal 4.1: Improve Customer Service by Expanding the City’s Use of Digital Tools and Online Services # When Who Objectives Done On Target Revised Notes
58 August 1, 2026 CC, IT, ATCM Complete implementation of the new Agenda Management System to streamline internal operations and allow for enhanced agenda forecasting. X Staff are currently being trained on the new
system with a tentative go-live scheduled for
September 2026.
59 By May 1, 2027 CC, IT
Scan and archive City Records for the Departments, Phase 1 to include: Fire, City Attorney, Waterfront & Economic Development, Planning Division of Community Development, and the Transit Division of Community Services.
X
Staff are currently scanning documents for the
City Attorney’s Office. A new agreement has
been signed for a third-party scanning
company for Waterfront and Fire documents.
60 By August 1,
2026 CC, IT Procure and implement a software solution to enhance workflow and reduce the burden of public records requests. X The new system is in the implementation
phase, and the tool is already being used for
data sorting and redacting. Full deployment
with stakeholder interaction modules and the
public portal is expected to be live by October,
2026.
61 By January 1,
2027
IT, ATCM
Utilize the internal Task Force’s efforts to improve information included on the City website and continue evaluating tools to enhance the global search function through approved artificial intelligence tools.
X
Staff is continuing to broaden Citywide
departmental content and enhance overall
communications consistency. Revize has
completed some configuration changes to the
AI chat bot and search to improve search result
consistency and aging of information in the
platform.
62 By January 1,
2027
ATCM
Provide a report on efforts of the Communications Team to consolidate information and increase visibility for local events and to coordinate the communication of key calendar events on the City website and through other means.
X
The Communications Team has developed
internal guidelines to help coordinate and
consolidate communication for the calendar of
events page on the City’s main website and
social media account. The team is
802
City of Redondo Beach Strategic Plan 2026-2027 | Page 10 of 11 implementing these guidelines and training
staff to ensure consistency.
63 By May 1, 2027 IT Develop an AI Strategic Plan to guide use by City officials (staff and elected) and provide a report on how AI tools can be utilized to promote productivity. X Staff is developing internal AI policies and
actively seeking tools that will improve internal
operations.
Priority Area 5: Community Stewardship
Goal 5.1: Advance Environmental Sustainability and Climate Resilience # When Who Objectives Done On Target Revised
64 By January 1,
2027
PW Hire a consultant to study and update the City’s Sewer System Management Plan and complete the first phase of CCTV inspection to prepare a condition assessment of the sewer system.
X
A Kick-off meeting with Dudek was held
August 13, 2026. The first phase of the
CCTV inspection program is scheduled to
begin in September 2026 and the 2
nd phase
in January 2027.
65 By May 1, 2027 WED Initiate a California Coastal Commission grant-funded effort to update the City’s Local Coastal Program and complete a sea level rise vulnerability assessment. X The project was kicked off with the consultant
team on May 28, 2026.
66 By May 1, 2027 PW Provide a report on City tree wells and their availability for planting and develop a mechanism to record trees planted on private property. X
A list of available / vacant tree wells has been
developed and is being continuously updated.
Staff will provide a status report to Council prior
to the May 2027 deadline.
Goal 5.2: Preserve and Promote the City’s Historic Resources and Neighborhood Character # When Who Objectives Done On Target Revised Notes
803
City of Redondo Beach Strategic Plan 2026-2027 | Page 11 of 11 67 By January 1,
2027 CD, CA Prepare a report for the City Council on cost/time-effective ways to update the City’s Historic Resources List while maintaining a voluntary, consent-based, Historic Resources Program. X 68 By May 1, 2027 CD
Research potential changes to the City’s Zoning Ordinance that would increase flexibility for parking regulations in Riviera Village and secure preferred uses for properties in the Village as well as other vital economic corridors, such as Pacific Coast Highway.
X
69 By September
1, 2026
CS, CM,
MAYOR, CC
Create a Mayor and City Council subcommittee to develop a City Park and City Facility renaming policy. X
The draft naming policy was presented to
City Council on September 8, 2026. The
item was referred to the Public Amenities
Commission for feedback.
804
Administrative
Report
J.1., File # 26-1132 Meeting Date: 9/15/2026
TITLE
For eComments and Emails Received from the Public
805
Administrative
Report
N.1., File # 26-1125 Meeting Date: 9/15/2026
To: MAYOR AND CITY COUNCIL
From: ELIZABETH HAUSE, WATERFRONT AND COMMUNITY SERVICES DIRECTOR
MARC WEINER, COMMUNITY DEVELOPMENT DIRECTOR
TITLE
DISCUSSION AND POSSIBLE ACTION REGARDING THE SEASIDE LAGOON REHABILITATION
PROJECT
APPROVE THE FINAL PREPARATION AND SUBMITTAL OF A COASTAL DEVELOPMENT PERMIT
APPLICATION TO THE CALIFORNIA COASTAL COMMISSION FOR THE SEASIDE LAGOON REHABILITATION PROJECT AT 200 PORTOFINO WAY
APPROVE THE ENVIRONMENTAL EXEMPTION DECLARATION FOR THE PROJECT
EXECUTIVE SUMMARY
The City is proposing the rehabilitation and modernization of Seaside Lagoon to replace aging infrastructure, address current water quality and public health requirements, and maintain the facility's longstanding function as a low-cost public waterfront recreational amenity. Following extensive community outreach, engineering and cost analysis, and regulatory review, in April 2026 the City Council directed staff to proceed with a project scope that can be delivered within available funding while maintaining the project's primary recreational and Measure C objectives.
The proposed project includes a new five-foot-deep recirculating recreational lagoon with beach areas, sand entry and water play features, a new mechanical building with contemporary water filtration and pump equipment, a new restroom facility, upgraded utilities and infrastructure, ADAaccessibility improvements, enhanced fencing, new shade structures, landscaping, and other site improvements.
The lagoon is within the CA Coastal Commission’s jurisdiction and requires approval of a coastal development permit (CDP). In order to complete construction of the Seaside Lagoon Rehabilitation Project prior to the start of the 2028 Summer Olympic Games, the CDP must be approved in early 2027.
On August 25, 2026, the Harbor Commission held a special meeting to review the project scope and environmental determination and received public testimony. As discussed in greater detail below, the Harbor Commission voted to find that the project design, as presented, is consistent with the applicable CEQA exemption determinations. Separately the commission voted to recommend the City Council not proceed with the current project design. The Commission instead recommended the City Council 1) pursue the design initially approved in 2024, which included greater water depth, a sand bottom, saltwater, and year-round activation amenities; 2) accommodate State guidelines for
806
N.1., File # 26-1125 Meeting Date: 9/15/2026
sand bottom, saltwater, and year-round activation amenities; 2) accommodate State guidelines for 2050 sea level rise; and 3) seek an extension of the related State grant.
Staff recommends advancing the project scope (as designed and discussed in April 2026) and submitting the corresponding CDP application to the California Coastal Commission. Following submission of the CDP application, staff will work with Commission personnel to address any public access, water quality, hazard, or sea level rise considerations/modifications that arise during the entitlement review. Any refinements to the project requested by the Commission will be presented to the City Council for final confirmation.
BACKGROUND
Seaside Lagoon is a City-owned recreational facility located within King Harbor at 200 Portofino Way within the Parks, Recreation, and Open Space (P-PRO) zone in the coastal zone. Constructed in 1962, Seaside Lagoon has served the residents of Redondo Beach, the greater Los Angeles area, and visitors from throughout California. Seaside Lagoon is open to the public between the Friday of Memorial Day weekend and Labor Day every year. For the 2026 summer season, the Lagoon received over 50,219 visitors, and over 100 reservations for camp and summer program activities.
The facility consists of a man-made, tidally-influenced saltwater swimming lagoon, sandy beach areas, picnic facilities, playgrounds, restroom facilities, and other visitor-serving recreational amenities. The Seaside Lagoon has operated seasonally as a public swimming facility for decades and is a long-standing defining feature of King Harbor. The facility's original infrastructure including its seawater intake, discharge, and chemical treatment systems have reached the end of their useful life. Continued maintenance of these structures has become increasingly difficult and costly. The systems do not allow for modern water circulation and filtration and rely on the intake and discharge of millions of gallons of ocean water each day. The antiquated systems predate modern water quality discharge requirements and frequently expose the City to violations and fines that are administered by the Los Angeles Regional Water Quality Control Board (Regional Board). Accordingly, the City has been evaluating and seeking funding for long-term site rehabilitation alternatives for the Seaside Lagoon for nearly two decades. The most recent planning and community outreach efforts for reconstruction of the Lagoon are outlined below.
2021-2022: Waterfront Public Amenities Planning and Community Outreach The City began planning for the rehabilitation of Seaside Lagoon in 2021 as part of the King Harbor Public Amenities Plan, with extensive community engagement including pop-ups, community meetings and online surveys. Outreach continued through 2022 and included multiple public meetings and events, with hundreds of residents and stakeholders participating in the feedback process. These outreach efforts considered a range of potential aquatic amenities and improvements to Seaside Lagoon.
2022-2023: Transition to Seaside Lagoon Project Design
Following the broader waterfront amenities planning process, the City moved into the design and engineering phase for the Seaside Lagoon project. The City Council approved the Lagoon’s design RFP in May 2022, received three qualified proposals, and selected NUVIS to lead the design, engineering, environmental review and entitlement process. The City and NUVIS then began project -specific community engagement and design development in 2023.
807
N.1., File # 26-1125 Meeting Date: 9/15/2026
2023-2024: Project-Specific Community Outreach
The City continued public engagement as the Lagoon design developed, including pop-up events, stakeholder meetings and Harbor Commission subcommittee meetings. A December 2023 community workshop specifically explored potential year-round amenities, including lap swimming and various wave-oriented concepts. This outreach informed the development of multiple conceptual design alternatives and refinement of the preferred project scope. 2024-2025: Harbor Commission and Council Review
The Harbor Commission considered the Seaside Lagoon project on September 9, 2024. At the meeting, the Commission discussed the various design options, including the style and orientation of new potential restroom, locker, office and cabana buildings, the configuration of a new promenade, alternative water sources, and the possibility and cost of a wave making feature. The Commission ultimately voted 7-0 to recommend that the City Council pursue a complete renovation of Seaside Lagoon using a phased approach, with Building Placement Option 2 and Promenade Design Option
2. The Commission’s recommendation was for a complete, multi-phased renovation, recognizing that the City would need to construct the project in phases as funding became available. The September 2024 staff report estimated the cost to construct the selected design at approximately $31.1 million, while Phase 1 was estimated at approximately $7.0 million. The concept contemplated obtaining entitlements for the entire project while using the funding available at the time to construct Phase 1.
On October 15, 2024, the City Council reviewed multiple conceptual alternatives, and, in alignment with the Harbor Commission’s recommendation, directed staff to continue development of “Design Option 2”, which envisioned a combined recreational lagoon and lap swimming facility integrated within a single water feature together with associated recreational amenities, and a two-story building to hold administrative and lifeguard offices.
