Cities Index.
Dec 9-Item 8

Reedley City Council
December 9, 2025

Document
Dec 9-Item 8
Meeting
December 9, 2025
Body
Reedley City Council
Pages
11
Original file
59.6 MB
Text extracted from the city's file for reading and search. Open the original on reedley.ca.gov. That file is the official record.
Page 2 of 11 ends

A) Adopt Resolution No. 2025-083, a Resolution of Application by the City of Reedley Requesting the Local Agency Formation Commission to take Proceedings for the Buttonwillow-Springfield Reorganization B) Adopt Resolution No. 2025-084, a Resolution of the City Council of the City of Reedley Adopting Environmental Assessment No. 2025-05, A Mitigated Negative Declaration, Dated August 14, 2025, and Approving Annexation Application No. 2025-01, General Plan Amendment Application No. 2025- 01, Rezone Application No. 2025-01, and Vesting Tentative Subdivision Map No. 6497
C) Introduce Ordinance No. 2025-004, an Ordinance of the City Council of the City of Reedley Approving Rezone Application No. 2025-01 and Authorizing the Amendment of the Official Zoning Map of the City of Reedley

EXECUTIVE SUMMARY
Annexation Application No. 2025-01, General Plan Amendment Application No. 2025-01, Rezone Application No. 2025-01 (Ordinance No. 2025-004), Vesting Tentative Subdivision Map No. 6497, and Environmental Assessment No. 2025-05 were filed with the Community Development Department by D.R. Horton CA3, Inc. and pertain to the annexation of approximately 39.7 gross acres into the City of Reedley, a general plan amendment to designate the project site in its entirety as Low Density Residential, a prezoning of the annexation area consistent with proposed General Plan Amendment Application No. 2025-01, and the subdivision of 33.98+ acres of land to accommodate future development of single-unit homes.

The proposed project includes the development of 166 single-unit homes on lots with varying sizes. The size of the proposed lots will vary from a minimum of 5,002 square feet to a maximum of approximately 11,111 square feet. The average lot size is approximately 5,561 square feet.

The proposed project also includes one 2-acre storm drain basin and seven (7) outlots. Two access points are proposed for the project area, the first access point will be located on South Buttonwillow Avenue and the second access point is proposed to be located on East North Avenue.

The proposed project is consistent with the City of Reedley General Plan Update 2030 goals and policies and the Reedley Municipal Code. Annexation Application No. 2025-01 is consistent with the Memorandum of Understanding between the County of Fresno and the City of Reedley.

The Subdivision Map Act (California Government Code Section 66400 et. seq.) findings can be made to approve Vesting Tentative Subdivision Map No. 6497. Staff has determined that a Mitigated Negative Declaration is appropriate for the project, through Environmental Assessment 2025-05. In accordance with State CEQA Guidelines, the appropriate posting, filing and noticing of such has taken place.

Staff presented Environmental Assessment 2025-05, Annexation Application No. 2025-01, General Plan Amendment Application No. 2025-01, Rezone Application No. 2025-01 (Ordinance No. 2025-004), and Vesting Tentative Subdivision Map No. 6497 to the Planning Commission for their consideration, to receive public comment, and to make a recommendation to the City Council. Planning Commission recommended approval of the entitlement

Page 3 of 11 ends

applications and accompanying environmental assessment. Rezone Application No. 2025-01 is being introduced for first reading as Ordinance No. 2025-004.

If granted, City Council’s approval of Annexation No. 2025-01 would authorize City staff to submit an annexation application to the Fresno Local Agency Formation Commission (LAFCo).

Upon completion of the annexation process and the general plan amendment process, the proposed project site would have a General Plan land use designation of Low Density Residential and an accompanying zone district designation of R-1-6 (Low Density Residential).

If first reading is held and approved, Ordinance No. 2025-004 would be resubmitted to the City Council for second reading and final adoption at their next scheduled regular meeting to be held on December 9, 2025.

BORDERING PROPERTY INFORMATION
Planned Land Use Existing Zoning Existing Land Use
North • Low Density Residential • R-1-6 (Low Density
Residential) • Orchards
East
• Public/Institutional Facility
• Low Density Residential
• RCO (Resource Conservation
and Open Space)
• AE20 (Exclusive Agricultural)
• Silas Bartsch
School and
Vacant Land
South • Low Density Residential • R-1-6 (Low Density
Residential)
• Residential
Homes
West • Low Density Residential • R-1-6 (Low Density
Residential)
• Residential
Homes

PROJECT DESCRIPTION
Annexation Application No. 2025-01, General Plan Amendment Application No. 2025-01, Rezone Application No. 2025-01 (Ordinance No. 2025-004), Vesting Tentative Subdivision Map No. 6497, and Environmental Assessment No. 2025-05 pertain to the annexation of approximately 39.7 gross acres in the City of Reedley to facilitate the subdivision of 33.98+ acres of land and proposed street dedications and improvements. The proposed land subdivision is to accommodate future development of single-unit homes. The following applications were filed with the Community Development Department by D.R. Horton CA3, Inc.:

Annexation Application No. 2025-01 pertains to the annexation of approximately 39.7 acres into the City of Reedley. The proposed annexation area includes APN 370-040-10, 370-040- 22, 370-040-23, 370-40-13 and existing right-of-way contiguous to parcel boundaries. The proposed annexation is within the City of Reedley’s adopted Sphere of Influence, is adjacent to the existing City of Reedley City Limits on three sides, and promotes orderly growth and development.

General Plan Amendment Application No. 2025-01 pertains to the reclassification of a 4- acre portion of a parcel (APN 370-040-10) that currently has a High Density Residential General Plan Land Use Designation. The proposed General Plan Amendment would reclassify the portion of the parcel from High Density Residential (15.1-29 dwelling units per acre) to Low Density Residential (4-8 dwelling units per acre). If General Plan Amendment Application No.

Page 4 of 11 ends

2025-01 is approved, then the entire parcel (APN 370-040-10) would have a Low Density Residential General Plan Land Use Designation (4-8 dwelling units per acre).

Rezone Application No. 2025-01 pertains to the reclassification of approximately 39.7 acres consisting of four parcels (APN 370-040-10, 370-040-22, 370-040-23, 370-40-13) from agricultural use (AL20) within Fresno County to the R-1-6 (Low Density Residential) zone district upon annexation into Reedley City Limits. The proposed zoning designation is consistent with the proposed general plan amendment as well as the existing Low Density Residential General Plan Planned Land Use Designation of the remaining project area.

Vesting Tentative Subdivision Map (VTSM) No. 6497 (Westhaven 2) pertains to the subdivision of land and proposed street dedications/improvements to accommodate for single unit development. The proposed project would include the subdivision of one parcel of land (APN 370-040-10) into 174 lots consisting of 166 lots for single unit development with a minimum lot size of 5,002 square feet, an average lot size of 5,561 square feet, and a residential density of 5.19 dwelling units per gross acre, as well as 7 outlots and one 2-acre storm drain basin. The subdivision would have two access points, one access point would be on South Buttonwillow Ave and the secondary access point would be on East North Avenue.

Conditions specific to the development may be found within Attachment 1, Exhibit A (Draft Conditions of Approval dated October 16, 2025, and attached to Resolution No. 2025-084), which details general, department-specific, and miscellaneous requirements the development must meet and/or perform, if approved. Additionally, the proposed vesting tentative subdivision map is included within Attachment 1, Exhibit A for Resolution No. 2025-084, showing the lot configurations and required right-of-way dedications.

GENERAL PLAN CONSISTENCY
The proposed project site is located outside of the Reedley City Limits but is within the City of Reedley’s Sphere of Influence. The City of Reedley General Plan Update 2030 designates approximately 35.7 acres of the project site with a Low Density Residential Planned Land Use Designation and the remaining 4 acres are currently designated as High Density Residential.

General Plan Amendment Application No. 2025-01 proposes that the entire project site be classified as Low Density Residential. This amendment would be consistent with the goals and policies of the Reedley General Plan 2030.

The City of Reedley General Plan Update 2030 states that the City should provide for a range of housing types, styles and densities. The essential goal for the City of Reedley is to ensure that housing opportunities are made available for all socio-economic levels. General Plan Amendment Application No. 2025-01 proposes a General Plan Planned Land Use Designation of Low Density Residential. The density range for General Plan Planned Land Use Designation of Low Density Residential is four-to-eight dwelling units per acre. The proposed project has a residential density of 5.19 dwelling units per gross acre. The Low Density Residential designation is intended for single-unit detached residential development, attached single-unit, and low-density multi-unit residential uses. Admittedly, residential subdivisions remain the primary residential land use and is represented in newly constructed housing projects within the City of Reedley. Below are those directly applicable goal and policy statements that the project would implement:

Page 5 of 11 ends

LU 2.6A New development shall be designed in a way that creates fully integrated neighborhoods with a variety of land uses arranged so that access by walking or bicycling is possible and encouraged.

LU 2.7C Preserve existing neighborhoods and create strong new neighborhoods that are well designed and maintained.

LU 2.7.3 Guide new development into compact neighborhoods around commercial centers, public open space and schools.

LU 2.7.5 Encourage and support within existing neighborhoods in-fill development.

LU 2.7.6 Ensure that residential development occurs in areas that have sufficient infrastructure to accommodate the density of residential development being proposed.

LU 2.7.7 Residential development shall be designed in a manner so that new development is well connected to the surrounding area and to encourage pedestrian and bicycle transportation.

The proposed annexation is consistent with the City of Reedley General Plan Update 2030 because the residential development proposed as part of this annexation application is consistent with the anticipated type of development identified in the proposed Low Density Residential Planned Land Use Designation.

Since the project is currently located outside of city limits, the project site (APN: 370-040-10) is not listed on the sites inventory of the Multi-Jurisdictional Housing Element. However, based on the Fresno Council of Government’s Regional Housing Needs Plan that was adopted in November 2022, the City of Reedley must plan to accommodate 1,463 housing units, divided between four different affordability levels, between July 20, 2023 and December 31, 2031. Of the 1,463 total units, the City must plan to accommodate 403 units for very low-income households, 183 units for low-income households, 211 units for moderate-income households, and 666 units for above moderate-income households. Based on similar market rate single-unit housing projects, Westhaven 2 will likely be in the above-moderate income level.

As discussed above, the intent of Vesting Tentative Subdivision Map No. 6497 is to subdivide and develop the 33.98+ acres of property into 166 single-unit residential lots. The proposed project is consistent with the proposed General Plan Designation and proposed zone district designation for the area. Development of the land is consistent with the development standards prescribed within the Reedley Municipal Code.

ZONING ORDINANCE CONSISTENCY
The project site parcel is situated within the County of Fresno’s jurisdiction and is currently zoned by the County as Exclusive Agricultural (AE20). This zone district is intended to be an exclusive district for agricultural and for those specified uses which are necessary and an integral part of the agricultural operation. The proposed project includes pre-zoning approximately 39.7 acres into the R-1-6 (Low Density Residential) zone district. With an approved General Plan Amendment Application No. 2025-01, the proposed pre-zoning for the proposed project remains consistent with the GPU Planned Land Use and Zoning District Consistency Matrix (GPU, Table 2-4, Page 30).

Page 6 of 11 ends

Upon annexation, the parcel would have a R-1-6 (Low Density Residential) zone district designation. The density range in the R-1-6 (Low Density Residential) zone district is four to eight dwelling units per acre with a minimum parcel size of 5,000 square feet. According to Section 10.10.010 of the Reedley Municipal Code, the intended purpose of the R-1-6 (Low Density Residential) zone district is to allow for a mixture of housing types and densities in newly developing and predominantly low-density residential areas of the City. These zone districts allow one-unit dwellings and encourage missing middle housing types (i.e., two-unit and three-unit dwellings), as well as complimentary human services land uses on a variety of parcel sizes. For example, public and private schools are permitted by-right within the R-1-6 (Low Density Residential) zone district.

The lots proposed to be subdivided through Tentative Subdivision Map No. 6497 meet the designation, lot and area requirements for the proposed zone district designations they are in, which confirms consistency with the Reedley Municipal Code.

STANDARDS FOR ANNEXATION
In order for territory to be annexed into the City, the Planning Commission and the City Council would have to authorize an application to be submitted to the Fresno Local Agency Formation Commission (LAFCo). LAFCo regulates, through approval or denial, the boundary changes proposed by other public agencies or individuals. If the City Council of the City of Reedley, upon recommendation from the Planning Commission, authorizes the submittal of an annexation/reorganization application to LAFCo, the Fresno Local Agency Formation Commission would take action on the annexation request and record the boundary change if the Commission’s action is to approve. The annexation/reorganization application has to be consistent with a variety of documents and laws, including: the City’s General Plan, ordinances, and policies; the Cortese-Knox-Hertzberg Local Government Reorganization Act; and the Memorandum of Understanding (MOU) between the County of Fresno and the City of Reedley.

As mentioned in the above section, the City of Reedley has determined that the application is consistent with the City of Reedley General Plan Update 2030, ordinances, and policies.

The three main purposes of the Cortese-Knox-Hertzberg Local Government Reorganization Act are to discourage urban sprawl, encourage orderly governmental boundaries, and preserve open-space and prime agricultural lands. The City of Reedley has historically taken a conservative approach to expansion of the Reedley City Limits, thus avoiding premature conversion of farmland. The City continues to take this approach. For example, one of the City of Reedley’s General Plan 2030 Land Use Policies (LU 2.5.8) is to not consider annexation of new territory for residential development until at least eighty percent (80%) of the existing residentially designated land inside the city limits is developed. As of the time of this staff report, more than 80% of the existing residentially designated land is developed.

The City incentivizes development to occur within city limits and the city center by reducing development impact fees and entitlement application fees. The proposed annexation application is adjacent to the existing Reedley City Limits on the north half of its eastern border (Silas Bartsch Elementary School) in addition to being adjacent to the existing Reedley City Limits on the entire length of its northern, western, and southern borders (low density residential development). This demonstrates orderly governmental boundaries and efforts to avoid urban sprawl.

Page 7 of 11 ends

Annexation Application No. 2025-01 identifies imminent development within the subject property, with more than 25% of the area proposed for annexation a part of the proposed development through a submitted tentative subdivision map application, which complies with the standards of annexation. Therefore, this annexation application is consistent with the City of Reedley General Plan Update 2030 and the Memorandum of Understanding between the County of Fresno and the City of Reedley.

TENTATIVE MAP FINDINGS (VESTING TENTATIVE SUBDIVISION MAP NO. 6497) Pursuant to the Subdivision Map Act and Reedley Municipal Code (RMC) Section 11.04.080, a tentative map shall be approved if the following findings can be made:

1. That the proposed tentative map is consistent with the general plan or any applicable specific plan as specified in Government Code section 65451.

As noted in the General Plan Consistency discussion above, the proposed vesting tentative subdivision map is consistent with the City of Reedley General Plan Update 2030. Further, pursuant to Title 11 (Subdivision Ordinance) of the RMC, the proposed vesting tentative subdivision map design meets the zoning ordinance criteria for development in the existing zone district classifications.

2. That the design or improvement of the proposed subdivision of land is consistent with the general plan or any applicable specific plan.

The proposed vesting tentative subdivision map, with its design and improvements, is consistent with the City of Reedley General Plan Update 2030 because its design helps achieve many of the General Plan’s adopted goals and policies, including orderly growth patterns, and designing well-connected neighborhoods with pedestrian amenities. The proposed vesting tentative subdivision map provides for improvements that are also consistent with the City of Reedley General Plan Update 2030 in terms of circulation and the future buildout of streets.

3. That the site of the proposed subdivision of land is physically suitable for the type of development.

This site is physically suitable for the proposed type and density of development, because the proposed extension of streets and conditions of approval prepared would ensure adequate access within and around the site, and that development shall occur in accordance with adopted standards, goals, objectives, and policies for development in the City of Reedley.

4. That the site of the proposed subdivision of land is physically suitable for the proposed density of development.

The site is physically suitable for the ultimate proposed average density of development set forth in the Reedley General Plan Planned Land Use Designation of Low Density Residential. The project density is approximately 5.19 dwelling units per acre, which is within the density range of 4-8 dwelling units per acre.

5. That the design of the proposed subdivision of land or the proposed improvements are not likely to cause significant and unavoidable impacts to fish, wildlife or their habitat.

Page 8 of 11 ends

The proposed vesting tentative subdivision map design and improvements are not likely to cause substantial and considerable damage to the natural environment, including fish, wildlife or their habitat, because the site is located adjacent to an area that has developed with urban uses.

6. That the design of the proposed subdivision of land or type of improvements are not likely to cause serious public health problems.

The proposed vesting tentative subdivision map design and improvements are not likely to cause serious public health and safety problems because the conditions of approval have shown and would ensure that the subdivision of land conforms to City health and safety standards, specifications, and policies.

7. That the design of the proposed subdivision of land or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision.

The proposed vesting tentative subdivision map design will not conflict with public easements within or through the site, because the project design and conditions of approval will assure noninterference with any existing or proposed easements on the subject property.

8. That the vesting tentative subdivision map meets or performs any of the requirements or conditions imposed by the Subdivision Map Act or the Reedley Municipal Code.

The vesting tentative subdivision map is subject to conditions of approval imposed by the Subdivision Map Act and the Reedley Municipal Code, therefore the development of the vesting tentative subdivision map is required to comply with all conditions, standards, and policies.

9. Pursuant to Government Code Section 66473.1, the design of a subdivision of land for which a vesting tentative subdivision map is required pursuant to Section 66426 shall provide, to the extent feasible, for future passive or natural heating or cooling opportunities in the subdivision.

The design of the associated subdivision provides, to the extent feasible, for future passive and natural heating or cooling opportunities due to the required compliance with the California Energy Code and sufficient landscaping throughout the site as required by the RMC.

The vesting tentative subdivision map, subject to the recommended conditions of approval, complies with the design and property development standards of the Zoning Ordinance, the Subdivision Map Act, and local Subdivision Ordinance. Based upon the plans and information submitted by the applicant and the recommended conditions of project approval, staff has determined that these findings can be made.

Therefore, the appropriateness of the proposed project has been examined with respect to its consistency with guiding land use principles, goals and policies of the City of Reedley General Plan Update 2030 and regulatory standards set forth in the RMC and its compatibility with

Page 9 of 11 ends

surrounding existing or proposed uses. These factors have been evaluated as described above.

Upon consideration of this evaluation, it can be concluded that the vesting tentative subdivision map is appropriate for the subject property.

PUBLIC NOTICING
Pursuant to the Government Code Section 65091 (Planning and Zoning Law) and Reedley Municipal Code, §10.110.040, it is required that a notice be published in a newspaper of general circulation and be sent to surrounding property owners. Such notices were appropriately disseminated to surrounding property owners on October 23, 2025; additionally, a notice was published in the October 23, 2025, publication of the Mid-Valley Times. See Attachment 5 for the proof of Public Noticing.

ENVIRONMENTAL REVIEW
The City of Reedley has conducted an environmental analysis for the above-described project (Environmental Assessment No. 2025-05). The project has been determined to be a subsequent project that not fully within the scope of the certified Program Environmental Impact Report (SCH No. 2010031106) prepared for the City of Reedley General Plan Update 2030 (GPU). Therefore, the City of Reedley, as the lead agency, proposes to adopt a Mitigated Negative Declaration for this project.

The completed environmental impact checklist, the associated narrative, and any proposed mitigation measure(s) reflect applicable comments of responsible and trustee agencies, as well as research and analysis conducted to examine the interrelationship between the proposed project and the physical environment. The information contained in the project application and its related environmental assessment application, responses to requests for comment, checklist and initial study narrative combine to form the record indicating that an initial study has been completed in compliance with the California Environmental Quality Act and CEQA Guidelines.

All new development activity and many non-physical projects contribute directly or indirectly toward cumulative impacts on the physical environment. It has been determined that the incremental effect contributed by this project toward cumulative impacts is not considered substantial or significant, and/or that cumulative impacts accruing from this project may be mitigated to less than significant with application of feasible mitigation measures.

For some categories of potential impacts, the checklist may indicate that a specific adverse environmental effect has been identified which is of sufficient magnitude to potentially be of concern without mitigation to reduce the level of significance. Such an effect may be inherent in nature and magnitude of the project. The completed environmental checklist form indicated whether an impact would be less than significant, or less than significant with mitigation. Effects so rated are not sufficient in themselves to require the preparation of an Environmental Impact Report, and have been mitigated to the extent reasonably feasible as required by CEQA. The City has proposed to self-regulate urban growth, which has a direct impact on premature and an unnecessary conversion of agricultural lands, by committing to annexing a maximum of five hundred (500) acres from within the existing SOI (See Policy LU 2.5.18) before implementing the Farmland Preservation Program.

The project is not located on a site which is included on any of the lists enumerated under Section 65962.5 of the Government Code including, but not limited to, lists of hazardous waste facilities, land designated as hazardous waste property, hazardous waste disposal sites and

Page 10 of 11 ends

others, and the information in the Hazardous Waste and Substance Statement required under subdivision (f) of that Section.

The initial study has concluded that the proposed project would not result in any adverse effects which fall within the “Mandatory Findings of Significance” contained in Section 15065 of the State CEQA Guidelines.

With the project specific mitigation imposed, there is no substantial evidence in the record that this project may have additional significant direct, indirect or cumulative effects on the environment that are significant and that were not identified and analyzed in the certified Program Environmental Impact Report prepared for the GPU. After conducting a review of the adequacy of the Program Environmental Impact Report (SCH No. 2010031106) pursuant to Public Resources Code Section 21083.3, as the lead agency, finds that no substantial changes have occurred with respect to circumstances under which the Program Environmental Impact Report (SCH No. 2010031106) was certified, and that no new information which was not known and could not have been know at the time that the Program Environmental Impact Report (SCH No. 2010031106) was certified, has become available.

Pursuant to the California Environmental Quality Act and CEQA Guidelines, a Notice of Intent to adopt a Mitigated Negative Declaration was filed with the County of Fresno and with the Governor’s Office of Land Use and Climate Innovation (LCI) on August 19, 2025. The comment period expired on September 18, 2025, at 5:00 p.m. Comments received by interested parties will be included in the record and responded to prior to Planning Commission consideration.

FINANCIAL IMPACT
The project applicant has paid all applicable entitlement application fees. The Fresno Local Agency Formation Commission annexation application and processing fees will also be paid by the applicant.

ATTACHMENTS & EXHIBITS

1. Adopt Resolution No. 2025-083, a Resolution of Application by the City of Reedley Requesting the Local Agency Formation Commission to take Proceedings for the Buttonwillow-Springfield Reorganization
Attachment 1: Exhibit A: Exhibits for Annexation Application No. 2025- 01 2. Adopt Resolution No. 2025-084, a Resolution of the City Council of the City of Reedley Adopting Environmental Assessment No. 2025-05, A Mitigated Negative Declaration, Dated August 14, 2025, and Approving Annexation Application No. 2025-01, General Plan Amendment Application No. 2025-01, Rezone Application No. 2025-01, and Vesting Tentative Subdivision Map No. 6497
Attachment 1: Exhibit A: Exhibits for Annexation Application No. 2025-01, Rezone Application No. 2025-01 (Ordinance No. 2025-004), General Plan Amendment Application No. 2025-01, Tentative Subdivision Map No. 6497, Accepted Conditions of Approval dated October 16, 2025

Page 11 of 11 ends

Attachment 2: Environmental Assessment No. 2025-05

3. Introduce Ordinance No. 2025-004, an Ordinance of the City Council of the City of Reedley Approving Rezone Application No. 2025-01 and Authorizing the Amendment of the Official Zoning Map of the City of Reedley
Attachment 1: Exhibit A: Exhibit for Rezone Application No. 2025-01

4. Planning Commission Resolution No. 2025-05

5. Memorandum of Understanding between the City of Reedley and County of Fresno

6. Proof of Publication and Public Noticing Map
CC Resolution No. 2025-083

Page 1 of 2 ends

RESOLUTION NO. 2025-083

A RESOLUTION OF APPLICATION BY THE CITY OF REEDLEY

REQUESTING THE LOCAL AGENCY FORMATION COMMISSION TO TAKE PROCEEDINGS

FOR THE BUTTONWILLOW-SPRINGFIELD REORGANIZATION
WHEREAS, the City of Reedley desires to initiate proceedings pursuant to the CorteseKnox-Hertzberg Local Government Reorganization Act of 2000, Division 3, commencing with Section 56000 of the California Government Code, for the proposed reorganization; and WHEREAS, the specific changes of organization requested consist of annexation to the City of Reedley and detachment from the Fresno County Fire Protection District and the Kings River Conservation District; and
WHEREAS, the territory proposed (APN: 370-040-10, 370-040-22, 370-040-23, and 370- 040-13) to be changed is largely uninhabited, and on this day contains eleven registered voters (APN: 370-040-22, 2 registered voters; and 370-040-13, 9 registered voters), according to information received from the County Elections Officer; and WHEREAS, a written description and map of the boundaries of the territory is set forth in Exhibit A, attached hereto and by this reference incorporated herein; and WHEREAS, this proposal is consistent with the sphere of influence of the City of Reedley and the Reedley General Plan 2030; and
WHEREAS, the proposed change of organization is subject to and consistent with the terms and conditions set forth in the with the Memorandum of Understanding between the County of Fresno and the City of Reedley; and
WHEREAS, the reasons for this proposed change are to provide opportunities for residential development within the City of Reedley because more than 80% of the existing designated land within existing City Limits is developed, and to ensure orderly development by annexing land that is adjacent to existing City of Reedley territory; and
WHEREAS, the City Council has considered Environmental Assessment No. 2025-05 (Mitigated Negative Declaration, dated August 14, 2025), prepared for the proposed change of organization in compliance with the California Environmental Quality Act.

CC Resolution No. 2025-083

Page 2 of 2 ends

NOW, THEREFORE, this Resolution of Application is hereby adopted and approved by the City Council of the City of Reedley, and the Local Agency Formation Commission of Fresno County is hereby requested to initiate proceedings for the reorganization of territory as described in Exhibit A in the manner provided by the Cortese-Knox-Hertzberg Local Government Reorganization Act of 2000.
* * * * * * * * * * * * * * * * * * * * * * * * *
This foregoing resolution is hereby approved and adopted at a regular meeting of the City Council of the City of Reedley held on the 9
th day of December, 2025, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:
__________________________________
Matthew Tuttle, Mayor
ATTEST:
__________________________________
Ruthie Greenwood, City Clerk
Attachments
EXHIBIT “A”

1. Buttonwillow-Springfield Reorganization (Annexation No. 2025-01), Area of Reorganization

2. Buttonwillow-Springfield Reorganization (Annexation No. 2025-01), Legal Description

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025
CC Resolution No. 2025-084

Page 1 of 5 ends

RESOLUTION NO. 2025-084

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REEDLEY ADOPTING ENVIRONMENTAL ASSESSMENT NO. 2025-05, A MITIGATED NEGATIVE DECLARATION, DATED AUGUST 14, 2025, AND APPROVING ANNEXATION APPLICATION NO. 2025-01, GENERAL PLAN AMENDMENT APPLICATION NO. 2025-01, REZONE APPLICATION NO. 2025-01, AND VESTING TENTATIVE SUBDIVISION MAP NO. 6497 WHEREAS, the City of Reedley, Community Development Department has initiated Annexation Application No. 2025-01 for the purpose of annexing the subject territory (39.7 gross acres) into the City of Reedley and detaching from the Fresno County Fire Protection District and the Kings River Conservation District; and
WHEREAS, the subject territory consists of four parcels (APNs: 370-040-10, 370- 040-22, 370-040-23, and 370-40-13) located on the southeast corner of South Buttonwillow Avenue and East North Avenue and is adjacent to the existing Reedley City Limits; and WHEREAS, the Reedley General Plan Update 2030 designates 35.7 gross acres of the subject territory with a Low Density Residential Planned Land Use Designation; and WHEREAS, the Reedley General Plan Update 2030 designates 4 gross acres of the subject territory with a High Density Residential Planned Land Use Designation; and WHEREAS, General Plan Amendment Application No. 2025-01 proposes to reclassify a four-acre portion of a parcel (APN 370-040-10) from High Density Residential to Low Density Residential; and
WHEREAS, upon approval of General Plan Amendment Application No. 2025-01, the pre-zoning for the proposed project identified in Rezone Application No. 2025-01, R-1-6 (Low Density Residential), will be consistent with the Reedley General Plan Update 2030 and the subject territory’s General Plan Planned Land Use Designation of Low Density Residential; and WHEREAS, the Annexation Application No. 2025-01 identifies imminent development within the subject property, with at least 25% of the area proposed for annexation has planned development, which is consistent with the Standards of Annexation within the Memorandum of Understanding between the City of Reedley and the County of Fresno, dated September 7, 2021; and
WHEREAS, Vesting Tentative Subdivision Map No. 6497, subject to the recommended conditions of approval, complies with the design and property development standards of the CC Resolution No. 2025-084

Page 2 of 5 ends

Reedley General Plan, the Reedley Municipal Code, and the Subdivision Map Act as appropriate; and
WHEREAS, the appropriateness of the proposed project has been examined with respect to its consistency with the goals and policies of the Reedley General Plan and regulatory standards set forth in the Reedley Municipal Code; and
WHEREAS, at a duly noticed public hearing on October 16, 2025, the City of Reedley Planning Commission, using their independent judgment, recommended to the City Council adoption of Environmental Assessment 2025-05, approval of Annexation Application No. 2025-01, General Plan Amendment Application No. 2025-01, Rezone Application No. 2025-01, and Tentative Subdivision Map 6497, and authorization of the submittal of a City Annexation application to the Fresno Local Agency Formation Commission; and
WHEREAS, the project was evaluated and processed in accordance with provisions of the California Environmental Quality Act; and
WHEREAS, Environmental Assessment No. 2025-05, dated August 14, 2025, determined that a mitigated negative declaration should be prepared for the project; and WHEREAS, pursuant to the California Environmental Quality Act, the City Council of the City of Reedley hereby declares that a Mitigated Negative Declaration has been prepared, posted and filed in accordance with State CEQA Sections 15070-15075 by the City of Reedley as the Lead Agency; and
WHEREAS, the City Council of the City of Reedley determined that there is no substantial evidence that the project will have a significant effect on the environment following the implementation of the agreed upon mitigation measures, and that the prepared mitigated negative declaration reflects the lead agency’s independent judgement and analysis; and WHEREAS, pursuant to Sections 65090 and 65091 (Planning and Zoning Law) of the Government Code and the procedures of Title 10 of the Reedley Municipal Code, a Notice of Public Hearing was published in a newspaper of general circulation on October 23, 2025, and was mailed to surrounding property owners on October 23, 2025; and WHEREAS, the City Council of the City of Reedley, at a Regular Meeting on November 18, 2025, held a public hearing to review the environmental assessment, annexation application, CC Resolution No. 2025-084

Page 3 of 5 ends

general plan amendment application, and rezone application, and vesting tentative subdivision map application; and
WHEREAS, the City Council received public testimony, oral and written staff report, and independently deliberated.

NOW, THEREFORE, the City Council of the City of Reedley, using their independent judgment, hereby finds and resolves as follows:

1. The above recitals are true and correct; and

2. A Mitigated Negative Declaration has been prepared for the project through Environmental Assessment No. 2025-05, and preparation of such has been conducted in the manner required by State CEQA regulations; and

3. Annexation Application No. 2025-01, General Plan Amendment Application No. 2025-01, Rezone Application No. 2025-01, and Vesting Tentative Subdivision Map No. 6497 are consistent with the Reedley General Plan 2030 and the Reedley Municipal Code, and

4. Annexation Application No. 2025-01 is consistent with the Cortese-Knox-Hertzberg Local Government Reorganization Act; and

5. Annexation Application No. 2025-01 is consistent with the Memorandum of Understanding between the City of Reedley and the County of Fresno; and

6. The City Council adopts Mitigated Negative Declaration (Environmental Assessment No. 2025-01, dated August 14, 2025, for the proposed Annexation Application No. 2025-01, General Plan Amendment Application No. 2025-01, Rezone Application No. 2025-01, and Vesting Tentative Subdivision Map No. 6497; and

7. The City Council approves Annexation Application No. 2025-01; and

8. The Council authorizes the submittal of the City Annexation Application to the Fresno Local Agency Formation Commission; and

9. The City Council approves General Plan Amendment Application No. 2025-01; and

10. The City Council approves Rezone Application No. 2025-01; and

11. The design or improvements of the proposed subdivision (Vesting Tentative Subdivision Map No. 6497) are consistent with the Reedley General Plan; and

12. The site of the proposed subdivision is physically suitable for the type of development; and

13. The site of the proposed subdivision is physically suitable for the proposed density of development; and
CC Resolution No. 2025-084

Page 4 of 5 ends

14. The design of the proposed subdivision or the proposed improvements are not likely to cause significant and unavoidable impacts to fish, wildlife or their habitat; and

15. The proposed subdivision design is not likely to cause serious public health problems; and

16. The design of the proposed subdivision or the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of property within the proposed subdivision; and

17. The tentative map meets or performs any of the requirements or conditions imposed by the subdivision map act or this title; and

18. Pursuant to Government Code Section 66473.1, the design of the proposed subdivision will provide, to the extent feasible, for future passive or natural heating or cooling opportunities in the subdivision; and

19. The City Council approves Vesting Tentative Subdivision Map No. 6497; and

20. The City Council approves the attached conditions of approval for Vesting Tentative Subdivision Map No. 6497, dated October 16, 2025; and

21. The City Council authorizes City staff to make minor adjustments to Conditions of Approval, dated October 16, 2025; and

22. This resolution is effective immediately upon adoption.

This foregoing resolution is hereby approved and adopted at a regular meeting of the City Council of the City of Reedley, held on the 9
th day of December 2025, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:
_______________________________
Matthew Tuttle, Mayor
ATTEST:
__________________________________
Ruthie Greenwood, City Clerk
CC Resolution No. 2025-084

Page 5 of 5 ends

Attachments:

1. Annexation Application No. 2025-01

2. General Plan Amendment Application No. 2025-01

3. Rezone Application No. 2025-01

4. Tentative Subdivision Map No. 6497, Conditions of Approval, dated October 16, 2025

5. Environmental Assessment No. 2025-01, a Mitigated Negative Declaration, dated August 14, 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

ECE I VE

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

NOTICE TO PROJECT APPLICANT
In accordance with the provisions of Government Code Section 66020(d)(1), the imposition of fees, dedication, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of imposition of fees, dedications, reservation, or exactions imposed on the development project.

This notice does not apply to those fees, dedications, reservations, or exactions which were previously imposed and duly noticed; or, where no notice was previously required under the provisions of Government Code Section 66020(d)(1) in effect before January 1, 1997.

PROJECT INFORMATION
Assessor’s Parcel No.: 370-040-10
Project Location: 9452 S. Buttonwillow Avenue. Northeast corner of South Buttonwillow Avenue and East Springfield Avenue.

Existing Planned Land Use: Low Density Residential (LDR) – 29.98 total acres High Density Residential (HDR) – 4.0 total acres
Proposed Planned Land Use: Low Density Residential (LDR) – 33:98 total acres Proposed Pre-Zoning: Low Density Residential (R-1-6) 33.98 total acres Project Description: Annexation Application No. 2022-01, pertains to the annexation of approximately 39.7 acres into the City of Reedley. The proposed annexation area includes APNs
370-040-10, 370-040-22, 370-040-23, 370-040-13, and

CITY OF REEDLEY

COMMUNITY DEVELOPMENT DEPARTMENT

CONDITIONS OF APPROVAL
TENTATIVE SUBDIVISION MAP NO. 6428 (WESTHAVEN II)
(REFERENCE ANNEXATION APPLICATION NO. 2025-01, GENERAL
PLAN AMENDMENT APPLICATION NO. 2025-01, AND REZONE
APPLICATION NO. 2025-01)
OCTOBER 16, 2025
JANUARY 9, 2024
Conditions of Approval
VTSM No. 6497
October 16, 2025

Page 2 ends

existing right-of-way contiguous to parcel boundaries. The proposed annexation is within the City of Reedley’s adopted Sphere of Influence, is adjacent to the existing City of Reedley City Limits on three sides, and appropriately
promotes orderly growth and development.

General Plan Amendment Application No. 2025-01,
pertains to the reclassification of a 4-acre portion of a parcel (APN 370-040-10) that currently has a High Density
Residential General Plan Land Use Designation. The
proposed General Plan Amendment would reclassify the 4- acre portion of the parcel from High Density Residential (15.1-29 dwelling units per acre) to Low Density Residential (4-8 dwelling units per acre). If General Plan Amendment Application No. 2025-01 is approved, the entire project site would have a General Plan Planned Land Use designation
as Low Density Residential (4-8 dwelling units per acre).

Rezone Application No. 2025-01, pertains to the
reclassification of approximately 39.7 acres consisting of four parcels (APNs 370-040-10, 370-040-22, 370-040-23,
370-040-13) from agricultural use (AL-20) within Fresno County to the R-1-6 (Single-Unit Residential) zone district upon annexation into Reedley City Limits. The proposed
zoning designation is consistent with the proposed General Plan Amendment Application as well as the existing Low
Density Residential General Plan Planned Land Use
designation of the project site.

Vesting Tentative Subdivision Map (VTSM) No. 6497
(Westhaven II), pertains to the subdivision of land and proposed street dedications/improvements to
accommodate for single unit residential development. The proposed project would include the subdivision of one
parcel of land (APN 370-040-10) into 174 lots. Of the 174 lots, 166 lots is proposed for single unit development with a minimum lot size of 5,002 square feet. Additionally, 7 outlots and one 2-acre storm drain basin is proposed for the
subdivision. The subdivision proposes to have two access points; one access point to be located on South
Buttonwillow Avenue and the secondary access point to be located on East North Avenue.

GENERAL CONDITIONS AND REQUIREMENTS

1. Please note that this project is subject to a variety of discretionary conditions of approval.

These include conditions based on adopted City plans and policies, those determined Conditions of Approval
VTSM No. 6497
October 16, 2025

Page 3 ends

through site plan review and environmental assessments essential to mitigate adverse effects on the environment including the health, safety, and welfare of the community, and recommended conditions for development that are essential to health, safety, and welfare, but would, on the whole, enhance the project and its relationship to the neighborhood and environment.

2. All discretionary conditions of approval will ultimately be deemed mandatory unless appealed verbally or in writing to the City of Reedley Community Development Department.

3. Approval of this special permit shall be considered null and void in the event of failure by the applicant and/or the authorized representative, architect, engineer, or designer to disclose and delineate all facts and information relating to the subject property and the proposed development including, but not limited to, the following:
a. All existing and proposed improvements including but not limited to buildings and structures, signs and their uses, trees, walls, driveways, outdoor storage, and open land use areas on the subject property and all of the preceding which are located on adjoining property and may encroach on the subject property; and b. All public and private easements, rights-of-way and any actual or potential prescriptive easements or uses of the subject property; and c. Existing and proposed grade differentials between the subject property and adjoining property zoned or planned for commercial use.

4. Approval of this special permit may become null and void in the event that development is not completed in accordance with all the conditions and requirements imposed on this special permit, the Zoning Ordinance, and all Public Works Standards and Specifications.

The Community Development Department shall not assume responsibility for any deletions or omissions resulting from the special permit review process or for additions or alterations to construction plans not specifically submitted and reviewed and approved pursuant to this special permit or subsequent amendments or revisions.

5. The applicant shall indemnify, hold harmless and defend the City of Reedley and each of its officers, officials, employees, agents and volunteers from any and all loss, liability, fines, penalties, forfeitures, damages and costs arising from, resulting from, or in connection with a challenge or contest of the entitlement application and/or the project approvals; or claims or allegations of a violation of the California Environmental Quality Act (CEQA) or any another law, rule or regulations in connection with the granting issuance or approval by the City of any or all rights or benefits granted to the applicant under this entitlement.

The City will promptly notify the Applicant of any such claim, action, or proceedings against the City and the Applicant will either undertake the defense of the matter or abandon the matter and pay the City’s associated legal costs or will advance funds to pay for defense of the matter by the City Attorney and or City-approved outside counsel.

By a separate instrument, the parties will mutually address the defense of the matter, including but not limited to selection of attorney, attorney's fees, litigation expenses and Conditions of Approval
VTSM No. 6497
October 16, 2025

Page 4 ends

administrative record preparation costs and deposits. Costs include fees for service by outside legal Counsel approved and appointed by the City of Reedley.

6. Prior to issues of building permit, Developer shall petition and request that the City annex the subject property (APN: 370-040-10) into the City’s Community Facilities District No. 2005-01 (“CFD”) for the maintenance and operation of public services and facilities. A Sample Petition and Written Consent document to be signed by the property owner and a City Council Resolution identifying the current Fiscal Year’s assessments are attached for reference. Annexation of the property into the City’s CFD is a condition precedent to the City’s obligation to issue any building permits for VTSM 6497, and the Developer acknowledges and agrees that if this property were not part of the CFD, the City might lack the financial resources to operate facilities and provide adequate public services to the property.
a. Willdan Financial Services (WFS) will serve as the primary contact and liaison between the City of Reedley and the developer and coordinate the CFD annexation process from start to finish. A representative from Willdan can be reached at (951) 972-8106 or via e-mail at [email protected]. b. The single-unit residential assessment for these public services is currently $1,054.19 per dwelling unit pursuant to City of Reedley, Resolution No. 2024-020.

See Attachment 8 for more information.

7. No uses of land, buildings, or structures shall be permitted other than those specifically approved pursuant to Vesting Tentative Subdivision Map No. 6497, and consistent with Annexation Application No. 2025-01, General Plan Amendment Application No. 2025-01, and Rezone Application No. 2025-01. Approval is also contingent upon issuance of a Certificate of Completion for Annexation Application No. 2022-01 by the Fresno Local Agency Formation Commission.

8. The developer shall pay applicable fees for, but not limited to, plan checks for street improvements and other grading and construction, street signs, water and sewer service, and inspections in accordance with the City of Reedley Master Fee Schedule and any amendments, modifications, or additions thereto, and in accordance with the requirements of State law.

9. Development shall take place in accordance with all city, county, state and federal laws and regulations.

10. All Development Impact Fees shall be paid in accordance with the City of Reedley City Council Resolution No. 2024-036 adopted April 23, 2024. Development Impact Fees for this project will be calculated as part of the building permit plan review and shall be due at time of building issuance.
a. The developer/property owner may elect to defer a portion of the payment of Development Impact Fees for any lot or parcel until the developer/owner makes a request for final inspection for a building(s) or structure(s) within a residential, commercial, industrial, professional, or institutional development by Conditions of Approval
VTSM No. 6497
October 16, 2025

Page 5 ends

entering into an agreement with the City. For program details, contact Rodney Horton, Community Development Director, at (559) 637-4200 x 286 for more information prior to building permit application submittal. b. Development Impact Fee credits may be available to developers who fund construction of eligible facilities outside of the requirements of the proposed project pursuant to City Council Resolution No. 2024-036 dated April 23, 2024.

The City shall determine which facilities will be eligible for developers to construct. Facilities must meet City standards for acquisition projects in order to be eligible for credits. Developers shall be responsible for complying with all applicable laws, codes, and regulations relating to contracting and construction procedures for publicly funded public works projects.

11. The exercise of rights granted by this special permit shall commence on the date that the Certificate of Completion for Annexation Application No. 2025-01 is issued by the Fresno Local Agency Formation Commission.

12. Tentative Subdivision Map No. 6428 shall expire two years (24 months) from the date that the Certificate of Completion for Annexation No. 2025-01 is issued by the Fresno Local Agency Formation Commission.
a. Time limits for development may be extended pursuant to Reedley Municipal Code Section 11.04.120 and or by any other actions undertaken by the Reedley City Council.

CITY OF REEDLEY DEPARTMENTAL REQUIREMENTS
Community Development Department:

Planning Division

13. Development shall take place in accordance with the Low Density Residential Planned Land Use Designations, as defined in the Reedley 2030 General Plan.

14. Development shall take place in accordance with the Reedley Municipal Code.

15. Development shall take place in accordance with included and attached exhibits.

16. Development shall take place in conformity with mitigation measures of the adopted Mitigated Negative Declaration (Environmental Assessment No. 2025-07).

17. The City will require the vibration reduction conditional approval in respect to the existing buildings to the north and south of the project construction boundary:
a) The construction contractor shall restrict large bulldozers and loaded trucks or require the use of light construction equipment (e.g., small bulldozers and trucks) within 15 feet of the existing buildings.
b) The construction contractor shall restrict the use of jackhammers or require the use of hand tools within 8 feet of the existing buildings.

Conditions of Approval
VTSM No. 6497
October 16, 2025

Page 6 ends

Building Division

18. Plans and construction shall comply with the applicable provisions of the California Building Code.

19. The Building Division requires full construction plan sets and application(s) submitted via the applicant portal at www.reedley.ca.gov.

20. All on-site construction shall comply with all applicable codes and standards as adopted by the City of Reedley, including, but not limited to, fire and building codes.

21. All of the conditions of approval must be complied with prior to the final inspection and/or the issuance of a “Certificate of Occupancy” by the Building Official.

Engineering Department:

22. Development shall take place in accordance with the conditions stipulated by the Engineering Department dated August 1, 2025. See Attachment 1.

OUTSIDE AGENCY REQUIREMENTS

23. Fresno County Department of Public Health – Environmental Health Division:

Development shall take place in accordance with the comment letter provided by Fresno County Department of Public Health – Environmental Health Division dated April 29, 2025.

See Attachment 2.

24. Fresno County Department of Public Works and Planning: Development shall take place in accordance with the comment letter provided by Fresno County Department of Public Works and Planning dated April 21, 2023. See attachment 3.

25. LAFCo: Development shall take place in accordance with the comment letter provided by LAFCo dated May 8, 2025. See attachment 4.

26. PGE: Development shall take place in accordance with the comment letters provided by PGE. See attachment 5.

27. San Joaquin Valley Air Pollution Control District: Development shall take place in accordance with the comment letters provided by San Joaquin Valley Air Pollution Control District. See attachment 6.

Enclosures: Exhibit A – Vesting Tentative Subdivision Map No. 6497, dated March 1, 2024 Exhibit B – Operational Statement, dated April 18, 2025 Attachment 1 – LLMD Petition and Written Consent & Engineering Conditions Attachment 2 – Fresno County Department of Public Health – Environmental Health Division comment letter dated April 29, 2025
Attachment 3 – Fresno County Department of Public Works and Planning comment letter dated May 9, 2025
Attachment 4 – LAFCo comment letter dated May 8, 2025
Attachment 5 – PGE comment letters
Conditions of Approval
VTSM No. 6497
October 16, 2025

Page 7 ends

Attachment 6 – San Joaquin Valley Air Pollution Control District comment letter dated May 8, 2025
Attachment 7 – Development Impact Fee (DIF) Estimate
Attachment 8 – CFD Petition to Annex into Community Facilities District No. 2005- 01 City of Reedley
Community Development Department
1733 Ninth Street
Reedley, CA 93654
(559) 637-4200
https://reedley.ca.gov
10/2024
Operational Statement Template
Our goal is to facilitate an accurate and complete description of your project in order to avoid unnecessary delays in gathering additional information. This is your opportunity to communicate in detail the important characteristics of your project/property that should be considered when your project is reviewed for completeness. Please use this template as a guide to explaining the scope of your project.

This template will assist you, various City departments and outside agencies, in their review, crafting of comments and conditions. If you have any questions about the requested information or need help completing any portions of this form please contact the Community Development Department at (559) 637- 4200, Option 3, Press 1 or via e-mail at [email protected]. This form must be completed and submitted in order to process your application. If this operational statement is not submitted or incomplete, your application will not be accepted for processing.

1. Project Description: ______________________ application is being submitted by _________________ on behalf of _______________________________ and pertains to _____________ acres of property located at ____________________________________________________.

2. Operational Narrative: (Describe your proposed operation/development in detail, including information such as name of business, product or service, anticipated traffic and deliveries, special events, required equipment, on-site storage, demolition or adaptive reuse of existing structures, etc.). ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________

3. List the hours of operation: __________________________ Number of Days per Week: ____________ If Seasonal, list the months of operation: ____________________________________________________

4. Number of Customers or Visitors per day: ______________ Maximum per Day: ___________________ During what hours will customers visit your property? ___________________________________________

5. Number of current employees: ______________________ Future employees: _____________________ Will any live on site? YES / NO

6. Will the operation or equipment used generate noise above existing levels in the area? YES / NO If yes, explain __________________________________________________________________________

7. Will hazardous materials or waste be produced as part of this business? YES / NO If yes, explain __________________________________________________________________________

8. Which building(s) or what portion of the building(s) will be used in your operation? __________________ _____________________________________________________________________________________ I hereby declare under penalty of perjury that this application and all information submitted as part of this application are true and accurate to the best of my knowledge. ______________________________________________________________________________________ Applicant’s Signature Date
Vesting Tentative Tract Map No. 6497 D.R.Horton CA3, Inc.

Ito Kamada Family Trust 33.98
9452 S. Buttonwillow Avenue - APN: 370-040-10
Please see the attached Narrative.
24 hours / day 7 days / week
Single Family Residential Use
150-300
8-10am & 3-6pm
n/a n/a
No
No
None
300
ECE I VE 4/3/25

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025
Vesting Tentative Tract Map No. 6497 and
related General Plan Amendment Application No. 2025-01
Operational Narrative Attachment
Commercial Fruit Orchard to be removed, stripping & removal of organics, then regraded to accommodate streets, wet and dry utilities for 166 single family residential lots.

Permanent retention basin proposed for all storm water run off. Improving and extending public utilities and streets.

Acreage to be amended: The current assessed acreage is 34.73, an ALTA survey of the property found the net acreage to be 33.98 acres for VTSM No. 6497.

The existing GP Designation for APN 370-040-10 which contains 33.98 acres is 4 acres of High density Residential (HDR) and the remainder of the property Low Density Residential (LDR). Applicant is proposing all 33.98 acres be designated as Low Density Residential (LDR).

The project is outside of existing City Limits but if annexed, the proposed pre-zoning of APN 370-040-10 would be R-1-6, which would be consistent with the entire property having a proposed land use designation of Low Density Residential.

The proposed land use designation is consistent with the surrounding properties within the city limits and would maintain a uniform size of lot in the area approaching the neighboring school.

The goals and objectives are going to be maintained by this development by having the majority of the property remain its original planned use, and to facilitate Springfield being constructed as close to its original proposed alignment as possible.

For the specific 4 acres of HDR to be amended, the surrounding property to the North and East is part of the TSM No. 6497 project area. Beyond this project area to the to the North there are three parcels (with two separate property owners) that will be included within the Annexation area. We have spoken to these neighboring property owners about our project and the annexation, but we have not discussed the specifics of this GPA with them. Beyond the project area to the East there is an agricultural parcel owned by Ben Kubota that is in the County and Silas Barsch School within the city limits. To the West is an existing subdivision with homes built circa 2004. To the South is a Century Communities subdivision that is currently still selling single-family homes. We have not spoken to any of these surrounding neighbors or any others that may be potentially impacted by the proposed GPA. However, we anticipate any such impact would be minimal because the GPA is only proposing for these 4 acres to be amended to a Low Density Residential (LDR) designation that the surrounding properties (that are in the City) already have themselves.

Page 1 of 1 ends

CITY OF REEDLEY
COMMUNITY DEVELOPMENT DEPT.

RD
APR 18 2025

PETITION AND WRITTEN CONSENT
(INCLUDING WAIVER)

REQUESTING COMMENCEMENT OF PROCEEDINGS UNDER
THE LANDSCAPING AND LIGHTING ACT OF 1972

TO ANNEX CERTAIN TERRITORY TO
LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT No. 1
To the Council of the City of Reedley
c/o the City Clerk of the City of Reedley
Reedley City Hall
1717 Ninth Street
Reedley, California 93654
Re: Request to Commence with Proceedings for
Assessor’s Parcel No. 370-040-10 (VSTM No. 6497)
Members of the City Council:

The undersigned is the duly authorized representative of the owner of all the territory of real property located in Assessor’s Parcel No. 370-040-10, Reedley, California, described on Exhibit A-1 and shown by the map in Exhibit B-1 (the “Parcel”), which exhibits are attached to and made part of this petition. The owner hereby petitions and requests that you commence proceedings pursuant to the Landscaping and Lighting Act of 1972 (Part 2, Division 15, of the California Streets & Highways Code) (the “Act”) to annex and add all the territory in the Parcel to the City’s existing Landscaping and Lighting Maintenance District No. 1 (“LLMD No. 1”), and to levy on the annexed territory the annual assessments levied within LLMD No. 1 for the maintenance and operation of landscaping facilities.

The owner further petitions and requests that the Council proceed as quickly as possible with all proceedings necessary to accomplish such annexation and levy. In that regard, to the extent allowed by law, the owner hereby expressly waives all notices, procedures and requirements otherwise required under Section 22608 and Article 1 (commencing with Section 22585) of the Act, California Government Code Sections 53750 through 53753.5 or any other provision of law, including without limitation adoption of any resolutions, filing of any engineer’s report, giving of any notices, holding any hearings and right of majority protest, and expressly consents to the annexation and levy without completion of or compliance with notices, procedures or requirements.

In consideration for the Council conducting the annexation and levy proceedings herein requested, the owner will immediately execute and deliver to the City any documents the City deems necessary to accomplish the annexation and levy proceedings and to further evidence the consent and waivers in this letter, including but not limited to assessment ballots and receipts for notice.

Also, in consideration for the Council conducting such annexation and levy proceedings, the owner agrees to remain the sole owner of all real property in such Parcels and to not transfer title to any such real property to any other person or entity until completion of the proceedings.

Respectfully submitted by:

PROPERTY OWNER:

Signature Date
(Notary Acknowledgement Attached)

Print Name

Title

EXHIBIT A-1

LEGAL DESCRIPTION
Real property in the unincorporated area of the County of Fresno, State of California, described as follows:

LOT 87 AND THE EAST HALF AND THE SOUTH HALF OF WEST HALF OF LOT 88 OF PRODUCERS COLONY, ACCORDING TO THE MAP THEREOF RECORDED IN BOOK 2, PAGE 39 OF RECORD OF SURVEYS, FRESNO COUNTY RECORDS.

APN: 370-040-10

VTSM 6497 Page 1 of 11
APN 370-040-10

MEMORANDUM
Engineering Department
1733 Ninth Street, Reedley, CA 93654
637-4200, Ext. 221
Date: August 1, 2025
To: Rodney Horton, Community Development Director
From: Marilu S. Morales, P.E., City Engineer
Re: Engineering Department Conditions of Approval VTSM No. 6497; APN 370- 040-10
General Conditions

1. All public improvements shall comply with the Reedley Municipal Code, the Standard Plans and Specifications of the City of Reedley and any addendums thereto. Public improvement plans shall be prepared by the Developer’s engineer, for review and approval by the City Engineer.

2. Developer’s engineer shall establish vertical control for this project to City (NAV88) Datum. Vertical control for this project shall be from City of Reedley Bench Mark No. BM 26J08, TM = 347.40 (NAV88) [TM =346.59, Bates – for reference only], chiseled square top of curb, southernly return on the southwesterly corner of Buttonwillow and Springfield Avenues. Developer’s engineer shall deliver to the City of Reedley an AutoCAD file of the development construction improvement plans drawn to City’s Horizontal datum, NAD83 (2007NSRS). All control points shall be approved by the City’s contract City Surveyor, DJ Johnson Land Surveying (559) 275-4900.

3. An improvement plan check fee of $2,120.00, or current fee at time of submittal according to the City Master Fee Schedule, shall be submitted to the City Engineer with the first submittal of improvement plans. Improvement plans will not be reviewed until the plan check fee is submitted to and processed by the City. Four (4) bond sets of the project improvement plans including civil improvements, grading and drainage, public utilities, and dry utilities, two hard copies of project documentation and a digital copy of all submitted items shall be submitted with the first submittal.

4. With the first submittal to the City, the developer shall prepare and submit an estimated cost of the offsite improvements, based on prevailing wages per California requirements, within the street rights-of-way and/or City easements.

5. The Developer’s contractor shall apply for an Encroachment Permit with the City of Reedley for all work within the right-of-way and easements. No work within the City right of way will begin until the inspection fees are received/processed and the City Engineer approves the encroachment permit. The inspection fee for the construction of public improvements for streets, water, sewer, storm drain and similar public improvement requirements shall be paid with the issuance of an encroachment permit. Inspection charge shall be 4.0% of the approved engineer’s cost estimate, or current fee at time of submittal according to the City Master Fee Schedule.

VTSM 6497 Page 2 of 11
APN 370-040-10

6. Any and all work performed in the City of Reedley Rights of Way shall be warranted for a period of 12 months from the date of installation.

7. The Developer shall abandon (removal of a portion of the casing and proper capping as per City Standard Plan W-11) any existing water wells within the boundary of the development according to standards and regulations as specified in Section 4-4-1 through 4-4-15 of the Reedley Municipal Code and Section 14.081160 of the Fresno County Code. The Public Works Department must verify either the nonexistence of such wells or the appropriate abandonment of an existing well prior to the issuance of building permits.

If required to abandon an onsite well, a demolition permit shall be obtained from the Building Official prior to the removal of any existing structures. All septic tanks, dry wells or seepage pits shall be pumped and filled. Inspection shall be made by the City Building Official prior to covering. Relative compaction of ninety percent (90%) is required for fill areas outside of existing or proposed City rights-of-way. All areas within existing and/or proposed City rights-of-way, relative compaction of ninety-five percent (95%) is required. Water supply wells shall be destroyed by a State Licensed C-57 Contractor in accordance with the requirements herein. A permit must be obtained from the Building Division before destroying any well. These above requirements shall be noted on the subdivision construction improvement plans.

8. The Developer shall remove any and all underground storage tank(s) existing on the property in accordance with the requirements of the County of Fresno Health Department and other applicable agencies. The Building Official must verify either the nonexistence of such tanks or the appropriate abandonment and/or removal, and provided with the copies of the Health Department certification prior to the issuance of building permits.

9. Abandoned water and sewer services shall be capped at the mains in accordance with City of Reedley standards and policies. All proposed service abandonments are to be verified and completed in the presence of the City’s Engineering or Public Works staff.

10. The Developer shall file a preliminary soil analysis and report as required by Section 17953 of the Health and Safety Code. The City Engineer shall have the authority to require the Developer to take such corrective action or make such improvements as the City Engineer may determine necessary to prevent structural defects. The soil classification report must be submitted to the Building Official for approval of the building pads prior to recordation of the final map. Such report shall address soil bearing capacity, effects of moisture variation on soil bearing capacity, compressibility and expansiveness. No grading shall commence until a soil engineering report is submitted and approved by the City and a grading permit is obtained from the City of Reedley Building Official. All grades and property stakes (corners) shall be in place prior to obtaining building permits.

11. If applicable, the Developer shall also comply with the Regional Water Quality Control Board Central Valley Region Order No. 5-00-175 construction activity requirements for all water discharges into the City’s storm drain collection system, resulting from, but not limited to, pressure testing, leakage testing and disinfecting.

12. Developer shall file a Notice of Intent to comply with the terms of the general discharge of storm water associated with construction activity (SWRCB Order No. 2009-0009- VTSM 6497 Page 3 of 11
APN 370-040-10
DWQ NPDES No. CAS000002) consistent with the requirements of the federal Clean Water Act. Developer shall also have a qualified professional prepare a site-specific Storm Water Pollution Prevention Plan (SWPPP) for this project and submit to the City Engineer, along with the Notice of Intent, for review of compliance before any construction begins. A copy of the SWPPP shall be made available at the construction site at all times.

13. Developer shall incorporate dust and erosion control measures into the construction phase of the project according to the San Joaquin Valley Unified Air Pollution Control District requirements. The City Engineer shall review and approve said measures prior to the issuance of building permits. Developer’s contractor shall take all reasonable precautions to prevent silt and other sedimentation from entering the City of Reedley’s storm drainage and sewer systems. Such precautions should generally conform to “California Storm Water Best Management Practice Handbooks” prepared by California Stormwater Quality Association (CASQA). Such precautions shall be noted or shown on the off-site and on-site construction improvements plans and are subject to the approval of the City Engineer. The Developer shall make all reasonable efforts to incorporate post-construction storm water control measures into the final design of the project.

14. With the final submittal of construction improvement plans for this project, the Developer’s engineer shall deliver to the City Engineer two (2) bond sets of the project civil improvement construction plans, and shall include a digital copy of the complete project plans, to include civil improvement construction and grading & drainage plans which shall include public utilities improvement plans.

15. All buildings and structures shall be located outside of existing or proposed easements.

16. Prior to issuance a Notice of Completion or Certificate of Occupancy, Developer’s engineer shall provide a certified statement stating that all grades shown on the approved construction improvement plans have been constructed to grade. Any discrepancies in grade shall be noted and corrections made on “AS BUILT” plans for review and approval by the City Engineer. In addition, the Developer’s engineer shall deliver a digital file (in AutoCAD format) of the projects civil plans drawn to the City’s Horizontal datum, NAD83(2007NSRS), to the City Engineer prior to issuance of a Notice of Completion and/or Certificate of Occupancy/Final to the Developer.

17. The location and type of mailboxes to be installed with this development shall be shown on the improvement plans. Developer shall contact the United States Postal Service (USPS) for approval of location and type of mailboxes prior to installation. The Developer shall, at their own expense, procure, construction and install all mail receptacle facilities for each location as specified and approved by the USPS. It is recommended that the Developer contact the local USPS representative at least 6 months prior to the first occupancy to execute a Mode of Delivery Agreement for New Construction.

18. The Subdivider/Developer shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the Reedley Municipal Code and the Subdivision Map Act. The Subdivider/Developer shall complete all the public improvements prior to the approval of the Subdivision Map by the City. If, at the time of Subdivision Map approval, any public improvements have not been completed and accepted in accordance with the standards VTSM 6497 Page 4 of 11
APN 370-040-10
of the City, the Subdivider/Developer may elect to enter into an agreement with the City to thereafter guarantee the completion of the improvements.

19. All of the conditions of approval must be completed prior to the final inspection and the issuance of a “Certificate of Occupancy/Final” by the Building Official.

20. The Development shall contribute its fair share portion of future roadway improvements as identified in the final Traffic Impact Study (TIS). In order to determine the fair share amounts that will be paid to the City, the Developer shall provide estimated construction costs for the proposed improvements as identified in the final TIS to the City for review and approval. The approved construction costs used in conjunction with the projects fair shares identified in the final TIS will be used to determine the amounts to be paid by the Development for these future projects.

21. The property owner shall provide written consent to the City of Reedley for preparation of annexing this property (APN: 370-040-10) into the Landscaping and Lighting Maintenance District No. 1 to provide for maintenance of the landscaping within the City right of way, maintenance of the park including all appurtenances, and street lights located within and throughout the proposed development. The assessment shall be a proportionate share of the City Engineer’s estimated cost for the District. A Landscape and Lighting formation fee in the amount of $2,205.00, or current fee at time of submittal according to the City Master Fee Schedule, shall be paid with the signed Landscape and Lighting Maintenance District No. 1, Petition and Written Consent (including waiver).

Mapping

22. All subdivision and block corners, lot corners and street centerlines shall be monumented as per Subdivision Map Act, City of Reedley Standard Plans ST-41 & 42 and City Specifications dated October 2019.

23. Vesting Tentative Subdivision Map No. 6497 must be recorded with the County of Fresno prior to the issuance of building permit(s).

24. An estimate deposit for final subdivision (tract) map checking in the amount of $2,810.00, or current fee at time of submittal according to the City Master Fee Schedule, shall be required with the submittal of the final tract map to the City of Reedley. Final tract map will not be reviewed until deposit is submitted to and processed by the City.

The total payment for final tract map checking and all pertinent fees in accordance with City resolutions, ordinances and policies must be paid in full prior to the final tract map being taken before the City Council for approval. Three (3) bond copies of the final tract map, one (1) hard copy of closure calculations, one (1) hard copy of a preliminary title report dated within sixty (60) days of submittal and a digital copy of all hard copy items shall be submitted with the first submittal.

25. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated to the City of Reedley. Public utility easements beyond the limits of the Final Map, but required as a condition of development, shall be acquired at the Subdivider’s cost and shall be dedicated by separate instrument at the time of Final Map approval. The relocation of existing utilities necessitated by the required public improvements shall be paid for by the Subdivider. The Subdivider is responsible to contact the appropriate utility companies for information.

VTSM 6497 Page 5 of 11
APN 370-040-10

26. Subdivider shall dedicate sufficient right of way to the City of Reedley along South Buttonwillow Avenue within the limits of the project for an ultimate width of forty-two feet (42.0’) east of the section line along the westerly limits of the project site.

27. Subdivider shall dedicate sufficient right of way to the City of Reedley along East Springfield Avenue within the limits of the project for an ultimate width of seventy-six feet (76.0’) north of the section line along the southernly limits of the project site.

28. Subdivider shall dedicate sufficient right of way to the City of Reedley along East North Avenue within the limits of the project for an ultimate width of forty-two feet (42.0’) north of the section line along the northernly limits of the project site.

29. Subdivider shall acquire sufficient right of way dedicated to the City of Reedley along East North Avenue adjacent to the limits of the project to ensure a travel way transition for vehicles to access Springfield Avenue along East North Avenue. Right of way acquisition may be necessary from APNs 370-040-13, 370-040-22 and/or 370-040-23.

Said acquisition area shall be approximately thirty feet (30.0’) wide and shall include proper measures to ensure drainage to City facilities.

30. Subdivider shall dedicate sufficient right of way to the City of Reedley for the interior roadways within the subdivision to the ultimate width of fifty feet (50.0’). Pedestrian easements shall be required at driveway locations that extend the sidewalk outside of dedicated rights of way.

31. Subdivider shall dedicate sufficient right of way to the City of Reedley for dead end roads within the subdivision that are one hundred ninety-nine feet (199.0’) in length or less to an ultimate width of ninety-four feet (94.0’) to ensure a minimum radius of forty-seven feet (47.0’) per City Standard ST-27. Pedestrian easements shall be required at driveway locations that extend the sidewalk outside of dedicated rights of way.

32. Subdivider shall dedicate sufficient right of way to the City of Reedley for dead end roads within the subdivision that are two hundred feet (200.0’) to five hundred feet (500.0’) in length to an ultimate width of one hundred ten feet (110.0’) to ensure a minimum radius of fifty-five feet (55.0’) and minimum ninety-six feet (96.0’) diameter from face of curb to face of curb. Pedestrian easements shall be required at driveway locations that extend the sidewalk outside of dedicated rights of way.

33. Waiver of direct access rights shall be shown on the Final Map for all portions of parcels along South Buttonwillow Avenue, East Springfield Avenue and East North Avenue and for all street side corner parcel lines. Driveway approaches will not be allowed to be installed along any street side corner parcel lines.

34. If the Subdivider/Developer proposes to file multiple final subdivision maps, thus phasing the development of this subdivision, additional conditions may be imposed to provide a complete and workable system of City and public utilities as well as development of streets to provide traffic circulation and access for emergency and service equipment as various phases of the project are developed. The initial phasing proposal and each subsequent proposal thereafter shall be submitted for review and approval and attachment of conditions in addition to the conditions contained herein. At a minimum, phasing of the subdivision will require looping of water lines to tie back to existing or extended services to provide a complete water service loop with no dead-ends and a minimum of two points of connection to existing public roadways.

VTSM 6497 Page 6 of 11
APN 370-040-10
Streets

35. All street structural sections shall be constructed, at a minimum, per City Standard detail ST-1. The applicant shall submit street structural section pavement calculations with the first submittal of improvement plans. Structural sections shall include R-value tests taken from soils where streets are to be placed. A map showing the location of the borings and results of the R-values shall be included with the calculations.

36. Construction within street rights-of-way shall be done with proper signing for construction and maintenance work zones in accordance with the State of California Manual of Traffic Controls and Work Area Traffic Control Handbook requirements. All work shall be in conformance with OSHA and other safety hazard prevention requirements.

37. All paving, repaving, and patching shall be done per the Standard Plans and Specifications and to the satisfaction of the City Engineer. Any travel way surface disturbed by construction activities shall be restored to provide a safe travel-way within the City streets and/or alley area. A slurry seal shall be required to provide continuity for re-paved areas with original street cross-section. All proposed trench patches within City streets shall be patched as per City Standard Plan ST-46, Section “A” Detail.

38. All streets within the limits of the development shall be fully constructed to current City & ADA standards including sidewalk, curb, gutter, driveway approaches and permanent asphalt concrete paving and street name, advisory and regulatory signs and street lights as directed by the City Engineer.

39. South Buttonwillow Avenue shall be constructed within the limits of the project as follows: thirty-two feet (32’) east of the section line to the face of the curb with an additional ten feet (10’) east of the face of curb for sidewalk and landscaping. South Buttonwillow Avenue shall have one twelve-foot (12’) two-way left turn lane to facilitate turns into and out of the new development, a minimum of one twelve-foot (12’) travel lane in each direction of travel, a six-foot (6’) wide class II bike lane on the eastern and western side of the roadway, and an eight-foot (8’) shoulder on the eastern and western side of the roadway. The applicant shall be responsible to adjust, modify, or remove any existing striping, that does not meet the cross-section listed above, which may be necessary on the west side of the road due to the ultimate build-out of the street, as appropriate.

40. South Buttonwillow Avenue along the western limits of the project shall be reconstructed to the centerline based on structural section pavement calculations. The structural section shall not be less than the street structural section identified in City Standard ST1.

41. South Buttonwillow Avenue along the western limits of the project from the centerline to the edge of pavement on the western side of the roadway shall be ground and overlaid with new asphalt. Developer is eligible for reimbursement or development impact fee credits for this portion of work.

42. South Buttonwillow Avenue in front of APN 370-040-13, 370-040-22, and 370-040-23 shall be fully improved to current City ADA standards including sidewalk, curb, gutter, and permanent asphalt concrete paving to ensure continuity of ADA path of travel.

VTSM 6497 Page 7 of 11
APN 370-040-10
Developer shall obtain and dedicate right of way as necessary to complete this requirement.

43. East North Avenue shall be constructed within the limits of the project as a partial collector street per City Standard ST-5 without a crown in the roadway. An AC dike shall be installed along the future centerline of East North Avenue/northern right of way line and constructed per Caltrans Standard A87A type B1-6.

44. East North Avenue shall have a temporary travel way transition constructed adjacent to the western edge of the project to allow vehicles to transition to East North Avenue west of the development limits. An AC dike shall be installed along the southern edge of East North Avenue to capture water runoff and constructed per Caltrans Standard A87A type B1-6. Developer is responsible for acquiring the necessary right of way from adjacent property owners to install travel way transition.

45. East Springfield Avenue shall be constructed along the southern limits of the project and within the small portion of right of way on the southwestern side of the project limits as a seventy-six-foot (76.0’) wide collector street with fifty-six feet (56’) from face of curb to face of curb with an additional ten feet (10’) north and south of the face of curb for sidewalk and landscaping. East Springfield Avenue shall have one twelve-foot (12’) twoway left turn lane to facilitate turns into and out of the new development, a minimum of one twelve-foot (12’) travel lane in each direction of travel, a ten-foot (10’) shoulder on the northern and southern side of the roadway, and a minimum five-foot (5’) wide sidewalk on the northern and southern side of the roadway. The applicant shall be responsible to adjust, modify, or remove any existing striping at the intersection of South Buttonwillow Avenue and East Springfield Avenue to ensure safe traffic movement.

46. A signing and striping plan for South Buttonwillow Avenue and cross streets that connect to South Buttonwillow Avenue shall be prepared by the Developer’s engineer for this development.

47. A drainage water test shall be performed under the supervision of the City’s Engineering Inspector on all curb and gutter lengths installed within the limits of the proposed project prior to the acceptance of public improvements by the City of Reedley.

General Utilities

48. The Developer shall coordinate with PG&E to ensure that all utility boxes and overhead facilities are installed in accordance with City policy (Section 11-5-11(G)). All PG&E transformers shall be installed in accordance with the Reedley Municipal Code.

49. As required per the Reedley Municipal Code Section 11-5-11(G) any existing overhead utility poles within the limits of the property shall be installed underground. The undergrounding shall only extend beyond such boundaries if determined necessary by the utility service provider.

50. Public utility plans and common trench utility plans for gas, electric, telephone and cable TV shall be prepared by the Developer’s public utility engineer and submitted with the subdivision improvement plans for review and approval by the City Engineer.

51. The Developer shall submit to the City Engineer, for review and approval, a detailed street lighting plan prepared by a qualified electrical engineer. The plan shall show the street light locations, wattage, and mast arm length at a minimum. Street lights within the VTSM 6497 Page 8 of 11
APN 370-040-10
limits of the project site shall be LED type luminaires installed per City of Reedley Standard Plans ST-65 to 70 and in accordance with the recommendations of the utility companies and as approved by the Public Works Director to qualify for PG&E LS-2 rate schedule. All streetlights shall be served by underground service. The Subdivider/Developer shall install all proposed streetlights. All streetlights within the right of way shall be City owned and maintained.

52. Ingress/egress rights shall be provided to the City for its employees and equipment to enter upon the property for the purpose of inspections related to water and sewer system maintenance as applicable.

Water

53. Water distribution facilities and services shall be installed in accordance with the Standard Plans and Specifications of the City of Reedley, and any amendments thereto as directed by the City Engineer.

54. The required facilities to provide service for this development shall be to:
a. Install a 10-inch water main along East Springfield Avenue that connects to the existing 10-inch water main located in South Buttonwillow Avenue and that connects to the existing 10-inch water main in Future Tobu Avenue. b. Extend the existing 10-inch water main in East North Avenue at the western edge of the development along East North Avenue and tie into the existing Tee at the intersection of East North Avenue and Future Tobu Avenue. c. On-site water system shall be sized and designed so as to meet development demands as approved by the City of Reedley Fire Chief and City Engineer. A minimum 8-inch water main shall be installed throughout the subdivision to provide services to each lot. Said system shall be looped for circulation except for the extensions into cul-de-sacs, unless otherwise noted.

55. All proposed trench patches within existing City streets shall be patched as per City Standard Plan ST-46, Section “A” Detail.

56. Fire hydrants shall be installed at 300 feet maximum spacing and in accordance with the requirements of the City Fire Chief, City Engineer, and City of Reedley Standard Specifications and Standard Plan W-1. All proposed fire hydrant locations shall be shown and noted on the construction improvement plans. Location of fire hydrants shall be planned to allow for a maximum amount of on-street parking.

57. In accordance with City ordinances and resolutions, the Developer shall install water service assemblies with water meter, box and reduced pressure backflow preventer within the City right-of-way per City Standard Plan W-4 or W-5, W-6, and W-15 and Specifications of the City of Reedley and any amendments thereto as directed by the City Engineer. Water service(s) shall be installed at the time of issuance of building permit(s). The size and location of proposed water service(s) shall be noted on the construction improvement plans.

58. All connections to the existing City of Reedley water system must be made in the presence of a City employee authorized by the Public Works Department to inspect water connections. All connections must be cleaned and disinfected to the satisfaction of the City of Reedley. In the event a City employee is not present to witness the connection, all connection operations must be terminated and the contractor or VTSM 6497 Page 9 of 11
APN 370-040-10
developer will be required to show proof that the proper cleaning and disinfection procedures were taken to the satisfaction of the City Engineer. Otherwise, remedial action such as flushing, cleaning of lines by polyurethane pigs, or other actions may be required by the City Engineer.

59. Backflow preventers shall be tested and certified prior to the utilization of water. The owner shall have the proposed backflow preventer tested (repaired if required) by a certified backflow plumber on a yearly basis at their expense and the results submitted to City of Reedley Public Works Department.

60. The standard location for water service laterals shall be located horizontally ten feet (10') from sewer service lateral. All water service lateral locations shall be shown and stationed on the construction improvement plans. Said services shall not be located within driveway approaches.

61. Water service(s) shall be installed at the time of issuance of building permit(s). The size and location of proposed water service(s) shall be noted on the construction improvement plans.

62. Upon building permit issuance, the necessary water meter(s) for the project shall be purchased and ordered from the City of Reedley. Larger sized water meters may require an extended lead time. The water meter(s) and anti-siphon device must be installed on each service line prior to utilization of water for any reason from the water service lines.

An anti-siphon device is not necessary where a backflow preventer is required.

63. The Developer’s contractor must apply for an Encroachment Permit Application and hydrant meter from the Public Works Department prior to any usage of water. Water trucks or water wagons must have appropriate air gap or Reduced Pressure Backflow prevention devices.

Sewer

64. Sanitary sewer distribution facilities and services shall be installed in accordance with the Standard Plans and Specifications of the City of Reedley, and any amendments thereto as directed by the City Engineer.

65. The required facilities to provide service for this development shall be to:
a. Tie into the existing 15-inch sewer main located at the intersection of South Buttonwillow Avenue and East Springfield Avenue, extend a 15-inch sewer main along South Buttonwillow Avenue to the northern limits of the project. i. This item may be installed by another development north of VSTM 6497, if this occurs then the developer may be required to reimburse a portion of this work if a reimbursement agreement is in place.
b. Connect the two existing 15-inch sewer main segments located at the intersection of South Buttonwillow Avenue and East Duff Avenue. This segment will cross Alta Irrigation District (AID) Facilities, which will require coordination and approval by AID.
i. This item may be installed by another development north of VSTM 6497, if this occurs then the developer may be required to reimburse a portion of this work if a reimbursement agreement is in place.
c. The development’s proposed sewer services shall tie into the 15-inch sewer main located in South Buttonwillow Avenue. The location and required size of the VTSM 6497 Page 10 of 11
APN 370-040-10
proposed sewer service connection shall be confirmed with the City Engineer. d. On-site sewer system shall be sized and designed so as to meet development demands as approved by the City Engineer. A minimum 8-inch sewer main shall be installed throughout the subdivision to provide services to each lot. *Some of these conditions may be eligible for credits

66. All proposed trench patches within existing City streets shall be patched as per City Standard Plan ST-46, Section “A” Detail.

67. Sewer services for the development shall be via gravity main. All design options shall be exhausted and provided to the City Engineer for review prior to requesting the installation of a sewer lift station. If applicable, the installation of a sewer lift station will be a last resort option.

68. The standard location for sewer service laterals shall be located horizontally ten feet (10') from water service lateral. All sewer service lateral locations shall be shown and stationed on the construction improvement plans. Said services shall not be located within driveway approaches.

69. Any private sewer facilities located within the subject property(s) shall be removed.

Grading & Drainage

70. Developer shall submit to the City Engineer for review and approval a grading and drainage plan prepared by a registered civil engineer for site drainage grades in accordance with applicable standards. Drainage from this development shall be in accordance with the City of Reedley’s 2014 Integrated Master Plan, or current version at time of submittal, for Storm Drainage Plan for this area and the City’s Standard Plans and Specifications.

71. The storm drainage collection system shall be designed, sized and constructed on the basis of the Rational Method or similar method approved by the City Engineer. Project on-site and off-site drainage from this development shall be directed towards an existing drainage basin located along Tobu Avenue and Evening Glow Avenue in Tract No. 5013 & 5178. The existing storm drainage retention basin shall be expanded onto APN 370- 060-03 to accommodate all of the drainage for this proposed development. Storm drainage facilities shall be installed to convey water underground to said storm drain facility. Developer shall install storm drainage inlets per City of Reedley Standard Plans and specifications. The Developer may also elect to provide on-site storm drainage storage upon approval of the City Engineer. If on-site storage is provided, the developer shall dedicate property adequately sized to accommodate the storm runoff from VSTM 6497 and major roadways adjacent to the development.

72. No on-site surface drainage shall be allowed to drain over sidewalk, driveways or onto adjacent property.

73. The Developer’s engineer shall provide a certified statement stating that all grades shown on the approved construction improvement plans have been constructed to grade. Any discrepancies in grade shall be noted and corrections made on “AS BUILT” plans for review and approval by the City Engineer.

Landscaping and Irrigation

74. Developer shall submit to the City Engineer for review and approval landscaping and VTSM 6497 Page 11 of 11
APN 370-040-10
irrigation plans for landscaping and irrigation proposed on-site and off-site within the City Right of Way.

75. All landscaping and irrigation shall be installed in accordance with the Standard Plans and Specifications of the City of Reedley and any amendments thereto as directed by the City Engineer.

County of Fresno

DEPARTMENT OF PUBLIC HEALTH
Environmental Health Division
Promotion, preservation and protection of the community’s health 1221 Fulton Street /P. O. Box 11867, Fresno, CA 93775
(559) 600-3357 • FAX (559) 455-4646
The County of Fresno is an Equal Employment Opportunity Employer www.co.fresno.ca.us • www.fcdph.org
April 29, 2025
LU0022984
Laura Friesen, Assistant Planner 2600
City of Reedley
Community Development Department
1733 Ninth Street
Reedley, CA 93654
Dear Ms. Friesen:

PROJECT NUMBER: ANX 2025-01, GPA 2025-01, R 2025-01, VTSM 6497 Annexation Application No. 2025-01 pertains to the annexation of approximately 39.7 acres into the City of Reedley. The proposed annexation area includes APN 370-040-10, 370-040-22, 370-040-23, 370-40-13 and existing right-of-way contiguous to parcel boundaries. The proposed annexation is within the City of Reedley’s adopted Sphere of Influence, is adjacent to the existing City of Reedley City Limits on three sides, and promotes orderly growth and development.

General Plan Amendment Application No. 2025-01 pertains to the reclassification of a 4-acre portion of a parcel (APN 370-040-10) that currently has a High Density Residential General Plan Land Use Designation. The proposed General Plan Amendment would reclassify the portion of the parcel from High Density Residential (15.1-29 dwelling units per acre) to Low Density Residential (4-8 dwelling units per acre). If General Plan Amendment Application No. 2025-01 is approved, then the entire parcel (APN 370-040-10) would have a Low Density Residential General Plan Land Use Designation (4-8 dwelling units per acre).

Re-Zone Application No. 2025-01 pertains to the reclassification of approximately 39.7 acres consisting of four parcels (APN 370-040-10, 370-040-22, 370-040-23, 370-40-13) from agricultural use (AL20) within Fresno County to the R-1-6 (One Family Residential) zone district upon annexation into Reedley City Limits. The proposed zoning designation is consistent with the proposed general plan amendment as well as the existing Low Density Residential General Plan Planned Land Use Designation of the remaining project area.

Vesting Tentative Subdivision Map (TSM) No. 6497 (Westhaven 2) pertains to the subdivision of land and proposed street dedications/improvements to accommodate for single unit development. The proposed project would include the subdivision of one parcel of land (APN 370-040-10) into 174 lots consisting of 166 lots for single unit development with a minimum lot size of 5,002 square feet, an average lot size of 5,561 square feet, and a residential density of 5.19 units per gross acre, as well as 7 out lots and one 2-acre storm drain basin. The subdivision would have two access points, one access point would be on Buttonwillow Ave and the secondary access point would be on East North Avenue.

APN: 370-040-10 ZONING: AL20 to R-1-6 ADDRESS: 9452 S. Buttonwillow Avenue Laura Friesen
April 29, 2025
ANX 2025-01, GPA 2025-01, R 2025-01, VTSM 6497

Page 2 of 2 ends

2 Recommended Conditions of Approval:
 Construction permits for the proposed development should be subject to assurance of sewer capacity of the City of Reedley Regional Wastewater Treatment Facility. Concurrence should be obtained from the California Regional Water Quality Control Board (RWQCB). For more information, contact staff at (559) 445-5116.
 Construction permits for the proposed development should be subject to assurance that the City of Reedley community water system has the capacity and quality to serve this project. Concurrence should be obtained from the State Water Resources Control Board, Division of Drinking WaterSouthern Branch. For more information call (559) 447-3300.  The proposed project has the potential to expose nearby residents to elevated noise levels.

Consideration should be given to the noise elements of your City’s Municipal Code and County Noise Ordinance Code.
 As a measure to protect ground water, all water wells and/or septic systems that exist or have been abandoned within the project area should be properly destroyed by an appropriately licensed contractor.
 Should any underground storage tank(s) be found during the project, the applicant shall apply for and secure an Underground Storage Tank Removal Permit from the Fresno County Department of Public Health, Environmental Health Division. Contact the Fresno County Hazmat Compliance Program at (559) 600-3271 for more information.

REVIEWED BY:

Kevin Tsuda, R.E.H.S.

Environmental Health Specialist II (559) 600-3271
cc: Deep Sidhu- Environmental Health Division (CT. 63.00)

DEVELOPMENT SERVICES AND CAPITAL PROJECTS DIVISION
2220 Tulare Street, Sixth Floor / Fresno, California 93721 / Phone (559) 600-4497 / 600-4022 / 600-4545 / FAX 600-4200 The County of Fresno is an Equal Employment Opportunity Employer

DEPARTMENT OF PUBLIC WORKS AND PLANNING
STEVEN E. WHITE, DIRECTOR
May 9, 2025
Laura Friesen, Assistant Planner
City of Reedley, Community Development Department
1733 9th Street
Reedley, CA 93654
SUBJECT: City of Reedley, ANX 2025-01
Dear Ms. Friesen,
The County of Fresno appreciates the opportunity to review and comment on the subject project being reviewed by the City of Reedley. The proposed subdivision of approximately 39.7-acres to allow for a 166 single-family residential units and related developments.

The documents received for this review were circulated to our various Fresno County Public Works and Planning divisions. See comments below.

Development Engineering:
1) According to the U.S.G.S. Quad Map, Buttonwillow Ditch is located along the eastern property line of the subject property. Any improvements constructed within or near a ditch should be coordinated with the owners of the ditch/appropriate agency. 2) Furthermore, according to the Wetlands Mapper of U.S. Fish and Wildlife Service, a wetland may be present along the eastern property line of the subject property. For any development on wetlands, U.S. Fish and Wildlife Service and other appropriate agencies should be consulted regarding any requirements they may have.

Road Maintenance and Operations:

Buttonwillow Avenue is a half county-maintained road classified as an arterial with an existing 30’ right of way east of section line and an ultimate right of way of 106’ per the Fresno County General Plan. Buttonwillow Ave has a total pavement width of 24.8’, an ADT of 10500 VPD per 2017 count date, and a PCI of 61. Roadway is in fair condition. 1) City of Reedley should be required to annex the full road right-of-way of Buttonwillow Avenue along parcel frontage.

Environmental Health Division: Please see enclosed comments previously sent to you via email on April 29, 2025.

This concludes Fresno County’s comments on the proposed project.

Sincerely,
Arianna Brown
Arianna Brown, Planner -- Development Services and Capital Projects Division "G:\4360Devs&Pln\PROJSEC\PROJDOCS\Environmental\OAR\City of Reedley\ANX2025-01\ANX 2025-01 City of Reedley- RESPONSE LETTER.docx" County of Fresno

DEPARTMENT OF PUBLIC HEALTH
Environmental Health Division
Promotion, preservation and protection of the community’s health 1221 Fulton Street /P. O. Box 11867, Fresno, CA 93775
(559) 600-3357 • FAX (559) 455-4646
The County of Fresno is an Equal Employment Opportunity Employer www.co.fresno.ca.us • www.fcdph.org
April 29, 2025
LU0022984
Laura Friesen, Assistant Planner 2600
City of Reedley
Community Development Department
1733 Ninth Street
Reedley, CA 93654
Dear Ms. Friesen:

PROJECT NUMBER: ANX 2025-01, GPA 2025-01, R 2025-01, VTSM 6497 Annexation Application No. 2025-01 pertains to the annexation of approximately 39.7 acres into the City of Reedley. The proposed annexation area includes APN 370-040-10, 370-040-22, 370-040-23, 370-40-13 and existing right-of-way contiguous to parcel boundaries. The proposed annexation is within the City of Reedley’s adopted Sphere of Influence, is adjacent to the existing City of Reedley City Limits on three sides, and promotes orderly growth and development.

General Plan Amendment Application No. 2025-01 pertains to the reclassification of a 4-acre portion of a parcel (APN 370-040-10) that currently has a High Density Residential General Plan Land Use Designation. The proposed General Plan Amendment would reclassify the portion of the parcel from High Density Residential (15.1-29 dwelling units per acre) to Low Density Residential (4-8 dwelling units per acre). If General Plan Amendment Application No. 2025-01 is approved, then the entire parcel (APN 370-040-10) would have a Low Density Residential General Plan Land Use Designation (4-8 dwelling units per acre).

Re-Zone Application No. 2025-01 pertains to the reclassification of approximately 39.7 acres consisting of four parcels (APN 370-040-10, 370-040-22, 370-040-23, 370-40-13) from agricultural use (AL20) within Fresno County to the R-1-6 (One Family Residential) zone district upon annexation into Reedley City Limits. The proposed zoning designation is consistent with the proposed general plan amendment as well as the existing Low Density Residential General Plan Planned Land Use Designation of the remaining project area.

Vesting Tentative Subdivision Map (TSM) No. 6497 (Westhaven 2) pertains to the subdivision of land and proposed street dedications/improvements to accommodate for single unit development. The proposed project would include the subdivision of one parcel of land (APN 370-040-10) into 174 lots consisting of 166 lots for single unit development with a minimum lot size of 5,002 square feet, an average lot size of 5,561 square feet, and a residential density of 5.19 units per gross acre, as well as 7 out lots and one 2-acre storm drain basin. The subdivision would have two access points, one access point would be on Buttonwillow Ave and the secondary access point would be on East North Avenue.

APN: 370-040-10 ZONING: AL20 to R-1-6 ADDRESS: 9452 S. Buttonwillow Avenue Laura Friesen
April 29, 2025
ANX 2025-01, GPA 2025-01, R 2025-01, VTSM 6497

Page 2 of 2 ends

2 Recommended Conditions of Approval:
 Construction permits for the proposed development should be subject to assurance of sewer capacity of the City of Reedley Regional Wastewater Treatment Facility. Concurrence should be obtained from the California Regional Water Quality Control Board (RWQCB). For more information, contact staff at (559) 445-5116.
 Construction permits for the proposed development should be subject to assurance that the City of Reedley community water system has the capacity and quality to serve this project. Concurrence should be obtained from the State Water Resources Control Board, Division of Drinking WaterSouthern Branch. For more information call (559) 447-3300.  The proposed project has the potential to expose nearby residents to elevated noise levels.

Consideration should be given to the noise elements of your City’s Municipal Code and County Noise Ordinance Code.
 As a measure to protect ground water, all water wells and/or septic systems that exist or have been abandoned within the project area should be properly destroyed by an appropriately licensed contractor.
 Should any underground storage tank(s) be found during the project, the applicant shall apply for and secure an Underground Storage Tank Removal Permit from the Fresno County Department of Public Health, Environmental Health Division. Contact the Fresno County Hazmat Compliance Program at (559) 600-3271 for more information.

REVIEWED BY:

Kevin Tsuda, R.E.H.S.

Environmental Health Specialist II (559) 600-3271
cc: Deep Sidhu- Environmental Health Division (CT. 63.00)

Fresno Local Agency Formation Commission
LAFCo Office: 1401 Fulton Street, Suite 800, Fresno, CA 93721 Phone (559) 600-0604
May 8, 2025
Laura Friesen
Assistant Planner
City of Reedley
Dear Ms. Friesen:

Subject: Comments Regarding Concurrent Applications: Annexation Application No. 2025-01, General Plan Amendment Application No. 2025-01, Re-Zone Application No. 2025- 01, and Vesting Tentative Subdivision Map No. 6497 (Westhaven 2) Thank you for the opportunity to comment on this project. From the material provided to this office, my understanding of the project description is as follows:
• Annexation Application No. 2025-01 pertains to the annexation of approximately 39.7 acres into the City of Reedley. The proposed annexation area includes APN 370-040-10, 370-040-22, 370-040-23, 370-40-13 and existing right-of-way contiguous to parcel boundaries. The proposed annexation is within the City of Reedley’s adopted Sphere of Influence, is adjacent to the existing City of Reedley City Limits on three sides, and promotes orderly growth and development.
• General Plan Amendment Application No. 2025-01 pertains to the reclassification of a 4-acre portion of a parcel (APN 370-040-10) that currently has a High Density Residential General Plan Land Use Designation. The proposed General Plan Amendment would reclassify the portion of the parcel from High Density Residential (15.1-29 dwelling units per acre) to Low Density Residential (4-8 dwelling units per acre). If General Plan Amendment Application No. 2025-01 is approved, then the entire parcel (APN 370-040-10) would have a Low Density Residential General Plan Land Use Designation (4-8 dwelling units per acre).
• Re-Zone Application No. 2025-01 pertains to the reclassification of approximately 39.7 acres consisting of four parcels (APN 370-040-10, 370-040-22, 370-040-23, 370-40-13) from agricultural use (AL20) within Fresno County to the R-1-6 (One Family Residential) zone district upon annexation into Reedley City Limits. The proposed zoning designation is consistent with the proposed general plan amendment as well as the existing Low Density Residential General Plan Planned Land Use Designation of the remaining project area.
• Vesting Tentative Subdivision Map No. 6497 (Westhaven 2) pertains to the subdivision of land and proposed street dedications/improvements to accommodate for single unit development. The proposed project would include the subdivision of one parcel of land (APN 370-040-10) into 174 lots consisting of 166 lots for single unit development with a minimum lot size of 5,002 square feet, an average lot size of 5,561 square feet, and a residential density of 5.19 units per gross acre, as well as 7 outlots and one 2-acre storm drain basin. The subdivision would have two access points, one access point would be on Buttonwillow Ave and the secondary access point would be on East North Avenue.

Laura Friesen
City of Reedley
No. 2025-01

Page 2 ends

The Fresno Local Agency Formation Commission (LAFCo) regulates, through approval or denial, the boundary changes proposed by local agencies or individuals. LAFCo’s objectives are to:
• Encourage orderly formation and development of agencies; • Encourage consistency with spheres of influence and recommended reorganization of agencies;
• Encourage orderly urban development and preservation of open space patterns; • Encourage conservation of prime agricultural lands and open space areas; and • Identify and address disadvantaged unincorporated communities.

LAFCo should be identified in the city’s environmental document as a Responsible Agency under CEQA whose role is to consider reorganizations and spheres of influence. Commission action on the reorganization request should be noted in the environmental document. As a Responsible Agency, the Commission is required to review and consider the city’s environmental documents prior to taking its action. A Responsible Agency complies with CEQA by considering the environmental analysis prepared by the Lead Agency and by reaching its own conclusions on whether to and how to approve the project. The Commission may then make a finding that it independently reviewed and considered the information in the environmental document and that the environmental document is sufficient to support a determination on the proposed reorganization.

Project-Specific Comments
The city will be required to submit the appropriate application materials including fees to LAFCo for reorganization. These materials are enumerated on our website (www.fresnolafco.org) through the “Applications and Documents” tab under “Items Necessary for a Complete Application.” The fee schedule for changes of organization/reorganization (annexation) of 21 to 40 acres is $9,600.

The city may send notice 56654(c) to the interested and affected agencies if the annexation is 100 percent uninhabited to reduce the project timeline.

If the proposal results in the annexation of land that is subject to a contract executed pursuant to the Williamson Act (Chapter 7, commencing with section 51200 of Division 1), then the petition and/or resolution for reorganization request shall state whether the City shall succeed to the contract pursuant to section 51243 or whether the City intends to exercise its option to not succeed to the contract pursuant to section 51243.5.

Annexation of full rights-of-way contiguous to parcel boundaries should be presumed in the reorganization’s legal description and map.

LAFCo is available to attend any community outreach meetings should the need arise.

Thank you for the opportunity to provide comments. If you have any questions, please contact me at (559) 600-1702 or email at [email protected].

Sincerely,
Jessica Gibson
LAFCo Analyst
1 Friesen, Laura
From: PGE Plan Review <[email protected]>
Sent: Thursday, April 24, 2025 4:08 PM
To: Friesen, Laura
Subject: Automatic reply: City of Reedley Request for Comment - Annexation 2025-01 EXTERNAL EMAIL - This email was sent by a person from outside your organization. Exercise caution when clicking links, opening attachments or taking further action, before validating its authenticity.

Hello,
Thank you for contacting PG&E’s Plan Review Team. Due to high volumes of requests for review, expect delays in receiving comments or a project specific response from PG&E. Please see PG&E’s general construction restrictions and guidelines for proposed projects around gas and electric facilities and incorporate these preliminary notes into your project design.

Gas Facilities
There could be gas transmission pipelines in this area which would be considered critical facilities for PG&E and a high priority subsurface installation under California law. Care must be taken to ensure safety and accessibility. So, please ensure that if PG&E approves work near gas transmission pipelines it is done in adherence with the below stipulations. Additionally, the following link provides additional information regarding legal requirements under California excavation laws: https://www.usanorth811.org/images/pdfs/CA-LAW2018.pdf

1. Standby Inspection: A PG&E Gas Transmission Standby Inspector must be present during any demolition or construction activity that comes within 10 feet of the gas pipeline. This includes all grading, trenching, substructure depth verifications (potholes), asphalt or concrete demolition/removal, removal of trees, signs, light poles, etc. This inspection can be coordinated through the Underground Service Alert (USA) service at 811. A minimum notice of 48 hours is required. Ensure the USA markings and notifications are maintained throughout the duration of your work.

2. Access: At any time, PG&E may need to access, excavate, and perform work on the gas pipeline. Any construction equipment, materials, or spoils may need to be removed upon notice. Any temporary construction fencing installed within PG&E’s easement would also need to be capable of being removed at any time upon notice. Any plans to cut temporary slopes exceeding a 1:4 grade within 10 feet of a gas transmission pipeline need to be approved by PG&E Pipeline Services in writing PRIOR to performing the work.

3. Wheel Loads: To prevent damage to the buried gas pipeline, there are weight limits that must be enforced whenever any equipment gets within 10 feet of traversing the pipe.

Ensure a list of the axle weights of all equipment being used is available for PG&E’s Standby Inspector. To confirm the depth of cover, the pipeline may need to be potholed by hand in a few areas.

Due to the complex variability of tracked equipment, vibratory compaction equipment, and cranes, PG&E must evaluate those items on a case-by-case basis prior to use over the gas pipeline (provide a list of any proposed equipment of this type noting model numbers and specific attachments). 2 No equipment may be set up over the gas pipeline while operating. Ensure crane outriggers are at least 10 feet from the centerline of the gas pipeline. Transport trucks must not be parked over the gas pipeline while being loaded or unloaded.

4. Grading: PG&E requires a minimum of 36 inches of cover over gas pipelines (or existing grade if less) and a maximum of 7 feet of cover at all locations. The graded surface cannot exceed a cross slope of 1:4.

5. Excavating: Any digging within 2 feet of a gas pipeline must be dug by hand. Note that while the minimum clearance is only 12 inches, any excavation work within 24 inches of the edge of a pipeline must be done with hand tools. So to avoid having to dig a trench entirely with hand tools, the edge of the trench must be over 24 inches away. (Doing the math for a 24 inch wide trench being dug along a 36 inch pipeline, the centerline of the trench would need to be at least 54 inches [24/2 + 24 + 36/2 = 54] away, or be entirely dug by hand.)
Water jetting to assist vacuum excavating must be limited to 1000 psig and directed at a 40° angle to the pipe.

All pile driving must be kept a minimum of 3 feet away.

Any plans to expose and support a PG&E gas transmission pipeline across an open excavation need to be approved by PG&E Pipeline Services in writing PRIOR to performing the work.

6. Boring/Trenchless Installations: PG&E Pipeline Services must review and approve all plans to bore across or parallel to (within 10 feet) a gas transmission pipeline. There are stringent criteria to pothole the gas transmission facility at regular intervals for all parallel bore installations.

For bore paths that cross gas transmission pipelines perpendicularly, the pipeline must be potholed a minimum of 2 feet in the horizontal direction of the bore path and a minimum of 12 inches in the vertical direction from the bottom of the pipe with minimum clearances measured from the edge of the pipe in both directions.

Standby personnel must watch the locator trace (and every ream pass) the path of the bore as it approaches the pipeline and visually monitor the pothole (with the exposed transmission pipe) as the bore traverses the pipeline to ensure adequate clearance with the pipeline. The pothole width must account for the inaccuracy of the locating equipment.

7. Substructures: All utility crossings of a gas pipeline should be made as close to perpendicular as feasible (90° +/- 15°). All utility lines crossing the gas pipeline must have a minimum of 12 inches of separation from the gas pipeline. Parallel utilities, pole bases, water line ‘kicker blocks’, storm drain inlets, water meters, valves, back pressure devices or other utility substructures are not allowed in the PG&E gas pipeline easement.

If previously retired PG&E facilities are in conflict with proposed substructures, PG&E must verify they are safe prior to removal. This includes verification testing of the contents of the facilities, as well as environmental testing of the coating and internal surfaces. Timelines for PG&E completion of this verification will vary depending on the type and location of facilities in conflict.

8. Structures: No structures are to be built within the PG&E gas pipeline easement. This includes buildings, retaining walls, fences, decks, patios, carports, septic tanks, storage sheds, tanks, loading ramps, or any structure that could limit PG&E’s ability to access its facilities.

9. Fencing: Permanent fencing is not allowed within PG&E easements except for perpendicular crossings which must include a 16 foot wide gate for vehicular access. Gates will be secured with PG&E corporation locks.

10. Landscaping: Landscaping must be designed to allow PG&E to access the pipeline for maintenance and not interfere with pipeline coatings or other cathodic protection systems. No trees, shrubs, brush, vines, and other vegetation may be planted within the easement area. Only those plants, ground covers, grasses, flowers, and low-growing plants that grow unsupported to a maximum of four feet (4’) in height at maturity may be planted within the easement area.
3 11. Cathodic Protection: PG&E pipelines are protected from corrosion with an “Impressed Current” cathodic protection system. Any proposed facilities, such as metal conduit, pipes, service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection system must be reviewed and approved by PG&E Corrosion Engineering.

12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas transmission pipelines in order to ensure public awareness of the presence of the pipelines. With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign that is in direct conflict with proposed developments may be temporarily relocated to accommodate construction work. The pipeline marker must be moved back once construction is complete.

13. PG&E is also the provider of distribution facilities throughout many of the areas within the state of California. Therefore, any plans that impact PG&E’s facilities must be reviewed and approved by PG&E to ensure that no impact occurs which may endanger the safe operation of its facilities.

Electric Facilities
It is PG&E’s policy to permit certain uses on a case by case basis within its electric transmission fee strip(s) and/or easement(s) provided such uses and manner in which they are exercised, will not interfere with PG&E’s rights or endanger its facilities. Some examples/restrictions are as follows:

1. Buildings and Other Structures: No buildings or other structures including the foot print and eave of any buildings, swimming pools, wells or similar structures will be permitted within fee strip(s) and/or easement(s) areas. PG&E’s transmission easement shall be designated on subdivision/parcel maps as “RESTRICTED USE AREA – NO BUILDING.”

2. Grading: Cuts, trenches or excavations may not be made within 25 feet of our towers. Developers must submit grading plans and site development plans (including geotechnical reports if applicable), signed and dated, for PG&E’s review. PG&E engineers must review grade changes in the vicinity of our towers. No fills will be allowed which would impair ground-to-conductor clearances. Towers shall not be left on mounds without adequate road access to base of tower or structure.

3. Fences: Walls, fences, and other structures must be installed at locations that do not affect the safe operation of PG&’s facilities. Heavy equipment access to our facilities must be maintained at all times. Metal fences are to be grounded to PG&E specifications. No wall, fence or other like structure is to be installed within 10 feet of tower footings and unrestricted access must be maintained from a tower structure to the nearest street. Walls, fences and other structures proposed along or within the fee strip(s) and/or easement(s) will require PG&E review; submit plans to PG&E Centralized Review Team for review and comment.

4. Landscaping: Vegetation may be allowed; subject to review of plans. On overhead electric transmission fee strip(s) and/or easement(s), trees and shrubs are limited to those varieties that do not exceed 10 feet in height at maturity. PG&E must have access to its facilities at all times, including access by heavy equipment. No planting is to occur within the footprint of the tower legs. Greenbelts are encouraged.

5. Reservoirs, Sumps, Drainage Basins, and Ponds: Prohibited within PG&E’s fee strip(s) and/or easement(s) for electric transmission lines.

6. Automobile Parking: Short term parking of movable passenger vehicles and light trucks (pickups, vans, etc.) is allowed. The lighting within these parking areas will need to be reviewed by PG&E; approval will be on a case by case basis. Heavy equipment access to PG&E facilities is to be maintained at all times. Parking is to clear PG&E structures by at least 10 feet. Protection of PG&E facilities from vehicular traffic is to be provided at developer’s expense AND to PG&E specifications. Blocked-up vehicles are not allowed. Carports, canopies, or awnings are not allowed.
4 7. Storage of Flammable, Explosive or Corrosive Materials: There shall be no storage of fuel or combustibles and no fueling of vehicles within PG&E’s easement. No trash bins or incinerators are allowed.

8. Streets and Roads: Access to facilities must be maintained at all times. Street lights may be allowed in the fee strip(s) and/or easement(s) but in all cases must be reviewed by PG&E for proper clearance. Roads and utilities should cross the transmission easement as nearly at right angles as possible. Road intersections will not be allowed within the transmission easement.

9. Pipelines: Pipelines may be allowed provided crossings are held to a minimum and to be as nearly perpendicular as possible. Pipelines within 25 feet of PG&E structures require review by PG&E. Sprinklers systems may be allowed; subject to review. Leach fields and septic tanks are not allowed. Construction plans must be submitted to PG&E for review and approval prior to the commencement of any construction.

10. Signs: Signs are not allowed except in rare cases subject to individual review by PG&E.

11. Recreation Areas: Playgrounds, parks, tennis courts, basketball courts, barbecue and light trucks (pickups, vans, etc.) may be allowed; subject to review of plans. Heavy equipment access to PG&E facilities is to be maintained at all times. Parking is to clear PG&E structures by at least 10 feet. Protection of PG&E facilities from vehicular traffic is to be provided at developer’s expense AND to PG&E specifications.

12. Construction Activity: Since construction activity will take place near PG&E’s overhead electric lines, please be advised it is the contractor’s responsibility to be aware of, and observe the minimum clearances for both workers and equipment operating near high voltage electric lines set out in the High-Voltage Electrical Safety Orders of the California Division of Industrial Safety (hƩps://www.dir.ca.gov/Title8/sb5g2.html), as well as any other safety regulations. Contractors shall comply with California Public Utilities Commission General Order 95 (hƩp://www.cpuc.ca.gov/gos/GO95/go_95_startup_page.html) and all other safety rules. No construction may occur within 25 feet of PG&E’s towers. All excavation activities may only commence after 811 protocols has been followed.

Contractor shall ensure the protection of PG&E’s towers and poles from vehicular damage by (installing protective barriers) Plans for protection barriers must be approved by PG&E prior to construction.

13. PG&E is also the owner of distribution facilities throughout many of the areas within the state of California.

Therefore, any plans that impact PG&E’s facilities must be reviewed and approved by PG&E to ensure that no impact occurs that may endanger the safe and reliable operation of its facilities.

Thank you,
Pacific Gas and Electric Company
Plan Review Team
Email: [email protected]
You can read about PG&E’s data privacy practices at PGE.com/privacy.

Plan Review Team
Land Management
[email protected]
PG&E Gas and Electric Facilities Page 1
Internal
April 25, 2025
Laura Friesen
Assistant Planner
Community Development Department
City of Reedley
1733 Ninth Street
Reedley, CA 93654
Ref: Gas and Electric Transmission and Distribution
Dear Laura Friesen,
Thank you for submitting the Annexation 2025-01 project plans for our review. PG&E will review the submitted plans in relationship to any existing Gas and Electric facilities within the project area. If the proposed project is adjacent/or within PG&E owned property and/or easements, we will be working with you to ensure compatible uses and activities near our facilities.

Attached you will find information and requirements as it relates to Gas facilities (Attachment 1) and Electric facilities (Attachment 2). Please review these in detail, as it is critical to ensure your safety and to protect PG&E’s facilities and its existing rights.

Below is additional information for your review:

1. This plan review process does not replace the application process for PG&E gas or electric service your project may require. For these requests, please continue to work with PG&E Service Planning: https://www.pge.com/en/account/servicerequests/building-and-renovation.html.

2. If the project being submitted is part of a larger project, please include the entire scope of your project, and not just a portion of it. PG&E’s facilities are to be incorporated within any CEQA document. PG&E needs to verify that the CEQA document will identify any required future PG&E services.

3. An engineering deposit may be required to review plans for a project depending on the size, scope, and location of the project and as it relates to any rearrangement or new installation of PG&E facilities.

Any proposed uses within the PG&E fee strip and/or easement, may include a California Public Utility Commission (CPUC) Section 851 filing. This requires the CPUC to render approval for a conveyance of rights for specific uses on PG&E’s fee strip or easement. PG&E will advise if the necessity to incorporate a CPUC Section 851filing is required.

This letter does not constitute PG&E’s consent to use any portion of its easement for any purpose not previously conveyed. PG&E will provide a project specific response as required.

Sincerely,
PG&E Gas and Electric Facilities Page 2
Internal
Plan Review Team
Land Management
PG&E Gas and Electric Facilities Page 3
Internal
Attachment 1 – Gas Facilities
There could be gas transmission pipelines in this area which would be considered critical facilities for PG&E and a high priority subsurface installation under California law. Care must be taken to ensure safety and accessibility. So, please ensure that if PG&E approves work near gas transmission pipelines it is done in adherence with the below stipulations. Additionally, the following link provides additional information regarding legal requirements under California excavation laws: https://www.usanorth811.org/images/pdfs/CA-LAW-2018.pdf

1. Standby Inspection: A PG&E Gas Transmission Standby Inspector must be present during any demolition or construction activity that comes within 10 feet of the gas pipeline. This includes all grading, trenching, substructure depth verifications (potholes), asphalt or concrete demolition/removal, removal of trees, signs, light poles, etc. This inspection can be coordinated through the Underground Service Alert (USA) service at 811. A minimum notice of 48 hours is required. Ensure the USA markings and notifications are maintained throughout the duration of your work.

2. Access: At any time, PG&E may need to access, excavate, and perform work on the gas pipeline. Any construction equipment, materials, or spoils may need to be removed upon notice.

Any temporary construction fencing installed within PG&E’s easement would also need to be capable of being removed at any time upon notice. Any plans to cut temporary slopes exceeding a 1:4 grade within 10 feet of a gas transmission pipeline need to be approved by PG&E Pipeline Services in writing PRIOR to performing the work.

3. Wheel Loads: To prevent damage to the buried gas pipeline, there are weight limits that must be enforced whenever any equipment gets within 10 feet of traversing the pipe.

Ensure a list of the axle weights of all equipment being used is available for PG&E’s Standby Inspector. To confirm the depth of cover, the pipeline may need to be potholed by hand in a few areas.

Due to the complex variability of tracked equipment, vibratory compaction equipment, and cranes, PG&E must evaluate those items on a case-by-case basis prior to use over the gas pipeline (provide a list of any proposed equipment of this type noting model numbers and specific attachments).

No equipment may be set up over the gas pipeline while operating. Ensure crane outriggers are at least 10 feet from the centerline of the gas pipeline. Transport trucks must not be parked over the gas pipeline while being loaded or unloaded.

4. Grading: PG&E requires a minimum of 36 inches of cover over gas pipelines (or existing grade if less) and a maximum of 7 feet of cover at all locations. The graded surface cannot exceed a cross slope of 1:4.

5. Excavating: Any digging within 2 feet of a gas pipeline must be dug by hand. Note that while the minimum clearance is only 24 inches, any excavation work within 24 inches of the edge of a pipeline must be done with hand tools. So to avoid having to dig a trench entirely with hand tools, the edge of the trench must be over 24 inches away. (Doing the math for a 24 inch PG&E Gas and Electric Facilities Page 4
Internal
wide trench being dug along a 36 inch pipeline, the centerline of the trench would need to be at least 54 inches [24/2 + 24 + 36/2 = 54] away, or be entirely dug by hand.) Water jetting to assist vacuum excavating must be limited to 1000 psig and directed at a 40° angle to the pipe. All pile driving must be kept a minimum of 3 feet away.

Any plans to expose and support a PG&E gas transmission pipeline across an open excavation need to be approved by PG&E Pipeline Services in writing PRIOR to performing the work.

6. Boring/Trenchless Installations: PG&E Pipeline Services must review and approve all plans to bore across or parallel to (within 10 feet) a gas transmission pipeline. There are stringent criteria to pothole the gas transmission facility at regular intervals for all parallel bore installations.

For bore paths that cross gas transmission pipelines perpendicularly, the pipeline must be potholed a minimum of 2 feet in the horizontal direction of the bore path and a minimum of 24 inches in the vertical direction from the bottom of the pipe with minimum clearances measured from the edge of the pipe in both directions. Standby personnel must watch the locator trace (and every ream pass) the path of the bore as it approaches the pipeline and visually monitor the pothole (with the exposed transmission pipe) as the bore traverses the pipeline to ensure adequate clearance with the pipeline. The pothole width must account for the inaccuracy of the locating equipment.

7. Substructures: All utility crossings of a gas pipeline should be made as close to perpendicular as feasible (90° +/- 15°). All utility lines crossing the gas pipeline must have a minimum of 24 inches of separation from the gas pipeline. Parallel utilities, pole bases, water line ‘kicker blocks’, storm drain inlets, water meters, valves, back pressure devices or other utility substructures are not allowed in the PG&E gas pipeline easement.

If previously retired PG&E facilities are in conflict with proposed substructures, PG&E must verify they are safe prior to removal. This includes verification testing of the contents of the facilities, as well as environmental testing of the coating and internal surfaces. Timelines for PG&E completion of this verification will vary depending on the type and location of facilities in conflict.

8. Structures: No structures are to be built within the PG&E gas pipeline easement. This includes buildings, retaining walls, fences, decks, patios, carports, septic tanks, storage sheds, tanks, loading ramps, or any structure that could limit PG&E’s ability to access its facilities.

9. Fencing: Permanent fencing is not allowed within PG&E easements except for perpendicular crossings which must include a 16 foot wide gate for vehicular access. Gates will be secured with PG&E corporation locks.

10. Landscaping: Landscaping must be designed to allow PG&E to access the pipeline for maintenance and not interfere with pipeline coatings or other cathodic protection systems. No trees, shrubs, brush, vines, and other vegetation may be planted within the easement area.

Only those plants, ground covers, grasses, flowers, and low-growing plants that grow unsupported to a maximum of four feet (4’) in height at maturity may be planted within the easement area.

PG&E Gas and Electric Facilities Page 5
Internal

11. Cathodic Protection: PG&E pipelines are protected from corrosion with an “Impressed Current” cathodic protection system. Any proposed facilities, such as metal conduit, pipes, service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection system must be reviewed and approved by PG&E Corrosion Engineering.

12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas transmission pipelines in order to ensure public awareness of the presence of the pipelines.

With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign that is in direct conflict with proposed developments may be temporarily relocated to accommodate construction work. The pipeline marker must be moved back once construction is complete.

13. PG&E is also the provider of distribution facilities throughout many of the areas within the state of California. Therefore, any plans that impact PG&E’s facilities must be reviewed and approved by PG&E to ensure that no impact occurs which may endanger the safe operation of its facilities.

PG&E Gas and Electric Facilities Page 6
Internal
Attachment 2 – Electric Facilities
It is PG&E’s policy to permit certain uses on a case by case basis within its electric transmission fee strip(s) and/or easement(s) provided such uses and manner in which they are exercised, will not interfere with PG&E’s rights or endanger its facilities. Some examples/restrictions are as follows:

1. Buildings and Other Structures: No buildings or other structures including the foot print and eave of any buildings, swimming pools, wells or similar structures will be permitted within fee strip(s) and/or easement(s) areas. PG&E’s transmission easement shall be designated on subdivision/parcel maps as “RESTRICTED USE AREA – NO BUILDING.”

2. Grading: Cuts, trenches or excavations may not be made within 25 feet of our towers.

Developers must submit grading plans and site development plans (including geotechnical reports if applicable), signed and dated, for PG&E’s review. PG&E engineers must review grade changes in the vicinity of our towers. No fills will be allowed which would impair ground-toconductor clearances. Towers shall not be left on mounds without adequate road access to base of tower or structure.

3. Fences: Walls, fences, and other structures must be installed at locations that do not affect the safe operation of PG&’s facilities. Heavy equipment access to our facilities must be maintained at all times. Metal fences are to be grounded to PG&E specifications. No wall, fence or other like structure is to be installed within 10 feet of tower footings and unrestricted access must be maintained from a tower structure to the nearest street. Walls, fences and other structures proposed along or within the fee strip(s) and/or easement(s) will require PG&E review; submit plans to PG&E Centralized Review Team for review and comment.

4. Landscaping: Vegetation may be allowed; subject to review of plans. On overhead electric transmission fee strip(s) and/or easement(s), plant only low-growing shrubs under the wire zone and only grasses within the area directly below the tower. Along the border of the transmission line right-of-way, plant only small trees no taller than 10 feet in height at maturity. PG&E must have access to its facilities at all times, including access by heavy equipment. No planting is to occur within the footprint of the tower legs. Greenbelts are encouraged.

5. Reservoirs, Sumps, Drainage Basins, and Ponds: Prohibited within PG&E’s fee strip(s) and/or easement(s) for electric transmission lines.

6. Automobile Parking: Short term parking of movable passenger vehicles and light trucks (pickups, vans, etc.) is allowed. The lighting within these parking areas will need to be reviewed by PG&E; approval will be on a case by case basis. Heavy equipment access to PG&E facilities is to be maintained at all times. Parking is to clear PG&E structures by at least 10 feet.

Protection of PG&E facilities from vehicular traffic is to be provided at developer’s expense AND to PG&E specifications. Blocked-up vehicles are not allowed. Carports, canopies, or awnings are not allowed.

7. Storage of Flammable, Explosive or Corrosive Materials: There shall be no storage of fuel or combustibles and no fueling of vehicles within PG&E’s easement. No trash bins or incinerators are allowed.

PG&E Gas and Electric Facilities Page 7
Internal

8. Streets and Roads: Access to facilities must be maintained at all times. Street lights may be allowed in the fee strip(s) and/or easement(s) but in all cases must be reviewed by PG&E for proper clearance. Roads and utilities should cross the transmission easement as nearly at right angles as possible. Road intersections will not be allowed within the transmission easement.

9. Pipelines: Pipelines may be allowed provided crossings are held to a minimum and to be as nearly perpendicular as possible. Pipelines within 25 feet of PG&E structures require review by PG&E. Sprinklers systems may be allowed; subject to review. Leach fields and septic tanks are not allowed. Construction plans must be submitted to PG&E for review and approval prior to the commencement of any construction.

10. Signs: Signs are not allowed except in rare cases subject to individual review by PG&E.

11. Recreation Areas: Playgrounds, parks, tennis courts, basketball courts, barbecue and light trucks (pickups, vans, etc.) may be allowed; subject to review of plans. Heavy equipment access to PG&E facilities is to be maintained at all times. Parking is to clear PG&E structures by at least 10 feet. Protection of PG&E facilities from vehicular traffic is to be provided at developer’s expense AND to PG&E specifications.

12. Construction Activity: Since construction activity will take place near PG&E’s overhead electric lines, please be advised it is the contractor’s responsibility to be aware of, and observe the minimum clearances for both workers and equipment operating near high voltage electric lines set out in the High-Voltage Electrical Safety Orders of the California Division of Industrial Safety (https://www.dir.ca.gov/Title8/sb5g2.html), as well as any other safety regulations.

Contractors shall comply with California Public Utilities Commission General Order 95 (http://www.cpuc.ca.gov/gos/GO95/go_95_startup_page.html) and all other safety rules. No construction may occur within 25 feet of PG&E’s towers. All excavation activities may only commence after 811 protocols has been followed.

Contractor shall ensure the protection of PG&E’s towers and poles from vehicular damage by (installing protective barriers) Plans for protection barriers must be approved by PG&E prior to construction.

13. PG&E is also the owner of distribution facilities throughout many of the areas within the state of California. Therefore, any plans that impact PG&E’s facilities must be reviewed and approved by PG&E to ensure that no impact occurs that may endanger the safe and reliable operation of its facilities.

Pacific Gas and Electric Company
Land Management
April 29, 2025
Laura Friesen
1733 Ninth Street
Reedley, CA 93654
Re: Annexation Application No. 2025-01, General Plan Amendment Application No. 2025-01, Rezone Application No. 2025-01, and Vesting Tentative Subdivision Map No. 6497; APNs 370- 040-10, 370-040-22, 370-040-23, and 370-40-13.

Dear Laura Friesen,
Thank you for providing PG&E the opportunity to review the Annexation Application No. 2025- 01, General Plan Amendment Application No. 2025-01, Rezone Application No. 2025-01, and Vesting Tentative Subdivision Map No. 6497 dated April 24, 2025.

PG&E recommends the following language be expressly stated in the offer of dedication for Public Utility Easements (“PUEs”):

I/We the undersigned, as Owner(s) of the land shown hereon, do hereby state that I/we am/are the only person(s) whose consent is necessary to pass clear title to said land and do hereby consent to the preparation and recordation of this map and offer for dedication and do hereby dedicate for public uses the Public Utility Easements (PUEs) shown on this map for public utility purposes including electric, gas, communication facilities and all other public utility purposes; together with any and all appurtenances thereto, including the right from time to time to trim and to cut down and clear away or otherwise control any trees or brush. The PUEs hereby offered for dedication are to be kept open and free of buildings, or any other structures of any kind.

The final map must contain such a statement setting forth the offer of dedication and such offer must be accepted by the county or municipality. The PUEs must also be of sufficient width, acceptable to PG&E, for PG&E to occupy with its distribution and service facilities. If the county or municipality has declined the offer of dedication, the applicant may be required to grant or secure easements in gross satisfactory to PG&E.

Our review indicates the design and/improvements identified on the map(s) appears to directly interfere with PG&E’s existing facilities and land rights.

There are existing PG&E electric distribution facilities, both overhead and underground within an easement on APN 370-040-10 that is not shown on Tract Map No 6497 (per Document No. 2003- 0264170). These rights shall be retained. No buildings and/or structures are permitted within 5’ feet of either side of said underground facilities and within 16’ of either side of said overhead facilities.

PG&E Gas and Electric Facilities Page 2
To request delineation maps for further review of PG&E’s existing facilities, please submit to the following mailbox for gas maps: [email protected]. For electric maps, submit through PG&E’s JUMP Portal: Joint Use Map Portal. Please note, when a request is submitted, the Delineation Team member will confirm with you if a Nondisclosure Agreement needs to be completed.

For any requests to modify or relocate PG&E existing facilities, or to request gas and/or electric service, please submit an application to PG&E’s Service Planning department through PG&E’s Your Project Portal: Sign In (yourprojects-pge.com).

As a reminder, before any digging or excavation occurs, please contact Underground Service Alert (USA) by dialing 811 a minimum of two (2) working days prior to commencing any work.

This free and independent service will ensure that all existing underground utilities are identified and marked on-site.

If you have any questions regarding this response, please contact me at (925)-359-5882 or [email protected].

Sincerely,
Katy Casner
Land Management
May 8, 2025
Laura Friesen
City of Reedley
Community Development
1733 Ninth Street
Reedley, CA 93654
Project: Annexation Application No. 2025-01, General Plan Amendment Application No. 2025-01, Rezone Application No. 2025-01, Vesting Tentative Subdivision Map No. 6497
District CEQA Reference No: 20250475
Dear Ms. Friesen,
The San Joaquin Valley Air Pollution Control District (District) has reviewed the CEQA Referral Documents from the City of Reedley (City) for the project mentioned above.

Per the documents, the project consists of 166 single family residential lots and a 2-acre retention basin (Project). The Project is located at 9452 S. Buttonwillow Avenue, in Reedley, CA.

The District offers the following comments at this time regarding the Project:

Project Related Emissions
At the federal level under the National Ambient Air Quality Standards (NAAQS), the District is designated as extreme nonattainment for the 8-hour ozone standards and serious nonattainment for the particulate matter less than 2.5 microns in size (PM2.5) standards. At the state level under California Ambient Air Quality Standards (CAAQS), the District is designated as nonattainment for the 8-hour ozone, PM10, and PM2.5 standards.

The District’s initial review of the Project concludes that emissions resulting from construction and/or operation of the Project may exceed any of the following significance thresholds as identified in the District’s Guidance for Assessing and Mitigating Air Quality Impacts: https://ww2.valleyair.org/media/g4nl3p0g/gamaqi.pdf.

The District recommends that a more detailed preliminary review of the Project be conducted for the Project’s construction and operational emissions.

San Joaquin Valley Air Pollution Control District Page 2 of 9 District Reference No: 20250475
May 8, 2025
Construction Emissions
The District recommends, to reduce impacts from construction-related diesel exhaust emissions, the Project should utilize the cleanest available off-road construction equipment.

Operational Emissions
Operational (ongoing) air emissions from mobile sources and stationary sources should be analyzed separately. For reference, the District’s significance thresholds are identified in the District’s Guidance for Assessing and Mitigating Air Quality Impacts:
https://ww2.valleyair.org/media/g4nl3p0g/gamaqi.pdf.

Recommended Mitigation Measure: At a minimum, project related impacts on air quality should be reduced to levels below the District’s significance thresholds through incorporation of design elements such as the use of cleaner Heavy Heavy-Duty (HHD) trucks and vehicles, measures that reduce Vehicle Miles Traveled (VMTs), and measures that increase energy efficiency. More information on transportation mitigation measures can be found at:
https://ww2.valleyair.org/media/ob0pweru/clean-air-measures.pdf Recommended Model for Quantifying Air Emissions
Project-related criteria pollutant emissions from construction and operational sources should be identified and quantified. Emissions analysis should be performed using the California Emission Estimator Model (CalEEMod), which uses the most recent CARB-approved version of relevant emissions models and emission factors. CalEEMod is available to the public and can be downloaded from the CalEEMod website at: www.caleemod.com.

Health Risk Screening/Assessment
The City should evaluate the risk associated with the Project for sensitive receptors (residences, businesses, hospitals, day-care facilities, health care facilities, etc.) in the area and mitigate any potentially significant risk to help limit exposure of sensitive receptors to emissions.

To determine potential health impacts on surrounding receptors (residences, businesses, hospitals, day-care facilities, health care facilities, etc.) a Prioritization and/or a Health Risk Assessment (HRA) should be performed for the Project. These health risk determinations should quantify and characterize potential Toxic Air Contaminants (TACs) identified by the Office of Environmental Health Hazard Assessment/California Air Resources Board (OEHHA/CARB) that pose a present or potential hazard to human health.

San Joaquin Valley Air Pollution Control District Page 3 of 9 District Reference No: 20250475
May 8, 2025
Health risk analyses should include all potential air emissions from the project, which include emissions from construction of the project, including multi-year construction, as well as ongoing operational activities of the project. Note, two common sources of TACs can be attributed to diesel exhaust emitted from heavy-duty off-road earth moving equipment during construction, and from ongoing operation of heavy-duty on-road trucks.

Prioritization (Screening Health Risk Assessment):

A “Prioritization” is the recommended method for a conservative screening-level health risk assessment. The Prioritization should be performed using the California Air Pollution Control Officers Association’s (CAPCOA) methodology. Please contact the District for assistance with performing a Prioritization analysis.

The District recommends that a more refined analysis, in the form of an HRA, be performed for any project resulting in a Prioritization score of 10 or greater. This is because the prioritization results are a conservative health risk representation, while the detailed HRA provides a more accurate health risk evaluation.

Health Risk Assessment:

Prior to performing an HRA, it is strongly recommended that land use agencies/ project proponents develop and submit for District review a health risk modeling protocol that outlines the sources and methodologies that will be used to perform the HRA.

A development project would be considered to have a potentially significant health risk if the HRA demonstrates that the health impacts would exceed the District’s established risk thresholds, which can be found here:
https://ww2.valleyair.org/permitting/ceqa/.

A project with a significant health risk would trigger all feasible mitigation measures.

The District strongly recommends that development projects that result in a significant health risk not be approved by the land use agency.

The District is available to review HRA protocols and analyses. For HRA submittals please provide the following information electronically to the District for review:
• HRA (AERMOD) modeling files
• HARP2 files
• Summary of emissions source locations, emissions rates, and emission factor calculations and methodologies.

San Joaquin Valley Air Pollution Control District Page 4 of 9 District Reference No: 20250475
May 8, 2025
For assistance, please contact the District’s Technical Services Department by:
• E-Mailing inquiries to: [email protected]
• Calling (559) 230-5900
Recommended Measure: Development projects resulting in TAC emissions should be located an adequate distance from residential areas and other sensitive receptors to prevent the creation of a significant health risk in accordance to CARB's Air Quality and Land Use Handbook: A Community Health Perspective located at https://ww2.arb.ca.gov/our-work/programs/resource-center/strategydevelopment/land-use-resources.

Ambient Air Quality Analysis
An Ambient Air Quality Analysis (AAQA) uses air dispersion modeling to determine if emissions increases from a project will cause or contribute to a violation of State or National Ambient Air Quality Standards. The District recommends an AAQA be performed for the Project if emissions exceed 100 pounds per day of any pollutant.

An AAQA uses air dispersion modeling to determine if emission increase from a project will cause or contribute to a violation of State or National Ambien Air Quality Standards. An acceptable analysis would include emissions from both projectspecific permitted and non-permitted equipment and activities. The District recommends consultation with District staff to determine the appropriate model and input data to use in the analysis.

Specific information for assessing significance, including screening tools and modeling guidance, is available online at the District’s website:
https://ww2.valleyair.org/permitting/ceqa/.

Voluntary Emission Reduction Agreement
Criteria pollutant emissions may result in emissions exceeding the District’s significance thresholds, potentially resulting in a significant impact on air quality.

When a project is expected to have a significant impact, the District recommends the environmental review also include a discussion on the feasibility of implementing a Voluntary Emission Reduction Agreement (VERA) for this Project.

A VERA is a mitigation measure by which the project proponent provides pound-forpound mitigation of emissions increases through a process that develops, funds, and implements emission reduction projects, with the District serving a role of administrator of the emissions reduction projects and verifier of the successful mitigation effort. To implement a VERA, the project proponent and the District enter into a contractual agreement in which the project proponent agrees to mitigate project specific emissions by providing funds for the District’s incentives programs.

San Joaquin Valley Air Pollution Control District Page 5 of 9 District Reference No: 20250475
May 8, 2025
The funds are disbursed by the District in the form of grants for projects that achieve emission reductions. Thus, project-related impacts on air quality can be mitigated.

Types of emission reduction projects that have been funded in the past include electrification of stationary internal combustion engines (such as agricultural irrigation pumps), replacing old heavy-duty trucks with new, cleaner, more efficient heavy-duty trucks, and replacement of agricultural equipment with the latest generation technologies.

In implementing a VERA, the District verifies the actual emission reductions that have been achieved as a result of completed grant contracts, monitors the emission reduction projects, and ensures the enforceability of achieved reductions. After the project is mitigated, the District certifies to the Lead Agency that the mitigation is completed, providing the Lead Agency with an enforceable mitigation measure demonstrating that project-related emissions have been mitigated. To assist the Lead Agency and project proponent in ensuring that the environmental document is compliant with CEQA, the District recommends the environmental document includes an assessment of the feasibility of implementing a VERA.

Vegetative Barriers and Urban Greening
There are residential units located near the Project and a middle school (Silas Bartsch School) located east of the Project. The District suggests the City consider the feasibility of incorporating vegetative barriers and urban greening as a measure to further reduce air pollution exposure on sensitive receptors (e.g., residential units and school).

While various emission control techniques and programs exist to reduce air quality emissions from mobile and stationary sources, vegetative barriers have been shown to be an additional measure to potentially reduce a population’s exposure to air pollution through the interception of airborne particles and the update of gaseous pollutants. Examples of vegetative barriers include, but are not limited to the following: trees, bushes, shrubs, or a mix of these. Generally, a higher and thicker vegetative barrier with full coverage will result in greater reductions in downwind pollutant concentrations. In the same manner, urban greening is also a way to help improve air quality and public health in addition to enhancing the overall beautification of a community with drought tolerant, low-maintenance greenery.

Clean Lawn and Garden Equipment in the Community
Since the Project consists of residential development, gas-powered residential lawn and garden equipment have the potential to result in an increase of NOx and PM2.5 emissions. Utilizing electric lawn care equipment can provide residents with immediate economic, environmental, and health benefits. The District recommends the Project proponent consider the District’s Clean Green Yard Machines (CGYM) program which provides incentive funding for replacement of existing gas powered San Joaquin Valley Air Pollution Control District Page 6 of 9 District Reference No: 20250475
May 8, 2025
lawn and garden equipment. More information on the District CGYM program and funding can be found at: https://ww2.valleyair.org/grants/clean-green-yardmachines-residential/ On-Site Solar Deployment
It is the policy of the State of California that renewable energy resources and zerocarbon resources supply 100% of retail sales of electricity to California end-use customers by December 31, 2045. While various emission control techniques and programs exist to reduce air quality emissions from mobile and stationary sources, the production of solar energy is contributing to improving air quality and public health. The District suggests that the City consider incorporating solar power systems as an emission reduction strategy for the Project.

District Rules and Regulations
The District issues permits for many types of air pollution sources, and regulates some activities that do not require permits. A project subject to District rules and regulations would reduce its impacts on air quality through compliance with the District’s regulatory framework. In general, a regulation is a collection of individual rules, each of which deals with a specific topic. As an example, Regulation II (Permits) includes District Rule 2010 (Permits Required), Rule 2201 (New and Modified Stationary Source Review), Rule 2520 (Federally Mandated Operating Permits), and several other rules pertaining to District permitting requirements and processes.

The list of rules below is neither exhaustive nor exclusive. Current District rules can be found online at: https://ww2.valleyair.org/rules-and-planning/current-district-rulesand-regulations. To identify other District rules or regulations that apply to future projects, or to obtain information about District permit requirements, the project proponents are strongly encouraged to contact the District’s Small Business Assistance (SBA) Office at (559) 230-5888.

District Rules 2010 and 2201 - Air Quality Permitting for Stationary Sources
Stationary Source emissions include any building, structure, facility, or installation which emits or may emit any affected pollutant directly or as a fugitive emission. District Rule 2010 (Permits Required) requires operators of emission sources to obtain an Authority to Construct (ATC) and Permit to Operate (PTO) from the District. District Rule 2201 (New and Modified Stationary Source Review) requires that new and modified stationary sources of emissions mitigate their emissions using Best Available Control Technology (BACT).

San Joaquin Valley Air Pollution Control District Page 7 of 9 District Reference No: 20250475
May 8, 2025
This Project may be subject to District Rule 2010 (Permits Required) and Rule 2201 (New and Modified Stationary Source Review) and may require District permits. Prior to construction, the Project proponent should submit to the District an application for an ATC. For further information or assistance, the project proponent may contact the District’s SBA Office at (559) 230-5888.

District Rule 9510 - Indirect Source Review (ISR)
The Project is subject to District Rule 9510 because it will receive a projectlevel discretionary approval from a public agency and will equal or exceed 50 residential units.

The purpose of District Rule 9510 is to reduce the growth in both NOx and PM emissions associated with development and transportation projects from mobile and area sources; specifically, the emissions associated with the construction and subsequent operation of development projects. The ISR Rule requires developers to mitigate their NOx and PM emissions by incorporating clean air design elements into their projects. Should the proposed development project clean air design elements be insufficient to meet the required emission reductions, developers must pay a fee that ultimately funds incentive projects to achieve off-site emissions reductions.

Per Section 5.0 of the ISR Rule, an Air Impact Assessment (AIA) application is required to be submitted no later than applying for project-level approval from a public agency. As of the date of this letter, the District has not received an AIA application for this Project. Please inform the project proponent to immediately submit an AIA application to the District to comply with District Rule 9510 so that proper mitigation and clean air design under ISR can be incorporated into the Project’s design.

Information about how to comply with District Rule 9510 can be found online at:
https://ww2.valleyair.org/permitting/indirect-source-review-rule-overview The AIA application form can be found online at:
https://ww2.valleyair.org/permitting/indirect-source-review-rule-overview/formsand-applications/ District staff is available to provide assistance and can be reached by phone at (559) 230-5900 or by email at [email protected].

San Joaquin Valley Air Pollution Control District Page 8 of 9 District Reference No: 20250475
May 8, 2025
District Rule 4002 (National Emissions Standards for Hazardous Air Pollutants)
In the event an existing building will be renovated, partially demolished or removed, the Project may be subject to District Rule 4002. This rule requires a thorough inspection for asbestos to be conducted before any regulated facility is demolished or renovated. Information on how to comply with District Rule 4002 can be found online at: https://ww2.valleyair.org/compliance/demolitionrenovation/ District Rule 4601 (Architectural Coatings)
The Project may be subject to District Rule 4601 since it is expected to utilize architectural coatings. Architectural coatings are paints, varnishes, sealers, or stains that are applied to structures, portable buildings, pavements or curbs.

The purpose of this rule is to limit VOC emissions from architectural coatings.

In addition, this rule specifies architectural coatings storage, cleanup and labeling requirements. Additional information on how to comply with District Rule 4601 requirements can be found online at:
https://ww2.valleyair.org/media/tkgjeusd/rule-4601.pdf
District Regulation VIII (Fugitive PM10 Prohibitions)
The project proponent may be required to submit a Construction Notification Form or submit and receive approval of a Dust Control Plan prior to commencing any earthmoving activities as described in Regulation VIII, specifically Rule 8021 – Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities.

Should the project result in at least 1-acre in size, the project proponent shall provide written notification to the District at least 48 hours prior to the project proponents intent to commence any earthmoving activities pursuant to District Rule 8021 (Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities). Also, should the project result in the disturbance of 5- acres or more, or will include moving, depositing, or relocating more than 2,500 cubic yards per day of bulk materials, the project proponent shall submit to the District a Dust Control Plan pursuant to District Rule 8021 (Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities). For additional information regarding the written notification or Dust Control Plan requirements, please contact District Compliance staff at (559) 230-5950.

The application for both the Construction Notification and Dust Control Plan can be found online at: https://ww2.valleyair.org/media/fm3jrbsq/dcp-form.docx San Joaquin Valley Air Pollution Control District Page 9 of 9 District Reference No: 20250475
May 8, 2025
Information about District Regulation VIII can be found online at:
https://ww2.valleyair.org/dustcontrol
District Rule 4901 - Wood Burning Fireplaces and Heaters The purpose of this rule is to limit emissions of carbon monoxide and particulate matter from wood burning fireplaces, wood burning heaters, and outdoor wood burning devices. This rule establishes limitations on the installation of new wood burning fireplaces and wood burning heaters.

Specifically, at elevations below 3,000 feet in areas with natural gas service, no person shall install a wood burning fireplace, low mass fireplace, masonry heater, or wood burning heater.

Information about District Rule 4901 can be found online at:
https://ww2.valleyair.org/compliance/residential-wood-smoke-reductionprogram/ Other District Rules and Regulations
The Project may also be subject to the following District rules: Rule 4102 (Nuisance) and Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance Operations).

District Comment Letter
The District recommends that a copy of the District’s comments be provided to the Project proponent.

If you have any questions or require further information, please contact Ryan Grossman by e-mail at [email protected] or by phone at (559) 230-6569.

Sincerely,
For Mark Montelongo
Director of Policy and Government Affairs
Project Description: 166
Address: 370-040-10
Transportation Facilities $6,080.47 per unit x 166 units = $1,009,358.02 Law Enforcement Facilities $134.70 per unit x 166 units = $22,360.20 Fire Protection Facilities $1,181.13 per unit x 166 units = $196,067.58 General Government Facilities $77.52 per unit x 166 units = $12,868.32 Storm Drainage Facilities $3,772.25 per unit x 166 units = $626,193.50 Wastewater Facilities $2,620.74 per unit x 166 units = $435,042.84 Water Facilities $2,746.69 per unit x 166 units = $455,950.54 Park and Recreational Facilities $7,306.07 per unit x 166 units = $1,212,807.62 Total Development Impact Fees: $23,919.57 per unit x 166 units = $3,970,648.62 Notes:

Date Prepared:

October 7, 2025

4. This estimate is only for the City of Reedley Development Impact Fees and does not include Building Permit Fees or any fees for other City Departments or other jurisdictions (Kings Canyon Unified School District, County Impact Fees, RTMF Joint Powers Agency, San Joaquin Valley Air Pollution Control District, etc.)

3. Development Impact Fees are paid at the time of building permit issuance.

Development Impact Fee Detail by Infrastructure Service Type:

2. The estimated fees are based upon information provided by the applicant and calculated using the City of Reedley Master Fee Schedule in place at the time of the estimate request. The Master Fee Schedule is reviewed annually by the City Council and is subject to change. All fees shall be subject to automatic Consumer Price Index adjustment prior to June 30th of every year.

1. The Expansion Area is defined as the area outside of the current city limit as of August 27, 2022 and within the approved 2030 General Plan SOI as of August 27, 2022.

Community Development Department
1733 Ninth Street
Reedley, CA 93654
(559) 637-4200
Development Impact Fees (DIF) Estimate:

Single Family
Residential (SFR)
Expansion Area
Single Family Homes (VTSM 6497)
9452 S. Buttonwillow Avenue APN:

PETITION AND WAIVER

REGARDING PROCEEDINGS FOR ANNEXATION OF TERRITORY TO A

COMMUNITY FACILITIES DISTRICT
To the Honorable City Council
City of Reedley
1733 9
th Street
Reedley, CA 93654
Re: Community Facilities District No. 2005-1 (Public Services) Annexation No. 24
Members of the City Council:

The undersigned is the owner (or duly authorized representative thereof) of all of the real property identified below and hereby requests that the City of Reedley (the “City”) institute proceedings to annex territory, including the property identified below, to the City’s Community Facilities District No. 2005-1 (Public Services) (the “CFD”) pursuant to the Mello-Roos Community Facilities Act of 1982, as amended (Sections 53311, et seq., California Government Code) (the “Act”), and hereby respectfully petitions and shows as follows:

1. The property identified below be annexed to the CFD, that a map of the annexation boundaries will be filed with the City Clerk, and that you take all steps necessary to complete the annexation to the CFD and to levy a special tax therein for the purpose of financing certain public improvements (and public services) previously approved for the CFD (the “Facilities”) (and the “Services”), all as more particularly specified in the proceedings for the creation of the CFD and the levy of the special tax.

2. To proceed as quickly as possible with the annexation to the CFD, the levy of said special tax, and it being further understood that, there being fewer than twelve registered voters residing within the area to be annexed to the CFD, the undersigned being the only expected qualified elector(s) for the annexation, hereby waives all otherwise applicable time periods for the election and notices of the conduct by you of the election under the Act, including all ballot arguments and analysis under the Act.

3. In furtherance of this waiver, the election may be conducted by mailed or hand delivered ballot to be returned as quickly as possible to the City Clerk of the City and that the results of said election be canvassed and reported to you as soon as possible.

Respectfully submitted as of this _____ day of _____________, 2026 by:

The properties that are the subject of this
Petition are Fresno County Assessor Parcel
No(s):
370-040-10
Name of owner of Record:

Craig Tasdashi Ito
Janet Ito Kamada
and the property contains a total of
approximately 34.73 acres
By:
__________________________
Its: _______________________
Craig Tasdashi Ito
Janet Ito Kamada
The address of the above owner for
purposes of Receiving all notices and
ballots is:

Craig Tasdashi Ito
Janet Ito Kamada
PO Box 707
Reedley, CA 93654
Proposed Boundary
The map below shows APN(s) 370-040-10 to be annexed into Community Facilities District No. 2005-1 (Public Services).

DRAFT INITIAL STUDY AND

MITIGATED NEGATIVE DECLARATION

VESTING TENTATIVE SUBDIVISION

MAP NO. 6497 – WESTHAVEN 2 PROJECT

REEDLEY, CALIFORNIA

AUGUST 2025

DRAFT INITIAL STUDY

VESTING TENTATIVE SUBDIVISION
MAP NO. 6497 – WESTHAVEN 2 PROJECT

Prepared for:
‹–› ‘ˆ ‡‡†Ž‡›
ͳ͹ͳ͹ ͻ–Š –”‡‡–
‡‡†Ž‡›ǡ  ͻ͵͸ͷͶ
‘–ƒ
– ‡”•‘ǣ ‘†‡› Ǥ
‘”–‘ǡ
‘—‹–› ‡˜‡Ž‘’‡– ‹”‡
–‘”

Š‘‡ǣ ሺͷͷͻሻ ͸͵͹ǦͶʹͲͲ
‘•—Ž–ƒ–ǣ
ƒšǣ ሺͷͷͻሻ ͹͵͵Ǧ͹ͺʹͳ
—‰—•– ʹͲʹͷ
”‘Œ‡
– ͓ʹͶͲʹʹ͹
ͷͲͺͲ ƒŽ‹ˆ‘”‹ƒ ˜‡—‡ǡ —‹–‡ ʹʹͲ
ƒ‡”•ˆ‹‡Ž†ǡ  ͻ͵͵Ͳͻ
‘–ƒ
–ǣ
ƒ›‹‡ Ǥ ”ƒ—‡”
Š‘‡ǣ ሺ͸͸ͳሻ ͸ͳ͸Ǧʹ͸ͲͲ

NOTICE OF PUBLIC HEARING AND INTENT TO ADOPT A MITIGATED NEGATIVE

DECLARATION
Š‹• ‹• –‘ ƒ†˜‹•‡ –Šƒ– –Ї ‹–› ‘ˆ ‡‡†Ž‡› ‘—‹–› ‡˜‡Ž‘’‡– ‹˜‹•‹‘ Šƒ• ’”‡’ƒ”‡† ƒ ‹–‹‰ƒ–‡† ‡‰ƒ–‹˜‡ ‡
Žƒ”ƒ–‹‘ ˆ‘” –Ї ”‘Œ‡
– ‹†‡–‹ˆ‹‡† „‡Ž‘™ –Šƒ– ‹• •
Ї†—އ† –‘ „‡ Їƒ”†
ƒ– –Ї ‹–› ‘ˆ ‡‡†Ž‡› Žƒ‹‰ ‘‹••‹‘ ‡‡–‹‰ ‘ Š—”•†ƒ›ǡ  –‘„‡” ͳ͸ǡ ʹͲʹͷǤ
  
 –Šƒ– –Ї ‹–› ‘ˆ ‡‡†Ž‡› ™‹ŽŽ
‘•‹†‡” –Ї ‹–‹‰ƒ–‡† ‡‰ƒ–‹˜‡
‡
Žƒ”ƒ–‹‘ ƒ– –Ї Žƒ‹‰ ‘‹••‹‘ ‡‡–‹‰ –‘ „‡ Їކ ‘  –‘„‡” ͳ͸ǡ ʹͲʹͷǤ
”‡•‡–ƒ–‹‘• ™‹ŽŽ „‡ ƒ†‡ ƒ– ƒ’’”‘š‹ƒ–‡Ž› ͷǣͲͲ Ǥ 
–‹‘ ‘ ‹–‡• ‘ –Ї Žƒ‹‰
‘‹••‹‘ ƒ‰‡†ƒ ™‹ŽŽ ‘

—” ƒˆ–‡” –Ї ’”‡•‡–ƒ–‹‘•Ǥ Ї ‡‡–‹‰ ™‹ŽŽ „‡ Їކ ‹ –Ї ‡‡†Ž‡›  Šƒ„‡”• Ž‘
ƒ–‡† ƒ– ͳ͹ͳ͹ ͻ–Š –”‡‡–ǡ ‡‡†Ž‡›ǡ  ͻ͵͸ͷͶǤ Ї ‹–› ‘ˆ ‡‡†Ž‡›
‹–›
‹–› 
‘—
‹Ž
‘—
‹Ž ™‹ŽŽ –ƒ‡ ˆ‹ƒŽ ƒ
–‹‘ –‘ ƒ’’”‘˜‡ ‘” †‡› ƒ ‡‡ ”ƒŽ Žƒ ‡†‡–
—’‘ ”‡
‘‡†ƒ–‹‘ „› –Ї Žƒ‹‰ ‘‹••‹‘Ǥ  ’—„Ž‹
Їƒ”‹‰ ˆ‘” –Ї ‹–› ‘—
‹Ž
•ŠƒŽŽ „‡ Їކ ƒ– ƒ Žƒ–‡” †ƒ–‡Ǥ
Project Name
‡•–‹‰ ‡–ƒ–‹˜‡ —„†‹˜‹•‹‘ ƒ’ ‘Ǥ ͸Ͷͻ͹ Ǧ ‡•–Šƒ˜‡ ʹ ”‘Œ‡ –
Project Location
Ї ’”‘’‘•‡† ”‘Œ‡
– ‹• Ž‘
ƒ–‡† ‘ ƒ —†‡˜‡Ž‘’‡† ͵ͶǦ‡–Ǧƒ
”‡ ’ƒ”
‡Ž ™‹–Š‹
—‹
‘”’‘”ƒ–‡† ”‡•‘ ‘—–›ǡ ‹‡†‹ƒ–‡Ž› ƒ†Œƒ
‡– –‘ –Ї
‹–› ‘ˆ ‡‡†Ž‡›
‘”’‘”ƒ–‡ Ž‹‹–•
ሺ••‡••‘”ǯ• ƒ”
‡Ž —„‡” ሾሿ ͵͹ͲǦͲͶͲǦͳͲሻǤ Ї ”‘Œ‡
– •‹–‡ ‹• ‰‡‡”ƒŽŽ› „‘—†‡† „›
ˆ—–—”‡ ƒ•– ‘”–Š ˜‡—‡ –‘ –Ї ‘”–Šǡ ‘—–Š —––‘™‹ŽŽ‘™ ˜‡—‡ –‘ –Ї ‡ƒ•–ǡ ƒ Š‘ ‹•–ƒ
”‡•‹†‡–‹ƒŽ •—„†‹˜‹•‹‘ –‘ –Ї •‘—–Šǡ ƒ† —––‘™‹ŽŽ‘™ ‹– Š –‘ –Ї ™‡•–Ǥ Ї •‹–‡ ‹• Ž‘
ƒ–‡†
™‹–Š‹ –Ї ‡‡†Ž‡›ǡ ƒŽ‹ˆ‘”‹ƒǡ ‹–‡† –ƒ–‡• ‡‘Ž‘‰ ‹
ƒŽ —”˜‡› ሺ
ሻ ͹ǤͷǦ‹—–‡
–‘’‘‰”ƒ’Š‹
ƒ’ǡ ‡
–‹‘ ʹͷǡ ‘™•Š‹’ ͳͷ ‘—–Šǡ ƒ‰‡ ʹ͵ ƒ•–ǡ ‘—– ‹ƒ„Ž‘ ƒ•‡ ƒ† ‡”‹†‹ƒ ሺƬሻǤ

– ‹• •‹–—ƒ–‡† ƒ’’”‘š‹ƒ–‡Ž› ‹‡ ‹Ž‡• ‘”–Їƒ•– ‘ˆ –ƒ–‡ ‘—–‡ ሺሻ ͻͻ ƒ† ‡‹‰Š– ‹Ž‡• •‘—–Š ‘ˆ ǦͳͺͲǤ ‡‰‹‘ƒŽ ƒ

‡•• –‘ –Ї ”‘Œ‡
– •‹–‡ ‹• ƒ˜ƒ‹Žƒ„އ „› Ǧͻͻ ƒ† ǦͳͺͲǤ ‘
ƒŽ ƒ

॥
–‘ –Ї ”‘Œ‡
– •‹–‡ ™‘—ކ „‡ ’”‘˜‹†‡† ˜‹ƒ ‘—–Š —––‘™‹ŽŽ‘™ ˜‡—‡ ƒ† ƒ•– ‘”–Š ˜‡—‡Ǥ Project Description
Ї ”‘Œ‡
– ’”‘’‘•‡• –Ї †‡˜‡Ž‘’‡– ‘ˆ ͳ͸͸ •‹‰Ž‡Ǧˆƒ‹Ž› Ž‘–• ƒ˜‡”ƒ‰‹‰ ͷǡͷ͸ͳ •“—ƒ”‡ ˆ‡‡– ’‡” Ž‘–ǡ †‡˜‡Ž‘’‡– ‘ˆ ƒ ‘Ǧ•‹–‡ •–‘” †”ƒ‹ „ƒ•‹ǡ ƒ† •‡˜‡ ‘—–Ž‘–• ‘˜‡” –™‘ ’Šƒ•‡•Ǥ Šƒ•‡ ͳ ™‘—ކ
‘•‹•– ‘ˆ ƒ’’”‘š‹ƒ–‡Ž› ͳͻǤͷ͹ ƒ
”‡• ƒ† †‡˜‡Ž‘’ ͺͻ Ž‘–•ǡ ˆ‹˜‡ ‘—–Ž‘–•ǡ ƒ† –Ї
‘Ǧ•‹–‡ •–‘” †”ƒ‹ „ƒ•‹Ǥ Šƒ•‡ ʹ ™‘—ކ
‘•‹•– ‘ˆ –Ї ”‡ƒ‹‹‰ ͳͶǤͶͳ ƒ
”‡• ƒ† †‡˜‡Ž‘’
͹͹ Ž‘–• ƒ† –™‘ ‘—–Ž‘–•ǡ ‘‡ ‘ˆ ™Š‹
Š ‹• ƒ •–‘” †”ƒ‹ „ƒ•‹Ǥ Ǧ ƒ† ‘ˆˆǦ•‹–‡ ‹’”‘˜‡‡–•ǡ ‹
Ž—†‹‰
‹”
—Žƒ–‹‘ ”‘ƒ†•ǡ ‹–‡”‹‘” Ž‘
ƒŽ •–”‡‡–•ǡ
—”„ǡ ‰—––‡”ǡ •‹†‡™ƒŽǡ ‘’‡ •’ƒ
‡ǡ ƒ†
Žƒ†•
ƒ’‹‰ǡ ƒ”‡ ’”‘’‘•‡† ƒ• ’ƒ”– ‘ˆ –Ї ”‘Œ‡
–Ǥ • ƒ ’ƒ”– ‘ˆ –Ї ”‘Œ‡
–ǡ –Ї —––‘™‹ŽŽ‘™
‹–
Š ™‹ŽŽ „‡ —†‡”‰”‘—†‡† ’‡” ‹–› ”‡“—‹”‡‡–•Ǥ

Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ™‹–Š‹ –Ї ‹–›ǯ• ’Ї”‡ ‘ˆ
ˆŽ—‡
‡ ሺ
ሻ ƒ† Šƒ• ƒ ’Žƒ‡† Žƒ†
—•‡ †‡•‹‰ƒ–‹‘ ‘ˆ ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽ ሺͶǦͺ †™‡ŽŽ‹‰ —‹–• ’‡” ƒ ”‡ ሾ†—Ȁƒ
”‡ሿሻ ƒ†
‹‰Š
‡•‹–› ‡•‹†‡–‹ƒŽ ሺͳͷǦʹͻ †—Ȁƒ
”‡ሻ ’—”•—ƒ– –‘ –Ї ‡‡†Ž‡› ʹͲ͵Ͳ
‡‡”ƒŽ ŽƒǤ Ї •‹–‡ ‹•
œ‘‡† ‹‹–‡† ‰”‹
—Ž–—”ƒŽ ሺǦʹͲሻ ƒ

‘”†‹‰ –‘ –Ї ‘—–› ‘ˆ ”‡•‘ œ‘‹‰ ƒ’Ǥ Ї
”‘Œ‡
– ’”‘’‘•‡• –‘ ƒ‡† –Ї ’Žƒ‡† Žƒ† —•‡ †‡•‹‰ƒ–‹‘ ‘ˆ ƒ ƒ’’”‘š‹ƒ–‡Ž› ͵ǤͷǦ ’‘”–‹‘ ‘ˆ –Ї ”‘Œ‡
– •‹–‡ ˆ”‘
‹‰Š ‡•‹–› ‡•‹†‡–‹ƒŽ –‘ ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽǤ
ƒ
”‡
††‹–‹‘ƒŽŽ›ǡ –Ї ”‘Œ‡
– ’”‘’‘•‡• –‘ ’”‡Ǧœ‘‡ –Ї ”‘Œ‡
– •‹–‡ ƒ† –Ї –Š”‡‡ ”—”ƒŽ ”‡•‹†‡–‹ƒŽ
’ƒ”
‡Ž• –‘ –Ї ‘”–Š™‡•–ǡ • ͵͹ͲǦͲͶͲǦͳ͵ǡ ͵͹ͲǦͲͶͲǦʹʹǡ ƒ† ͵͹ͲǦͲͶͲǦʹ͵ǡ –‘ –Ї ǦͳǦ͸ ሺ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽሻ œ‘‡ †‹•–”‹
– ‹ ’”‡’ƒ”ƒ–‹‘ ˆ‘” ƒ‡šƒ–‹‘ ‘ˆ –Ї ’ƒ”
‡Ž•
‘•‹•–‡–
™‹–Š –Ї ‡‡†Ž‡› ʹͲ͵Ͳ
‡‡”ƒŽ ŽƒǤ Ї ƒ‡šƒ–‹‘ ”‡“—‡•– ™‘—ކ ”‡‘˜‡ –Ї ƒ”‡ƒ ˆ”‘ –Ї ”‡•‘ ‘—–› ‹”‡ ”‘–‡
–‹‘ ‹•–”‹
– ƒ† –Ї ‹‰• ‹˜‡” ‘•‡”˜ƒ–‹‘ ‹•–”‹
– •‡”˜‹
‡
„‘—†ƒ”‹‡•Ǥ ‘” ’—”’‘•‡• ‘ˆ –Ї  ƒƒŽ›•‹•ǡ –Ї•‡ –Š”‡‡ ’”‘’‡”–‹‡• ƒ”‡ ‘Ž› ‘•‹†‡”‡†
ˆ‘” ƒ‡šƒ–‹‘ ‹–‘ –Ї
‹–› Ž‹‹–•Ǥ Ї”‡ ‹• ‘ ‡™ †‡˜‡Ž‘’‡– ‘”
Šƒ‰‡ ‹ Žƒ† —•‡
’”‘’‘•‡† ‘ –Ї•‡ ’”‘’‡”–‹‡•ǡ ƒ† –Ї› ƒ”‡
‘•‹†‡”‡† –‘ „‡ ƒ ’ƒ”– ‘ˆ –Ї „ƒ•‡Ž‹‡Ǥ
ƒ–‡”ǡ •‡™‡”ǡ •‘Ž‹† ™ƒ•–‡ǡ ƒ† •–‘” †”ƒ‹ƒ‰‡ —–‹Ž‹–‹‡• ™‹ŽŽ „‡ ’”‘˜‹†‡† „› –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ އ
–”‹
‹–› ™‹ŽŽ „‡ ’”‘˜‹†‡† „› ƒ
‹ˆ‹