The direction provided by Council in 2024 was not based on a construction-ready design. It was direction to proceed with the selected design concept, pursue entitlements, and to begin developing more refined project plans and specifications and associated construction cost estimates. That distinction is important because many of the issues that ultimately changed the project scope could not be fully evaluated until the design was developed further and more specific feedback from staff at the applicable regulatory agencies was provided.
2025-2026: Refined Project Engineering and Regulatory Review As engineering and budget assessments advanced, several factors required modification of the original concept:
· Coordination with the Los Angeles County Department of Public Health determined that the lap pool and recreational lagoon could not operate as the combined water feature contemplated in the 2024 concept. The two uses would need to be physically separated, with significant decking setbacks and fencing between them. Incorporating the health department requirements into the project design substantially increased the cost of providing both a separate lap pool and recreational lagoon. By 2026, the estimated cost for the updated Phase 1 configuration exceeded $16 million.
· Additionally, geotechnical investigations identified a high groundwater table that limited the
808
N.1., File # 26-1125 Meeting Date: 9/15/2026
· Additionally, geotechnical investigations identified a high groundwater table that limited the feasibility of excavating the lagoon to its current and desired depth. The design team determined that excavation beyond approximately 3.5 feet of depth, would encounter significant groundwater and result in substantial dewatering requirements and associated construction costs. The cost and variability of dewatering was one of the critical reasons for ultimately refining the project scope. The potential need to construct and install a sheet-pile system was also a major concern.
At the time these engineering determinations were made, the City had approximately $7.9 million remaining in the project account and it was clear the lagoon could not be constructed at its current depth nor include a separate lap pool within budget. As such, staff and NUVIS revisited the design and identified what could realistically be built using the available funds.
April 2026: City Council Direction
On April 21, 2026, the City Council considered the updated project scope, construction cost estimates, and level of available funding for the Seaside Lagoon Rehabilitation Project. Following discussion, the City Council directed staff to proceed with a reduced project scope that was within available funding and achieved the project's principal objectives, including modernization of the Lagoon's aging infrastructure, compliance with current water quality and public health standards, consistency with Measure C, and completion of construction prior to the 2028 Olympic Games. The Council also discussed identifying additional funds (and later appropriated QUIMBY monies) to support building the lagoon to a depth of five feet (by increasing the decking height), include a prefabricated restroom with two unisex stalls in the project, upgrade the facility’s perimeter fencing with an eight-foot-tall tube steel fence, and to include a sand entry in and around the lagoon’s water feature.
August 2026: Harbor Commission Special Meeting
The Harbor Commission held a special meeting on August 25, 2026, to review the Seaside Lagoon Rehabilitation Project. City staff and the City's consultants presented the project history, existing site conditions and constraints, and the updated design elements following Council's April discussion, including the revised lagoon depth, new pump and filtration building, restroom facility, perimeter fencing, and related site improvements.
Following the discussion, the Harbor Commission voted 7-0 to find that the project design, as presented, was consistent with the applicable California Environmental Quality Act (CEQA) exemption determinations. The Commission separately voted 7-0 to recommend the City Council not proceed with the design as presented.
Instead, the Harbor Commission recommended the City continue to pursue the design initially approved in 2024, including greater water depth, a sand-bottom lagoon, saltwater, and year-round activation amenities. The Commission also recommended the Project accommodate the State's 2050 sea level rise guidelines and the City Council seek an extension of the related State grant.
Project Design
The proposed project replaces the aging seawater lagoon and supporting infrastructure with a modern recreational swimming lagoon that complies with current public health, safety, accessibility, and water quality standards. The project is designed to improve the year-round functionality of the site, while maintaining expansive public open space and creating flexible areas capable of
809
N.1., File # 26-1125 Meeting Date: 9/15/2026
accommodating passive recreation, community gatherings, and special events.
The architecture and site design were developed to enhance the waterfront recreational facility with high-quality public spaces through the integration of recreational amenities, landscaping, and architecturally compatible buildings. The proposed improvements maintain the open character of the site, strengthen connections to the Harbor waterfront, and enhance accessibility throughout the facility through new pedestrian pathways, plazas, and gathering areas.
The existing seawater lagoon would be replaced with a new recirculating recreational lagoon utilizing a closed-loop filtration and treatment system. The lagoon is designed with a walk-in sand beach entry along the northern shoreline that gradually transitions into a deeper swimming area on the harbor side with a maximum water depth of five feet and a plaster-finished bottom. A submerged dividing wall separates the shallow sand-bottom recreation area from the deeper swimming area with a line of buoys located above the dividing wall to clearly identify the transition for users. Sand beaches surrounding the majority of the lagoon are included to create a natural beach environment while maintaining a defined swimming area. The project also includes new water play features, improved pathway circulation around the lagoon perimeter, enhanced landscape and hardscape, and expanded opportunities for recreational use.
Figure 1: Lagoon Cross-Section
In addition to the lagoon improvements, the project includes construction of a new 2,660-square-foot, approximately 18.5-foot-tall pump station and equipment building to house the mechanical, filtration, and water treatment systems required to operate the recirculating lagoon. A new two-sided restroom building is also proposed to serve both Seaside Lagoon patrons and visitors utilizing the adjacent Harbor waterfront promenade and public boat launch. The architectural design of these buildings incorporates articulated façades with white painted brick, standing seam metal roofs, coordinated exterior materials that will complement the existing structure, and architectural detailing that complement the surrounding Harbor environment while maintaining a low-profile scale appropriate for the waterfront setting. Supporting infrastructure improvements include new utilities, drainage facilities, grading, lighting, electrical improvements, and other infrastructure necessary for the longterm operation of the facility.
The project substantially enhances the lagoon adjacent recreational facilities through the addition of ADA-accessible pedestrian pathways, ADA-compliant ramping into the Lagoon water, plaza areas, a 12-foot-tall luau shade shelter, picnic and barbecue facilities, seating areas, decorative paving, improved perimeter fencing, and removable partition fencing that allows the water area to be separated and secured when not in operation, and allowing public access to the surrounding sand areas adjacent to the waterfront. Extensive landscape improvements include new trees, shrubs, irrigation, and natural grass areas to enhance the visual quality of the site, and provide additional
810
N.1., File # 26-1125 Meeting Date: 9/15/2026
irrigation, and natural grass areas to enhance the visual quality of the site, and provide additional shade.
Figure 2 - Seaside Lagoon Fencing
Implementation of the project requires demolition and replacement of portions of the existing lagoon infrastructure, including removal of the existing lagoon basin, mechanical equipment, additional restroom facilities, fencing, hardscape improvements, selected landscaping, and associated site improvements. Existing sand will be relocated and reused where feasible, mature palm trees will be preserved or relocated where practical, and new landscaping will be installed throughout the project area. The project has been designed to minimize impacts to existing recreational facilities while preserving significant landscape features wherever feasible.
Overall, the proposed improvements will transform Seaside Lagoon into a modern, year-round waterfront recreational destination while preserving its role as a public swimming and beach recreation facility. As depicted in the project plans and architectural renderings, the project combines contemporary coastal architecture, high-quality landscape design, enhanced public amenities, environmentally compliant and sustainable operational systems, and upgraded recreational facilities in a cohesive waterfront environment. The project preserves public views toward King Harbor and the Pacific Ocean, maintains human-powered watercraft access to the Harbor, improves accessibility and visitor comfort, and provides modern infrastructure capable of supporting the continued operation of Seaside Lagoon in compliance with current public health, safety, and environmental regulations, and consistent with the City's King Harbor Amenities Plan and Measure C.
Measure C Compliance
The project is designed for consistency with the voter-approved requirements of Measure C, which amended the Public, Recreation and Open Space (P-PRO) regulations applicable to the Seaside Lagoon Regional Park. Measure C requires that if the existing saltwater swimming facility is replaced for water quality purposes, it be replaced with a recreational swimming facility of at least equivalent water surface area that complies with applicable public health, safety, and environmental regulations while preserving the park's primary recreational amenities, including the sandy beach, volleyball
811
N.1., File # 26-1125 Meeting Date: 9/15/2026
while preserving the park's primary recreational amenities, including the sandy beach, volleyball courts, picnic and barbecue areas, play equipment, luau shelter, restroom facilities, human-powered watercraft access, and public open space. The proposed project satisfies these requirements by replacing the existing lagoon with a modern recreational swimming facility of equivalent surface area that complies with current public health and water quality standards, preserves the site's recreational function and visitor-serving amenities, maintains public access and open space, and continues Seaside Lagoon's long-standing role as a premier waterfront recreational destination.
Coastal Access
The proposed project maintains and enhances public coastal access by improving pedestrian circulation, accessibility, and visitor-serving amenities without restricting access to the Harbor or waterfront promenade. Improvements include new ADA-accessible pathways, plazas, landscaping, and reconfigurable fencing that allows greater year-round public access to the park and lawn space when the lagoon is not in operation. The project also includes a new two-sided restroom building that will serve both Seaside Lagoon patrons and the general public accessing the waterfront promenade.
Staff finds the project improves public coastal access and is consistent with the public access policies of the Coastal Act.
Noise
The project consists of rehabilitation of the existing Seaside Lagoon and replacement of aging infrastructure, including the lagoon, pump building, restroom facilities, shade structures, landscaping, and site improvements. The project does not increase the intensity or capacity of the existing recreational use and is not expected to generate additional long-term operational noise. Construction -related noise will be temporary and subject to applicable City regulations.
Parking
The proposed improvements modernize the existing Seaside Lagoon without expanding its recreational use or increasing visitor capacity. The project does not introduce new commercial uses or development that would increase parking demand. Existing public parking facilities serving King Harbor and Seaside Lagoon will continue to accommodate the project. Staff finds the project will not result in significant parking impacts.
Traffic/Pedestrian Access
The project replaces and upgrades existing recreational facilities without increasing the intensity of use or generating additional vehicle trips. Improvements include ADA-accessible walkways, enhanced pedestrian connections, new plazas, landscaping, and improved circulation throughout the site. These improvements enhance pedestrian safety and accessibility while maintaining existing traffic patterns. Staff finds the project will not result in significant traffic impacts and will improve pedestrian access to Seaside Lagoon, the waterfront promenade, and adjacent Harbor amenities.
Environmental Status
The proposed project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Sections 15301 (Existing Facilities) and 15302 (Replacement or Reconstruction). The project consists of the rehabilitation and modernization of the existing Seaside Lagoon through the replacement of aging recreational infrastructure, including the lagoon, pump building, water treatment systems, restroom facilities, utilities, hardscape, and landscaping, while maintaining the existing recreational use and operational capacity of the site. The replacement improvements will serve substantially the same purpose at the same location and do not result in an expansion of the facility or its intensity of use. Staff has also determined that none of the exceptions Page 7 of 14 812
N.1., File # 26-1125 Meeting Date: 9/15/2026
expansion of the facility or its intensity of use. Staff has also determined that none of the exceptions to the use of a categorical exemption identified in CEQA Guidelines Section 15300.2 apply.
At its August 25, 2026 special meeting, the Harbor Commission considered the CEQA determination as part of its review of the project and voted 7-0 to recommend the Council approve the CEQA Exemption Declaration.
Project Questions
During the August 2026 Special Meeting of the Harbor Commission, questions arose regarding certain elements of the Seaside Lagoon rehabilitation project. Those questions are answered below.
Does the Seaside Lagoon Rehabilitation Project accommodate 2050 Sea Level Rise Guidelines?
The Project is subject to, and will be evaluated for consistency with the California Commission’s 2024 Sea Level Rise Policy Guidance and the California Ocean Protection Council’s 2024 State Sea Level Rise Guidance. Staff have met with Coastal Commission personnel to discuss the Project’s compliance with these Guidelines. The discussions with coastal staff indicate the proposed Seaside Lagoon Project design will comply. It is important to note that the State guidance does not establish a single elevation that projects must meet by 2050. Rather, it provides a range of scenarios and recommends that projects consider location, anticipated service life, potential consequences of flooding or failure, and the ability to adapt over time.
For the Los Angeles tide-gauge area, the guidance projects approximately 0.4 to 1.1 feet of sea level rise by 2050, relative to the year 2000, and approximately 0.6 to 6.3 feet by 2100 depending on the scenario. The guidance therefore emphasizes an adaptive approach for projects with long service lives rather than requiring projects to be constructed initially to accommodate the highest projection in year 2100.
The current sand bottom Seaside Lagoon is excavated to provide roughly 8 feet of water depth when full. The concrete liner of the new Lagoon is expected to be roughly 4 feet higher than the current excavated depth of the facility and include approximately 2 feet of sub material. In 2019 Pace conducted a study that showed the Lagoon maintains approximately 2 feet of tidally influenced water during the offseason. Accordingly, the concrete liner and base for the new lagoon are planned to be built above this elevation. If the mean tide line rises a full foot over the next 25 years, a portion of the sub material will be subjected to periodic ground water. The concrete liner should however remain above the mean high tide line.
The Seaside Lagoon Project does not include an adjustment to the existing seawall or bulkhead, so no specific construction is proposed for those features to accommodate 2050 sea level rise projections. However, it is important to note the Lagoon’s structural design incorporates a pressurerelief system to address elevated groundwater pressures and buoyancy during significant groundwater events, providing added resilience as groundwater conditions change over time. The design also accommodates future adaptation measures that could be constructed should sea level rise become a significant operational concern. These include raising or modifying the bulkhead or coping, improving backflow protection, and relocating or adapting ancillary facilities as conditions warrant.
In short, the project is designed to meet current sea level conditions and accommodate an
813
N.1., File # 26-1125 Meeting Date: 9/15/2026
In short, the project is designed to meet current sea level conditions and accommodate an appropriate initial sea level rise planning horizon, while preserving the ability to implement additional adaptation measures if needed, as sea level rise occurs. The California Coastal Commission will evaluate the Project’s proposed sea level rise strategies as part of the CDP review process.
What will be the impact to the Lagoon during storm surges, and how will the project protect the Lagoon's structural integrity?
The proposed Lagoon is designed to withstand significant storm-related groundwater fluctuations through a pressure-relief system incorporated into the Lagoon structure. This system will allow elevated groundwater pressure beneath the concrete shell to dissipate, reducing upward buoyant forces and protecting the structural integrity of the Lagoon during significant groundwater events.
Storm surge and sea level rise present related but distinct engineering considerations. Sea level rise is a gradual increase in coastal water levels over time, while a major storm can temporarily increase both coastal and groundwater elevations. Because the proposed Lagoon is a below-grade, concretelined structure, elevated groundwater beneath the Lagoon can create hydrostatic pressure and upward buoyant forces.
NUVIS evaluated this condition using the project’s geotechnical information and determined that, during a significant groundwater surge, portions of a deeper Lagoon could experience buoyancy forces greater than the self-weight of the concrete bottom. Under the current analysis, areas deeper than approximately 2.33 feet would require additional buoyancy protection.
Three preliminary approaches were evaluated to address this condition:
· Tiedown piles: Mechanically anchor the Lagoon structure to resist upward buoyant forces.
NUVIS' preliminary order-of-magnitude cost was approximately $53.89 per square foot. · Structural concrete system: Construct two 12-inch concrete slabs connected by approximately 18-inch square concrete columns, with the intervening space infilled with concrete to provide additional structural weight. The preliminary order-of-magnitude cost was approximately $113.70 per square foot.
· Pressure-relief system: Use a lighter concrete slab incorporating pressure-relief valves to allow groundwater pressure beneath the Lagoon structure to dissipate during an elevated groundwater condition. This is the option included in the proposed design and has cost of approximately $29.89 per square foot.
Based on current site conditions, geotechnical information, and engineering evaluation, NUVIS is incorporating the pressure-relief approach into the design. The system addresses the identified buoyancy condition by allowing groundwater pressure beneath the Lagoon to dissipate rather than relying solely on additional structural weight or mechanical anchoring. It also provides resilience as groundwater conditions change over the life of the project.
The design team also evaluated permanent subdrainage beneath the Lagoon. Because the Lagoon structure is above the anticipated normal groundwater table, a subdrainage system would primarily operate only during unusual groundwater surges and would require pumps and associated infrastructure that would need to be maintained despite limited normal use. Based on the current
814
N.1., File # 26-1125 Meeting Date: 9/15/2026
infrastructure that would need to be maintained despite limited normal use. Based on the current groundwater conditions and engineering evaluation, NUVIS does not recommend permanent subdrainage as part of the final design.
Can the Seaside Lagoon be designed as a saltwater amenity, and how would the cost compare with a chlorinated freshwater system?
The Seaside Lagoon could potentially be designed as a saltwater system, but it would be subject to significant regulatory challenges as compared to a fresh water system. In this context, “saltwater” would refer to a conventional saltwater pool system, rather than a system using seawater. A saltwater pool uses water with a relatively low concentration of dissolved salt and an electrolytic chlorine-generation system to produce chlorine for disinfection. The system remains a recirculating pool system and would not have the salinity of ocean water.
Converting the currently proposed chlorinated freshwater recirculating system to a saltwater system is technically feasible, though cost and discharge requirements may create regulatory constraints and operational consequences. Based on preliminary estimates from the design team, a saltwater system would add approximately $150,000 to $200,000 in initial construction costs. Ongoing operating costs are expected to be higher than a traditional chlorine system but would depend on the type of system selected and the amount of required salt, replacement of electrolytic cells, increased equipment maintenance, effectiveness of corrosion-resistant components, additional water-quality monitoring, and other potential maintenance requirements.
The more significant consideration is water discharge for both routine filter backwash and evacuation of pool water in significant volume. The proposed Lagoon is designed as a closed, recirculating system, substantially reducing the need for high volume discharge and eliminating the historical direct discharge to King Harbor. While a saltwater system would also be recirculating, the addition of salt introduces an additional water-quality consideration whenever Lagoon water must be discharged.
Discharge of salt water from the lagoon to the environment (street, storm drain or directly to the harbor) is in violation of the City’s Municipal Code and strictly prohibited by State Law without a discharge permit from the Regional Board, which is in contradiction to project goals to no longer be obligated by such a permit.
The new system must be designed to discharge to the City’s sewer collection system. Discharge to the City’s sewer system is regulated by the City and by the Sanitation District of Los Angeles County, the agency that manages municipal sewage transmission, treatment, and eventual ocean discharge for much of the county.
The City has not yet quantitatively evaluated impacts of salt water brine from both the lagoon and filter backwash water to its sewage infrastructure, primarily the Portofino Pump Station located just outside of the entrance to the facility. Salt water, in anticipated concentrations, is markedly more corrosive than fresh (chlorinated) water and would likely reduce the life span (and therefore reliability) of Portofino Pump Station’s mechanical and electrical components. The pump station was just rebuilt, but not with regular concentrations of saltwater in mind. More work is needed to quantify the impacts of a salt water system on City infrastructure, especially the Portofino Pump Station, but qualitatively staff anticipates increased expense in maintenance and operations of the sewer system under a salt water scenario.
815
N.1., File # 26-1125 Meeting Date: 9/15/2026
The Sanitation District must operate under its NPDES discharge permit, which is also regulated by the Regional Board. Under current Los Angeles Regional Water Quality Control Board requirements of that permit, dechlorinated swimming-pool water may be discharged through the municipal storm drain system when specified water-quality and best-management-practice requirements are satisfied.
These requirements address chlorine, pH, pollutants, and total dissolved solids, including salts. In addition to these discharge parameters, pool water from systems commonly referred to as “saltwater pools” may not contain salt concentrations that exceed applicable water-quality objectives. Largevolume discharges are also subject to additional discharge-management and notification requirements.
These parameters should be considered a minimum standard from the Sanitation District, but more specific standards may apply. For instance, the County’s Public Works Department, where it serves as the authority having jurisdiction over the sewer collection system, does not allow discharge of saltwater from pools to the sewer system and significantly controls the manner and requirements of discharge of fresh water from pool facilities. Although the County Public Works Department is a legally sperate agency than the Sanitation District, these agencies share employees, and therefore concerns and have adopted a strict “no” policy when it comes to discharge of salt water to the sewer system. More work needs to be done as design develops to understand specific application of Sanitation District standards and regulatory constraints to this project, but it will not likely result in an operationally simple or economical advantage for the City.
The restrictions to be imposed by the Sanitation District will result in an important operational distinction between the two systems. With the proposed freshwater system, the City would manage the water-quality requirements associated with a conventional chlorinated recirculating pool. A saltwater system would add salt concentration as another parameter that must be monitored and managed before water could be discharged. This could become particularly significant when the Lagoon needs to be partially or fully drained for major maintenance, repairs, or other circumstances requiring the removal of a substantial volume of water. The City would need to confirm that the salt concentration of the discharged water complies with applicable water-quality requirements or constraints and identify an alternative approved method of disposal if needed (e.g. tanker truck).
The discharge issue is particularly relevant given the City's experience with the existing Lagoon's historic flow-through system and its associated NPDES requirements. One of the objectives of the proposed rehabilitation is to move away from that direct-discharge model and establish a more manageable, closed recirculating system. Introducing salt into the new system would not recreate the historical system, but it would reintroduce an additional water-quality consideration and uncertainty that the freshwater system avoids.
For these reasons, while a saltwater system is possible, the currently proposed freshwater recirculating system provides a more straightforward approach from a regulatory and long-term operational perspective. The estimated $150,000 to $200,000 initial construction premium for a saltwater system is just the initial cost. Lifecycle cost increases would also need to be considered together with the additional water-quality monitoring, discharge management, and operational considerations associated with managing salt in the Lagoon water.