ƒ• ƒ† އ
–”‹
ƒ† ƒ–—”ƒŽ ‰ƒ• ™‹ŽŽ „‡
’”‘˜‹†‡† „› ‘—–Ї” ƒŽ‹ˆ‘”‹ƒ ƒ•Ǥ
‘•–”—
–‹‘ ‘ˆ –Ї ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– ™‘—ކ ‘

—” ‘˜‡” ƒ ƒš‹— ‘ˆ Ͷͺ ‘–Š•Ǥ
–
‹• ƒ–‹
‹’ƒ–‡† –Šƒ– –Ї ˆ‘ŽŽ‘™‹‰ ’‹‡
‡• ‘ˆ ‡“—‹’‡– ™‘—ކ „‡ —•‡† †—”‹‰
‘•–”—
–‹‘
ƒ
–‹˜‹–‹‡•ǣ
x ‘ŽŽ‡”
x ‘ƒ†‡† –”—
•
x š
ƒ˜ƒ–‘”
x ‡‡”ƒ–‘”
x ‡”˜‹
‡ –”—

x ‹”
‘’”‡••‘”
–‹–އ‡–• ƒ† ’’”‘˜ƒŽ•ǣ
x
‡‡”ƒŽ Žƒ ‡†‡– ’’Ž‹
ƒ–‹‘ ‘Ǥ ʹͲʹͷǦͲͳ
x ‡œ‘‡ ’’Ž‹
ƒ–‹‘ ‘Ǥ ʹͲʹͷǦͲͳ
x ‡•–‹‰ ‡–ƒ–‹˜‡ ”ƒ
– ƒ’ ‘Ǥ ͸Ͷͻ͹
x ‡šƒ–‹‘ ‘ˆ –Ї †‡•
”‹„‡† ’”‘’‡”–‹‡• ‹–‘ –Ї ‹–› „›  ‘ –Š”‘—‰Š ‡šƒ–‹‘ ’’Ž‹
ƒ–‹‘ ‘Ǥ ʹͲʹͷǦͲͳ
Ї †‘
—‡– ƒ† †‘
—‡–• ”‡ˆ‡”‡
‡† ‹ –Ї
‹–‹ƒŽ –—†›Ȁ‹–‹‰ƒ–‡† ‡‰ƒ–‹˜‡
‡
Žƒ”ƒ–‹‘ ƒ”‡ ƒ˜ƒ‹Žƒ„އ ˆ‘” ”‡˜‹‡™ ƒ– –Ї ‹–› ‘ˆ ‡‡†Ž‡› ‘—‹–› ‡˜‡Ž‘’‡– ‡’ƒ”–‡–ǡ Ž‘
ƒ–‡† ƒ– ͳ͹ͳ͹ ͻ–Š –”‡‡–ǡ ‡‡†Ž‡›ǡ  ͻ͵͸ͷͶǤ
• ƒ†ƒ–‡† „› –Ї ƒŽ‹ˆ‘”‹ƒ ˜‹”‘‡–ƒŽ —ƒŽ‹–› 
– ሺሻǡ –Ї ’—„Ž‹
”‡˜‹‡™ ’‡”‹‘†
ˆ‘” –Š‹• †‘
—‡– ™ƒ• ͵Ͳ †ƒ›• ሺ ‡
–‹‘ ͳͷͲ͹͵ሾ„ሿሻǤ Ї ’—„Ž‹
”‡˜‹‡™ ’‡”‹‘† ‹• —‰—•–
ͳͻǡ ʹͲʹͷǡ ƒ† ‡†• ‘ ‡’–‡„‡” ͳͺǡ ʹͲʹͷǤ ‘” ˆ—”–Ї” ‹ˆ‘”ƒ–‹‘ǡ ’އƒ•‡ ‘–ƒ
– ‘†‡›
Ǥ
‘”–‘ǡ  ƒ– ͷͷͻǦ͸͵͹ǦͶʹͲͲǡ š–Ǥ ʹͺ͸ǡ ‘” ”‘†‡›ǤŠ‘”–‘̷”‡‡†Ž‡›Ǥ ƒǤ‰‘˜Ǥ
Table of Contents
‹•– ‘ˆ
” •  ” ‹‘•  ƒ† ‡˜‹ƒ– ‘› „„ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ‹˜ ‹– † ƒ– ‡
Žƒ”ƒ– ‹‰ƒ–‡ ‹˜‡ ‡‰ ‹‘ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͳ  
ͳ
” —
‘   – –‹ Ǧ ‘† ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͳ ͳǦ ͳ ˜‡”˜‹‡™ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ

ʹ ƒŽ‹ˆ‘”‹ƒ ˜‹”‘‡–ƒŽ —ƒŽ‹–› 
–ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ

Ǥ
Ǥ
Ǥ͵
Ǧ
Ǧ
Ǧ
’ƒ
– ‡”‹‘Ž‘‰›ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ Ǧ
Ǧ
Ǧ
ͳ
ͳ
ͳ

Ͷ ‘
—‡– ”‰ƒ‹œƒ–‹‘ ƒ† ‘–‡–•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ

ͳ
ͳ
ͳ
ͳ
ͳ
Ǥ
Ǥͷ
Ǧ
Ǧ

‘”’‘”ƒ–‡† „› ‡ˆ‡”‡
‡ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͳ
ͳ
ͳ
ͳ
ͳ
Ǧ
Ǧ
ʹ
ʹ

 
ʹ ”‘ ‡
– ” –‹   Œ ‹’ Ǧ ‡•
‘ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ʹ ͳǦ ͳ
–”‘†—
–‹‘ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ

ʹ ‘
ƒ–‹‘ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ

͵
Œ
Œ
‡
–
‡
– ˜‹”‘‡–ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ

ʹ
ʹ
ʹ
ʹ
Ǥ
Ǥ
Ǥ
ǤͶ
Ǧ
Ǧ
Ǧ
Ǧ
”‘
”‘
”‘’‘•‡† ”‘Œ‡
– ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ʹ
ʹ
ʹ
ʹ
Ǧ
Ǧ
Ǧ
Ǧ
ͳ
ͳ
ͳ
ͳ

 
͵
–‹  ›   ‹ –—† Ǧ ƒŽ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵ ͳǦ Ǥͳ ‘‡–ƒ Ї
Ž‹•– ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͳ Ǥʹ
˜‹”
˜‹”‘‡–ƒ
Ž
Ž ƒ
–‘”• ‘–‡–‹ƒŽŽ› ˆˆ‡
–‡† ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ Ǥ͵ ‡–‡”‹ƒ–‹‘ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ Ͷ
Ͷ
͵
͵
͵
͵ǤͶ
Ǧ
Ǧ
Ǧ
Ǧ ˜ƒŽ—ƒ–‹‘ ‘ˆ ˜‹”‘‡–ƒŽ
’ƒ
–• ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ Ǧ
Ǧ
Ǧ
Ǧ͸
ͳ ‡•–Ї–‹
• ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵
͵
͵
͵
͵Ǧͺ
ʹ ‰”‹
—Ž–—”‡ ƒ† ‘” ‡•–”› ‡•‘—”
‡•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͳ ͵


‹” —ƒŽ‹–› ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͳ
ͳ͹
Ͷ
Ǧ
Ǧ
Ǧ
Ǧ ‹‘Ž‘‰‹
ƒŽ ‡•‘—”
‡• ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵
͵
͵
Ǧ
Ǧ
Ǧ͵Ͳ
Ǥ
Ǥ
Ǥ
Ǥ
Ǥ
Ǥ
Ǥ
Ǥ
Ǥ
Ǥͷ Ǧ —Ž–—”ƒŽ ”‡•‘—”
‡•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ǦͶͻ Ǥ Ǥ͸ ‡”‰›ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵ Ǥ ͹ ‡‘Ž‘‰ › ƒ† ‘‹Ž•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͷ
Ǥ ͷ͸
Ǥͺ ” ‡‡Š‘—•‡ ƒ• ‹••‹‘•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵ ͻ
Ǧ
Ǧ
Ǧ
Ǧ
ƒœƒ”†• ƒ†
ƒœƒ”†‘—• ƒ–‡”‹ƒŽ•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͸
͸͸
͵
͵
͵
͵
͵
͵
͵
͵
͵
͵
Ͷ
Ͷ
Ͷ
Ͷ
Ͷ
Ͷ
Ͷ
Ǥ
Ǥ
Ǥ
Ͷ
Ͷ
Ͷ
Ǥ
ǤͳͲ Ǧ
›†”‘Ž‘‰› ƒ† ƒ–‡” —ƒŽ‹–› ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵
͵
͵
͵
͵
͵
Ǧ
Ǧ
Ǧ
Ǧ
Ǧ͹ʹ
Ǥ ͳ ƒ† •‡ ƒ† Žƒ‹‰ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵ǦͺͲ Ǥ
Ǥ
Ǥ ʹ ‹‡”ƒŽ ‡•‘—”
‡•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵ Ǥ Ǥ ͵ ‘‹•‡ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ Ǧ
Ǧ
ͺ
ͺͷ
Ͷ ‘’—Žƒ–‹‘ ƒ†
‘—•‹‰ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ʹ ͵
͵
͵
͵
͵
Ͷ
Ͷ
Ͷ
Ǥ
Ǥ
Ͷ
Ͷ
ͳ
ͳ
ͳ
Ǥ
Ǥ
ͳ
ͳͷ
Ǧ
Ǧ
Ǧ
Ǧ
Ǧ —„Ž‹
‡”˜‹
‡•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵
͵
͵
͵
Ǧ
Ǧ
ͻ
ͻͶ
͵Ǥ Ǥ ͸ ‡
”‡ƒ–‹‘ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵Ǧͻͺ ͵Ǥ
Ͷ
ͶǤ
ͳ
ͳ͹
Ǧ
Ǧ ”ƒ•’‘”–ƒ–‹‘ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵ǦͳͲͲ VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page i

͵ ͺ ”‹„ƒŽ —Ž–—”ƒŽ ‡•‘—”
‡•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵ǦͳͳͲ ͵
Ǥ
Ǥ
Ͷ
Ͷ
Ǥ
Ǥ
ͳ
ͳͻ
Ǧ
Ǧ –‹Ž‹–‹‡• ƒ† ‡”˜‹
‡ ›•–‡• ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵Ǧͳͳʹ ͵ Ͳ ‹Ž†ˆ‹”‡ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ Ǧ ͳͺ ͵
Ǥ
Ǥ
Ͷ
Ͷ
Ǥ
Ǥ
ʹ
ʹͳ
Ǧ
Ǧ ƒ†ƒ–‘”› ‹ †‹‰• ‘ˆ ‹‰‹ˆ‹
ƒ
‡ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵
͵Ǧ
ͳ
ͳʹͳ
 
Ͷ  ‘ˆ ƒ”‡”   Ǧ ”‡’ ‹•– • ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͶǦͳ  
ͷ ‹„ ” ’ ›   Ž‹‘‰ Š Ǧ ƒ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͷ ͳǦ  
͸  ‹‰ƒ–‹  ‘” ‰ † ‘” ‰ ” ”  Ǧ ‘ ‹ ‡’  ƒ  ‹– ‘‹– ƒ –‹ ‘‰ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͸ ͳǦ Appendices

 Ȃ ‹” —ƒŽ‹–›
’ƒ
– ••‡••‡–

Ȃ —Ž–—”ƒŽ ‡•‘—”
‡• ‡’‘”–


 Ȃ ƒ–‡” —’’Ž› ••‡••‡–

Ȃ 
‘—•–‹
ƒŽ ƒŽ›•‹•






’’‡†‹š
’’‡†‹š
’’‡†‹š
’’‡†‹š
’’‡†‹š  Ȃ ”ƒˆˆ‹
–—†›
List of Figures
” ͳ ‡‰‹‘ƒŽ ‘
ƒ–‹‘ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵

”
Ǧ
Ǧʹ ”‘Œ‡
– ‹–‡ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ Ǧ
ǦͶ

” Ǧ͵ ’Ї”‡ ‘ˆ
ˆŽ—‡
‡ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ Ǧͷ

”
ͳ
ͳ
ͳ
ͳǦͶ ‡–ƒ–‹˜‡ ”ƒ
– ƒ’ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ
ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͳ
ͳ
ͳ
ͳǦ͸

‹‰—
‹‰—
‹‰—
‹‰—
‹‰— ”
‡
‡
‡
‡
‡ ͵ǤͶǤʹǦͳ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ͵Ǧͳ͵

List of Tables
Ž ͳ  ––ƒ‹‡– –ƒ–—• ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͺ Ž
‡
‡
͵
͵
Ǥ
Ǥ
Ͷ
Ͷ
Ǥ
Ǥ
͵
͵
Ǧ
Ǧʹ



  Š”‡•Бކ• ‘ˆ ‹‰‹ˆ‹
ƒ
‡ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵
͵
Ǧ
Ǧ
ͳ
ͳͻ
͵ Š‘”–Ǧ–‡” ”‘Œ‡
– ‹••‹‘•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ Ͳ ƒ
ƒ
ƒ
ƒ
„
„
„
„
Ž
Ž
‡
‡
͵
͵
Ǥ
Ǥ
Ͷ
Ͷ
Ǥ
Ǥ
͵
͵
Ǧ
ǦͶ ’‡”ƒ–‹‘ƒŽ ‹••‹‘•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͳ ͵ǤͶǤ͵Ǧͷ ‘’ƒ”ƒ–‹˜‡ ƒŽ›•‹• ƒ•‡† ‘ 
 ʹͲʹͲ
˜‡–‘”› ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ Ͷ
͵ǤͶǤ͵Ǧ͸ 
 ʹͲʹͷ ”‘Œ‡
–‹‘ Ȃ ‘• ’‡”
‡ƒ” ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ
͵ǤͶǤ͵Ǧ͹
‹••‹‘
‹••‹‘

˜‡–‘”›

˜‡–‘”› ”‡•‘ ‘—–› ʹͲʹͷ ”‘Œ‡
–‹‘ Ȃ ‘• ’‡”
‡ƒ” ǤǤǤǤǤǤǤǤǤ
͵
͵
͵
͵
͵
Ǧ
Ǧ
Ǧ
Ǧ
Ǧ
ʹ
ʹ
ʹ
ʹ
ʹ
ͷ
ͷ
͵ǤͶǤ͵Ǧͺ ʹͲʹͷ ‹••‹‘• ”‘Œ‡
–‹‘• Ȃ ”‘’‘•‡† ”‘Œ‡
–ǡ ” ‡•‘ ‘—–› ƒ†

 ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͷ ͵ǤͶǤ͵Ǧͻ ‡•‹–‹˜‡ ‡
‡’–‘”• ‘
ƒ–‡† ൏ ‡ ‹Ž‡ ˆ”‘ ”‘Œ‡
–ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ
Ǧ
Ǧ ͸
ƒ„އ ͵ǤͶǤ͵ǦͳͲ ‘–‡–‹ƒŽ ƒš‹—
’ƒ
–• ”‡†‹
–‡† „›
 ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ
ʹ
ʹ
ʹ͹
Žƒ– ’‡
‹‡• 

—””‹‰ ‹ –Ї ‡‰‹‘ ‘ˆ –Ї  ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ
͵
͵
͵
͵
Ǧ
Ǧ͵ʹ
ƒ„އ
ƒ„އ
ƒ„އ
ƒ„އ
ƒ„އ
ƒ„އ
ƒ„އ
͵ǤͶǤͶǦͳ
͵ǤͶǤͶǦͳ
’‡
‹ƒŽǦ–
’‡
‹ƒŽǦ–
ƒ–—•
ƒ–—• ‹Ž†Ž‹ˆ‡ ’‡
‹‡• 

—””‹‰ ‹ –Ї ‡‰‹‘ ‘ˆ –Ї ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵͵
ƒ ͸ ‹ – ‡”‰› •‡ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͷͶ ƒ
„
„
Ž
Ž
‡
‡
͵
͵
Ǥ
Ǥ
Ͷ
Ͷ
Ǥ
Ǥͺ
Ǧ
Ǧ
ͳ
ͳ
•–
•–‹
ƒ
ƒ–
‡
‡
†
† —ƒŽ

‹••‹‘• ሺȀ
‡ƒ”ሻ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵
͵
͵
Ǧ
Ǧ
Ǧ͸͵
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page ii
ƒ„އ ͵ǤͶǤͳͲǦͳ ‘”ƒŽ
‡ƒ” —’’Ž› ƒ† ‡ƒ† ‘’ƒ”‹•‘ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͳͲǦʹ ‹‰Ž‡ ”›
‡ƒ” —’’Ž› ƒ† ‡ƒ† ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵
͵
Ǧ
Ǧ
͹
͹
Ͷ
Ͷ
ͳͲǦ͵ —Ž–‹’އ ”›
‡ƒ” —’’Ž› ƒ† ‡ƒ†
‘’ƒ”‹•‘
‘’ƒ”‹•‘ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͹Ͷ ͳ͵Ǧͳ ‘Ǧ •’‘ –‹‘ ‘‹•‡ –ƒ†ƒ”†•ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͳ͵Ǧʹ ‘Ǧ
”ƒ
”ƒ•’‘
”–ƒ
”–ƒ–‹‘
ሺ–ƒ–
ሺ–ƒ–
‹‘ƒ”›ሻ
‹‘ƒ”›ሻ ‘‹•‡
‡˜‡Ž
‡˜‡Ž –ƒ†ƒ”†• ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ
͸
͸
͵Ǥ
͵Ǥ
͵Ǥ
͵Ǥ
͵Ǥ
ͶǤ
ͶǤ
ͶǤ
ͶǤ
ͶǤͳ͵Ǧ͵ ›’‹
ƒŽ ‘•–”—
–‹‘ “—‹’‡– ƒš‹— ‘‹•‡ ‡˜‡Ž•ǡ † ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͹ ƒ„އ
ƒ„އ
ƒ„އ
ƒ„އ
ƒ„އ
ƒ„އ ͵ǤͶǤͳ͵ǦͶ

›’‹
ƒŽ ‹„”ƒ–‹‘ ‡˜‡Ž• ˆ‘” ‘•–”—
–‹‘ “—‹’‡–ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ
͵
͵
͵
͵
͵
Ǧ
Ǧ
Ǧ
Ǧ
Ǧ
ͺ
ͺ
ͺ
ͺͻ
Ǥ ͳ ”‹’ ‡‡” ƒ–‹‘ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ Ͳ͵ Ǥ ʹ ‹– •‹‰ƒŽ‹œ‡†
–‡”•‡
–‹‘ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ Ǥ
Ǥ
Ǥ ͵






”
”‹–
‡
‡
”‹ƒ
”‹ƒ
ǡ
ǡ ‹‰ƒŽ‹œ‡†
–‡”•‡
–‹‘ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͳ
ͳ
ͳ
ͲͶ
ͲͶ
„
„
„
„ Ͷ
 ‡ 
‘—” Ͷ
‡
‡
‡
‡
‡
͵
͵
͵
͵
͵
Ͷ
Ͷ
Ǥ
Ǥ
Ǥ
Ͷ
Ͷ
Ͷ
ͳ
ͳ
ͳ
Ǥ
Ǥ
ͳ
ͳ
͹
͹
͹
͹
͹
Ǧ
Ǧ
Ǧ
Ǧ
Ǧͷ

–‡”•‡
–
–‡”•‡
–
‹‘
‹‘





  ‡
ƒ
ƒ
‘—”
ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ
ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ
͵
͵
͵
ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵
͵
Ǧ
Ǧ
Ǧ
Ǧ
Ǧ
ͳͲ
ͳͲͷ
ƒ
ƒ
ƒ
ƒ
ƒ
ƒ
Ž
Ž
Ž
Ž
„
„
Ž
އ ͵ǤͶǤͳ͹Ǧ͸  ƒŽ›•‹• ‡•—Ž–• ǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤǤ ͵ǦͳͲͺ VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page iii

LIST OF ACRONYMS AND ABBREVIATIONS

 ‹”’‘”– ƒ† •‡ ‘’ƒ–‹„‹Ž‹–› Žƒ
 ••‡••‘”ǯ• ƒ”
‡Ž —„‡”
• ‡•– ƒƒ‰‡‡– ”ƒ
–‹
‡•
 „‹‘Ž‘‰‹
ƒŽ •—”˜‡› ƒ”‡ƒ
ƒŽ
 ‡‘Ž‘‰ ‹
‡”‰› ƒƒ‰‡‡– ‹˜‹•‹‘
 ƒŽ‹ˆ‘”‹ƒ ‹” ‡•‘—”
‡• ‘ƒ”†

ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‹•Š ƒ† ƒ‡
 ƒŽ‹ˆ‘”‹ƒ ˜‹”‘‡–ƒŽ —ƒŽ‹–› 
–

Ƭ ƒŽ‹ˆ‘”‹ƒ
‡ƒŽ–Š Ƭ ƒˆ‡–› ‘†‡
 ƒŽ‹ˆ‘”‹ƒ ƒ–—”ƒŽ ‹˜‡”•‹–› ƒ–ƒ„ƒ•‡
 ƒŽ‹ˆ‘”‹ƒ ƒ–‹˜‡ Žƒ– ‘
‹‡–›
 ƒŽ‹ˆ‘”‹ƒ ‡‰‹‘ƒŽ ƒ–‡” —ƒŽ‹–› ‘–”‘Ž ‘ƒ”†
 އƒ ƒ–‡” 
–
 ‡’ƒ”–‡– ƒ–‡” ‡•‘—”
‡•
 ‡”‰‡
› ’‡”ƒ–‹‘• Žƒ
 ˜‹”‘‡–ƒŽ ”‘–‡
–‹‘ ‰‡
›

 ‹ƒŽ ˜‹”‘‡–ƒŽ
’ƒ
– ‡’‘”–
 ‡†‡”ƒŽ ‡”‰‡
› ƒƒ‰‡‡– ‰‡
›

 ‡† ‡”ƒŽ
‹‰Š™ƒ› †‹‹•–”ƒ–‹‘
 ƒ”Žƒ† ƒ ’‹‰ ƒ† ‘‹–‘”‹‰ ”‘‰”ƒ
 ‡† ‡”ƒŽ ”ƒ•‹– †‹‹•–”ƒ–‹‘
‰’ ‰ƒŽŽ‘• ’‡” ‹—–‡
 ”‘—† ™ƒ–‡” —•–ƒ‹ƒ„‹Ž‹–› ‰‡
›
 ”‘—† ™ƒ–‡” —•–ƒ‹ƒ„‹Ž‹–› Žƒ

ʹ
‘–•’‘– ƒŽ›•‹• ƒ† ‡’‘”–‹‰ ”‘‰”ƒ

Šƒœƒ”† ‹†‡š
Š’ Š‘”•‡’‘™‡”

’ƒ
ˆ‘”ƒ–‹‘ Žƒ‹‰ ƒ† ‘•—Ž–ƒ–‹‘


‹–‹ƒŽ –—†›
 ‘
ƒŽ ‡•’‘•‹„‹Ž‹–› ”‡ƒ
 ‹‰”ƒ–‘”› ‹”† ”‡ƒ–› 
–
‰ ‹ŽŽ‹‰”ƒ


 —Ž–‹Ǧ
—”‹•†‹
–‹‘ƒŽ
ƒœƒ”† ‹–‹‰ƒ–‹‘ Žƒ
 ‹–‹‰ƒ–‹‘ ‘‹–‘”‹‰ ƒ† ‡’‘”–‹‰ ”‘‰”ƒ
 ‹–‹‰ƒ–‡† ‡‰ƒ–‹˜‡ ‡
Žƒ”ƒ–‹‘
’Š ‹Ž‡• ’‡” Š‘—”

• ‹‡”ƒŽ ‡•‘—
‡
‘‡•
 ƒ–‹‘ƒŽ „‹‡– ‹” —ƒŽ‹–› –ƒ†ƒ”†•

 ƒ–‹˜‡ ‡”‹
ƒ
‡”‹–ƒ‰‡ ‘‹••‹‘

 ƒ–‹‘ƒŽ
›†”‘‰”ƒ’Š› ƒ–ƒ„ƒ•‡
 ƒ–‹‘ƒŽ ‘ŽŽ—–ƒ– ‹•
Šƒ”‰‡ Ž‹‹ƒ–‹‘ ›•–‡
 ‡™ •‘—”
‡ ”‡˜‹‡™

ƒ–‹‘ƒŽ ‡–Žƒ†•
˜‡–‘”›
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page iv


Ƭ ƒ
‹ˆ‹

ƒ• ƒ† އ
–”‹
‘’ƒ›

 ’‡ƒ ’ƒ”–‹
އ ˜‡Ž‘
‹–›

 —„Ž‹
‡•‘—”
‡• ‘†‡

 ‘—–Ї” ƒŽ‹ˆ‘”‹ƒ ƒ•


 —•–ƒ‹ƒ„އ
”‘—†™ƒ–‡” ƒƒ‰‡‡– 
–


 ƒ
‘ƒ“—‹ ‹– ˆ‘š


 ƒ
‘ƒ“—‹ ƒŽŽ‡› ‹ ƒ•‹


 ƒ
‘ƒ“—‹ ƒŽŽ‡› ‹” ‘ŽŽ—–‹‘ ‘–”‘Ž ‹•–”‹
–

 ƒŽŽ ”‘Œ‡
– ƒŽ›•‹• ‡˜‡Ž

 –ƒ–‡ ‘— ‡

 –‘”™ƒ–‡” ‘ŽŽ—–‹‘ ”‡˜‡–‹‘ Žƒ

• –‘š‹
ƒ‹”
‘–ƒ‹ƒ–•

 ‹–‡† –ƒ–‡• ”› ‘”’• ‰‹‡‡”•

  ‹–‡† –ƒ–‡• ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ‡”˜‹
‡

 ˜‡Š‹
އ ‹Ž‡• –”ƒ˜‡Ž‡†

 ‘”‡” ˜‹”‘‡–ƒŽ ™ƒ”‡‡•• ”ƒ‹‹‰

œɊ‰Ȁ ‹
”‘‰”ƒ• ’‡” Ž‹–‡”

VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page v

Mitigated Negative Declaration

MITIGATED NEGATIVE DECLARATION
• ‡ƒ† ‰‡
› —†‡” ǡ –Ї ‹–› ‘ˆ ‡‡†Ž‡› ‘—‹–› ‡˜‡Ž‘’‡– ‡’ƒ”–‡– Šƒ• ”‡˜‹‡™‡† –Ї ”‘Œ‡
– †‡•
”‹„‡† „‡Ž‘™ –‘ †‡–‡”‹‡ ™Š‡–Ї” ‹–
‘—ކ Šƒ˜‡ ƒ •‹‰‹ˆ‹
ƒ– ‡ˆˆ‡
–
‘ –Ї ‡˜‹”‘‡– „‡
ƒ—•‡ ‘ˆ ‹–• †‡˜‡Ž‘’‡–Ǥ
 ƒ

‘”†ƒ
‡ ™‹–Š  —‹†‡Ž‹‡• ‡
–‹‘
ͳͷ͵ͺʹǡ Dzሾ•ሿ‹‰‹ˆ‹
ƒ– ‡ˆˆ‡
– ‘ –Ї ‡˜‹”‘‡–dz ‡ƒ• ƒ •—„•–ƒ–‹ƒŽǡ ‘” ’‘–‡–‹ƒŽŽ› •—„•–ƒ–‹ƒŽǡ ƒ†˜‡”•‡
Šƒ‰‡ ‹ ƒ› ‘ˆ –Ї ’Š›•‹
ƒŽ
‘†‹–‹‘• ™‹–Š‹ –Ї ƒ”‡ƒ ƒˆˆ‡
–‡† „› –Ї
”‘Œ‡
–ǡ ‹
Ž—†‹‰ Žƒ†ǡ ƒ‹”ǡ ™ƒ–‡”ǡ ‹‡”ƒŽ•ǡ ˆŽ‘”ƒǡ ˆƒ—ƒǡ ƒ„‹‡– ‘‹•‡ǡ ƒ† ‘„Œ‡ –• ‘ˆ
Š‹•–‘”‹
‘” ƒ‡•–Ї–‹
•‹‰‹ˆ‹
ƒ
‡Ǥ
Project Name
‡•–‹‰ ‡–ƒ–‹˜‡ —„†‹˜‹•‹‘ ƒ’ ‘Ǥ ͸Ͷͻ͹ Ǧ ‡•–Šƒ˜‡ ʹ ”‘Œ‡ –
Project Location
Ї ’”‘’‘•‡† ”‘Œ‡
– ‹• Ž‘
ƒ–‡† ™‹–Š‹ —‹
‘”’‘”ƒ–‡† ”‡•‘ ‘—–›ǡ ‹‡†‹ƒ–‡Ž› ƒ†Œƒ
‡–
–‘ –Ї ‹–› ‘ˆ ‡‡†Ž‡›
‘”’‘”ƒ–‡ Ž‹‹–• ሺ ͵͹ͲǦͲͶͲǦͳͲሻǤ Ї ”‘Œ‡
– •‹–‡ ‹• ‰‡‡”ƒŽŽ›
„‘—†‡† „› ˆ—–—”‡ ƒ•– ‘”–Š ˜‡—‡ –‘ –Ї ‘”–Šǡ ‘—–Š —––‘™‹ŽŽ‘™ ˜‡—‡ –‘ –Ї ‡ƒ•–ǡ ƒ
Š‘ ‹•–ƒ ”‡•‹†‡–‹ƒŽ •—„†‹˜‹•‹‘ –‘ –Ї •‘—–Šǡ ƒ† —––‘™‹ŽŽ‘™ ‹– Š –‘ –Ї ™‡•–ǡ ƒ† ‹•
•‹–—ƒ–‡† ƒ’’”‘š‹ƒ–‡Ž› ‹‡ ‹Ž‡• ‘”–Їƒ•– ‘ˆ  ͻͻ ƒ† ‡‹‰Š– ‹Ž‡• •‘—–Š ‘ˆ ǦͳͺͲǤ ‡‰‹‘ƒŽ ƒ

‡•• –‘ –Ї ”‘Œ‡
– •‹–‡ ‹• ƒ˜ƒ‹Žƒ„އ „› Ǧͻͻ ƒ† ǦͳͺͲǤ ‘
ƒŽ ƒ

‡•• –‘ –Ї
”‘Œ‡
– •‹–‡ ™‘—ކ „‡ ’”‘˜‹†‡† ˜‹ƒ ‘—–Š —––‘™‹ŽŽ‘™ ˜‡—‡ ƒ† ƒ•– ‘”–Š ˜‡—‡Ǥ Ї •‹–‡ ‹• Ž‘
ƒ–‡† ™‹–Š‹ –Ї ‡‡†Ž‡›ǡ ƒŽ‹ˆ‘”‹ƒǡ   ͹ǤͷǦ‹—–‡ –‘’‘‰”ƒ’Š‹ ƒ’ǡ ‡
–‹‘ ʹͷǡ
‘™•Š‹’ ͳͷ ‘—–Šǡ ƒ‰‡ ʹ͵ ƒ•–ǡ ƬǤ
Project Description
Ї ”‘Œ‡
– ’”‘’‘•‡• –Ї †‡˜‡Ž‘’‡– ‘ˆ ͳ͸͸ •‹‰Ž‡Ǧˆƒ‹Ž› Ž‘–• ƒ˜‡”ƒ‰‹‰ ͷǡͷ͸ͳ •“—ƒ”‡ ˆ‡‡– ’‡” Ž‘–ǡ †‡˜‡Ž‘’‡– ‘ˆ ƒ ‘Ǧ•‹–‡ •–‘” †”ƒ‹ „ƒ•‹ǡ ƒ† •‡˜‡ ‘—–Ž‘–• ‘˜‡” –™‘ ’Šƒ•‡•Ǥ Šƒ•‡ ͳ ™‘—ކ
‘•‹•– ‘ˆ ƒ’’”‘š‹ƒ–‡Ž› ͳͻǤͷ͹ ƒ
”‡• ƒ† †‡˜‡Ž‘’ ͺͻ Ž‘–•ǡ ˆ‹˜‡ ‘—–Ž‘–•ǡ ƒ† –Ї
‘Ǧ•‹–‡ •–‘” †”ƒ‹ „ƒ•‹Ǥ Šƒ•‡ ʹ ™‘—ކ
‘•‹•– ‘ˆ –Ї ”‡ƒ‹‹‰ ͳͶǤͶͳ ƒ
”‡• ƒ† †‡˜‡Ž‘’
͹͹ Ž‘–• ƒ† –™‘ ‘—–Ž‘–•ǡ ‘‡ ‘ˆ ™Š‹
Š ‹• ƒ •–‘” †”ƒ‹ „ƒ•‹Ǥ Ǧ ƒ† ‘ˆˆǦ•‹–‡ ‹’”‘˜‡‡–•ǡ ‹
Ž—†‹‰
‹”
—Žƒ–‹‘ ”‘ƒ†•ǡ ‹–‡”‹‘” Ž‘
ƒŽ •–”‡‡–•ǡ
—”„ǡ ‰—––‡”ǡ •‹†‡™ƒŽǡ ‘’‡ •’ƒ
‡ǡ ƒ†
Žƒ†•
ƒ’‹‰ǡ ƒ”‡ ’”‘’‘•‡† ƒ• ’ƒ”– ‘ˆ –Ї ”‘Œ‡
–Ǥ • ƒ ’ƒ”– ‘ˆ –Ї ”‘Œ‡
–ǡ –Ї —––‘™‹ŽŽ‘™
‹–
Š ™‹ŽŽ „‡ —†‡”‰”‘—†‡† ’‡” ‹–› ”‡“—‹”‡‡–•Ǥ
Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ™‹–Š‹ –Ї ‹–›ǯ• ’Ї”‡ ‘ˆ
ˆŽ—‡
‡ ሺ
ሻ ƒ† Šƒ• ƒ ’Žƒ‡† Žƒ†
—•‡ †‡•‹‰ƒ–‹‘ ‘ˆ ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽ ሺͶǦͺ †™‡ŽŽ‹‰ —‹–• ’‡” ƒ ”‡ ሾ†—Ȁƒ
”‡ሿሻ ƒ†
‹‰Š
‡•‹–› ‡•‹†‡–‹ƒŽ ሺͳͷǦʹͻ †—Ȁƒ
”‡ሻ ’—”•—ƒ– –‘ –Ї ‡‡†Ž‡› ʹͲ͵Ͳ ‡‡”ƒŽ ŽƒǤ Ї •‹–‡ ‹• œ‘‡† ‹‹–‡† ‰”‹
—Ž–—”ƒŽ ሺǦʹͲሻ ƒ

‘”†‹‰ –‘ –Ї ‘—–› ‘ˆ ”‡•‘ œ‘‹‰ ƒ’Ǥ Ї
”‘Œ‡
– ’”‘’‘•‡• –‘ ƒ‡† –Ї ’Žƒ‡† Žƒ† —•‡ †‡•‹‰ƒ–‹‘ ‘ˆ ƒ ƒ’’”‘š‹ƒ–‡Ž› ͵ǤͷǦ ’‘”–‹‘ ‘ˆ –Ї ”‘Œ‡
– •‹–‡ ˆ”‘
‹‰Š ‡•‹–› ‡•‹†‡–‹ƒŽ –‘ ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽǤ
ƒ
”‡
††‹–‹‘ƒŽŽ›ǡ –Ї ”‘Œ‡
– ’”‘’‘•‡• –‘ ’”‡Ǧœ‘‡ –Ї ”‘Œ‡
– •‹–‡ ƒ† –Ї –Š”‡‡ ”—”ƒŽ ”‡•‹†‡–‹ƒŽ
’ƒ”
‡Ž• –‘ –Ї ‘”–Š™‡•–ǡ • ͵͹ͲǦͲͶͲǦͳ͵ǡ ͵͹ͲǦͲͶͲǦʹʹǡ ƒ† ͵͹ͲǦͲͶͲǦʹ͵ǡ –‘ –Ї ǦͳǦ͸ ሺ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽሻ œ‘‡ †‹•–”‹
– ‹ ’”‡’ƒ”ƒ–‹‘ ˆ‘” ƒ‡šƒ–‹‘ ‘ˆ –Ї ’ƒ”
‡Ž•
‘•‹•–‡–
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 1

Mitigated Negative Declaration
™‹–Š –Ї ‡‡†Ž‡› ʹͲ͵Ͳ ‡ ‡”ƒŽ ŽƒǤ Ї ƒ‡šƒ–‹‘ ”‡“—‡•– ™‘—ކ ”‡‘˜‡ –Ї ƒ”‡ƒ ˆ”‘ –Ї ”‡•‘ ‘—–› ‹”‡ ”‘–‡
–‹‘ ‹•–”‹
– ƒ† –Ї ‹‰• ‹˜‡” ‘•‡”˜ƒ–‹‘ ‹•–”‹
– •‡”˜‹
‡
„‘—†ƒ”‹‡•Ǥ ‘” ’—”’‘•‡• ‘ˆ –Ї  ƒƒŽ›•‹•ǡ –Ї•‡ –Š”‡‡ ’”‘’‡”–‹‡• ƒ”‡ ‘Ž› ‘•‹†‡”‡†
ˆ‘” ƒ‡šƒ–‹‘ ‹–‘ –Ї
‹–› Ž‹‹–•Ǥ Ї”‡ ‹• ‘ ‡™ †‡˜‡Ž‘’‡– ‘”
Šƒ‰‡ ‹ Žƒ† —•‡
’”‘’‘•‡† ‘ –Ї•‡ ’”‘’‡”–‹‡•ǡ ƒ† –Ї› ƒ”‡
‘•‹†‡”‡† –‘ „‡ ƒ ’ƒ”– ‘ˆ –Ї „ƒ•‡Ž‹‡Ǥ
ƒ–‡”ǡ •‡™‡”ǡ •‘Ž‹† ™ƒ•–‡ǡ ƒ† •–‘” †”ƒ‹ƒ‰‡ —–‹Ž‹–‹‡• ™‹ŽŽ „‡ ’”‘˜‹†‡† „› –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ އ
–”‹
‹–› ™‹ŽŽ „‡ ’”‘˜‹†‡† „› ƒ
‹ˆ‹
ƒ• ƒ† އ
–”‹
ƒ† ƒ–—”ƒŽ ‰ƒ• ™‹ŽŽ „‡
’”‘˜‹†‡† „› ‘—–Ї” ƒŽ‹ˆ‘”‹ƒ ƒ•Ǥ
‘•–”—
–‹‘ ‘ˆ –Ї ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– ™‘—ކ ‘

—” ‘˜‡” ƒ ƒš‹— ‘ˆ Ͷͺ ‘–Š•Ǥ
–
‹• ƒ–‹
‹’ƒ–‡† –Šƒ– –Ї ˆ‘ŽŽ‘™‹‰ ’‹‡
‡• ‘ˆ ‡“—‹’‡– ™‘—ކ „‡ —•‡† †—”‹‰
‘•–”—
–‹‘
ƒ
–‹˜‹–‹‡•ǣ
x ‘ŽŽ‡”
x ‘ƒ†‡† –”—
•
x š
ƒ˜ƒ–‘”
x ‡‡”ƒ–‘”
x ‡”˜‹
‡ –”—

x ‹”
‘’”‡••‘”
–‹–އ‡–• ƒ† ’’”‘˜ƒŽ•ǣ
x ‡ ‡”ƒŽ Žƒ ‡†‡– ’’Ž‹
ƒ–‹‘ ‘Ǥ ʹͲʹͷǦͲͳ
x ‡œ‘‡ ’’Ž‹
ƒ–‹‘ ‘Ǥ ʹͲʹͷǦͲͳ
x ‡•–‹‰ ‡–ƒ–‹˜‡ ”ƒ
– ƒ’ ‘Ǥ ͸Ͷͻ͹
x ‡šƒ–‹‘ ‘ˆ –Ї †‡•
”‹„‡† ’”‘’‡”–‹‡• ‹–‘ –Ї ‹–› „›  ‘ –Š”‘—‰Š ‡šƒ–‹‘ ’’Ž‹
ƒ–‹‘ ‘Ǥ ʹͲʹͷǦͲͳ
Ї †‘
—‡– ƒ† †‘
—‡–• ”‡ˆ‡”‡
‡† ‹ –Ї
‹–‹ƒŽ –—†›Ȁ‹–‹‰ƒ–‡† ‡‰ƒ–‹˜‡
‡
Žƒ”ƒ–‹‘ ƒ”‡ ƒ˜ƒ‹Žƒ„އ ˆ‘” ”‡˜‹‡™ ƒ– –Ї ‹–› ‘ˆ ‡‡†Ž‡› ‘—‹–› ‡˜‡Ž‘’‡– ‡’ƒ”–‡–ǡ Ž‘
ƒ–‡† ƒ– ͳ͹ͳ͹ ͻ–Š –”‡‡–ǡ ‡‡†Ž‡›ǡ  ͻ͵͸ͷͶǤ
• ƒ†ƒ–‡† „› ǡ –Ї ’—„Ž‹
”‡˜‹‡™ ’‡”‹‘† ˆ‘” –Š‹• †‘
—‡– ™ƒ• ͵Ͳ †ƒ›• ሺ
‡
–‹‘ ͳͷͲ͹͵ሾ„ሿሻǤ Ї ’—„Ž‹
”‡˜‹‡™ ’‡”‹‘† „‡‰ƒ ‘ —‰—•– ͳͻǡ ʹͲʹͷǡ ƒ† ‡†• ‘
‡’–‡„‡” ͳͺǡ ʹͲʹͷǤ ‘” ˆ—”–Ї” ‹ˆ‘”ƒ–‹‘ǡ ’އƒ•‡
‘–ƒ
– ‘†‡› Ǥ
‘”–‘ǡ ǡ ƒ– ͷͷͻǦ
͸͵͹ǦͶʹͲͲǡ š–Ǥ ʹͺ͸ǡ ‘” ”‘†‡›ǤŠ‘”–‘̷”‡‡†Ž‡›Ǥ
ƒǤ‰‘˜Ǥ
Mailing Address and Phone Number of Contact Person
‹–› ‘ˆ ‡‡†Ž‡›ǡ ‘—‹–› ‡˜‡Ž‘’‡– ‡’ƒ”–‡–
ͳ͹ͳ͹ ͻ–Š –Ǥǡ
‡‡†Ž‡›ǡ  ͻ͵͸ͷͶ
‘–ƒ
– ‡”•‘ǣ ‘†‡›
‘”–‘ǡ 
Š‘‡ǣ ሺͷͷͻሻ ͸͵͹ǦͶʹͲͲ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 2

Mitigated Negative Declaration
Findings
• ‡ƒ† ‰‡
›ǡ –Ї ‹–› ‘ˆ ‡‡†Ž‡› ‘—‹–› ‡˜‡Ž‘’‡– ‡’ƒ”–‡– ˆ‹†• –Šƒ– –Ї ”‘Œ‡
– ™‹ŽŽ ‘– Šƒ˜‡ ƒ •‹‰‹ˆ‹
ƒ– ‡ˆˆ‡
– ‘ –Ї ‡˜‹”‘‡–Ǥ Ї ˜‹”‘‡–ƒŽ Ї
Ž‹•–
ሺ —‹†‡Ž‹‡• ’’‡†‹š ሻ ‘”
‹–‹ƒŽ  ሺ –—†›
ሻ ሺ•‡‡  ͵ ” ‡
–‹‘ Ǧ ˜‹ ‘‡–ƒŽ Ї
 ‹•–   ሻ Ž
‹†‡–‹ˆ‹‡† ‘‡ ‘” ‘”‡ ’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ– ‡ˆˆ‡
–• ‘ –Ї ‡˜‹”‘‡–ǡ „—– ”‡˜‹•‹‘• –‘ –Ї
”‘Œ‡
– Šƒ˜‡ „‡‡ ƒ†‡ „‡ˆ‘”‡ –Ї ”‡Ž‡ƒ•‡ ‘ˆ –Š‹• ‹–‹‰ƒ–‡† ‡‰ƒ–‹˜‡ ‡ Žƒ”ƒ–‹‘ ሺሻ ‘”
‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• ™‘—ކ „‡ ‹’އ‡–‡† –Šƒ– ”‡†—
‡ ƒŽŽ ’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ– ‹’ƒ
–•
އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– އ˜‡Ž•Ǥ Ї ‡ƒ† ‰‡
› ˆ—”–Ї” ˆ‹†• –Šƒ– –Ї”‡ ‹• ‘ •—„•–ƒ–‹ƒŽ
‡˜‹†‡
‡ –Šƒ– –Š‹• ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ •‹‰‹ˆ‹
ƒ– ‡ˆˆ‡
– ‘ –Ї ‡˜‹”‘‡–Ǥ
Mitigation Measures Included in the Project to Avoid Potentially Significant Effects
 
Ǧͳǣ  ’”‡
‘•–”—
–‹‘
އƒ”ƒ
‡ •—”˜‡› •ŠƒŽŽ „‡
‘†—
–‡† ™‹–Š‹ ͳͶ †ƒ›• ’”‹‘” –‘
–Ї ‹••—ƒ
‡ ‘ˆ ‰”ƒ†‹‰ ’‡”‹–• ‘” ‰”‘—† †‹•–—”„ƒ
‡ ƒ
–‹˜‹–‹‡• –‘ †‡–‡”‹‡ ‹ˆ •’‡
‹ƒŽǦ
•–ƒ–—• •’‡
‹‡• ƒ”‡ ’”‡•‡– ™‹–Š‹ ʹͷͲ ˆ‡‡– ‘ˆ –Ї ”‘Œ‡
–Ǥ Ї ˆ‘
ƒŽ •’‡
‹‡• •ŠƒŽŽ ‹
Ž—†‡ –Ї
™‡•–‡” „—””‘™‹‰ ‘™Žǡ Ž‘‰‰‡”Їƒ† •Š”‹‡ǡ ƒ† ™ƒ‹•‘ǯ• Šƒ™Ǥ  ‘’› ‘ˆ –Ї ”‡’‘”–
‘—–Ž‹‹‰ –Ї ”‡•—Ž–• ‘ˆ –Ї •—”˜‡› •ŠƒŽŽ „‡ •—„‹––‡† –‘ –Ї އƒ† ƒ‰‡ › ƒ• ‡˜‹†‡
‡ ‘ˆ

‘’Ž‹ƒ
‡Ǥ
 
Ǧʹǣ
ˆ
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• ‘

—” „‡–™‡‡ ‡„”—ƒ”› ͳ ƒ† ‡’–‡„‡” ͳͷǡ ’”‡Ǧ
†‹•–—”„ƒ
‡ •—”˜‡›• ˆ‘” ƒ
–‹˜‡ ”ƒ’–‘” ƒ† ‹‰”ƒ–‘”› „‹”† ‡•–• —•– „‡
‘†—
–‡† ‘ ‘”‡
–Šƒ ͳͲ †ƒ›• ’”‹‘” –‘ –Ї
‘‡
‡‡– ‘ˆ †‹•–—”„ƒ
‡Ǥ —”˜‡›• •ŠƒŽŽ ˆ‘ŽŽ‘™   ƒ†
  ‰—‹†ƒ
‡ ƒ†Ȁ‘” ’”‘–‘
‘Ž•ǡ ƒ• ƒ’’Ž‹
ƒ„އǤ
ˆ ‘ ƒ
–‹˜‡ ‡•–• ‘” ‡•–‹‰ „‹”†• ƒ”‡
‹†‡–‹ˆ‹‡†ǡ –Ї ”‘Œ‡
–
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• ƒ› ’”‘
‡‡†ǡ ƒ† ‘ ˆ—”–Ї” ‹–‹‰ƒ–‹‘
‡ƒ•—”‡• ˆ‘” ‡•–‹‰ „‹”†• ƒ”‡ ”‡“—‹”‡†Ǥ
ˆ ƒ
–‹˜‡ ‡•–ሺ•ሻ ƒ”‡ ‹†‡–‹ˆ‹‡†ǡ –Ї ƒ
–‹˜‡ ‡•–ሺ•ሻ
•Š‘—ކ „‡
‘–‹—‘—•Ž› •—”˜‡›‡† ˆ‘” –Ї ˆ‹”•– ʹͶ Š‘—”• ƒˆ–‡” †‡–‡
–‹‘ –‘ ‡•–ƒ„Ž‹•Š ƒ
„‡Šƒ˜‹‘”ƒŽ „ƒ•‡Ž‹‡ ’”‹‘” –‘ ƒ›
‘•–”—
–‹‘Ǧ”‡Žƒ–‡† ƒ
–‹˜‹–‹‡•Ǥ

‡
‘•–”—
–‹‘
‘‡
‡•ǡ ƒŽŽ ‡•–• •ŠƒŽŽ „‡
‘–‹—‘—•Ž› ‘‹–‘”‡† –‘ †‡–‡
– ƒ›
„‡Šƒ˜‹‘”ƒŽ
Šƒ‰‡• „‡
ƒ—•‡ ‘ˆ –Ї ”‘Œ‡
– ሺ‹Ǥ‡Ǥǡ ‡•– ƒ˜‘‹†ƒ
‡ ‘” ƒ„ƒ†‘‡–ሻǤ
ˆ
„‡Šƒ˜‹‘”ƒŽ
Šƒ‰‡• ƒ”‡ ‘„•‡”˜‡†ǡ –Ї ™‘”
ƒ—•‹‰ –Šƒ–
Šƒ‰‡ •ŠƒŽŽ
‡ƒ•‡ —–‹Ž –Ї
ƒ’’Ž‹
ƒ–̵• “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•–
‘•—Ž–• ™‹–Š –Ї   ƒ†Ȁ‘” –Ї  ǡ ƒ† –Ї “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•– —•‡† „› –Ї ƒ’’Ž‹
ƒ– ‹’އ‡–• –Ї ”‡
‘‡†‡† ‡ƒ•—”‡•Ǥ —”‹‰ •—
Š –‹‡•
ƒ• –Ї “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹
ƒŽ ‘‹–‘” ‹• ‘– ‘ •‹–‡ ™Š‹Ž‡
‘•–”—
–‹‘ ™‘”‡”• ƒ”‡ ‘ •‹–‡ǡ
‹‹— ‘Ǧ†‹•–—”„ƒ
‡ „—ˆˆ‡” ‘ˆ ʹͷͲ ˆ‡‡– •ŠƒŽŽ „‡ ‡•–ƒ„Ž‹•Ї† ƒ”‘—† ƒ
–‹˜‡ ‡•–• ƒ†
ƒ
ƒ
ͷͲͲǦˆ‘‘– ‘Ǧ†‹•–—”„ƒ
‡ „—ˆˆ‡” ƒ”‘—† –Ї ‡•–• ‘ˆ ”ƒ’–‘”• —–‹Ž –Ї „”‡‡†‹‰ •‡ƒ•‘ Šƒ• ‡†‡† ‘” —–‹Ž ƒ “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•– Šƒ• †‡–‡”‹‡† –Šƒ– –Ї „‹”†• Šƒ˜‡ ˆŽ‡†‰‡† ƒ† ƒ”‡ ‘ Ž‘‰‡” ”‡Ž‹ƒ– —’‘ –Ї ‡•– ‘” ’ƒ”‡–ƒŽ
ƒ”‡ ˆ‘” •—”˜‹˜ƒŽǡ ƒ† ƒ› ƒ†—Ž– „‹”†• ƒ”‡ ‘ Ž‘‰‡”
‘

—’›‹‰ –Ї ‡•–Ǥ ‡˜‹ƒ–‹‘• ˆ”‘ –Ї•‡ ‘Ǧ†‹•–—”„ƒ
‡ „—ˆˆ‡”• ƒ› „‡ ‹’އ‡–‡† ‹ˆ –Ї
“—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•–
‘
Ž—†‡• –Šƒ– ™‘” ™‹–Š‹ –Ї „—ˆˆ‡” ƒ”‡ƒ ™‘—ކ ‘–
ƒ—•‡ ‡•–
ƒ˜‘‹†ƒ
‡ ‘” ƒ„ƒ†‘‡– ሺ‡Ǥ‰Ǥǡ ™Š‡ –Ї †‹•–—”„ƒ
‡ ƒ”‡ƒ ™‘—ކ „‡
‘
‡ƒŽ‡† ˆ”‘ ƒ ‡•–
•‹–‡ „› –‘’‘‰”ƒ’Š›ሻ ’”‘˜‹†‡† –Šƒ– ‘–‹ˆ‹
ƒ–‹‘ ‘ˆ –Š‹• †‡–‡”‹ƒ–‹‘ ‘ˆ ƒ †‡˜‹ƒ–‹‘ ‹ –Ї ‘Ǧ
†‹•–—”„ƒ
‡ „—ˆˆ‡” ‹• ’”‘˜‹†‡† „› –Ї “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•– ‘ އ•• –Šƒ ͳͷ †ƒ›• ‹ ƒ†˜ƒ ‡ –‘
–Ї ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ƒ† –Ї ‹–‡† –ƒ–‡• ‹ •Š ƒ† ‹Ž†Ž‹ˆ‡Ǥ VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3

Mitigated Negative Declaration
 
Ǧ͵ǣ ‡
ƒ—•‡ –Ї”‡ ‹• ’‘–‡–‹ƒŽ ˆ‘” –Ї ™‡•–‡” „—””‘™‹‰ ‘™Ž –‘ ‘

—” ™‹–Š‹ ‘” ‡ƒ”
–Ї ”‘Œ‡
– ƒ”‡ƒǡ ”‘Œ‡
–Ǧ”‡Žƒ–‡† ˜‡Š‹
އ• •ŠƒŽŽ ‘„•‡”˜‡ ƒ †ƒ›–‹‡ •’‡‡† Ž‹‹– ‘ˆ ʹͲ ’Š
–Š”‘—‰Š‘—– –Ї •‹–‡ ‹ ƒŽŽ ”‘Œ‡
– ƒ”‡ƒ•ǡ ‡š
‡’– ‘ ‘—–› ”‘ƒ†• ƒ† –ƒ–‡ ƒ† ˆ‡†‡”ƒŽ
Š‹‰Š™ƒ›•Ǣ –Š‹• ‹• ’ƒ”–‹
—Žƒ”Ž› ‹’‘”–ƒ– ƒ– ‹‰Š– ™Š‡ ™‡•–‡” „—””‘™‹‰ ‘™Ž• ƒ”‡ ‘•– ƒ
–‹˜‡Ǥ Ž–Š‘—‰Š ‘– ƒ–‹
‹’ƒ–‡† ˆ‘” –Š‹• ”‘Œ‡
–ǡ ‹‰Š––‹‡
‘•–”—
–‹‘ „‡ ‹‹‹œ‡†
–‘ –Ї ‡š–‡– ’‘••‹„އǤ
‘™‡˜‡”ǡ ‹ˆ ‹‰Š–
‘•–”—
–‹‘ •ŠƒŽŽ ‘

—”ǡ –Ї –Ї •’‡‡† Ž‹‹– •ŠƒŽŽ
„‡ ”‡†—
‡† –‘ ͳͲ ’ŠǤ ˆˆǦ”‘ƒ† –”ƒˆˆ‹
‘—–•‹†‡ ‘ˆ †‡•‹‰ƒ–‡† ”‘Œ‡
– ƒ”‡ƒ•
•ŠƒŽŽ
•ŠƒŽŽ „‡ ’”‘Š‹„‹–‡†Ǥ
ƒǤ ‘ ’”‡˜‡– ‹ƒ†˜‡”–‡– ‡–”ƒ’‡– ‘ˆ ™‹Ž†Ž‹ˆ‡ †—”‹‰ –Ї ‘•–”—
–‹‘ ’Šƒ•‡ ‘ˆ ƒ
”‘Œ‡
–ǡ ƒŽŽ ‡š
ƒ˜ƒ–‡†ǡ •–‡‡’Ǧ™ƒŽŽ‡† Бއ• ‘” –”‡
Ї• ‰”‡ƒ–‡” –Šƒ ʹǦˆ‡‡– †‡‡’ •ŠƒŽŽ
„‡
‘˜‡”‡† ƒ– –Ї
Ž‘•‡ ‘ˆ ‡ƒ
Š ™‘”‹‰ †ƒ› „› ’Ž›™‘‘† ‘” •‹‹Žƒ” ƒ–‡”‹ƒŽ•Ǥ
ˆ –Ї
–”‡
Ї•
ƒ‘– „‡
‘˜‡”‡†ǡ ‘‡ ‘” ‘”‡ ‡•
ƒ’‡ ”ƒ’•
‘•–”—
–‡† ‘ˆ ‡ƒ”–ЇǦˆ‹ŽŽ ‘”
™‘‘†‡ ’Žƒ• •ŠƒŽŽ „‡ ‹•–ƒŽŽ‡†Ǥ ‡ˆ‘”‡ •—
РБއ• ‘” –”‡
Ї• ƒ”‡ ˆ‹ŽŽ‡†ǡ –Ї› •ŠƒŽŽ
„‡ –Š‘”‘—‰ŠŽ› ‹•’‡
–‡† ˆ‘” –”ƒ’’‡† ™‹Ž†Ž‹ˆ‡Ǥ
„Ǥ ‡•–‡” „—””‘™‹‰ ‘™Ž• ƒ”‡ ƒ––”ƒ
–‡† –‘ „—””‘™ǦŽ‹‡ •–”—
–—”‡• •—
Š ƒ• ’‹’‡• ƒ†
ƒ› ‡–‡” •–‘”‡† ’‹’‡• ƒ† „‡
‘‡ –”ƒ’’‡† ‘” ‹Œ—”‡†Ǥ ŽŽ
‘•–”—
–‹‘ ’‹’‡•ǡ

—Ž˜‡”–•ǡ ‘” •‹‹Žƒ” •–”—
–—”‡• ™‹–Š ƒ †‹ƒ‡–‡” ‘ˆ ͶǦ‹
Ї• ‘” ‰”‡ƒ–‡” •–‘”‡† ƒ– ƒ

‘•–”—
–‹‘ •‹–‡ ˆ‘” ‘‡ ‘” ‘”‡ ‘˜‡”‹‰Š– ’‡”‹‘†• •ŠƒŽŽ „‡ –Š‘”‘—‰ŠŽ› ‹•’‡ –‡† ˆ‘”
™‡•–‡” „—””‘™‹‰ ‘™Ž „‡ˆ‘”‡ –Ї ’‹’‡ ‹• •—„•‡“—‡–Ž› „—”‹‡†ǡ ƒ’’‡†ǡ ‘” ‘–Ї”™‹•‡
—•‡† ‘” ‘˜‡† ‹ ƒ› ™ƒ›Ǥ

Ǥ ŽŽ ˆ‘‘†Ǧ”‡Žƒ–‡† –”ƒ•Š ‹–‡• •—
Š ƒ• ™”ƒ’’‡”•ǡ
ƒ•ǡ „‘––އ•ǡ ƒ† ˆ‘‘† •
”ƒ’• •ŠƒŽŽ „‡
†‹•’‘•‡† ‘ˆ ‹ •‡
—”‡Ž›
Ž‘•‡†
‘–ƒ‹‡”• ƒ† ”‡‘˜‡† ƒ– އƒ•– ‘
‡ ƒ ™‡‡ ˆ”‘ –Ї
”‘Œ‡
– •‹–‡Ǥ
†Ǥ ‘ ’‡–•ǡ •—
Š ƒ• †‘‰• ‘”
ƒ–•ǡ •ŠƒŽŽ „‡ „”‘—‰Š– ‘–‘ –Ї ”‘Œ‡
– •‹–‡ „› ™‘”‡”• –‘
’”‡˜‡– Šƒ”ƒ••‡–ǡ ‘”–ƒŽ‹–› ‘ˆ ™‡•–‡” „—””‘™‹‰ ‘™Ž•ǡ ‘” †‡•–”— –‹‘ ‘ˆ „—””‘™•Ǥ
‡Ǥ •‡ ‘ˆ ”‘†‡–‹
‹†‡• ƒ† Ї”„‹
‹†‡• ‘ –Ї ”‘Œ‡
– •‹–‡ •ŠƒŽŽ „‡ ”‡•–”‹
–‡†Ǥ Š‹• ‹•
‡
‡••ƒ”› –‘ ’”‡˜‡– ’”‹ƒ”› ‘” •‡
‘†ƒ”› ’‘‹•‘‹‰ ‘ˆ ™‡•–‡” „—””‘™‹‰ ‘™Ž• ƒ†
–Ї †‡’އ–‹‘ ‘ˆ ’”‡› ’‘’—Žƒ–‹‘• ‘ ™Š‹
Š –Ї› †‡’‡†Ǥ ŽŽ —•‡• ‘ˆ •—
Š
‘’‘—†•
•ŠƒŽŽ ‘„•‡”˜‡ Žƒ„‡Ž ƒ† ‘–Ї” ”‡•–”‹
–‹‘• ƒ†ƒ–‡† „› –Ї ǤǤ ˜‹”‘‡–ƒŽ
”‘–‡
–‹‘ ‰‡
›ǡ ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘‘† ƒ† ‰”‹
—Ž–—”‡ǡ ƒ† ‘–Ї” –ƒ–‡
ƒ† ˆ‡†‡”ƒŽ އ‰‹•Žƒ–‹‘ǡ ƒ• ™‡ŽŽ ƒ• ƒ††‹–‹‘ƒŽ ”‘Œ‡
–Ǧ”‡Žƒ–‡† ”‡•–”‹
–‹‘• †‡‡‡†
‡
‡••ƒ”› „› –Ї ‡”˜‹
‡Ǥ
ˆ ”‘†‡–
‘–”‘Ž —•– „‡
‘†—
–‡†ǡ œ‹
’Š‘•’Š‹†‡ •ŠƒŽŽ
„‡ —•‡† „‡
ƒ—•‡ ‘ˆ ƒ ’”‘˜‡ Ž‘™‡” ”‹• –‘ ™‹Ž†Ž‹ˆ‡Ǥ
ˆǤ  ”‡’”‡•‡–ƒ–‹˜‡ •ŠƒŽŽ „‡ ƒ’’‘‹–‡† „› –Ї ”‘Œ‡
– ’”‘’‘‡– ‘”
‘–”ƒ
–‘” ™Š‘ •ŠƒŽŽ
„‡ –Ї
‘–ƒ
– •‘—”
‡ ˆ‘” ƒ› ‡’Ž‘›‡‡ ‘”
‘–”ƒ
–‘” ™Š‘ ‹‰Š– ‘„•‡”˜‡ ƒ ™‡•–‡”
„—””‘™‹‰ ‘™ŽǤ Ї ”‡’”‡•‡–ƒ–‹˜‡ ™‹ŽŽ „‡ ‹†‡–‹ˆ‹‡† †—”‹‰ –Ї ‡’Ž‘›‡‡ ‡†— ƒ–‹‘
’”‘‰”ƒ ƒ† Š‹• ‘” Ї” ƒ‡ ƒ† –‡Ž‡’Š‘‡ —„‡” •ŠƒŽŽ „‡ ’”‘˜‹†‡† –‘ –Ї †‡•‹‰ƒ–‡† „‹‘Ž‘‰‹•–Ǥ
‰Ǥ  ‡’Ž‘›‡‡ ‡†—
ƒ–‹‘ ’”‘‰”ƒ •ŠƒŽŽ „‡
‘†—
–‡† ˆ‘” ƒ› ”‘Œ‡
– –Šƒ– Šƒ•
ƒ–‹
‹’ƒ–‡† ‹’ƒ
–• –‘ ™‡•–‡” „—””‘™‹‰ ‘™Ž•ǡ ™ƒ‹•‘ǯ• Šƒ™•ǡ Ž‘‰‰‡”Їƒ† VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 4

Mitigated Negative Declaration
„‡ ”‡“—‹”‡† ˆ‘” ™‘”
‘†—
–‡† †—”‹‰ –Š‹• ’ƒ”– ‘ˆ –Ї ›‡ƒ”ǡ ƒ† ‘ ˆ—”–Ї” ‹–‹‰ƒ–‹‘ ˆ‘” ‡•– †‹•–—”„ƒ
‡ ‹• ”‡“—‹”‡†Ǥ
ƒǤ ”‘–‘
‘Ž —”˜‡›•Ǥ ‘” ™‘” –Šƒ– „‡‰‹• „‡–™‡‡ ƒ”
Š ͳ ƒ† —‰—•– ͵Ͳǡ ƒ “—ƒŽ‹ˆ‹‡†
„‹‘Ž‘‰‹•– ™‹–Š ‡š’‡”–‹•‡ ‹ ™ƒ‹•‘̵• Šƒ™ •ŠƒŽŽ
‘†—
– ’”‘–‘
‘Ž •—”˜‡›• ‘ˆ
’‘–‡–‹ƒŽ ‡•–‹‰ Šƒ„‹–ƒ– ™‹–Š‹ ͲǤͷ ‹Ž‡• ‘ˆ ƒ›
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• ’”‹‘” –‘
‹‹–‹ƒ–‹‘ ‘ˆ •—
Š ƒ
–‹˜‹–‹‡•Ǥ Ї ”‘Œ‡
– ƒ’’Ž‹
ƒ– •ŠƒŽŽ
‘†—
– ƒ ’”‘–‘
‘ŽǦއ˜‡Ž
•—”˜‡› ‹
‘ˆ‘”ƒ
‡ ™‹–Š –Ї ̶‡
‘‡†‡† ‹‹‰ ƒ† ‡–Š‘†‘Ž‘‰› ˆ‘”
™ƒ‹•‘̵•
ƒ™ ‡•–‹‰ —”˜‡›• ‹ ƒŽ‹ˆ‘”‹ƒ̵• ‡–”ƒŽ ƒŽŽ‡›ǡ̶ ™ƒ‹•‘̵• ƒ™
‡
А‹
ƒŽ †˜‹•‘”› ‘‹––‡‡ ሺሻ
ሺŠ––’•ǣȀȀ™™™Ǥ™‹Ž†Ž‹ˆ‡Ǥ
ƒǤ‰‘˜Ȁ
‘•‡”˜ƒ–‹‘Ȁ•—”˜‡›Ǧ’”‘–‘
‘Ž•͓͵͹͹ʹͺͳʹͺͶǦ„‹”†•ሻ
ሺƒ› ͵ͳǡ ʹͲͲͲሻǡ Ї”‡„› ‹
‘”’‘”ƒ–‡† „› ”‡ˆ‡”‡
‡Ǥ Š‹• ’”‘–‘
‘Ž ’”‡•
”‹„‡•
‹‹— •–ƒ†ƒ”†• ˆ‘” •—”˜‡› ‡“—‹’‡–ǡ ‘†‡ ‘ˆ •—”˜‡›ǡ ƒ‰Ž‡ ƒ† †‹•–ƒ ‡ –‘ –”‡‡ǡ
•’‡‡†ǡ ˜‹•—ƒŽ ƒ† ƒ—†‹„އ
Ž—‡•ǡ †‹•–”ƒ
–‹‘•ǡ ‘–‡• ƒ† ‘„•‡”˜ƒ–‹‘•ǡ ƒ† –‹‹‰ ‘ˆ
•—”˜‡›•Ǥ
 ™”‹––‡ ”‡’‘”– ™‹–Š –Ї ’”‡Ǧ
‘•–”—
–‹‘ •—”˜‡› ”‡•—Ž–• —•– „‡ ’”‘˜‹†‡† –‘ –Ї
Žƒ‹‰ ‡’ƒ”–‡– ƒ†   ™‹–Š‹ ͵Ͳ †ƒ›• ‘ˆ
‘‡
‡‡– ‘ˆ

‘•–”—
–‹‘Ǧ”‡Žƒ–‡† ƒ
–‹˜‹–‹‡•Ǥ Ї ”‡’‘”– •ŠƒŽŽ ‹
Ž—†‡ǣ
–Ї
–Ї †ƒ–‡ ‘ˆ –Ї ”‡’‘”–ǡ
ƒ—–Š‘”• ƒ† ƒˆˆ‹Ž‹ƒ–‹‘•ǡ
‘–ƒ
– ‹ˆ‘”ƒ–‹‘ǡ ‹–”‘†—
–‹‘ǡ ‡–Š‘†•ǡ •–—†› Ž‘
ƒ–‹‘ǡ
‹
Ž—†‹‰ ƒ ƒ’ǡ ”‡•—Ž–•ǡ †‹•
—••‹‘ǡ ƒ† Ž‹–‡”ƒ–—”‡
‹–‡†Ǥ

ˆ –Ї ”‡“—‹”‡† ’”‘–‘
‘Ž •—”˜‡›• •Š‘™ –Ї”‡ ƒ”‡ ‘ ƒ
–‹˜‡ ™ƒ‹•‘̵• Šƒ™ ‡•–•
™‹–Š‹ ͲǤͷ ‹Ž‡• ‘ˆ
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ –Ї ‘ ˆ—”–Ї” ‹–‹‰ƒ–‹‘ ˆ‘” ‡•–
†‹•–—”„ƒ
‡ ™‹ŽŽ „‡ ”‡“—‹”‡†Ǥ
ˆ ’”‘–‘
‘Ž •—”˜‡›• •Š‘™ –Šƒ– –Ї”‡ ƒ”‡ ‘ ƒ
–‹˜‡
™ƒ‹•‘̵• Šƒ™ ‡•–• ™‹–Š‹ ͳͲ ‹Ž‡• ‘ˆ –Ї •‹–‡ǡ –Ї ‘ ˆ—”–Ї” ‹–‹‰ƒ–‹‘ ˆ‘” ˆ‘”ƒ‰‹‰ ‹’ƒ
–• ™‹ŽŽ „‡ ”‡“—‹”‡†Ǥ
„Ǥ ‡•– ˜‘‹†ƒ
‡Ǥ
ˆ ‡•–‹‰ ™ƒ‹•‘̵• Šƒ™• ƒ”‡ ‘„•‡”˜‡† ™‹–Š‹ ͲǤͷ ‹Ž‡• ‘ˆ –Ї ”‘Œ‡
– •‹–‡ †—”‹‰ –Ї ’”
’”‡Ǧƒ’’”‘˜‡† ‹–‹‰ƒ–‹‘
‘–‘
‘Ž •—”˜‡›•ǡ –Ї ”‘Œ‡
– ƒ’’Ž‹
ƒ– —•– ‹’އ‡–  
‡ƒ•—”‡• ‹
Ž—†‡ǣ
 ‡ƒ•—”‡• –‘ ƒ˜‘‹† ‡•– ‹’ƒ
–• †—”‹‰
‘•–”—
–‹‘Ǥ Ї•‡
x ŽŽ ”‘Œ‡
–Ǧ”‡Žƒ–‡† ƒ
–‹˜‹–‹‡• ™‹–Š –Ї ’‘–‡–‹ƒŽ –‘
ƒ—•‡ ‡•– ƒ„ƒ†‘‡– ‘”
ˆ‘”
‡† ˆŽ‡†‰‹‰ ‘ˆ ›‘—‰ •ŠƒŽŽ „‡ ƒ˜‘‹†‡† —–‹Ž –Ї ›‘—‰ Šƒ˜‡ ˆŽ‡†‰‡†Ǥ x
ˆ †‹•–—”„ƒ
‡•ǡ Šƒ„‹–ƒ–
‘˜‡”•‹‘•ǡ ‘” ‘–Ї” ”‘Œ‡
–Ǧ”‡Žƒ–‡† ƒ
–‹˜‹–‹‡• –Šƒ– ƒ›

ƒ—•‡ ‡•– ƒ„ƒ†‘‡– ‘” ˆ‘”
‡† ˆŽ‡†‰‹‰ ƒ”‡ ‡
‡••ƒ”›ǡ ™‹–Š‹ –Ї ‡•–
’”‘–‡
–‹‘ „—ˆˆ‡” œ‘‡ ሺͲǤͷǦ‹Ž‡ሻǡ ‘‹–‘”‹‰ ‘ˆ –Ї ‡•– •‹–‡ „› ƒ “—ƒŽ‹ˆ‹‡† ”ƒ’–‘” „‹‘Ž‘‰‹•–ǡ ˆ—†‡† „› –Ї ”‘Œ‡
– ƒ’’Ž‹
ƒ–ǡ •ŠƒŽŽ „‡ ”‡“—‹”‡† –‘ †‡–‡”‹‡ ‹ˆ –
‡•– ‹• ƒ„ƒ†‘‡†Ǥ
ˆ –Ї ‡•– ‹• ƒ„ƒ†‘‡†ǡ „—– –Ї ‡•–Ž‹‰• ƒ”‡ •–‹ŽŽ ƒŽ‹˜‡ǡ – Ї
Ї
”‘Œ‡
– ’”‘’‘‡– ‹• ”‡“—‹”‡† –‘ ˆ—† –Ї ”‡
‘˜‡”› ƒ† Šƒ
‹‰ǡ –Šƒ– ‹•ǡ –Ї

‘–”‘ŽŽ‡† ”‡Ž‡ƒ•‡ ‘ˆ
ƒ’–‹˜‡Ǧ”‡ƒ”‡† ›‘—‰ǡ ‘ˆ –Ї ‡•–Ž‹‰Ǥ
x Ї ”‘Œ‡
– ƒ’’Ž‹
ƒ– •ŠƒŽŽ „‡ ”‡“—‹”‡† –‘
‘‘”†‹ƒ–‡ ™‹–Š   –‘ †‡–‡”‹‡ ‹ˆ
”‘Œ‡
– ƒ
–‹˜‹–‹‡• ™‹–Š –Ї ’‘–‡–‹ƒŽ –‘
ƒ—•‡ †‹•–—”„ƒ
‡ –‘ ‡•–‹‰ ™ƒ‹•‘̵•
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 6
Mitigated Negative Declaration
Šƒ™• ™‹–Š‹ –Ї ͲǤͷǦ‹Ž‡ „—ˆˆ‡” ƒ› ’”‘
‡‡† ™‹–Š ƒ ”‡†—
‡† ‡•– „—ˆˆ‡” ƒ† ƒ
ƒ’’”‘˜‡† „‹‘Ž‘‰‹
ƒŽ ‘‹–‘”Ǥ   ƒ› ƒ—–Š‘”‹œ‡ ƒ ”‡†—
‡† ‡•– „—ˆˆ‡” ™‹–Š –Ї
’”‡•‡
‡ ‘ˆ ƒ ‘‹–‘”‹‰ „‹‘Ž‘‰‹•– †—”‹‰
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• –‘ ‡•—”‡ –Šƒ–
–Ї ‡•– ‹• ‘– †‹•–—”„‡†Ǥ ‘—–‹‡ †‹•–—”„ƒ
‡• •—
Š ƒ• ƒ‰”‹
—Ž–—”ƒŽ ƒ
–‹˜‹–‹‡•ǡ

‘—–‡” –”ƒˆˆ‹
ǡ ƒ† ”‘—–‹‡ ƒ‹–‡ƒ
‡ ƒ
–‹˜‹–‹‡• ™‹–Š‹ ͲǤͷ ‹Ž‡• ‘ˆ ƒ ƒ
–‹˜‡
‡•– ƒ”‡ ‘– ’”‘Š‹„‹–‡†Ǥ
 
Ǧ͹ǣ ”‹‘” –‘ –Ї ‹‹–‹ƒ–‹‘ ‘ˆ
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ ƒŽŽ
‘•–”—
–‹‘ ’‡”•‘‡Ž •ŠƒŽŽ
ƒ––‡† ƒ ‘”‡” ˜‹”‘‡–ƒŽ ™ƒ”‡‡•• ”ƒ‹‹‰ ’”‘‰”ƒ †‡˜‡Ž‘’‡† „› ƒ “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•–Ǥ › ’‡”•‘‡Ž ƒ••‘
‹ƒ–‡† ™‹–Š
‘•–”—
–‹‘ –Šƒ– †‹† ‘– ƒ––‡† –Ї ‹‹–‹ƒŽ –”ƒ‹‹‰
•ŠƒŽŽ „‡ –”ƒ‹‡† „› –Ї ƒ—–Š‘”‹œ‡† „‹‘Ž‘‰‹•– ‘” ƒ—–Š‘”‹œ‡† ‘•–”—
–‹‘ ’‡”•‘‡Ž ’”‹‘” –‘

™‘”‹‰ ™‹–Š‹ –Ї ”‘Œ‡
– ƒ”‡ƒǤ › ‡’Ž‘›‡‡ ”‡•’‘•‹„އ ˆ‘” –Ї ‘’‡”ƒ–‹‘•ǡ ƒ‹–‡ƒ ‡ǡ

‘” †‡
‘‹••‹‘‹‰ ‘ˆ ”‘Œ‡
– ˆƒ
‹Ž‹–‹‡• •ŠƒŽŽ ƒ––‡† –Ї ‘”‡”

”ƒ‹‹‰ ’”‘‰”ƒ ’”‹‘” –‘ •–ƒ”–‹‰ ™‘” ‘ –Ї ”‘Œ‡
–Ǥ ŽŽ ‘
˜‹”‘‡–ƒŽ ™ƒ”‡‡••
Ǧ•‹–‡ ™‘”‡”• •ŠƒŽŽ ƒ––‡†

–”ƒ‹‹‰ ‘ ƒ ƒ—ƒŽ „ƒ•‹•Ǥ Ї ”‘‰”ƒ •ŠƒŽŽ „‡ †‡˜‡Ž‘’‡† ƒ† ’”‡•‡–‡† „› –Ї ”‘Œ‡ –̵•

“—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•–ሺ•ሻ ‘” †‡•‹‰‡‡ ƒ’’”‘˜‡† „› –Ї “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•–ሺ•ሻǤ Ї ’”‘‰”ƒ •ŠƒŽŽ

‹
Ž—†‡ ‹ˆ‘”ƒ–‹‘ ƒ„‘—– –Ї Ž‹ˆ‡ Š‹•–‘”‹‡• ‘ˆ –ƒ–‡ ‘” ˆ‡†‡”ƒŽŽ› Ž‹•–‡† •’‡ ‹‡• ™‹–Š ’‘–‡–‹ƒŽ

–‘ ‘

—” ‹ –Ї ”‘Œ‡
– ƒ”‡ƒǡ –Ї‹” އ‰ƒŽ •–ƒ–—•ǡ
‘—”•‡ ‘ˆ ƒ
–‹‘ •Š‘—ކ –Ї•‡ •’‡
‹‡• „‡

‡
‘—–‡”‡† ‘Ǧ•‹–‡ǡ ƒ† ƒ˜‘‹†ƒ
‡ ƒ† ‹‹‹œƒ–‹‘ ‡ƒ•—”‡• –‘ ’”‘–‡
– –Ї•‡ •’‡
‹‡•Ǥ Ї

–”ƒ‹‹‰ •ŠƒŽŽ ‹
Ž—†‡ –Ї ˆ‘ŽŽ‘™‹‰
‘’‘‡–•ǣ

ƒǤ
ˆ‘”ƒ–‹‘ ƒ„‘—– –Ї Ž‹ˆ‡ Š‹•–‘”› ƒ† ‹†‡–‹ˆ‹
ƒ–‹‘ ‘ˆ ˆ‡†‡”ƒŽŽ› Ž‹•–‡† ’Žƒ– ƒ†

™‹Ž†Ž‹ˆ‡ •’‡
‹‡•ǡ ƒ• ™‡ŽŽ ƒ• ‘–Ї” •’‡
‹ƒŽǦ•–ƒ–—• ’Žƒ– ƒ† ™‹Ž†Ž

ƒˆˆ‡
–‡† „› ”‘Œ‡
– ƒ
–‹˜‹–‹‡•Ǥ Ї ’”‘‰”ƒ •ŠƒŽŽ ’”‡•‡– –Ї Ž
‹ˆ‡ •’‡
‹‡• –Šƒ– ƒ› „‡
‡‰ƒŽ ’”‘–‡
‹‘ – •–ƒ–—• ‘ˆ
‡ƒ
Š •—
Š •’‡
‹‡•ǡ –Ї †‡ˆ‹‹–‹‘ ‘ˆ Dz–ƒ‡dz —†‡” –Ї ‡ †‡”ƒŽ †ƒ‰‡”‡† ’‡ ‹‡• 
–
ƒ† ƒŽ‹ˆ‘”‹ƒ †ƒ‰‡”‡† ’‡
‹‡• 
–ǡ ‡ƒ•—”‡• –Ї ”‘Œ‡
– ’”‘’‘‡–Ȁ‘’‡”ƒ–‘”
•ŠƒŽŽ ‹’އ‡– –‘ ’”‘–‡
– –Ї •’‡
‹‡•ǡ ”‡’‘”–‹‰ ”‡“—‹”‡‡–•ǡ •’‡
‹ˆ‹
‡ƒ•—”‡• ˆ‘”
™‘”‡”• –‘ ƒ˜‘‹† –ƒ‡ ‘ˆ •’‡
‹ƒŽǦ•–ƒ–—• ’Žƒ– ƒ† ™‹Ž†Ž‹ˆ‡ •’‡
‹‡•ǡ ƒ† ’‡ƒŽ–‹‡• ˆ‘”
˜‹‘Žƒ–‹‘ ‘ˆ ”‘Œ‡
– ’‡”‹–• ‘” ‘–Ї” ”‘Œ‡
–Ǧ”‡Žƒ–‡† ‡˜‹”‘‡–ƒŽ ‡ƒ•—”‡•Ǥ
„Ǥ  ƒ
‘™Ž‡†‰‡‡– ˆ‘” •‹‰‡† „› ‡ƒ
Š ™‘”‡” ‹†‹
ƒ–‹‰ –Šƒ– –Ї ‘”‡”
˜‹”‘‡–ƒŽ ™ƒ”‡‡•• ”ƒ‹‹‰ ƒ† †—
ƒ–‹‘ ’”‘‰”ƒ Šƒ• „‡‡
‘’އ–‡† •ŠƒŽŽ
„‡ ‡’– ‘ ˆ‹Ž‡ ƒ– –Ї
‘•–”—
–‹‘ •‹–‡Ǥ

Ǥ 
‘’› ‘ˆ –Ї –”ƒ‹‹‰ –”ƒ•
”‹’– ƒ†Ȁ‘” –”ƒ‹‹‰ ˜‹†‡‘ǡ ƒ• ™‡ŽŽ ƒ• ƒ Ž‹•– ‘ˆ –Ї ƒ‡• ‘ˆ ƒŽŽ ’‡”•‘‡Ž ™Š‘ ƒ––‡†‡† –Ї ‘”‡” ˜‹”‘‡–ƒŽ ™ƒ”‡‡•• ”ƒ‹‹‰ ƒ† †—
ƒ–‹‘ ’”‘‰”ƒǡ ƒ† •‹‰‡† ƒ
‘™Ž‡†‰‡‡– ˆ‘”•ǡ •ŠƒŽŽ „‡ •—„‹––‡† –‘ –Ї

‘–”ƒ
–‘”ǯ•
‘•–”—
–‹‘ ƒƒ‰‡” ‘” ‘Ǧ•‹–‡ •—’‡”‹–‡†‡–Ǥ
†Ǥ 
‘’› ‘ˆ –Ї –”ƒ‹‹‰ –”ƒ•
”‹’–ǡ –”ƒ‹‹‰ ˜‹†‡‘ ‘” ‹ˆ‘”ƒ–‹‘ƒŽ „‹†‡” ˆ‘” •’‡
‹ˆ‹

’”‘
‡†—”‡• •ŠƒŽŽ „‡ ‡’– ƒ˜ƒ‹Žƒ„އ ˆ‘” ƒŽŽ ’‡”•‘‡Ž –‘ ”‡˜‹‡™ ƒ† „‡ ˆƒ‹Ž‹ƒ” ™‹–Šǡ ƒ• ‡
‡••ƒ”›Ǥ
‡Ǥ Ї
‘•–”—
–‹‘
”‡™• ƒ†
‘–”ƒ
–‘”ሺ•ሻ •ŠƒŽŽ „‡ ”‡•’‘•‹„އ ˆ‘” ’”‡˜‡–‹‰
—ƒ—–Š‘”‹œ‡† ‹’ƒ
–• ˆ”‘ ”‘Œ‡
– ƒ
–‹˜‹–‹‡• –‘ •‡•‹–‹˜‡ „‹‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• –Šƒ– ƒ”‡
‘—–•‹†‡ –Ї ƒ”‡ƒ• †‡ˆ‹‡† ƒ• •—„Œ‡
– –‘ ‹’ƒ
–• „› ”‘Œ‡
– ’‡”‹–•Ǥ ƒ—–Š‘”‹œ‡†
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 7

Mitigated Negative Declaration
‹’ƒ
–• ƒ› ”‡•—Ž– ‹ ”‘Œ‡
– •–‘’’ƒ‰‡ǡ ƒ†Ȁ‘” ˆ‹‡• †‡’‡†‹‰ ‘ –Ї ‹’ƒ
– ƒ†

‘‘”†‹ƒ–‹‘ ™‹–Š –Ї ƒ’’”‘’”‹ƒ–‡ –ƒ–‡ ‘” ˆ‡†‡”ƒŽ „‹‘Ž‘‰‹ ƒŽ ƒ‰‡
›Ǥ
 
Ǧͺǣ ”‹‘” –‘ –Ї ‹••—ƒ
‡ ‘ˆ ƒ› ‰”ƒ†‹‰ ‘” „—‹Ž†‹‰ ’‡”‹–ǡ –Ї ”‘Œ‡
–
’”‘’‘‡–Ȁ†‡˜‡Ž‘’‡” •ŠƒŽŽ
‘†—
– ƒ †‡Ž‹‡ƒ–‹‘ ‘ˆ –Ї —––‘™‹ŽŽ‘™ ‹–
Šǡ ƒ† ’”‡’ƒ”‡ ƒ
“—ƒ–‹
‡•‘—”
‡• ‡Ž‹‡ƒ–‹‘ ‡’‘”– ሺሻǤ Ї  •ŠƒŽŽ „‡ •—„‹––‡† ™‹–Š ƒ ˆ‘”ƒŽ ‘–‹ˆ‹
ƒ–‹‘ –‘ –Ї  ”› ‘”’• ‘ˆ ‰‹‡‡”• ሺሻǡ ƒ–‡” ‡•‘—” ‡• ‘–”‘Ž ‘ƒ”†
ሺሻǡ ƒ† ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ሺ ሻǤ ˆ ‘
‘‡–• ‘”
”‡“—‡•–• ˆ‘” ƒ††‹–‹‘ƒŽ ’‡”‹––‹‰ ƒ”‡ ”‡
‡‹˜‡† „› –Ї ƒ‰‡
‹‡•ǡ ‘ ˆ—”–Ї” ƒ
–‹‘ ‹•
‡
‡••ƒ”›Ǥ 
‘’› ‘ˆ ƒŽŽ
‘””‡•’‘†‡
‡ •ŠƒŽŽ „‡ •—„‹––‡† –‘ –Ї އƒ† ƒ‰‡
›Ǥ

ˆ ƒ ”‡‰—Žƒ–‘”› ƒ‰‡
›
‘‡–• ‘” ”‡“—‡•–• ƒ††‹–‹‘ƒŽ ’‡”‹––‹‰ǡ –Ї ˆ‘ŽŽ‘™‹‰ ƒ –‹‘•
ƒ› „‡ –ƒ‡Ǥ 
‘’› ‘ˆ ƒŽŽ
‘””‡•’‘†‡
‡ ƒ† •—„•‡“—‡– ’‡”‹––‹‰ ƒ†Ȁ‘” ”‡’‘”–• •ŠƒŽŽ
„‡ ƒ†‡ ƒ˜ƒ‹Žƒ„އ –‘ –Ї ‡ƒ† ‰‡
›Ǥ Ї ”‡’‘”– •ŠƒŽŽ ‹
Ž—†‡ ‹ˆ‘”ƒ–‹‘ ƒ• •Š‘™ „‡Ž‘™ǡ
ƒ• ƒ ’Žƒ ‹ˆ ‡
‡••ƒ”›ǡ ƒ† •ŠƒŽŽ ‘—–Ž‹‡
‘’Ž‹ƒ
‡ ™‹–Š –Ї ˆ‘ŽŽ‘™‹‰ǣ
ƒǤ ‡Ž‹‡ƒ–‹‘ ‘ˆ ƒŽŽ Œ—”‹•†‹
–‹‘ƒŽ ˆ‡ƒ–—”‡• ƒ– –Ї ’”‘Œ‡
– •‹–‡Ǥ ‘–‡–‹ƒŽ Œ—”‹•†‹
–‹‘ƒŽ
ˆ‡ƒ–—”‡• ™‹–Š‹ –Ї ’”‘Œ‡
– „‘—†ƒ”› ‹†‡–‹ˆ‹‡† ‹ –Ї Œ—”‹•†‹
–‹‘ƒŽ †‡Ž‹‡ƒ–‹‘
”‡’‘”– ƒ› „‡ •Š‘™
„Ǥ
ˆ –Ї ”‘Œ‡
– Šƒ• ƒ
‹ ’Žƒ ˆ‘”Ǥ
’‘–‡–‹ƒŽ –‘ †‹”‡
–Ž› ‘” ‹ ‹”‡
–Ž› † ‹’ƒ
– Œ—”‹•†‹
‹‘ƒŽ – ƒ“—ƒ–‹

”‡•‘—”
‡•ǡ ƒ ˆ‘”ƒŽ ƒ“—ƒ–‹
”‡•‘—”
‡ †‡Ž‹‡ƒ–‹‘ ‘ˆ –Ї•‡ ƒ”‡ƒ• •ŠƒŽŽ „‡ ’‡”ˆ‘”‡† „›
ƒ “—ƒŽ‹ˆ‹‡† ’”‘ˆ‡••‹‘ƒŽ –‘ †‡–‡”‹‡ –Ї ‡š–‡– ‘ˆ ƒ‰‡ › Œ—”‹•†‹
–‹‘ ƒ†
’‡”‹–•Ȁƒ—–Š‘”‹œƒ–‹‘• ˆ”‘ –Ї ƒ’’”‘’”‹ƒ–‡ ”‡‰—Žƒ–‹‰ ƒ‰‡ ‹‡• ሺ‡–”ƒŽ ƒŽŽ‡›
‡‰‹‘ƒŽ ƒ–‡” —ƒŽ‹–› ‘–”‘Ž ‘ƒ”† ሺሻǡ   ƒ†  ”› ‘”’• ‘ˆ ‰‹‡‡”• ሺሻ •ŠƒŽŽ „‡ ‘„–ƒ‹‡† ’”‹‘” –‘ †‹•–—”„ƒ
‡ –‘ Œ—”‹•†‹
–‹‘ƒŽ ˆ‡ƒ–—”‡•Ǥ

ˆ ‹– ‹• †‡–‡”‹‡† –Šƒ– †”ƒ‹ƒ‰‡ ‹• Œ—”‹•†‹
–‹‘ƒŽ ƒ†
ƒ‘– „‡ ƒ˜‘‹†‡†ǡ –Ї ”‘Œ‡
–
’”‘’‘‡– •ŠƒŽŽ ‘„–ƒ‹ ƒ ‡
–‹‘ ͶͲͳ ƒ–‡” —ƒŽ‹–› ‡”–‹ˆ‹
ƒ–‹‘ ˆ”‘ –Ї ǡ ƒ
‡
–‹‘ ͶͲͶ ’‡”‹– ˆ”‘ ǡ ƒ† ƒ ƒ‡ ƒ† –”‡ƒ„‡† Ž–‡”ƒ–‹‘ ‰”‡‡‡– —†‡” ‡
–‹‘ ͳ͸Ͳʹ ˆ”‘ –Ї  ǡ ‹ˆ ”‡“—‹”‡†ǡ ’”‹‘” –‘ ‹’ƒ
–‹‰ ƒ› ™ƒ–‡”•Ǥ
• ’ƒ”– ‘ˆ –Ї•‡ ƒ—–Š‘”‹œƒ–‹‘•ǡ
‘’‡•ƒ–‘”› ‹–‹‰ƒ–‹‘ ƒ› „‡ ”‡“—‹”‡† „› – ‡
”‡‰—Žƒ–‹‰ ƒ‰‡
‹‡• –‘ ‘ˆˆ•‡– –Ї Ž‘•• ‘ˆ ƒ“—ƒ–‹
”‡•‘—”
‡•Ǥ
ˆ •‘ǡ ƒ† ƒ• ’ƒ”– ‘ˆ –
Š
Ї
’‡”‹– ƒ’’Ž‹
ƒ–‹‘ ’”‘
‡••ǡ ƒ “—ƒŽ‹ˆ‹‡† ’”‘ˆ‡••‹‘ƒŽ •ŠƒŽŽ †”ƒˆ– ƒ ‹–‹‰ƒ–‹‘ ƒ† ‘‹–‘”‹‰ Žƒ –‘ ƒ††”‡•• ‹’އ‡–ƒ–‹‘ ƒ† ‘‹–‘”‹‰ ”‡“—‹”‡‡–• —†‡” –Ї ’‡”‹– –‘ ‡•—”‡ –Šƒ– –Ї ”‘Œ‡
– ™‘—ކ ”‡•—Ž– ‹ ‘ ‡– Ž‘•• ‘ˆ Šƒ„‹–ƒ– ˆ—
–‹‘• ƒ†
˜ƒŽ—‡•Ǥ Ї Žƒ •ŠƒŽŽ
‘–ƒ‹ǡ ƒ– ƒ ‹‹—ǡ ‹–‹‰ƒ–‹‘ ‰‘ƒŽ• ƒ† ‘„Œ‡
–‹˜‡•ǡ
‹–‹‰ƒ–‹‘ Ž‘
ƒ–‹‘ǡ ƒ †‹•
—••‹‘ ‘ˆ ƒ
–‹‘• –‘ „‡ ‹’އ‡–‡† –‘ ‹–‹‰ƒ–‡ –Ї ‹’ƒ
–ǡ
‘‹–‘”‹‰ ‡–Š‘†• ƒ† ’‡”ˆ‘”ƒ
‡
”‹–‡”‹ƒǡ ‡š–‡– ‘ˆ ‘‹–‘”‹‰ –‘ „‡
‘†—
–‡†ǡ
ƒ
–‹‘• –‘ „‡ –ƒ‡ ‹ –Ї ‡˜‡– –Šƒ– –Ї ‹–‹‰ƒ–‹‘ ‹• ‘– •—

‡••ˆ—Žǡ ƒ† ”‡’‘”–‹‰
”‡“—‹”‡‡–•Ǥ Ї Žƒ •ŠƒŽŽ „‡ ƒ’’”‘˜‡† „› –Ї ƒ’’”‘’”‹ƒ–‡ ”‡‰—Žƒ–‹‰ ƒ‰‡ ‹‡•ǡ ƒ†

‘’‡•ƒ–‘”› ‹–‹‰ƒ–‹‘ •ŠƒŽŽ –ƒ‡ ’Žƒ
‡ ‡‹–Ї” ‘Ǧ•‹–‡ ‘” ƒ– ƒ ƒ’’”‘’”‹ƒ–‡ ‘ˆˆǦ•‹–‡
Ž‘
ƒ–‹‘Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 8

Mitigated Negative Declaration

Ǥ › ƒ–‡”‹ƒŽȀ•’‘‹Ž• ‰‡‡”ƒ–‡† ˆ”‘ ’”‘Œ‡
– ƒ
–‹˜‹–‹‡•
‘–ƒ‹‹‰ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ•
•ŠƒŽŽ „‡ Ž‘
ƒ–‡† ƒ™ƒ› ˆ”‘ Œ—”‹•†‹
–‹‘ƒŽ ƒ”‡ƒ• ‘” •’‡
‹ƒŽǦ•–ƒ–—• Šƒ„‹–ƒ– ƒ† ’”‘–‡
–‡†
ˆ”‘ •–‘” ™ƒ–‡” ”—Ǧ‘ˆˆ —•‹‰ –‡’‘”ƒ”› ’‡”‹‡–‡” •‡†‹‡– „ƒ””‹‡”• •— Š ƒ•
„‡”•ǡ •‹Ž– ˆ‡
‡•ǡ ˆ‹„‡” ”‘ŽŽ•ǡ
‘˜‡”•ǡ •ƒ†Ȁ‰”ƒ˜‡Ž „ƒ‰•ǡ ƒ† •–”ƒ™ „ƒŽ‡ „ƒ””‹‡”•ǡ ƒ•
ƒ’’”‘’”‹ƒ–‡Ǥ ”‘–‡
–‹‘ ‡ƒ•—”‡• •Š‘—ކ ˆ‘ŽŽ‘™ ’”‘Œ‡
–Ǧ•’‡
‹ˆ‹

”‹–‡”‹ƒ ƒ• †‡˜‡Ž‘’‡†
‹ ƒ –‘”™ƒ–‡” ‘ŽŽ—–‹‘ ”‡˜‡–‹‘ ƒ† ”‘–‡
–‹‘ Žƒ ሺሻǤ
†Ǥ “—‹’‡–
‘–ƒ‹‹‰ Šƒœƒ”†‘—• Ž‹“—‹† ƒ–‡”‹ƒŽ• •ŠƒŽŽ „‡ •–‘”‡† ‘ ‹’‡”˜‹‘—• •—”ˆƒ
‡• ‘” ’Žƒ•–‹
‰”‘—†
‘˜‡”• –‘ ’”‡˜‡– ƒ› •’‹ŽŽ• ‘” އƒƒ‰‡ ˆ”‘
‘–ƒ‹ƒ–‹‰
–Ї ‰”‘—† ƒ† ƒ– އƒ•– ͷͲ ˆ‡‡– ‘—–•‹†‡ –Ї †‡Ž‹‡ƒ–‡† „‘—†ƒ”› ‘ˆ Œ—”‹•†‹ –‹‘ƒŽ
™ƒ–‡” ˆ‡ƒ–—”‡•Ǥ
‡Ǥ › •’‹ŽŽƒ‰‡ ‘ˆ ƒ–‡”‹ƒŽ •ŠƒŽŽ „‡ •–‘’’‡† ‹ˆ ‹–
ƒ „‡ †‘‡ •ƒˆ‡Ž›Ǥ Ї
‘–ƒ‹ƒ–‡†
ƒ”‡ƒ •ŠƒŽŽ „‡
އƒ‡†ǡ ƒ† ƒ›
‘–ƒ‹ƒ–‡† ƒ–‡”‹ƒŽ• ’”‘’‡”Ž› †‹•’‘•‡†Ǥ ‘” ƒŽŽ
•’‹ŽŽ•ǡ –Ї ’”‘Œ‡
– ˆ‘”‡ƒ ‘” †‡•‹‰ƒ–‡† ‡˜‹”‘‡–ƒŽ ”‡’”‡•‡–ƒ–‹˜‡ •ŠƒŽŽ „‡ ‘–‹ˆ‹‡†Ǥ
 Ǧͳǣ
ˆ ’”‡Š‹•–‘”‹
‘” Š‹•–‘”‹
Ǧ‡”ƒ
—Ž–—”ƒŽ ƒ–‡”‹ƒŽ• ƒ”‡ ‡
‘—–‡”‡† †—”‹‰

‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ ƒŽŽ ™‘” ‹ –Ї ‹‡†‹ƒ–‡ ˜‹
‹‹–› ‘ˆ –Ї ˆ‹† •ŠƒŽŽ ŠƒŽ– —–‹Ž ƒ
“—ƒŽ‹ˆ‹‡† ƒ”
Šƒ‡‘Ž‘‰‹•–
ƒ ‡˜ƒŽ—ƒ–‡ –Ї ˆ‹† ƒ† ƒ‡ ”‡
‘‡†ƒ–‹‘•Ǥ —Ž–—”ƒŽ ”‡•‘—”
‡
ƒ–‡”‹ƒŽ• ƒ› ‹
Ž—†‡ ’”‡Š‹•–‘”‹
”‡•‘—”
‡• •—
Š ƒ• ˆŽƒ‡† ƒ† ‰”‘—† •–‘‡ –‘‘Ž• ƒ†
†‡„”‹•ǡ •Š‡ŽŽǡ „‘‡ǡ
‡”ƒ‹
•ǡ ƒ† ˆ‹”‡Ǧƒˆˆ‡
–‡† ”‘
ǡ ƒ• ™‡ŽŽ ƒ• Š‹•–‘”‹
”‡•‘—”
‡• •—
Š ƒ•
‰Žƒ••ǡ ‡–ƒŽǡ ™‘‘†ǡ „”‹
ǡ ‘” •–”—
–—”ƒŽ ”‡ƒ–•Ǥ
ˆ ƒ “—ƒŽ‹ˆ‹‡† ƒ”
Šƒ‡‘Ž‘‰‹•– †‡–‡”‹‡• –Šƒ–
–Ї †‹•
‘˜‡”› ”‡’”‡•‡–• ƒ ’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ–
—Ž–—”ƒŽ ”‡•‘—”
‡ǡ ƒ††‹–‹‘ƒŽ ‹˜‡•–‹‰ƒ–‹‘•
ƒ› „‡ ”‡“—‹”‡† –‘ ‹–‹‰ƒ–‡ ƒ†˜‡”•‡ ‹’ƒ
–• ˆ”‘ ”‘Œ‡
– ‹’އ‡–ƒ–‹‘Ǥ Ї•‡ ƒ††‹–‹‘ƒŽ
•–—†‹‡• ƒ› ‹
Ž—†‡ ƒ˜‘‹†ƒ
‡ǡ –‡•–‹‰ǡ ƒ† ‡˜ƒŽ—ƒ–‹‘ǡ ‘” †ƒ–ƒ ”‡
‘˜‡”› ‡š
ƒ˜ƒ–‹‘Ǥ
 Ǧʹǣ
 –Ї ‡˜‡– –Šƒ– „—”‹‡† ’”‡Š‹•–‘”‹
ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• ƒ”‡ †‹•
‘˜‡”‡†
†—”‹‰ ‡š
ƒ˜ƒ–‹‘ ƒ†Ȁ‘”
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ
‘•–”—
–‹‘ •ŠƒŽŽ •–‘’ ‹ –Ї ‹‡†‹ƒ–‡
˜‹
‹‹–› ‘ˆ –Ї ˆ‹†ǡ ƒ† ƒ “—ƒŽ‹ˆ‹‡† ƒ”
Šƒ‡‘Ž‘‰‹•– •ŠƒŽŽ „‡
‘•—Ž–‡† –‘ †‡–‡”‹‡ ™Š‡–Ї” –Ї
”‡•‘—”
‡ ”‡“—‹”‡• ˆ—”–Ї” •–—†›Ǥ Ї “—ƒŽ‹ˆ‹‡† ƒ”
Šƒ‡‘Ž‘‰‹•– •ŠƒŽŽ ƒ‡ ”‡
‘‡†ƒ–‹‘• –‘
–Ї †‡˜‡Ž‘’‡” ƒ† ‹–› ‘ –Ї ‡ƒ•—”‡• –Šƒ– •ŠƒŽŽ „‡ ‹’އ‡–‡† –‘ ’”‘–‡ – –Ї †‹•
‘˜‡”‡†
”‡•‘—”
‡•ǡ ‹
Ž—†‹‰ „—– ‘– Ž‹‹–‡† –‘ ‡š
ƒ˜ƒ–‹‘ ‘ˆ –Ї ˆ‹†• ƒ† ‡˜ƒŽ—ƒ–‹‘ ‘ˆ –Ї ˆ‹†• ‹
ƒ

‘”†ƒ
‡ ™‹–Š ‡
–‹‘ ͳͷͲ͸ͶǤͷ ‘ˆ –Ї  —‹†‡Ž‹‡• Ǥ

ˆ –Ї ”‡•‘—”
‡• ƒ”‡ †‡–‡”‹‡† –‘ „‡ —‹“—‡ ’”‡Š‹•–‘”‹
ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• ƒ• †‡ˆ‹‡†
—†‡” ‡
–‹‘ ͳͷͲ͸ͶǤͷ ‘ˆ –Ї  —‹†‡Ž‹‡•ǡ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• •ŠƒŽŽ „‡ ‹†‡–‹ˆ‹‡† „› –Ї ‘‹–‘” ƒ† ”‡“—‹”‡† –‘ „‡ ’”‘˜‹†‡† –‘ –Ї †‡˜‡Ž‘’‡” ƒ† ‹–›Ǥ ’’”‘’”‹ƒ–‡ ‡ƒ•—”‡• ˆ‘” •‹‰‹ˆ‹
ƒ– ”‡•‘—”
‡•
‘—ކ ‹
Ž—†‡ ƒ˜‘‹†ƒ
‡ ‘”
ƒ’’‹‰ǡ ‹
‘”’‘”ƒ–‹‘ ‘ˆ –Ї •‹–‡ ‹ ‰”‡‡
•’ƒ
‡ǡ ’ƒ”•ǡ ‘” ‘’‡ •’ƒ
‡ǡ ‘” †ƒ–ƒ ”‡
‘˜‡”› ‡š
ƒ˜ƒ–‹‘• ‘ˆ –Ї ˆ‹†•Ǥ ‘ ˆ—”–Ї” ‰”ƒ†‹‰
•ŠƒŽŽ ‘

—” ‹ –Ї ƒ”‡ƒ ‘ˆ –Ї †‹•
‘˜‡”› —–‹Ž –Ї އƒ† ƒ‰‡
› ƒ’’”‘˜‡• –Ї ‡ƒ•—”‡• –‘
’”‘–‡
– –Ї•‡ ”‡•‘—”
‡•Ǥ
› ’”‡Š‹•–‘”‹
ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ ƒ”–‹ˆƒ
–• ”‡
‘˜‡”‡† ƒ• ƒ ”‡•—Ž– ‘ˆ ‹–‹‰ƒ–‹‘ •ŠƒŽŽ „‡ ’”‘˜‹†‡†
–‘ ƒ ‹–›Ǧƒ’’”‘˜‡† ‹•–‹–—–‹‘ ‘” ’‡”•‘ ™Š‘ ‹•
ƒ’ƒ„އ ‘ˆ ’”‘˜‹†‹‰ Ž‘‰Ǧ–‡” ’”‡•‡”˜ƒ–‹‘
–‘ ƒŽŽ‘™ ˆ—–—”‡ •
‹‡–‹ˆ‹
•–—†›Ǥ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 9
Mitigated Negative Declaration
 Ǧ͵ǣ
 –Ї ‡˜‡– –Šƒ– Š—ƒ ”‡ƒ‹• ƒ”‡ —‡ƒ”–Ї† †—”‹‰ ‡š
ƒ˜ƒ–‹‘ ƒ† ‰”ƒ†‹‰
ƒ
–‹˜‹–‹‡• ‘ˆ ƒ› ˆ—–—”‡ †‡˜‡Ž‘’‡– ”‘Œ‡
–ǡ ƒŽŽ ƒ
–‹˜‹–› •ŠƒŽŽ
‡ƒ•‡ ‹‡†‹ƒ–‡Ž›Ǥ —”•—ƒ– –‘

‡ƒŽ–Š ƒ† ƒˆ‡–› ‘†‡ ሺ
ሻ ‡
–‹‘ ͹ͲͷͲǤͷǡ ‘ ˆ—”–Ї” †‹•–—”„ƒ
‡ •ŠƒŽŽ ‘

—” —–‹Ž –Ї
‘—–› ‘”‘‡” Šƒ• ƒ†‡ –Ї ‡
‡••ƒ”› ˆ‹†‹‰• ƒ• –‘ ‘”‹‰‹ ƒ† †‹•’‘•‹–‹‘ ’—”•—ƒ– –‘  ‡
–‹‘ ͷͲͻ͹ǤͻͺሺƒሻǤ

ˆ –Ї ”‡ƒ‹• ƒ”‡ †‡–‡”‹‡† –‘ „‡ ‘ˆ ƒ–‹˜‡ ‡”‹
ƒ †‡•
‡–ǡ –Ї ‘”‘‡” •ŠƒŽŽǡ ™‹–Š‹ ʹͶ
Š‘—”•ǡ ‘–‹ˆ› –Ї 
Ǥ Ї 
 •ŠƒŽŽ –Ї
‘–ƒ
– –Ї ‘•– Ž‹‡Ž› †‡•
‡†ƒ– ‘ˆ –Ї
†‡
‡ƒ•‡† ƒ–‹˜‡ ‡”‹
ƒǡ ™Š‘ •ŠƒŽŽ –Ї •‡”˜‡ ƒ• –Ї
‘•—Ž–ƒ– ‘ Š‘™ –‘ ’”‘
‡‡† ™‹–Š
–Ї ”‡ƒ‹•Ǥ —”•—ƒ– –‘  ‡
–‹‘ ͷͲͻ͹Ǥͻͺሺ„ሻǡ —’‘ –Ї †‹•
‘˜‡”› ‘ˆ ƒ–‹˜‡ ‡”‹
ƒ
”‡ƒ‹•ǡ –Ї Žƒ†‘™‡” •ŠƒŽŽ ‡•—”‡ –Šƒ– –Ї ‹‡†‹ƒ–‡ ˜‹ ‹‹–›ǡ ƒ

‘”†‹‰ –‘ ‰‡‡”ƒŽŽ›
ƒ

‡’–‡†
—Ž–—”ƒŽ ‘” ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ •–ƒ†ƒ”†• ‘” ’”ƒ
–‹
‡•ǡ ™Š‡”‡ –Ї ƒ–‹˜‡ ‡”‹
ƒ
Š—ƒ ”‡ƒ‹• ƒ”‡ Ž‘
ƒ–‡† ‹• ‘– †ƒƒ‰‡† ‘” †‹•–—”„‡† „› ˆ—”–Ї” †‡˜‡Ž‘’‡– ƒ –‹˜‹–›
—–‹Ž –Ї Žƒ†‘™‡” Šƒ• †‹•
—••‡† ƒ†
‘ˆ‡””‡† ™‹–Š –Ї ‘•– Ž‹‡Ž› †‡•
‡†ƒ–• ”‡‰ƒ”†‹‰
–Ї‹” ”‡
‘‡†ƒ–‹‘•ǡ ‹ˆ ƒ’’Ž‹
ƒ„އǡ –ƒ‹‰ ‹–‘ ƒ

‘—– –Ї ’‘••‹„‹Ž‹–› ‘ˆ —Ž–‹’އ Š—ƒ
”‡ƒ‹•Ǥ
  Ǧͳǣ ”‹‘” –‘ ‹••—ƒ
‡ ‘ˆ ‰”ƒ†‹‰ ‘” „—‹Ž†‹‰ ’‡”‹–•ǡ –Ї ”‘Œ‡
– ƒ’’Ž‹
ƒ– •ŠƒŽŽ
•—„‹– –‘ –Ї ‹–›ǣ ሺͳሻ –Ї ƒ’’”‘˜‡†  ƒ† ሺʹሻ –Ї ‘–‹ ‡ ‘ˆ
–‡– ሺ
ሻ –‘
‘’Ž›
™‹–Š –Ї ‡‡”ƒŽ  ˆ”‘ –Ї ‡–”ƒŽ ƒŽŽ‡› ‡‰‹‘ƒŽ ƒ–‡” —ƒŽ‹–› ‘–”‘Ž ‘ƒ”†Ǥ Ї ”‡“—‹”‡‡–• ‘ˆ –Ї  ƒ†  •ŠƒŽŽ „‡ ‹
‘”’‘”ƒ–‡† ‹–‘ †‡•‹‰ •’‡
‹ˆ‹
ƒ–‹‘• ƒ†

‘•–”—
–‹‘
‘–”ƒ
–•Ǥ ‡
‘‡†‡† ‡•– ƒƒ‰‡‡– ”ƒ
–‹
‡• ˆ‘” –Ї
‘•–”—
–‹‘
’Šƒ•‡ ƒ› ‹
Ž—†‡ –Ї ˆ‘ŽŽ‘™‹‰ǣ
x –‘
’‹Ž‹‰ ƒ† †‹•’‘•‹‰ ‘ˆ †‡‘Ž‹–‹‘ †‡„”‹•ǡ
‘
”‡–‡ǡ ƒ† •‘‹Ž ’”‘’‡”Ž›Ǥ
x ”‘–‡
–‹‰ ‡š‹•–‹‰ •–‘” †”ƒ‹ ‹Ž‡–• ƒ† •–ƒ„‹Ž‹œ‹‰ †‹•–—”„‡† ƒ”‡ƒ•Ǥ x
’އ‡–‹‰ ‡”‘•‹‘
‘–”‘Ž•Ǥ
x ”‘’‡”Ž› ƒƒ‰‹‰
‘•–”—
–‹‘ ƒ–‡”‹ƒŽ•Ǥ
x ƒƒ‰‹‰ ™ƒ•–‡ǡ ƒ‰‰”‡••‹˜‡Ž›
‘–”‘ŽŽ‹‰ Ž‹––‡”ǡ ƒ† ‹’އ‡–‹‰ •‡†‹‡–
‘–”‘ŽǤ
  Ǧʹǣ
 –Ї ‡˜‡– ’ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• ƒ”‡ ‡
‘—–‡”‡† †—”‹‰ ‰”‘—†Ǧ
†‹•–—”„ƒ
‡ ƒ
–‹˜‹–‹‡•ǡ ƒŽŽ ™‘” ™‹–Š‹ ʹͷ ˆ‡‡– ‘ˆ –Ї ˆ‹† •ŠƒŽŽ ŠƒŽ– —–‹Ž ƒ “—ƒŽ‹ˆ‹‡† ’ƒŽ‡‘–‘Ž‘‰‹•–ǡ ƒ• †‡ˆ‹‡† „› –Ї ‘
‹‡–› ‘ˆ ‡”–‡„”ƒ–‡ ƒŽ‡‘–‘Ž‘‰› –ƒ†ƒ”† ”‘
‡†—”‡• ˆ‘”
–Ї ••‡••‡– ƒ† ‹–‹‰ƒ–‹‘ ‘ˆ †˜‡”•‡
’ƒ
–• –‘ ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ‡•‘—”
‡• ሺʹͲͳͲሻǡ
ƒ
‡˜ƒŽ—ƒ–‡ –Ї ˆ‹† ƒ† ƒ‡ ”‡
‘‡†ƒ–‹‘• ”‡‰ƒ”†‹‰ –”‡ƒ–‡–Ǥ ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡
ƒ–‡”‹ƒŽ• ƒ› ‹
Ž—†‡ ”‡•‘—”
‡• •—
Š ƒ• ˆ‘••‹Ž•ǡ ’Žƒ– ‹’”‡••‹‘•ǡ ‘” ƒ‹ƒŽ –”ƒ
•
’”‡•‡”˜‡† ‹ ”‘
Ǥ Ї “—ƒŽ‹ˆ‹‡† ’ƒŽ‡‘–‘Ž‘‰‹•– •ŠƒŽŽ
‘–ƒ
– –Ї ƒ–—”ƒŽ
‹•–‘”› —•‡— ‘ˆ
‘• ‰‡Ž‡• ‘—–› ‘” ƒ‘–Ї” ƒ’’”‘’”‹ƒ–‡ ˆƒ
‹Ž‹–› ”‡‰ƒ”†‹‰ ƒ› †‹•
‘˜‡”‹‡• ‘ˆ
’ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡•Ǥ

ˆ –Ї “—ƒŽ‹ˆ‹‡† ’ƒŽ‡‘–‘Ž‘‰‹•– †‡–‡”‹‡• –Šƒ– –Ї †‹•
‘˜‡”› ”‡’”‡•‡–• ƒ ’‘–‡–‹ƒŽŽ›
•‹‰‹ˆ‹
ƒ– ’ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡ǡ ƒ††‹–‹‘ƒŽ ‹˜‡•–‹‰ƒ–‹‘• ƒ† ˆ‘••‹Ž ”‡
‘˜‡”› ƒ› „‡
”‡“—‹”‡† –‘ ‹–‹‰ƒ–‡ ƒ†˜‡”•‡ ‹’ƒ
–• ˆ”‘ ”‘Œ‡
– ‹’އ‡–ƒ–‹‘Ǥ
ˆ ƒ˜‘‹†ƒ
‡ ‹• ‘–
ˆ‡ƒ•‹„އǡ –Ї ’ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• •ŠƒŽŽ „‡ ‡˜ƒŽ—ƒ–‡† ˆ‘” –Ї‹” •‹‰‹ˆ‹
ƒ
‡Ǥ
ˆ –Ї
”‡•‘—”
‡• ƒ”‡ ‘– •‹‰‹ˆ‹
ƒ–ǡ ƒ˜‘‹†ƒ
‡ ‹• ‘– ‡
‡••ƒ”›Ǥ
ˆ –Ї ”‡•‘—”
‡• ƒ”‡ •‹‰‹ˆ‹
ƒ–ǡ –Ї›
•ŠƒŽŽ „‡ ƒ˜‘‹†‡† –‘ ‡•—”‡ ‘ ƒ†˜‡”•‡ ‡ˆˆ‡
–•ǡ ‘” •—
Š ‡ˆˆ‡
–• —•– „‡ ‹–‹‰ƒ–‡†Ǥ ‘•–”—
–‹‘
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 10
Mitigated Negative Declaration
‹ –Šƒ– ƒ”‡ƒ •ŠƒŽŽ ‘– ”‡•—‡ —–‹Ž –Ї ”‡•‘—”
‡Ǧƒ’’”‘’”‹ƒ–‡ ‡ƒ•—”‡• ƒ”‡ ”‡
‘‡†‡† ‘”
–Ї ƒ–‡”‹ƒŽ• ƒ”‡ †‡–‡”‹‡† –‘ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
ˆ –Ї ”‡•‘—”
‡ ‹• •‹‰‹ˆ‹
ƒ– ƒ†
ˆ‘••‹Ž ”‡
‘˜‡”› ‹• –Ї ‹†‡–‹ˆ‹‡† ˆ‘” ‘ˆ –”‡ƒ–‡–ǡ –Ї –Ї ˆ‘••‹Ž •ŠƒŽŽ „‡ †‡’‘•‹–‡† ‹ ƒ ƒ

”‡†‹–‡† ƒ† ’‡”ƒ‡– •
‹‡–‹ˆ‹
‹•–‹–—–‹‘Ǥ ‘’‹‡• ‘ˆ ƒŽŽ
‘””‡•’‘†‡
‡ ƒ† ”‡’‘”–•
•ŠƒŽŽ „‡ •—„‹––‡† –‘ –Ї ‡ƒ† ‰‡
›Ǥ
 Ǧͳǣ  •‘—† ™ƒŽŽ •ŠƒŽŽ „‡
‘•–”—
–‡† –‘ ƒ ‹‹— Ї‹‰Š– ‘ˆ ͸ ˆ‡‡– ƒŽ‘‰ –Ї ‘—–Š
—––‘™‹ŽŽ‘™ ˜‡—‡ ”‘Œ‡
– •‹–‡ ˆ”‘–ƒ‰‡Ǥ Ї •‘—† ™ƒŽŽ •ŠƒŽŽ „‡ –—”‡† ‹™ƒ”† ƒ– ‘– ͳǡ ‘– ͻͺǡ ‘– ͻͻǡ ƒ† ‘– ͳͲͻǤ —‹–ƒ„އ
‘•–”—
–‹‘ ƒ–‡”‹ƒŽ• ‹
Ž—†‡
‘
”‡–‡ „Ž‘
•ǡ
ƒ•‘”›ǡ ‘” •–—

‘ ‘ „‘–Š •‹†‡• ‘ˆ ƒ ™‘‘† ‘” •–‡‡Ž •–—† ™ƒŽŽǤ ”‹‘” –‘ –Ї ‹••—ƒ ‡ ‘ˆ „—‹Ž†‹‰
’‡”‹–•ǡ ’Žƒ• ƒ† •’‡
‹ˆ‹
ƒ–‹‘• •ŠƒŽŽ ‹
Ž—†‡ –Ї ‹†‡–‹ˆ‹
ƒ–‹‘ ‘ˆ –Ї ”‡“—‹”‡† •‘—† ™ƒŽŽ
Ž‘
ƒ–‹‘ǡ Ї‹‰Š–ǡ ƒ†
‘•–”—
–‹‘ ƒ–‡”‹ƒŽ•Ǥ
 Ǧͳǣ Ї ”‘Œ‡
– ’”‘’‘‡– •ŠƒŽŽ ’ƒ› ‹–• ‡“—‹–ƒ„އ •Šƒ”‡
‘•– ’‡”
‡–ƒ‰‡ ˆ‘”
‹–‡”•‡
–‹‘ ‹’”‘˜‡‡–• ƒ– – Ž‹•–‡† ‹–‡”•‡
–‹‘Ǥ ƒ›‡– ƒ‘—– ‘ˆ –Ї ‡“—‹–ƒ„އ •Šƒ”‡

‘•–• •ŠƒŽŽ „‡ †‡–‡”‹‡† „› –
Ї
Ї ‹–› ‘ˆ ‡‡†Ž‡› ƒ† ’ƒ‹† ’”‹‘” –‘ –Ї ‹••—ƒ
‡ ‘ˆ „—‹Ž†‹‰
’‡”‹–•Ǥ
ƒǤ ‹‰ƒŽ‹œƒ–‹‘ ‘ˆ ‘—–Š —––‘™‹ŽŽ‘™ ˜‡—‡ ƒ† ‘”–Š ˜‡—‡ǣ ʹͲǤͷͳ ’‡” ‡–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 11

Introduction
SECTION 1 - INTRODUCTION

1.1 - Overview
ǤǤ
‘”–‘ ሺƒ’’Ž‹
ƒ–ሻ ‹• ’”‘’‘•‹‰ –‘
‘•–”—
– ƒ ͳ͸͸ǦŽ‘– •‹‰Ž‡Ǧˆƒ‹Ž› •—„†‹˜‹•‹‘
ሺ”‘Œ‡
–ሻ ‹ –Ї ‹–› ‘ˆ ‡‡†Ž‡› ‹ ”‡•‘ ‘—–› ‹ –Ї ƒ
‘ƒ“—‹ ƒŽŽ‡›ǡ ƒŽ‹ˆ‘”‹ƒǤ Ї
”‘Œ‡
– ™‹ŽŽ ”‡“—‹”‡ ƒ’’”‘˜ƒŽ ‘ˆ ƒ ƒ‡šƒ–‹‘ ‘ˆ –Ї ’”‘’‡”–› ‹–‘ –Ї ‹–› Ž‹‹–•ǡ ƒ ‡‡”ƒŽ Žƒ ‡†‡–ǡ ƒ ’”‡Ǧœ‘‡
Šƒ‰‡ǡ ƒ† ƒ’’”‘˜ƒŽ ‘ˆ ƒ •—„†‹˜‹•‹‘ ƒ’Ǥ
‹‰—”‡ ͳǦͳ ‹• ƒ ƒ’ ‘ˆ –Ї ”‡‰‹‘ƒŽ Ž‘
ƒ–‹‘ǡ ƒ† ‹‰—”‡ ͳǦʹ •Š‘™• –Ї ”‘Œ‡
– Ž‘
ƒ–‹‘ǡ ‹‰—”‡
ͳǦ͵ †‡’‹
–• –Ї ”‘Œ‡
– ‹ ”‡Žƒ–‹‘ –‘ –Ї ‹–›ǯ• ’Ї”‡ ‘ˆ
ˆŽ—‡
‡ ሺ
ሻǡ ƒ† ‹ ‰—”‡ ͳǦͶ
†‡’‹
–• –Ї –‡–ƒ–‹˜‡ –”ƒ
– ƒ’Ǥ

1.2 - California Environmental Quality Act
Ї ‹–› ‘ˆ ‡‡†Ž‡› ‹• –Ї ‡ƒ† ‰‡
› ˆ‘” –Š‹• ”‘Œ‡
– ’—”•—ƒ– –‘ –Ї  —‹†‡Ž‹‡ •
ሺ—„Ž‹
‡•‘—”
‡• ‘†‡ ‡
–‹‘ ͳͷͲͲͲ ‡– •‡“ǤሻǤ Ї ˜‹”‘‡–ƒŽ Ї
Ž‹•– ሺ
—‹†‡Ž‹‡• ’’‡†‹š ሻ ‘”
 ሺ•‡‡  – ‘ ͵
– ƒ  — › ‡ ‹
Ȃ   Ž † ‹ ‹ – ሻ
’”‘˜‹†‡• ƒƒŽ›•‹• –Šƒ– ‡šƒ‹‡•
–Ї ’‘–‡–‹ƒŽ ‡˜‹”‘‡–ƒŽ ‡ˆˆ‡
–• ‘ˆ –Ї
‘•–”—
–‹‘ ƒ† ‘’‡”ƒ–‹‘ ‘ˆ –Ї ”‘Œ‡
–Ǥ ‡
–‹‘

ͳͷͲ͸͵ ‘ˆ –Ї  —‹†‡Ž‹‡• ”‡“—‹”‡• –Ї ‡ƒ† ‰‡
› –‘ ’”‡’ƒ”‡ ƒ
 –‘ †‡–‡”‹‡

™Š‡–Ї” ƒ †‹•
”‡–‹‘ƒ”› ”‘Œ‡
– ™‹ŽŽ Šƒ˜‡ ƒ •‹‰‹ˆ‹
ƒ– ‡ˆˆ‡
– ‘ –Ї ‡˜‹”‘‡–Ǥ   ‹•

ƒ’’”‘’”‹ƒ–‡ ™Š‡ ƒ
 Šƒ• „‡‡ ’”‡’ƒ”‡†ǡ ƒ† ƒ †‡–‡”‹ƒ–‹‘
ƒ „‡ ƒ†‡ –
•‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‡ˆˆ‡
–• ™‹ŽŽ ‘

—” „‡
ƒ—•‡ ”‡˜‹•‹‘• –‘ –Ї ”‘Œ‡
– Šƒ˜‡ „‡
Šƒ– ‘
‡ ƒ†‡
‘” ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• ™‹ŽŽ „‡ ‹’އ‡–‡† –Šƒ– ”‡†—
‡ ƒŽŽ ’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ– ‹’ƒ
–•
–‘ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– އ˜‡Ž•Ǥ Ї
‘–‡– ‘ˆ ƒ  ‹• –Ї •ƒ‡ ƒ• ƒ ‡‰ƒ–‹˜‡ ‡
Žƒ”ƒ–‹‘ǡ
™‹–Š –Ї ƒ††‹–‹‘ ‘ˆ ‹†‡–‹ˆ‹‡† ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• ƒ† ƒ ‹–‹‰ƒ–‹‘ ‘‹–‘”‹‰ ƒ† ‡’‘”–‹‰ ”‘‰”ƒ ሺሻ ሺ•‡‡ ‡
–‹‘ ͸ Ȃ ‹–‹‰ƒ–‹‘ ‘‹ ƒ† ”‘‰”ƒ   –‘”‹‰ ‡’‘”–‹‰ ሻǤ ƒ•‡† ‘ –Ї
ǡ –Ї ‡ƒ† ‰‡
› Šƒ• †‡–‡”‹‡† –Šƒ– –Ї ‡˜‹”‘‡–ƒŽ ”‡˜‹‡™ ˆ‘” –Ї
’”‘’‘•‡† ƒ’’Ž‹
ƒ–‹‘
ƒ „‡
‘’އ–‡† ™‹–Š ƒ Ǥ

1.3 - Impact Terminology
Ї ˆ‘ŽŽ‘™‹‰ –‡”‹‘Ž‘‰› ‹• —•‡† –‘ †‡•
”‹„‡ –Ї އ˜‡Ž ‘ˆ •‹‰‹ˆ‹
ƒ
‡ ‘ˆ ‹’ƒ
–•Ǥ
x  ˆ‹†‹‰ ‘ˆDz‘ ‹’ƒ
–dz‹• ƒ’’”‘’”‹ƒ–‡ ‹ˆ–Ї ƒƒŽ›•‹•
‘
Ž—†‡• –Šƒ– –Ї ”‘Œ‡
– ™‘—ކ
‘– ƒˆˆ‡
– ƒ –‘’‹
ƒ”‡ƒ ‹ ƒ› ™ƒ›Ǥ
x  ‹•
‘•‹†‡”‡† Dzއ•• –Šƒ •‹‰‹ˆ‹
ƒ–dz ‹ˆ –Ї ƒƒŽ›•‹•
‘
Ž—†‡• –Šƒ– ‹– ™‘—ކ

ƒ—•‡ ‘ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡
Šƒ‰‡ –‘ –Ї ‡˜‹”‘‡– ƒ† ”‡“—‹”‡• ‘ ‹–‹‰ƒ–‹‘Ǥ
x 
‹’ƒ
–
‹’ƒ
– ‹•
‘•‹†‡”‡† Dzއ•• –Šƒ •‹‰‹ˆ‹
ƒ– ™‹–Š ‹–‹‰ƒ–‹‘ ‹
‘”’‘”ƒ–‡†dz ‹ˆ –Ї
ƒƒŽ›•‹•
‘
Ž—†‡• –Šƒ– ‹– ™‘—ކ
ƒ—•‡ ‘ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡
Šƒ‰‡ –‘ –Ї
‡˜‹”‘‡– ™‹–Š –Ї ‹
Ž—•‹‘ ‘ˆ ‡˜‹”‘‡–ƒŽ
‘‹–‡–• –Šƒ– Šƒ˜‡ „‡‡
ƒ‰”‡‡† –‘ „› –Ї ƒ’’Ž‹
ƒ–Ǥ
x  ‹’ƒ
– ‹•
‘•‹†‡”‡† Dz’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ–dz‹ˆ –Ї ƒƒŽ›•‹•
‘
Ž—†‡• –Šƒ– ‹–
‘—ކ
Šƒ˜‡ ƒ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ‡ˆˆ‡
– ‘ –Ї ‡˜‹”‘‡–Ǥ
VTSM 6497- Westhaven II Project August 2025

City of Reedley Page 1-1

Introduction

1.4 - Document Organization and Contents
Ї
‘–‡– ƒ† ˆ‘”ƒ– ‘ˆ –Š‹•
‹–‹ƒŽ –—†›Ȁ‹–‹‰ƒ–‡† ‡‰ƒ–‹˜‡ ‡
Žƒ”ƒ–‹‘ ሺ
Ȁሻ ‹•
†‡•‹‰‡† –‘ ‡‡– –Ї ”‡“—‹”‡‡–• ‘ˆ Ǥ Ї ”‡’‘”–
‘–ƒ‹• –Ї ˆ‘ŽŽ‘™‹‰ •‡
–‹‘•ǣ
x ‡
–‹‘ ͳ Ȃ –”‘†—
–‹‘
ǣ Š‹• •‡
–‹‘ ’”‘˜‹†‡• ƒ ‘˜‡”˜‹‡™ ‘ˆ  ”‡“—‹”‡‡–•ǡ
‹–‡†‡† —•‡• ‘ˆ –Ї
Ȁǡ †‘
—‡– ‘”‰ƒ‹œƒ–‹‘ǡ ƒ† ƒ Ž‹•– ‘ˆ ”‡‰—Žƒ–‹‘• –Šƒ–
Šƒ˜‡ „‡‡ ‹
‘”’‘”ƒ–‡† „› ”‡ˆ‡”‡
‡Ǥ
x ‡
–‹‘ Ȃ ”‘Œ‡
– ʹ ‡•
”‹’–‹‘ǣ Š‹• •‡
–‹‘ †‡•
”‹„‡• –Ї ”‘Œ‡
– ƒ† ’”‘˜‹†‡• †ƒ–ƒ
‘ –Ї •‹–‡ǯ• Ž‘
ƒ–‹‘Ǥ
x ‡ –‹  Ȃ 
͵ – ƒ  › ‘
— ‹ ‹ Ž – † ǣ Š‹• •‡
–‹‘
‘–ƒ‹• –Ї ‡˜ƒŽ—ƒ–‹‘ ‘ ʹͳ ˆ †‹ˆˆ‡”‡–
‡˜‹”‘‡–ƒŽ ”‡•‘—”
‡ ˆƒ
–‘”•
‘–ƒ‹‡† ‹ ’’‡†‹š ‘ˆ –Ї  —‹†‡Ž‹‡• Ǥ ƒ
Š
‡˜‹”‘‡–ƒŽ ”‡•‘—”
‡ ˆƒ
–‘” ‹• ƒƒŽ›œ‡† –‘ †‡–‡”‹‡ ™Š‡–Ї” –Ї ’”‘’‘•‡†

”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ ‹’ƒ
–Ǥ ‡ ‘ˆ ˆ‘—” ˆ‹†‹‰• ‹• ƒ†‡ǡ ™Š‹
Š ‹
Ž—†‡• ‘ ‹’ƒ
–ǡ

އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–ǡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ– ™‹–Š ‹–‹‰ƒ–‹‘ǡ ‘” •‹‰‹ˆ‹
ƒ– ƒ†

—ƒ˜‘‹†ƒ„އǤ
ˆ –Ї ‡˜ƒŽ—ƒ–‹‘ ”‡•—Ž–• ‹ ƒ ˆ‹†‹‰ ‘ˆ •‹‰‹ˆ‹
ƒ– ƒ†

‹’ƒ
–• ˆ‘” ƒ› ‘ˆ –Ї ʹͳ ‡˜‹”‘‡–ƒŽ ”‡•‘—”
‡ ˆƒ
–‘”•ǡ –Ї ƒ 
—ƒ˜‘‹†ƒ„އ

’ƒ
– ‡’‘”– ™‹ŽŽ „‡ ”‡“—‹”‡†Ǥ
˜‹”‘‡–ƒŽ

x ‡
–‹‘  ‘ˆ Ͷ ‹•– Ȃ ”‡’ƒ”‡”•ǣ Š‹• •‡
–‹‘ ‹†‡–‹ˆ‹‡• –Ї ‹†‹˜‹†—ƒŽ• ™Š‘ ’”‡’ƒ”‡† –Ї

ȀǤ
x ‡
–‹‘ Ȃ  ǣ ͷ ‹„Ž‹‘‰”ƒ’Š› Š‹• •‡
–‹‘
‘–ƒ‹• ƒ ˆ—ŽŽ Ž‹•– ‘ˆ ”‡ˆ‡”‡
‡• –Šƒ– ™‡”‡ —•‡†
‹ –Ї ’”‡’ƒ”ƒ–‹‘ ‘ˆ –Š‹•
ȀǤ
x ‡
–‹‘ ͸  ‹‰ƒ–‹‘ Ȃ ‘‹–‘”‹‰ ‹– ƒ ‡’‘”–‹ ”‘‰”ƒǣ †
‰ Š‹• •‡
–‹‘
‘–ƒ‹• –Ї
‹–‹‰ƒ–‹‘ ‘‹–‘”‹‰ ƒ† ‡’‘”–‹‰ ”‘‰”ƒǤ

1.5 - Incorporated by Reference
Ї ˆ‘ŽŽ‘™‹‰ †‘
—‡–• ƒ†Ȁ‘” ”‡‰—Žƒ–‹‘• ƒ”‡ ‹
‘”’‘”ƒ–‡† ‹–‘ –Š‹•
Ȁ „›
”‡ˆ‡”‡
‡ǣ
x ‹–› ‘ˆ ‡‡†Ž‡› ʹͲ͵Ͳ ‡ ‡”ƒŽ Žƒ

x ‹–› ‘ˆ ‡‡†Ž‡› ‡‡”ƒŽ Žƒ ˜‹”‘‡–ƒŽ
’ƒ
– ‡’‘”– ሺ
ሻ

x —‹
‹ ‘†‡ Ȃ ͳͲ
‘‹‰ ‡‰—Žƒ–‹‘•

x
‡‡†Ž‡›
‡‡†Ž‡› —‹
‹
’ƒŽ
’ƒŽ ‘†‡ Ȃ
‹–އ
‹–އ ͳͳ —„†‹˜‹•‹‘ ‡‰—Žƒ–‹‘•

x ”‡•‘ ‘—–› ‹”’‘”– ƒ† •‡ ‘’ƒ–‹„‹Ž‹–› Žƒ

VTSM 6497- Westhaven II Project August 2025

City of Reedley Page 1-2

Introduction
‹ ‰—”‡ ͳǦͳ

‡‰‹‘ƒŽ ‘
ƒ–‹‘

VTSM 6497- Westhaven II Project August 2025

City of Reedley Page 1-3

Introduction
‹ ‰—”‡ ͳǦʹ

”‘Œ‡
– ‹–‡

VTSM 6497- Westhaven II Project August 2025

City of Reedley Page 1-4

Introduction
‹ ‰—”‡ ͳǦ͵

’Ї”‡ ‘ˆ
ˆŽ—‡
‡

VTSM 6497- Westhaven II Project August 2025

City of Reedley Page 1-5

Introduction
‹ ‰—”‡ ͳǦͶ

‡–ƒ–‹˜‡ ”ƒ
– ƒ’

VTSM 6497- Westhaven 2 Project August 2025City of Reedley Page 1-6

Project Description
SECTION 2 - PROJECT DESCRIPTION

2.1 - Introduction
ǤǤ
‘”–‘ ሺƒ’’Ž‹
ƒ–ሻ ‹• ’”‘’‘•‹‰ –‘
‘•–”—
– ƒ ͳ͸͸ǦŽ‘– •‹‰Ž‡Ǧˆƒ‹Ž› •—„†‹˜‹•‹‘
ሺ”‘Œ‡
–ሻ ‹ –Ї ‹–› ‘ˆ ‡‡†Ž‡› ‹ ”‡•‘ ‘—–› ‹ –Ї ƒ
‘ƒ“—‹ ƒŽŽ‡›ǡ ƒŽ‹ˆ‘”‹ƒǤ Ї
”‘Œ‡
– ™‹ŽŽ ”‡“—‹”‡ ƒ’’”‘˜ƒŽ ‘ˆ ƒ ƒ‡šƒ–‹‘ ‘ˆ –Ї ’”‘’‡”–› ‹–‘ –Ї ‹–› Ž‹‹–•ǡ ƒ ‡‡”ƒŽ Žƒ ‡†‡–ǡ ƒ ’”‡Ǧœ‘‡
Šƒ‰‡ǡ ƒ† ƒ’’”‘˜ƒŽ ‘ˆ ƒ •—„†‹˜‹•‹‘ ƒ’Ǥ ‹‰—”‡ ͳǦͳ ‹• ƒ ƒ’ ‘ˆ –Ї ”‡‰‹‘ƒŽ Ž‘
ƒ–‹‘ǡ ƒ† ‹‰—”‡ ͳǦʹ •Š‘™• –Ї ”‘Œ‡
– Ž‘
ƒ–‹‘ǡ ‹‰—”‡ ͳǦ͵ •Š‘™ –Ї
’”‘Œ‡
– •‹–‡ ‹ ”‡Žƒ–‹‘ –‘ –Ї 
ǡ ƒ† ‹‰—”‡ ͳǦͶ †‡’‹
–• –Ї –‡–ƒ–‹˜‡ –”ƒ
– ƒ’Ǥ

2.2 - Project Location
Ї ’”‘’‘•‡† ”‘Œ‡
– ‹• Ž‘
ƒ–‡† ™‹–Š‹ —‹
‘”’‘”ƒ–‡† ”‡•‘ ‘—–›ǡ ‹‡†‹ƒ–‡Ž› ƒ†Œƒ
‡–
–‘ –Ї ‹–› ‘ˆ ‡‡†Ž‡›
‘”’‘”ƒ–‡ Ž‹‹–• ሺ ͵͹ͲǦͲͶͲǦͳͲሻǤ Ї ”‘Œ‡
– •‹–‡ ‹• ‰‡‡”ƒŽŽ›
„‘—†‡† „› ˆ—–—”‡ ƒ•– ‘”–Š ˜‡—‡ –‘ –Ї ‘”–Šǡ ‘—–Š —––‘™‹ŽŽ‘™ ˜‡—‡ –‘ –Ї ‡ƒ•–ǡ ƒ
Š‘ ‹•–ƒ ”‡•‹†‡–‹ƒŽ •—„†‹˜‹•‹‘ –‘ –Ї •‘—–Šǡ ƒ† —––‘™‹ŽŽ‘™ ‹– Š –‘ –Ї ™‡•–ǡ ƒ† ‹•
•‹–—ƒ–‡† ƒ’’”‘š‹ƒ–‡Ž› ‹‡ ‹Ž‡• ‘”–Їƒ•– ‘ˆ  ͻͻ ƒ† ‡‹‰Š– ‹Ž‡• •‘—–Š ‘ˆ ǦͳͺͲǤ ‡‰‹‘ƒŽ ƒ

‡•• –‘ –Ї ”‘Œ‡
– •‹–‡ ‹• ƒ˜ƒ‹Žƒ„އ „› Ǧͻͻ ƒ† ǦͳͺͲǤ ‘
ƒŽ ƒ

‡•• –‘ –Ї
”‘Œ‡
– •‹–‡ ™‘—ކ „‡ ’”‘˜‹†‡† ˜‹ƒ ‘—–Š —––‘™‹ŽŽ‘™ ˜‡—‡ ƒ† ƒ•– ‘”–Š ˜‡—‡Ǥ Ї •‹–‡ ‹• Ž‘
ƒ–‡† ™‹–Š‹ –Ї ‡‡†Ž‡›ǡ ƒŽ‹ˆ‘”‹ƒǡ   ͹ǤͷǦ‹—–‡ –‘’‘‰”ƒ’Š‹ ƒ’ǡ ‡
–‹‘ ʹͷǡ
‘™•Š‹’ ͳͷ ‘—–Šǡ ƒ‰‡ ʹ͵ ƒ•–ǡ ƬǤ

2.3 - Project Environment
Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ‹ —‹
‘”’‘”ƒ–‡† ”‡•‘ ‘—–›ǡ ‹‡†‹ƒ–‡Ž› ƒ†Œƒ
‡– –‘ –Ї ‹–›
‘ˆ ‡‡†Ž‡›
‘”’‘”ƒ–‡ Ž‹‹–•Ǥ Ї ”‘Œ‡
– •‹–‡ ‹• †‡•‹‰ƒ–‡† ƒ• ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽ ሺͶǦͺ
†—Ȁƒ
”‡ ሾ͵ͲǤͷ ƒ
”‡•ሿሻ ƒ†
‹‰Š ‡•‹–› ‡•‹†‡–‹ƒŽ ሺͳͷǦʹͻ †—Ȁƒ
”‡ ሾ͵Ǥͷ ƒ
”‡•ሿሻ ‹ –Ї ‹–› ‘ˆ
‡‡†Ž‡› ʹͲ͵Ͳ ‡ ‡”ƒŽ ŽƒǤ Ї ”‘Œ‡
– •‹–‡ ‹• œ‘‡† ǦʹͲ ሺ‹‹–‡† ‰”‹
—Ž–—”ƒŽሻ „› –Ї
‘—–› ‘ˆ ” ‡•‘Ǥ
Ї ’”‘’‘•‡† ”‘Œ‡
– •‹–‡ ‹• ‰‡‡”ƒŽŽ› „‘—†‡† „› ˆ—–—”‡ ƒ•– ‘”–Š ˜‡—‡ –‘ ‘”–Šǡ ‘—–Š ˜‡—‡ –‘ –Ї ‡ƒ•–ǡ ƒ
Š‘ ‹•–ƒ ”‡•‹†‡–‹ƒŽ •—„†‹˜‹•‹‘ –‘
–Ї
–Ї •‘—–Šǡ
ƒ†
—––‘™‹ŽŽ‘™
—––‘™‹ŽŽ‘™ ‹–
Š –‘ –Ї ™‡•–Ǥ ‡‰‹‘ƒŽ ƒ

‡•• –‘ –Ї ”‘Œ‡
– •‹–‡ ‹• ƒ˜ƒ‹Žƒ„އ „› Ǧͻͻ
ƒ† ǦͳͺͲǤ ‘
ƒŽ ƒ

‡•• –‘ –Ї ”‘Œ‡
– •‹–‡ ™‘—ކ „‡ ’”‘˜‹†‡† ˜‹ƒ ‘—–Š —––‘™‹ŽŽ‘™
˜‡—‡ ƒ† ˆ—–—”‡ ƒ•– ‘”–Š ˜‡—‡Ǥ
Ї ’”‘’‡”–› ‹• •—””‘—†‡† „› ƒ‰”‹
—Ž–—”ƒŽ ƒ† ˜ƒ
ƒ– Žƒ† –‘ –Ї ‘”–Šǡ ƒ •
Š‘‘Ž –‘ –Ї ‡ƒ•–ǡ
ƒ‰”‹
—Ž–—”ƒŽ Žƒ† –‘ –Ї •‘—–Šǡ ƒ† •‹‰Ž‡Ǧˆƒ‹Ž› ”‡•‹†‡
‡• –‘ –Ї ™‡•–Ǥ

2.4 - Proposed Project
Ї ”‘Œ‡
– ’”‘’‘•‡• –Ї †‡˜‡Ž‘’‡– ‘ˆ ͳ͸͸ •‹‰Ž‡Ǧˆƒ‹Ž› Ž‘–• ƒ˜‡”ƒ‰‹‰ ͷǡͷ͸ͳ •“—ƒ”‡ ˆ‡‡– ’‡” Ž‘–ǡ †‡˜‡Ž‘’‡– ‘ˆ ƒ ‘Ǧ•‹–‡ •–‘” †”ƒ‹ „ƒ•‹ǡ ƒ† •‡˜‡ ‘—–Ž‘–• ‘˜‡” –™‘ ’Šƒ•‡•Ǥ Šƒ•‡ ͳ ™‘—ކ
‘•‹•– ‘ˆ ƒ’’”‘š‹ƒ–‡Ž› ͳͻǤͷ͹ ƒ
”‡• ƒ† †‡˜‡Ž‘’ ͺͻ Ž‘–•ǡ ˆ‹˜‡ ‘—–Ž‘–•ǡ ƒ† –Ї
‘Ǧ•‹–‡ •–‘” †”ƒ‹ „ƒ•‹Ǥ Šƒ•‡ ʹ ™‘—ކ
‘•‹•– ‘ˆ –Ї ”‡ƒ‹‹‰ ͳͶǤͶͳ ƒ
”‡• ƒ† †‡˜‡Ž‘’
VTSM 6497- Westhaven II Project August 2025
City of Reedley Page 2-1

Project Description
͹͹ Ž‘–• ƒ† –™‘ ‘—–Ž‘–•ǡ ‘‡ ‘ˆ ™Š‹
Š ‹• ƒ •–‘” †”ƒ‹ „ƒ•‹Ǥ Ǧ ƒ† ‘ˆˆǦ•‹–‡ ‹’”‘˜‡‡–•ǡ ‹
Ž—†‹‰
‹”
—Žƒ–‹‘ ”‘ƒ†•ǡ ‹–‡”‹‘” Ž‘
ƒŽ •–”‡‡–•ǡ
—”„ǡ ‰—––‡”ǡ •‹†‡™ƒŽǡ ‘’‡ •’ƒ
‡ǡ ƒ†
Žƒ†•
ƒ’‹‰ǡ ƒ”‡ ’”‘’‘•‡† ƒ• ’ƒ”– ‘ˆ –Ї ”‘Œ‡
–Ǥ • ƒ ’ƒ”– ‘ˆ –Ї ”‘Œ‡
–ǡ –Ї —––‘™‹ŽŽ‘™
‹–
Š ™‹ŽŽ „‡ —†‡”‰”‘—†‡† ’‡” ‹–› ”‡“—‹”‡‡–•Ǥ
Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ™‹–Š‹ –Ї ‹–›ǯ• ’Ї”‡ ‘ˆ
ˆŽ—‡
‡ ሺ
ሻ ƒ† Šƒ• ƒ ’Žƒ‡† Žƒ†
—•‡ †‡•‹‰ƒ–‹‘ ‘ˆ ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽ ሺͶǦͺ †™‡ŽŽ‹‰ —‹–• ’‡” ƒ ”‡ ሾ†—Ȁƒ
”‡ሿሻ ƒ†
‹‰Š
‡•‹–› ‡•‹†‡–‹ƒŽ ሺͳͷǦʹͻ †—Ȁƒ
”‡ሻ ’—”•—ƒ– –‘ –Ї ‡‡†Ž‡› ʹͲ͵Ͳ
‡‡”ƒŽ ŽƒǤ Ї •‹–‡ ‹•
œ‘‡† ‹‹–‡† ‰”‹
—Ž–—”ƒŽ ሺǦʹͲሻ ƒ

‘”†‹‰ –‘ –Ї ‘—–› ‘ˆ ”‡•‘ œ‘‹‰ ƒ’Ǥ Ї
”‘Œ‡
– ’”‘’‘•‡• –‘ ƒ‡† –Ї ’Žƒ‡† Žƒ† —•‡ †‡•‹‰ƒ–‹‘ ‘ˆ ƒ ƒ’’”‘š‹ƒ–‡Ž› ͵ǤͷǦ ’‘”–‹‘ ‘ˆ –Ї ”‘Œ‡
– •‹–‡ ˆ”‘
‹‰Š ‡•‹–› ‡•‹†‡–‹ƒŽ –‘ ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽǤ
ƒ
”‡
††‹–‹‘ƒŽŽ›ǡ –Ї ”‘Œ‡
– ’”‘’‘•‡• –‘ ’”‡Ǧœ‘‡ –Ї ”‘Œ‡
– •‹–‡ ƒ† –Ї –Š”‡‡ ”—”ƒŽ ”‡•‹†‡–‹ƒŽ
’ƒ”
‡Ž• –‘ –Ї ‘”–Š™‡•–ǡ • ͵͹ͲǦͲͶͲǦͳ͵ǡ ͵͹ͲǦͲͶͲǦʹʹǡ ƒ† ͵͹ͲǦͲͶͲǦʹ͵ǡ –‘ –Ї ǦͳǦ͸ ሺ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽሻ œ‘‡ †‹•–”‹
– ‹ ’”‡’ƒ”ƒ–‹‘ ˆ‘” ƒ‡šƒ–‹‘ ‘ˆ –Ї ’ƒ”
‡Ž•
‘•‹•–‡–
™‹–Š –Ї ‡‡†Ž‡› ʹͲ͵Ͳ
‡‡”ƒŽ ŽƒǤ Ї ƒ‡šƒ–‹‘ ”‡“—‡•– ™‘—ކ ”‡‘˜‡ –Ї ƒ”‡ƒ ˆ”‘ –Ї ”‡•‘ ‘—–› ‹”‡ ”‘–‡
–‹‘ ‹•–”‹
– ƒ† –Ї ‹‰• ‹˜‡” ‘•‡”˜ƒ–‹‘ ‹•–”‹
– •‡”˜‹
‡
„‘—†ƒ”‹‡•Ǥ Ї”‡ ‹• ‘ ‡™ †‡˜‡Ž‘’‡– ‘”
Šƒ‰‡ ‹ Žƒ† —•‡ ’”‘’‘•‡† ‘ –Ї•‡
’”‘’‡”–‹‡•ǡ ƒ† –Ї› ƒ”‡
‘•‹†‡”‡† –‘ „‡ ƒ ’ƒ”– ‘ˆ –Ї „ƒ•‡Ž‹‡Ǥ
ƒ–‡”ǡ •‡™‡”ǡ •‘Ž‹† ™ƒ•–‡ǡ ƒ† •–‘” †”ƒ‹ƒ‰‡ —–‹Ž‹–‹‡• ™‹ŽŽ „‡ ’”‘˜‹†‡† „› –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ އ
–”‹
‹–› ™‹ŽŽ „‡ ’”‘˜‹†‡† „› ƒ
‹ˆ‹

ƒ• ƒ† އ
–”‹
ƒ† ƒ–—”ƒŽ ‰ƒ• ™‹ŽŽ „‡
’”‘˜‹†‡† „› ‘—–Ї” ƒŽ‹ˆ‘”‹ƒ ƒ•Ǥ
‘•–”—
–‹‘ ‘ˆ –Ї ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– ™‘—ކ ‘

—” ‘˜‡” ƒ ƒš‹— ‘ˆ Ͷͺ ‘–Š•Ǥ
–
‹• ƒ–‹
‹’ƒ–‡† –Šƒ– –Ї ˆ‘ŽŽ‘™‹‰ ’‹‡
‡• ‘ˆ ‡“—‹’‡– ™‘—ކ „‡ —•‡† †—”‹‰
‘•–”—
–‹‘
ƒ
–‹˜‹–‹‡•ǣ
x ‘ŽŽ‡”
x ‘ƒ†‡† –”—
•
x š
ƒ˜ƒ–‘”
x ‡‡”ƒ–‘”
x ‡”˜‹
‡ –”—

x ‹”
‘’”‡••‘”
–‹–އ‡–• ƒ† ’’”‘˜ƒŽ•ǣ
x
‡‡”ƒŽ Žƒ ‡†‡– ’’Ž‹
ƒ–‹‘ ‘Ǥ ʹͲʹͷǦͲͳ
x ‡œ‘‡ ’’Ž‹
ƒ–‹‘ ‘Ǥ ʹͲʹͷǦͲͳ
x ‡•–‹‰ ‡–ƒ–‹˜‡ ”ƒ
– ƒ’ ‘Ǥ ͸Ͷͻ͹
x ‡šƒ–‹‘ ‘ˆ –Ї †‡•
”‹„‡† ’”‘’‡”–‹‡• ‹–‘ –Ї ‹–› „›  ‘ –Š”‘—‰Š ‡šƒ–‹‘ ’’Ž‹
ƒ–‹‘ ‘Ǥ ʹͲʹͷǦͲͳ
VTSM 6497- Westhaven II Project August 2025

City of Reedley Page 2-2

Initial Study
SECTION 3 - INITIAL STUDY

3.1 - Environmental Checklist
ͳǤ ”‘Œ‡
– ‹–އǣ
‡•–‹‰ ‡–ƒ–‹˜‡ ”ƒ
– ƒ’ ‘Ǥ ͸Ͷͻ͹ Ǧ ‡•–Šƒ˜‡ ʹ —„†‹˜‹•‹‘ ”‘Œ‡
–
ʹǤ ‡ƒ† ‰‡
› ƒ‡ ƒ† ††”‡••ǣ
‹–› ‘ˆ ‡‡†Ž‡› ‘—‹–› ‡˜‡Ž‘’‡– ‡’ ”–‡–
ͳ͹ͳ͹ ͻ–Š  ”‡‡–
–
‡‡†Ž‡›ǡ  ͻ͵͸ͷͶ

͵Ǥ ‘–ƒ
– ‡”•‘ ƒ† Š‘‡ —„‡”ǣ
‘†‡›
‘”–‘ǡ 
ሺͷͷͻሻ ͸͵͹ǦͶʹͲͲ
‘†‡›ǤŠ‘”–‘̷”‡‡†Ž‡›Ǥ
ƒǤ‰‘˜
ͶǤ ”‘Œ‡
– ‘
ƒ–‹‘ǣ
’
ƒ

Ї ’”‘’‘•‡† ”‘Œ‡
– ‹• Ž‘
ƒ–‡† ‘ ƒ —†‡˜‡Ž‘’‡† ͵ͶǦ‡–Ǧƒ
”‡ ’ƒ”
‡Ž ™‹–Š‹
—‹
‘” ‘”ƒ–‡† ”‡•‘ ‘—–›ǡ ‹‡†‹ƒ–‡Ž› ƒ†Œƒ
‡– –‘ –Ї ‹–› ‘ˆ ‡‡†Ž‡›
‘”’‘”ƒ–‡
Ž‹‹–• ሺ••‡••‘”ǯ• ƒ”
‡Ž —„‡” ሾሿ ͵͹ͲǦͲͶͲǦͳͲሻǤ Ї ”‘Œ‡
– •‹–‡ ‹• ‰‡‡”ƒŽŽ›
„‘—†‡† „› ˆ—–—”‡ ƒ•– ‘”–Š ˜‡—‡ –‘ –Ї ‘”–Šǡ ‘—–Š —––‘™‹ŽŽ‘™ ˜‡—‡ –‘ –Ї ‡ƒ•–ǡ ƒ
Š‘ ‹•–ƒ ”‡•‹†‡–‹ƒŽ •—„†‹˜‹•‹‘ –‘ –Ї •‘—–Šǡ ƒ† —––‘™‹ŽŽ‘™ ‹– Š –‘ –Ї
™‡•–Ǥ Ї •‹–‡ ‹• Ž‘
ƒ–‡† ™‹–Š‹ –Ї ‡‡†Ž‡›ǡ ƒŽ‹ˆ‘”‹ƒǡ ‹–‡† –ƒ–‡•
‡‘Ž‘‰‹
ƒŽ —”˜‡›
ሺ
ሻ ͹ǤͷǦ‹—–‡ –‘’‘‰”ƒ’Š‹
ƒ’ǡ ‡
–‹‘ ʹͷǡ ‘™•Š‹’ ͳͷ ‘—–Šǡ ƒ‰‡ ʹ͵ ƒ•–ǡ
‘—– ‹ƒ„Ž‘ ƒ•‡ ƒ† ‡”‹†‹ƒ ሺƬሻǤ

– ‹• •‹–—ƒ–‡† ƒ’’”‘š‹ƒ–‡Ž› ‹‡ ‹Ž‡• ‘”–Їƒ•– ‘ˆ –ƒ–‡ ‘—–‡ ሺሻ ͻͻ ƒ† ‡‹‰Š– ‹Ž‡• •‘—–Š ‘ˆ ǦͳͺͲǤ ‡‰‹‘ƒŽ ƒ