What is the ongoing operational cost associated with the new Seaside Lagoon design, and how does it compare with current costs?
816
N.1., File # 26-1125 Meeting Date: 9/15/2026
The new Lagoon, as proposed, is expected to have a positive net annual impact on the City’s Tidelands Fund as compared to the current facility.
The Lagoon is not expected to materially change the daily staffing model. Lifeguard, cashier, guestservice, and similar seasonal staffing requirements are expected to remain generally comparable to the current operation. Staff is, however, evaluating the possibility of extending the operating season beyond the current Memorial Day through Labor Day schedule to capture additional warm-weather demand. An extended season would increase staffing costs, with a portion potentially offset by additional admissions revenue.
Some maintenance activities will change as a result of the new lagoon configuration and treatment system. The proposed Lagoon would operate as a recirculating system rather than the existing flowthrough seawater system. Water would be filtered, chemically treated, and returned to the Lagoon rather than continuously drawn from and discharged to King Harbor. This change is expected to substantially reduce the City's regulatory burden and costs associated with the existing direct discharge. The current operation requires approximately $50,000 annually for water-quality monitoring and testing under the City's NPDES requirements and has resulted in more than $935,000 in historical penalties associated with discharge exceedances.
The recirculating system will, however, introduce other types operating costs. These include potable water for the initial fill and replacement of evaporation and splash-out losses; electricity for pumps and filtration equipment; chemicals; filter maintenance; periodic cleaning; occasional sewer discharge fees; and routine removal of accumulated sand and debris. However, the proposed Lagoon will contain substantially less water than the existing facility. The existing Lagoon holds approximately
1.4 million gallons, compared with an estimated 770,000 gallons in the proposed Lagoon - a reduction of approximately 45 percent. Based on an estimate provided by Cal Water, filling the proposed Lagoon once would cost approximately $12,300. Ongoing potable-water consumption would primarily be associated with evaporation, splash-out, maintenance, and other water losses, rather than the continuous seawater intake and discharge required by the existing system.
The difference in water volume is particularly significant when considering the existing flow-through operation. Past Regional Water Board documents indicate that the existing system was designed to receive approximately 3,200 gallons per minute of seawater and discharge approximately 3,200 gallons per minute of dechlorinated water to King Harbor while the Lagoon was in operation. The proposed recirculating system would eliminate this continuous intake and discharge and substantially reduce the volume of water required to fill and maintain the Lagoon.
The new configuration will also require periodic removal of accumulated sand and particulates.
Filtration inlets are being designed above the lagoon floor to reduce the amount of sand entering the filtration system. Staff may use commercial in-water pool vacuums or similar equipment to remove accumulated sand and debris. The frequency and cost of this maintenance will depend on actual operating conditions and the amount of sand migrating from the surrounding beach area into the deeper portion of the Lagoon.
The City's annual operating budget provides an existing baseline for Seaside Lagoon operation including personnel, maintenance, chemicals, supplies, and internal service costs. The proposed recirculating system will eliminate or reduce certain existing costs, particularly those associated with continuous seawater circulation, discharge monitoring, and regulatory compliance, while introducing Page 12 of 14 817
N.1., File # 26-1125 Meeting Date: 9/15/2026
continuous seawater circulation, discharge monitoring, and regulatory compliance, while introducing some new costs associated with potable water, filtration and system maintenance.
Staff is continuing to evaluate the anticipated operating costs of the proposed system, including staffing, potable water, electricity, chemicals, filtration and maintenance, water-quality monitoring, regulatory compliance, equipment replacement, and periodic maintenance, but expect the Lagoon’s fiscal bottom line to be improved following construction of the new facility.
Coastal Commission Coastal Development Permit Application The Seaside Lagoon Rehabilitation Project is located within the California Coastal Zone and within an area subject to the California Coastal Commission's retained coastal development permit jurisdiction. As part of the entitlement process for the proposed rehabilitation, the City will need to obtain a Coastal Development Permit (CDP) from the California Coastal Commission.
The City has been coordinating with Coastal Commission staff during the development of the project.
Staff has discussed the proposed project, including the reduced project scope directed by the City Council in April 2026, the project's recreational and public access components, water quality considerations, and sea level rise and coastal hazard issues. These discussions have helped identify information and technical analysis that will need to be addressed as part of the CDP application.
The CDP application will include the project plans and supporting technical materials necessary for the Commission's review. The application is expected to address, among other matters, the project's consistency with applicable Coastal Act policies; public access and recreational use of the site; coastal hazards and sea level rise; water quality; site design and visual resources; and constructionrelated impacts. The City's environmental documentation and applicable technical studies will be incorporated into the application materials as appropriate.
Following submittal, Coastal Commission staff will review the application for completeness and consistency with the Coastal Act and applicable policies. Commission staff may request additional information or revisions as part of its review. Once the application is complete and staff has completed its analysis, the project will be scheduled for consideration by the Coastal Commission at a publicly noticed meeting. Commission staff will prepare a staff report and recommendation, and the Commission will ultimately determine whether to approve, conditionally approve, or deny the CDP.
The purpose of the City Council's action at this time is to authorize staff to proceed with the final preparation and submittal of the Coastal Development Permit application. This action would initiate the Commission's formal review process and would not constitute approval of the CDP itself. The final project remains subject to the Coastal Commission's review and action.
Staff recommends the City Council authorize staff to proceed with final preparation and submittal of the Coastal Development Permit application for the Seaside Lagoon Rehabilitation Project and to continue coordination with California Coastal Commission staff throughout the permitting process.
Staff also recommends the City Council approve the environmental exemption declaration.
COORDINATION
The Community Services Department coordinated this report with the Community Development and
818
N.1., File # 26-1125 Meeting Date: 9/15/2026
Public Works Departments.
FISCAL IMPACT
The estimated construction cost for the reduced-scope Phase 1 project is approximately $11.5 million, including Council’s direction from April 2026 on Lagoon depth, additional restroom facilities, and fence replacement. Approximately $10.9 million in combined State grant and City funding is currently available in the project account for construction. Additional Quimby funds are expected to be appropriated following the final contract bidding process if needed. Staff is also pursuing grant funding through the Statewide Park Development and Community Revitalization (SPP) Program to help support the project.
APPROVED BY:
Mike Witzansky, City Manager
ATTACHMENTS
· Conceptual Plans and Renderings
· Exemption Declaration
819
CIVIL & STRUCTURAL ENGINEER:
JMC
2 411 N. HARBOR BLVD, Suite 201
SAN PEDRO, CA 90731
(310) 241-6550
CONTACT: KHALED ABDO
LANDSCAPE ARCHITECT:
NUVIS
20250 SW ACACIA ST, Suite 260
NEWPORT BEACH, CA 92660
(714) 754-7311
CONTACT: PERRY CARDOZA
ELECTRICAL ENGINEER:
CD DESIGN GROUP
P.O. BOX 4107
IRVINE, CA 92616-4107
(949) 387-8476
CONTACT: CHRIS KARJALA
ARCHITECT:
ZIESE ARCHITECTURE
612 MOULTON AVE
LOS ANGELES, CA 90031
(323) 275-1340
CONTACT: DANIEL ZIESE
CITY OF REDONDO BEACH
PLANNING DEPARTMENT
415 DIAMOND STREET, DOOR 2
REDONDO BEACH, CA 90277
(310) 318-0637
CONTACT: PLANNING DIVISION
[email protected]
CITY OF REDONDO BEACH
WATERFRONT & ECONOMIC DEVELOPMENT
415 DIAMOND STREET, DOOR 2
REDONDO BEACH, CA 90277
CONTACT: ELIZABETH HAUSE
GEOTECHNICAL ENGINEER:
CONVERSE CONSULTANTS
717 SOUTH MYRTLE AVE.
MONROVIA, CA 91016
(626) 930-1200
CONTACT: SIVA SIVATHAASAN
ENVIRONMENTAL:
ULTRA SYSTEMS ENVIRONMENTAL
16431 SCIENTIFIC WAY
IRVINE, CA 92618
(949) 788-4900
CONTACT: BETSY LINDSAY
COVER SHEET G001 07-17-2026
DRAWING INDEX
SHEET SHEET DESCRIPTION
NO.
GENERAL
G001 COVER SHEET
G002 MEASURE C COMPLIANCE
G003 OVERVIEW SITE DEMOLITION PLAN
G004 SCHEMATIC LANDSCAPE PLAN
G005 3D LANDSCAPE RENDERING
G006 3D LANDSCAPE RENDERING
G007 3D LANDSCAPE RENDERING
CIVIL
C-100 GRADING NOTES / LEGEND
C-101 GRADING PLAN
C-102 GRADING PLAN
C-103 CROSS SECTION
C-104 UTILITY PLAN
C-105 CONSTRUCTION DETAILS
C-106 LID PLAN
ARCHITECTURAL
A2.1 PUMP ROOM BUILDING - FIRST FLOOR
A2.2 PUMP ROOM BUILDING - ROOF PLAN
A3.1 PUMP ROOM BUILDING - ELEVATIONS
A4.1 PUMP ROOM BUILDING - SECTIONS
A5.1 BOARDWALK RESTROOM - FLOOR PLAN
AQUATIC / WATER ENGINEERING
W100 SWIM LAGOON SYSTEM FLOW SCHEMATIC
W200 SWIM LAGOON PLAN
W201 SWIM LAGOON PIPING PLAN
W202 SWIM LAGOON SECTIONS
W510 PUMP STATION EQUIPMENT LIST & PIPE SCHEDULE
W520 PUMP STATION MECH PLAN
W521 PUMP STATION MECH SECTIONS
W600 ELECTRIC SINGLE LINE DIAGRAM
LANDSCAPE
L-101 LANDSCAPE FENCING PLAN
L-102 OVERALL CONSTRUCTION SITE PLAN
L-103 SITE AMENITIES
L-104 SCHEMATIC TREE PLANTING PLAN
L-105 SCHEMATIC SHRUB PLANTING PLAN
L-106 PLANT PALETTE AND IMAGERY
L-107 SCHEMATIC IRRIGATION
GEOTECHNICAL
FINAL GEOTECH REPORT
THE PROJECT SCOPE CONSISTS OF IMPROVEMENTS TO THE EXISTING
SEASIDE LAGOON INCLUDING A CONSTRUCTION OF A NEW ADA-ACCESSIBLE
CONCRETE-BOTTOM LAGOON WITH AN ASSOCIATED NEW PUMP STATION
EQUIPMENT BUILDING AND IMPROVEMENTS TO SURROUNDING
RECREATIONAL AMENITIES INCLUDING A NEW SHADE STRUCTURE, BBQ
COUNTER, IMPROVED ADA-ACCESSIBLE PEDESTRIAN PATHWAYS AND PLAZA
SPACES, RENOVATED LANDSCAPE AREAS INCLUDING OPEN NATURAL GRASS SPACES AND RENOVATION OF THE PERIMETER FENCING.