‡•• –‘ –Ї ”‘Œ‡
– •‹–‡ ‹• ƒ˜ƒ‹Žƒ„އ „› Ǧͻͻ ƒ† ǦͳͺͲǤ
‘
ƒŽ ƒ

‡•• –‘ –Ї ”‘Œ‡
– •‹–‡ ™‘—ކ „‡ ’”‘˜‹†‡† ˜‹ƒ ‘—–Š —––‘™‹ŽŽ‘™ ˜‡—‡ ƒ† ƒ•– ‘”–Š ˜‡—‡Ǥ
ͷǤ
‡‡”ƒŽ Žƒ ‡•‹‰ƒ–‹‘ǣ
š‹•–‹‰ǣ ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽ ሺͶǦͺ †—Ȁƒ
”‡ሻǡ ͵ͲǤͶͺ ƒ
”‡•ǡ ƒ†
‹‰Š ‡•‹–›
‡•‹†‡–‹ƒŽ ሺͳͷǦʹͻ †—Ȁƒ
”‡ሻǡ ͵Ǥͷ ƒ
”‡•
”‘’‘•‡†ǣ ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽ ሺͶǦͺ †—Ȁƒ
”‡ሻǡ ͵͵Ǥͻͺ ƒ
”‡•
͸Ǥ
‘‹‰ǣ
š‹•–‹‰ǣ ǦʹͲ ሺ‹‹–‡† ‰”‹
—Ž–—”ƒŽሻ
”‘’‘•‡†ǣ ǦͳǦ͸ ሺ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽሻ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-1
Initial Study
͹Ǥ ‡•
”‹’–‹‘ ‘ˆ ”‘Œ‡
–ǣ
Ї ”‘Œ‡
– ’”‘’‘•‡• –Ї †‡˜‡Ž‘’‡– ‘ˆ ͳ͸͸ •‹‰Ž‡Ǧˆƒ‹Ž› Ž‘–• ƒ˜‡”ƒ‰‹‰ ͷǡͷ͸ͳ •“—ƒ”‡ ˆ‡‡– ’‡” Ž‘–ǡ †‡˜‡Ž‘’‡– ‘ˆ ƒ ‘Ǧ•‹–‡ •–‘” †”ƒ‹ „ƒ•‹ǡ ƒ† •‡˜‡ ‘—–Ž‘–• ‘˜‡” –™‘ ’Šƒ•‡•Ǥ Šƒ•‡ ͳ ™‘—ކ
‘•‹•– ‘ˆ ƒ’’”‘š‹ƒ–‡Ž› ͳͻǤͷ͹ ƒ
”‡• ƒ† †‡˜‡Ž‘’ ͺͻ Ž‘–•ǡ ˆ‹˜‡
‘—–Ž‘–•ǡ ƒ† –Ї ‘Ǧ•‹–‡ •–‘” †”ƒ‹ „ƒ•‹Ǥ Šƒ•‡ ʹ ™‘—ކ ‘•‹•– ‘ˆ –Ї ”‡ƒ‹‹‰ ͳͶǤͶͳ
ƒ
”‡• ƒ† †‡˜‡Ž‘’ ͹͹ Ž‘–• ƒ† –™‘ ‘—–Ž‘–•Ǥ Ǧ ƒ† ‘ˆˆǦ•‹–‡ ‹’”‘˜‡‡–•ǡ ‹ Ž—†‹‰

‹”
—Žƒ–‹‘ ”‘ƒ†•ǡ ‹–‡”‹‘” Ž‘
ƒŽ •–”‡‡–•ǡ
—”„ǡ ‰—––‡”ǡ •‹†‡™ƒŽǡ ‘’‡ •’ƒ
‡ǡ ƒ†
Žƒ†•
ƒ’‹‰ǡ ƒ”‡ ’”‘’‘•‡† ƒ• ’ƒ”– ‘ˆ –Ї ”‘Œ‡
–Ǥ
Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ™‹–Š‹ –Ї ‹–›ǯ• ’Ї”‡ ‘ˆ
ˆŽ—‡
‡ ሺ
ሻ ƒ† Šƒ• ƒ ’Ž ‡†
Žƒ† —•‡ †‡•‹‰ƒ–‹‘ ‘ˆ ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽ ሺͶǦͺ †™‡ŽŽ‹‰ —‹–• ’‡” ƒ ”‡ ሾ†—Ȁ
ƒ
ƒ
”‡ሿሻ
ƒ†
‹‰Š ‡•‹–› ‡•‹†‡–‹ƒŽ ሺͳͷǦʹͻ †—Ȁƒ
”‡ሻ ’—”•—ƒ– –‘ –Ї ‡‡†Ž‡› ʹͲ͵Ͳ ‡ ‡”ƒŽ
ŽƒǤ Ї •‹–‡ ‹• œ‘‡† ‹‹–‡† ‰”‹
—Ž–—”ƒŽ ሺǦʹͲሻ ƒ

‘”†‹‰ –‘ –Ї ‘—–› ‘ˆ ”‡•‘
œ‘‹‰ ƒ’Ǥ Ї ”‘Œ‡
– ’”‘’‘•‡• –‘ ƒ‡† –Ї ’Žƒ‡† Žƒ† —•‡ †‡•‹‰ƒ–‹‘ ‘ˆ ƒ ƒ’’”‘š‹ƒ–‡Ž› ͵ǤͷǦƒ
”‡ ’‘”–‹‘ ‘ˆ ”‘Œ‡
– •‹–‡ ˆ”‘
‹‰Š ‡•‹–› ‡•‹†‡–‹ƒŽ –‘ ‘™
‡•‹–› ‡•‹†‡–‹ƒŽǤ ††‹–‹‘ƒŽŽ›ǡ
–Ї
–Ї ”‘Œ‡
– ’”‘’‘•‡• –‘ ’”‡Ǧœ‘‡ –Ї ”‘Œ‡
– •‹–‡ 
–Ї –Š”‡‡ ”—”ƒŽ ”‡•‹†‡–‹ƒŽ ’ƒ”
‡Ž• –‘ –Ї ‘”–Š™‡•–ǡ • ͵͹ͲǦͲͶͲǦͳ͵ǡ ͵͹ͲǦͲͶͲǦʹʹǡ
ƒ
ƒ
†
†
͵͹ͲǦͲͶͲǦʹ͵ǡ –‘ –Ї ǦͳǦ͸ ሺ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽሻ œ‘‡ †‹•–”‹ – ‹ ’”‡’ƒ”ƒ–‹‘ ˆ‘”
ƒ‡šƒ–‹‘ ‘ˆ –Ї ’ƒ”
‡Ž•
‘•‹•–‡– ™‹–Š –Ї ‡‡†Ž‡› ʹͲ͵Ͳ ‡ ‡”ƒŽ ŽƒǤ Ї ƒ‡šƒ–‹‘ ”‡“—‡•– ™‘—ކ ”‡‘˜‡ –Ї ƒ”‡ƒ ˆ”‘ –Ї ”‡• ‘ 
‹‰• ‹˜‡” ‘•‡”˜ƒ–‹‘ ‹•–”‹
– •‡”˜‹
‡ „‘—†ƒ”‹‡•Ǥ
‘—–› ‹”‡ ”‘–‡
–‹‘ ‹•–”‹
– ƒ† –Ї
ƒ–‡”ǡ •‡™‡”ǡ •‘Ž‹† ™ƒ•–‡ǡ ƒ† •–‘” †”ƒ‹ƒ‰‡ —–‹Ž‹–‹‡• ™‹ŽŽ „‡ ’”‘˜‹†‡† „› –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ އ
–”‹
‹–› ™‹ŽŽ „‡ ’”‘˜‹†‡† „› ƒ
‹ˆ‹
ƒ• ƒ† އ
–”‹
ƒ† ƒ–—”ƒŽ ‰ƒ• ™‹ŽŽ „‡
’”‘˜‹†‡† „› ‘—–Ї” ƒŽ‹ˆ‘”‹ƒ ƒ•Ǥ
‘•–”—
–‹‘ ‘ˆ –Ї ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– ™‘—ކ ‘

—” ‘˜‡” ƒ ƒš‹— ‘ˆ Ͷͺ ‘–Š•Ǥ

– ‹• ƒ–‹
‹’ƒ–‡† –Šƒ– –Ї ˆ‘ŽŽ‘™‹‰ ’‹‡
‡• ‘ˆ ‡“—‹’‡– ™‘—ކ „‡ —•‡† †—”‹‰

‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǣ
Ȉ ‘ŽŽ‡”

Ȉ ‘ƒ†‡† –”—
•

š
ƒ˜ƒ–‘”

‡‡”ƒ–‘”
‡”˜‹
‡ –”—


Ȉ
Ȉ
Ȉ
Ȉ ‹”
‘’”‡••‘”

–‹–އ‡–• ƒ† ’’”‘˜ƒŽ•ǣ
x ‡ ‡”ƒŽ Žƒ ‡†‡– ’’Ž‹
ƒ–‹‘ ‘Ǥ ʹͲʹͷǦͲͳǡ
x ‡œ‘‡ ’’Ž‹
ƒ–‹‘ ‘Ǥ ʹͲʹͷǦͲͳǡ ƒ
x ‡•–‹‰ ‡–ƒ–‹˜‡ ”ƒ
– ƒ’ ‘Ǥ ͸Ͷͻ͹
x ‡šƒ–‹‘ ‘ˆ –Ї †‡•
”‹„‡† ’”‘’‡”–‹‡• ‹–‘ –Ї ‹–› „›  ‘ –Š”‘—‰Š ‡šƒ–‹‘ ’’Ž‹
ƒ–‹‘ ‘Ǥ ʹͲʹͷǦͲͳ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-2

Initial Study
ͺǤ —””‘—†‹‰ ƒ† •‡• ƒ† ‡––‹‰ǣ
Ї ’”‘’‡”–› ‹• „‘—† † „› •‹‰Ž‡Ǧˆƒ‹Ž› ”‡•‹†‡
‡• ƒ† ˜ƒ
ƒ– Žƒ† –‘ –Ї ‘”–Šǡ ƒ •
Š‘‘Ž
ƒ† ˜ƒ
ƒ– Žƒ† –‘ –Ї
‡
‡ƒ•–ǡ ƒ† •‹‰Ž‡Ǧˆƒ‹Ž› •—„†‹˜‹•‹‘• –‘ –Ї •‘—–Š ƒ† ™‡•–Ǥ ͻǤ –Ї” —„Ž‹
‰‡
‹‡• Š‘•‡ ’’”‘˜ƒŽ ƒ› „‡ ‡“—‹”‡†ǣ
x –ƒ–‡ ƒ–‡” ‡•‘—”
‡• ‘–”‘Ž ‘ƒ”†
x
ƒŽ‹ˆ‘”‹ƒ
ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡
x ‡‰‹‘ƒŽ ƒ–‡” —ƒŽ‹–› ‘–”‘Ž ‘ƒ”† Ȃ ‡–”ƒŽ ƒŽŽ‡› x ƒ
‘ƒ“—‹ ƒŽŽ‡› ‹” ‘ŽŽ—–‹‘ ‘–”‘Ž ‹•–”‹
–
x ”‡•‘ ‘
ƒŽ ‰‡
› ‘”ƒ–‹‘ ‘‹••‹‘
x  ‹•Š ƒ† ‹Ž†Ž‹ˆ‡
x ”› ‘”’• ‘ˆ ‰‹‡‡”•
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-3

Initial Study

3.2 - Environmental Factors Potentially Affected
Ї ‡˜‹”‘‡–ƒŽ ˆƒ
–‘”•
Ї
‡† „‡Ž‘™ ™‘—ކ „‡ ’‘–‡–‹ƒŽŽ› ƒˆˆ‡
–‡† „› –Š‹• ”‘Œ‡
–ǡ
‹˜‘Ž˜‹‰ ƒ– އƒ•– ‘‡ ‹’ƒ
– –Šƒ– ‹• ƒ ̶‘–‡–‹ƒŽŽ› ‹‰‹ˆ‹
ƒ–
’ƒ
–̶ ƒ• ‹†‹
ƒ–‡† „› –Ї

Ї
Ž‹•– ‘ –Ї ˆ‘ŽŽ‘™‹‰ ’ƒ‰‡•Ǥ
‡•–Ї–‹
• ‰”‹
—Ž–—”‡ ƒ† ‘”‡•–”› ‹” —ƒŽ‹–›
‡•‘—”
‡•
‹‘Ž‘‰‹
ƒŽ ‡•‘—”
‡• —Ž–—”ƒŽ ‡•
‡• ‡”‰›
‡‘Ž‘ ‰› Ȁ ‘‹Ž• ”‡‡Š‘ —•‡ ƒ• ‹••‹‘•
ƒœƒ”†• Ƭ
ƒœƒ”† •
ƒ–‡”‹ƒŽ•

›†”‘Ž‘‰› Ȁ ƒ–‡” ƒ† •‡ Ȁ Žƒ‹‰ ‹‡”ƒŽ ‡•‘—”
‡•
—ƒŽ‹–›
‘‹•‡ ‘’—Žƒ–‹‘ Ȁ
‘—•‹‰ —„Ž‹
‡”˜‹
‡•
‡
”‡ƒ–‹‘ ”ƒ•’‘”–ƒ–‹‘ ”‹„ƒŽ —Ž– ”ƒŽ ‡•‘—
‡•
–‹Ž‹–‹‡• Ȁ ‡ ‹
‡ ‹Ž†ˆ‹”‡ ƒ†ƒ–‘”›

›•–‡•
‹‰‹ˆ‹
ƒ
‡
‹†‹‰•

3.3 - Determination
 –Ї „ƒ•‹• ‘ˆ –Š‹• ‹‹–‹ƒŽ ‡˜ƒŽ—ƒ–‹‘ǣ

ˆ‹† –Šƒ– –Ї ’”‘’‘•‡† ”‘Œ‡
–   Šƒ˜‡ ƒ •‹‰‹ˆ‹
ƒ– ‡ˆˆ‡
– ‘ –Ї
‡˜‹”‘‡–ǡ ƒ† ƒ 

 


 ™‹ŽŽ „‡ ’”‡’ƒ”‡†Ǥ

ˆ‹† –Šƒ– ƒŽ–Š‘—‰Š –Ї ’”‘’‘•‡† ”‘Œ‡
–
‘—ކ Šƒ˜‡ ƒ •‹‰‹ˆ‹
ƒ– ‡ˆˆ‡
– ‘ –
‡˜‹”‘‡–ǡ –Ї”‡ ™‹ŽŽ ‘– „‡ ƒ •‹‰‹ˆ‹
ƒ– ‡ˆˆ‡
– ‹ –Š‹•
ƒ•‡ „‡
ƒ—•‡ ”‡˜‹•‹‘• ‹ –
Ї
Ї
”‘Œ‡
– Šƒ˜‡ „‡‡ ƒ†‡ „› ‘” ƒ‰”‡‡† –‘ „› –Ї ”‘Œ‡
– ’”‘’‘‡–Ǥ  





 
 ™‹ŽŽ „‡ ’”‡’ƒ”‡†Ǥ

ˆ‹† –Šƒ– –Ї ’”‘’‘•‡† ”‘Œ‡
– 
Šƒ˜‡ ƒ •‹‰‹ˆ‹
ƒ– ‡ˆˆ‡
– ‘ –Ї ‡˜‹”‘‡–ǡ ƒ†
ƒ 

  ‹• ”‡“—‹”‡†Ǥ

ˆ‹† –Šƒ– –Ї ’”‘’‘•‡† ”‘Œ‡
– 
Šƒ˜‡ ƒ Dz’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ– ‹’ƒ
–dz ‘”
Dz’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ– —Ž‡•• ‹–‹‰ƒ–‡†dz ‹’ƒ
– ‘ –Ї ‡˜‹”‘‡–ǡ „—– ƒ– އƒ•– ‘‡
‡ˆˆ‡
– ሺƒሻ Šƒ• „‡‡ ƒ†‡“—ƒ–‡Ž› ƒƒŽ›œ‡† ‹ ƒ ‡ƒ”Ž‹‡” †‘
—‡– ’—”•—ƒ– –‘ ƒ’’Ž‹
ƒ„އ
އ‰ƒŽ •–ƒ†ƒ”†•ǡ ƒ† ሺ„ሻ Šƒ• „‡‡ ƒ††”‡••‡† „› ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• „ƒ•‡† ‘ –Ї ‡ƒ”Ž‹‡” ƒƒŽ›•‹• ƒ• †‡•
”‹„‡† ‘ ƒ––ƒ
Ї† •Ї‡–•Ǥ  

 
‹• ”‡“—‹”‡†ǡ „—– ‹– —•– ƒƒŽ›œ‡ ‘Ž› –Ї ‡ˆˆ‡
–• –Šƒ– ”‡ƒ‹ –‘ „‡ ƒ††”‡••‡†Ǥ

ˆ‹† –Šƒ– ƒŽ–Š‘—‰Š –Ї ’”‘’‘•‡† ”‘Œ‡
–
‘—ކ Šƒ˜‡ ƒ •‹‰‹ˆ‹
ƒ– ‡ˆˆ‡
– ‘ –Ї
‡˜‹”‘‡–ǡ „‡
ƒ—•‡ ƒŽŽ ’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ– ‡ˆˆ‡
–• ሺƒሻ Šƒ˜‡ „‡‡ ƒƒŽ›œ‡†
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-4

Initial Study
ƒ†‡“—ƒ–‡Ž› ‹ ƒ ‡ƒ”Ž‹‡” 
 ‘”  
 
 ’—”•—ƒ– –‘ ƒ’’Ž‹
ƒ„އ
•–ƒ†ƒ”†•ǡ ƒ† ሺ„ሻ Šƒ˜‡ „‡‡ ƒ˜‘‹†‡† ‘” ‹–‹‰ƒ–‡† ’—”•—ƒ– –‘ –Šƒ– ‡ƒ”Ž‹‡”   ‘”


 
ǡ ‹
Ž—†‹‰ ”‡˜‹•‹‘• ‘” ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• –Šƒ– ƒ”‡
‹’‘•‡† —’‘ –Ї ’”‘’‘•‡† ”‘Œ‡
–ǡ ‘–Š‹‰ ˆ—”–Ї” ‹• ”‡“—‹”‡†Ǥ
‹‰ƒ–—”‡ ƒ–‡
‘†‡›
‘”–‘ǡ  ‹–› ‡‡†Ž‡›
”‹–‡† ƒ‡
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-5

Initial Study

3.4 - Evaluation of Environmental Impacts
ͳǤ  „”‹‡ˆ ‡š’Žƒƒ–‹‘ ‹• ”‡“—‹”‡† ˆ‘” ƒŽŽ ƒ•™‡”• ‡š
‡’– ̶‘
’ƒ
–̶ ƒ•™‡”• –Šƒ– ƒ”‡
ƒ†‡“—ƒ–‡Ž› •—’’‘”–‡† „› –Ї ‹ˆ‘”ƒ–‹‘ •‘—”
‡• ƒ ‡ƒ† ‰‡
›
‹–‡• ‹
ˆ‘ŽŽ‘™‹‰ ‡ƒ
Š “—‡•–‹‘Ǥ  ̶‘
’ƒ
–̶ ƒ•™‡” ‹• ƒ†‡“—ƒ–‡Ž› •—’’‘”–‡† ‹ˆ
–Ї ’ƒ”‡–Ї•‡•
–Ї ”‡ˆ‡”‡
‡†
‹ˆ‘”ƒ–‹‘ •‘—”
‡• •Š‘™ –Šƒ– –Ї ‹’ƒ
– •‹’Ž› †‘‡• ‘– ƒ’’Ž› –‘ ”‘Œ‡
–• Ž‹‡ –Ї ‘‡
‹˜‘Ž˜‡† ሺ‡Ǥ‰Ǥǡ –Ї ”‘Œ‡
– ˆƒŽŽ• ‘—–•‹†‡ ƒ ˆƒ—Ž– ”—’–—”‡ œ‘‡ሻǤ  ̶‘
’ƒ
–̶ ƒ•™‡” •Š‘—ކ
„‡ ‡š’Žƒ‹‡† ™Š‡”‡ ‹– ‹• „ƒ•‡† ‘ ”‘Œ‡
–Ǧ•’‡
‹ˆ‹
ˆƒ
–‘”• ƒ• ™‡ŽŽ ƒ• ‰‡‡”ƒŽ •–ƒ†ƒ”†•
ሺ‡Ǥ‰Ǥǡ –Ї ”‘Œ‡
– ™‹ŽŽ ‘– ‡š’‘•‡ •‡•‹–‹˜‡ ”‡
‡’–‘”• –‘ ’‘ŽŽ—–ƒ–•ǡ „ƒ•‡† ‘ ƒ ”‘Œ‡
–Ǧ
•’‡
‹ˆ‹
•
”‡‡‹‰ ƒƒŽ›•‹•ሻǤ
ʹǤ ŽŽ ƒ•™‡”• —•– –ƒ‡ ƒ

‘—– ‘ˆ –Ї ™Š‘އ ƒ
–‹‘ ‹˜‘Ž˜‡†ǡ ‹
Ž—†‹‰ ‘ˆˆǦ•‹–‡ ƒ• ™‡ŽŽ
‘Ǧ•‹–‡ǡ
——Žƒ–‹˜‡ ƒ• ™‡ŽŽ ƒ• ”‘Œ‡
–Ǧއ˜‡Žǡ ‹†‹”‡
– ƒ• ™‡ŽŽ ƒ• †‹”‡
–ǡ ƒ†
‘•–”—
–‹‘
ĥ
ĥ
™‡ŽŽ ƒ• ‘’‡”ƒ–‹‘ƒŽ ‹’ƒ
–•Ǥ
͵Ǥ 
‡ –Ї ‡ƒ† ‰‡
› Šƒ• †‡–‡”‹‡† –Šƒ– ƒ ’ƒ”–‹
—Žƒ” ’Š›•‹
ƒŽ ‹’ƒ
– ƒ› ‘

—”ǡ –Ї
–Ї
Ї
Ž‹•– ƒ•™‡”• —•– ‹†‹
ƒ–‡ ™Š‡–Ї” –Ї ‹’ƒ
– ‹• ’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ–ǡ އ••
–Šƒ •‹‰‹ˆ‹
ƒ– ™‹–Š ‹–‹‰ƒ–‹‘ǡ ‘” އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ ̶‘–‡–‹ƒŽŽ› ‹‰‹ˆ‹
ƒ–
’ƒ
–̶
‹• ƒ’’”‘’”‹ƒ–‡ ‹ˆ –Ї”‡ ‹• •—„•–ƒ–‹ƒŽ ‡˜‹†‡
‡ –Šƒ– ƒ ‡ˆˆ‡
– ƒ› „‡ •‹‰‹ˆ‹
ƒ–Ǥ
ˆ –Ї”‡
ƒ”‡ ‘‡ ‘” ‘”‡ ̶‘–‡–‹ƒŽŽ› ‹‰‹ˆ‹
ƒ–
’ƒ
–̶ ‡–”‹‡• ™Š‡ –Ї †‡–‡”‹ƒ–‹‘ ‹• ƒ†‡ǡ
ƒ 
 ‹• ”‡“—‹”‡†Ǥ
ͶǤ ̶‡‰ƒ–‹˜‡ ‡
Žƒ”ƒ–‹‘ǣ ‡•• Šƒ ‹‰‹ˆ‹
ƒ– ‹–Š ‹–‹‰ƒ–‹‘

‘”’‘”ƒ–‡†̶ ƒ’’Ž‹‡•
™Š‡”‡ –Ї ‹
‘”’‘”ƒ–‹‘ ‘ˆ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• Šƒ• ”‡†—
‡† ƒ ‡ˆˆ‡
– ˆ”‘ ̶‘–‡–‹ƒŽŽ›
‹‰‹ˆ‹
ƒ–
’ƒ
–̶ –‘ ƒ ̶‡••ǦŠƒǦ‹‰‹ˆ‹
ƒ–
’ƒ
–Ǥ̶ Ї ‡ƒ† ‰‡
› —•– †‡•
”‹„‡
–Ї ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡•ǡ ƒ† „”‹‡ˆŽ› ‡š’Žƒ‹ Š‘™ –Ї› ”‡†— ‡ –Ї ‡ˆˆ‡
– –‘ ƒ އ••Ǧ–ŠƒǦ
•‹‰‹ˆ‹
ƒ– އ˜‡Ž ሺ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• ˆ”‘ ̶ƒ”Ž‹‡” ƒŽ›•‡•ǡ̶ ƒ• †‡• ”‹„‡† ‹ ሺͷሻ „‡Ž‘™ǡ
ƒ› „‡
”‘••Ǧ”‡ˆ‡”‡
‡†ሻǤ
ͷǤ ƒ”Ž‹‡” ƒƒŽ›•‡• ƒ› „‡ —•‡† ™Š‡”‡ǡ ’—”•—ƒ– –‘ –Ї –‹‡”‹‰ǡ ’”‘‰”ƒ  ǡ ‘” ‘–Ї” 
’”‘
‡••ǡ ƒ ‡ˆˆ‡
– Šƒ• „‡‡ ƒ†‡“—ƒ–‡Ž› ƒƒŽ›œ‡† ‹ ƒ ‡ƒ”Ž‹‡” 
 ‘” ‡‰ƒ–‹˜‡ †‡
Žƒ”ƒ–‹‘Ǥ
‡
–‹‘ ͳͷͲ͸͵ሺ
ሻሺ͵ሻሺሻǤ
 –Š‹•
ƒ•‡ǡ ƒ „”‹‡ˆ †‹•
—••‹‘ •Š‘—ކ ‹†‡–‹ˆ› –Ї ˆ‘ŽŽ‘™‹‰ǣ
ƒǤ ƒ”Ž‹‡” ƒŽ›•‹• •‡†Ǥ
†‡–‹ˆ› ƒ† •–ƒ–‡ ™Š‡”‡ –Ї› ƒ”‡ ƒ˜ƒ‹Žƒ„އ ˆ‘” ”‡˜‹‡™Ǥ
„Ǥ
’ƒ
–• †‡“—ƒ–‡Ž› ††”‡••‡†Ǥ
†‡–‹ˆ› ™Š‹
Š ‡ˆˆ‡
–• ˆ”‘ –Ї ƒ„‘˜‡
Ї
Ž‹•– ™‡”‡
™‹–Š‹ –Ї •
‘’‡ ‘ˆ ƒ† ƒ†‡“—ƒ–‡Ž› ƒƒŽ›œ‡† ‹ ƒ ‡ƒ”Ž‹‡” †‘
—‡– ’—”•—ƒ– –‘
ƒ’’Ž‹
ƒ„އ އ‰ƒŽ •–ƒ†ƒ”†•ǡ ƒ† •–ƒ–‡ ™Š‡–Ї” •—
Š ‡ˆˆ‡
–• ™‡”‡ ƒ††”‡••‡† „›
‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• „ƒ•‡† ‘ –Ї ‡ƒ”Ž‹‡” ƒƒŽ›•‹•Ǥ

Ǥ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡•Ǥ ‘” ‡ˆˆ‡
–• –Šƒ– ƒ”‡ ̶‡•• –Šƒ ‹‰‹ˆ‹
ƒ– ™‹–Š ‹–‹‰ƒ–‹‘
‡ƒ•—”‡•

‘”’‘”ƒ–‡†ǡdz †‡•
”‹„‡ –Ї ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• ™‡”‡ ‹
‘”’‘”ƒ–‡†
‘” ”‡ˆ‹‡† ˆ”‘ –Ї ‡ƒ”Ž‹‡” †‘
—‡– ƒ† –Ї ‡š–‡– –‘
™Š‹
Š
™Š‹
Š –Ї› ƒ††”‡•• •‹–‡Ǧ
•’‡
‹ˆ‹

‘†‹–‹‘• ˆ‘” –Ї ”‘Œ‡
–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-6

Initial Study
͸Ǥ ‡ƒ† ƒ‰‡
‹‡• ƒ”‡ ‡
‘—”ƒ‰‡† –‘ ‹
‘”’‘”ƒ–‡ ‹–‘ –Ї
Ї
Ž‹•– ”‡ˆ‡”‡
‡• –‘ ‹ˆ‘”ƒ–‹‘
•‘—”
‡• ˆ‘” ’‘–‡–‹ƒŽ ‹’ƒ
–• ሺ‡Ǥ‰Ǥǡ ‰‡‡”ƒŽ ’Žƒ•ǡ œ‘‹‰ ‘”†‹ƒ
‡•ሻǤ ‡ˆ‡”‡
‡ –‘ ƒ
’”‡˜‹‘—•Ž› ’”‡’ƒ”‡† ‘” ‘—–•‹†‡ †‘
—‡– •Š‘—ކǡ ™Š‡”‡ ƒ’’”‘’”‹ƒ–‡ǡ ‹
Ž—†‡ ƒ ”‡ˆ‡”‡
‡
–‘ –Ї ’ƒ‰‡ ‘” ’ƒ‰‡• ™Š‡”‡ –Ї •–ƒ–‡‡– ‹• •—„•–ƒ–‹ƒ–‡†Ǥ ͹Ǥ —’’‘”–‹‰
ˆ‘”ƒ–‹‘ ‘—”
‡•ǣ  •‘—”
‡ Ž‹•– •Š‘—ކ „‡ ƒ––ƒ
Ї†ǡ ƒ† ‘–Ї” •‘—”
‡•
—•‡†ǡ ‘” ‹†‹˜‹†—ƒŽ•
‘–ƒ
–‡† •Š‘—ކ „‡
‹–‡† ‹ –Ї †‹•
—••‹‘Ǥ
ͺǤ Š‹• ‹• ‘Ž› ƒ •—‰‰‡•–‡† ˆ‘”ǡ ƒ† އƒ† ƒ‰‡
‹‡• ƒ”‡ ˆ”‡‡ –‘ —•‡ †‹ˆˆ‡”‡– ˆ‘”ƒ–•Ǣ
Š‘™‡˜‡”ǡ އƒ† ƒ‰‡
‹‡• •Š‘—ކ ‘”ƒŽŽ› ƒ††”‡•• –Ї “—‡•–‹‘• ˆ”‘ –Š‹•
Ї
Ž‹•– –Šƒ–
ƒ”‡ ”‡Ž‡˜ƒ– –‘ ƒ ”‘Œ‡
–̵• ‡˜‹”‘‡–ƒŽ ‡ˆˆ‡
–• ‹ ™Šƒ–‡˜‡” ˆ‘”ƒ– ‹• •‡Ž‡
–‡†Ǥ
ͻǤ Ї ‡š’Žƒƒ–‹‘ ‘ˆ ‡ƒ
Š ‹••—‡ •Š‘—ކ ‹†‡–‹ˆ›ǣ
ƒǤ Ї •‹‰‹ˆ‹
ƒ
‡
”‹–‡”‹ƒ ‘” –Š”‡•Бކǡ ‹ˆ ƒ›ǡ —•‡† –‘ ‡˜ƒŽ—ƒ–‡ ‡ƒ
Š “—‡•–‹‘Ǥ
„Ǥ Ї ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡ ‹†‡–‹ˆ‹‡†ǡ ‹ˆ ƒ›ǡ –‘ ”‡†—
‡ –Ї ‹’ƒ
– –‘ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-7

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.1 - AESTHETICS
š
‡’– ƒ• ’”‘˜‹†‡† ‹ —„Ž‹
‡•‘—”
‡• ‘†‡
‡
–‹‘ ʹͳͲͻͻǡ ™‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ
ƒ ‡ ƒ • „• ƒ ‹ƒŽ ƒ† ‡ •‡ ‡ ‡
•  ƒ •
‡‹

˜‹•–ƒǫ
„Ǥ  „•–ƒ ‹ƒŽŽ› †ƒƒ‰‡ •
‡‹
‡•‘—
‡•ǡ
‹
Ž—†‹‰ǡ „—– ‘– Ž‹‹–‡† –‘ǡ –”‡‡•ǡ ”‘
‘—–
”‘’’‹‰•ǡ ƒ† Š‹•–‘”‹
„—‹Ž†‹‰• ™‹–Š‹


ƒ
•–ƒ–‡ •
‡‹
Š‹‰Š™ƒ›ǫ

Ǥ
  Ǧ—”„ƒ‹œ‡† ƒ ‡ƒǡ •—„•–ƒ ‹ƒŽŽ› †‡‰”ƒ†‡
–Ї ‡š‹•–‹‰ ˜‹•—ƒŽ
Šƒ”ƒ
–‡” ‘” “—ƒŽ‹–› ‘ˆ
’—„Ž‹
˜‹‡™• ‘ˆ –Ї •‹–‡ ƒ† ‹–• •—””‘—†‹‰•ǫ

ˆ –Ї ”‘Œ‡
– ‹• ‹ ƒ —”„ƒ‹œ‡† ƒ”‡ƒǡ ™‘—ކ
–Ї ”‘Œ‡
–
‘ˆŽ‹
– ™‹–Š ƒ’’Ž‹
ƒ„އ œ‘‹‰
ƒ† ‘–Ї” ”‡‰—Žƒ–‹‘• ‰‘˜‡”‹‰ •
‡‹

“—ƒŽ‹–›ǫ
†Ǥ ”‡ƒ–‡ ƒ ‡™ •‘—
‡ • „•–ƒ–‹ƒŽ Ž‹‰Š–
‰Žƒ”‡ –Šƒ– ™‘—ކ ƒ†˜‡”•‡Ž› ƒˆˆ‡
– †ƒ› ‘”
‹‰Š––‹‡ ˜‹‡™• ‹ –Ї ƒ”‡ƒǫ
Discussion

’ƒ
– ͓͵ǤͶǤͳƒ Ȃ ‘—ކ –Ї ”‘Œ‡
– Šƒ˜‡ ƒ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ‡ˆˆ‡
– ‘ ƒ •
‡‹
˜‹•–ƒǫ

‡‹
˜‹•–ƒ• ƒ”‡ †‡ˆ‹‡† ƒ• ‡š’ƒ•‹˜‡ ˜‹‡™• ‘ˆ Š‹‰ŠŽ› ˜ƒŽ—‡† Žƒ†• ƒ’‡• ˆ”‘ ’—„Ž‹
Ž›
ƒ

‡••‹„އ ˜‹‡™’‘‹–•Ǥ 
‡‹
˜‹•–ƒ• ‹
Ž—†‡ ˜‹‡™• ‘ˆ ƒ–—”ƒŽ ˆ‡ƒ–—”‡• •—
Š ƒ• –‘’‘‰”ƒ’Š›ǡ
™ƒ–‡”
‘—”•‡•ǡ ”‘
 ‘—–
”‘’•ǡ ƒ† ƒ–—”ƒŽ ˜‡‰‡–ƒ–‹‘ǡ ƒ• ™‡ŽŽ ƒ• ƒƒ†‡ •
‡‹
•–”—
–—”‡•Ǥ
Ї ‹–› ‘ˆ ‡‡†Ž‡› ‡ ‡”ƒŽ Žƒ ʹͲ͵Ͳ 
 ሺ ‡ ‡”ƒŽ Žƒ 
ሻ ‹†‡–‹ˆ‹‡• –Ї ‹–›ǯ• ’”‹ƒ”›
•
‡‹
ƒ† ˜‹•—ƒŽ ”‡•‘—”
‡• ƒ• –Ї Žƒ† —•‡ ’ƒ––‡” –Š”‘—‰Š‘—– –Ї
‹–› ƒ† –Ї •
‡‹
˜‹•–ƒ•
‘ˆ –Ї •—””‘—†‹‰ ƒ‰”‹
—Ž–—”ƒŽ Žƒ† ˆ”‘ –Ї
‹–›ǯ• —”„ƒ ‡†‰‡ ሺ‹–› ‘ˆ ‡‡†Ž‡› ʹͲͳ͵ሻǤ Ї
‡‡”ƒŽ Žƒ 
 ˆ‘—† ‘ •‹‰‹ˆ‹
ƒ– ‹’ƒ
–• –‘ •
‡‹
˜‹•–ƒ• ‹ –Ї ”‘Œ‡
– ƒ”‡ƒ ˆ”‘ ˆ—–—”‡
„—‹Ž†‘—– ‘ˆ –Ї ‡‡”ƒŽ ŽƒǤ ‹–› ‡‡”ƒŽ Žƒ ‘Ž‹
›  ͶǤʹǤʹ ‹†‡–‹ˆ‹‡• –Ї ‡‡† –‘ ˆ‘•–‡”
ƒ† ƒ‹–ƒ‹ –Ї •
‡‹
ƒ–‘•’Ї”‡ ‘ˆ –Ї ”‹˜‡” ˆ”‘– ƒ”‡ƒǤ Ї ”‘Œ‡
– •‹–‡ ‹• ‘– Ž‘
ƒ–‡†
‡ƒ” –Ї ”‹˜‡” ˆ”‘–Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‘—ކ ‘– ƒ†˜‡”•‡Ž› ‹’ƒ
– •
‡‹
˜‹•–ƒ• ‘” •
‡‹

”‡•‘—”
‡• ‹ –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ
Ї ”‘Œ‡
– •‹–‡ ‹• ‘– ™‹–Š‹ ‘” ‹ –Ї ˜‹
‹‹–› ‘ˆ ƒ
‹–›ǡ
‘—–›ǡ ‘” –ƒ–‡Ǧ‹†‡–‹ˆ‹‡† •
‡‹
˜‹•–ƒǤ
—” –Ї”‘”‡ǡ –Ї †‡˜‡Ž‘’‡– ‘ˆ –Ї ”‘Œ‡
– ™‘—ކ ‘– „Ž‘
 ‘”
‘ˆ ‹’‘”–ƒ
‡ ‘” ™Šƒ– ™‘—ކ „‡
‘•‹†‡”‡† ˜‹•—ƒŽŽ› ƒ’’‡ƒŽ‹‰ Žƒ
’”‡
Ž—†‡ ˜‹‡™• ‘ˆ ƒ› ƒ”‡ƒ
†ˆ‘”•Ǥ Ї”‡ˆ‘”‡ǡ ƒ އ••Ǧ
–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
– ‹• ƒ–‹
‹’ƒ–‡† ‘ •
‡‹
”‡•‘—”
‡•Ǥ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-8
Initial Study

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ƒ އ••Ǧ Ǧ ‰ ˆ‹
ƒ– ƒ
– –Šƒ ‹ •‹ ‹’ Ǥ

’ƒ
– ͓͵ǤͶǤͳ„ Ȃ ‘—ކ –Ї ”‘Œ‡
– •—„•–ƒ–‹ƒŽŽ› †ƒƒ‰‡ •
‡‹
”‡•‘—”
‡•ǡ ‹
Ž—†‹‰ǡ „—– ‘–
Ž‹‹–‡† –‘ǡ –”‡‡•ǡ ”‘
 ‘—–
”‘’’‹‰•ǡ ƒ† Š‹•–‘”‹
„—‹Ž†‹‰• ™‹–Š‹ ƒ •–ƒ–‡ •
‡‹
Š‹‰Š™ƒ›ǫ
‡‡
’ƒ
– ͓͵ǤͶǤͳƒ ƒ„‘˜‡Ǥ
Ї ”‘Œ‡
– †‘‡• ‘– Ž‹‡ ‡ƒ” ‘” ™‹–Š‹ ƒ –ƒ–‡ ‡•‹‰ƒ–‡† ‘” Ž‹‰‹„އ –ƒ–‡  ‡‹

‹‰Š™ƒ›
ሺƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ”ƒ•’‘”–ƒ–‹‘ ʹͲʹͶሻǤ Ї ‡ƒ”‡•– Ž‹‰‹„އ  ‡‹

‹‰Š™ƒ› ‹• Ǧ
ͳͺͲǡ ƒ’’”‘š‹ƒ–‡Ž› ‡‹‰Š– ‹Ž‡• ‘”–Š ‘ˆ –Ї ”‘Œ‡
– •‹–‡Ǥ Ї ”‘Œ‡
– †‘‡• ‘– ‹
Ž—†‡ –Ї
†‡•–”—
–‹‘ ‘ˆ ”‘
 ‘—–
”‘’’‹‰• ‘” †‡‰”ƒ†ƒ–‹‘ ‘ˆ ƒ› Š‹•–‘”‹
„—‹Ž†‹‰ሺ•ሻǤ Ї ”‘Œ‡
–
™‘—ކ ”‡‘˜‡ –Ї ƒ‰”‹
—Ž–—”ƒŽ ‘”
Šƒ”† ˆ”‘ –Ї •‹–‡ǡ ‘‡ ‘ˆ ™Š‹
Š ƒ”‡ ƒ–‹˜‡ –”‡‡ •’‡
‹‡•Ǥ

‘™‡˜‡”ǡ ƒ• ‘–‡† ‹
’ƒ
– ͵ǤͶǤͳƒ ƒ„‘˜‡ǡ –Ї ‡‡”ƒŽ Žƒ 
 ˆ‘—† ‘ •‹‰‹ˆ‹
ƒ– ‹’ƒ
–•
–‘ •
‡‹
˜‹•–ƒ• ‹ –Ї ”‘Œ‡
– ƒ”‡ƒ ˆ”‘ ˆ—–—”‡ „—‹Ž†‘—– ‘ˆ –Ї ‡ ‡”ƒŽ ŽƒǤ Ї”‡ˆ‘”‡ǡ ”‘Œ‡
– ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳ
Ȃ
 ƒ ‘Ǧ—”„ƒ‹œ‡† ƒ”‡ƒǡ •—„•–ƒ–‹ƒŽŽ› †‡‰”ƒ†‡ –Ї ‡š‹•–‹‰ ˜‹•—ƒŽ Šƒ”ƒ
–‡”
‘” “—ƒŽ‹–› ‘ˆ ’—„Ž‹
˜‹‡™• ‘ˆ –Ї •‹–‡ ƒ† ‹–• •—””‘—†‹‰•ǫ
ˆ –Ї ”‘Œ‡
– ‹• ‹ ƒ —”„ƒ‹œ‡†
ƒ”‡ƒǡ ™‘—ކ –Ї ”‘Œ‡
–
‘ˆŽ‹
– ™‹–Š ƒ’’Ž‹
ƒ„އ œ‘‹‰ ƒ† ‘–Ї” ”‡‰—Žƒ–‹‘• ‰‘˜‡”‹‰
•
‡‹
“—ƒŽ‹–›ǫ
Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ƒŽ‘‰ –Ї ‡ƒ•–‡” ‡†‰‡ ‘ˆ –Ї ‹–›Ǥ Ї ’”‘’‡”–› ‹• „‘—†‡† „› ƒ‰”‹
—Ž–—”ƒŽ ƒ† ˜ƒ
ƒ– Žƒ† –‘ –Ї ‘”–Šǡ •‹‰Ž‡Ǧˆƒ‹Ž› ”‡•‹†‡–‹ƒŽ –‘ –Ї ‡ƒ•–ǡ ˜ƒ ƒ– Žƒ†
ƒ† ƒ •
Š‘‘Ž –‘ –Ї ™‡•–ǡ ƒ† •‹‰Ž‡Ǧˆƒ‹Ž› ”‡•‹†‡–‹ƒŽ –‘ –Ї •‘—–ŠǤ Ї ’”‘’‘•‡† ’”‡Ǧœ‘‹‰ †‡•‹‰ƒ–‹‘ ‘ˆ ǦͳǦ͸ ‹•
‘•‹•–‡– ™‹–Š –Ї ’Žƒ‡† Žƒ† —•‡ †‡•‹‰ƒ–‹‘ ‘ˆ –Ї •‹–‡Ǥ Ї ’”‘’‘•‡† ”‡•‹†‡–‹ƒŽ † ™‹ŽŽ „‡ •—„Œ‡
– –‘ –Ї ‹–›
‘‹‰ ‘†‡ǡ Šƒ’–‡”
ͳͲǤͳͲǤͲ͵Ͳǡ ™Š‹
Š
‘–ƒ‹• †
‡˜‡Ž‘’‡–
‡˜‡Ž‘’‡– ƒ† Žƒ†•
ƒ’‹‰ •–ƒ†ƒ”†• ˆ‘” ”‡•‹†‡–‹ƒŽŽ› œ‘‡†
ƒ”‡ƒ•Ǥ Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ „‡
‘•–”—
–‡† –‘ Šƒ˜‡ ƒ •‹‹Žƒ” ˜‹•—ƒŽ “—ƒŽ‹–› ƒ†

Šƒ”ƒ
–‡” ƒ• –Ї ‡š‹•–‹‰ ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡–• –‘ ™‡•– ƒ† •‘—–Šǡ ƒ† ™‘—ކ ‘– •—„•–ƒ–‹ƒŽŽ› †‡‰”ƒ†‡ –Ї ‡š‹•–‹‰ ˜‹•—ƒŽ
Šƒ”ƒ
–‡” ‘ˆ
–Ї
–Ї ƒ”‡ƒǤ Ї ”‘Œ‡
– ™‘—ކ
‘’Ž›
™‹–Š ƒ’’Ž‹
ƒ„އ ‹–› †‡˜‡Ž‘’‡– ƒ† Žƒ†•
ƒ’‡ •–ƒ†ƒ”†• ƒ• †‡ˆ‹‡† ‹ –Ї
‘‹‰ ‘†‡ ˆ‘”
–Ї ǦͳǦ͸ ሺ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽሻ œ‘‡ †‹•–”‹
– ƒ† ™‘—ކ ‘–
‘ˆŽ‹
– ™‹–Š ƒ’’Ž‹
ƒ„އ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-9

Initial Study
œ‘‹‰ ƒ† ‘–Ї” ”‡‰—Žƒ–‹‘• ‰‘˜‡”‹‰ •
‡‹
“—ƒŽ‹–›Ǥ • •—
Šǡ ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ
•‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
– ͓͵ǤͶǤͳ† Ȃ ‘—Ž –Ї ”‘Œ‡
–
”‡ƒ–‡ ƒ ‡™ •‘—”
‡ ‘ˆ •—„•–ƒ–‹ƒŽ Ž‹‰Š– ‘” ‰Žƒ”‡ –Šƒ–
™‘—ކ ƒ†˜‡”•‡Ž› ƒˆˆ‡
–
†
†ƒ› ‘” ‹‰Š––‹‡ ˜‹‡™• ‹ –Ї ƒ”‡ƒǫ
š‹•–‹‰ •‘—”
‡• ‘ˆ ‹‰Š––‹‡ Ž‹‰Š–‹‰ ‹ –Ї ˜‹
‹‹–› ‘ˆ –Ї •‹–‡ ‹
Ž—†‡ •–”‡‡–Ž‹‰Š–• ƒŽ‘‰ ‘—–Š
—––‘™‹ŽŽ‘™˜‡—‡ǡ Ž‹‰Š–ˆ”‘ –Ї Їƒ†Ž‹‰Š–• ‘ˆ ˜‡Š‹
އ• –”ƒ˜‡Ž‹‰ ƒŽ‘‰ ‘—–Š —––‘™‹ŽŽ‘™
˜‡—‡ǡ ‘—–†‘‘” Ž‹‰Š–‹‰ ˆ”‘ –Ї ‡‹‰Š„‘”‹‰ •
Š‘‘Ž –‘ –Ї ‡ƒ•–ǡ ƒ† –Ї •—””‘—†‹‰
”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡–Ǥ
‘•–”—
–‹‘ ‘ˆ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‰‡‡”ƒŽŽ› ‘

—” †—”‹‰ †ƒ›–‹‡ Š‘—”•ǡ ƒ•
”‡‰—Žƒ–‡† „› –Ї ‡‡”ƒŽ Žƒ ‘‹•‡ އ‡–Ǥ

”‡ƒ•‡† –”—
 –”ƒˆˆ‹
ƒ† –Ї –”ƒ•’‘”– ‘ˆ

‘•–”—
–‹‘ ƒ–‡”‹ƒŽ• –‘ –Ї ”‘Œ‡
– •‹–‡ ™‘—ކ ƒŽ•‘ „‡ ‹‹ƒŽ ƒ† –‡’‘”ƒ”› ‹ ƒ–—”‡Ǥ
‘•–”—
–‹‘ ƒ
–‹˜‹–› ™‘—ކ ˆ‘
—• ‘ •’‡
‹ˆ‹
ƒ”‡ƒ• ‘ –Ї •‹–‡•ǡ ƒ† ƒ› •‘—”
‡• ‘ˆ ‰Žƒ”‡
™‘—ކ ‘– „‡ •–ƒ–‹‘ƒ”› ˆ‘” ƒ ’”‘Ž‘‰‡† ’‡”‹‘† ‘ˆ –‹‡Ǥ Ї”‡ˆ‘”‡ǡ ‘•–”—
–‹‘ ‘ˆ –Ї
’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘–
”‡ƒ–‡ ƒ ‡™ •‘—”
‡ ‘ˆ •—„•–ƒ–‹ƒŽ ‰Žƒ”‡ –Šƒ– ™‘—ކ ƒˆˆ‡
–
†ƒ›–‹‡ ˜‹‡™• ‹ –Ї ƒ”‡ƒǤ

‡
‘•–”—
–‡†ǡ –Ї ”‘Œ‡
– ™‹ŽŽ ‹
Ž—†‡ –›’‹
ƒŽ ‡š–‡”‹‘” Ž‹‰Š–‹‰ ˆ‘” –Ї ’”‘’‘•‡†
”‡•‹†‡
‡•Ǥ ‹–Š –Ї
‘’Ž‹ƒ
‡ ‘ˆ –Ї ‡‡†Ž‡›
‘‹‰ ”†‹ƒ
‡ ƒ† ‡‡”ƒŽ Žƒǡ
•’‡
‹ˆ‹
ƒŽŽ› ‡
–‹‘ ͻǦͶǦͶ ‘ˆ –Ї ‡‡†Ž‡› —‹
‹’ƒŽ ‘†‡ ˆ‘” ’”‘’‡”–› ƒ‹–‡ƒ
‡ •–ƒ†ƒ”†•
ˆ‘” ‡š–‡”‹‘” Ž‹‰Š–‹‰ǡ ƒ† ‘–Ї” ƒ’’Ž‹
ƒ„އ Ž‘
ƒŽ †‡˜‡Ž‘’‡– •–ƒ†ƒ”†•ǡ –Ї ’”‘’‘•‡† ”‘Œ‡
–
™‘—ކ ‘–
”‡ƒ–‡ ‡™ •‘—”
‡• ‘ˆ •—„•–ƒ–‹ƒŽ Ž‹‰Š– ‘” ‰Žƒ”‡ –Šƒ– ™‘—ކ ƒ†˜‡”•‡Ž› ƒˆˆ‡ – †ƒ› ‘”
‹‰Š––‹‡ ˜‹‡™• ‹ –Ї ƒ”‡ƒǤ Ї”‡ˆ‘”‡ǡ ”‘Œ‡
– ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-10

Initial Study
‘–‡–‹ƒŽŽ›
‹‰‹ˆ‹
ƒ–

’ƒ
–

3.4.2 - AGRICULTURE AND FORESTRY RESOURCES

 †‡–‡”‹‹‰ ™Š‡–Ї” ‹’ƒ
–• –‘ ƒ‰”‹
—Ž–—”ƒŽ
”‡•‘—”
‡• ƒ”‡ •‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‡ˆˆ‡
–•ǡ އƒ†
ƒ‰‡
‹‡• ƒ› ”‡ˆ‡” –‘ –Ї ƒŽ‹ˆ‘”‹ƒ ‰”‹
—Ž–—”ƒŽ
ƒ† ˜ƒŽ—ƒ–‹‘ ƒ† ‹–‡ ••‡••‡– ‘†‡Ž ሺͳͻͻ͹ሻ
’”‡’ƒ”‡† „› –Ї ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ
‘•‡”˜ƒ–‹‘ ƒ• ƒ ‘’–‹‘ƒŽ ‘†‡Ž –‘ —•‡ ‹ ƒ••‡••‹‰
‹’ƒ
–• ‘ ƒ‰”‹
—Ž–—”‡ ƒ† ˆƒ”Žƒ†Ǥ
 †‡–‡”‹‹‰
™Š‡–Ї” ‹’ƒ
–• –‘ ˆ‘”‡•– ”‡•‘—”
‡•ǡ ‹
Ž—†‹‰
–‹„‡”Žƒ†ǡ ƒ”‡ •‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‡ˆˆ‡
–•ǡ
އƒ† ƒ‰‡
‹‡• ƒ› ”‡ˆ‡” –‘ ‹ˆ‘”ƒ–‹‘
‘’‹Ž‡† „›
–Ї ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘”‡•–”› ƒ† ‹”‡
”‘–‡
–‹‘ ”‡‰ƒ”†‹‰ –Ї •–ƒ–‡ǯ• ‹˜‡–‘”› ‘ˆ ˆ‘”‡•–
Žƒ†ǡ ‹
Ž—†‹‰ –Ї ‘ ”‡•– ƒ† ƒ‰‡ ••‡••‡–
”‘Œ‡
– ƒ† –Ї ‘”‡•– ‡‰ƒ
› ••‡••‡– ”‘Œ‡
–Ǣ
ƒ† ˆ‘”‡•–
ƒ”„‘ ‡ƒ•—”‡‡– ‡–Š‘†‘Ž‘‰›
’”‘˜‹†‡† ‹ ‘”‡•– ”‘–‘
‘Ž• ƒ†‘’–‡† „› –Ї
ƒŽ‹ˆ‘”‹ƒ ‹” ‡•‘—”
‡• ‘ƒ”†Ǥ ‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ ‘ ‡  ‹‡ ƒ”Žƒ†ǡ ‹“—‡ ƒ”Žƒ†ǡ
‘” ƒ”Žƒ† ‘ˆ –ƒ–‡™‹†‡
’‘”–ƒ
‡
ሺ ƒ”Žƒ†ሻǡ ƒ• •Š‘™ ‘ –Ї ƒ’• ’”‡’ƒ”‡†
’—”•—ƒ– –‘ –Ї ƒ”Žƒ† ƒ’’‹‰ ƒ†
‘‹–‘”‹‰ ”‘‰”ƒ ‘ˆ –Ї ƒŽ‹ˆ‘”‹ƒ
‡•‘—”
‡• ‰‡
›ǡ –‘ ‘Ǧƒ‰”‹
—Ž–—”ƒŽ —•‡ǫ
„Ǥ ‘ Ž‹
– ‹ Š ‡š‹•–‹‰ œ‘‹‰ ƒ‰”‹
—Ž —”ƒŽ
—•‡ ‘” ƒ ‹ŽŽ‹ƒ•‘ 
–
‘–”ƒ
–ǫ

Ǥ ‘ˆŽ‹
– ‹ Š ‡š‹•–‹‰ œ‘‹‰ ǡ
ƒ—•‡
”‡œ‘‹‰ ‘ˆǡ ˆ‘”‡•– Žƒ† ሺƒ• †‡ˆ‹‡† ‹ —„Ž‹

‡•‘—”
‡• ‘†‡ ‡
–‹‘ ͳʹʹʹͲሺ‰ሻሻǡ
–‹„‡”Žƒ† ሺƒ• †‡ˆ‹‡† „› —„Ž‹
‡•‘—”
‡•
‘†‡ ‡
–‹‘ Ͷͷʹ͸ሻǡ ‘” –‹„‡”Žƒ† œ‘‡†
‹„‡”Žƒ† ”‘†—
–‹‘ ሺƒ• †‡ˆ‹‡† „›
‘˜‡ ”‡– ‘†‡ ‡
–‹‘ ͷͳͳͲͶሺ‰ሻሻǫ
†Ǥ ‡•—Ž ‹ –Ї Ž‘•• ”‡•– Žƒ†
‘˜‡”•‹ 
‘ˆ ˆ‘”‡•– Žƒ† –‘ ‘Ǧˆ‘”‡•– —•‡ǫ
‡Ǥ
˜‘Ž˜‡ ‘–Ї
Šƒ‰‡• ‹ Ї ‡š‹•–‹‰
‡˜‹”‘‡– ™Š‹
Šǡ †—‡ –‘ –Ї‹” Ž‘
ƒ–‹‘ ‘”

ƒ–—”‡ǡ
‘—ކ ”‡•—Ž– ‹
‘˜‡”•‹‘ ‘ˆ

ƒ”Žƒ†ǡ –‘ ‘Ǧƒ‰”‹
—Ž–—”ƒŽ —•‡ ‘”

‘˜‡”•‹‘ ‘ˆ ˆ‘”‡•– Žƒ† –‘ ‘Ǧˆ‘”‡•– —•‡ǫ

‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
™‹–Š ‡••Ǧ–Šƒ Ǧ
‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘


‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-11

Initial Study
Discussion

’ƒ
– ͓͵ǤͶǤʹƒ Ȃ ‘—ކ –Ї ”‘Œ‡
–
‘˜‡”– ”‹‡ ƒ”Žƒ†ǡ ‹“—‡ ƒ”Žƒ†ǡ ‘” ƒ”Žƒ†
‘ˆ –ƒ–‡™‹†‡
’‘”–ƒ
‡ ሺ ƒ”Žƒ†ሻǡ ƒ• •Š‘™ ‘ –Ї ƒ’• ’”‡’ƒ”‡† ’—”•—ƒ– –‘ –Ї ƒ”Žƒ† ƒ’’‹‰ ƒ† ‘‹–‘”‹‰ ”‘‰”ƒ ‘ˆ –Ї ƒŽ‹ˆ‘”‹ƒ ‡•‘—” ‡• ‰‡
›ǡ –‘ ‘Ǧ
ƒ‰”‹
—Ž–—”ƒŽ —•‡ǫ
Ї ƒ”Žƒ† ƒ’’‹‰ ƒ† ‘‹–‘”‹‰ ”‘‰”ƒ ሺ ሻ †‡•‹‰ƒ–‹‘ ‘ˆ –Ї ”‘Œ‡ – •‹–‡ ‹•
Ž‹•–‡† ƒ• ͳͺǤ͵ ƒ
”‡• ‘ˆ ƒ”Žƒ† ‘ˆ –ƒ–‡™‹†‡
’‘”–ƒ
‡ ƒ† ͳͷǤͻ ƒ
”‡• ‘ˆ ”‹‡ ƒ”Žƒ†
ƒ• †‡’‹
–‡† ‹ ‹‰—”‡ ͵ǤͶǤʹǦͳ ሺƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘•‡”˜ƒ–‹‘ ʹͲʹͶሻǤ Ї ‹–› ‡ ‡”ƒŽ Žƒ ‹†‹
ƒ–‡• –Šƒ– –Ї ”‘Œ‡
– ‹• ™‹–Š‹ –Ї ‹–› 
ƒ† Šƒ• †‡•‹‰ƒ–‡† –Ї •‹–‡ ˆ‘” Ž‘™
†‡•‹–› ”‡•‹†‡–‹ƒŽǤ
Ї ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘•‡”˜ƒ–‹‘ ‹†‹
ƒ–‡• –Šƒ– ”‡•‘ ‘—–› Šƒ† ƒ –‘–ƒŽ ƒ
”‡ƒ‰‡
‘ˆ ͸ͷͺǡͳͶ͸ ƒ
”‡• ‘ˆ ”‹‡ ǡ ͵ͺͲǡʹͺͷ ƒ
”‡• ‘ˆ ƒ”Žƒ† ‘ˆ –ƒ–‡™‹†‡
’‘”–ƒ
‡ǡ
ͻͶǡʹͳͷ ƒ
”‡• ‘ˆ ‹“—‡
ƒ”Žƒ†
ƒ”Žƒ†ǡ ƒ† ʹͲʹǡͳͷͻ ƒ
”‡• ‘ˆ ƒ”Žƒ† ‘ˆ ‘
ƒŽ
’‘”–ƒ
‡
ሺƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘•‡”˜ƒ–‹‘ ʹͲʹʹሻǤ

‘•‹†‡”ƒ–‹‘ ‘ˆ –Ї ”‘Œ‡
–ǡ ƒ
‘˜‡”•‹‘
‘ˆ ƒ’’”‘š‹ƒ–‡Ž› ͵ͶǤʹ ƒ
”‡• ‘ˆ
’‘”–ƒ– ƒ”Žƒ† ሺͳͷǤͻ ƒ
”‡• ‘ˆ ”‹‡ ƒ”Žƒ† ƒ† ͳͺǤ͵
ƒ
”‡• ‘ˆ ƒ”Žƒ† ‘ˆ –ƒ–‡™‹†‡ ‹’‘”–ƒ
‡ሻ –‘ ‘Ǧƒ‰”‹
—Ž–—”ƒŽ —•‡ ™‘—ކ ‘

—”Ǥ Ї

‘˜‡”•‹‘ ‘ˆ ”‹‡ ƒ” Žƒ† ™‘—ކ „‡ ƒ’’”‘š‹ƒ–‡Ž› ͲǤͲͲʹ ’‡” ‡–ǡ ƒ† –Ї
‘˜‡”•‹‘ ‘ˆ
ƒ”Žƒ† ‘ˆ –ƒ–‡™‹†‡
’‘”–ƒ
‡ –‘ ƒ ‘Ǧƒ‰”‹
—Ž–—”ƒŽ —•‡ ™‘—ކ „‡ ͲǤͲͲͶ ’‡”
‡– ‘ˆ –Ї

’‘”–ƒ– ƒ”Žƒ† –‘–ƒŽ• †‹•
—••‡† ƒ„‘˜‡Ǥ
Ї ‡‡”ƒŽ Žƒ
‘–ƒ‹• ƒ ”ƒ‰‡ ‘ˆ ’‘Ž‹
‹‡• –Šƒ– ™‘—ކ ‹‹‹œ‡ –Ї ’‘–‡–‹ƒŽ ˆ‘”
’”‡ƒ–—”‡
‘˜‡”•‹‘ ‘ˆ ‹’‘”–ƒ– ˆƒ”Žƒ† ™‹–Š‹ –Ї 
ǡ ‹
Ž—†‹‰  ʹǤͷǤʹǡ ™Š‹
Š
”‡“—‹”‡• †‡˜‡Ž‘’‡– ‘’’‘”–—‹–‹‡• ‹ –Ї ‹–› –‘ „‡ •‡“—‡–‹ƒŽ ƒ† ‘–‹‰—‘—• –‘ ‡š‹•–‹‰
†‡˜‡Ž‘’‡– –‘ ‡•—”‡ –Ї ‘”†‡”Ž› ‡š–‡•‹‘ ‘ˆ —‹
‹’ƒŽ •‡”˜‹
‡• ƒ† —‡
‡••ƒ”›

‘˜‡”•‹‘ ‘ˆ ƒ‰”‹
—Ž–—”ƒŽ Žƒ†Ǥ ††‹–‹‘ƒŽŽ›ǡ  ʹǤͷǤ͹ ”‡“—‹”‡•
‘–‹‰—‘—• †‡˜‡Ž‘’‡–
™‹–Š‹ –Ї 
—Ž‡•• ‹–
ƒ „‡ †‡‘•–”ƒ–‡† –Šƒ– –Ї †‡˜‡Ž‘’‡– ‘ˆ
‘–‹‰—‘—• ’”‘’‡”–›
‹• ‹ˆ‡ƒ•‹„އǤ †‡” ‘Ž‹
›  ͶǤ͵Ǥ͵ǡ ƒ ƒ”Ž ƒ† ”‡•‡”˜ƒ–‹‘ Žƒ –Šƒ– ‹
Ž—†‡• ƒ •‡– ‘ˆ
’‘Ž‹
‹‡•ǡ •–ƒ†ƒ” •ǡ ƒ† ‡ƒ•—”‡• –‘ ƒ˜‘‹† —‡
‡••ƒ”›
‘˜‡”•‹‘ ‘ˆ ƒ‰”‹
—Ž–—”ƒŽ Žƒ†•
™‘—ކ „‡ ƒ†‘’–‡
†
† „› –Ї ‹–›Ǥ
Ї ”‘Œ‡
– •‹–‡ ‹• †‹”‡
–Ž› ƒ†Œƒ
‡– –‘ „—‹Ž–Ǧ—’ ƒ”‡ƒ• ™‹–Š‹ –Ї ‹–› Ž‹‹–•Ǥ Ž–Š‘—‰Š ”‘Œ‡ –
‹’އ‡–ƒ–‹‘ ™‘—ކ ”‡•—Ž– ‹ –Ї
‘˜‡”•‹‘ ‘ˆ ˆƒ”Žƒ† –‘ ƒ
ƒ’’”‘˜ƒŽ ‘ˆ –Ї ”‘Œ‡
– ™‘—ކ
‘•–‹–—–‡
‘–‹‰—‘—• †‡˜‡Ž‘’‡–ǡ
‘Ǧƒ‰”‹
—Ž–—”ƒŽ —•‡ǡ
’‘–‡–‹ƒŽ
——Žƒ–‹˜‡
‘•—’–‹‘ ‘ˆ ƒ‰”‹
—Ž–—”ƒŽ Žƒ† ˆ‘” ƒ††‹–‹‘ƒŽ †‡
™Š‹
Š ™‘—ކ ’”‡˜‡–
˜‡Ž‘’‡– ‹ –Ї ‹–›
‘ˆ ‡‡†Ž‡›Ǥ Š‹•
‘˜‡”•‹‘
ƒ „‡
‘•‹†‡”‡† ƒ• †‡˜‡Ž‘’‡– –Š”‘—‰Š ‡‡”ƒŽ Žƒ
‹’އ‡–ƒ–‹‘ ƒ• †‹•
—••‡† ‹ –Ї ‡‡”ƒŽ Žƒ 
Ǥ • ‘–‡† ƒ„‘˜‡ǡ –Ї ‹–› Šƒ• †‡•‹‰ƒ–‡†
–Ї ”‘Œ‡
– •‹–‡ ˆ‘” ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– –Š”‘—‰Š ‹–• Žƒ† —•‡ †‡•‹‰ƒ–‹‘ǡ ™Š‹ Š ‹•

‘•‹•–‡– ™‹–Š –Ї ‡ ‡”ƒŽ Žƒ ‘Ž‹
‹‡• ‘–‡† ƒ„‘˜‡Ǥ • •—
Šǡ –Š‹• ‹’ƒ
– ‹• އ•• –Šƒ
•‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-12

Initial Study
‹ ‰—”‡ ͵ǤͶǤʹǦͳ



VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-13

Initial Study

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤʹ„ Ȃ ‘—ކ –Ї ”‘Œ‡
–
‘ˆŽ‹
– ™‹–Š ‡š‹•–‹‰ œ‘‹‰ ˆ‘” ƒ‰”‹
—Ž–—”ƒŽ —•‡ ‘” ƒ
‹ŽŽ‹ƒ•‘ 
–
‘–”ƒ
–ǫ
Ї ”‘Œ‡
– •‹–‡ ‹• ‘– •—„Œ‡
– –‘ ƒ ‹ŽŽ‹ƒ•‘ 
– Žƒ† —•‡
‘–”ƒ
–ǡ ƒ

‘”†‹‰ –‘ †ƒ–ƒ
ƒ˜ƒ‹Žƒ„އ ˆ”‘ –Ї ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘•‡”˜ƒ–‹‘Ǥ Ї ”‘Œ‡ – •‹–‡ ‹• œ‘‡† ˆ‘”
ƒ‰”‹
—Ž–—”ƒŽ —•‡ —†‡” –Ї ‘—–› ‘ˆ ”‡•‘Ǣ Š‘™‡˜‡”ǡ –Ї ”‘Œ‡ – •‹–‡ ‹• ’Žƒ‡† ˆ‘”
”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– ‹ –Ї ‡‡”ƒŽ ŽƒǤ
• †‹•
—••‡† ‹
’ƒ
– ͓͵ǤͶǤʹƒǡ –Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ™‹–Š‹ –Ї ‹–›ǯ• 
ƒ† Šƒ• „‡‡
†‡•‹‰ƒ–‡† ˆ‘” ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– –Š”‘—‰Š –Ї ƒ†‘’–‡† ‡‡ ”ƒŽ Žƒ ƒ† •‡ ƒ’Ǥ Ї ”‘Œ‡
– ’”‘’‘•‡• –‘ †‡˜‡Ž‘’ –Ї •‹–‡ ˆ‘” ”‡•‹†‡–‹ƒŽ ’—”’‘•‡• –Šƒ– ‹• ‘•‹•–‡– ™‹–Š –Ї
‡‡†Ž‡› ‡‡”ƒŽ Žƒ ƒ†
‘‹‰ ”†‹ƒ
‡Ǥ †‡” ƒ†‘’–‡† ’‘Ž‹
‹‡• ‘ˆ –Ї ‡‡”ƒŽ Žƒǡ
‰”‘™–Š ‹–‘ ƒ‰”‹
—Ž–—”ƒŽ ƒ”‡ƒ• ‹• ƒƒ‰‡† –Š”‘—‰Š Ž‹‹–‹‰ ’”‡ƒ–—”‡
‘˜‡”•‹‘ ‘ˆ
ƒ‰”‹
—Ž–—”ƒŽ ƒ”‡ƒ• ƒ† ‡•—”‹‰ –Šƒ– ƒ‰”‹
—Ž–—”ƒŽ —•‡ ‘ˆ Žƒ† ™‹–Š‹ –Ї 
”‡ƒ‹• ˜‹ƒ„އ
—–‹Ž •—
Š –‹‡ ƒ• –Ї ƒ‡šƒ–‹‘ ƒ† †‡˜‡Ž‘’‡– ‘ˆ ƒ •‹–‡ ‹•
‘–‹‰—‘—• ™‹–Š —”„ƒ
†‡˜‡Ž‘’‡–Ǥ Ї”‡ˆ‘”‡ǡ ƒŽ–Š‘—‰Š –Ї •‹–‡ ‹•
—””‡–Ž› œ‘‡† ˆ‘” ƒ‰”‹
—Ž–—”ƒŽ —•‡ǡ ‹–• Ž‘
ƒ–‹‘
™‹–Š‹ –Ї 
ƒ† ‹–• ’”‘š‹‹–› –‘ ƒ†Œƒ
‡– ‡š‹•–‹‰ —”„ƒ †‡˜‡Ž‘’‡– ƒ‡ –Ї ”‘Œ‡
–
–Ї ƒ–—”ƒŽ ’”‘‰”‡••‹‘ –‘™ƒ”† –Ї ˆ—ŽŽ „—‹Ž†‘—– ‘ˆ –Ї ‡‡”ƒŽ Žƒ ƒ†ǡ –Ї”‡ˆ‘”‡ǡ ™‘—ކ

‘’Ž› ™‹–Š ’”‡˜‹‘—•Ž› †‹•
—••‡† ‡‡”ƒŽ Žƒ ’‘Ž‹
‹‡• ˆ‘” ‘”†‡”Ž› ‡š’ƒ•‹‘ ƒ† ƒƒ‰‡†
‰”‘™–ŠǤ Š‹• ƒŽŽ‘™• –Ї ’”‘’‘•‡† ƒ‡šƒ–‹‘ ƒ† ’”‡œ‘‹‰ ‘ˆ –Ї ”‘Œ‡ – •‹–‡ –‘ ƒ ‘Ǧ
ƒ‰”‹
—Ž–—”ƒŽ —•‡ –‘ ‘

—”Ǥ • •—
Šǡ ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤʹ
Ȃ ‘—ކ –Ї ”‘Œ‡
–
‘ˆŽ‹
– ™‹–Š ‡š‹•–‹‰ œ‘‹‰ ˆ‘”ǡ ‘”
ƒ—•‡ ”‡œ‘‹‰ ‘ˆǡ
ˆ‘”‡•– Žƒ† ሺƒ• †‡ˆ‹‡† ‹ —„Ž‹
‡•‘—”
‡• ‘†‡ ‡
–‹‘ ͳʹʹʹͲሺ‰ሻሻǡ –‹„‡”Žƒ† ሺƒ• †‡ˆ‹‡†
„› —„Ž‹
‡•‘—”
‡• ‘†‡ ‡
–‹‘ Ͷͷʹ͸ሻǡ ‘” –‹„‡”Žƒ† œ‘‡† ‹„‡”Žƒ† ”‘†—
–‹‘ ሺƒ•
†‡ˆ‹‡† „› ‘˜ ‡”‡– ‘†‡ ‡
–‹‘ ͷͳͳͲͶሺ‰ሻሻǫ
—„Ž‹
‡•‘—”
‡• ‘†‡ ሺሻ ‡
–‹‘ ͳʹʹʹͲሺ‰ሻ ƒ† ‡
–‹‘ Ͷͷʹ͸ †‡ˆ‹‡• Dzˆ‘”‡•– Žƒ†dz ƒ•
Žƒ† –Šƒ–
ƒ •—’’‘”– ͳͲ ’‡”
‡– ƒ–‹˜‡ –”‡‡
‘˜‡” ‘ˆ ƒ› •’‡
‹‡•ǡ ‹
Ž—†‹‰ Šƒ”†™‘‘†•ǡ
—†‡” ƒ–—”ƒŽ
‘†‹–‹‘• ƒ† –Šƒ– ƒŽŽ‘™• ˆ‘” –Ї ƒƒ‰‡‡– ‘ˆ ‘‡ ‘” ‘”‡ ˆ‘”‡•– ”‡•‘—”
‡•ǡ ‹
Ž—†‹‰ –‹„‡”ǡ ƒ‡•–Ї–‹
•ǡ ˆ‹•Š ƒ† ™‹Ž†Ž‹ˆ‡ǡ „‹‘†‹˜‡”•‹–›ǡ ™ƒ–‡” “—ƒŽ‹–›ǡ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-14

Initial Study
”‡
”‡ƒ–‹‘ǡ ƒ† ‘–Ї” ’—„Ž‹
„‡‡ˆ‹–•Ǥ ‹„‡”Žƒ†ǡ ’—”•—ƒ– –‘  Ͷͷʹ͸ǡ ‹• Žƒ† ‘–Ї” –Šƒ Žƒ† ‘™‡† „› –Ї ˆ‡†‡”ƒŽ ‰‘˜‡”‡– ƒ† Žƒ† †‡•‹‰ƒ–‡† ƒ• ‡š’‡”‹‡–ƒŽ ˆ‘”‡•– Žƒ†ǡ ™Š‹
Š ‹• ƒ˜ƒ‹Žƒ„އ ˆ‘” ƒ†
ƒ’ƒ„އ ‘ˆ ‰”‘™‹‰ ƒ
”‘’ ‘ˆ –”‡‡• ‘ˆ ƒ
‘‡”
‹ƒŽ •’‡
‹‡• —•‡† –‘
’”‘†—
‡ Ž—„‡” ƒ† ‘–Ї” ˆ‘”‡•– ’”‘†—
–•ǡ ‹
Ž—†‹‰ Š”‹•–ƒ• –”‡‡•Ǥ
Ї”‡ ƒ”‡ ‘ ˆ‘”‡•– Žƒ†• ‘” –‹„‡”Žƒ†• ‹†‡–‹ˆ‹‡† ‘ –Ї ”‘Œ‡ – •‹–‡ǡ ƒ† –Ї ”‘Œ‡
–
‘– ”‡•—Ž– ‹ –Ї Ž‘•• ‘”
‘˜‡”•‹‘ ‘ˆ ˆ‘”‡•– Žƒ† –‘ ƒ ‘Ǧˆ‘”‡•– —•‡Ǥ Ї”‡ˆ‘”‡ǡ –Ї”‡ ™‘—ކ
™‘—ކ
„‡ ‘ ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ

’ƒ
– ͓͵ǤͶǤʹ† Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ –Ї Ž‘•• ‘ˆ ˆ‘”‡•– Žƒ† ‘”
‘˜‡”•‹‘ ‘ˆ ˆ‘”‡•–
Žƒ† –‘ ‘Ǧˆ‘”‡•– —•‡ǫ
‡‡ †‹•
—••‹‘ ‘ˆ
’ƒ
– ͓͵ǤͶǤʹ
ƒ„‘˜‡Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ

’ƒ
– ͓͵ǤͶǤʹ‡ Ȃ ‘—ކ –Ї ”‘Œ‡
– ‹˜‘Ž˜‡ ‘–Ї”
Šƒ‰‡• ‹ –Ї ‡š‹•–‹‰ ‡˜‹”‘‡– ™Š‹
Šǡ
†—‡ –‘ –Ї‹” Ž‘
ƒ–‹‘ ‘” ƒ–—”‡ǡ
‘—ކ ”‡•—Ž– ‹
‘˜‡”•‹‘ ‘ˆ ƒ”Žƒ†ǡ –‘ ‘Ǧƒ‰”‹
—Ž–—”ƒŽ
—•‡ ‘”
‘˜‡”•‹‘ ‘ˆ ˆ‘”‡•– Žƒ† –‘ ‘Ǧˆ‘”‡•– —•‡ǫ
‡‡ †‹•
—••‹‘ ‘ˆ
’ƒ
–• ͓͵ǤͶǤʹƒǡ ͓͵ǤͶǤʹ„ǡ ƒ† ͓͵ǤͶǤʹ
ƒ„‘˜‡Ǥ
• ‘–‡† ’”‡˜‹‘—•Ž›ǡ –Ї •‹–‡ ‹•
—””‡–Ž› ’Žƒ–‡† –‘
‹–”—• ˆ”—‹–Ǣ Š‘™‡˜‡”ǡ ‹– ‹• –Ї
Žƒ†‘™‡”ǯ• †‡•‹”‡ –‘ †‹•
‘–‹—‡ ˆƒ”‹‰ ƒ† †‡˜‡Ž‘’ –Ї •‹–‡ –‘
‘’އ‡– ƒ†Œƒ
‡–
—”„ƒǦ–›’‡ †‡˜‡Ž‘’‡– –‘ –Ї ™‡•– ƒ† ‘”–ŠǤ Ї •‹–‡ ‹• ‹†‡ƒŽŽ› •—‹–‡† ˆ‘” –Ї ’”‘’‘•‡† ”‘Œ‡
– ƒ• ‹– ‹• ™‹–Š‹ ƒ ”‡ƒ•‘ƒ„އ
‘–‹—‹–› ‘ˆ —”„ƒǦ–›’‡ †‡˜‡Ž‘’‡–Ǥ Ї ƒŒ‘”‹–› ‘ˆ
’”‘’‡”–‹‡• –‘ –Ї ‘”–Šǡ ‡ƒ•–ǡ ƒ† ™‡•– ƒ”‡ ƒŽŽ †‡•‹‰ƒ–‡† ƒ• ‘Ǧƒ‰”‹ —Ž–—”ƒŽ —†‡” –Ї
 ǡ ƒ† •‡˜‡”ƒŽ ƒ”‡ ƒŽ”‡ƒ†› „‡‹‰ †‡˜‡Ž‘’‡† ™‹–Š ”‡•‹†‡–‹ƒŽ –”ƒ –•Ǥ
• ’”‡˜‹‘—•Ž› †‹•
—••‡†ǡ –Ї ‡‡”ƒŽ Žƒ ’‘Ž‹
‹‡• ”‡“—‹”‡ ƒ ‘”†‡”Ž› ‡š’ƒ•‹‘ ‘ˆ –Ї
‡‡†Ž‡› ‹–› ‹‹–•ǡ –Š—• ƒ˜‘‹†‹‰ ’”‡ƒ–—”‡
‘˜‡”•‹‘ ‘ˆ ˆƒ”Žƒ†Ǥ ††‹–‹‘ƒŽŽ›ǡ –Ї
‡‡”ƒŽ Žƒ ’”‘˜‹†‡• ˆ‘” ’Žƒ‡†ǡ ‘”†‡”Ž› ‡š’ƒ•‹‘ –Š”‘—‰Š ‹’އ‡–ƒ–‹‘ ‘ˆ ‹–• ƒ†‘’–‡† ‡‡”ƒŽ Žƒ ƒ† •‡ ƒ’Ǥ Ї ”‘Œ‡
– ‹•
‘•‹•–‡– ™‹–Š „‘–Š ‡‡”ƒŽ Žƒ ’‘Ž‹
› ƒ†
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-15
Initial Study

‡‡”ƒŽ Žƒ †‡•‹‰ƒ–‡† Žƒ† —•‡• ƒ† ™‘—ކ ‘– ”‡•—Ž– ‹ –Ї ‘˜‡”•‹‘ ‘ˆ
’‘”–ƒ–
ƒ”Žƒ† –‘ ‘Ǧƒ‰”‹
—Ž–—”ƒŽ —•‡ ‘”
‘˜‡”•‹‘ ‘ˆ ˆ‘”‡•– Žƒ† –‘ ‘Ǧˆ‘”‡•– —•‡Ǥ
’ƒ
–•
™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-16

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.3 - AIR QUALITY

Ї”‡ ƒ˜ƒ‹Žƒ„އǡ–Ї •‹‰‹ˆ‹
ƒ
‡
”‹–‡”‹ƒ ‡•–ƒ„Ž‹•Ї† „› –Ї ƒ’’Ž‹
ƒ„އ ƒ‹” “—ƒŽ‹–› ƒƒ‰‡‡– ‘” ƒ‹” ’‘ŽŽ—–‹‘

‘–”‘Ž †‹•–”‹
– ƒ› „‡ ”‡Ž‹‡† —’‘ –‘ ƒ‡ –Ї ˆ‘ŽŽ‘™‹‰ †‡–‡”‹ƒ–‹‘•Ǥ ‘—ކ –Ї ”‘Œ‡ –ǣ
ƒǤ ‘ˆŽ‹
– ‹–Š „• —
‹’އ‡–ƒ–‹‘
–Ї ƒ’’Ž‹
ƒ„އ ƒ‹” “—ƒŽ‹–› ’Žƒǫ
„Ǥ ‡•—Ž– ‹ ƒ
——Žƒ–‹˜‡Ž›
‘•‹†‡”ƒ„އ ‡
‹
”‡ƒ•‡ ‘ˆ ƒ›
”‹–‡”‹ƒ ’‘ŽŽ—–ƒ– ˆ‘” ™Š‹
Š
–Ї ”‘Œ‡
– ”‡‰‹‘ ‹• ‘Ǧƒ––ƒ‹‡– —†‡”
ƒ ƒ’’Ž‹
ƒ„އ ˆ‡†‡”ƒŽ ‘” •–ƒ–‡ ƒ„‹‡– ƒ‹”
“—ƒŽ‹–› •–ƒ†ƒ”†ǫ

Ǥ š’‘•‡ •‡•‹–‹˜‡ ‡
‡ ”• •—„•–ƒ–‹ƒŽ
’‘ŽŽ—–ƒ–
‘
‡–”ƒ–‹‘•ǫ
†Ǥ ‡•—Ž ‹ ‘–Ї ‡‹••‹‘• ሺ•—
Š ƒ• Š‘•‡
އƒ†‹‰ –‘ ‘†‘”ሻ ƒ†˜‡”•‡Ž› ƒˆˆ‡
–‹‰ ƒ
•—„•–ƒ–‹ƒŽ —„‡” ‘ˆ ’‡‘’އǫ
Discussion
Ї ƒƒŽ›•‡• ‹ –Š‹• •‡
–‹‘ ƒ”‡ „ƒ•‡† ‘ ‹” —ƒŽ‹–›
’ƒ
–  ሺ ʹͲʹͷƒሻ ƒ––ƒ
Ї†
ƒ• ’’‡†‹š Ǥ
ƒ ƒŽ›•‹•

’ƒ
– ͓͵ǤͶǤ͵ƒ Ȃ ‘—ކ –Ї ”‘Œ‡
–
‘ˆŽ‹
– ™‹–Š ‘” ‘„•–”—
– ‹’އ‡–ƒ–‹‘ ‘ˆ –Ї
ƒ’’Ž‹
ƒ„އ ƒ‹” “—ƒŽ‹–› ’Žƒǫ
Ї ”‘Œ‡
– ƒ”‡ƒ ‹• Ž‘
ƒ–‡† ™‹–Š‹ ”‡•‘ ‘—–› ‹ –Ї ƒ
‘ƒ“—‹ ƒŽŽ‡› ‹” ƒ•‹ ሺ

‘” ƒ•‹ሻǤ ”‡•‘ ‘—–› ‹• ‹
Ž—†‡† ƒ‘‰ –Ї ‡‹‰Š–
‘—–‹‡• –Šƒ–
‘’”‹•‡ –Ї ƒ
‘ƒ“—‹
ƒŽŽ‡› ‹” ‘ŽŽ—–‹‘ ‘–”‘Ž ‹•–”‹
– ሺ
ሻǤ Ї 
 ƒ
–• ƒ• –Ї ”‡‰—Žƒ–‘”› ƒ‰‡
›
ˆ‘” ƒ‹” ’‘ŽŽ—–‹‘
‘–”‘Ž ‹ –Ї ƒ•‹ ƒ† ‹• –Ї Ž‘
ƒŽ ƒ‰‡
› ‡’‘™‡”‡† –‘ ”‡‰—Žƒ–‡ ƒ‹”
’‘ŽŽ—–ƒ– ‡‹••‹‘• ˆ‘” –Ї ”‘Œ‡
– ƒ”‡ƒǤ †‡” –Ї ’”‘˜‹•‹‘• ‘ˆ –Ї ǤǤ އƒ ‹” 
–ǡ –Ї
”‡•‘ ‘—–› ’‘”–‹‘ ‘ˆ –Ї 
 Šƒ• „‡‡
Žƒ••‹ˆ‹‡† ƒ• ‘Ǧƒ––ƒ‹‡–Ȁ‡š–”‡‡ǡ ‘Ǧ
ƒ––ƒ‹‡–Ȁ•‡˜‡”‡ǡ ‘Ǧƒ––ƒ‹‡–ǡ ƒ––ƒ‹‡–Ȁ —
Žƒ••‹ˆ‹‡†ǡ ƒ––ƒ‹‡–ǡ ‘” —
Žƒ••‹ˆ‹‡†
—†‡” –Ї ‡•–ƒ„Ž‹•Ї† ƒ–‹‘ƒŽ „‹‡– ‹” —ƒŽ‹–› –ƒ†ƒ”†• ሺሻ ƒ† ƒŽ‹ˆ‘”‹ƒ „‹‡– ‹” —ƒŽ‹–› –ƒ†ƒ”†• ሺሻ ˆ‘” ˜ƒ”‹‘—•
”‹–‡”‹ƒ ’‘ŽŽ—–ƒ–• ƒ• •—ƒ”‹œ‡† ‹
ƒ„އ ͵ǤͶǤ͵ǦͳǤ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-17

Initial Study

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤ͵„ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ ƒ
——Žƒ–‹˜‡Ž›
‘•‹†‡”ƒ„އ ‡– ‹
”‡ƒ•‡ ‘ˆ ƒ›

”‹–‡”‹ƒ ’‘ŽŽ—–ƒ– ˆ‘” ™Š‹
Š –Ї ”‘Œ‡
– ”‡‰‹‘ ‹• ‘Ǧƒ––ƒ‹‡– —†‡” ƒ ƒ’’Ž‹
ƒ„އ ˆ‡†‡”ƒŽ
‘” •–ƒ–‡ ƒ„‹‡– ƒ‹” “—ƒŽ‹–› •–ƒ†ƒ”† ሺ‹
Ž—†‹‰ ”‡Ž‡ƒ•‹‰ ‡‹••‹‘• ™Š‹
Š ‡š
‡‡†
“—ƒ–‹–ƒ–‹˜‡ –Š”‡•Бކ• ˆ‘” ‘œ‘‡ ’”‡
—”•‘”•ሻǫ
Ї ”‘Œ‡
– ‹• ™‹–Š‹ –Ї 
 ƒ† —†‡” –Ї Œ—”‹•†‹
–‹‘ ‘ˆ –Ї 
Ǥ Ї ƒ†‘’–‡† ‹”
—ƒŽ‹–› ––ƒ‹‡– Žƒ• ˆ‘” –Ї 
 •‡– ˆ‘”–Š
‘’”‡Š‡•‹˜‡ ’”‘‰”ƒ• –Šƒ– ™‹ŽŽ އƒ† –Ї

 ‹–‘
‘’Ž‹ƒ
‡ ™‹–Š ˆ‡†‡”ƒŽ ƒ† –ƒ–‡ ƒ„‹‡– ƒ‹” “—ƒŽ‹–› •–ƒ†ƒ”†•Ǥ Ї 
ǯ• 
–Š”‡•Бކ• ƒ”‡ †‡•‹‰‡† –‘ ‹’އ‡– –Ї ‰‡‡”ƒŽ
”‹–‡”‹ƒ ˆ‘” ƒ‹”
“—ƒŽ‹–› ‡‹••‹‘• ƒ• ”‡“—‹”‡† ‹ –Ї  —‹†‡Ž‹‡• ǡ ’’‡†‹š ǡ ƒ”ƒ‰”ƒ’Š

ሺ‹–އ ͳͶ ‘ˆ
–Ї ƒŽ‹ˆ‘”‹ƒ ‘†‡ ‘ˆ ‡‰—Žƒ–‹‘• ȚͳͷͲ͸ͶǤ͹ሻ ƒ†  ሺƒŽ‹ˆ‘”‹ƒ  ‡ –‹‘• ʹͳͲͲͲ ‡–Ǥ
ƒŽሻǤ 
ǯ• •’‡
‹ˆ‹
 ƒ‹” “—ƒŽ‹–› –Š”‡•Бކ• ƒ”‡ ’”‡•‡–‡† „‡Ž‘™Ǥ
Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ „‡ ”‡“—‹”‡† –‘
‘’Ž› ™‹–Š ƒŽŽ ”‡
‘‡†‡† ‡ƒ•—”‡• ˆ‘”

‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• Ž‹•–‡† ‹ –Ї 
ǡ ƒ’’Ž‹
ƒ„އ ‡ƒ•—”‡• •‡– ˆ‘”–Š ‹ ‹–އ ʹͶ ‘ˆ –Ї
‹ˆ‘” —‹Ž†‹‰ ‘†‡ǡ ƒ† ƒ’’Ž‹
ƒ„އ 
 ”—އ•Ǥ
Short-Term Construction Emissions
Ї ’”‘’‘•‡† ”‘Œ‡
– ‹
Ž—†‡• –Ї
‘•–”—
–‹‘ ‘ˆ ƒ ͳͺͷǦŽ‘– •‹‰Ž‡Ǧˆƒ‹Ž› •—„†‹˜‹•‹‘ ™‹–Š
–Ї ƒ••‘
‹ƒ–‡† ‹’”‘˜‡‡–• ‘ ƒ ‡š‹•–‹‰ ͶͲǤ͸Ǧƒ
”‡ ’ƒ”
‡ŽǤ
Ї
‘•–”—
–‹‘ ‡‹••‹‘• ™‡”‡ „ƒ•‡† ‘ –Ї †‡ˆƒ—Ž– ƒŽ‘† ‡“—‹’‡– Ž‹•– ˆ‘” –Ї ’”‘’‘•‡† ”‘Œ‡
–ǯ• Žƒ† —•‡ –›’‡ ƒ† †‡˜‡Ž‘’‡– ‹–‡•‹–› ƒ† ƒ’’Ž›‹‰ ‘†‡Ž †‡ˆƒ—Ž–• ƒ• ™‡ŽŽ ƒ• ƒ
‘•‡”˜ƒ–‹˜‡ ƒƒŽ›•‹• ƒ’’”‘ƒ
ŠǤ ‘•–”—
–‹‘ ‡‹••‹‘• ™‡”‡ ‡•–‹ƒ–‡† —†‡” –Ї
ƒ••—’–‹‘ –Šƒ– –Ї ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– ™‘—ކ „‡‰‹ ‘•–”—
–‹‘ ‹ 
–‘„‡” ʹͲʹͶǤ Ї
†ƒ–‡• ‡–‡”‡† ‹–‘ –Ї ƒŽ‘† ’”‘‰”ƒ ”‡’”‡•‡– –Ї ‡ƒ”Ž‹‡•– ‘•–”—
–‹‘ –‹‡Ž‹‡ǡ
™Š‹
Š ™‘—ކ ‡•–‹ƒ–‡ –Ї ™‘”•–Ǧ
ƒ•‡ ‡‹••‹‘• ƒ•
‘•–”—
–‹‘ ‡“—‹’‡– –‡
А‘Ž‘‰› ƒ†
‡‹••‹‘• ‹’”‘˜‡ ‘˜‡” –‹‡Ǣ –Ї”‡ˆ‘”‡ǡ ƒŽŽ ‡•–‹ƒ–‡† ‡‹••‹‘ –‘–ƒŽ• ƒ”‡ ‘•‡”˜ƒ–‹˜‡ ƒ†
”‡ˆŽ‡
– ƒ ”‡ƒ•‘ƒ„އ ƒ† އ‰ƒŽŽ› •—ˆˆ‹
‹‡– ‡•–‹ƒ–‡ ‘ˆ ’‘–‡–‹ƒŽ ‹’ƒ
–•Ǥ ŽŽ
‘•–”—
–‹‘
‡“—‹’‡– ƒ
–‹˜‹–› އ˜‡Ž• ƒ••—‡† ™‡”‡ „ƒ•‡† ‘ –Ї ƒŽ‘† †‡ˆƒ—Ž– ˜ƒŽ—‡• ˆ‘” –›’‡ ƒ† —„‡” ‘ˆ ‡“—‹’‡– ƒ† Š‘—”• ’‡” †ƒ›Ǥ

ǯ• ”‡“—‹”‡† ‡ƒ•—”‡• ˆ‘” ƒŽŽ ”‘Œ‡
–• ™‡”‡ ƒŽ•‘ ƒ’’Ž‹‡†ǣ
x ƒ–‡” ‡š’‘•‡† ƒ”‡ƒ• –Š”‡‡ –‹‡• ’‡” †ƒ›Ǣ ƒ†
x ‡†—
‡ ˜‡Š‹
އ •’‡‡†
ƒ„އ ͵ǤͶǤ͵Ǧʹ •—ƒ
–‘ އ•• –Šƒ ͳͷ ‹Ž‡• ’‡” Š‘—”Ǥ

‘•–”—
–‹‘ ‘ˆ –Ї ’”‘
”‹œ‡• –Ї ƒ–‹
‹’ƒ–‡† ’‘ŽŽ—–ƒ– ‡‹••‹‘• ”‡•—Ž–‹‰ ˆ”‘ –Ї
’‘•‡† ”‘Œ‡
–Ǥ ‡˜‡Ž‘’‡– ‘ˆ –Ї ’”‘’‘•‡† ”‘Œ‡
– ‹• ƒ–‹
‹’ƒ–‡† –‘
‰‡‡”ƒ–‡
”‹–‡”‹ƒ ’‘ŽŽ—–ƒ– ‡‹••‹‘• „‡Ž‘™ 
 •‹‰‹ˆ‹
ƒ
‡ –Š”‡•Бކ އ˜‡Ž•Ǥ •
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-22

Initial Study

ƒŽ
—Žƒ–‡† ™‹–Š ƒŽ‘†ǡ –Ї ‡•–‹ƒ–‡† •Š‘”–Ǧ–‡”
‘•–”—
–‹‘Ǧ”‡Žƒ–‡† ‡‹••‹‘• ˆ‘”

”‹–‡”‹ƒ ’‘ŽŽ—–ƒ–• ™‘—ކ ‘– ‡š
‡‡† •‹‰‹ˆ‹
ƒ
‡ –Š”‡•Бކ އ˜‡Ž•Ǥ
Long-Term Operational Emissions
‘‰Ǧ–‡” ‡‹••‹‘• ƒ”‡
ƒ—•‡† „› ‘’‡”ƒ–‹‘ƒŽ ‘„‹Ž‡ǡ ƒ”‡ƒǡ ƒ† ‡‡”‰› •‘—”
‡•Ǥ ‘‰Ǧ–‡”
‡‹••‹‘• ™‘—ކ
‘•‹•– ‘ˆ –Ї ˆ‘ŽŽ‘™‹‰
‘’‘‡–•ǣ

FUGITIVE DUST EMISSIONS
’‡”ƒ–‹‘ ‘ˆ –Ї ”‘Œ‡
– •‹–‡ ƒ– ˆ—ŽŽ „—‹Ž†Ǧ‘—– ‹• ‘– ‡š’‡
–‡† –‘ ’”‡•‡– ƒ •—„•–ƒ–‹ƒŽ •‘—”
‡
‘ˆ ˆ—‰‹–‹˜‡ †—•– ሺͳͲሻ ‡‹••‹‘•Ǥ Ї ƒ‹ •‘—”
‡ ‘ˆ ͳͲ ‡‹••‹‘• ™‘—ކ „‡ ˆ”‘
˜‡Š‹
—Žƒ” –”ƒˆˆ‹
ƒ••‘
‹ƒ–‡† ™‹–Š –Ї ”‘Œ‡
– •‹–‡Ǥ
• †‹•
—••‡† ‹
’ƒ
– ͓͵ǤͶǤ͵ƒǡ ͳͲǡ ‘ ‹–• ‘™ ƒ• ™‡ŽŽ ƒ• ‹
‘„‹ƒ–‹‘ ™‹–Š ‘–Ї”
’‘ŽŽ—–ƒ–•ǡ
”‡ƒ–‡• ƒ ЇƒŽ–Š Šƒœƒ”†Ǥ Ї 
ǯ• ‡‰—Žƒ–‹‘ 

‡•–ƒ„Ž‹•Ї• ”‡“—‹”‡†

‘–”‘Ž• –‘ ”‡†—
‡ ƒ† ‹‹‹œ‡ ˆ—‰‹–‹˜‡ †—•– ‡‹••‹‘• ƒ† ™‘—ކ „‡ ƒ’’Ž‹ ƒ„އ –‘™ƒ”†•
–Ї ”‘Œ‡
–Ǥ
Ї ”‘Œ‡
– ™‘—ކ
‘’Ž› ™‹–Š ƒ’’Ž‹
ƒ„އ 
 —އ• ƒ† ‡‰—Žƒ–‹‘•ǡ ƒ† –Ї Ž‘
ƒŽ

‡‡”ƒŽ Žƒ ’‘Ž‹
‹‡• ƒ† œ‘‹‰
‘†‡•Ǥ

EXHAUST EMISSIONS
”‘Œ‡
–Ǧ”‡Žƒ–‡† –”ƒ•’‘”–ƒ–‹‘ ƒ
–‹˜‹–‹‡• ˆ”‘ ”‡•‹†‡
‡• ™‘—ކ ‰‡‡”ƒ–‡ ‘„‹Ž‡ •‘—”
‡

ǡ šǡ šǡ ǡ ͳͲǡ ƒ† ʹǤͷ ‡šŠƒ—•– ‡‹••‹‘•Ǥ šŠƒ—•– ‡‹••‹‘• ™‘—ކ ˜ƒ”› •—„•–ƒ–‹ƒŽŽ› ˆ”‘ †ƒ› –‘ †ƒ› „—– ™‘—ކ ƒ˜‡”ƒ‰‡ ‘—– ‘˜‡” –Ї ‘—”•‡ ‘ˆ ƒ ‘’‡”ƒ–‹‘ƒŽ ›‡ƒ”Ǥ
Ї ˜ƒ”‹ƒ„އ• ˆƒ
–‘”‡† ‹–‘ ‡•–‹ƒ–‹‰ –‘–ƒŽ ”‘Œ‡
– ‡‹••‹‘• ‹
Ž—†‡ǣ އ˜‡Ž ‘ˆ ƒ
–‹˜‹–›ǡ •‹–‡

Šƒ”ƒ
–‡”‹•–‹
•ǡ ™‡ƒ–Ї”
‘†‹–‹‘•ǡ ƒ† —„‡” ‘ˆ ˜‹•‹–‘”•Ǥ • –Ї ”‘Œ‡
– ‹• ‘– ‡š’‡
–‡† –‘
‰‡‡”ƒ–‡ ƒ ƒ†˜‡”•‡
Šƒ‰‡ ‹
—””‡– ƒ
–‹˜‹–› އ˜‡Ž•ǡ •—„•–ƒ–‹ƒŽ ‡‹••‹‘• ƒ”‡ ‘–
ƒ–‹
‹’ƒ–‡†Ǥ Ї –”‹’ ”ƒ–‡• —•‡† ‹ ƒŽ‘† ™‡”‡ ƒ†Œ—•–‡† –‘ ”‡ˆŽ‡ – ”‘Œ‡
–Ǧ•’‡
‹ˆ‹

‡•–‹ƒ–‡•Ǥ ‡Š‹
އ ˆŽ‡‡– ‹š ™ƒ• ”‡˜‹•‡† ’‡” –Ї ƒ’’”‘˜‡† 
 ”‡•‹†‡–‹ƒŽ ˆŽ‡‡– ‹šǤ

PROJECTED EMISSIONS
’‡”ƒ–‹‘ ‘ˆ –Ї ’”‘’‘•‡† ”‘Œ‡
– ‹• ƒ–‹
‹’ƒ–‡† –‘ ‰‡‡”ƒ–‡
”‹–‡”‹ƒ ’‘ŽŽ—–ƒ– ‡‹••‹‘•
„‡Ž‘™ 
 •‹‰‹ˆ‹
ƒ
‡ –Š”‡•Бކ އ˜‡Ž•ǡ ƒ• •Š‘™ ‹ ƒ„އ ͵ǤͶǤ͵ǦͶ ƒ„‘˜‡Ǥ
Ї ‹•–”‹
–ǯ• ‘Ǧƒ––ƒ‹‡– •–ƒ–—• ‹• ƒ ”‡•—Ž– ‘ˆ ’ƒ•– ƒ† ’”‡•‡– †‡˜‡Ž‘’‡– ™‹–Š‹ –Ї 
Ǥ —”–Ї”‘”‡ǡ ƒ––ƒ‹‡– ‘ˆ ƒ„‹‡– ƒ‹” “—ƒŽ‹–› •–ƒ†ƒ”†• ƒ „‡ Œ‡‘’ƒ”†‹œ‡† „›
‹
”‡ƒ•‹‰ ‡‹••‹‘•Ǧ‰‡‡”ƒ–‹‰ ƒ
–‹˜‹–‹‡• ‹ –Ї ”‡‰‹‘Ǥ ‘ •‹‰Ž‡ ’”‘Œ‡
– ™‘—ކ „‡ •—ˆˆ‹
‹‡–
‹ •‹œ‡ „› ‹–•‡Žˆ –‘ ”‡•—Ž– ‹ ‘Ǧƒ––ƒ‹‡– ‘ˆ –Ї ”‡‰‹‘ƒŽ ƒ‹” “—ƒŽ‹–› •–ƒ†ƒ”†•Ǥ •–‡ƒ†ǡ ƒ
’”‘Œ‡
–ǯ• ‡‹••‹‘• ƒ› „‡ ‹†‹˜‹†—ƒŽŽ› Ž‹‹–‡†ǡ „—–
——Žƒ–‹˜‡Ž›
‘•‹†‡”ƒ„އ ™Š‡ –ƒ‡
‹
‘„‹ƒ–‹‘ ™‹–Š ’ƒ•–ǡ ’”‡•‡–ǡ ƒ† ˆ—–—”‡ †‡˜‡Ž‘’‡– ™‹–Š‹ –Ї ƒ ‘ƒ“—‹ ƒŽŽ‡› ‹”
ƒ•‹Ǥ Ї ƒ••‡••‹‰ ™Š‡–Ї” –Ї”‡ ‹• ƒ ‡™ •‹‰‹ˆ‹
ƒ–
——Žƒ–‹˜‡ ‡ˆˆ‡
–ǡ –Ї ‡ƒ† ‰‡
›
•ŠƒŽŽ
‘•‹†‡” ™Š‡–Ї” –Ї ‹
”‡‡–ƒŽ ‡ˆˆ‡
–• ‘ˆ –Ї ’”‘Œ‡
– ƒ”‡
——Žƒ–‹˜‡Ž›
‘•‹†‡”ƒ„އǤ
Dz——Žƒ–‹˜‡Ž›
‘•‹†‡”ƒ„އdz ‡ƒ• –Šƒ– –Ї ‹
”‡‡–ƒŽ ‡ˆˆ‡
–• ‘ˆ ƒ ‹†‹˜‹†—ƒŽ ’”‘Œ‡
– ƒ”‡
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-23

Initial Study
x ‘–‡–‹ƒŽ
ƒ”
‹‘‰‡‹
”‹• ˆ”‘ –Ї ’”‘’‘•‡† ”‘Œ‡
– ‹• „‡Ž‘™ –Ї •‹‰‹ˆ‹
ƒ
‡ އ˜‡Ž
‘ˆ –™‡–› ‹ ƒ ‹ŽŽ‹‘ ƒ– ‡ƒ
Š ‘ˆ –Ї ‘†‡Ž‡† ”‡
‡’–‘”•Ǥ
x Ї ‹†‡š ˆ‘” –Ї ’‘–‡–‹ƒŽ
Š”‘‹
‘Ǧ ”‹• ˆ”‘ –Ї ’”‘’‘•‡† ”‘Œ‡
–
‹• „‡Ž‘™ –Ї •‹‰‹ˆ‹
ƒ
‡ އ˜‡Ž ‘ˆ ͳǤͲ ƒ– ‡ƒ
Š ‘ˆ –Ї ‘†‡Ž‡† ”‡
‡’–‘”•Ǥ
x Ї
Šƒœƒ”†
Šƒœƒ”† ‹†‡š ˆ‘” –Ї ’‘–‡–‹ƒŽ ƒ
—–‡ ‘Ǧ

ƒ
‡”

ƒ
‡” ”‹• ™ƒ• ‘–
ƒŽ
—Žƒ–‡† •‹
‡
–Ї”‡ ‹• ‘ ƒ
—–‡ ”‹• ƒ••‘
‹ƒ–‡† ™‹–Š  ‡‹••‹‘Ǣ –Ї”‡ˆ‘”‡ǡ –Ї ’”‘’‘•‡† ”‘Œ‡
–
‹•
‘•‹†‡”‡† „‡Ž‘™ –Ї •‹‰‹ˆ‹
ƒ
‡ އ˜‡ŽǤ
Ї”‡ˆ‘”‡ǡ ’‘–‡–‹ƒŽ ”‹• –‘ –Ї ’‘’—Žƒ–‹‘ ƒ––”‹„—–ƒ„އ –‘ ‡‹••‹‘• ‘ˆ • ˆ”‘ –Ї
’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤ͵† Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ ‡‹••‹‘• ሺ•—
Š ƒ• –Š‘•‡ އƒ†‹‰ –‘ ‘†‘”•ሻ
ƒ†˜‡”•‡Ž› ƒˆˆ‡
–‹‰ ƒ •—„•–ƒ–‹ƒŽ —„‡” ‘ˆ ’‡‘’އǫ
Ї 
ǯ• 
•–ƒ–‡•ǡ Dz ƒƒŽ›•‹• ‘ˆ ’‘–‡–‹ƒŽ ‘†‘” ‹’ƒ
–• •Š‘—ކ „‡
‘†—
–‡†
ˆ‘” „‘–Š ‘ˆ –Ї ˆ‘ŽŽ‘™‹‰ –™‘ •‹–—ƒ–‹‘•ǣ
ͳǤ ‡‡”ƒ–‘”• Ȃ ”‘Œ‡
–• –Šƒ– ™‘—ކ ’‘–‡–‹ƒŽŽ› ‰‡‡”ƒ–‡ ‘†‘”‘—• ‡‹••‹‘• ’”‘’‘•‡† –‘ Ž‘
ƒ–‡ ‡ƒ” ‡š‹•–‹‰ •‡•‹–‹˜‡ ”‡
‡’–‘”• ‘” ‘–Ї” Žƒ† —•‡• ™Š‡”‡ ’‡‘’އ ƒ›

‘‰”‡‰ƒ–‡ǡ ƒ†
ʹǤ ‡
‡‹˜‡”• Ȃ ”‡•‹†‡–‹ƒŽ ‘” ‘–Ї” •‡•‹–‹˜‡ ”‡
‡’–‘” ”‘Œ‡
–• ‘” ‘–Ї” ”‘Œ‡
–• „—‹Ž– ˆ‘”
–Ї ‹–‡– ‘ˆ ƒ––”ƒ
–‹‰ ’‡‘’އ Ž‘
ƒ–‹‰ ‡ƒ” ‡š‹•–‹‰ ‘†‘” •‘—”
‡•Ǥdz
Ї 
ƒŽ•‘ •–ƒ–‡•ǡ DzЇ ‹•–”‹
– Šƒ• ‹†‡–‹ˆ‹‡† •‘‡
‘‘ –›’‡• ‘ˆ ˆƒ
‹Ž‹–‹‡• –Šƒ–
Šƒ˜‡ „‡‡ ‘™ –‘ ’”‘†—
‡ ‘†‘”• ‹ –Ї ƒ
‘ƒ“—‹ ƒŽŽ‡› ‹” ƒ•‹Ǥ Ї•‡ ƒ”‡ ’”‡•‡–‡†
‹ ƒ„އ ͸ ሺ
”‡‡‹‰ ‡˜‡Ž• ˆ‘” ‘–‡–‹ƒŽ †‘” ‘—”
‡•ሻǡ ƒŽ‘‰ ™‹–Š ƒ ”‡ƒ•‘ƒ„އ †‹•–ƒ
‡
ˆ”‘ –Ї •‘—”
‡ ™‹–Š‹ ™Š‹
Š –Ї †‡‰”‡‡ ‘ˆ ‘†‘”•
‘—ކ ’‘••‹„Ž› „‡ •‹‰‹ˆ‹
ƒ–Ǥ ሾƒ„އ ͸ሿ
ƒ
„‡ —•‡† ƒ• ƒ •
”‡‡‹‰ –‘‘Ž –‘ “—ƒŽ‹–ƒ–‹˜‡Ž› ƒ••‡•• ƒ ”‘Œ‡
–ǯ• ’‘–‡–‹ƒŽ –‘ ƒ†˜‡”•‡Ž› ƒˆˆ‡
–
ƒ”‡ƒ ”‡
‡’–‘”•Ǥdz ሺƒ
‘ƒ“—‹ ƒŽŽ‡› ‹” ‘ŽŽ—–‹‘ ‘–”‘Ž ‹•–”‹
– ʹͲͳͷሻǤ ‡
ƒ—•‡ –Ї ”‘Œ‡
–
‹• ƒ ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– † –Ї ƒ–‹
‹’ƒ–‡† ƒ
–‹˜‹–‹‡• ˆ‘” –Ї ”‘Œ‡
– •‹–‡ ƒ”‡ ‘– Ž‹•–‡†
‹ ƒ„އ ͸ ‘ˆ –Ї 
ĥ
ƒ
ƒ •‘—”
‡ –Šƒ– ™‘—ކ
”‡ƒ–‡ ‘„Œ‡
–‹‘ƒ„އ ‘†‘”•ǡ –Ї ”‘Œ‡
– ‹•
‘– ‡š’‡
–‡† –‘ „‡ ƒ •‘—”
‡ ‘ˆ ‘„Œ‡
–‹‘ƒ„އ ‘†‘”•Ǥ
ƒ•‡† ‘ –Ї ’”‘˜‹•‹‘• ‘ˆ –Ї 
ǯ• 
ǡ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– ‡š
‡‡†
ƒ› •
”‡‡‹‰ –”‹‰‰‡” އ˜‡Ž• –‘ „‡
‘•‹†‡”‡† ƒ •‘—”
‡ ‘ˆ ‘„Œ‡
–‹‘ƒ„އ ‘†‘”• ‘” ‘†‘”‘—•

‘’‘—†• ሺƒ
‘ƒ“—‹ ƒŽŽ‡› ‹” ‘ŽŽ—–‹‘ ‘–”‘Ž ‹•–”‹
– ʹͲͳͷሻǤ —”–Ї”‘”‡ǡ –Ї”‡
†‘‡• ‘– ƒ’’‡ƒ” –‘ „‡ ƒ› •‹‰‹ˆ‹
ƒ– •‘—”
‡ ‘ˆ ‘„Œ‡
–‹‘ƒ„އ ‘†‘”• ‹
Ž‘•‡ ’”‘š‹‹–› –Šƒ–
ƒ› ƒ†˜‡”•‡Ž› ‹’ƒ
– –Ї ”‘Œ‡
– •‹–‡ ™Š‡ ‹– ‹• ‹ ‘’‡”ƒ–‹‘Ǥ ††‹–‹‘ƒŽŽ›ǡ –Ї ”‘Œ‡ –
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-28

Initial Study
‡‹••‹‘• ‡•–‹ƒ–‡• ‹†‹
ƒ–‡ –Šƒ– ‹– ™‘—ކ ‘– „‡ ‡š’‡
–‡† –‘ ƒ†˜‡”•‡Ž› ‹’ƒ
– •—””‘—†‹‰
”‡
‡’–‘”•Ǥ • •—
Šǡ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– „‡ ƒ •‘—”
‡ ‘ˆ ƒ› ‘†‘”‘—•
‘’‘—†•
‘” ™‘—ކ ‹– Ž‹‡Ž› „‡ ‹’ƒ
–‡† „› ƒ› ‘†‘”‘—• •‘—”
‡Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‹ŽŽ Šƒ˜‡ ƒ
އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-29

Initial Study
‹†‡–‹ˆ‹‡† ƒ• ƒ
ƒ†‹†ƒ–‡ǡ •‡•‹–‹˜‡ǡ ‘” •’‡
‹ƒ Ǧ
•–ƒ–—• •’‡
‹‡ ‹ Ž‘
ƒŽ ‹‘ƒ Žƒ•ǡ ’‘Ž‹
‹‡•ǡ ‘” ”‡‰—Žƒ–‹‘• ‘” „› –Ї ƒŽ‹ˆ‘”‹ƒ
‡’ƒ”–‡– ‘ˆ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ǤǤ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ‡”˜‹ ‡ǫ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-30

3.4.4 - BIOLOGICAL RESOURCES
‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ
ƒ ‡ ƒ • „• ƒ ‹ƒŽ ƒ† ‡ •‡ ‡ ‡
ǡ ‡‹ Ї
†‹”‡
–Ž› ‘” –Š”‘—‰Š Šƒ„‹–ƒ– ‘†‹ˆ‹
ƒ–‹‘•ǡ ‘
ƒ› •’‡
‹‡• ‹†‡–‹ˆ‹‡† ƒ• ƒ
ƒ†‹†ƒ–‡ǡ •‡•‹–‹˜‡ǡ
‘” •’‡
‹ƒŽǦ•–ƒ–—• •’‡
‹‡• ‹ Ž‘
ƒŽ ‘” ”‡‰‹‘ƒŽ
’Žƒ•ǡ ’‘Ž‹
‹‡•ǡ ‘” ”‡‰—Žƒ–‹‘• ‘” „› –Ї
ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ‘”
ǤǤ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ‡”˜‹
‡ǫ
„Ǥ
ƒ ‡ ƒ • „• ƒ ‹ƒŽ ƒ† ‡ •‡ ‡ ‡
 ƒ›
”‹’ƒ”‹ƒ Šƒ„‹–ƒ– ‘” ‘–Ї”

‘—‹–› ‹†‡–‹ˆ‹‡† ‹ Ž‘
ƒŽ
•‡•‹–‹˜‡ ƒ–—”ƒŽ
‘” ”‡‰‹‘ƒŽ
’Žƒ•ǡ ’‘Ž‹
‹‡•ǡ ”‡‰—Žƒ–‹‘•ǡ ‘” „› –Ї ƒŽ‹ˆ‘”‹ƒ
‡’ƒ”–‡– ‘ˆ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ‘” ǤǤ ‹•Š
ƒ† ‹Ž†Ž‹ˆ‡ ‡”˜‹
‡ǫ

Ǥ
ƒ ‡ ƒ • „• ƒ ‹ƒŽ ƒ† ‡ •‡ ‡ ‡
 • ƒ ‡
ˆ‡†‡”ƒŽŽ› ’”‘–‡
–‡† ™‡–Žƒ†• ሺ‹
Ž—†‹‰ǡ „—–
‘– Ž‹‹–‡† –‘ǡ ƒ”•Šǡ ˜‡”ƒŽ ’‘‘Žǡ
‘ƒ•–ƒŽǡ ‡–
Ǥሻ
–Š”‘—‰Š †‹”‡
– ”‡‘˜ƒŽǡ ˆ‹ŽŽ‹‰ǡ Š›†”‘Ž‘‰‹
ƒŽ
‹–‡””—’–‹‘ǡ ‘” ‘–Ї” ‡ƒ•ǫ
†Ǥ
–‡”ˆ‡”‡ •—„•–ƒ–‹ƒŽŽ› ‹ Š –Ї ‘˜‡‡–
ƒ› ƒ–‹˜‡ ”‡•‹†‡– ‘” ‹‰”ƒ–‘”› ˆ‹•Š ‘”
™‹Ž†Ž‹ˆ‡ •’‡
‹‡•ǡ ‘” ™‹–Š ‡•–ƒ„Ž‹•Ї† ƒ–‹˜‡
”‡•‹†‡– ‘” ‹‰”ƒ–‘”› ™‹Ž†Ž‹ˆ‡
‘””‹†‘”•ǡ ‘”
‹’‡†‡ –Ї —•‡ ‘ˆ ƒ–‹˜‡ ™‹Ž†Ž‹ˆ‡ —”•‡”›
•‹–‡•ǫ
‡Ǥ ‘ Ž‹
– ‹–Š ƒ› Ž‘
ƒŽ ’‘Ž‹
‹‡• ‘”†‹ 
‡•
’”‘–‡
–‹‰ „‹‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡•ǡ •—
Š ƒ•
ƒ
ƒ –”‡‡
’”‡•‡”˜ƒ–‹‘ ’‘Ž‹
› ‘” ‘”†‹ƒ
‡ǫ
ˆǤ ‘ Ž‹
– ‹–Š –Ї ‘˜‹•‹ • ƒ ƒ† ’–‡†
Šƒ„‹–ƒ–
‘•‡”˜ƒ–‹‘ ’Žƒǡ ƒ–—”ƒŽ
‘—‹–›

‘•‡”˜ƒ–‹‘ ’Žƒǡ ‘” ‘–Ї” ƒ’’”‘˜‡† Ž‘
ƒŽǡ
”‡‰‹‘ƒŽǡ ‘” •–ƒ–‡ Šƒ„‹–ƒ–
‘•‡”˜ƒ–‹‘ ’Žƒǫ
Discussion

’ƒ
– ͓͵ǤͶǤͶƒ Ȃ ‘—ކ –Ї ”‘Œ‡
– Šƒ˜‡ ƒ
–Š”‘—‰Š Šƒ„‹–ƒ– ‘†‹ˆ‹
ƒ–‹‘•ǡ ‘ ƒ› •’‡
‹‡•
• ‘” ”‡‰ Ž ’
‘”
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–
•—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ‡ˆˆ‡
–ǡ ‡‹–Ї” †‹”‡
–Ž› ‘
Ž
”

Initial Study
 ”‡
‘ƒ‹••ƒ
‡ •—”˜‡› ‘ˆ –Ї ”‘Œ‡
– ƒ† ƒ ͷͲͲǦˆ‘‘– „—ˆˆ‡” ሺ‹‘Ž‘‰‹
ƒŽ —”˜‡› ”‡ƒǡ ‘”
ሻǡ ™Š‡”‡ ˆ‡ƒ•‹„އǡ ™ƒ•
‘†—
–‡† „› “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•–• ‘
ƒ—ƒ”› ʹ͵ǡ ʹͲʹͶǤ Ї
’—”’‘•‡ ‘ˆ –Ї •—”˜‡› ™ƒ• –‘ †‡–‡”‹‡ –Ї Ž‘
ƒ–‹‘• ƒ† ‡š–‡– ‘ˆ •‡•‹–‹˜‡ –

‘—‹–‹‡• ƒ† Šƒ„‹–ƒ–•ǡ †‡–‡”‹‡ –Ї ’‘–‡–‹ƒŽ ˆ‘” –Ї ‘

—””‡
‡ ‘ˆ •’‡
‹ƒŽǦ•–ƒ–—•
’Žƒ
’Žƒ–
ƒ† ™‹Ž†Ž‹ˆ‡ •’‡
‹‡•ǡ ƒ† ‹†‡–‹ˆ› ‘–Ї” •‡•‹–‹˜‡ „‹‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• ™‹–Š‹ –Ї Ǥ
‡ƒ†‡”‹‰ ’‡†‡•–”‹ƒ –”ƒ•‡
–• ™‡”‡ ™ƒŽ‡† –Š”‘—‰Š –Ї  –‘ ƒ
Š‹‡˜‡ ͳͲͲ ’‡”
‡–
˜‹•—ƒŽ
‘˜‡”ƒ‰‡ ™‹–Š –Ї ƒ‹† ‘ˆ „‹‘
—Žƒ”• ‹ ƒ”‡ƒ• –Šƒ– ™‡”‡ ‹ƒ

‡••‹„އǤ ‘
ƒ–‹‘• ‘ˆ ƒ›
‘„•‡”˜‡† •‡•‹–‹˜‡ „‹‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• ™‡”‡ †‘
—‡–‡†Ǥ Š‘–‘‰”ƒ’Š• ™‡”‡ –ƒ‡ –‘
†‘
—‡– –Ї ‡š‹•–‹‰ Žƒ†•
ƒ’‡ ƒ† •‡•‹–‹˜‡ „‹‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡•Ǥ ‡–ƒ‹Ž‡† ‘–‡• ‘ˆ ’Žƒ–
ƒ† ™‹Ž†Ž‹ˆ‡ •’‡
‹‡• ƒ† •‹–‡
‘†‹–‹‘• ‘„•‡”˜‡† ™‡”‡ –ƒ‡ ™Š‹Ž‡
‘†—
–‹‰ –Ї •—”˜‡›Ǥ
 ”‡˜‹‡™ ‘ˆ –Ї Ž‹–‡”ƒ–—”‡ ƒ† ƒ‰‡
› †ƒ–ƒ„ƒ•‡• ™ƒ•
‘†—
–‡† –‘ ‘„–ƒ‹ ‹ˆ‘”ƒ–‹‘ ‘ –Ї
‘

—””‡
‡• ‘ˆ ƒ–—”ƒŽ
‘—‹–‹‡• ƒ† •’‡
‹ƒŽǦ•–ƒ–—• •’‡
‹‡• ‘™ ˆ”‘ –Ї ˜‹
‹‹–› ‘ˆ
–Ї ”‘Œ‡
– •‹–‡Ǥ Ї ƒŽ‹ˆ‘”‹ƒ ƒ–—”ƒŽ ‹˜‡”•‹–› ƒ–ƒ„ƒ•‡ ሺሻǡ –Ї ƒŽ‹ˆ‘”‹ƒ ƒ–‹˜‡ Žƒ– ‘
‹‡–› ሺሻ ƒ–ƒ„ƒ•‡ǡ † –Ї ǤǤ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ‡”˜‹ ‡ ሺ ሻ
ˆ‘”ƒ–‹‘
ˆ‘” Žƒ‹‰ ሺ
ƒሻ –Š”‡ƒ–‡‡†
ƒ
ƒ† ‡†ƒ‰‡”‡† •’‡
‹‡• Ž‹•– ™‡”‡ ”‡˜‹‡™‡†Ǥ ‘ •ƒ–‹•ˆ› ‘–Ї”
•–ƒ†ƒ”† •‡ƒ”
Š
”‹–‡”‹ƒǡ  ”‡
‘”†• ™‹–Š‹ ƒ ͳͲǦ‹Ž‡ ”ƒ†‹—• ‘ˆ –Ї ”‘Œ‡
– •‹–‡ ƒ† –Ї
•—””‘—†‹‰ ‹‡   “—ƒ†”ƒ‰Ž‡• ˆ‘” –Ї
ƒ •‡ƒ”
Š ™‡”‡ “—‡”‹‡†Ǥ
Site Conditions
Ї ”‘Œ‡
– •‹–‡ ‹• •‹–—ƒ–‡† ‘ ƒ ͵ͶǦƒ
”‡
‹–”—• ‘”
Šƒ”† –Šƒ– Šƒ• „‡‡ ”‘—–‹‡Ž› ƒ‹–ƒ‹‡†
ƒ†
—””‡–Ž›
‘•‹•–• ‘ˆ ™‡‡†› ˜‡‰‡–ƒ–‹‘ ‰”‘™‹‰ ‘ –Ї ‰”‘—†Ǥ —‡ –‘ –Ї Žƒ  ‘ˆ •—‹–ƒ„އ
Šƒ„‹–ƒ– ƒ† –Ї †‹•–—”„‡†
‘†‹–‹‘ ‘ˆ –Ї ”‘Œ‡
– •‹–‡ǡ ’”‘–‘
‘Ž •—”˜‡›• ˆ‘” •’‡
‹ˆ‹
•’‡
‹ƒŽǦ
•–ƒ–—• ’Žƒ– •’‡
‹‡• ™ƒ• ‘– ™ƒ””ƒ–‡†Ǥ
‘Ǧƒ–‹˜‡ ’Žƒ–
‘—‹–‹‡• ‘

—” ™‹–Š‹ –Ї Ǥ Ї ”‘Œ‡
– •‹–‡
‘•‹•–• ‘ˆ ƒ ’ƒ”–‹ƒŽŽ›
ƒ‹–ƒ‹‡† ሺ š
ሺ
ሻ
ƒ”„ƒ–—•ሻǡ
˜‡
ƒ†

‹–”—• –”‡‡ ‹–”—• •‹‡•‹• ‘”
Šƒ”† ƒ† ‹•
—””‡–Ž› ‰‡–ƒ–‡† ™‹–Š ”—†‡”ƒŽ
•’‡
‹‡•ǡ ƒ‹Ž› ‡†‹–‡””ƒ‡ƒ ‰”ƒ•• 
Š‹•—• „ ƒŽ‘‰ ˆ‹‡Ž† ƒ”‰‹•Ǥ —†‡”ƒŽ
‘”ƒ‡–ƒŽ •’‡
‹‡• •—
Š ƒ•
‘
Ž‡„—” ሺƒ–Š‹— ሻǡ
—”Ž› †‘
 —‡š
”‹•’—•ሻǡ
—– „”‘‡ ”‘—• ‹ƒ ”—•ሻǡ ‘Ž‹˜‡ އƒ ‡—”‘’ƒ‡ƒ
•–”—ƒ”‹— ሺ
”‹’‰ ሺ † † –”‡‡ ሺ ሻǡ ƒ† ”‡†Ǧ•–‡ ˆ‹Žƒ”‡‡ ሺ”‘†‹—

‹
—–ƒ”‹—ሻǡ ™Š‹
Š ƒ”‡ Ž‘
ƒ–‡† ‘—–•‹†‡ ‘ˆ –Ї ”‘Œ‡
– •‹–‡ „—– ™‹–Š‹ –Ї Ǥ
Special-Status Plant Species
Ї”‡ ™‡”‡ ͳ͸ •’‡
‹ƒŽǦ•–ƒ–—• ’Žƒ– •’‡
‹‡• ‹†‡–‹ˆ‹‡† ‹ – Ž‹–‡”ƒ–—”‡ ƒ† †ƒ–ƒ„ƒ•‡ ”‡˜‹‡™
–Šƒ– ƒ”‡ ‘™ ‘” Šƒ˜‡ –Ї ’‘–‡–‹ƒŽ –‘ ‘

—” ™‹–Š‹ –
Ї
Ї •—””‘—†‹‰ ‹‡ “—ƒ†”ƒ‰Ž‡•

‡–‡”‡† ‘ –Ї ”‘Œ‡
– •‹–‡Ǥ ‘—” ‘ˆ –Ї•‡ •’‡
‹‡•ǡ
‘‘˜‡”ǯ• • ‰‡ ሺ ’Š‘”„‹ƒ ‡”‹ሻǡ ƒ
ƒ•• ሺ
—––‹ƒ ƒ‡“—ƒŽ‹•
’—” — Š‘‘˜

‘ƒ“—‹ ƒŽŽ‡› ”
—–– ‰” ” ‹ ሻǡ ƒ
‘ƒ“—‹ ƒ†‘„‡ •—„—”•– ሺ•‡—†‘„ƒŠ‹ƒ
’‡‹”•‘‹‹ሻǡ ƒ† ”‡‡‡ǯ• –—
–‘”‹ƒ ሺ— ‰ ‡‡‹
–‘”‹ƒ ”‡ ሻ ƒ”‡ ˆ‡†‡”ƒŽŽ› ƒ† –ƒ–‡ Ž‹•–‡†Ǥ ‘‡ ‘ˆ
–Ї •’‡
‹ƒŽǦ•–ƒ–—• ’Žƒ– •’‡
‹‡• Šƒ• Š‹•–‘”‹
ƒŽ ”‡
‘”†• ‘

—””‹‰ ‘ –Ї  ‘” ‹• ‡š’‡
–‡† –‘
‘

—” †—‡ –‘ –Ї Žƒ
 ‘ˆ •—‹–ƒ„އ Šƒ„‹–ƒ–
‘ •’‡
‹ƒŽǦ•–ƒ–—• ’Žƒ– •’‡
‹‡• ™‡”‡ ’
‘ –Ї Ǥ
”‡•‡– ™‹–Š‹ –Ї Ǥ Ї •—”˜‡›
‘‹
‹†‡† ™‹–Š
•‘‡ǡ „—– ‘– ƒŽŽǡ ‘ˆ –Ї ’Žƒ– •’‡
‹‡•ǯ ‘’–‹ƒŽ „Ž‘‘‹‰ ’‡”‹‘†•Ǥ ‘‡ ‘ˆ –Ї •’‡
‹‡•
‹†‡–‹ˆ‹‡† ‹ –Ї  ‘”
ƒ †ƒ–ƒ„ƒ•‡ “—‡”‹‡• ƒ”‡ ‡š’‡
–‡† –‘ ‘

—” ‘Ǧ•‹–‡ †—‡ –‘ –Ї
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-31

Initial Study

‹‡–‹ˆ‹
 ‘ ‡†‡”ƒŽ  –‡   ‘–‡–‹ƒŽ ƒ–‹‘ƒŽ‡
ƒ‡ ƒ‡ –ƒ–—• 
–ƒ
–ƒ–—• –ƒ–—• –‘ 

—” ʹ Ž –• ”‡•—‡† ‡š–‹ ƒ–‡† ‹ ƒŽ‹ˆ ”‹ƒǡ „—  ‡
   ‡†‡ ƒŽŽ› ƒ†‹†ƒ–‡ Š ‡ƒ–‡‡†
‡Ž•‡™Š‡”‡ –ƒ–‡ ƒ‹‰

ʹ Ž
ƒ
ƒ–• ƒ”‡ǡ Š”‡ƒ–‡‡†ǡ ‘” †ƒ‰‡”‡† ‹ ƒŽ‹ˆ‘”‹ƒǡ „—– ‘”‡  – – †ƒ‰‡”‡†

‘‘ ‡Ž•‡™Š‡”‡  –ƒ–
‡
‡ Š”‡ƒ–‡‡†

 Š”‡ƒ– ‘†‡ 𖇐•‹‘ǣ  – ‹ †ƒ‰‡”‡†

Ǥͳ ‡”‹‘—•Ž› ‡†ƒ‰‡”‡† ‹ ƒŽ‹ˆ‘”‹ƒ ሺ‘˜‡” ͺͲΨ ‘ˆ ‘

—””‡
‡•




–
ƒ
ƒ
ƒ
–‡
–‡


ƒ
ƒ


†
†‹
†ƒ
†ƒ
–‡
–‡ Š”‡ƒ–‡‡†

–Š”‡ ‡‡† Ȁ Š‹‰Š †‡‰”‡‡ ƒ† ‹‡†‹ƒ
› ‘ˆ –Š”‡ƒ–ሻ   —ŽŽ › ”‘–‡
–‡†

Ǥʹ ƒ‹”Ž› ‡†ƒ‰‡”‡† ‹ ƒŽ‹ˆ‘”‹ƒ ሺʹͲǦͺͲΨ ‘

—””‡
‡• 


–ƒ–
–ƒ–
‡
‡ ’‡
‹‡• ‘ˆ ’‡
‹ƒŽ ‘
‡”

–Š”‡ ‡‡†ሻ

Ǥ͵ ‘– ˜‡”› ‡†ƒ‰‡”‡† ‹ ƒŽ‹ˆ‘”‹ƒ ሺ൏ʹͲΨ ‘ˆ ‘

—””‡
‡•

–Š”‡
ƒ–
ƒ–
ƒ–‡‡†ሻ

ˆ –Ї ͳͻ •’‡
‹ƒŽǦ•–ƒ–—• •’‡
‹‡• Ž‹•–‡† ƒ„‘˜‡ –Šƒ– Šƒ˜‡ –Ї ’‘–‡–‹ƒŽ –‘ ‘

—” ‹ –Ї ”‡‰‹‘ǡ
‘Ž› –Š”‡‡ •’‡
‹‡• Šƒ˜‡ –Ї ’‘–‡–‹ƒŽ –‘ ‡•– ‘” ˆ‘”ƒ‰‡ ‘ •‹–‡ǣ –Ї ™‡•–‡” „—””‘™‹‰ ‘™Ž ሺ–Ї‡
—‹
—Žƒ”‹ƒ ••’Ǥ Š› ƒ‡ƒ ’—‰ ሻǡ Ž‘‰‰‡”Їƒ† •Š”‹‡ ሺƒ‹—• Ž—†‘˜‹ ‹ƒ—•ሻǡ ƒ †
™ƒ‹•‘ǯ• Šƒ™ ሺ—–‡‘ •™ƒ‹•‘‹ሻǤ Ї ”‡ƒ‹‹‰ ͳ͸ •’‡ ‹‡• †‘ ‘– Šƒ˜‡ –Ї ’‘–‡–‹ƒŽ –‘
‘

—” „‡
ƒ—•‡ –Ї •‹–‡ ‹• ‘—–•‹†‡ ‘ˆ –Ї‹” ‘™ ”ƒ‰‡ǡ †‘‡• ‘– ‘–ƒ‹ •—‹–ƒ„އ ‡•–‹‰ ‘”
ˆ‘”ƒ‰‹‰ Šƒ„‹–ƒ–ǡ Žƒ
• ƒ ’‡”ƒ‡– ™ƒ–‡” •‘—”
‡ǡ ƒ† ‹• •—„Œ‡
– –‘ ‘–Ї” ‡˜‹”‘‡–ƒŽ
Ž‹‹–ƒ–‹‘•Ǥ
Ї”‡ ƒ”‡ •‡˜‡”ƒŽ Žƒ”‰‡ ‡—
ƒŽ›’–—• ƒ† ˜ƒ”‹‘—• ‘”ƒ‡–ƒŽ –”‡‡• –Šƒ–
‘—ކ •—’’‘”– ‡•–‹‰
„‹”†• ƒ†Ȁ‘” ”ƒ’–‘”• ‘ ƒ† ‡ƒ” –Ї ”‘Œ‡
– •‹–‡Ǥ ‘ ‹ƒ
–‹˜‡ ‘” ƒ
–‹˜‡ •–‹
 ‡•–• ™‡”‡
•Š‘—ކ‡”‡† Šƒ™ ሺ Ž‹‡ƒ–—• ǡ ”‡†Ǧ–ƒ‹Ž‡ Šƒ™ —–‡‘ †
‹†‡–‹ˆ‹‡† †—”‹‰ –Ї •—”˜‡›Ǣ Š‘™‡˜‡”ǡ •‡˜‡”ƒŽ ”ƒ’–‘”• ™‡”‡ ‹†‡–‹ˆ‹‡†ǡ ‹ Ž—†‹‰ ”‡†Ǧ
—–‡‘ ሻ † ሺ Œƒƒ‹
‡•‹•ሻǡ •Šƒ”’Ǧ•Š‹‡
Šƒ™ ሺ

‹’‹–‡” —• •–”‹ƒ– ሻǡ ƒ † ‡”‹
ƒ ‡•–”‡Ž ሺ ƒŽ
‘ ’ ‡”‹—• • ƒ”˜ ሻǤ ƒŽŽ‡” ‘”ƒ‡–ƒŽ
–”‡‡• ƒ••‘
‹ƒ–‡† ™‹–Š –Ї ’”‹˜ƒ–‡ ”‡•‹†‡
‡• •—””‘—†‹‰ –Ї ”‘Œ‡
– •‹–‡
‘—ކ •—’’‘”–
‡•–‹‰ ’ƒ••‡”‹‡ „‹”† •’‡
‹‡•Ǥ ‘‘ ‹‰”ƒ–‘”› „‹”† •’‡
‹‡• ‘„•‡”˜‡† †—”‹‰ –Ї •—”˜‡›
‹
Ž—†‡† ‘—”‹‰ †‘˜‡ ሺ
‡ ƒ ƒ ƒ ” —   ‘ ‹†
”ƒሻǡ ‡”‹
ƒ
”‘™ ሺ‘”˜—• Š „ ” › ”ƒ
Š› 
Š‘•ሻǡ ƒ †
‘”–Ї” ‘
‹‰„‹”† ሺ‹—•
’‘Ž›‰Ž‘––‘•ሻǤ

‘ •ƒŽŽ ƒƒŽ „—””‘™• •—‹–ƒ„އ ˆ‘” •’‡
‹ƒŽǦ•–ƒ–—• •’‡
‹‡• ™‡”‡ ’”‡•‡– ™‹–Š‹ –Ї Ǥ
Ї”‡ ™ƒ• •‹‰ ሺ‹Ǥ‡Ǥǡ ™‡ƒ–Ї”‡† •‘‹Ž ‘—†‹‰ሻ
”‡ƒ–‡† „› ’‘
‡– ‰‘’Ї” ሺŠ‘‘›•
„‘––ƒ‡ሻ ’”‡•‡– ™‹–Š‹ ‘ –Ї ”‘Œ‡
– •‹–‡Ǥ Ї”‡ ™‡”‡ •‡˜‡”ƒŽ ‰”‘—† •“—‹””‡Ž•
ሺ–‘•’‡”‘’Ћޗ• „ Ї›‹ ‡‡
ሻ „—””‘™• ™‹–Š •‹‰ ሺ‹Ǥ‡Ǥ –”ƒ
 ” ǡ • ƒ† ‡š’Ž‘ ƒ–‘”› †‹‰‰‹‰ሻ ‘ –Ї
ƒ’”‘ ‘ˆ –Ї „—””‘™• ™‹–Š‹ –Ї Ǥ

WESTERN BURROWING OWL
Ї”‡ ‹• ‘ •—‹–ƒ„އ ‡•–‹‰ Šƒ„‹–ƒ– ‘ –Ї ”‘Œ‡
– •‹–‡ ‹–•‡Žˆǡ „—– –Ї ‘’‡ ‘Ǧƒ–‹˜‡
‰”ƒ••Žƒ† –‘ –Ї ‘”–Їƒ•– ƒ† ‡ƒ•– ™‹–Š‹ –Ї  ’”‘˜‹†‡• •—‹–ƒ„އ ‡•–‹‰ ƒ† ˆ‘”ƒ‰‹‰ Šƒ„‹–ƒ– ˆ‘” –Ї •’‡
‹‡•Ǥ ‡˜‡”ƒŽ ƒŽ‹ˆ‘”‹ƒ ‰”‘—† •“—‹””‡Ž „—””‘™• ™‡”‡ ‘„•‡”˜‡† ‘ –Ї ”‘Œ‡
– •‹–‡ ƒ†
‘—ކ •Їޖ‡” •—‹–ƒ„އ ’”‡› •’‡
‹‡• ˆ‘” –Ї •’‡
‹‡•ǡ ”‡•—Ž–‹‰ ‹ ƒ ‹‹ƒŽ
ƒ‘—– ‘ˆ •—‹–ƒ„އ ‡•–‹‰ Šƒ„‹–ƒ– ‘ –Ї ”‘Œ‡
– •‹–‡Ǥ
‘™‡˜‡”ǡ –Š‹• •’‡
‹‡• ‹• ˜‡”› •‡•‹–‹˜‡
–‘ Š—ƒ ƒ
–‹˜‹–‹‡• ƒ† ‘‹•‡ǡ ƒ† –Ї „—‹Ž–Ǧ—’ ƒ† —”„ƒ
Šƒ”ƒ
–‡”‹•–‹
• ‘ˆ –Ї •—””‘—†‹‰
ƒ”‡ƒ Ž‹‹– –Ї ’‘–‡–‹ƒŽ ˆ‘” –Ї „—””‘™‹‰ ‘™Ž –‘ ‹Šƒ„‹– –Ї •‹–‡Ǥ ††‹–‹‘ƒŽŽ›ǡ –Ї”‡ ‹• ƒ Ž‹‹–‡† ’”‡› „ƒ•‡ ƒ˜ƒ‹Žƒ„އ –‘ •—’’‘”– –Ї „—””‘™‹‰ ‘™Žǡ ƒ† –Ї •—””‘—†‹‰ Šƒ„‹–ƒ– ’”‘˜‹†‡• ‹‹ƒŽ ˆ‘”ƒ‰‹‰ ‘” ‡•–‹‰ ‘’’‘”–—‹–‹‡•Ǥ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-37

Initial Study
Ž–Š‘—‰Š ‹’ƒ
–• –‘ –Š‹• •’‡
‹‡• ƒ”‡ —Ž‹‡Ž›ǡ –‘ ‹‹‹œ‡ –Ї ’‘–‡–‹ƒŽ ‹’ƒ
–• –‘ ‡•–‹‰
ƒ† ˆ‘”ƒ‰‹‰ ™‡•–‡” „—””‘™‹‰ ‘™Ž•ǡ ‹’އ‡–ƒ–‹‘ ‘ˆ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• ሺሻ  Ǧͳǡ
Ǧ
Ǧ͵ –Š”‘—‰Š Ǧ
Ǧͷǡ ƒ† Ǧ
Ǧ͹ ™‘—ކ ”‡†—
‡ ƒ› ‹’ƒ
–• –‘ –Ї •’‡
‹‡• –‘
„‡Ž‘™ •‹‰‹ˆ‹
ƒ– އ˜‡Ž•Ǥ  
Ǧͳ ”‡“—‹”‡• –Šƒ– ƒ ’”‡
‘•–”—
–‹‘ •—”˜‡› „‡
‘†—
–‡† ͳͶ
†ƒ›• ’”‹‘” –‘ ”‘Œ‡
– ƒ
–‹˜‹–‹‡•ǡ  
Ǧ͵ –Š”‘—‰Š 
Ǧͷ ‡•–ƒ„Ž‹•Ї• ’”‘
‡†—”‡• –‘ „‡
‹’އ‡–‡† •Š‘—ކ ƒ ™‡•–‡” „—””‘™‹‰ ‘™Ž „‡ ‘„•‡”˜‡† †—”‹‰ –Ї ’”‡ ‘•–”—
–‹‘
•—”˜‡›ǡ ƒ†  
Ǧ͹ ”‡“—‹”‡• –Šƒ– ƒ “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•–
‘†—
– ƒ –”ƒ‹‹‰ ’”‘‰”ƒ ˆ‘” ƒŽŽ

‘•–”—
–‹‘ ’‡”•‘‡Ž ’”‹‘” –‘ ”‘Œ‡
– ƒ
–‹˜‹–‹‡•Ǥ

LOGGERHEAD SHRIKE
‡ ƒ†—Ž–Ž‘‰‰‡”Їƒ† •Š”‹‡ ™ƒ• ‘„•‡”˜‡† †—”‹‰ –Ї •—”˜‡› ™‹–Š‹ –Ї Ǥ —‹–ƒ„އ ‡•–‹‰ ƒ† ˆ‘”ƒ‰‹‰ Šƒ„‹–ƒ– ƒ”‡ ’”‡•‡– ™‹–Š‹ –Ї  „—– ‘– ™‹–Š‹ –Ї ”‘Œ‡ – •‹–‡ ‹–•‡ŽˆǤ Ї”‡
ƒ”‡ •‡˜‡”ƒŽ •ƒŽŽ‡” ‘”ƒ‡–ƒŽ –”‡‡• –‘ –Ї ™‡•– ƒ† ‘”–Š –Šƒ– ƒ› „‡ •—‹–ƒ„އ ‡•–‹‰ Šƒ„‹–ƒ– ˆ‘” –Ї •’‡
‹‡•Ǥ

’ƒ
–• –‘ ‡•–‹‰ ƒ† ˆ‘”ƒ‰‹‰ Ž‘‰‰‡”Їƒ† •Š”‹‡•
‘—ކ ‘

—” †—”‹‰
‘•–”—
–‹‘ †—‡ –‘
‘‹•‡ǡ ˜‹„”ƒ–‹‘ǡ †‹”‡
– ‘”–ƒŽ‹–› ˆ”‘ ˜‡Š‹
އ •–”‹‡•ǡ ƒ† –Ї ’”‡•‡
‡ ‘ˆ
‘•–”—
–‹‘
™‘”•ǡ ™Š‹
Š ƒ› ƒŽ–‡” ‘”ƒŽ „‡Šƒ˜‹‘”• ƒ† ’‘••‹„Ž› އƒ† –‘ ‡•– ˆƒ‹Ž—”‡Ǥ ’އ‡–ƒ–‹‘
‘ˆ  
Ǧͳ ሺ’”‡
‘•–”—
–‹‘ •—”˜‡›ሻǡ Ǧ
Ǧʹ ”‡“—‹”‹‰ ’”‡
‘•–”—
–‹‘ •—”˜‡›• ˆ‘”
ƒ
–‹˜‡ ”ƒ’–‘” ƒ† ‹‰”ƒ–‘”› „‹”† ‡•–• „‡–™‡‡ ‡„”—ƒ”› ͳ ƒ† ‡’–‡„‡” ͳͷǡ Ǧ Ǧͷ
”‡“—‹”‹‰ †ƒ‹Ž› •‹–‡ ˜‹•‹–• ˆ‘” ƒ› ‡•– ‡ƒ”
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ ƒ†



Ǧ
Ǧ͹
ሺ
‘•–”—
–‹‘ ’‡”•‘‡Ž –”ƒ‹‹‰ሻ ™‘—ކ ”‡†—
‡ ƒ› ‹’ƒ
–• –‘ –Ї •’‡
‹‡• –‘ „‡Ž‘™
•‹‰‹ˆ‹
ƒ– އ˜‡Ž•Ǥ
SWAINSON’S HAWK
Ї ™ƒ‹•‘ǯ• Šƒ™ ሺ—–‡‘ •™ƒ‹•‘‹ሻ – Šƒ• Ї ’‘–‡–‹ƒŽ –‘ ‘

—” ™‹–Š‹ –Ї  „—– ‹•
—Ž‹‡Ž› –‘ „‡ ˆ‘—† ‘ –Ї ”‘Œ‡
– •‹–‡ ‹–•‡ŽˆǤ Ї”‡ ‹• ‘ •—‹–ƒ„އ ‡•–‹‰ Šƒ„‹–ƒ– ‘ –Š ”‘Œ‡
– •‹–‡ǡ ƒŽ–Š‘—‰Š –Ї”‡ ƒ”‡ •‡˜‡”ƒŽ Žƒ”‰‡ ‡—
ƒŽ›’–—• –”‡‡• ‹ –Ї  –Šƒ–
‘—ކ ’”‘˜‹†
•—‹–ƒ„އ ‡•–‹‰ Šƒ„‹–ƒ–Ǥ —‹–ƒ„އ ˆ‘”ƒ‰‹‰ Šƒ„‹–ƒ– ‹• ƒ„•‡– ˆ”‘ –Ї ”‘Œ‡ – •‹–‡ǡ „—– –Ї”
‡
‡
‡
ƒ”‡ ‘’‡ ‘Ǧƒ–‹˜‡ ‰”ƒ••Žƒ†• –‘ –Ї ‘”–Їƒ•– ƒ† ‡ƒ•– ‘ˆ –Ї  –Šƒ– ‘—ކ •—’’‘”– –Ї
•’‡
‹‡•Ǥ ‡˜‡”ƒŽ ‰”‘—† •“—‹””‡Ž ƒ† ’‘
‡– ‰‘’Ї” —””‘™• ‹†‹
ƒ–‡ –Ї ’‘–‡–‹ƒŽ ˆ‘” ƒ
Ž‹‹–‡† ’”‡› „ƒ•‡ ‹ –Ї ‹‡†‹ƒ–‡ ˜‹
‹‹–›Ǥ Ї ’”‡›
„
„ƒ•‡ ˆ‘” –Š‹• •’‡
‹‡• ‹• Ž‘™ǡ ‰‹˜‡ –Ї
—”„ƒ ƒ† „—‹Ž–Ǧ—’
Šƒ”ƒ
–‡”‹•–‹
• ‘ˆ –Ї •—””‘—†‹‰ ’”‘’‡”–‹‡•ǡ ƒ† –Ї ƒ”‡ƒ ™‘—ކ „‡

‘•‹†‡”‡† ‘ˆ Ž‘™ ˆ‘”ƒ‰‹‰ “—ƒŽ‹–›Ǥ

‘™‡˜‡”ǡ –‘ ‹‹‹œ‡ ’‘–‡–‹ƒŽ ‹’ƒ
–• –‘ ™ƒ‹•‘ǯ• Šƒ™• –Šƒ–
‘—ކ ‘

—” †—”‹‰

‘•–”—
–‹‘ †—‡ –‘ ‘‹•‡ǡ ˜‹„”ƒ–‹‘ǡ ƒ† –Ї ’”‡•‡
‡ ‘ˆ
‘•–”—
–‹‘ ™‘”‡”•ǡ
‹’އ‡–ƒ–‹‘ ‘ˆ Ǧ
Ǧͳ ሺ’”‡
‘•–”—
–‹‘ •—”˜‡›ሻǡ Ǧ
Ǧʹ ሺ‡•–‹‰ „‹”†
’”‡
‘•–”—
–‹‘ •—”˜‡›ሻǡ Ǧ
Ǧͷ –Š”‘—‰Š 
Ǧ͹ ሺ•‹–‡ ˜‹•‹–• ˆ‘” ƒ› ‡•–• ‡ƒ”

‘•–”—
–‹‘ǡ ’”‘–‘
‘Ž •—”˜‡›• ˆ‘” ™ƒ‹•‘ǯ• Šƒ™ǡ
‘•–”—
–‹‘ ’‡”•‘‡Ž –”ƒ‹‹‰ሻ ™‘—ކ
”‡†—
‡ ƒ› ‹’ƒ
–• –‘ –Ї •’‡
‹‡• –‘ „‡Ž‘™ •‹‰‹ˆ‹
ƒ– އ˜‡Ž•Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-38

Initial Study

NESTING BIRDS
Ї”‡ ™‡”‡ ‘ ‡•–• ሺƒ
–‹˜‡ ‘” ‹ƒ
–‹˜‡ሻ ’”‡•‡– ™‹–Š‹ –Ї  †—”‹‰ –Ї •—”˜‡›Ǥ
ƒ„‹–ƒ–
–‘ •—’’‘”– ‡•–‹‰ „‹”†• ‹• Ž‹‹–‡† –‘ ‘”ƒ‡–ƒŽ –”‡‡• Ž‘ ƒ–‡† ™‹–Š‹ –Ї  ƒ† –Ї
•—””‘—†‹‰ —”„ƒ †‡˜‡Ž‘’‡–ǡ ™Š‹
Š ƒ› •—’’‘”– ’ƒ••‡”‹‡ ‡•–• ‘” Žƒ”‰‡” ”ƒ’–‘” ‡•–•Ǥ
—‡ –‘ –Ї ’‡”‹‘†‹
‘”
Šƒ”† ƒ‹–‡ƒ
‡ǡ ‹– ‹• —Ž‹‡Ž› –Šƒ– ‰”‘—†Ǧ‡•–‹‰ •’‡
‹‡• ™‘—ކ
‡•– ™‹–Š‹ –Ї Ǥ ††‹–‹‘ƒŽŽ›ǡ –Ї”‡ ƒ”‡ ƒ ˜ƒ”‹‡–› ‘ˆ ƒǦƒ†‡ •–”— –—”‡• ሺ—–‹Ž‹–› ’‘އ•ǡ
–”ƒ•‹••‹‘ –‘™‡”•ǡ ƒ‰”‹
—Ž–—”ƒŽ ”‡•‹†‡
‡•ǡ ‡–
Ǥሻ ƒ† –”‡‡• ™‹–Š‹ –Ї  ƒ† ‹ –Ї
˜‹
‹‹–› ‘ˆ –Ї ”‘Œ‡
–ǡ ™Š‹
Š
‘—ކ •—’’‘”– ƒ ˜ƒ”‹‡–› ‘ˆ ‡•–‹‰ „‹”† •’‡
‹‡•Ǥ
ˆ –Ї”‡ ƒ”‡
ƒ
–‹˜‡ ‡•–• ’”‡•‡– †—”‹‰ ”‘Œ‡
– ƒ
–‹˜‹–‹‡•ǡ ‡•–•
‘—ކ „‡ ‹’ƒ
–‡†ǡ

‘—ކ ‹–‡”ˆ‡”‡ ™‹–Š ‘”ƒŽ „”‡‡†‹‰ „‡Šƒ˜‹‘”•ǡ ™Š‹
Š
‘—ކ †‹•
‘—”ƒ‰
ƒ† ”‘Œ‡
– ƒ
–‹˜‹–‹‡•
‡ „”‡‡†‹‰ ‘” އƒ† –‘

‡•– ƒ„ƒ†‘‡– ‘” ˆƒ‹Ž—”‡Ǥ
’އ‡–ƒ–‹‘ ‘ˆ  
Ǧͳ ሺ’”‡
‘•–”—
–‹‘ •—”˜‡›ሻǡ 

Ǧʹ ሺ‡•–‹‰ „‹”† ’”‡
‘•–”—
–‹‘ •—”˜‡›ሻǡ ƒ†  
Ǧ͹ ሺ
‘•–”—
–‹‘ ’‡”•‘‡Ž
–”ƒ‹‹‰ሻ ™‘—ކ ”‡†—
‡ ‹’ƒ
–• –‘ –Ї•‡ •’‡
‹‡• –‘ „‡Ž‘™ •‹‰‹ˆ‹
ƒ– އ˜‡Ž•Ǥ

MITIGATION MEASURE(S)
 
Ǧͳǣ  ’”‡
‘•–”—
–‹‘
އƒ”ƒ
‡ •—”˜‡› •ŠƒŽŽ „‡
‘†—
–‡† ™‹–Š‹ ͳͶ †ƒ›• ’”‹‘” –‘
–Ї ‹••—ƒ
‡ ‘ˆ ‰”ƒ†‹‰ ’‡”‹–• ‘” ‰”‘—† †‹•–—”„ƒ
‡ ƒ
–‹˜‹–‹‡• –‘ †‡–‡”‹‡ ‹ˆ •’‡
‹ƒŽǦ
•–ƒ–—• •’‡
‹‡• ƒ”‡ ’”‡•‡– ™‹–Š‹ ʹͷͲ ˆ‡‡– ‘ˆ –Ї ”‘Œ‡
–Ǥ Ї ˆ‘
ƒŽ •’‡
‹‡• •ŠƒŽŽ ‹
Ž—†‡ –Ї
™‡•–‡” „—””‘™‹‰ ‘™Žǡ Ž‘‰‰‡”Їƒ† •Š”‹‡ǡ ƒ† ™ƒ‹•‘ǯ• Šƒ™Ǥ  ‘’› ‘ˆ –Ї ”‡’‘”–
‘—–Ž‹‹‰ –Ї ”‡•—Ž–• ‘ˆ –Ї •—”˜‡› •ŠƒŽŽ „‡ •—„‹––‡† –‘ –Ї އƒ† ƒ‰‡ › ƒ• ‡˜‹†‡
‡ ‘ˆ

‘’Ž‹ƒ
‡Ǥ
 
Ǧʹǣ
ˆ
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• ‘

—” „‡–™‡‡ ‡„”—ƒ”› ͳ ƒ† ‡’–‡„‡” ͳͷǡ ’”‡Ǧ
†‹•–—”„ƒ
‡ •—”˜‡›• ˆ‘” ƒ
–‹˜‡ ”ƒ’–‘” ƒ† ‹‰”ƒ–‘”› „‹”† ‡•–• —•– „‡
‘†—
–‡† ‘ ‘”‡
–Šƒ ͳͲ †ƒ›• ’”‹‘” –‘ –Ї
‘‡
‡‡– ‘ˆ †‹•–—”„ƒ
‡Ǥ —”˜‡›• •ŠƒŽŽ ˆ‘ŽŽ‘™   ƒ†
  ‰—‹†ƒ
‡ ƒ†Ȁ‘” ’”‘–‘
‘Ž•ǡ ƒ• ƒ’’Ž‹
ƒ„އǤ
ˆ ‘ ƒ
–‹˜‡ ‡•–• ‘” ‡•–‹‰ „‹”†• ƒ”‡
‹†‡–‹ˆ‹‡†ǡ –Ї ”‘Œ‡
–
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• ƒ› ’”‘
‡‡†ǡ ƒ† ‘ ˆ—”–Ї” ‹–‹‰ƒ–‹‘
‡ƒ•—”‡• ˆ‘” ‡•–‹‰ „‹”†• ƒ”‡ ”‡“—‹”‡†Ǥ
ˆ ƒ
–‹˜‡ ‡•–ሺ•ሻ ƒ”‡ ‹†‡–‹ˆ‹‡†ǡ –Ї ƒ
–‹˜‡ ‡•–ሺ•ሻ
•Š‘—ކ „‡
‘–‹—‘—•Ž› •—”˜‡›‡† ˆ‘” –Ї ˆ‹”•– ʹͶ Š‘—”• ƒˆ–‡” †‡–‡
–‹‘ –‘ ‡•–ƒ„Ž‹•Š ƒ
„‡Šƒ˜‹‘”ƒŽ „ƒ•‡Ž‹‡ ’”‹‘” –‘ ƒ›
‘•–”—
–‹‘Ǧ”‡Žƒ–‡† ƒ
–‹˜‹–‹‡•Ǥ