ADDITIONAL IMPROVEMENTS INCLUDE A NEW TWO-SIDED RESTROOM
BUILDING SERVING BOTH THE PUBLIC BOAT LAUNCH / BOARDWALK AREA AS
WELL AS THE SEPARATE LAGOON SPACE AND A NUMBER OF
INFRASTRUCTURE UPGRADES TO ENHANCE FUNCTIONALITY, SAFETY & YEAR ROUND PUBLIC ACCES & USE OF THE LAGOON FACILITY.
TRAFFIC ENGINEER:
General Technologies and Solutions
11900 W OLYMPIC BLVD #450
LOS ANGELES, CA 90064
(213) 267-2332
CONTACT: RAWAD HANI
200 PORTOFINO WAY, REDONDO BEACH, CA 90277
SEASIDE LAGOON & WATERFRONT PROMENADE
ENTITLEMENT PACKAGE
VICINITY MAP
LOCATION MAP
PACIFIC OCEAN
SCOPE OF WORK
SITE PLAN
GOVERNING AGENCY PROJECT TEAM
NOT TO SCALE
NOT TO SCALE
PACIFIC OCEAN
NOT TO SCALE
820
MEASURE-C COMPLIANCE OVERVIEW G002 07-17-2026
821
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA OVERALL SITE DEMOLITION PLAN G003 07-17-2026 0'
SCALE: 1" = 30'
15' 30' 60' 120'
1. CONTRACTOR SHALL MEET WITH THE AUTHORIZED CITY'S REPRESENTATIVE AND ENGINEER PRIOR TO START OF CONSTRUCTION TO DISCUSS THE EXISTING CONDITIONS, EXTENT OF DEMOLITION, AND FENCING. PROVIDE & MAINTAIN ACCESS TO THE EXISTING COMMERCE FACILITIES IF APPLICABLE. CONTRACTOR SHALL INCLUDE THE PROVISION OF ACCESS IN THEIR BID.
2. CONTRACTOR IS RESPONSIBLE FOR NOTIFYING UTILITY COMPANIES AND ASSURING ALL UTILITIES TO BE CUT OFF DURING REMOVAL. ALL ACTIVE UTILITIES SHALL BE PROTECTED AND TO REMAIN IN PLACE.
3. CARE SHALL BE TAKEN DURING DEMOLITION AND REMOVAL WORK TO AVOID DAMAGE TO EXISTING FACILITIES AND AMENITIES AS NOTED ON PLANS.
4. CONTRACTOR SHALL REMOVE AND DISPOSE OF PROPERLY OFFSITE ALL ITEMS NOTED FOR REMOVAL IN A LEGAL MANNER.
5. UNLESS OTHERWISE NOTED, ALL EXISTING TREES SHALL REMAIN & BE PROTECTED.
6. THE STUMPS OF ALL TREES BEING REMOVED SHALL BE GROUND DOWN TO A MINIMUM 6" BELOW SURROUNDING GRADE. FILL HOLE WITH SOIL FLUSH WITH ADJACENT GRADE. COORDINATE WITH SOIL REMOVAL.
7. REMOVAL OF ANY EXISTING TREE SHALL BE REVIEWED AND APPROVED BY THE ENGINEER & CITY ARBORIST PRIOR TO CONSTRUCTION.
8. CONTRACTOR SHALL SECURE PROJECT SITE DURING CONSTRUCTION STAGES OF DEVELOPMENT & AS DIRECTED BY CITY. CONTRACTOR SHALL PAY FOR AND PROVIDE ADDITIONAL TEMPORARY CONSTRUCTION FENCE AS NECESSARY TO SECURE SITE.
9. REMOVAL QUANTITIES NOTED ON PLANS ARE APPROXIMATE, CONTRACTOR IS RESPONSIBLE FOR VERIFYING QUANTITIES PRIOR TO BID.
10. CONTRACTOR SHALL PAY FOR, INCLUDE IN THEIR BID, & CONSTRUCT A TEMPORARY 6' HIGH CONSTRUCTION FENCE WITH SCREEN FABRIC. TEMPORARY FENCING SHALL BE CONSTRUCTED PRIOR TO SITE DEMOLITION & AS DIRECTED BY ENGINEER. FINAL LOCATION OF THE TEMPORARY CONSTRUCTION FENCE SHALL BE REVIEWED AND APPROVED BY THE ENGINEER PRIOR TO CONSTRUCTION.
11. COST INCURRED DUE TO REPAIR, AND OR REPLACEMENT OF EXISTING IMPROVEMENTS WHICH ARE NOT
DESIGNATED FOR REMOVAL AND WHICH ARE DAMAGED AS A RESULT OF CONSTRUCTION OPERATIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
12. ABANDONED PIPES SHALL BE CAPPED OR PLUGGED IN A MANNER APPROVED BY THE CITY'S AUTHORIZED REPRESENTATIVE.
13. CONCRETE INDICATED FOR REMOVAL SHALL BE CUT TO A TRUE LINE NEATLY SAWED EDGES. IF A SAWCUT IS WITHIN THREE FEET (3') OF AN EXISTING EXPANSION OR CONTROL JOINT, CONCRETE SHALL BE REMOVED TO THAT JOINT OR EDGE.
DEMOLITION PLAN NOTES
EXISTING BUILDING
TO BE REMOVED
(1,846 SF)
DECK
EXISTING SPRAY
FOUNTAIN TO BE
REMOVED AND
SALVAGE AS
DIRECTED BY CITY
DECK
CONCRETE
PAD (4)
CONTAINERS (3)
REMOVAL LEGEND
SYMBOL DESCRIPTION QTY
REMOVE (ITEM AS NOTED) SHOWN
PROTECT IN PLACE (ITEM AS NOTED) SHOWN
RELOCATE (ITEM AS NOTED) SHOWN
CLEAR + GRUB REMOVAL 7,419 SF
EXISTING CONCRETE REMOVAL 8,776 SF
EXISTING ASPHALT SURFACE REMOVAL 0 SF
EXISTING SAND RELOCATION 94,641 SF
EXISTING HARDSCAPE TO REMAIN 15,690 SF
EXISTING LANDSCAPE TO REMAIN 23,733 SF
A
B
C
LIGHT POLE
RELOCATE SAND
APPROX. 94,546 SF
EXISTING LANDSCAPE TO BE
REMOVED (3,394 SQFT).
2' WIDE 18" TALL
SEAT WALL
APPROX. 22 LF
2' WIDE 18" TALL
SEAT WALL
APPROX. 56 LF
BENCH
DECK
2' WIDE 18" TALL SEAT WALL
APPROX. 30 LF
EXISTING LANDSCAPE TO BE
REMOVED (1,191 SQFT).
LIGHT POLE
CHAIN LINK FENCE TO
BE REMOVED
APPROX. 46 LF
CONCRETE
RAMP CONCRETE
LAGOON WALL
AND DECK
DECK
LIGHT POLE
EXISTING PALMS TO BE
PROTECTED IN PLACE
(QTY: 4)
EXISTING PALMS TO BE
PROTECTED IN PLACE
(QTY: 4)
EXISTING PALMS TO BE
RELOCATED (QTY: 1)
EXISTING PALMS TO BE
RELOCATED (QTY: 4) EXISTING PALMS TO BE
REMOVED (QTY: 2)
LIGHT POLE
EXISTING PALMS TO BE
RELOCATED (QTY: 6)
EXISTING PALMS TO BE
REMOVED (QTY: 2)
LIGHT
POLE
EXISTING PALMS
AND TREES TO
BE REMOVED
(QTY: 5)
OUTDOOR SHOWER
TO BE REMOVED
EXISTING LANDSCAPE TO
BE REMOVED (110 SQFT).
EXISTING
FENCE PANEL ONLY
(POST TO REMAIN)
EXISTING PALM TO BE
REMOVED (QTY: 1)
OUTDOOR
SHOWER
C
C
A
A
A
A
A
A
A
A
A
B
C
A
B
B
C
A
A
A
A
C
A
A
B
B
B
C
C
C
A
C
C
A
A
A
A
A
A
B
A
A
C
C
B
A
A
A
B
B
EXISTING
FENCE PANEL ONLY
(POST TO REMAIN)
WOOD FENCE
EXISTING FENCE
PANEL ONLY (POST
TO REMAIN)
LANDSCAPE
PROTECT IN PLACE
WOOD FENCE
PROTECT IN PLACE
LANDSCAPE
PROTECT IN PLACE
EQUIPMENT TO BE
REMOVED
REMOVE WOOD
FENCE
RELOCATE
SEASIDE SIGN
REMOVE (E) TREE
RELOCATE
STREET LIGHT
BUILT IN
BBQ
BLUE FENCE GATE
PROTECT IN PLACE
WOOD FENCE
PROTECT IN PLACE
WOOD FENCE
PROTECT IN PLACE
A
B
B
B
A
B
B
A
A
EXISTING FENCE
PANEL ONLY (POST
TO REMAIN)
EXISTING FENCE
PANEL ONLY (POST
TO REMAIN)
EXISTING STAINLESS
STEEL HANDRAIL
EXISTING
STAINLESS
STEEL HANDRAIL
WOOD FENCE
PROTECT IN PLACE
WOOD FENCE
PROTECT IN PLACE
EXISTING LANDSCAPE TO BE
REMOVED (3,394 SQFT).
822
SCHEMATIC LANDSCAPE PLAN G004
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
0'
SCALE: 1" = 30'
15' 30' 60' 120'
823
3D LANDSCAPE RENDERING G005
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
0'
SCALE: 1" = 30'
15' 30' 60' 120'
824
3D LANDSCAPE RENDERING G006
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
0'
SCALE: 1" = 30'
15' 30' 60' 120'
825
3D LANDSCAPE RENDERING G007
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
0'
SCALE: 1" = 30'
15' 30' 60' 120'
826
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
LA (CORPORATE) : 411 N. HARBOR BLVD., STE. 201,
SAN PEDRO, CA 90731
P - (310) 241-6550 ORANGE COUNTY : 6850 LINCOLN AVE., STE. 206, BUENA PARK, CA 90731
P - (714) 444-2422 WWW.JMC-2.COM I WWW.OKAMOTO-SE.COM GRADING NOTES / LEGEND C-100 827
IMPROVEMENT CONSTRUCTION NOTES:
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
LA (CORPORATE) : 411 N. HARBOR BLVD., STE. 201,
SAN PEDRO, CA 90731
P - (310) 241-6550 ORANGE COUNTY : 6850 LINCOLN AVE., STE. 206, BUENA PARK, CA 90731
P - (714) 444-2422 WWW.JMC-2.COM I WWW.OKAMOTO-SE.COM 0' SCALE: 1" = 20'
10' 20' 40' 80'
KEYMAP N.T.S.
PACIFIC
OCEAN BOARDWALK
ACCESS RD.