‡
‘•–”—
–‹‘
‘‡
‡•ǡ ƒŽŽ ‡•–• •ŠƒŽŽ „‡
‘–‹—‘—•Ž› ‘‹–‘”‡† –‘ †‡–‡
– ƒ›
„‡Šƒ˜‹‘”ƒŽ
Šƒ‰‡• „‡
ƒ—•‡ ‘ˆ –Ї ”‘Œ‡
– ሺ‹Ǥ‡Ǥǡ ‡•– ƒ˜‘‹†ƒ
‡ ‘” ƒ„ƒ†‘‡–ሻǤ
ˆ
„‡Šƒ˜‹‘”ƒŽ
Šƒ‰‡• ƒ”‡ ‘„•‡”˜‡†ǡ –Ї ™‘”
ƒ—•‹‰ –Šƒ–
Šƒ‰‡ •ŠƒŽŽ
‡ƒ•‡ —–‹Ž –Ї
ƒ’’Ž‹
ƒ–̵• “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•–
‘•—Ž–• ™‹–Š –Ї   ƒ†Ȁ‘” –Ї  ǡ ƒ† –Ї “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•– —•‡† „› –Ї ƒ’’Ž‹
ƒ– ‹’އ‡–• –Ї ”‡
‘‡†‡† ‡ƒ•—”‡•Ǥ —”‹‰ •—
Š –‹‡•
ƒ• –Ї “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹
ƒŽ ‘‹–‘” ‹• ‘– ‘ •‹–‡ ™Š‹Ž‡
‘•–”—
–‹‘ ™‘”‡”• ƒ”‡ ‘ •‹–‡ǡ ƒ
‹‹— ‘Ǧ†‹•–—”„ƒ
‡ „—ˆˆ‡” ‘ˆ ʹͷͲ ˆ‡‡– •ŠƒŽŽ „‡ ‡•–ƒ„Ž‹•Ї† ƒ”‘—† ƒ
–‹˜‡ ‡•–• ƒ† ƒ
ͷͲͲǦˆ‘‘– ‘Ǧ†‹•–—”„ƒ
‡ „—ˆˆ‡” ƒ”‘—† –Ї ‡•–• ‘ˆ ”ƒ’–‘”• —–‹Ž –Ї „”‡‡†‹‰ •‡ƒ•‘ Šƒ• ‡†‡† ‘” —–‹Ž ƒ “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•– Šƒ• †‡–‡”‹‡† –Šƒ– –Ї „‹”†• Šƒ˜‡ ˆŽ‡†‰‡† ƒ† ƒ”‡ ‘ Ž‘‰‡” ”‡Ž‹ƒ– —’‘ –Ї ‡•– ‘” ’ƒ”‡–ƒŽ
ƒ”‡ ˆ‘” •—”˜‹˜ƒŽǡ ƒ† ƒ› ƒ†—Ž– „‹”†• ƒ”‡ ‘ Ž‘‰‡”
‘

—’›‹‰ –Ї ‡•–Ǥ ‡˜‹ƒ–‹‘• ˆ”‘ –Ї•‡ ‘Ǧ†‹•–—”„ƒ
‡ „—ˆˆ‡”• ƒ› „‡ ‹’އ‡–‡† ‹ˆ –Ї
“—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•–
‘
Ž—†‡• –Šƒ– ™‘” ™‹–Š‹ –Ї „—ˆˆ‡” ƒ”‡ƒ ™‘—ކ ‘–
ƒ—•‡ ‡•–
ƒ˜‘‹†ƒ
‡ ‘” ƒ„ƒ†‘‡– ሺ‡Ǥ‰Ǥǡ ™Š‡ –Ї †‹•–—”„ƒ
‡ ƒ”‡ƒ ™‘—ކ „‡
‘
‡ƒŽ‡† ˆ”‘ ƒ ‡•–
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-39

Initial Study
•‹–‡ „› –‘’‘‰”ƒ’Š›ሻ ’”‘˜‹†‡† –Šƒ– ‘–‹ˆ‹
ƒ–‹‘ ‘ˆ –Š‹• †‡–‡”‹ƒ–‹‘ ‘ˆ ƒ †‡˜‹ƒ–‹‘ ‹ –Ї ‘Ǧ
†‹•–—”„ƒ
‡ „—ˆˆ‡” ‹• ’”‘˜‹†‡† „› –Ї “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•– ‘ އ•• –Šƒ ͳͷ †ƒ›• ‹ ƒ†˜ƒ ‡ –‘
–Ї ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ƒ† –Ї ‹–‡† –ƒ–‡• ‹ •Š ƒ† ‹Ž†Ž‹ˆ‡Ǥ  
Ǧ͵ǣ ‡
ƒ—•‡ –Ї”‡ ‹• ’‘–‡–‹ƒŽ ˆ‘” –Ї ™‡•–‡” „—””‘™‹‰ ‘™Ž –‘ ‘

—” ™‹–Š‹ ‘” ‡ƒ”
–Ї ”‘Œ‡
– ƒ”‡ƒǡ ”‘Œ‡
–Ǧ”‡Žƒ–‡† ˜‡Š‹
އ• •ŠƒŽŽ ‘„•‡”˜‡ ƒ †ƒ›–‹‡ •’‡‡† Ž‹‹– ‘ˆ ʹͲ ’Š
–Š”‘—‰Š‘—– –Ї •‹–‡ ‹ ƒŽŽ ”‘Œ‡
– ƒ”‡ƒ•ǡ ‡š
‡’– ‘ ‘—–› ”‘ƒ†• ƒ† –ƒ–‡ ƒ† ˆ‡†‡”ƒŽ
Š‹‰Š™ƒ›•Ǣ –Š‹• ‹• ’ƒ”–‹
—Žƒ”Ž› ‹’‘”–ƒ– ƒ– ‹‰Š– ™Š‡ ™‡•–‡” „—””‘™‹‰ ‘™Ž• ƒ”‡ ‘•– ƒ
–‹˜‡Ǥ Ž–Š‘—‰Š ‘– ƒ–‹
‹’ƒ–‡† ˆ‘” –Š‹• ”‘Œ‡
–ǡ ‹‰Š––‹‡
‘•–”—
–‹‘ „‡ ‹‹‹œ‡†
–‘ –Ї ‡š–‡– ’‘••‹„އǤ
‘™‡˜‡”ǡ ‹ˆ ‹‰Š–
‘•–”—
–‹‘ •ŠƒŽŽ ‘

—”ǡ –Ї –Ї •’‡‡† Ž‹‹– •ŠƒŽŽ
„‡ ”‡†—
‡† –‘ ͳͲ ’ŠǤ ˆˆǦ”‘ƒ† –”ƒˆˆ‹
‘—–•‹†‡ ‘ˆ †‡•‹‰ƒ–‡† ”‘Œ‡
– ƒ”‡ƒ•
•ŠƒŽŽ
•ŠƒŽŽ „‡ ’”‘Š‹„‹–‡†Ǥ
ƒǤ ‘ ’”‡˜‡– ‹ƒ†˜‡”–‡– ‡–”ƒ’‡– ‘ˆ ™‹Ž†Ž‹ˆ‡ †—”‹‰ –Ї ‘•–”—
–‹‘ ’Šƒ•‡ ‘ˆ ƒ
”‘Œ‡
–ǡ ƒŽŽ ‡š
ƒ˜ƒ–‡†ǡ •–‡‡’Ǧ™ƒŽŽ‡† Бއ• ‘” –”‡
Ї• ‰”‡ƒ–‡” –Šƒ ʹǦˆ‡‡– †‡‡’ •ŠƒŽŽ
„‡
‘˜‡”‡† ƒ– –Ї
Ž‘•‡ ‘ˆ ‡ƒ
Š ™‘”‹‰ †ƒ› „› ’Ž›™‘‘† ‘” •‹‹Žƒ” ƒ–‡”‹ƒŽ•Ǥ
ˆ –Ї
–”‡
Ї•
ƒ‘– „‡
‘˜‡”‡†ǡ ‘‡ ‘” ‘”‡ ‡•
ƒ’‡ ”ƒ’•
‘•–”—
–‡† ‘ˆ ‡ƒ”–ЇǦˆ‹ŽŽ ‘”
™‘‘†‡ ’Žƒ• •ŠƒŽŽ „‡ ‹•–ƒŽŽ‡†Ǥ ‡ˆ‘”‡ •—
РБއ• ‘” –”‡
Ї• ƒ”‡ ˆ‹ŽŽ‡†ǡ –Ї› •ŠƒŽŽ
„‡ –Š‘”‘—‰ŠŽ› ‹•’‡
–‡† ˆ‘” –”ƒ’’‡† ™‹Ž†Ž‹ˆ‡Ǥ
„Ǥ ‡•–‡” „—””‘™‹‰ ‘™Ž• ƒ”‡ ƒ––”ƒ
–‡† –‘ „—””‘™ǦŽ‹‡ •–”—
–—”‡• •—
Š ƒ• ’‹’‡• ƒ†
ƒ› ‡–‡” •–‘”‡† ’‹’‡• ƒ† „‡
‘‡ –”ƒ’’‡† ‘” ‹Œ—”‡†Ǥ ŽŽ
‘•–”—
–‹‘ ’‹’‡•ǡ

—Ž˜‡”–•ǡ ‘” •‹‹Žƒ” •–”—
–—”‡• ™‹–Š ƒ †‹ƒ‡–‡” ‘ˆ ͶǦ‹
Ї• ‘” ‰”‡ƒ–‡” •–‘”‡† ƒ– ƒ

‘•–”—
–‹‘ •‹–‡ ˆ‘” ‘‡ ‘” ‘”‡ ‘˜‡”‹‰Š– ’‡”‹‘†• •ŠƒŽŽ „‡ –Š‘”‘—‰ŠŽ› ‹•’‡ –‡† ˆ‘”
™‡•–‡” „—””‘™‹‰ ‘™Ž „‡ˆ‘”‡ –Ї ’‹’‡ ‹• •—„•‡“—‡–Ž› „—”‹‡†ǡ ƒ’’‡†ǡ ‘” ‘–Ї”™‹•‡
—•‡† ‘” ‘˜‡† ‹ ƒ› ™ƒ›Ǥ

Ǥ ŽŽ ˆ‘‘†Ǧ”‡Žƒ–‡† –”ƒ•Š ‹–‡• •—
Š ƒ• ™”ƒ’’‡”•ǡ
ƒ•ǡ „‘––އ•ǡ ƒ† ˆ‘‘† •
”ƒ’• •ŠƒŽŽ „‡
†‹•’‘•‡† ‘ˆ ‹ •‡
—”‡Ž›
Ž‘•‡†
‘–ƒ‹‡”• ƒ† ”‡‘˜‡† ƒ– އƒ•– ‘
‡ ƒ ™‡‡ ˆ”‘ –Ї
”‘Œ‡
– •‹–‡Ǥ
†Ǥ ‘ ’‡–•ǡ •—
Š ƒ• †‘‰• ‘”
ƒ–•ǡ •ŠƒŽŽ „‡ „”‘—‰Š– ‘–‘ –Ї ”‘Œ‡
– •‹–‡ „› ™‘”‡”• –‘
’”‡˜‡– Šƒ”ƒ••‡–ǡ ‘”–ƒŽ‹–› ‘ˆ ™‡•–‡” „—””‘™‹‰ ‘™Ž•ǡ ‘” †‡•–”— –‹‘ ‘ˆ „—””‘™•Ǥ
‡Ǥ •‡ ‘ˆ ”‘†‡–‹
‹†‡• ƒ† Ї”„‹
‹†‡• ‘ –Ї ”‘Œ‡
– •‹–‡ •ŠƒŽŽ „‡ ”‡•–”‹
–‡†Ǥ Š‹• ‹•
‡
‡••ƒ”› –‘ ’”‡˜‡– ’”‹ƒ”› ‘” •‡
‘†ƒ”› ’‘‹•‘‹‰ ‘ˆ ™‡•–‡” „—””‘™‹‰ ‘™Ž• ƒ†
–Ї †‡’އ–‹‘ ‘ˆ ’”‡› ’‘’—Žƒ–‹‘• ‘ ™Š‹
Š –Ї› †‡’‡†Ǥ ŽŽ —•‡• ‘ˆ •—
Š
‘’‘—†•
•ŠƒŽŽ ‘„•‡”˜‡ Žƒ„‡Ž ƒ† ‘–Ї” ”‡•–”‹
–‹‘• ƒ†ƒ–‡† „› –Ї ǤǤ ˜‹”‘‡–ƒŽ
”‘–‡
–‹‘ ‰‡
›ǡ ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘‘† ƒ† ‰”‹
—Ž–—”‡ǡ ƒ† ‘–Ї” –ƒ–‡
ƒ† ˆ‡†‡”ƒŽ އ‰‹•Žƒ–‹‘ǡ ƒ• ™‡ŽŽ ƒ• ƒ††‹–‹‘ƒŽ ”‘Œ‡
–Ǧ”‡Žƒ–‡† ”‡•–”‹
–‹‘• †‡‡‡†
‡
‡••ƒ”› „› –Ї ‡”˜‹
‡Ǥ
ˆ ”‘†‡–
‘–”‘Ž —•– „‡
‘†—
–‡†ǡ œ‹
’Š‘•’Š‹†‡ •ŠƒŽŽ
„‡ —•‡† „‡
ƒ—•‡ ‘ˆ ƒ ’”‘˜‡ Ž‘™‡” ”‹• –‘ ™‹Ž†Ž‹ˆ‡Ǥ
ˆǤ  ”‡’”‡•‡–ƒ–‹˜‡ •ŠƒŽŽ „‡ ƒ’’‘‹–‡† „› –Ї ”‘Œ‡
– ’”‘’‘‡– ‘”
‘–”ƒ
–‘” ™Š‘ •ŠƒŽŽ
„‡ –Ї
‘–ƒ
– •‘—”
‡ ˆ‘” ƒ› ‡’Ž‘›‡‡ ‘”
‘–”ƒ
–‘” ™Š‘ ‹‰Š– ‘„•‡”˜‡ ƒ ™‡•–‡”
„—””‘™‹‰ ‘™ŽǤ Ї ”‡’”‡•‡–ƒ–‹˜‡ ™‹ŽŽ „‡ ‹†‡–‹ˆ‹‡† †—”‹‰ –Ї ‡’Ž‘›‡‡ ‡†— ƒ–‹‘
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-40

Initial Study
–Šƒ– ‘

—””‡† ƒ† ƒ
–‹˜‹–› ƒ– ƒ ƒ
–‹˜‡ ‡•– ‘” †‡ǡ ƒ† †‘
—‡– –Ї ’”‘‰”‡•• ‘ˆ –Ї ”‘Œ‡
–
™‹–Š ’Š‘–‘‰”ƒ’Š•Ǥ
 
Ǧ͸ǣ
ˆ
‘•–”—
–‹‘ ™‘” ‘

—”• ƒˆ–‡” —‰—•– ͵Ͳ ƒ† ‡†• „‡ˆ‘”‡ ƒ”
Š ͳ ሺ‘—–•‹†‡ ‘ˆ
–Ї „”‡‡†‹‰ •‡ƒ•‘ሻǡ ‹’ƒ
–• –‘ –Ї ™ƒ‹•‘̵• Šƒ™ ™‘—ކ „‡ ƒ˜‘‹†‡†Ǥ —”˜‡›• ™‘—ކ ‘– „‡ ”‡“—‹”‡† ˆ‘” ™‘”
‘†—
–‡† †—”‹‰ –Š‹• ’ƒ”– ‘ˆ –Ї ›‡ƒ”ǡ ƒ† ‘ ˆ—”–Ї” ‹–‹‰ƒ–‹‘ ˆ‘” ‡•– †‹•–—”„ƒ
‡ ‹• ”‡“—‹”‡†Ǥ
ƒǤ ”‘–‘
‘Ž —”˜‡›•Ǥ ‘” ™‘” –Šƒ– „‡‰‹• „‡–™‡‡ ƒ”
Š ͳ ƒ† —‰—•– ͵Ͳǡ ƒ “—ƒŽ‹ˆ‹‡†
„‹‘Ž‘‰‹•– ™‹–Š ‡š’‡”–‹•‡ ‹ ™ƒ‹•‘̵• Šƒ™
‘†—
– ’”‘–‘
‘Ž •—”˜‡›• ‘ˆ
’‘–‡–‹ƒŽ ‡•–‹‰ Šƒ„‹–ƒ– ™‹–Š‹ ͲǤͷ ‹Ž‡• ‘ˆ ƒ›
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• ’”‹‘” –‘
‹‹–‹ƒ–‹‘ ‘ˆ •—
Š ƒ
–‹˜‹–‹‡•Ǥ Ї ”‘Œ‡
– ƒ’’Ž‹
ƒ–
•ŠƒŽŽ
•ŠƒŽŽ
‘†—
– ƒ ’”‘–‘
‘ŽǦއ˜‡Ž •—”˜‡›
‹
‘ˆ‘”ƒ
‡ ™‹–Š –Ї ̶‡
‘‡†‡† ‹‹‰ ƒ† ‡–Š‘†‘Ž‘‰› ˆ‘” ™ƒ‹•‘̵•

ƒ™ ‡•–‹‰ —”˜‡›• ‹ ƒŽ‹ˆ‘”‹ƒ̵• ‡–”ƒŽ ƒŽŽ‡›ǡ̶ ™ƒ‹•‘̵• ƒ™ ‡
А‹
ƒŽ
†˜‹•‘”› ‘‹––‡‡ ሺሻ ሺŠ––’•ǣȀȀ™™™Ǥ™‹Ž†Ž‹ˆ‡Ǥ
ƒǤ‰‘˜Ȁ
‘•‡”˜ƒ–‹‘Ȁ•—”˜‡›Ǧ
’”‘–‘
‘Ž•͓͵͹͹ʹͺͳʹͺͶǦ„‹”†•ሻ ሺƒ› ͵ͳǡ ʹͲͲͲሻǡ Ї”‡„› ‹
‘”’‘”ƒ–‡† „› ”‡ˆ‡”‡
‡Ǥ Š‹•
’”‘–‘
‘Ž ’”‡•
”‹„‡• ‹‹— •–ƒ†ƒ”†• ˆ‘” •—”˜‡› ‡“—‹’‡–ǡ ‘†‡ ‘ˆ •—”˜‡›ǡ ƒ‰Ž‡ ƒ† †‹•–ƒ
‡ –‘ –”‡‡ǡ •’‡‡†ǡ ˜‹•—ƒŽ ƒ† ƒ—†‹„އ
Ž—‡•ǡ †‹•–”ƒ
–‹‘•ǡ ‘–‡• ƒ†
‘„•‡”˜ƒ–‹‘•ǡ ƒ† –‹‹‰
 ™”‹––‡ ”‡’‘”– ™‹–Š –
‘ˆ •—”˜‡›•Ǥ
Ї ’”‡Ǧ
‘•–”—
–‹‘ •— ˜‡› ” ”‡•—Ž–• —•– „‡ ’ ‘ ‹ † ‘ ” ˜ †‡ – –Ї
Žƒ‹‰ ‡’ƒ”–‡– ƒ†   ™‹–Š‹ ͵Ͳ †ƒ›• ‘ˆ
‘‡
‡‡– ‘ˆ

‘•–”—
–‹‘Ǧ”‡Žƒ–‡† ƒ
–‹˜‹–‹‡•Ǥ Ї ”‡’‘”– •ŠƒŽŽ ‹
Ž—†‡ǣ
–Ї
–Ї †ƒ–‡ ‘ˆ –Ї ”‡’‘”–ǡ
ƒ—–Š‘”• ƒ† ƒˆˆ‹Ž‹ƒ–‹‘•ǡ
‘–ƒ
– ‹ˆ‘”ƒ–‹‘ǡ ‹–”‘†—
–‹‘ǡ ‡–Š‘†•ǡ •–—†› Ž‘
ƒ–‹‘ǡ
‹
Ž—†‹‰ ƒ ƒ’ǡ ”‡•—Ž–•ǡ †‹•
—••‹‘ǡ ƒ† Ž‹–‡”ƒ–—”‡
‹–‡†Ǥ

ˆ –Ї ”‡“—‹”‡† ’”‘–‘
‘Ž •—”˜‡›• •Š‘™ –Ї”‡ ƒ”‡ ‘ ƒ
–‹˜‡ ™ƒ‹•‘̵• Šƒ™ ‡•–•
™‹–Š‹ ͲǤͷ ‹Ž‡• ‘ˆ
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ –Ї ‘ ˆ—”–Ї” ‹–‹‰ƒ–‹‘ ˆ‘” ‡•–
†‹•–—”„ƒ
‡ ™‹ŽŽ „‡ ”‡“—‹”‡†Ǥ
ˆ ’”‘–‘
‘Ž •—”˜‡›• •Š‘™ –Šƒ– –Ї”‡ ƒ”‡ ‘ ƒ
–‹˜‡
™ƒ‹•‘̵• Šƒ™ ‡•–• ™‹–Š‹ ͳͲ ‹Ž‡• ‘ˆ –Ї •‹–‡ǡ –Ї ‘ ˆ—”–Ї” ‹–‹‰ƒ–‹‘ ˆ‘” ˆ‘”ƒ‰‹‰ ‹’ƒ
–• ™‹ŽŽ „‡ ”‡“—‹”‡†Ǥ
„Ǥ ‡•– ˜‘‹†ƒ
‡Ǥ
ˆ ‡•–‹‰ ™ƒ‹•‘̵• Šƒ™• ƒ”‡ ‘„•‡”˜‡† ™‹–Š‹ ͲǤͷ ‹Ž‡• ‘ˆ –Ї ”‘Œ‡
– •‹–‡ †—”‹‰ –Ї ’”
’”‡Ǧƒ’’”‘˜‡† ‹–‹‰ƒ–‹‘
‘–‘
‘Ž •—”˜‡›•ǡ –Ї ”‘Œ‡
– ƒ’’Ž‹
ƒ– —•– ‹’އ‡–  
‡ƒ•—”‡• ‹
Ž—†‡ǣ
 ‡ƒ•—”‡• –‘ ƒ˜‘‹† ‡•– ‹’ƒ
–• †—”‹‰
‘•–”—
–‹‘Ǥ Ї•‡
x ŽŽ ”‘Œ‡
–Ǧ”‡Žƒ–‡† ƒ
–‹˜‹–‹‡• ™‹–Š –Ї ’‘–‡–‹ƒŽ –‘
ƒ—•‡ ‡•– ƒ„ƒ†‘‡– ‘”
ˆ‘”
‡† ˆŽ‡†‰‹‰ ‘ˆ ›‘—‰ •ŠƒŽŽ „‡ ƒ˜‘‹†‡† —–‹Ž –Ї ›‘—‰ Šƒ˜‡ ˆŽ‡†‰‡†Ǥ x
ˆ †‹•–—”„ƒ
‡•ǡ Šƒ„‹–ƒ–
‘˜‡”•‹‘•ǡ ‘” ‘–Ї” ”‘Œ‡
–Ǧ”‡Žƒ–‡† ƒ
–‹˜‹–‹‡• –Šƒ– ƒ›

ƒ—•‡ ‡•– ƒ„ƒ†‘‡– ‘” ˆ‘”
‡† ˆŽ‡†‰‹‰ ƒ”‡ ‡
‡••ƒ”›ǡ ™‹–Š‹ –Ї ‡•–
’”‘–‡
–‹‘ „—ˆˆ‡” œ‘‡ ሺͲǤͷǦ‹Ž‡ሻǡ ‘‹–‘”‹‰ ‘ˆ –Ї ‡•– •‹–‡ „› ƒ “—ƒŽ‹ˆ‹‡† ”ƒ’–‘” „‹‘Ž‘‰‹•–ǡ ˆ—†‡† „› –Ї ”‘Œ‡
– ƒ’’Ž‹
ƒ–ǡ •ŠƒŽŽ „‡ ”‡“—‹”‡† –‘ †‡–‡”‹‡ ‹ˆ –
‡•– ‹• ƒ„ƒ†‘‡†Ǥ
ˆ –Ї ‡•– ‹• ƒ„ƒ†‘‡†ǡ „—– –Ї ‡•–Ž‹‰• ƒ”‡ •–‹ŽŽ ƒŽ‹˜‡ǡ – Ї
Ї
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-42

Initial Study
”‘Œ‡
– ’”‘’‘‡– ‹• ”‡“—‹”‡† –‘ ˆ—† –Ї ”‡
‘˜‡”› ƒ† Šƒ
‹‰ǡ –Šƒ– ‹•ǡ –Ї

‘–”‘ŽŽ‡† ”‡Ž‡ƒ•‡ ‘ˆ
ƒ’–‹˜‡Ǧ”‡ƒ”‡† ›‘—‰ǡ ‘ˆ –Ї ‡•–Ž‹‰Ǥ
x Ї ”‘Œ‡
– ƒ’’Ž‹
ƒ– •ŠƒŽŽ „‡ ”‡“—‹”‡† –‘
‘‘”†‹ƒ–‡ ™‹–Š   –‘ †‡–‡”‹‡ ‹ˆ
”‘Œ‡
– ƒ
–‹˜‹–‹‡• ™‹–Š –Ї ’‘–‡–‹ƒŽ –‘
ƒ—•‡ †‹•–—”„ƒ
‡ –‘ ‡•–‹‰ ™ƒ‹•‘̵•
Šƒ™• ™‹–Š‹ –Ї ͲǤͷǦ‹Ž‡ „—ˆˆ‡” ƒ› ’”‘
‡‡† ™‹–Š ƒ ”‡†—
‡† ‡•– „—ˆˆ‡” ƒ† ƒ
ƒ’’”‘˜‡† „‹‘Ž‘‰‹
ƒŽ ‘‹–‘”Ǥ   ƒ› ƒ—–Š‘”‹œ‡ ƒ ”‡†—
‡† ‡•– „—ˆˆ‡” ™‹–Š –Ї
’”‡•‡
‡ ‘ˆ ƒ ‘‹–‘”‹‰ „‹‘Ž‘‰‹•– †—”‹‰
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• –‘ ‡•—”‡ –Šƒ–
–Ї ‡•– ‹• ‘– †‹•–—”„‡†Ǥ ‘—–‹‡ †‹•–—”„ƒ
‡• •—
Š ƒ• ƒ‰”‹
—Ž–—”ƒŽ ƒ
–‹˜‹–‹‡•ǡ

‘—–‡” –”ƒˆˆ‹
ǡ ƒ† ”‘—–‹‡ ƒ‹–‡ƒ
‡ ƒ
–‹˜‹–‹‡• ™‹–Š‹ ͲǤͷ ‹Ž‡• ‘ˆ ƒ ƒ
–‹˜‡
‡•– ƒ”‡ ‘– ’”‘Š‹„‹–‡†Ǥ
 
Ǧ͹ǣ ”‹‘” –‘ –Ї ‹‹–‹ƒ–‹‘ ‘ˆ
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ ƒŽŽ
‘•–”—
–‹‘ ’‡”•‘‡Ž •ŠƒŽŽ
ƒ––‡† ƒ ‘”‡” ˜‹”‘‡–ƒŽ ™ƒ”‡‡•• ”ƒ‹‹‰ ’”‘‰”ƒ †‡˜‡Ž‘’‡† „› ƒ “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•–Ǥ › ’‡”•‘‡Ž ƒ••‘
‹ƒ–‡† ™‹–Š
‘•–”—
–‹‘ –Šƒ– †‹† ‘– ƒ––‡† –Ї ‹‹–‹ƒŽ –”ƒ‹‹‰
•ŠƒŽŽ „‡ –”ƒ‹‡† „› –Ї ƒ—–Š‘”‹œ‡† „‹‘Ž‘‰‹•– ‘” ƒ—–Š‘”‹œ‡† ‘•–”—
–‹‘ ’‡”•‘‡Ž ’”‹‘” –‘

™‘”‹‰ ™‹–Š‹ –Ї ”‘Œ‡
– ƒ”‡ƒǤ › ‡’Ž‘›‡‡ ”‡•’‘•‹„އ ˆ‘” –Ї ‘’‡”ƒ–‹‘•ǡ ƒ‹–‡ƒ ‡ǡ

‘” †‡
‘‹••‹‘‹‰ ‘ˆ ”‘Œ‡
– ˆƒ
‹Ž‹–‹‡• •ŠƒŽŽ ƒ––‡† –Ї ‘”‡”

”ƒ‹‹‰ ’”‘‰”ƒ ’”‹‘” –‘ •–ƒ”–‹‰ ™‘” ‘ –Ї ”‘Œ‡
–Ǥ ŽŽ ‘
˜‹”‘‡–ƒŽ ™ƒ”‡‡••
Ǧ•‹–‡ ™‘”‡”• •ŠƒŽŽ ƒ––‡†

–”ƒ‹‹‰ ‘ ƒ ƒ—ƒŽ „ƒ•‹•Ǥ Ї ”‘‰”ƒ •ŠƒŽŽ „‡ †‡˜‡Ž‘’‡† ƒ† ’”‡•‡–‡† „› –Ї ”‘Œ‡ –̵•

“—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•–ሺ•ሻ ‘” †‡•‹‰‡‡ ƒ’’”‘˜‡† „› –Ї “—ƒŽ‹ˆ‹‡† „‹‘Ž‘‰‹•–ሺ•ሻǤ Ї ’”‘‰”ƒ •ŠƒŽŽ

‹
Ž—†‡ ‹ˆ‘”ƒ–‹‘ ƒ„‘—– –Ї Ž‹ˆ‡ Š‹•–‘”‹‡• ‘ˆ –ƒ–‡ ‘” ˆ‡†‡”ƒŽŽ› Ž‹•–‡† •’‡ ‹‡• ™‹–Š ’‘–‡–‹ƒŽ

–‘ ‘

—” ‹ –Ї ”‘Œ‡
– ƒ”‡ƒǡ –Ї‹” އ‰ƒŽ •–ƒ–—•ǡ
‘—”•‡ ‘ˆ ƒ
–‹‘ •Š‘—ކ –Ї•‡ •’‡
‹‡• „‡

‡
‘—–‡”‡† ‘Ǧ•‹–‡ǡ ƒ† ƒ˜‘‹†ƒ
‡ ƒ† ‹‹‹œƒ–‹‘ ‡ƒ•—”‡• –‘ ’”‘–‡
– –Ї•‡ •’‡
‹‡•Ǥ Ї

–”ƒ‹‹‰ •ŠƒŽŽ ‹
Ž—†‡ –Ї ˆ‘ŽŽ‘™‹‰
‘’‘‡–•ǣ

ƒǤ
ˆ‘”ƒ–‹‘ ƒ„‘—– –Ї Ž‹ˆ‡ Š‹•–‘”› ƒ† ‹†‡–‹ˆ‹
ƒ–‹‘ ‘ˆ ˆ‡†‡”ƒŽŽ› Ž‹•–‡† ’Žƒ– ƒ†

™‹Ž†Ž‹ˆ‡ •’‡
‹‡•ǡ ƒ• ™‡ŽŽ ƒ• ‘–Ї” •’‡
‹ƒŽǦ•–ƒ–—• ’Žƒ– ƒ† ™‹Ž†Ž

ƒˆˆ‡
–‡† „› ”‘Œ‡
– ƒ
–‹˜‹–‹‡•Ǥ Ї ’”‘‰”ƒ •ŠƒŽŽ ’”‡•‡– –Ї Ž
‹ˆ‡ •’‡
‹‡• –Šƒ– ƒ› „‡
‡‰ƒŽ ’”‘–‡
‹‘ – •–ƒ–—• ‘ˆ
‡ƒ
Š •—
Š •’‡
‹‡•ǡ –Ї †‡ˆ‹‹–‹‘ ‘ˆ Dz–ƒ‡dz —†‡” –Ї ‡ †‡”ƒŽ †ƒ‰‡”‡† ’‡ ‹‡• 
–
ƒ† ƒŽ‹ˆ‘”‹ƒ †ƒ‰‡”‡† ’‡
‹‡• 
–ǡ ‡ƒ•—”‡• –Ї ”‘Œ‡
– ’”‘’‘‡–Ȁ‘’‡”ƒ–‘”
•ŠƒŽŽ ‹’އ‡– –‘ ’”‘–‡
– –Ї •’‡
‹‡•ǡ ”‡’‘”–‹‰ ”‡“—‹”‡‡–•ǡ •’‡
‹ˆ‹
‡ƒ•—”‡• ˆ‘”
™‘”‡”• –‘ ƒ˜‘‹† –ƒ‡ ‘ˆ •’‡
‹ƒŽǦ•–ƒ–—• ’Žƒ– ƒ† ™‹Ž†Ž‹ˆ‡ •’‡
‹‡•ǡ ƒ† ’‡ƒŽ–‹‡• ˆ‘”
˜‹‘Žƒ–‹‘ ‘ˆ ”‘Œ‡
– ’‡”‹–• ‘” ‘–Ї” ”‘Œ‡
–Ǧ”‡Žƒ–‡† ‡˜‹”‘‡–ƒŽ ‡ƒ•—”‡•Ǥ
„Ǥ  ƒ
‘™Ž‡†‰‡‡– ˆ‘” •‹‰‡† „› ‡ƒ
Š ™‘”‡” ‹†‹
ƒ–‹‰ –Šƒ– –Ї ‘”‡”
˜‹”‘‡–ƒŽ ™ƒ”‡‡•• ”ƒ‹‹‰ ƒ† †—
ƒ–‹‘ ’”‘‰”ƒ Šƒ• „‡‡
‘’އ–‡† •ŠƒŽŽ
„‡ ‡’– ‘ ˆ‹Ž‡ ƒ– –Ї
‘•–”—
–‹‘ •‹–‡Ǥ

Ǥ 
‘’› ‘ˆ –Ї –”ƒ‹‹‰ –”ƒ•
”‹’– ƒ†Ȁ‘” –”ƒ‹‹‰ ˜‹†‡‘ǡ ƒ• ™‡ŽŽ ƒ• ƒ Ž‹•– ‘ˆ –Ї ƒ‡• ‘ˆ ƒŽŽ ’‡”•‘‡Ž ™Š‘ ƒ––‡†‡† –Ї ‘”‡” ˜‹”‘‡–ƒŽ ™ƒ”‡‡•• ”ƒ‹‹‰ ƒ† †—
ƒ–‹‘ ’”‘‰”ƒǡ ƒ† •‹‰‡† ƒ
‘™Ž‡†‰‡‡– ˆ‘”•ǡ •ŠƒŽŽ „‡ •—„‹––‡† –‘ –Ї

‘–”ƒ
–‘”ǯ•
‘•–”—
–‹‘ ƒƒ‰‡” ‘” ‘Ǧ•‹–‡ •—’‡”‹–‡†‡–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-43

Initial Study
†Ǥ 
‘’› ‘ˆ –Ї –”ƒ‹‹‰ –”ƒ•
”‹’–ǡ –”ƒ‹‹‰ ˜‹†‡‘ ‘” ‹ˆ‘”ƒ–‹‘ƒŽ „‹†‡” ˆ‘” •’‡
‹ˆ‹

’”‘
‡†—”‡• •ŠƒŽŽ „‡ ‡’– ƒ˜ƒ‹Žƒ„އ ˆ‘” ƒŽŽ ’‡”•‘‡Ž –‘ ”‡˜‹‡™ ƒ† „‡ ˆƒ‹Ž‹ƒ” ™‹–Šǡ ƒ• ‡
‡••ƒ”›Ǥ
‡Ǥ Ї
‘•–”—
–‹‘
”‡™• ƒ†
‘–”ƒ
–‘”ሺ•ሻ •ŠƒŽŽ „‡ ”‡•’‘•‹„އ ˆ‘” ’”‡˜‡–‹‰
—ƒ—–Š‘”‹œ‡† ‹’ƒ
–• ˆ”‘ ”‘Œ‡
– ƒ
–‹˜‹–‹‡• –‘ •‡•‹–‹˜‡ „‹‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• –Šƒ– ƒ”‡
‘—–•‹†‡ –Ї ƒ”‡ƒ• †‡ˆ‹‡† ƒ• •—„Œ‡
– –‘ ‹’ƒ
–• „› ”‘Œ‡
– ’‡”‹–•Ǥ ƒ—–Š‘”‹œ‡†
‹’ƒ
–• ƒ› ”‡•—Ž– ‹ ”‘Œ‡
– •–‘’’ƒ‰‡ǡ ƒ†Ȁ‘” ˆ‹‡• †‡’‡†‹‰ ‘ –Ї ‹’ƒ
– ƒ†

‘‘”†‹ƒ–‹‘ ™‹–Š –Ї ƒ’’”‘’”‹ƒ–‡ –ƒ–‡ ‘” ˆ‡†‡”ƒŽ „‹‘Ž‘‰‹ ƒŽ ƒ‰‡
›Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ Š ‘ ‘ Ǥ – ‹–  ‹‰ƒ–‹ ‹ ’ ” ‡† ™ ‹–
‘” ƒ–

’ƒ
’ƒ
– ͓͵ǤͶǤͶ„ Ȃ ‘—ކ –Ї ”‘Œ‡
– Šƒ˜‡ ƒ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ‡ˆˆ‡
– ‘ ƒ› ”‹’ƒ”‹ƒ Šƒ„‹–ƒ–
‘” ‘–Ї” •‡•‹–‹˜‡ ƒ–—”ƒŽ
‘—‹–› ‹†‡–‹ˆ‹‡† ‹ Ž‘
ƒŽ ‘” ”‡‰‹‘ƒŽ ’Žƒ•ǡ ’‘Ž‹
‹‡•ǡ
”‡‰—Žƒ–‹‘•ǡ ‘” „› –Ї ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ‘” ǤǤ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ‡”˜‹
‡ǫ
‡•‹–‹˜‡ ƒ–—”ƒŽ
‘—‹–‹‡• ƒ”‡ †‡•‹‰ƒ–‡† „› ˜ƒ”‹‘—• ”‡•‘—”
‡ ƒ‰‡
‹‡•ǡ ‹
Ž—†‹‰ –Ї
ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ሺ ሻǡ  ǡ —”‡ƒ— ‘ˆ ƒ† ƒƒ‰‡‡– ሺሻǡ ǤǤ ‘”‡•– ‡”˜‹
‡ ሺ ሻǡ ‘” ƒ”‡ †‡•‹‰ƒ–‡† „› Ž‘
ƒŽ ƒ‰‡
‹‡• –Š”‘—‰Š ’‘Ž‹
‹‡•ǡ
‘”†‹ƒ
‡•ǡ ƒ† ”‡‰—Žƒ–‹‘•Ǥ
Ї”‡ ‹• ‘ ”‹’ƒ”‹ƒ Šƒ„‹–ƒ– ‘” •‡•‹–‹˜‡ ƒ–—”ƒŽ
‘—‹–‹‡• ™‹–Š‹ –Ї ”‘Œ‡
– „‘—†ƒ”‹‡•ǡ
ƒ† ‘ ’”‘–‡
–‡† Šƒ„‹–ƒ–• ™‡”‡ ‘„•‡”˜‡† †—”‹‰ –Ї •—”˜‡›Ǥ Ї”‡ˆ‘”‡ǡ –Ї”‡ ™‘—ކ „‡ ‘ ‹’ƒ
–•Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ

’ƒ
– ͓͵ǤͶǤͶ
Ȃ ‘—ކ –Ї ”‘Œ‡
– Šƒ˜‡ ƒ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ‡ˆˆ‡
– ‘ –ƒ–‡ ‘” ˆ‡†‡”ƒŽŽ›
’”‘–‡
–‡† ™‡–Žƒ†• ሺ‹
Ž—†‹‰ǡ „—– ‘– Ž‹‹–‡† –‘ǡ ƒ”•Šǡ ˜‡”ƒŽ ’‘‘Žǡ
‘ƒ•–ƒŽǡ ‡–
Ǥሻ –Š”‘—‰Š
†‹”‡
– ”‡‘˜ƒŽǡ ˆ‹ŽŽ‹‰ǡ Š›†”‘Ž‘‰‹
ƒŽ ‹–‡””—’–‹‘ǡ ‘” ‘–Ї” ‡ƒ•ǫ
Ї ǤǤ ”› ‘”’• ‘ˆ ‰‹‡‡”• ሺሻ Šƒ• ”‡‰—Žƒ–‘”› ƒ—–Š‘”‹–› ‘˜‡” –Ї އƒ ƒ–‡” 
– ሺሻǡ ƒ• ’”‘˜‹†‡† ˆ‘” „› –Ї ˜‹”‘‡–ƒŽ ”‘–‡
–‹‘ ‰‡
› ሺሻǤ Ї  Šƒ•
‡•–ƒ„Ž‹•Ї† •’‡
‹ˆ‹

”‹–‡”‹ƒ ˆ‘” –Ї †‡–‡”‹ƒ–‹‘ ‘ˆ ™‡–Žƒ†• „ƒ•‡† ‘ –Ї ’”‡•‡ ‡ ‘ˆ
™‡–Žƒ† Š›†”‘Ž‘‰›ǡ Š›†”‹
•‘‹Ž•ǡ ƒ† Š›†”‘’Ћދ
˜‡‰‡–ƒ–‹‘Ǥ Ї”‡ ƒ”‡ ‘ ˆ‡†‡”ƒŽŽ› ’”‘–‡
–‡†
™‡–Žƒ†• ‘” ˜‡”ƒŽ ’‘‘Ž• –Šƒ– ‘

—” ™‹–Š‹ –Ї ”‘Œ‡
–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-44

Initial Study
‡–Žƒ†•ǡ •–”‡ƒ•ǡ ”‡•‡”˜‘‹”•ǡ •Ž‘—‰Š•ǡ ƒ† ’‘†• –›’‹
ƒŽŽ› ‡‡– –Ї
”‹–‡”‹ƒ ˆ‘” ˆ‡†‡”ƒŽ
Œ—”‹•†‹
–‹‘ —†‡” ‡
–‹‘ ͶͲͶ ‘ˆ –Ї  ƒ† –ƒ–‡ Œ—”‹•†‹
–‹‘ —†‡” –Ї ‘”–‡”Ǧ‘Ž‘‰‡
ƒ–‡” —ƒŽ‹–› ‘–”‘Ž 
–Ǥ –”‡ƒ• ƒ† ’‘†• –›’‹
ƒŽŽ› ‡‡– –Ї
”‹–‡”‹ƒ ˆ‘” –ƒ–‡
Œ—”‹•†‹
–‹‘ —†‡” ‡
–‹‘ ͳ͸Ͳʹ ‘ˆ –Ї ƒŽ‹ˆ‘”‹ƒ ‹•Š ƒ† ƒ‡ ‘†‡Ǥ Ї”‡ ƒ”‡ ‘ ‹†‡–‹ˆ‹‡† ™ƒ–‡” ˆ‡ƒ–—”‡•ǡ ˆ‡†‡”ƒŽ ™ƒ–‡”•ǡ ‘” ™‡–Žƒ†• Ž‘
ƒ–‡† ‘ ‘” ‡ƒ” –Ї ”‘Œ‡
–ǡ ƒ† –Ї”‡ ™‘—ކ
„‡ ‘ ‹’ƒ
–•Ǥ
Ї ƒ–‹‘ƒŽ ‡–Žƒ†•
˜‡–‘”› ሺ
ሻ ƒ† ƒ–‹‘ƒŽ
›†”‘‰”ƒ’Š› ƒ–ƒ•‡– ሺ
ሻ †‹† ‘–
‹†‡–‹ˆ› ƒ› ˆ‡ƒ–—”‡• ™‹–Š‹ –Ї ”‘Œ‡
– •‹–‡Ǥ Ї „‹‘Ž‘‰‹
ƒŽ •—”˜‡› †‹† ‘– ‹†‡–‹ˆ› ƒ› ‘–Ї”
ˆ‡ƒ–—”‡• ‘ ‘” ‡ƒ” –Ї ”‘Œ‡
– –Šƒ– ™‘—ކ ‡‡– –Ї
”‹–‡”‹ƒ ˆ‘” ‡‹–Ї” ˆ‡†‡”ƒŽ ‘” –ƒ–‡
Œ—”‹•†‹
–‹‘Ǥ
‘™‡˜‡”ǡ –Ї —––‘™‹ŽŽ‘™ ‹–
Šǡ ™Š‹
Š ‹• ‹†‡–‹ˆ‹‡† ƒ• ƒ „Ž—‡Ž‹‡ ”—‹‰ ƒŽ‘‰
–Ї ™‡•–‡”Ž› •‹–‡ „‘—†ƒ”›ǡ ™‹ŽŽ „‡ —†‡”‰”‘—† ƒ

‘”†‹‰ –‘ ‹–› ”‡“—‹”‡‡–•Ǥ ‘
Œ—”‹•†‹
–‹‘ƒŽ †‡Ž‹‡ƒ–‹‘ ‘ˆ –Ї †‹–
Š ™ƒ•
‘’އ–‡†Ǥ  †‡Ž‹‡ƒ–‹‘ ‡‡–‹‰ –ƒ–‡ ƒ† ˆ‡†‡”ƒŽ
”‡“—‹”‡‡–• ™‘—ކ „‡
‘†—
–‡† –‘ †‡–‡”‹‡ ‹ˆ –Ї †‹–
Š ‡‡–• –Ї
”‹–‡”‹ƒ ˆ‘” ‡‹–Ї”
ˆ‡†‡”ƒŽ ‘” –ƒ–‡ Œ—”‹•†‹
–‹‘Ǥ  
Ǧͺ ”‡“—‹”‡• ƒ †‡Ž‹‡ƒ–‹‘ ƒ† ƒ ˆ‘”ƒŽ ‘–‹ˆ‹
ƒ–‹‘ ‘ˆ –Ї
’”‘Œ‡
– –‘ „‡ •—„‹––‡† –‘ –Ї ’‡”–‹‡– ”‡‰—Žƒ–‘”› ƒ‰‡
‹‡• ’”‹‘” –‘ –Ї ‹••—ƒ
‡ ‘ˆ ‰”ƒ†‹‰
’‡”‹–•Ǥ
 –Ї ‡˜‡– †”ƒ‹ƒ‰‡ ‹• Œ—”‹•†‹
–‹‘ƒŽǡ ƒ††‹–‹‘ƒŽ ’‡”‹––‹‰ ™‹–Š –Ї ƒ’’”‘’”‹ƒ–‡
”‡‰—Žƒ–‘”› ƒ‰‡
‹‡• ‹• ƒŽ•‘ ”‡“—‹”‡† ’”‹‘” –‘
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•Ǥ ‹–Š –Ї ‹’އ‡–ƒ–‹‘
‘ˆ  
Ǧͺǡ –Ї ‹’ƒ
– ‘ˆ –Ї ’”‘Œ‡
– ”‡Žƒ–‡† –‘ ™ƒ–‡” ˆ‡ƒ–—”‡• ™‘—ކ „‡ އ•• –Šƒ
•‹‰‹ˆ‹
ƒ–Ǥ


‘”†‹‰Ž›ǡ –Ї”‡ ƒ”‡ ‘ ™‡–Žƒ†• ‘” ƒ–‡”• ‘ˆ –Ї ǤǤ ‘

—””‹‰ ‘ –Ї ”‘Œ‡
– •‹–‡Ǥ Ї”‡
™‘—ކ „‡ ‘ ‹’ƒ
– –‘ ‡†‡”ƒŽŽ› ‘” –ƒ–‡ ’”‘–‡
–‡† ™‡–Žƒ†• ‘” ™ƒ–‡”™ƒ›• ƒ• ƒ ”‡•—Ž– ‘ˆ –Ї
’”‘’‘•‡† ”‘Œ‡
–Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ‘ ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
 
Ǧͺǣ ”‹‘” –‘ –Ї ‹••—ƒ
‡ ‘ˆ ƒ› ‰”ƒ†‹‰ ‘” „—‹Ž†‹‰ ’‡”‹–ǡ –Ї ”‘Œ‡
–
’”‘’‘‡–Ȁ†‡˜‡Ž‘’‡” •ŠƒŽŽ
‘†—
– ƒ †‡Ž‹‡ƒ–‹‘ ‘ˆ –Ї —––‘™‹ŽŽ‘™ ‹–
Šǡ ƒ† ’”‡’ƒ”‡ ƒ
“—ƒ–‹
‡•‘—”
‡• ‡Ž‹‡ƒ–‹‘ ‡’‘”– ሺሻǤ Ї  •ŠƒŽŽ „‡ •—„‹––‡† ™‹–Š ƒ ˆ‘”ƒŽ ‘–‹ˆ‹
ƒ–‹‘ –‘ –Ї  ”› ‘”’• ‘ˆ ‰‹‡‡”• ሺሻǡ ƒ–‡” ‡•‘—” ‡• ‘–”‘Ž ‘ƒ”†
ሺሻǡ ƒ† ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ሺ ሻǤ ˆ ‘
‘‡–• ‘”
”‡“—‡•–• ˆ‘” ƒ††‹–‹‘ƒŽ ’‡”‹––‹‰ ƒ”‡ ”‡
‡‹˜‡† „› –Ї ƒ‰‡
‹‡•ǡ ‘ ˆ—”–Ї” ƒ
–‹‘ ‹•
‡
‡••ƒ”›Ǥ 
‘’› ‘ˆ ƒŽŽ
‘””‡•’‘†‡
‡ •ŠƒŽŽ „‡ •—„‹––‡† –‘ –Ї އƒ† ƒ‰‡
›Ǥ

ˆ ƒ ”‡‰—Žƒ–‘”› ƒ‰‡
›
‘‡–• ‘” ”‡“—‡•–• ƒ††‹–‹‘ƒŽ ’‡”‹––‹‰ǡ –Ї ˆ‘ŽŽ‘™‹‰ ƒ –‹‘•
ƒ› „‡ –ƒ‡Ǥ 
‘’› ‘ˆ ƒŽŽ
‘””‡•’‘†‡
‡ ƒ† •—„•‡“—‡– ’‡”‹––‹‰ ƒ†Ȁ‘” ”‡’‘”–• •ŠƒŽŽ
„‡ ƒ†‡ ƒ˜ƒ‹Žƒ„އ –‘ –Ї ‡ƒ† ‰‡
›Ǥ Ї ”‡’‘”– •ŠƒŽŽ ‹
Ž—†‡ ‹ˆ‘”ƒ–‹‘ ƒ• •Š‘™ „‡Ž‘™ǡ
ƒ• ƒ ’Žƒ ‹ˆ ‡
‡••ƒ”›ǡ ƒ† •ŠƒŽŽ ‘—–Ž‹‡
‘’Ž‹ƒ
‡ ™‹–Š –Ї ˆ‘ŽŽ‘™‹‰ǣ
ƒǤ ‡Ž‹‡ƒ–‹‘ ‘ˆ ƒŽŽ Œ—”‹•†‹
–‹‘ƒŽ ˆ‡ƒ–—”‡• ƒ– –Ї ’”‘Œ‡
– •‹–‡Ǥ ‘–‡–‹ƒŽ Œ—”‹•†‹
–‹‘ƒŽ
ˆ‡ƒ–—”‡• ™‹–Š‹ –Ї ’”‘Œ‡
– „‘—†ƒ”› ‹†‡–‹ˆ‹‡† ‹ –Ї Œ—”‹•†‹
–‹‘ƒŽ †‡Ž‹‡ƒ–‹‘
”‡’‘”– ƒ› „‡ •Š‘™
„Ǥ
ˆ –Ї ”‘Œ‡
– Šƒ• ƒ
‹ ’Žƒ ˆ‘”Ǥ
’‘–‡–‹ƒŽ –‘ †‹”‡
–Ž› ‘” ‹ ‹”‡
–Ž› † ‹’ƒ
– Œ—”‹•†‹
‹‘ƒŽ – ƒ“—ƒ–‹

”‡•‘—”
‡•ǡ ƒ ˆ‘”ƒŽ ƒ“—ƒ–‹
”‡•‘—”
‡ †‡Ž‹‡ƒ–‹‘ ‘ˆ –Ї•‡ ƒ”‡ƒ• •ŠƒŽŽ „‡ ’‡”ˆ‘”‡† „›
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-45
Initial Study
ƒ “—ƒŽ‹ˆ‹‡† ’”‘ˆ‡••‹‘ƒŽ –‘ †‡–‡”‹‡ –Ї ‡š–‡– ‘ˆ ƒ‰‡ › Œ—”‹•†‹
–‹‘ ƒ†
’‡”‹–•Ȁƒ—–Š‘”‹œƒ–‹‘• ˆ”‘ –Ї ƒ’’”‘’”‹ƒ–‡ ”‡‰—Žƒ–‹‰ ƒ‰‡ ‹‡• ሺ‡–”ƒŽ ƒŽŽ‡›
‡‰‹‘ƒŽ ƒ–‡” —ƒŽ‹–› ‘–”‘Ž ‘ƒ”† ሺሻǡ   ƒ†  ”› ‘”’• ‘ˆ ‰‹‡‡”• ሺሻ •ŠƒŽŽ „‡ ‘„–ƒ‹‡† ’”‹‘” –‘ †‹•–—”„ƒ
‡ –‘ Œ—”‹•†‹
–‹‘ƒŽ ˆ‡ƒ–—”‡•Ǥ

ˆ ‹– ‹• †‡–‡”‹‡† –Šƒ– †”ƒ‹ƒ‰‡ ‹• Œ—”‹•†‹
–‹‘ƒŽ ƒ†
ƒ‘– „‡ ƒ˜‘‹†‡†ǡ –Ї ”‘Œ‡
–
’”‘’‘‡– •ŠƒŽŽ ‘„–ƒ‹ ƒ ‡
–‹‘ ͶͲͳ ƒ–‡” —ƒŽ‹–› ‡”–‹ˆ‹
ƒ–‹‘ ˆ”‘ –Ї ǡ ƒ
‡
–‹‘ ͶͲͶ ’‡”‹– ˆ”‘ ǡ ƒ† ƒ ƒ‡ ƒ† –”‡ƒ„‡† Ž–‡”ƒ–‹‘ ‰”‡‡‡– —†‡” ‡
–‹‘ ͳ͸Ͳʹ ˆ”‘ –Ї  ǡ ‹ˆ ”‡“—‹”‡†ǡ ’”‹‘” –‘ ‹’ƒ
–‹‰ ƒ› ™ƒ–‡”•Ǥ
• ’ƒ”– ‘ˆ –Ї•‡ ƒ—–Š‘”‹œƒ–‹‘•ǡ
‘’‡•ƒ–‘”› ‹–‹‰ƒ–‹‘ ƒ› „‡ ”‡“—‹”‡† „› – ‡
”‡‰—Žƒ–‹‰ ƒ‰‡
‹‡• –‘ ‘ˆˆ•‡– –Ї Ž‘•• ‘ˆ ƒ“—ƒ–‹
”‡•‘—”
‡•Ǥ
ˆ •‘ǡ ƒ† ƒ• ’ƒ”– ‘ˆ –
Š
Ї
’‡”‹– ƒ’’Ž‹
ƒ–‹‘ ’”‘
‡••ǡ ƒ “—ƒŽ‹ˆ‹‡† ’”‘ˆ‡••‹‘ƒŽ •ŠƒŽŽ †”ƒˆ– ƒ ‹–‹‰ƒ–‹‘ ƒ† ‘‹–‘”‹‰ Žƒ –‘ ƒ††”‡•• ‹’އ‡–ƒ–‹‘ ƒ† ‘‹–‘”‹‰ ”‡“—‹”‡‡–• —†‡” –Ї ’‡”‹– –‘ ‡•—”‡ –Šƒ– –Ї ”‘Œ‡
– ™‘—ކ ”‡•—Ž– ‹ ‘ ‡– Ž‘•• ‘ˆ Šƒ„‹–ƒ– ˆ—
–‹‘• ƒ†
˜ƒŽ—‡•Ǥ Ї Žƒ •ŠƒŽŽ
‘–ƒ‹ǡ ƒ– ƒ ‹‹—ǡ ‹–‹‰ƒ–‹‘ ‰‘ƒŽ• ƒ† ‘„Œ‡
–‹˜‡•ǡ
‹–‹‰ƒ–‹‘ Ž‘
ƒ–‹‘ǡ ƒ †‹•
—••‹‘ ‘ˆ ƒ
–‹‘• –‘ „‡ ‹’އ‡–‡† –‘ ‹–‹‰ƒ–‡ –Ї ‹’ƒ
–ǡ
‘‹–‘”‹‰ ‡–Š‘†• ƒ† ’‡”ˆ‘”ƒ
‡
”‹–‡”‹ƒǡ ‡š–‡– ‘ˆ ‘‹–‘”‹‰ –‘ „‡
‘†—
–‡†ǡ
ƒ
–‹‘• –‘ „‡ –ƒ‡ ‹ –Ї ‡˜‡– –Šƒ– –Ї ‹–‹‰ƒ–‹‘ ‹• ‘– •—

‡••ˆ—Žǡ ƒ† ”‡’‘”–‹‰
”‡“—‹”‡‡–•Ǥ Ї Žƒ •ŠƒŽŽ „‡ ƒ’’”‘˜‡† „› –Ї ƒ’’”‘’”‹ƒ–‡ ”‡‰—Žƒ–‹‰ ƒ‰‡ ‹‡•ǡ ƒ†

‘’‡•ƒ–‘”› ‹–‹‰ƒ–‹‘ •ŠƒŽŽ –ƒ‡ ’Žƒ
‡ ‡‹–Ї” ‘Ǧ•‹–‡ ‘” ƒ– ƒ ƒ’’”‘’”‹ƒ–‡ ‘ˆˆǦ•‹–‡
Ž‘
ƒ–‹‘Ǥ

Ǥ › ƒ–‡”‹ƒŽȀ•’‘‹Ž• ‰‡‡”ƒ–‡† ˆ”‘ ’”‘Œ‡
– ƒ
–‹˜‹–‹‡•
‘–ƒ‹‹‰ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ•
•ŠƒŽŽ „‡ Ž‘
ƒ–‡† ƒ™ƒ› ˆ”‘ Œ—”‹•†‹
–‹‘ƒŽ ƒ”‡ƒ• ‘” •’‡
‹ƒŽǦ•–ƒ–—• Šƒ„‹–ƒ– ƒ† ’”‘–‡
–‡†
ˆ”‘ •–‘” ™ƒ–‡” ”—Ǧ‘ˆˆ —•‹‰ –‡’‘”ƒ”› ’‡”‹‡–‡” •‡†‹‡– „ƒ””‹‡”• •— Š ƒ•
„‡”•ǡ •‹Ž– ˆ‡
‡•ǡ ˆ‹„‡” ”‘ŽŽ•ǡ
‘˜‡”•ǡ •ƒ†Ȁ‰”ƒ˜‡Ž „ƒ‰•ǡ ƒ† •–”ƒ™ „ƒŽ‡ „ƒ””‹‡”•ǡ ƒ•
ƒ’’”‘’”‹ƒ–‡Ǥ ”‘–‡
–‹‘ ‡ƒ•—”‡• •Š‘—ކ ˆ‘ŽŽ‘™ ’”‘Œ‡
–Ǧ•’‡
‹ˆ‹

”‹–‡”‹ƒ ƒ• †‡˜‡Ž‘’‡†
‹ ƒ –‘”™ƒ–‡” ‘ŽŽ—–‹‘ ”‡˜‡–‹‘ ƒ† ”‘–‡
–‹‘ Žƒ ሺሻǤ
†Ǥ “—‹’‡–
‘–ƒ‹‹‰ Šƒœƒ”†‘—• Ž‹“—‹† ƒ–‡”‹ƒŽ• •ŠƒŽŽ „‡ •–‘”‡† ‘ ‹’‡”˜‹‘—• •—”ˆƒ
‡• ‘” ’Žƒ•–‹
‰”‘—†
‘˜‡”• –‘ ’”‡˜‡– ƒ› •’‹ŽŽ• ‘” އƒƒ‰‡ ˆ”‘
‘–ƒ‹ƒ–‹‰
–Ї ‰”‘—† ƒ† ƒ– އƒ•– ͷͲ ˆ‡‡– ‘—–•‹†‡ –Ї †‡Ž‹‡ƒ–‡† „‘—†ƒ”› ‘ˆ Œ—”‹•†‹ –‹‘ƒŽ
™ƒ–‡” ˆ‡ƒ–—”‡•Ǥ
‡Ǥ › •’‹ŽŽƒ‰‡ ‘ˆ ƒ–‡”‹ƒŽ •ŠƒŽŽ „‡ •–‘’’‡† ‹ˆ ‹–
ƒ „‡ †‘‡ •ƒˆ‡Ž›Ǥ Ї
‘–ƒ‹ƒ–‡†
ƒ”‡ƒ •ŠƒŽŽ „‡
އƒ‡†ǡ ƒ† ƒ›
‘–ƒ‹ƒ–‡† ƒ–‡”‹ƒŽ• ’”‘’‡”Ž› †‹•’‘•‡†Ǥ ‘” ƒŽŽ
•’‹ŽŽ•ǡ –Ї ’”‘Œ‡
– ˆ‘”‡ƒ ‘” †‡•‹‰ƒ–‡† ‡˜‹”‘‡–ƒŽ ”‡’”‡•‡–ƒ–‹˜‡ •ŠƒŽŽ „‡ ‘–‹ˆ‹‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‹– ‘
‘” ‘ ƒ– Ǥ –  ‹ ” ‹– ‹‰ƒ–‹ ’ ‡†
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-46

Initial Study

’ƒ
– ͓͵ǤͶǤͶ† Ȃ ‘—ކ –Ї ”‘Œ‡
– ‹–‡”ˆ‡”‡ •—„•–ƒ–‹ƒŽŽ› ™‹–Š –Ї ‘˜‡‡– ‘ˆ ƒ› ƒ–‹˜‡ ”‡•‹†‡– ‘” ‹‰”ƒ–‘”› ˆ‹•Š ‘” ™‹Ž†Ž‹ˆ‡ •’‡
‹‡•ǡ ‘” ™‹–Š ‡•–ƒ„Ž‹•Ї† ƒ–‹˜‡ ”‡•‹†‡– ‘”
‹‰”ƒ–‘”› ™‹Ž†Ž‹ˆ‡
‘””‹†‘”•ǡ ‘” ‹’‡†‡ –Ї —•‡ ‘ˆ ƒ–‹˜‡ ™‹Ž†Ž‹ˆ‡ —”•‡”› •‹–‡•ǫ ‹Ž†Ž‹ˆ‡ ‘˜‡‡–
‘””‹†‘”•ǡ ƒŽ•‘ ”‡ˆ‡””‡† –‘ ƒ• †‹•’‡”•ƒŽ
‘””‹†‘”• ‘” Žƒ†•
ƒ’‡ Ž‹ƒ‰‡•ǡ
ƒ”‡ ‰‡‡”ƒŽŽ› †‡ˆ‹‡† ƒ• Ž‹‡ƒ” ˆ‡ƒ–—”‡• ƒŽ‘‰ ™Š‹
Š ƒ‹ƒŽ•
ƒ –”ƒ˜‡Ž ˆ”‘ ‘‡ Šƒ„‹–ƒ– ‘”
”‡•‘—”
‡ ƒ”‡ƒ –‘ ƒ‘–Ї”Ǥ ‹Ž†Ž‹ˆ‡ ‘˜‡‡–
‘””‹†‘”•
ƒ „‡ Žƒ”‰‡ –”ƒ
–• ‘ˆ Žƒ† –Šƒ–

‘‡
– ”‡‰‹‘ƒŽŽ› ‹’‘”–ƒ– Šƒ„‹–ƒ–• –Šƒ– •—’’‘”– ™‹Ž†Ž‹ˆ‡ ‹ ‰‡‡”ƒŽǡ •— Š ƒ• •–‘’‘˜‡”
Šƒ„‹–ƒ–• –Šƒ– •—’’‘”– ‹‰”ƒ–‹‰ „‹”†• ‘” Žƒ”‰‡
‘–‹‰—‘—• ƒ–—”ƒŽ Šƒ„‹–ƒ–• –Šƒ– •—’’‘”–
ƒ‹ƒŽ• ™‹–Š ˜‡”› Žƒ”‰‡ Š‘‡ ”ƒ‰‡• ሺ‡Ǥ‰Ǥǡ
‘›‘–‡•ǡ —އ †‡‡”ሻǤ Ї›
ƒ ƒŽ•‘ „‡ •ƒŽŽǦ•
ƒŽ‡
‘˜‡‡–
‘””‹†‘”•ǡ •—
Š ƒ• ”‹’ƒ”‹ƒ œ‘‡•ǡ –Šƒ– ’”‘˜‹†‡
‘‡
–‹˜‹–› ƒ†
‘˜‡” –‘ •—’’‘”–
–Ї ‘˜‡‡– ƒ– ƒ
Ї  ‹• ‘– ™‹–Š‹
Ž‘
ƒŽ •
ƒŽ‡Ǥ
ƒ› †‡•‹‰ƒ–‡† ™‹Ž†Ž‹ˆ‡ Ž‹ƒ‰‡ ‘” ‘˜‡‡–
‘””‹†‘”•Ǥ Ї ”‘Œ‡
– ‹•
•‹–—ƒ–‡† ™‹–Š‹ ƒ ƒ”‡ƒ †‡˜‡Ž‘’‡† ˆ‘” —”„ƒ ƒ† ƒ‰”‹
—Ž–—”ƒŽ —•‡ ƒ† †‘‡• ‘– ’”‘˜‹†‡ ƒ
Ž‹ƒ‰‡ „‡–™‡‡ •—‹–ƒ„އ ƒ–—”ƒŽ Šƒ„‹–ƒ–• ˆ‘” ‘•– ™‹Ž†Ž‹ˆ‡ •’‡ ‹‡•Ǥ —‡ –‘ –Ї †‹•–—”„‡†

‘†‹–‹‘ ‘ˆ –Ї ”‘Œ‡
– ƒ† –Ї •—””‘—†‹‰ ƒ”‡ƒǡ –Ї”‡ ‹• ‘ •—„•–ƒ–‹ƒŽ ‘˜‡‡– ‘ˆ ™‹Ž†Ž‹ˆ‡ ‘–‘ ‘” ‘ˆˆ –Ї ǡ ƒ† –Ї”‡ ™‘—ކ „‡ ‘ ‹’ƒ –•Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ

’ƒ
– ͓͵ǤͶǤͶ‡ Ȃ ‘—ކ –Ї ”‘Œ‡
–
‘ˆŽ‹
– ™‹–Š ƒ› Ž‘
ƒŽ ’‘Ž‹
‹‡• ‘” ‘”†‹ƒ
‡• ’”‘–‡
–‹‰
„‹‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡•ǡ •—
Š ƒ• ƒ –”‡‡ ’”‡•‡”˜ƒ–‹‘ ’‘Ž‹
› ‘” ‘”†‹ƒ
‡ǫ
Ї
‡‡”ƒŽ Žƒ
‘–ƒ‹• ’‘Ž‹
‹‡• ƒ‹‡† ƒ– –Ї ’”‡•‡”˜ƒ–‹‘ ‘ˆ „‹‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• ƒ†
’”‘‘–‡•
‘‘”†‹ƒ–‹‘ ™‹–Š ˆ‡†‡”ƒŽ ƒ† –ƒ–‡ ”‡•‘—”
‡ ƒ‰‡
‹‡•Ǥ Ї•‡ ’‘Ž‹
‹‡• ‹
Ž—†‡ǣ
x  ͶǤͳ͵ǣ • ˆ‡ƒ•‹„އǡ ’”‡•‡”˜‡ ƒ–‹˜‡ ˜‡‰‡–ƒ–‹‘ ƒ† ’”‘–‡ –‡† ™‹Ž†Ž‹ˆ‡ǡ Šƒ„‹–ƒ–
ƒ”‡ƒ•ǡ ƒ† ˜‡‰‡–ƒ–‹‘ǡ –Š”‘—‰Š ƒ˜‘‹†ƒ
‡ǡ ‹’ƒ
– ‹–‹‰ƒ–‹‘ǡ ƒ† Šƒ„‹–ƒ–
‡Šƒ
‡‡–Ǥ
x  ͶǤͳ͵ǤͶǣ • ’ƒ”– ‘ˆ –Ї ‡
ƒሻ ‹‘Ž‘‰‹
ƒŽ •–—†‹‡• •ŠƒŽŽ „‡
˜‹”‘‡–ƒŽ ”‡˜‹‡™ ‘ˆ ‡™ †‡˜‡Ž‘’‡– ’”‘Œ‡
–•ǣ
’”‡’ƒ”‡† –‘ ƒ••‡•• Šƒ„‹–ƒ– ˜ƒŽ—‡ ™Š‡ †‡–‡”‹‡†
ƒ’’”‘’”‹ƒ–‡ „› –Ї ‘—‹–› ‡˜‡Ž‘’‡– ‡’ƒ”–‡–Ǥ
„ሻ ‹–‹‰ƒ–‹‘ •ŠƒŽŽ „‡ ƒ’’Ž‹‡† –‘ ƒ••—”‡ –Šƒ– †‡‰”ƒ†ƒ–‹‘ ‘ˆ Šƒ„‹–ƒ– ‘” ‹’ƒ –• –‘
•‡•‹–‹˜‡ •’‡
‹‡• ‹• ”‡†—
‡† ‘” ‡Ž‹‹ƒ–‡†Ǥ

ሻ
’—– ™‹ŽŽ „‡ •‘—‰Š– ˆ”‘ ƒ‰‡
‹‡• ƒ† ‹†‹˜‹†—ƒŽ• ™‹–Š ‡š’‡”–‹•‡ ‹ „‹‘Ž‘‰‹
ƒŽ
”‡•‘—”
‡•ǡ ‹
Ž—†‹‰ –Ї ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‹•Š ƒ† ƒ‡ ǡ ƒŽ‹ˆ‘”‹ƒ VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-47

Initial Study
ƒ–‡” —ƒŽ‹–› ‘–”‘Ž ‘ƒ”†ǡ ǤǤ ”› ‘”’• ‘ˆ ‰‹‡‡”•ǡ ǤǤ ‹•Š ƒ† ‹Ž†Ž‹ˆ‡ ‡”˜‹
‡ǡ ƒ† ǤǤ ˜‹”‘‡–ƒŽ ”‘–‡
–‹‘ ‰‡
›Ǥ
Ї”‡ ƒ”‡ ‘ ‹’ƒ
–• ™‹–Š ”‡•’‡
– –‘ Ž‘
ƒŽ ’‘Ž‹
‹‡• ƒ† ‘”†‹ƒ
‡•ǡ ƒ† ‘ ‹–‹‰ƒ–‹‘
‡ƒ•—”‡• ƒ”‡ ™ƒ””ƒ–‡†Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ

’ƒ
– ͓͵ǤͶǤͶˆ Ȃ ‘—ކ –Ї ”‘Œ‡
–
‘ˆŽ‹
– ™‹–Š –Ї ’”‘˜‹•‹‘• ‘ˆ ƒ ƒ†‘’–‡† Šƒ„‹–ƒ–

‘•‡”˜ƒ–‹‘ ’Žƒǡ ƒ–—”ƒŽ
‘—‹–›
‘•‡”˜ƒ–‹‘ ’Žƒǡ ‘” ‘–Ї” ƒ’’”‘˜‡† Ž‘
ƒŽǡ ”‡‰‹‘ƒŽǡ
‘” •–ƒ–‡ Šƒ„‹–ƒ–
‘•‡”˜ƒ–‹‘ ’Žƒǫ
Ї ”‘Œ‡
– ‹• ‘– Ž‘
ƒ–‡† ™‹–Š‹ ƒ› ƒ–—”ƒŽ ‘—‹–› ‘•‡”˜ƒ–‹‘ Žƒ ‘” ƒ› ‘–Ї” Ž‘
ƒŽǡ ”‡‰‹‘ƒŽǡ ‘” –ƒ–‡ ‘•‡”˜ƒ–‹‘ ŽƒǤ ‹–Š ‹–‹‰ƒ–‹‘ǡ –Ї ’”‘’‘•‡† ”‘Œ‡ – ™‘—ކ ‘–

‘ˆŽ‹
– ™‹–Š –Ї ’”‘˜‹•‹‘• ‘ˆ ƒ› ƒ†‘’–‡†
ƒ„‹–ƒ– ‘•‡”˜ƒ–‹‘ Žƒǡ ƒ–—”ƒŽ ‘—‹–›
‘•‡”˜ƒ–‹‘ Žƒǡ ‘” ‘–Ї” ƒ’’”‘˜‡† Ž‘
ƒŽǡ ”‡‰‹‘ƒŽǡ ‘” –ƒ–‡
ƒ„‹–ƒ– ‘•‡”˜ƒ–‹‘ ŽƒǤ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-48

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.5 - CULTURAL RESOURCES
‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ ƒ—•‡ ƒ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡
Šƒ‰‡ ‹ –Ї
•‹‰‹ˆ‹
ƒ
‡ ‘ˆ ƒ Š‹•–‘”‹
ƒŽ ”‡•‘—”
‡ ’—”•—ƒ–

–‘  —‹ †‡Ž‹‡• ‡
–‹‘ ͳͷͲ͸ͶǤͷǫ

„Ǥ ƒ—•‡ ƒ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡
Šƒ‰‡ ‹ –Ї
•‹‰‹ˆ‹
ƒ
‡ ‘ˆ ƒ ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡

’—”•—ƒ– –‘  —‹†‡ Ž‹‡• ‡
–‹‘ ͳͷͲ͸ͶǤͷǫ

Ǥ ‹•–—”„ ƒ› Š—ƒ ”‡ƒ‹•ǡ ‹
Ž—†‹‰ Š‘•‡

‹–‡””‡† ‘—–•‹†‡ ‘ˆ ˆ‘”ƒŽ
‡‡–‡”‹‡•ǫ

Discussion
Ї †‹•
—••‹‘ „‡Ž‘™ ‹• „ƒ•‡† ‘ –Ї —Ž–—”ƒŽ ‡•‘—”
‡• ‡’‘”–
‘’އ–‡† ˆ‘” –Ї ”‘Œ‡
–ǡ
ƒ––ƒ
Ї† ƒ• ’’‡†‹š  ሺ ʹͲʹͷ„ሻǤ

’ƒ
– ͓͵ǤͶǤͷƒ Ȃ ‘—ކ –Ї ”‘Œ‡
–
ƒ—•‡ ƒ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡
Šƒ‰‡ ‹ –Ї •‹‰‹ˆ‹
ƒ
‡ ‘ˆ
ƒ Š‹•–‘”‹
ƒŽ ”‡•‘—”
‡ ’—”•—ƒ– –‘  —‹†‡Ž‹‡• ‡
–‹‘ ͳͷͲ͸ͶǤͷǫ
‘ ’ƒ”– ‘ˆ –Ї ”‘Œ‡
– ‹• ™‹–Š‹ –Ї ƒ”‡ƒ †‡•‹‰ƒ–‡† –‘ „‡ Š‹•–‘”‹
„› –Ї ‹–›ǯ• ‡‡”ƒŽ Žƒ
ሺ‹–› ‘ˆ ‡‡†Ž‡› ʹͲͳͶሻǤ

—Ž–—”ƒŽ ”‡•‘—”
‡• ”‡
‘”†• •‡ƒ”
Š ሺ͓ʹͷǦͲʹͷሻ ™ƒ•
‘†—
–‡† ƒ– –Ї ‘—–Ї” ƒ
‘ƒ“—‹
ƒŽŽ‡›
ˆ‘”ƒ–‹‘ ‡–‡”ǡ  ƒ‡”•ˆ‹‡Ž†ǡ –‘ ‹†‡–‹ˆ› ’”‡˜‹‘—•Ž› ”‡ ‘”†‡† ”‡•‘—”
‡• ƒ†
’”‹‘” •—”˜‡›• ™‹–Š‹ –Ї ”‘Œ‡
– ƒ”‡ƒ ƒ† –Ї •—””‘—†‹‰ ŠƒŽˆǦ‹Ž‡ ƒ”‡ƒǤ ‘
—Ž–—”ƒŽ
”‡•‘—”
‡• Šƒ˜‡ „‡‡ ‹†‡–‹ˆ‹‡† ‘” ”‡
‘”†‡† ™‹–Š‹ ‘‡ǦŠƒŽˆ ‹Ž‡ ‘ˆ –Ї ”‘Œ‡
–Ǥ
 ƒ
”‡† ƒ†• ‹Ž‡ ”‡“—‡•– ™ƒ• ƒŽ•‘ •—„‹––‡† –‘ –Ї ƒ–‹˜‡ ‡”‹ ƒ
‡”‹–ƒ‰‡ ‘‹••‹‘
ሺ
ሻǤ  ”‡•’‘•‡ †ƒ–‡†
ƒ—ƒ”› ͻǡ ʹͲʹͷǡ ‹†‹
ƒ–‡• ‡‰ƒ–‹˜‡ ”‡•—Ž–•Ǥ Ї 
 ƒŽ•‘
’”‘˜‹†‡† ƒ Ž‹•– ‘ˆ –”‹„‡• ‘ˆ ‹–‡”‡•– ™‹–Š‹ –Ї ”‘Œ‡
– ˜‹
‹‹–›Ǥ ‡––‡”• ™‡”‡ •‡– „› –Ї އƒ†
ƒ‰‡
› –‘ –Ї –”‹„‡• ‘ ’”‹Ž ʹ͵ǡ ʹͲʹͷǡ ™‹–Š ‹ˆ‘”ƒ–‹‘ ‘ –Ї ”‘Œ‡ –ǡ ƒ† –Ї› ™‡”‡ ‰‹˜‡
ƒ ͵ͲǦ†ƒ›
‘‡– ”‡˜‹‡™ ’‡”‹‘†Ǥ ‘ †ƒ–‡ǡ ‘‡ ”‡•’‘•‡ Šƒ• „‡‡ ”‡ ‡‹˜‡† †‡
Ž‹‹‰ –Ї

‘•—Ž–ƒ–‹‘ ”‡“—‡•–Ǥ 
‘’› ‘ˆ –Šƒ–
‘””‡•’‘†‡
‡ ‹• ‹
Ž—†‡† ‹ ’’‡†‹š Ǥ
Ž–Š‘—‰Š –Ї
‘’‘‡–• ‘ˆ –Ї ”‘Œ‡
– ƒ”‡ ™‹–Š‹ ƒ ’”‡˜‹‘—•Ž› †‹•–—”„‡† •‹–‡ǡ —‘™
Š‹•–‘”‹
ƒŽ ”‡•‘—”
‡• ƒ› „‡ †‹•
‘˜‡”‡† †—”‹‰ ‰”‘—†Ǧ†‹•–—”„‹‰ ƒ
–‹˜‹–‹‡•Ǥ
 ‘”†‡” –‘
ƒ