PORTOFINO WAY
0'
SCALE: 1" = 20'
10' 20' 40' 80'
MATCH LINE SEE SHEET C-102
GRADING PLAN C-101
828
IMPROVEMENT CONSTRUCTION NOTES:
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
LA (CORPORATE) : 411 N. HARBOR BLVD., STE. 201,
SAN PEDRO, CA 90731
P - (310) 241-6550 ORANGE COUNTY : 6850 LINCOLN AVE., STE. 206, BUENA PARK, CA 90731
P - (714) 444-2422 WWW.JMC-2.COM I WWW.OKAMOTO-SE.COM 0' SCALE: 1" = 20'
10' 20' 40' 80'
KEYMAP N.T.S.
PACIFIC
OCEAN BOARDWALK
ACCESS RD.
PORTOFINO WAY
0'
SCALE: 1" = 20'
10' 20' 40' 80'
GRADING PLAN C-102
MATCH LINE SEE SHEET C-101
829
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
LA (CORPORATE) : 411 N. HARBOR BLVD., STE. 201,
SAN PEDRO, CA 90731
P - (310) 241-6550 ORANGE COUNTY : 6850 LINCOLN AVE., STE. 206, BUENA PARK, CA 90731
P - (714) 444-2422 WWW.JMC-2.COM I WWW.OKAMOTO-SE.COM 0' SCALE: 1" = 20'
10' 20' 40' 80'
KEYMAP N.T.S.
PACIFIC
OCEAN BOARDWALK
ACCESS RD.
PORTOFINO WAY
CROSS SECTION C-103
830
SEWER NOTES:
WATER CONSTRUCTION NOTES:
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
LA (CORPORATE) : 411 N. HARBOR BLVD., STE. 201,
SAN PEDRO, CA 90731
P - (310) 241-6550 ORANGE COUNTY : 6850 LINCOLN AVE., STE. 206, BUENA PARK, CA 90731
P - (714) 444-2422 WWW.JMC-2.COM I WWW.OKAMOTO-SE.COM KEYMAP N.T.S.
PACIFIC
OCEAN BOARDWALK
ACCESS RD.
PORTOFINO WAY
0'
SCALE: 1" = 30'
15' 30' 60' 120'
UTILITY PLAN C-104
831
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
LA (CORPORATE) : 411 N. HARBOR BLVD., STE. 201,
SAN PEDRO, CA 90731
P - (310) 241-6550 ORANGE COUNTY : 6850 LINCOLN AVE., STE. 206, BUENA PARK, CA 90731
P - (714) 444-2422 WWW.JMC-2.COM I WWW.OKAMOTO-SE.COM KEYMAP N.T.S.
PACIFIC
OCEAN BOARDWALK
ACCESS RD.
PORTOFINO WAY
CONSTRUCTION DETAILS
INLET 1 FILTERRA VAULT 2
TRENCH DRAIN 3 BEDDING AND TRENCHING 4
C-105
832
LAGOON SECTION A-A
SCALE: 1/4"=1'-0" Seaside Lagoon & Waterfront Promenade REDONDO BEACH, CA 07-17-2026
LA (CORPORATE) : 411 N. HARBOR BLVD., STE. 201,
SAN PEDRO, CA 90731
P - (310) 241-6550 ORANGE COUNTY : 6850 LINCOLN AVE., STE. 206, BUENA PARK, CA 90731
P - (714) 444-2422 WWW.JMC-2.COM I WWW.OKAMOTO-SE.COM KEYMAP N.T.S.
PACIFIC
OCEAN BOARDWALK
ACCESS RD.
PORTOFINO WAY
LID PLAN
LID SUMMARY TABLE:
LEGEND:
C-106
0'
SCALE: 1" = 30'
15' 30' 60' 120'
833
DUMPSTER ENCLOSURE
A2.1
0'
SCALE: 1/8" = 1' - 0"
4' 8' 16' 32'
PUMP ROOM BUILDING - FIRST FLOOR PLAN
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-16-2026
KEYMAP
PACIFIC
OCEAN
BOARDWALK
ACCESS RD.
PORTOFINO WAY
N.T.S.
DUMPSTER ENCLOSURE
07-17-2026
834
PUMP ROOM BUILDING - ROOF PLAN A2.2
KEYMAP
PACIFIC
OCEAN
BOARDWALK
ACCESS RD.
PORTOFINO WAY
N.T.S.
DUMPSTER ENCLOSURE
0'
SCALE: 1/8" = 1' - 0"
0' 4' 8' 16' 32'
SCALE: 1/8" = 1' - 0" Seaside Lagoon & Waterfront Promenade 4' 8' 16' 32' REDONDO BEACH, CA 07-16-2026
07-17-2026
835
18'-6" 5'-6" 16'-6"
T.O. PARAPET
PIT
T.O.F.F.
T.O. ROOF 2'-0"
2 1 3 18'-6" 5'-6" 16'-6"
T.O. PARAPET
PIT
T.O.F.F.
T.O. ROOF 2'-0"
3 1 2 18'-6" 5'-6" 16'-6"
T.O. PARAPET
PIT
T.O.F.F.
T.O. ROOF 2'-0" 6'-0" 3'-7" 2'-4"
2 1 3 18'-6" 5'-6" 16'-6"
T.O. PARAPET
PIT
T.O.F.F.
T.O. ROOF 2'-0" 6'-0" 3'-7" 2'-4"
1 2 3
KEYMAP
PACIFIC
OCEAN
BOARDWALK
ACCESS RD.
PORTOFINO WAY
N.T.S.
DUMPSTER ENCLOSURE
PUMP ROOM BUILDING - ELEVATIONS A3.1
A: NORTH ELEVATION
C: EAST ELEVATION
0'
SCALE: 1/8" = 1' - 0"
0' 4' 8' 16' 32'
SCALE: 1/8" = 1' - 0"
4' 8' 16' 32'
SCALE: 1/8" = 1' - 0"
SCALE: 1/8" = 1' - 0"
MATERIALS:
1. STANDING SEAM METAL 2: WHITE PAINTED BRICK
C
C
A
A
B: WEST ELEVATION
D: SOUTH ELEVATION
SCALE: 1/8" = 1' - 0"
SCALE: 1/8" = 1' - 0"
D D
B
B
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-16-2026
3: WHITE STRUCTURAL COVER
07-17-2026
836
18'-6" 5'-6" 16'-6"
T.O. PARAPET
PIT
T.O.F.F.
T.O. ROOF 2'-0" 18'-6" 5'-6" 16'-6"
T.O. PARAPET
PIT
T.O.F.F.
T.O. ROOF 2'-0"
KEYMAP
PACIFIC
OCEAN
BOARDWALK
ACCESS RD.
PORTOFINO WAY
N.T.S.
DUMPSTER ENCLOSURE
PUMP ROOM BUILDING - SECTIONS A4.1
0'
SCALE: 1/8" = 1' - 0"
0' 4' 8' 16' 32'
SCALE: 1/8" = 1' - 0"
4' 8' 16' 32'
A: BUILDING SECTION
B: BUILDING SECTION
SCALE: 1/8" = 1' - 0"
SCALE: 1/8" = 1' - 0"
B B A
A
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA
07-17-2026
07-16-2026
837
KEYMAP
PACIFIC
OCEAN
BOARDWALK
ACCESS RD.
PORTOFINO WAY
N.T.S.
DUMPSTER ENCLOSURE
A5.1
0'
SCALE: 1/4" = 1' - 0"
2' 4' 8' 16'
BOARDWALK RESTROOM FLOOR PLAN
BOARDWALK / SEASIDE LAGOON RESTROOM
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-16-2026
CONCEPT IMAGE
MATERIALS:
1. STANDING SEAM METAL 2: WHITE PAINTED BRICK
07-17-2026
838
ENTER +GF+ Seaside Lagoon & Waterfront Promenade REDONDO BEACH, CA 07-17-2026 17520 Newhope Street, Suite 200 Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering SWIM LAGOON SYSTEM FLOW SCHEMATIC W100 839
40'-0" MINIMUM SLIDE SAFETY CLEARANCE
20'-6" MINIMUM
SLIDE SAFETY
CLEARANCE SLIDE TOWER DECK SWIM LAGOON WS 10.0 BOT. 5.0 150 75 0 150 300 TOW 10.5 TOW 9.5 9.0 5.0 6.07.0 W202 A 8.0 7.06.0 SAND BEACH WS 10.0 BOT. 7.0 Seaside Lagoon & Waterfront Promenade REDONDO BEACH, CA 07-17-2026 17520 Newhope Street, Suite 200 Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering SWIM LAGOON PLAN W200 20'-0" 20'-0" 840
AQUATIC FACILITY DATA: SWIM LAGOON VOLUME 770,000 GALLONS SURFACE AREA 44,000 SF (1 ACRE) PERIMETER 830 FT MAX DEPTH 5'-0" FILTRATION FLOW 3,000 GPM TURNOVER RATE 4.3 HOURS SAND BEACH SWIM LAGOON SEE SHEET W200 PUMP STATION SEE SHEET W520 EXISTING RESTROOM 10"Ø SWIM LAGOON DISCHARGE 10"Ø SWIM LAGOON THROUGH GRAVITY DRAIN INDICATES RECIRCULATION DISCHARGE PIPE LEGEND: INDICATES TROUGH GRAVITY DRAIN PIPE 20 10 0 20 40 10"Ø SWIM LAGOON DISCHARGE Seaside Lagoon & Waterfront Promenade REDONDO BEACH, CA 07-17-2026 17520 Newhope Street, Suite 200 Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering SWIM LAGOON PIPING PLAN W201 841
SWIM LAGOON - SECTION 'A' EXISTING GRADE POSSIBLE GROUND WATER EL 3.4 WS 10 DRY SAND EXISTING STRUCTURE 5'-0"
9"
REINFORCED
CONCRETE MEMBRANE LINERS SWIM LAGOON FF 5.0 POSSIBLE GROUND WATER EL 3.4 TYPICAL MAIN DRAIN PIPING - SECTION 1/2"=1'-0" MAIN DRAIN SUMP 10"Ø MAIN DRAIN INTAKE PIPE INSTALL GEOTEXTILE FABRIC BELOW GRAVEL 5'-0"
6"
FREE BOARD POSSIBLE GROUND WATER EL 3.4 EXISTING GRADE CONCRETE SHELL 4 2 0 4 8 EL 9.5 1'-0" FFE 10.5 FF 5.0 1/4"=1'-0" MEMBRANE LINER Seaside Lagoon & Waterfront Promenade REDONDO BEACH, CA 07-17-2026 17520 Newhope Street, Suite 200 Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering SWIM LAGOON SECTIONS W202 SAND BEACH FF 6.0 EL 7.5 EL 9.0 842
PUMP STATION EQUIPMENT LIST AND PIPE SCHEDULE W510 Seaside Lagoon & Waterfront Promenade REDONDO BEACH, CA 07-17-2026 17520 Newhope Street, Suite 200 Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering PUMP STATION EQUIPMENT LIST EQUIPMENT TAG / PID ITEM MODEL MFG/SUPPLIER DESCRIPTION QTY PUMPS FILTERS HEATER UV EQUIPMENT CHEMICAL EQUIPMENT MISCELLANEOUS BUILDING HVAC EQUIPMENT INSTRUMENTATION LIST PMP-100 PMP-101 PMP-102 HT-200 HT-201 HT-202 UV-100 UV-101 UV-102 ST-100 ST-101 ST-102 PMP-400 PMP-401 PMP-402 M-100 M-101 M-102 M-103 PMP-403 PMP-404 PMP-405 PMP-406 PMP-407 PMP-500 PMP-501 PMP-502 G-100 G-101 G-200 G-201 FLT-100 FLT-101 FLT-102 843
4'-0" (TYP.) 8'-0"
17'-4" 23'-3" 41'-11"
63'-6"
10'-0" 53'-0" 25'-6" 15'-11"
8'-9"
(TYP.)
1'-0"
(TYP.)
1'-0"
(TYP.) 4'-0" (TYP.) 4'-0" 4'-0"
4'-5"
(TYP.)
3'-0" MECHANICAL PLAN VIEW SCALE: 1/4" = 1'-0" A W531 W521 B W521 C W521 D W521 E Seaside Lagoon & Waterfront Promenade REDONDO BEACH, CA 07-17-2026 17520 Newhope Street, Suite 200 Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering PUMP STATION MECH PLAN W520 4 2 0 4 8 844
FFE 4.00' FFE 10.50' TOR 27.00' TOW 29.00' 8'-9" (TYP.) 3'-8"
(TYP.) 4'-5" (TYP.) 8" 1'-0" 8" 53'-0"
5'-6" 8'-10" (TYP.) 1'-0" (TYP.)
2'-0" FFE 4.00' FFE 10.50' TOR 27.00'
5'-6" 1'-6" 1'-6" 4'-0" 4'-0"
5'-6" FFE 4.00' FFE 10.50' TOR 27.00' 5'-0"16'-0" 4'-0" 5'-6" 16'-0" FFE 4.00' FFE 10.50' TOR 27.00' TOW 29.00' 1'-6" FFE 29.00' FFE 10.50' TOR 27.00' 25'-6" 15'-11"
16'-0" 3'-0" 9'-0" SECTION - A SCALE: 1/4" = 1'-0" SECTION - B SCALE: 1/4" = 1'-0" SECTION - C SCALE: 1/4" = 1'-0" SECTION - D SCALE: 1/4" = 1'-0" SECTION - E SCALE: 1/4" = 1'-0" Seaside Lagoon & Waterfront Promenade REDONDO BEACH, CA 07-17-2026 17520 Newhope Street, Suite 200 Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering PUMP STATION MECH SECTIONS W521 BACKWASH WATER TANK 4 2 0 4 8 845
4 5 14 11 1 3 1312 2 123 6 6 6 6 9 6 6 8 9 MOTOR CONTROL CENTER "A" (MCC-A) (MAIN BREAKER 400 AMPS @ 480V) EQUIPMENT NAME HP AMPS @ 480V AIR SOURCE HEAT PUMP (PMP-XXXXX) 10 14 SWIM LAGOON FILTER PUMP NO. 1 (PMP-XXXXX) 20 27 SWIM LAGOON FILTER PUMP NO. 2 (PMP-XXXXX) 20 27 SWIM LAGOON FILTER PUMP NO. 3 (PMP-XXXXX) 20 27 PS EXHAUST FAN NO. 1 (EXH-XXXXX) 1 2.1 PS EXHAUST FAN NO. 2 (EXH-XXXXX) 1 2.1 XFMR-B (30KVA) (MAX LOAD) - 36.08 PANELBOARD "A" - 33.6 SUBTOTAL 168.88 25% LARGEST MOTOR 6.75 GRAND TOTAL 175.63 % CAPACITY 43.91% 15 Seaside Lagoon & Waterfront Promenade REDONDO BEACH, CA 07-17-2026 17520 Newhope Street, Suite 200 Fountain Valley, CA 92708 P: (714) 481-7300 | www.pacewater.com Advanced Water Engineering ELECTRICAL SINGLE LINE DIAGRAM W600 846
CONSTRUCTION LEGEND
1 EXISTING WOOD FENCE TO REMAIN & BE PROTECTED IN PLACE 2 NEW WOOD FENCE AROUND NEW TRASH ENCLOSURE
3 4
5 6
7 EXISTING DECORATIVE METAL PICKET FENCE @ ENTRY TO
REMAIN AND BE PROTECTED IN PLACE
EXISTING WOOD POLE & CHAINLINK FENCE TO BE REFRESHED
WITH NEW METAL MESH PANELS
NEW WOOD POLE & METAL MESH PANEL FENCE TO MATCH
EXISTING WOOD POLES
EXISTING FENCE ALONG SURF CLUB TO REMAIN AND BE
PROTECTED IN PLACE
TEMPORARY REMOVABLE FENCING
LANDSCAPE FENCING PLAN L-101
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
0'
SCALE: 1" = 30'
15' 30' 60' 120'
EXISTING ADMIN
PORTOFINO WAY
847
OVERALL CONSTRUCTION SITE PLAN L-102
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
0'
SCALE: 1" = 30'
15' 30' 60' 120'
SYMBOL CODE DESCRIPTION QTY
CONCRETE PAVING 19,292 SF
NATURAL TURF 6,027 SF
PLANTING AREA 3,984 SF
EXISTING BEACH SAND 62,422 SF
CONCRETE BOTTOM SWIM LAGOON 43,560 SF
CONSTRUCTION LEGEND
NEW MECHANICAL BUILDING WITH LAGOON
EQUIPMENT
NEW 1 ACRE LAGOON W/ SAND ENTRY
1 2
3 NEW SEATING NODE FOR BEACH CHAIRS
4 NEW WATER SLIDE
5 NEW DOUBLE GATE ENTRY
6 NEW SEASONAL LAGOON FENCE
7 NEW LAGOON SPLASH JETS / FOUNTAIN
8 EXISTING BEACH SAND
9 EXISTING ADMIN BUILDING
10 DAM WALL RAISED 1' ABOVE EXISTING SURFACE
11 EXISTING HARDSCAPE
12 NATURAL TURF
13 NEW SAND BARRIER WALL/ SWIMMING BUOYS
NEW CONCRETE PAVING.
FINISH: TBD
14A
15 NEW METAL SCREEN PANEL FENCE
16 NEW OUTDOOR SHOWER
17 NEW SOLID ROOF SHADE STRUCTURE
18 NEW BBQ PIT SLEEVES
19 NEW LID BIOSWALE FILTRATION
20 NEW PUBLIC RESTROOM
21 EXISTING FENCE
22 NEW OUTDOOR SINK W/ BUILT-IN BBQ
23 NEW RETAINING WALL
14A COLOR:
FINISH: TBD
BARK MULCH:
PLANTING AREAS
CONCRETE FINISHES
14B COLOR:
FINISH: TBD
COLOR:
FINISH: TBD
10 NEW SEATING NODE FOR BEACH CHAIRS WITH
PICNIC TABLES
3A
NEW CONCRETE PAVING.
FINISH: TBD
24 NEW SMALL PILASTER
25 NEW POLIGON SHADE STRUCTURE
EXISTING ADMIN
NEW HANDICAP ACCESSIBLE RAMP INTO LAGOON
7 2
8 13
13 7
4 10 14
16 20
5 15
11 21
8 11
6 21
5 12
21 6
11 11
23 12
12 11
22 14B
14A
14A
12 21
19 19
1 18
3A
3 15
14B
15 13
16 12
16 13 13
24 24
24 25 9
26 13
26 14B
P.A
P.A
P.A
P.A
P.A
P.A
P.A
P.A
14B
7A NEW LAGOON WATER FEATURE SCULPTURE
7A
27 NEW METAL BOLLARDS
27 27
PORTOFINO WAY
P.A
P.A
P.A
848
SITE AMENITIES L-103
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
0'
SCALE: 1/8" = 1'
4' 8' 16' 32'
SHOWER TOWER ADA
SITE AMENITIES
DRINKING FOUNTAIN TRASH CAN WATER FEATURE SCULPTURE WATER SLIDE
SHADE STRUCTURE - SECTION SKETCH & ELEVATION
SHADE STRUCTURE - GROUND VIEW SHADE STRUCTURE - ISOMETRIC VIEW
MATERIALS
STANDING SEAM METAL ROOF
SHADE STRUCTURE
PORTOFINO WAY
POLIGON SHADE STRUCTURE - ENLARGED PLAN
849
SCHEMATIC TREE PLANTING PLAN L-104
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
0'
SCALE: 1" = 30'
15' 30' 60' 120'
SYMBOL CODE BOTANICAL NAME COMMON NAME
TREES
CH CHAMAEROPS HUMILIS MEDITERRANEAN FAN PALM
LW LAGERSTROEMIA INDICA X FAURIEI 'NATCHEZ' NATCHEZ CRAPE MYRTLE MULTI-TRUNK LX2 LAURUS X 'SARATOGA' SARATOGA HYBRID LAUREL
WF WASHINGTONIA X FILIBUSTA HYBRID FAN PALM
PLANT LEGEND
EXISTING ADMIN
PORTOFINO WAY
850
SCHEMATIC SHRUB PLANTING PLAN L-105
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
0'
SCALE: 1" = 30'
15' 30' 60' 120'
SYMBOL CODE BOTANICAL NAME COMMON NAME
SHRUBS
AP2 AGAPANTHUS X 'PURPLE CLOUD' PURPLE CLOUD AFRICAN LILY
DB DIANELLA REVOLUTA 'CLARITY BLUE' CLARITY BLUE FLAX LILLY
DS DIETES GRANDIFLORA 'SUNSTRIPE' YELLOW STRIPED FORTNIGHT LILY GT GREVILLEA LANIGERA 'MT. TAMBORITHA' MT. TAMBORITHA WOOLLY GREVILLEA
LH LANTANA X 'NEW GOLD' NEW GOLD LANTANA
LS LEUCADENDRON X 'SAFARI SUNSET' SAFARI SUNSET CONEBUSH LL2 LIGUSTRUM LUCIDUM GLOSSY PRIVET
RB RHAPHIOLEPIS INDICA 'BALLERINA' BALLERINA INDIAN HAWTHORN VINES
TJ TRACHELOSPERMUM JASMINOIDES CHINESE STAR JASMINE
GROUND COVERS
CD CYNODON DACTYLON BERMUDAGRASS
PLANT LEGEND
EXISTING ADMIN
PORTOFINO WAY
851
PLANT PALETTE & IMAGERY L-106
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
SYMBOL CODE BOTANICAL NAME COMMON NAME SIZE QTY MATURE HEIGHT MATURE WIDTH TREES
CH CHAMAEROPS HUMILIS MEDITERRANEAN FAN PALM 24" BOX 5 10 - 15FT. HT. 10 - 15FT. W.
LW LAGERSTROEMIA INDICA X FAURIEI 'NATCHEZ' NATCHEZ CRAPE MYRTLE MULTI-TRUNK 48" BOX 9 15 - 25FT. HT. 15 - 25FT. W.
LX2 LAURUS X 'SARATOGA' SARATOGA HYBRID LAUREL 48" BOX 8 25 - 40FT. HT. 15 - 25FT. W.
WF WASHINGTONIA X FILIBUSTA HYBRID FAN PALM 48" BOX 9
SHRUBS
AP2 AGAPANTHUS X 'PURPLE CLOUD' PURPLE CLOUD AFRICAN LILY 15 GAL. 69 DB DIANELLA REVOLUTA 'CLARITY BLUE' CLARITY BLUE FLAX LILLY 5 GAL. 87 18 - 36IN. HT. 1 - 3FT. W.
DS DIETES GRANDIFLORA 'SUNSTRIPE' YELLOW STRIPED FORTNIGHT LILY 15 GAL. 89 18 - 6FT. HT. 1 - 3FT. W.
GT GREVILLEA LANIGERA 'MT. TAMBORITHA' MT. TAMBORITHA WOOLLY GREVILLEA 5 GAL. 36 18 - 36IN. HT. 3 - 6FT. W.
LH LANTANA X 'NEW GOLD' NEW GOLD LANTANA 5 GAL. 48 6 - 18IN. HT. 3 - 6FT. W.
LS LEUCADENDRON X 'SAFARI SUNSET' SAFARI SUNSET CONEBUSH 5 GAL. 34 6 - 10FT. HT. 3 - 1FT. W.
LL2 LIGUSTRUM LUCIDUM GLOSSY PRIVET 5 GAL. 27 6 - 10FT. HT. 10 - 15FT. W.
RB RHAPHIOLEPIS INDICA 'BALLERINA' BALLERINA INDIAN HAWTHORN 15 GAL. 46 18 - 36IN. HT. 1 - 3FT. W.
VINES
TJ TRACHELOSPERMUM JASMINOIDES CHINESE STAR JASMINE 15 GAL. 10 3 - 6FT. HT. 3 - 6FT. W.
GROUND COVERS
CD CYNODON DACTYLON BERMUDAGRASS LINERS 6,027 SF < 6IN. HT.
TREES PLANT LEGEND
KEY
VINES
SHRUBS
13 10 11 12
5 6 7 8 9
1 NO.
1 2
3 4
5 6
7 8
9 10
11 12
13 LOW WATER USE
CALIFORNIA NATIVE
ACCENT PLANT
FLOWERING PLANT
2 3 4
14 GROUNDCOVER
14 852
1"
2"
2"
2"
POC
2"
1"
2"
1"
2"
SCHEMATIC IRRIGATION PLAN L-107
Seaside Lagoon & Waterfront Promenade
REDONDO BEACH, CA 07-17-2026
0'
SCALE: 1" = 30'
15' 30' 60' 120'
SYMBOL MANUFACTURER/MODEL/DESCRIPTION
RAIN BIRD R-VAN-STRIP 1806-SAM-P45
TURF ROTARY, 8FT.-14FT. 45-270 DEGREES AND
360 DEGREES. HAND ADJUSTABLE
MULTI-STREAM ROTARY W/1800 TURF SPRAY
BODY ON 6IN. POP-UP, WITH CHECK VALVE AND
45 PSI IN-STEM PRESSURE REGULATOR. 1/2IN.
NPT FEMALE THREADED INLET.
RAIN BIRD R-VAN14 1806-SAM-P45
TURF ROTARY, 8FT.-14FT. 45-270 DEGREES AND
360 DEGREES. HAND ADJUSTABLE
MULTI-STREAM ROTARY W/1800 TURF SPRAY
BODY ON 6IN. POP-UP, WITH CHECK VALVE AND
45 PSI IN-STEM PRESSURE REGULATOR. 1/2IN.
NPT FEMALE THREADED INLET.
RAIN BIRD R-VAN18 1806-SAM-P45
TURF ROTARY, 13FT.-18FT. 45-270 DEGREES AND
360 DEGREES. HAND ADJUSTABLE
MULTI-STREAM ROTARY W/1800 TURF SPRAY
BODY ON 6IN. POP-UP, WITH CHECK VALVE AND
45 PSI IN-STEM PRESSURE REGULATOR. 1/2IN.
NPT FEMALE THREADED INLET.
RAIN BIRD R-VAN24 1806-SAM-P45
TURF ROTARY, 17FT.-24FT. 45-270 DEGREES AND
360 DEGREES. HAND ADJUSTABLE
MULTI-STREAM ROTARY W/1800 TURF SPRAY
BODY ON 6IN. POP-UP, WITH CHECK VALVE AND
45 PSI IN-STEM PRESSURE REGULATOR. 1/2IN.
NPT FEMALE THREADED INLET.
RAIN BIRD RWS-B-C 1400 SERIES
ROOT WATERING SYSTEM WITH 4.0IN. DIAMETER
X 36.0IN. LONG WITH LOCKING GRATE,
SEMI-RIGID MESH TUBE, AND CHECK VALVE. RAIN
BIRD BUBBLER OPTION AS INDICATED: 1401 0.25
GPM, 1402 0.5 GPM, 1404 1.0 GPM, 1408 2.0 GPM.
SYMBOL MANUFACTURER/MODEL/DESCRIPTION
RAIN BIRD XCZ-150-LCDR
HIGH FLOW CONTROL ZONE KIT, FOR LARGE
COMMERCIAL DRIP ZONES. 1-1/2IN. PESB-R
SCRUBBER GLOBE VALVE WITH HIGH-CAPACITY
FILTER AND PRESSURE REGULATING SYSTEM
(PRS) FIXED AT 40PSI. FLOW RANGE: 20 - 62 GPM.
TORO T-FCH-H-FIPT
FLUSH VALVE, PLUMBED TO FLUSH MANIFOLD AT
LOW POINT.
RAIN BIRD ARV050
1/2IN. AIR RELIEF VALVE, MADE OF QUALITY
RUST-PROOF MATERIALS, WITH A 6IN. DRIP
VALVE BOX (SEB 7XB EMITTER BOX). USE WITH
INSTALLATION BELOW SOIL. THE VALVE WILL
ALLOW AIR TO ESCAPE THE PIPELINE, THUS
PREVENTING WATER HAMMER OR BLOCKAGE.
RAIN BIRD OPERIND
DRIP SYSTEM OPERATION INDICATOR, STEM
RISES 6IN. FOR CLEAR VISIBILITY WHEN DRIP
SYSTEM IS CHARGED TO A MINIMUM OF 20PSI.
INCLUDES 16IN. OF 1/4IN. DISTRIBUTION TUBING
WITH CONNECTION FITTING PRE-INSTALLED.
AREA TO RECEIVE DRIPLINE
RAIN BIRD XFS-CV-06-12
XFS-CV SUB-SURFACE AND ON-SURFACE
LANDSCAPE DRIPLINE WITH A HEAVY-DUTY 4.3
PSI CHECK VALVE. 0.6 GPH EMITTERS AT 12" O.C.
DRIPLINE LATERALS SPACED AT 12" APART, WITH
EMITTERS OFFSET FOR TRIANGULAR PATTERN.
SPECIFY XF INSERT FITTINGS.
SYMBOL MANUFACTURER/MODEL/DESCRIPTION
RAIN BIRD PEB-IVM
1IN., 1-1/2IN., 2IN. PLASTIC INDUSTRIAL SMART
VALVES W/ FACTORY INSTALLED IVM-SOL. LOW
FLOW OPERATING CAPABILITY, GLOBE
CONFIGURATION.
RAIN BIRD ESPLXME2-LXMM
12 STATION TRADITIONALLY-WIRED,
COMMERCIAL CONTROLLER. INDOOR/OUTDOOR,
PLASTIC WALL-MOUNT ENCLOSURE. INSTALL IN
LXMM POWDER COATED, METAL WALL-MOUNTED
CABINET.
POINT OF CONNECTION 4"
IRRIGATION LATERAL LINE: DUCTILE IRON PIPECLASS 350
IRRIGATION LATERAL LINE: PVC CLASS 200
IRRIGATION MAINLINE: PVC SCHEDULE 40
L S R
LST SST RST
14 ADJ 14 F
18 18
18 ADJ 18 F
24 24
24 ADJ 24 F
1401 1402 1404
F
A
X
X
X
IRRIGATION LEGEND
PORTOFINO WAY EXISTING ADMIN
853
CITY OF REDONDO BEACH
EXEMPTION DECLARATION
PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
DATE: August 25, 2026
PROJECT ADDRESS: 200 Portofino Way
PROPOSED PROJECT: Seaside Lagoon Rehabilitation
In accordance with Chapter 3, Title 10, Section 10-3.301(a) of the Redondo Beach Municipal Code, the proposed project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Sections 15301 (Existing Facilities) and 15302 (Replacement or Reconstruction) of the CEQA Guidelines.
The proposed project consists of the rehabilitation and modernization of the existing Seaside Lagoon through the replacement of aging recreational infrastructure, including the existing lagoon, pump building, restroom facilities, utilities, hardscape, landscaping, and other associated site improvements. The project maintains the existing recreational use and operational capacity of Seaside Lagoon as a public waterfront recreational facility while improving compliance with current public health, safety, accessibility, and water quality standards. The replacement improvements will serve substantially the same purpose at the same location and do not expand the facility or intensify its existing use.
Accordingly, the project qualifies for the Class 1 Categorical Exemption (CEQA Guidelines Section 15301) because it consists of the repair, rehabilitation, and minor alteration of an existing public recreational facility involving negligible expansion of the existing use, and the Class 2 Categorical Exemption (CEQA Guidelines Section 15302) because it replaces existing public facilities with new facilities serving substantially the same purpose and capacity at the same site. Staff has further determined that none of the exceptions to the use of a categorical exemption identified in CEQA Guidelines Section 15300.2 apply; therefore, preparation of additional environmental documentation is not required.
854
Administrative
Report
P.1., File # 26-1114 Meeting Date: 9/15/2026
To: CITY COUNCIL
From: JAMES LIGHT, MAYOR
TITLE
DISCUSSION AND CONSIDERATION OF A MAYOR APPOINTMENT TO THE PLANNING
COMMISSION DUE TO A VACANCY
ATTACHMENTS
Mayor Light Appointment Recommendation
855
COMMISSION APPOINTMENT – SEPTEMBER 15, 2026
PLANNING COMMISSION DISTRICT TERM RECRUITMENT TYPE
Richard Luce, Jr. 5 9/16/2026 - 9/31/2027 IMMEDIATE
856
Administrative
Report
V.1., File # 26-1139 Meeting Date: 9/15/2026
TITLE
ADJOURN IN MEMORY OF DOKO “SOPEN” KALUDEROVIC, FATHER-IN-LAW OF COUNCIL
MEMBER PAIGE KALUDEROVIC
857