‘—– ˆ‘” —ƒ–‹
‹’ƒ–‡† †‹•
‘˜‡”‹‡• ƒ† –Ї ’‘–‡–‹ƒŽ –‘ ‹’ƒ
– ’”‡˜‹‘—•Ž› —†‘
—‡–‡†
‘” —‘™ ”‡•‘—”
‡•ǡ ‹–‹‰ƒ–‹‘ ‹• ”‡
‘‡†‡†Ǥ Ї ‹’އ‡–ƒ–‹‘ ‘ˆ  Ǧͳ™‘—ކ
‡•–ƒ„Ž‹•Š ƒ ’”‘
‡†—”‡ ˆ‘” –Ї †‹•
‘˜‡”› ‘ˆ
—Ž–—”ƒŽ ”‡•‘—”
‡• ‹ –Ї —Ž‹‡Ž› ‡˜‡– –Ї› ƒ”‡
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-49

Initial Study
—‡ƒ”–Ї† †—”‹‰
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•Ǥ Ї”‡ˆ‘”‡ ™‹–Š ‹’އ‡–ƒ–‹‘ ‘ˆ  Ǧͳǡ
‹’ƒ
–• —†‡” –Š‹•
”‹–‡”‹‘ ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
 Ǧͳǣ
ˆ ’”‡Š‹•–‘”‹
‘” Š‹•–‘”‹
Ǧ‡”ƒ
—Ž–—”ƒŽ ƒ–‡”‹ƒŽ• ƒ”‡ ‡
‘—–‡”‡† †—”‹‰

‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ ƒŽŽ ™‘” ‹ –Ї ‹‡†‹ƒ–‡ ˜‹
‹‹–› ‘ˆ –Ї ˆ‹† •ŠƒŽŽ ŠƒŽ– —–‹Ž ƒ
“—ƒŽ‹ˆ‹‡† ƒ”
Šƒ‡‘Ž‘‰‹•–
ƒ ‡˜ƒŽ—ƒ–‡ –Ї ˆ‹† ƒ† ƒ‡ ”‡
‘‡†ƒ–‹‘•Ǥ —Ž–—”ƒŽ ”‡•‘—”
‡
ƒ–‡”‹ƒŽ• ƒ› ‹
Ž—†‡ ’”‡Š‹•–‘”‹
”‡•‘—”
‡• •—
Š ƒ• ˆŽƒ‡† ƒ† ‰”‘—† •–‘‡ –‘‘Ž• ƒ†
†‡„”‹•ǡ •Š‡ŽŽǡ „‘‡ǡ
‡”ƒ‹
•ǡ ƒ† ˆ‹”‡Ǧƒˆˆ‡
–‡† ”‘
ǡ ƒ• ™‡ŽŽ ƒ• Š‹•–‘”‹
”‡•‘—”
‡• •—
Š ƒ•
‰Žƒ••ǡ ‡–ƒŽǡ ™‘‘†ǡ „”‹
ǡ ‘” •–”—
–—”ƒŽ ”‡ƒ–•Ǥ
ˆ ƒ “—ƒŽ‹ˆ‹‡† ƒ”
Šƒ‡‘Ž‘‰‹•– †‡–‡”‹‡• –Šƒ–
–Ї †‹•
‘˜‡”› ”‡’”‡•‡–• ƒ ’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ–
—Ž–—”ƒŽ ”‡•‘—”
‡ǡ ƒ††‹–‹‘ƒŽ ‹˜‡•–‹‰ƒ–‹‘•
ƒ› „‡ ”‡“—‹”‡† –‘ ‹–‹‰ƒ–‡ ƒ†˜‡”•‡ ‹’ƒ
–• ˆ”‘ ”‘Œ‡
– ‹’އ‡–ƒ–‹‘Ǥ Ї•‡ ƒ††‹–‹‘ƒŽ
•–—†‹‡• ƒ› ‹
Ž—†‡ ƒ˜‘‹†ƒ
‡ǡ –‡•–‹‰ǡ ƒ† ‡˜ƒŽ—ƒ–‹‘ǡ ‘” †ƒ–ƒ ”‡
‘˜‡”› ‡š
ƒ˜ƒ–‹‘Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‹– ‘
‘” ‘ ƒ– –  ‹ ” ‹– ‹‰ƒ–‹ ’ ‡†Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͷ„ Ȃ ‘—ކ –Ї ”‘Œ‡
–
ƒ—•‡ ƒ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡
Šƒ‰‡ ‹ –Ї •‹‰‹ˆ‹
ƒ
‡ ‘ˆ
ƒ ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡ ’—”•—ƒ– –‘  —‹† ‡Ž‹‡• ‡
–‹‘ ͳͷͲ͸ͶǤͷǫ
‡‡ †‹•
—••‹‘ ‘ˆ
’ƒ
– ͓͵ǤͶǤͷƒ ƒ„‘˜‡Ǥ
‘•–”—
–‹‘ ‘ˆ –Ї ”‘Œ‡
– ™‹ŽŽ ‹
Ž—†‡ ‰”‘—†Ǧ†‹•–—”„‹‰ ƒ
–‹˜‹–‹‡•Ǥ Ž–Š‘—‰Š —Ž‹‡Ž›ǡ –Ї”‡
‹• ƒ
Šƒ
‡ –Šƒ– –”‡
Š‹‰ ƒ† ‰”ƒ†‹‰ ƒ
–‹˜‹–‹‡•
‘—ކ —‡ƒ”–Š ’”‡˜‹‘—•Ž› —‘™
ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡•Ǥ
’އ‡–ƒ–‹‘ ‘ˆ  Ǧʹ ™‘—ކ ‡•—”‡ –Šƒ– ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ
”‡•‘—”
‡• †‹•
‘˜‡”‡† †—”‹‰ ”‘Œ‡
– ƒ
–‹˜‹–‹‡• ƒ”‡ ƒ†‡“—ƒ–‡Ž› ƒ††”‡••‡† –Š”‘—‰Š ƒ••‡••‡–
ƒ† ƒ˜‘‹†ƒ
‡ ‡ƒ•—”‡• ‡•–ƒ„Ž‹•Ї† „› –Ї “—ƒŽ‹ˆ‹‡† ƒ”
Šƒ‡‘Ž‘‰‹•–Ǥ  Ǧʹ ‡•—”‡• –Šƒ–
’‘–‡–‹ƒŽ ‹’ƒ
–• ƒ••‘
‹ƒ–‡† ™‹–Š ƒ”
Šƒ‡‘Ž‘‰› ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
 Ǧʹǣ
 –Ї ‡˜‡– –Šƒ– „—”‹‡† ’”‡Š‹•–‘”‹
ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• ƒ”‡ †‹•
‘˜‡”‡†
†—”‹‰ ‡š
ƒ˜ƒ–‹‘ ƒ†Ȁ‘”
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ
‘•–”—
–‹‘ •ŠƒŽŽ •–‘’ ‹ –Ї ‹‡†‹ƒ–‡
˜‹
‹‹–› ‘ˆ –Ї ˆ‹†ǡ ƒ† ƒ “—ƒŽ‹ˆ‹‡† ƒ”
Šƒ‡‘Ž‘‰‹•– •ŠƒŽŽ „‡
‘•—Ž–‡† –‘ †‡–‡”‹‡ ™Š‡–Ї” –Ї
”‡•‘—”
‡ ”‡“—‹”‡• ˆ—”–Ї” •–—†›Ǥ Ї “—ƒŽ‹ˆ‹‡† ƒ”
Šƒ‡‘Ž‘‰‹•– •ŠƒŽŽ ƒ‡ ”‡
‘‡†ƒ–‹‘• –‘
–Ї †‡˜‡Ž‘’‡” ƒ† ‹–› ‘ –Ї ‡ƒ•—”‡• –Šƒ– •ŠƒŽŽ „‡ ‹’އ‡–‡† –‘ ’”‘–‡ – –Ї †‹•
‘˜‡”‡†
”‡•‘—”
‡•ǡ ‹
Ž—†‹‰ „—– ‘– Ž‹‹–‡† –‘ ‡š
ƒ˜ƒ–‹‘ ‘ˆ –Ї ˆ‹†• ƒ† ‡˜ƒŽ—ƒ–‹‘ ‘ˆ –Ї ˆ‹†• ‹
ƒ

‘”†ƒ
‡ ™‹–Š ‡
–‹‘ ͳͷͲ͸ͶǤͷ ‘ˆ –Ї  —‹†‡Ž‹‡• Ǥ

ˆ –Ї ”‡•‘—”
‡• ƒ”‡ †‡–‡”‹‡† –‘ „‡ —‹“—‡ ’”‡Š‹•–‘”‹
ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• ƒ• †‡ˆ‹‡†
—†‡” ‡
–‹‘ ͳͷͲ͸ͶǤͷ ‘ˆ –Ї  —‹†‡Ž‹‡•ǡ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• •ŠƒŽŽ „‡ ‹†‡–‹ˆ‹‡† „› –Ї ‘‹–‘” ƒ† ”‡“—‹”‡† –‘ „‡ ’”‘˜‹†‡† –‘ –Ї †‡˜‡Ž‘’‡” ƒ† ‹–›Ǥ ’’”‘’”‹ƒ–‡ ‡ƒ•—”‡• ˆ‘” •‹‰‹ˆ‹
ƒ– ”‡•‘—”
‡•
‘—ކ ‹
Ž—†‡ ƒ˜‘‹†ƒ
‡ ‘”
ƒ’’‹‰ǡ ‹
‘”’‘”ƒ–‹‘ ‘ˆ –Ї •‹–‡ ‹ ‰”‡‡
•’ƒ
‡ǡ ’ƒ”•ǡ ‘” ‘’‡ •’ƒ
‡ǡ ‘” †ƒ–ƒ ”‡
‘˜‡”› ‡š
ƒ˜ƒ–‹‘• ‘ˆ –Ї ˆ‹†•Ǥ ‘ ˆ—”–Ї” ‰”ƒ†‹‰
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-50

Initial Study
•ŠƒŽŽ ‘

—” ‹ –Ї ƒ”‡ƒ ‘ˆ –Ї †‹•
‘˜‡”› —–‹Ž –Ї އƒ† ƒ‰‡
› ƒ’’”‘˜‡• –Ї ‡ƒ•—”‡• –‘
’”‘–‡
– –Ї•‡ ”‡•‘—”
‡•Ǥ
› ’”‡Š‹•–‘”‹
ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ ƒ”–‹ˆƒ
–• ”‡
‘˜‡”‡† ƒ• ƒ ”‡•—Ž– ‘ˆ ‹–‹‰ƒ–‹‘ •ŠƒŽŽ „‡ ’”‘˜‹†‡†
–‘ ƒ ‹–›Ǧƒ’’”‘˜‡† ‹•–‹–—–‹‘ ‘” ’‡”•‘ ™Š‘ ‹•
ƒ’ƒ„އ ‘ˆ ’”‘˜‹†‹‰ Ž‘‰Ǧ–‡” ’”‡•‡”˜ƒ–‹‘
–‘ ƒŽŽ‘™ ˆ—–—”‡ •
‹‡–‹ˆ‹
•–—†›Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‹– ‘
‘” ‘ ƒ– –  ‹ ” ‹– ‹‰ƒ–‹ ’ ‡†Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͷ
Ȃ ‘—ކ –Ї ”‘Œ‡
– †‹•–—”„ ƒ› Š—ƒ ”‡ƒ‹•ǡ ‹
Ž—†‹‰ –Š‘•‡ ‹–‡””‡†
‘—–•‹†‡ ‘ˆ ˆ
Ї”‡ ƒ”‡ ‘
‘”ƒŽ
‡‡–‡”‹‡•ǫ
‘™
‡‡–‡”‹‡• ‘” „—”‹ƒŽ• ‘ ‘” ‡ƒ” –Ї ”‘Œ‡
–Ǥ Ž–Š‘—‰Š —Ž‹‡Ž›ǡ
•—„•—”ˆƒ
‡
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ •—
Š ƒ• –”‡
Š‹‰ ƒ† ‰”ƒ†‹‰ǡ ƒ••‘
‹ƒ–‡† ™‹–Š –Ї
’”‘’‘•‡† ”‘Œ‡
–
‘—ކ ’‘–‡–‹ƒŽŽ› †‹•–—”„ ’”‡˜‹‘—•Ž› —†‹•
‘˜‡”‡† Š—ƒ „—”‹ƒŽ •‹–‡•Ǥ


‘”†‹‰Ž›ǡ –Š‹• ‹• ƒ ’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ Ž–Š‘—‰Š
‘•‹†‡”‡† —Ž‹‡Ž›ǡ •—„•—”ˆƒ
‡

‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•
‘—ކ
ƒ—•‡ ƒ ’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ– ‹’ƒ
– –‘ ’”‡˜‹‘—•Ž›
—†‹•
‘˜‡”‡† Š—ƒ „—”‹ƒŽ •‹–‡•Ǥ Ї
—Ž–—”ƒŽ ”‡•‘—”
‡• ƒ† ƒ
”‡† ƒ†• ‹Ž‡ ”‡
‘”†•
•‡ƒ”
Ї• †‹† ‘– ‹†‹
ƒ–‡ –Ї ’”‡•‡
‡ ‘ˆ Š—ƒ ”‡ƒ‹•ǡ „—”‹ƒŽ•ǡ ‘”
‡‡–‡”‹‡• ™‹–Š‹ ‘” ‹
–Ї ˜‹
‹‹–› ‘ˆ –Ї ”‘Œ‡
– •‹–‡Ǥ ‘ Š—ƒ ”‡ƒ‹• Šƒ˜‡ „‡‡ †‹•
‘˜‡”‡† ƒ– –Ї ”‘Œ‡
– •‹–‡ǡ
ƒ† ‘ „—”‹ƒŽ• ‘”
‡‡–‡”‹‡• ƒ”‡ ‘™ –‘ ‘

—” ™‹–Š‹ –Ї ƒ”‡ƒ ‘ˆ –Ї •‹–‡Ǥ
‘™‡˜‡”ǡ

‘•–”—
–‹‘ ™‘—ކ ‹˜‘Ž˜‡ ‡ƒ”–ŠǦ†‹•–—”„‹‰ ƒ
–‹˜‹–‹‡•ǡ ƒ† ‹– ‹• •–‹ŽŽ ’‘••‹„އ –Šƒ– Š—ƒ
”‡ƒ‹• ƒ› „‡ †‹•
‘˜‡”‡†ǡ ’‘••‹„Ž› ‹ ƒ••‘
‹ƒ–‹‘ ™‹–Š ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ •‹–‡•Ǥ

’އ‡–ƒ–‹‘ ‘ˆ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡ Ǧ͵ ™‘—ކ ‡•—”‡ –Šƒ– –Ї ’”‘’‘•‡† ”‘Œ‡ – ™‘—ކ
‘– †‹”‡
–Ž› ‘” ‹†‹”‡
–Ž› †‡•–”‘› ’”‡˜‹‘—•Ž› —‘™ Š—ƒ ”‡ƒ‹•Ǥ
– ‹• —Ž‹‡Ž› –Šƒ– –Ї
’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ †‹•–—”„ ƒ› ‘™ Š—ƒ ”‡ƒ‹•ǡ ‹
Ž—†‹‰ –Š‘•‡ ‹–‡””‡† ‘—–•‹†‡
‘ˆ ˆ‘”ƒŽ
‡‡–‡”‹‡•Ǥ ‹–Š –Ї ‹’އ‡–ƒ–‹‘ ‘ˆ –Ї ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡•ǡ ‹’ƒ –• ™‘—ކ
„‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
 Ǧ͵ǣ
 –Ї ‡˜‡– –Šƒ– Š—ƒ ”‡ƒ‹• ƒ”‡ —‡ƒ”–Ї† †—”‹‰ ‡š
ƒ˜ƒ–‹‘ ƒ† ‰”ƒ†‹‰
ƒ
–‹˜‹–‹‡• ‘ˆ ƒ› ˆ—–—”‡ †‡˜‡Ž‘’‡– ”‘Œ‡
–ǡ ƒŽŽ ƒ
–‹˜‹–› •ŠƒŽŽ
‡ƒ•‡ ‹‡†‹ƒ–‡Ž›Ǥ —”•—ƒ– –‘

‡ƒŽ–Š ƒ† ƒˆ‡–› ‘†‡ ሺ
ሻ ‡
–‹‘ ͹ͲͷͲǤͷǡ ‘ ˆ—”–Ї” †‹•–—”„ƒ
‡ •ŠƒŽŽ ‘

—” —–‹Ž –Ї
‘—–› ‘”‘‡” Šƒ• ƒ†‡ –Ї ‡
‡••ƒ”› ˆ‹†‹‰• ƒ• –‘ ‘”‹‰‹ ƒ† †‹•’‘•‹–‹‘ ’—”•—ƒ– –‘  ‡
–‹‘ ͷͲͻ͹ǤͻͺሺƒሻǤ

ˆ –Ї ”‡ƒ‹• ƒ”‡ †‡–‡”‹‡† –‘ „‡ ‘ˆ ƒ–‹˜‡ ‡”‹
ƒ †‡•
‡–ǡ –Ї ‘”‘‡” •ŠƒŽŽǡ ™‹–Š‹ ʹͶ
Š‘—”•ǡ ‘–‹ˆ› –Ї 
Ǥ Ї 
 •ŠƒŽŽ –Ї
‘–ƒ
– –Ї ‘•– Ž‹‡Ž› †‡•
‡†ƒ– ‘ˆ –Ї
†‡
‡ƒ•‡† ƒ–‹˜‡ ‡”‹
ƒǡ ™Š‘ •ŠƒŽŽ –Ї •‡”˜‡ ƒ• –Ї
‘•—Ž–ƒ– ‘ Š‘™ –‘ ’”‘
‡‡† ™‹–Š
–Ї ”‡ƒ‹•Ǥ —”•—ƒ– –‘  ‡
–‹‘ ͷͲͻ͹Ǥͻͺሺ„ሻǡ —’‘ –Ї †‹•
‘˜‡”› ‘ˆ ƒ–‹˜‡ ‡”‹
ƒ
”‡ƒ‹•ǡ –Ї Žƒ†‘™‡” •ŠƒŽŽ ‡•—”‡ –Šƒ– –Ї ‹‡†‹ƒ–‡ ˜‹ ‹‹–›ǡ ƒ

‘”†‹‰ –‘ ‰‡‡”ƒŽŽ›
ƒ

‡’–‡†
—Ž–—”ƒŽ ‘” ƒ”
Šƒ‡‘Ž‘‰‹
ƒŽ •–ƒ†ƒ”†• ‘” ’”ƒ
–‹
‡•ǡ ™Š‡”‡ –Ї ƒ–‹˜‡ ‡”‹
ƒ
Š—ƒ ”‡ƒ‹• ƒ”‡ Ž‘
ƒ–‡† ‹• ‘– †ƒƒ‰‡† ‘” †‹•–—”„‡† „› ˆ—”–Ї” †‡˜‡Ž‘’‡– ƒ –‹˜‹–›
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-51
Initial Study
—–‹Ž –Ї Žƒ†‘™‡” Šƒ• †‹•
—••‡† ƒ†
‘ˆ‡””‡† ™‹–Š –Ї ‘•– Ž‹‡Ž› †‡•
‡†ƒ–• ”‡‰ƒ”†‹‰
–Ї‹” ”‡
‘‡†ƒ–‹‘•ǡ ‹ˆ ƒ’’Ž‹
ƒ„އǡ –ƒ‹‰ ‹–‘ ƒ

‘—– –Ї ’‘••‹„‹Ž‹–› ‘ˆ —Ž–‹’އ Š—ƒ
”‡ƒ‹•Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‹– ‘
‘” ‘ ƒ– –  ‹ ” ‹– ‹‰ƒ–‹ ’ ‡†Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-52

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.6 - ENERGY
‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ ‡• Ž ‹ ƒ –‡–‹ƒŽŽ› •‹‰‹ ‹
ƒ–
‡˜‹”‘‡–ƒŽ ‹’ƒ
– †—‡ –‘ ™ƒ•–‡ˆ—Žǡ

‹‡ˆˆ‹
‹‡–ǡ ‘” —‡
‡••ƒ”›
‘•—’–‹‘ ‘ˆ

‡‡”‰› ”‡•‘—”
‡•ǡ †—”‹‰ ”‘Œ‡
–
‘•–”—
–‹‘

‘” ‘’‡”ƒ–‹‘ǫ

„Ǥ   Ž‹
‹ Š „•
ƒ • ƒ ‡ Ž
ƒŽ Žƒ

ˆ‘” ”‡‡™ƒ„އ ‡‡”‰› ‘” ‡‡”‰› ‡ˆˆ‹
‹‡
›ǫ

Discussion

’ƒ
– ͓͵ǤͶǤ͸ƒ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ ƒ ’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‹’ƒ
–
†—‡ –‘ ™ƒ•–‡ˆ—Žǡ ‹‡ˆˆ‹
‹‡–ǡ ‘” —‡
‡••ƒ”›
‘•—’–‹‘ ‘ˆ ‡‡”‰› ”‡•‘—”
‡•ǡ †—”‹‰ ”‘Œ‡
–

‘•–”—
–‹‘ ‘” ‘’‡”ƒ–‹‘ǫ
Construction
‡”‰› †‡ƒ† †—”‹‰ –Ї
‘•–”—
–‹‘ ’Šƒ•‡ ™‘—ކ ”‡•—Ž– ˆ”‘ –Ї –”ƒ•’‘”–ƒ–‹‘ ‘ˆ
ƒ–‡”‹ƒŽ•ǡ
‘•–”—
–‹‘ ‡“—‹’‡–ǡ ƒ†
‘•–”—
–‹‘ ™‘”‡” ˜‡Š‹
އ –”‹’•Ǥ ‘•–”—
–‹‘
‡“—‹’‡–
ƒ ‹
Ž—†‡ –”ƒ
–‘”•ǡ Ž‘ƒ†‡† –”—
•ǡ ˆ‘”Ž‹ˆ–•ǡ ‰‡‡”ƒ–‘”•ǡ
”ƒ‡•ǡ ”‘ŽŽ‡”•ǡ

‘’ƒ
–‘”•ǡ ƒ† ƒ ƒ‹”
‘’”‡••‘”Ǥ Ї ”‘Œ‡
– ™‘—ކ
‘’Ž› ™‹–Š –Ї 

”‡“—‹”‡‡–• ”‡‰ƒ”†‹‰ –Ї —•‡ ‘ˆ ˆ—‡ŽǦ‡ˆˆ‹
‹‡– ˜‡Š‹
އ• ƒ† ‡“—‹’‡– –‘ –Ї ‡š–‡–
ˆ‡ƒ•‹„އǤ ‘’Ž‹ƒ
‡ ™‹–Š •–ƒ†ƒ”† ”‡‰‹‘ƒŽ ƒ† Ž‘
ƒŽ ”‡‰—Žƒ–‹‘• ™‘—ކ ‹‹‹œ‡ ˆ—‡Ž

‘•—’–‹‘ †—”‹‰ ”‘Œ‡
–
‘•–”—
–‹‘Ǥ
Ї”‡ ƒ”‡ ‘ ——•—ƒŽ ”‘Œ‡
–
Šƒ”ƒ
–‡”‹•–‹
• –Šƒ– ™‘—ކ
ƒ—•‡
‘•–”—
–‹‘ ‡“—‹’‡– –‘ „‡
އ•• ‡‡”‰› ‡ˆˆ‹
‹‡–
‘’ƒ”‡† ™‹–Š ‘–Ї” •‹‹Žƒ”
‘•–”—
–‹‘ •‹–‡• ‹ ‘–Ї” ’ƒ”–• ‘ˆ –Ї
–ƒ–‡Ǥ Š—•ǡ
‘•–”—
–‹‘Ǧ”‡Žƒ–‡† ˆ—‡Ž
‘•—’–‹‘ ƒ– –Ї ”‘Œ‡
– ™‘—ކ ‘– ”‡•—Ž– ‹
‹‡ˆˆ‹
‹‡–ǡ ™ƒ•–‡ˆ—Žǡ ‘” —‡
‡••ƒ”› ‡‡”‰› —•‡Ǥ
Operations
އ
–”‹
‹–› •‡”˜‹
‡ ˆ‘” –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ „‡ ’”‘˜‹†‡† „› ƒ
‹ˆ‹
ƒ• ƒ† އ
–”‹

‘’ƒ› ሺ
ƬሻǤ އ
–”‹
‹–›
‘•—’–‹‘ ‹ ”‡•‘ ‘—–› ‹ ʹͲʹ͵ ™ƒ• ͹ǡͶͳͶ ‰‹‰ƒ™ƒ––Ǧ
Š‘—”• ሺ
Šሻǡ ƒ† ƒ–—”ƒŽ ‰ƒ•
‘•—’–‹‘ ƒ––”‹„—–ƒ„އ –‘ ”‡•‘ ‘—–› ‹ ʹͲʹ͵ ™ƒ• ͵͵ͻǤ͹ ‹ŽŽ‹‘ –Ї”• ሺሻ ሺƒŽ‹ˆ‘”‹ƒ ‡”‰› ‘‹••‹‘ ʹͲʹͷƒǡ ƒŽ‹ˆ‘”‹ƒ ‡”‰› ‘‹••‹‘ ʹͲʹͷ„ሻǤ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-53

Initial Study
–‘ ”‡†—
‡ ‡‡”‰›
‘•—’–‹‘ ‹
Ž—†‡ •Š—––‹‰ †‘™ ‡“—‹’‡– ™Š‡ ‘– ‹ —•‡ ˆ‘”
‡š–‡†‡† ’‡”‹‘†•ǡ Ž‹‹–‹‰ –Ї —•ƒ‰‡ ‘ˆ
‘•–”—
–‹‘ ‡“—‹’‡– –‘ ‡‹‰Š–
——Žƒ–‹˜‡ Š‘—”•
’‡” †ƒ›ǡ ƒ† —•ƒ‰‡ ‘ˆ ‡Ž‡
–”‹
‡“—‹’‡– ˆ‘”
‘•–”—
–‹‘ ™Š‡‡˜‡” ’‘••‹„އ ‹ Ž‹‡— ‘ˆ †‹‡•‡Ž
‘” ‰ƒ•‘Ž‹‡Ǧ’‘™‡”‡† ‡“—‹’‡–Ǥ ‡•– ƒƒ‰‡‡– ”ƒ
–‹
‡• ሺሻ ™‘—ކ „‡ ‹’އ‡–‡†
ƒ• ’ƒ”– ‘ˆ –Ї ”‘Œ‡
–Ǥ
ƒ•‡† ‘ –Š‹• ƒƒŽ›•‹•ǡ –Ї ”‘Œ‡
– ™‘—ކ „‡
‘•‹•–‡– ƒ† ‘–
‘ˆŽ‹
– ™‹–Š ‘” ‘„•–”—
– ƒ
–ƒ–‡ ‘” Ž‘
ƒŽ ’Žƒ ”‡Žƒ–‡† –‘ ”‡‡™ƒ„އ ‡‡”‰› ‘” ‡‡”‰›
‘•—’–‹‘Ǥ
’ƒ
–• ™‘—ކ „‡
އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-55

Initial Study

3.4.7 - GEOLOGY AND SOILS
‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ ‹”‡
Ž› ‹†‹”‡
Ž›
ƒ •‡ ‘–‡–‹ƒŽ
•—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ‡ˆˆ‡
–•ǡ ‹
Ž—†‹‰ –Ї ”‹•
‘ˆ Ž‘••ǡ ‹Œ—”›ǡ ‘” †‡ƒ–Š ‹˜‘Ž˜‹‰ǣ
‹Ǥ  ‡ ƒ   ‡ƒ Š ƒ‡ ƒ Ž ǡ ƒ•
†‡Ž‹‡ƒ–‡† ‘ –Ї ‘•– ”‡
‡– Ž“—‹•–Ǧ”‹‘Ž‘
ƒ”–Š“—ƒ‡ ƒ—Ž–
‘‹‰ ƒ’ ‹••—‡† „› –Ї
–ƒ–‡ ‡‘Ž‘‰‹•– ˆ‘” –Ї ƒ”‡ƒ ‘” „ƒ•‡† ‘
‘–Ї” •—„•–ƒ–‹ƒŽ ‡˜‹†‡
‡ ‘ˆ ƒ ‘™ ˆƒ—Ž–ǫ
‡ˆ‡” –‘ ‹˜‹•‹‘ ‘ˆ ‹‡• ƒ† ‡‘Ž‘‰›
’‡
‹ƒŽ —„Ž‹
ƒ–‹‘ ͶʹǤ
‹‹Ǥ  ‰ •‡‹•‹
‰”‘—† •Šƒ‹‰ǫ
‹‹‹Ǥ ‡‹•‹
Ǧ ‡Žƒ–‡† ‰” —† ˆƒ‹Ž—”‡ǡ ‹
Ž—†‹‰
Ž‹“—‡ˆƒ
–‹‘ǫ
‹˜Ǥ ƒ†•Ž‹†‡•ǫ
„Ǥ ‡•—Ž ‹ •—„•–ƒ–‹ƒŽ •‘‹Ž ‡”‘•‹‘ –Ї Ž‘••
–‘’•‘‹Žǫ

Ǥ ‡ Ž‘
ƒ–‡†  ƒ ‰‡‘Ž‘‰‹
‹– •‘‹Ž Šƒ ‹•
—•–ƒ„އǡ ‘” –Šƒ– ™‘—ކ „‡
‘‡ —•–ƒ„އ ƒ• ƒ
”‡•—Ž– ‘ˆ –Ї ”‘Œ‡
–ǡ ƒ† ’‘–‡–‹ƒŽŽ› ”‡•—Ž– ‹
‘Ǧ ‘” ‘ˆˆǦ•‹–‡ Žƒ†•Ž‹†‡ǡ Žƒ–‡”ƒŽ •’”‡ƒ†‹‰ǡ
•—„•‹†‡
‡ǡ Ž‹“—‡ˆƒ
–‹‘ǡ ‘”
‘ŽŽƒ’•‡ǫ
†Ǥ ‡ Ž‘
ƒ–‡†  ‡š’ƒ•‹˜‡ •‘‹Žǡ ƒ• †‡ˆ‹‡† ‹
ƒ„އ ͳͺǦͳǦ ‘ˆ –Ї ‹ˆ‘” —‹Ž†‹‰ ‘†‡
ሺͳͻͻͶሻǡ
”‡ƒ–‹‰ •—„•–ƒ–‹ƒŽ ”‹•• –‘ Ž‹ˆ‡ ‘”
’”‘’‡”–›ǫ
‡Ǥ
ƒ˜‡ •‘‹Ž• ‹
ƒ’ƒ„އ ƒ†‡“ ƒ ‡Ž› •—’’‘” ‹‰
–Ї —•‡ ‘ˆ •‡’–‹
–ƒ• ‘” ƒŽ–‡”ƒ–‹˜‡
†‹•’‘•ƒŽ •›•–‡• ‹ ƒ”‡ƒ• ™Š‡”‡
•‡™‡”• ƒ”‡ ‘– ƒ˜ƒ‹Žƒ„އ ˆ‘” –Ї †‹•’‘•ƒŽ ‘ˆ
™ƒ•–‡™ƒ–‡”
™ƒ•–‡™ƒ–‡”ǫ
ˆǤ ‹”‡
–Ž› ‹†‹ ‡
–Ž› †‡• ‘› ƒ ‹ ‡
’ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡ ‘” •‹–‡ ‘” —‹“—‡
‰‡‘Ž‘‰‹
ˆ‡ƒ–—”‡ǫ
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-56

Initial Study
Discussion

’ƒ
– ͓͵ǤͶǤ͹ƒሺ‹ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
– ‹”‡
–Ž› ‘” ‹†‹”‡
–Ž›
ƒ—•‡ ’‘–‡–‹ƒŽ •—„•–ƒ–‹ƒŽ
ƒ†˜‡”•‡ ‡ˆˆ‡
–•ǡ ‹
Ž—†‹‰ –Ї ”‹• ‘ˆ Ž‘••ǡ ‹Œ—”›ǡ ‘” †‡ƒ–Š ‹˜‘Ž˜‹‰ Ȃ —’–—”‡ ‘ˆ ƒ ‘™ ‡ƒ”–Š“—ƒ‡ ˆƒ—Ž–ǡ ƒ• †‡Ž‹‡ƒ–‡† ‘ –Ї ‘•– ”‡
‡– Ž“—‹•–Ǧ”‹‘Ž‘ ƒ”–Š“—ƒ‡ ƒ—Ž–
‘‹‰
ƒ’ ‹••—‡† „› –Ї –ƒ–‡ ‡‘Ž‘ ‰‹•– ˆ‘” –Ї ƒ”‡ƒ ‘” „ƒ•‡† ‘ ‘–Ї” •—„•–ƒ–‹ƒŽ ‡˜‹†‡ ‡ ‘ˆ ƒ
‘™ ˆƒ—Ž–ǫ
‘™ ƒŒ‘” ˆƒ—Ž–• ƒ”‡ ‘˜‡” ͷͲ ‹Ž‡• ƒ™ƒ› ƒ† ‹
Ž—†‡ –Ї ƒ †”‡ƒ• ƒ—Ž–ǡ ‘ƒŽ‹‰ƒ ƒ”‡ƒ
„Ž‹† –Š”—•– ˆƒ—Ž–ሺ•ሻǡ –Ї ‘‰ ƒŽŽ‡›ǡ ™‡• ƒŽŽ‡›ǡ ƒ† Š‹–‡ ‘ŽˆȀ‡Šƒ Šƒ’‹ ˆƒ—Ž– •›•–‡•
ሺƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘•‡”˜ƒ–‹‘ ʹͲʹͶƒሻǤ
Ї ’”‘’‘•‡† ”‘Œ‡
– ‹• ‡š’‡
–‡† –‘
‘’Ž› ™‹–Š –Ї ƒŽ‹ˆ‘”‹ƒ —‹Ž†‹‰ ‘†‡ ሺሻ
”‡“—‹”‡‡–• –Šƒ– ™‘—ކ ‡•—”‡ ƒ

‡’–ƒ„އ ƒ† •ƒˆ‡ „—‹Ž†‹‰ ’”ƒ
–‹
‡• ƒ”‡ ‹’އ‡–‡† –‘
”‡†—
‡ ’‘–‡–‹ƒŽ ƒ†˜‡”•‡ ‡ˆˆ‡
–• ˆ”‘ ˆƒ—Ž–Ǧ”‡Žƒ–‡† ‰”‘—† •Šƒ‹‰Ǥ Ї”‡ˆ‘”‡ǡ ™‹–Š

‘•‹†‡”ƒ–‹‘ ‘ˆ –Ї †‹•–ƒ
‡ ‘ˆ –Ї ”‘Œ‡
– ˆ”‘ ‡ƒ”–Š“—ƒ‡ ˆ

‘’Ž‹ƒ
‡ ™‹–Š  ”‡“—‹”‡‡–•ǡ –Ї ”‘Œ‡
– ™‘—ކ ”‡•—Ž– ‹ Ž
ƒ
ƒ
—Ž–• ƒ† ƒ†ƒ–‘”›
‡••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ–
‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤ͹ƒሺ‹‹ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
– ‹”‡
–Ž› ‘” ‹†‹”‡
–Ž›
ƒ—•‡ ’‘–‡–‹ƒŽ •—„•–ƒ–‹ƒŽ
ƒ†˜‡”•‡ ‡ˆˆ‡
–•ǡ ‹
Ž—†‹‰ –Ї ”‹• ‘ˆ Ž‘••ǡ ‹Œ—”›ǡ ‘” †‡ƒ–Š ‹˜‘Ž˜‹‰ Ȃ •–”‘‰ •‡‹•‹ ‰”‘—†
•Šƒ‹‰ǫ
‡‡ †‹•
—••‹‘ ‘ˆ
’ƒ
– ͓͵ǤͶǤ͹ƒሺ‹ሻ ƒ„‘˜‡Ǥ
Ї”‡ ƒ”‡ ‘ ‘™ ƒ
–‹˜‡ ‡ƒ”–Š“—ƒ‡ ˆƒ—Ž–• ‘” Ž“—‹•–Ǧ”‹‘Ž‘ ˆƒ—Ž– œ‘‡• –Šƒ– –”ƒ˜‡”•‡ –Ї ‹–›Ǥ
‘™‡˜‡”ǡ •‡‹•‹
‡˜‡–•
ƒ—•‡† „› ƒ
–‹˜‡ ƒ† ’‘–‡–‹ƒŽŽ› ƒ
–‹˜‡ ˆƒ—Ž–• ‹ –Ї ”‡‰‹‘

‘—ކ ”‡•—Ž– ‹ •‡‹•‹
‰”‘—† •Šƒ‹‰ ‘Ǧ•‹–‡Ǥ ‘•–”—
–‹‘ ™‹ŽŽ
‘’Ž› ™‹–Š ƒŽŽ ƒ’’Ž‹
ƒ„އ
Ž‘
ƒŽ ƒ† –ƒ–‡ ”‡‰—Žƒ–‹‘• ‹
Ž—†‹‰ ƒ’’Ž‹
ƒ„އ  ”‡“—‹”‡‡–• ˆ‘” •ƒˆ‡ ƒ† ƒ

‡’–ƒ„އ
„—‹Ž†‹‰ ’”ƒ
–‹
‡• –‘ ”‡†—
‡ ’‘–‡–‹ƒŽ ƒ†˜‡”•‡ ‡ˆˆ‡
–• ˆ”‘ •–”‘‰ •‡‹•‹
‰”‘—† •Šƒ‹‰
ƒ† ‡ ‡”ƒŽ Žƒ ‘Ž‹
›  ͷǤʹǤͳ ”‡“—‹”‹‰ ‰‡‘–‡
А‹
ƒŽ ƒ† •‡‹•‹
”‡’‘”–• ™Š‡ ƒ ’”‘Œ‡
–
‹• Ž‘
ƒ–‡† ‘ Žƒ† ‡šŠ‹„‹–‹‰ ’‘–‡–‹ƒŽŽ› —•–ƒ„އ •‘‹Ž
‘†‹–‹‘•ǡ •—‹–ƒ„‹Ž‹–› ˆ‘” ƒ††‹–‹‘ƒŽ
†‡˜‡Ž‘’‡–ǡ ‘” ‘–Ї” Šƒœƒ”†‘—• ‰‡‘Ž‘‰‹

‘†‹–‹‘•Ǥ ‘’Ž‹ƒ
‡ ™‹–Š –Ї•‡ ”‡‰—Žƒ–‘”›
”‡“—‹”‡‡–• ”‡†—
‡• ƒ› ’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ– ‹’ƒ
–• –‘ •–”—
–—”‡• ”‡•—Ž–‹‰ ˆ”‘ •–”‘‰
•‡‹•‹
‰”‘—† •Šƒ‹‰ ƒ– –Ї ”‘Œ‡
– •‹–‡Ǥ Ї”‡ˆ‘”‡ǡ ”‘Œ‡
– ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ
•‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-57

Initial Study

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤ͹ƒሺ‹‹‹ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
– ‹”‡
–Ž› ‘” ‹†‹”‡
–Ž›
ƒ—•‡ ’‘–‡–‹ƒŽ •—„•–ƒ–‹ƒŽ
ƒ†˜‡”•‡ ‡ˆˆ‡
–•ǡ ‹
Ž—†‹‰ –Ї ”‹• ‘ˆ Ž‘••ǡ ‹Œ—”›ǡ ‘” †‡ƒ–Š ‹˜‘Ž˜‹‰ Ȃ •‡‹•‹ Ǧ”‡Žƒ–‡† ‰”‘—†
ˆƒ‹Ž—”‡ǡ ‹
Ž—†‹‰ Ž‹“—‡ˆƒ
–‹‘ǫ
‡‡ †‹•
—••‹‘ ‘ˆ
’ƒ
– ͓͵ǤͶǤ͹ƒሺ‹ሻ ƒ† ሺ‹‹ሻ ƒ„‘˜‡Ǥ
Ї ‡‡†Ž‡› ’Žƒ‹‰ ƒ”‡ƒ ‹•
Šƒ”ƒ
–‡”‹œ‡† ƒ• Šƒ˜‹‰ ƒ ”‡Žƒ–‹˜‡Ž› –Š‹ •‡
–‹‘ ‘ˆ •‡†‹‡–ƒ”›
”‘
 ‘˜‡”Ž›‹‰ ‰”ƒ‹–‡Ǥ Ї ƒ’Ž‹ˆ‹
ƒ–‹‘ ‘ˆ •Šƒ‹‰ –Šƒ– ™‘—ކ ƒˆˆ‡
– Ž‘™Ǧ–‘Ǧ‡†‹— ”‹•‡
•–”—
–—”‡• ‹• ”‡Žƒ–‹˜‡Ž› Š‹‰ŠǤ ‡
‘†ƒ”› Šƒœƒ”†• †—‡ –‘ Žƒ†•Ž‹†‡•ǡ •—„•‹†‡
‡ ƒ†
•‡––އ‡–ǡ Ž‹“—‡ˆƒ
–‹‘ǡ ƒ† •‡‹
Š‹‰ ƒ”‡
‘•‹†‡”‡† ‹‹ƒŽ ‹ –Š‹• ƒ”‡ƒ ሺ‹–› ‘ˆ ‡‡†Ž‡›
ʹͲͳͶሻǤ
‹“—‡ˆƒ
–‹‘ ‹• †‡ˆ‹‡† ƒ• ƒ ’Ї‘‡‘ ™Š‡”‡ ‡ƒ”–Š“—ƒ‡Ǧ‹†—
‡† ‰”‘—† ˜‹„”ƒ–‹‘•
•—††‡ Ž‘•• ‘ˆ •‘‹Ž •–”‡‰–Š ”‡•—Ž–‹‰ ˆ”‘ •Šƒ‹‰ †—”‹‰ ƒ ‡ƒ”–Š“—ƒ‡Ǥ ƒ† ™‹–Š –Ї ™ƒ–‡” –ƒ„އ އ•• –Šƒ ͷͲ ˆ‡‡– „‡Ž‘™ ‰”ƒ†‡ ሺ„‰•ሻ ‹• ‡•’‡ ‹ƒŽŽ› ˜—ސ‡”ƒ„އ Ǥ Ї –Š‹• ‘

—”•ǡ
–Ї •‘‹Ž
ƒ
‘’އ–‡Ž› Ž‘•‡ ‹–• •Їƒ” •–”‡‰–Š ƒ† ‡–‡” ƒ Ž‹“—‡ˆ‹‡† •–ƒ–‡Ǥ Ї ’‘••‹„‹Ž‹–› ‘ˆ Ž‹“—‡ˆƒ
–‹‘ ‹• †‡’‡†‡– —’‘ ‰”ƒ‹ •‹œ‡ǡ ”‡Žƒ–‹˜‡ †‡•‹–›ǡ
‘ˆ‹‹‰ ’”‡••—”‡ǡ •ƒ–—”ƒ–‹‘ ‘ˆ
–Ї •‘‹Ž•ǡ ƒ† ‹–‡•‹–› ƒ† †—”ƒ–‹‘ ‘ˆ ‰”‘—† •Šƒ‹‰Ǥ  ‘”†‡” ˆ‘” Ž‹“—‡ˆƒ
–‹‘ –‘ ‘

—”ǡ
–Š”‡‡
”‹–‡”‹ƒ —•– „‡ ‡–ǣ DzŽ‘™ †‡•‹–›ǡdz
‘ƒ”•‡Ǧ‰”ƒ‹‡† ሺ•ƒ†›ሻ •‘‹Ž•ǡ ƒ ‰”‘—†™ƒ–‡” †‡’–Š
‘ˆ އ•• –Šƒ ƒ„‘—– ͷͲ ˆ‡‡–ǡ ƒ† ƒ ’‘–‡–‹ƒŽ ˆ‘” •‡‹•‹
•Šƒ‹‰ ˆ”‘ ‡ƒ”„› Žƒ”‰‡ ƒ‰‹–—†‡
‡ƒ”–Š“—ƒ‡•Ǥ Ї ƒ”‡ƒ ƒ”‘—† –Ї ‹–› Šƒ• ƒ ‡ƒ•—”‡† †‡’–Š ‘ˆ ƒ’’”‘š‹ƒ–‡Ž› ͹ͻ ˆ‡‡– „‰• ሺƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ƒ–‡” ‡•‘—”
‡• ʹͲʹͷሻǤ ‡
ƒ—•‡ –Ї †‡’–Š ‘ˆ –Ї ‰”‘—†™ƒ–‡”
•‹–‡ ‹• ‰”‡ƒ–‡” –Šƒ ͷͲ ˆ‡‡–ǡ –Ї”‡ ‹• ƒ ‡‰Ž‹‰‹„އ ”‹• ‘ˆ Ž‹“—‡ˆƒ –‹‘ ‘

—””‹‰
ƒ–
–Ї ƒ–
–Ї
”‘Œ‡
–
”‘Œ‡
– •‹–‡ †—”‹‰ ƒ •‡‹•‹
‡˜‡–Ǥ
ƒ•‡† ‘ –Š‹• ƒƒŽ›•‹•ǡ –Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
– ‡š’‘•‹‰ ’‡‘’އ
‘” •–”—
–—”‡• –‘ ’‘–‡–‹ƒŽ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ‡ˆˆ‡
–•ǡ ‹
Ž—†‹‰ –Ї ”‹• ‘ˆ Ž‘••ǡ ‹Œ—”›ǡ ‘”
†‡ƒ–Š ‹˜‘Ž˜‹‰ •‡‹•‹
Ǧ”‡Žƒ–‡† ‰”‘—† ˆƒ‹Ž—”‡ǡ ‹
Ž—†‹‰ Ž‹“—‡ˆƒ
–‹‘Ǥ †Š‡”‡
‡ –‘ ƒŽŽ
ƒ’’Ž‹
ƒ„އ ”‡‰—Žƒ–‹‘• ™‘—ކ ”‡†—
‡ ‘” ƒ˜‘‹† ƒ› ’‘–‡–‹ƒŽ ‹’ƒ
–• –‘ •–”—
–—”‡• ”‡•—Ž–‹‰
ˆ”‘ Ž‹“—‡ˆƒ
–‹‘ ƒ– –Ї ”‘Œ‡
– •‹–‡ǡ ƒ† ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-58

Initial Study

’ƒ
– ͓͵ǤͶǤ͹ƒሺ‹˜ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
– ‹”‡
–Ž› ‘” ‹†‹”‡
–Ž›
ƒ—•‡ ’‘–‡–‹ƒŽ •—„•–ƒ–‹ƒŽ
ƒ†˜‡”•‡ ‡ˆˆ‡
–•ǡ ‹
Ž—†‹‰ –Ї ”‹• ‘ˆ Ž‘••ǡ ‹Œ—”›ǡ ‘” †‡ƒ–Š ‹˜‘Ž˜‹‰ Ȃ Žƒ†•Ž‹†‡•ǫ Ї ”‘Œ‡
– •‹–‡ ƒ† ˜‹
‹‹–› ‹• ”‡Žƒ–‹˜‡Ž› ˆŽƒ– ™‹–Š ‘ •‹‰‹ˆ‹
ƒ– –‘’‘Ž‘‰‹
ƒŽ ˆ‡ƒ–—”‡•Ǥ • •—
Šǡ
–Ї”‡ ‹• ‘ ’‘–‡–‹ƒŽ ˆ‘” ”‘
 ˆƒŽŽ• ‘” Žƒ†•Ž‹†‡• –‘ ‹’ƒ
– –Ї ”‘Œ‡
– ‹ –Ї ‡˜‡– ‘ˆ ƒ
‡ƒ”–Š“—ƒ‡ǡ ƒ• –Ї ƒ”‡ƒ Šƒ• ‘ †”ƒƒ–‹
‡Ž‡˜ƒ–‹‘
Šƒ‰‡•Ǥ Ї ”‘Œ‡
– ™‹ŽŽ ‘– †‹”‡
–Ž› ‘”
ƒŒ‘”
‹†‹”‡
–Ž›
ƒ—•‡ ’‘–‡–‹ƒŽ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ‡ˆˆ‡
–•ǡ ‹
Ž—†‹‰ –Ї ”‹• ‘ˆ Ž‘••ǡ ‹Œ—”›ǡ ‘”
†‡ƒ–Š ‹˜‘Ž˜‹‰ Žƒ†•Ž‹†‡•Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‹ŽŽ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤ͹„ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ •—„•–ƒ–‹ƒŽ •‘‹Ž ‡”‘•‹‘ ‘” –Ї Ž‘•• ‘ˆ –‘’•‘‹Žǫ Ї ”‘Œ‡
– •‹–‡ ƒ† •—””‘—†‹‰ ƒ”‡ƒ ‹• ‘•–Ž› ˆŽƒ–Ǥ ‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• ˆ‘” –Ї ”‘Œ‡
–
ƒ› †‹•–—”„ ‹‹ƒŽ ƒ‘—–• ‘ˆ •‘‹Ž• †—”‹‰
‘•–”—
–‹‘ ƒ† ™‘—ކ ‡š’‘•‡ –Ї•‡ †‹•–—”„‡†
ƒ”‡ƒ• –‘ ‡”‘•‹‘ „› ™‹† ƒ† ™ƒ–‡”Ǥ
‘™‡˜‡”ǡ •‹
‡ –Ї ”‘Œ‡
–‹• ƒ–‹
‹’ƒ–‡† –‘ †‹•–—”„ ‘”‡
–Šƒ ‘‡ ƒ
”‡ ‘ˆ Žƒ† ƒ–ǡ –Ї ”‘Œ‡
– ‹• •—„Œ‡
– –‘ ƒ–‹‘ƒŽ ‘ŽŽ—–ƒ– ‹•
Šƒ”‰‡ Ž‹‹ƒ–‹‘
›•–‡ ሺሻ ”‘‰”ƒ ”‡“—‹”‡‡–•Ǥ • •—
Šǡ ‹– ™‹ŽŽ Šƒ˜‡ –‘ †‡˜‡Ž‘’ ƒ –‘”™ƒ–‡”
‘ŽŽ—–‹‘ ”‡˜‡–‹‘ Žƒ ሺሻǤ   —•– ‹†‡–‹ˆ› ’‘–‡–‹ƒŽ •‘—” ‡• ‘ˆ ‡”‘•‹‘ ‘”
•‡†‹‡–ƒ–‹‘ ƒ• ™‡ŽŽ ƒ• ‹†‡–‹ˆ› ƒ† ‹’އ‡– ˜ƒ”‹‘—• –›’‡• ‘ˆ • –‘ ’”‡˜‡– ‡”‘•‹‘ ƒ† •‡†‹‡–ƒ–‹‘ ˆ”‘ ‘

—””‹‰ †—”‹‰
‘•–”—
–‹‘Ǥ ›’‹
ƒŽ • ‹–‡†‡† –‘
‘–”‘Ž
‡”‘•‹‘ ‹
Ž—†‡ •ƒ†„ƒ‰•ǡ ”‡–‡–‹‘ „ƒ•‹•ǡ •‹Ž– ˆ‡
‹‰ǡ •–”‡‡– •™‡‡’‹‰ǡ ‡–
Ǥ
‹–‹‰ƒ–‹‘ ‡ƒ•—”‡  Ǧͳ ”‡“—‹”‡• –Ї ƒ’’”‘˜ƒŽ ‘ˆ ƒ  –‘ ‘’Ž› ™‹–Š –Ї 
‡‡”ƒŽ ‘•–”—
–‹‘ ‡”‹–Ǥ Ї ”‘Œ‡
– ™‹ŽŽ
‘’Ž› ™‹–Š ƒŽŽ ‰”ƒ†‹‰ ”‡“—‹”‡‡–• ƒ•
‘—–Ž‹‡† ‹ ‹–އ ʹͶ ƒ† ’’‡†‹š
‘ˆ –Ї Ǥ Ї ”‘Œ‡
– ‹• ‘– ‡š’‡
–‡† –‘ ”‡•—Ž– ‹
•—„•–ƒ–‹ƒŽ ‡”‘•‹‘ ‘” –Ї Ž‘•• ‘ˆ –‘’•‘‹Ž ™‹–Š –Ї ‹
‘”’‘”ƒ–‹‘ ‘ˆ  ǦͳǤ

‡
‘•–”—
–‡†ǡ –Ї ”‘Œ‡
– ™‹ŽŽ Šƒ˜‡ „‘–Š ‹’‡”‡ƒ„އ •—”ˆƒ
‡• ƒ• ™‡ŽŽ ƒ• ’‡”‡ƒ„އ
•—”ˆƒ
‡•Ǥ
’‡”‡ƒ„އ •—”ˆƒ
‡ ™‘—ކ ‹
Ž—†‡ ”‘ƒ†™ƒ›•ǡ †”‹˜‡™ƒ›•ǡ ƒ† „—‹Ž†‹‰ •‹–‡•Ǥ
‡”‡ƒ„އ •—”ˆƒ
‡• ™‘—ކ ‹
Ž—†‡ ƒ› Žƒ†•
ƒ’‡† ƒ”‡ƒ•Ǥ –‘”™ƒ–‡” ™‹ŽŽ „‡ †‹”‡
–‡† –‘ –Ї
’Žƒ‡† ͳǤ͹ͷǦƒ
”‡ ‘Ǧ•‹–‡ •–‘”™ƒ–‡” „ƒ•‹ǡ †‡˜‡Ž‘’‡† —†‡” ‹–› ‘ˆ ‡‡†Ž‡› ƒ†‘’–‡† •–ƒ†ƒ”†•Ǥ Ї”‡ˆ‘”‡ǡ –Ї †‡˜‡Ž‘’‡– ‘ˆ –Ї ”‘Œ‡
– ™‘—ކ ‘– ”‡•—Ž– ‹ •—„•–ƒ–‹ƒŽ •—”ˆƒ
‡
•‘‹Ž• ‡š’‘•—”‡ –‘ ™‹† ‘” ™ƒ–‡”ǡ ƒ† ™‹–Š ‹’އ‡–ƒ–‹‘ ‘ˆ  Ǧͳǡ ™‘—ކ ”‡•—Ž– ‹ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
  Ǧͳǣ ”‹‘” –‘ ‹••—ƒ
‡ ‘ˆ ‰”ƒ†‹‰ ‘” „—‹Ž†‹‰ ’‡”‹–•ǡ –Ї ”‘Œ‡
– ƒ’’Ž‹
ƒ– •ŠƒŽŽ
•—„‹– –‘ –Ї ‹–›ǣ ሺͳሻ –Ї ƒ’’”‘˜‡†  ƒ† ሺʹሻ –Ї ‘–‹ ‡ ‘ˆ
–‡– ሺ
ሻ –‘
‘’Ž›
™‹–Š –Ї ‡‡”ƒŽ  ˆ”‘ –Ї ‡–”ƒŽ ƒŽŽ‡› ‡‰‹‘ƒŽ ƒ–‡” —ƒŽ‹–› ‘–”‘Ž ‘ƒ”†Ǥ Ї VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-59

Initial Study
”‡“—‹”‡‡–• ‘ˆ –Ї  ƒ†  •ŠƒŽŽ „‡ ‹
‘”’‘”ƒ–‡† ‹–‘ †‡•‹‰ •’‡
‹ˆ‹
ƒ–‹‘• ƒ†

‘•–”—
–‹‘
‘–”ƒ
–•Ǥ ‡
‘‡†‡† ‡•– ƒƒ‰‡‡– ”ƒ
–‹
‡• ˆ‘” –Ї
‘•–”—
–‹‘
’Šƒ•‡ ƒ› ‹
Ž—†‡ –Ї ˆ‘ŽŽ‘™‹‰ǣ
x –‘
’‹Ž‹‰ ƒ† †‹•’‘•‹‰ ‘ˆ †‡‘Ž‹–‹‘ †‡„”‹•ǡ
‘
”‡–‡ǡ ƒ† •‘‹Ž ’”‘’‡”Ž›Ǥ
x ”‘–‡
–‹‰ ‡š‹•–‹‰ •–‘” †”ƒ‹ ‹Ž‡–• ƒ† •–ƒ„‹Ž‹œ‹‰ †‹•–—”„‡† ƒ”‡ƒ•Ǥ x
’އ‡–‹‰ ‡”‘•‹‘
‘–”‘Ž•Ǥ
x ”‘’‡”Ž› ƒƒ‰‹‰
‘•–”—
–‹‘ ƒ–‡”‹ƒŽ•Ǥ
x ƒƒ‰‹‰ ™ƒ•–‡ǡ ƒ‰‰”‡••‹˜‡Ž›
‘–”‘ŽŽ‹‰ Ž‹––‡”ǡ ƒ† ‹’އ‡–‹‰ •‡†‹‡–
‘–”‘ŽǤ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‹– ‘
‘” ‘ ƒ– –  ‹ ” ‹– ‹‰ƒ–‹ ’ ‡†Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤ͹
Ȃ ‘—ކ –Ї ”‘Œ‡
– „‡ Ž‘
ƒ–‡† ‘ ƒ ‰‡‘Ž‘‰‹
—‹– ‘” •‘‹Ž –Šƒ– ‹• —•–ƒ„އǡ ‘”
–Šƒ– ™‘—ކ „‡
‘‡ —•–ƒ„އ ƒ• ƒ ”‡•—Ž– ‘ˆ –Ї ”‘Œ‡
–ǡ ƒ† ’‘–‡–‹ƒŽŽ› ”‡•—Ž– ‹ ‘Ǧ ‘” ‘ˆˆǦ•‹–‡
Žƒ†•Ž‹†‡ǡ Žƒ–‡”ƒŽ •’”‡ƒ†‹‰ǡ •—„•‹†‡
‡ǡ Ž‹“—‡ˆƒ
–‹‘ǡ ‘”
‘ŽŽƒ’•‡ǫ
‡‡ †‹•
—••‹‘ ‹
’ƒ
– ͓͵ǤͶǤ͹ƒሺ‹‹‹ሻ ƒ† ͵ǤͶǤ͹ƒሺ‹˜ሻ ƒ„‘˜‡Ǥ
Ї”‡ ƒ”‡ ‘ •Ž‘’‡• ‘ ‘” ‡ƒ” –Ї •‹–‡ǡ ƒ† –Ї ”‘Œ‡
– ™‘—ކ ‘– ‡š’‘•‡ –Ї ’‡‘’އ ‘”
•–”—
–—”‡• –‘ •‹‰‹ˆ‹
ƒ– ”‹•• ˆ”‘ Žƒ†•Ž‹†‡•Ǥ
Ї ’”‘’‘•‡† ”‘Œ‡
– ™‹ŽŽ
‘’Ž› ™‹–Š ƒŽŽ ‹–› ƒ† –ƒ–‡ ”‡‰—Žƒ–‹‘• ’‡”–ƒ‹‹‰ –‘

‘•–”—
–‹‘ǡ ‹
Ž—†‹‰  ƒ† –Ї ‹–›ǯ• —‹
‹’ƒŽ ‘†‡Ǥ ‘’Ž‹ƒ
‡ ™‹–Š –Ї ‡š‹•–‹‰
”‡‰—Žƒ–‘”› ˆ”ƒ‡™‘” ™‘—ކ „‡ ƒ†‡“—ƒ–‡ –‘ ”‡†—
‡ ƒ› ’‘–‡–‹ƒŽ ‹’ƒ
–• –‘ އ••Ǧ–ŠƒǦ
•‹‰‹ˆ‹
ƒ– އ˜‡Ž•Ǥ ‘”‡‘˜‡”ǡ –Ї ”‘Œ‡
– ™‹ŽŽ „‡ †‡•‹‰‡† „› ƒ ‡‰‹‡‡” –‘ ”‡•‹•– ’‘–‡–‹ƒŽ
•‹†‡ ‡ˆˆ‡
–• ‘ˆ •’”‡ƒ†‹‰ǡ •—„•‹†‡
‡ǡ Ž‹“—‡ˆƒ
–‹‘ǡ ‘”
‘ŽŽƒ’•‡Ǥ Ї”‡ˆ‘”‡ǡ –Ї ‹’ƒ
–• ™‘—ކ
„‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤ͹† Ȃ ‘—ކ –Ї ”‘Œ‡
– „‡ Ž‘
ƒ–‡† ‘ ‡š’ƒ•‹˜‡ •‘‹Žǡ ƒ• †‡ˆ‹‡† ‹ ƒ„އ ͳͺǦͳǦ
‘ˆ –Ї ‹ˆ‘” —‹Ž†‹‰ ‘†‡ ሺͳͻͻͶሻǡ
”‡ƒ–‹‰ •—„•–ƒ–‹ƒŽ ”‹•• –‘ Ž‹ˆ‡ ‘” ’”‘’‡”–›ǫ
Žƒ› •‘‹Ž• ƒ”‡ –›’‹
ƒŽŽ› ‘”‡ •—•
‡’–‹„އ –‘ ‡š’ƒ•‹‘ ƒ† •—„•‡“—‡– Šƒœƒ”†• †—‡ –‘ –Ї
†‹•’ƒ”‹–› „‡–™‡‡ –Ї‹” ™‡– ƒ† †”›
‘’‘•‹–‹‘•Ǥ ‡” –Ї ƒ–‹‘ƒŽ ‡•‘—”
‡• ‘•‡”˜ƒ–‹‘
‡”˜‹
‡ ሺሻǡ ‡„ ‘‹Ž —”˜‡›ǡ –Ї ”‘Œ‡
– •‹–‡
‘•‹•–• ‘ˆ ”‡‡ˆ‹‡Ž† •ƒ†› Ž‘ƒǡ
‘†‡”ƒ–‡Ž› †‡‡’ǡ Ͳ –‘ ͵ ’‡”
‡– •Ž‘’‡•ǡ ƒ† ƒ‘ƒ Ž‘ƒ ሺƒ–—”ƒŽ ‡•‘—”
‡• ‘•‡”˜ƒ–‹‘
‡”˜‹
‡ ʹͲʹͶሻǤ ƒ†› Ž‘ƒ •‘‹Ž• ƒ”‡ –›’‹
ƒŽŽ›
‘’”‹•‡† ‘ˆ •ƒ† ƒ† •‹Ž–
‘’‘•‹–‹‘• ™‹–Š ƒ
Ž‘™ ’‡”
‡–ƒ‰‡ ‘ˆ
Žƒ›Ǥ ‹–Š
‘•‹†‡”ƒ–‹‘ ‘ˆ –Ї •‘‹Ž –›’‡ ‹†‡–‹ˆ‹‡† ‘ –Ї •‹–‡ǡ –Ї ”‘Œ‡ –
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-60
Initial Study
™‘—ކ ‘– „‡ Ž‘
ƒ–‡† ‘ ‡š’ƒ•‹˜‡ •‘‹ŽǤ ††‹–‹‘ƒŽŽ›ǡ –Ї ”‘Œ‡
– ™‹ŽŽ
‘’Ž› ™‹–Š ƒ’’Ž‹
ƒ„އ
 ”‡‰—Žƒ–‹‘• ˆ‘” †‡˜‡Ž‘’‡– ™‹–Š‹ •’‡
‹ˆ‹
•‘‹Ž –›’‡• ƒ† ™‘—ކ ”‡•—Ž– ‹ އ••Ǧ–ŠƒǦ
•‹‰‹ˆ‹
ƒ– ‹’ƒ
–•Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤ͹‡ Ȃ ‘—ކ –Ї ”‘Œ‡
– Šƒ˜‡ •‘‹Ž• ‹
ƒ’ƒ„އ ‘ˆ ƒ†‡“—ƒ–‡Ž› •—’’‘”–‹‰ –Ї —•‡ ‘ˆ
•‡’–‹
–ƒ• ‘” ƒŽ–‡”ƒ–‹˜‡ ™ ‡™ƒ–‡” †‹•’‘•ƒŽ •›•–‡• ‹ ƒ”‡ƒ• ™Š‡”‡ •‡™‡”• ƒ”‡ ‘– ƒ˜ƒ‹Žƒ„އ ˆ‘” –Ї †‹•’‘•ƒŽ ‘ˆ ™
ƒ•–
ƒ•–‡™ƒ–‡”ǫ
Ї ’”‘’‘•‡† ”‘Œ‡
– †‘‡• ‘– ‹
Ž—†‡ ’”‹˜ƒ–‡ •‡’–‹
•›•–‡•Ǥ Ї ”‘Œ‡
– ™‹ŽŽ
‘‡
– –‘ –Ї
‡š‹•–‹‰ ‹–› •‡™‡” •›•–‡ ˆ‘” –Ї †‹•’‘•ƒŽ ‘ˆ ‰‡‡”ƒ–‡† ™ƒ•–‡™ƒ–‡” †—”‹‰ ‘’‡”ƒ–‹‘•Ǥ Ї ”‘Œ‡
– ™‹ŽŽ
‘’Ž› ™‹–Š ƒ’’Ž‹
ƒ„އ ‹–› ‘ˆ ‡‡†Ž‡› †‡˜‡Ž‘’‡– •–ƒ†ƒ”†• ˆ‘”
‘‡
–‹‘ –‘
‡š‹•–‹‰ ‹–› •‡™‡” ‹ˆ”ƒ•–”—
–—”‡Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ‘ ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ

’ƒ
– ͓͵ǤͶǤ͹ˆ Ȃ ‘—ކ –Ї ”‘Œ‡
– †‹”‡
–Ž› ‘” ‹†‹”‡
–Ž› †‡•–”‘› ƒ —‹“—‡ ’ƒŽ‡‘–‘Ž‘‰‹
ƒŽ
”‡•‘—”
‡ ‘” •‹–‡ ‘” —‹“—‡ ‰
Ї ”‘Œ‡
– •‹–‡ Šƒ• ’”‡˜‹‘—•Ž› „‡‡
‡‘Ž‘‰‹
ˆ‡ƒ–—”‡ǫ
†‹•–—”„‡† „› ’ƒ•– ƒ‰”‹
—Ž–—”ƒŽ ƒ
–‹˜‹–‹‡•Ǥ
‘™‡˜‡”ǡ
‰”‘—†Ǧ†‹•–—”„‹‰ ƒ
–‹˜‹–‹‡• †—”‹‰
‘•–”—
–‹‘
‘—ކ ’‘–‡–‹ƒŽŽ› ‹’ƒ
– ’”‡˜‹‘—•Ž›
—†‹•
‘˜‡”‡† ’ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• ‘” —‹“—‡ ‰‡‘Ž‘‰‹
ˆ‡ƒ–—”‡•Ǥ Ї ‹’އ‡–ƒ–‹‘ ‘ˆ
 Ǧʹ ™‘—ކ ”‡†—
‡ ’‘–‡–‹ƒŽ ‹’ƒ
–• –‘ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– އ˜‡ŽǤ • •—
Šǡ ™‹–Š –Ї
‹
‘”’‘”ƒ–‹‘ ‘ˆ   Ǧʹǡ ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
  Ǧʹǣ
 –Ї ‡˜‡– ’ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• ƒ”‡ ‡
‘—–‡”‡† †—”‹‰ ‰”‘—†Ǧ
†‹•–—”„ƒ
‡ ƒ
–‹˜‹–‹‡•ǡ ƒŽŽ ™‘” ™‹–Š‹ ʹͷ ˆ‡‡– ‘ˆ –Ї ˆ‹† •ŠƒŽŽ ŠƒŽ– —–‹Ž ƒ “—ƒŽ‹ˆ‹‡† ’ƒŽ‡‘–‘Ž‘‰‹•–ǡ ƒ• †‡ˆ‹‡† „› –Ї ‘
‹‡–› ‘ˆ ‡”–‡„”ƒ–‡ ƒŽ‡‘–‘Ž‘‰› –ƒ†ƒ”† ”‘
‡†—”‡• ˆ‘”
–Ї ••‡••‡– ƒ† ‹–‹‰ƒ–‹‘ ‘ˆ †˜‡”•‡
’ƒ
–• –‘ ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ‡•‘—”
‡• ሺʹͲͳͲሻǡ
ƒ
‡˜ƒŽ—ƒ–‡ –Ї ˆ‹† ƒ† ƒ‡ ”‡
‘‡†ƒ–‹‘• ”‡‰ƒ”†‹‰ –”‡ƒ–‡–Ǥ ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡
ƒ–‡”‹ƒŽ• ƒ› ‹
Ž—†‡ ”‡•‘—”
‡• •—
Š ƒ• ˆ‘••‹Ž•ǡ ’Žƒ– ‹’”‡••‹‘•ǡ ‘” ƒ‹ƒŽ –”ƒ
•
’”‡•‡”˜‡† ‹ ”‘
Ǥ Ї “—ƒŽ‹ˆ‹‡† ’ƒŽ‡‘–‘Ž‘‰‹•– •ŠƒŽŽ
‘–ƒ
– –Ї ƒ–—”ƒŽ
‹•–‘”› —•‡— ‘ˆ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-61
Initial Study
‘• ‰‡Ž‡• ‘—–› ‘” ƒ‘–Ї” ƒ’’”‘’”‹ƒ–‡ ˆƒ
‹Ž‹–› ”‡‰ƒ”†‹‰ ƒ› †‹•
‘˜‡”‹‡• ‘ˆ
’ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡•Ǥ

ˆ –Ї “—ƒŽ‹ˆ‹‡† ’ƒŽ‡‘–‘Ž‘‰‹•– †‡–‡”‹‡• –Šƒ– –Ї †‹•
‘˜‡”› ”‡’”‡•‡–• ƒ ’‘–‡–‹ƒŽŽ›
•‹‰‹ˆ‹
ƒ– ’ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡ǡ ƒ††‹–‹‘ƒŽ ‹˜‡•–‹‰ƒ–‹‘• ƒ† ˆ‘••‹Ž ”‡
‘˜‡”› ƒ› „‡
”‡“—‹”‡† –‘ ‹–‹‰ƒ–‡ ƒ†˜‡”•‡ ‹’ƒ
–• ˆ”‘ ”‘Œ‡
– ‹’އ‡–ƒ–‹‘Ǥ
ˆ ƒ˜‘‹†ƒ
‡ ‹• ‘–
ˆ‡ƒ•‹„އǡ –Ї ’ƒŽ‡‘–‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡• •ŠƒŽŽ „‡ ‡˜ƒŽ—ƒ–‡† ˆ‘” –Ї‹” •‹‰‹ˆ‹
ƒ
‡Ǥ
ˆ –Ї
”‡•‘—”
‡• ƒ”‡ ‘– •‹‰‹ˆ‹
ƒ–ǡ ƒ˜‘‹†ƒ
‡ ‹• ‘– ‡
‡••ƒ”›Ǥ
ˆ –Ї ”‡•‘—”
‡• ƒ”‡ •‹‰‹ˆ‹
ƒ–ǡ –Ї›
•ŠƒŽŽ „‡ ƒ˜‘‹†‡† –‘ ‡•—”‡ ‘ ƒ†˜‡”•‡ ‡ˆˆ‡
–•ǡ ‘” •—
Š ‡ˆˆ‡
–• —•– „‡ ‹–‹‰ƒ–‡†Ǥ ‘•–”—
–‹‘
‹ –Šƒ– ƒ”‡ƒ •ŠƒŽŽ ‘– ”‡•—‡ —–‹Ž –Ї ”‡•‘—”
‡Ǧƒ’’”‘’”‹ƒ–‡ ‡ƒ•—”‡• ƒ”‡ ”‡
‘‡†‡† ‘”
–Ї ƒ–‡”‹ƒŽ• ƒ”‡ †‡–‡”‹‡† –‘ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
ˆ –Ї ”‡•‘—”
‡ ‹• •‹‰‹ˆ‹
ƒ– ƒ†
ˆ‘••‹Ž ”‡
‘˜‡”› ‹• –Ї ‹†‡–‹ˆ‹‡† ˆ‘” ‘ˆ –”‡ƒ–‡–ǡ –Ї –Ї ˆ‘••‹Ž •ŠƒŽŽ „‡ †‡’‘•‹–‡† ‹ ƒ ƒ

”‡†‹–‡† ƒ† ’‡”ƒ‡– •
‹‡–‹ˆ‹
‹•–‹–—–‹‘Ǥ ‘’‹‡• ‘ˆ ƒŽŽ
‘””‡•’‘†‡
‡ ƒ† ”‡’‘”–•
•ŠƒŽŽ „‡ •—„‹––‡† –‘ –Ї ‡ƒ† ‰‡
›Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ– ™ Š ‹– ‘
‘” ‘ ƒ– ‹– ‹‰ƒ–‹ ’ ‡†  ‹ ” Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-62

Initial Study
–Ї ‘˜ ‡”‘” ƒŽ•‘ •‹‰‡† š‡
—–‹˜‡ ”†‡” ǦͷͷǦͳͺǡ ™Š‹
Š
‘‹–• ƒŽ‹ˆ‘”‹ƒ –‘ –‘–ƒŽǡ
‡
‘‘›Ǧ™‹†‡
ƒ”„‘ ‡—–”ƒŽ‹–› „› ʹͲͶͷǤ އƒ”Ž›ǡ –Ї ʹͲͲͻ —‹†ƒ
‡ ƒ› „‡ •‘‡™Šƒ–
‹ƒ†‡“—ƒ–‡ ‹ ’”‘†—
‹‰ ƒ ‡ƒ‹‰ˆ—Ž
‘’ƒ”‹•‘ „› –‘†ƒ›ǯ• •–ƒ†ƒ”†•ǡ ™Š‹
Š ’”‘’‘•‡ ƒ
‰”ƒ† ˜‹•‹‘ –Šƒ–ǡ ‹ˆ ƒ
Š‹‡˜‡†ǡ ™‘—ކ ˆ—†ƒ‡–ƒŽŽ›
Šƒ‰‡ Š‘™ „—•‹‡•• ‹•
‘†—
–‡† ƒ†

‹–‹œ‡• Ž‹˜‡ ‹ –Ї –ƒ–‡Ǥ Š—•ǡ ƒ• †‹•
—••‡† ‹ –Ї ‘•– ”‡
‡– —’†ƒ–‡• –‘ –Ї 
‘’‹‰ Žƒǡ
–Ї ‘„Œ‡
–‹˜‡• ‘ˆ –Ї 
‘’‹‰ Žƒ ƒˆˆ‡
– ‡–‹”‡ •‡
–‘”• ‘ˆ –Ї ‡
‘‘›ǡ ƒ† ‹– ‘ Ž‘‰‡” ƒ‡•
•‡•‡ –‘ ‡˜ƒŽ—ƒ–‡

‡‹••‹‘• ‘ ƒ ’”‘Œ‡
– އ˜‡ŽǤ
‘” –Ї•‡ ”‡ƒ•‘•ǡ –Ї ”‘Œ‡
–

‡‹••‹‘• އ˜‡Ž• ’”‡•‡–‡† ‹ ƒ„އ ͵ǤͶǤͺǦͳ ƒ”‡ ’”‹ƒ”‹Ž› ˆ‘” †‹•
Ž‘•—”‡ ’—”’‘•‡•Ǥ Ї ”‘Œ‡
–ǯ• Žƒ”‰‡•–
‘–”‹„—–‘”• –‘

‡‹••‹‘• ƒ”‡ ˆ”‘
‡Ž‡
–”‹
‹–› ƒ† ‡šŠƒ—•– ˆ”‘ –”ƒ•’‘”–ƒ–‹‘ ˆ—‡Ž•Ǥ އ
–”‹
‹–› ƒ† –”ƒ•’‘”–ƒ–‹‘ ˆ—‡Ž• ƒ”‡ǡ ‹
‡ˆˆ‡
–ǡ ”‡‰—Žƒ–‡† „› ”‡“—‹”‹‰ ’”‘˜‹†‡”• ƒ† ‹’‘”–‡”• ‘ˆ ‡Ž‡ –”‹
‹–› ƒ† ˆ—‡Ž –‘ ’ƒ”–‹
‹’ƒ–‡ ‹
–Ї

ƒ’Ǧƒ†Ǧ”ƒ†‡ ”‘‰”ƒ ƒ† ‘–Ї” ’”‘‰”ƒ• ሺ‡Ǥ‰Ǥǡ Ž‘™
ƒ”„‘ ˆ—‡Ž •–ƒ†ƒ”†ǡ
”‡‡™ƒ„އ ’‘”–ˆ‘Ž‹‘ •–ƒ†ƒ”†ǡ ‡–
ǤሻǤ ƒ
Š •—
Š •‡
–‘”Ǧ™‹†‡ ’”‘‰”ƒ ‡š‹•–• ™‹–Š‹ –Ї
ˆ”ƒ‡™‘” ‘ˆ ••‡„Ž› ‹ŽŽ ሺሻ ͵ʹ ƒ† ‹–• †‡•
‡†ƒ– Žƒ™•ǡ –Ї ’—”’‘•‡ ‘ˆ ™Š‹
Š ‹• –‘
ƒ
Š‹‡˜‡

‡‹••‹‘• ”‡†—
–‹‘•
‘•‹•–‡– ™‹–Š –Ї  ͵ʹ 
‘’‹‰ ŽƒǤ
Ї ”‘Œ‡
– ™‘—ކ ‰‡‡”ƒ–‡

• ˆ”‘ ‡Ž‡
–”‹
‹–› —•‡ ƒ†
‘„—•–‹‘ ‘ˆ ‰ƒ•‘Ž‹‡Ȁ†‹‡•‡Ž
ˆ—‡Ž•ǡ ‡ƒ
Š ‘ˆ ™Š‹
Š ‹• ”‡‰—Žƒ–‡† ‡ƒ” –Ї –‘’ ‘ˆ –Ї •—’’Ž›
Šƒ‹Ǥ • •—
Šǡ ‡ƒ
Š
‹–‹œ‡ ‘ˆ
ƒŽ‹ˆ‘”‹ƒ ሺ‹
Ž—†‹‰ –Š‘•‡
”‡ƒ–‹‰ ‡‹••‹‘• ‘ˆ –Š‹• ”‘Œ‡
–ሻ ™‹ŽŽ Šƒ˜‡ ‘
Š‘‹
‡ „—– –‘
’—”
Šƒ•‡ ‡Ž‡
–”‹
‹–› ƒ† ˆ—‡Ž• ’”‘†—
‡† ‹ ƒ ™ƒ› –Šƒ– ‹• ƒ

‡’–ƒ„އ –‘ –Ї ƒŽ‹ˆ‘”‹ƒ ƒ”‡–Ǥ
Š—•ǡ ”‘Œ‡
–

‡‹••‹‘• ™‹ŽŽ „‡
‘•‹•–‡– ™‹–Š –Ї ”‡Ž‡˜ƒ– ’Žƒ ሺ‹Ǥ‡Ǥǡ  ͵ʹ 
‘’‹‰
ŽƒሻǤ Ї ”‘Œ‡
– ™‘—ކ ‡‡– ‹–• ˆƒ‹” •Šƒ”‡ ‘ˆ –Ї
‘•– –‘ ‹–‹‰ƒ–‡ –Ї
——Žƒ–‹˜‡ ‹’ƒ
– ‘ˆ
‰Ž‘„ƒŽ
Ž‹ƒ–‡
Šƒ‰‡ „‡
ƒ—•‡ ‡‡”‰› ’—”
Šƒ•‡• ƒ”‡ ˆ”‘ –Ї ƒŽ‹ˆ‘”‹ƒ ƒ”‡–Ǥ Š—•ǡ

‘•—‡”• ‘ˆ ‡Ž‡
–”‹
‹–› ƒ† –”ƒ•’‘”–ƒ–‹‘ ˆ—‡Ž• ƒ”‡ǡ ‹ ‡ˆˆ‡
–ǡ ”‡‰—Žƒ–‡† „› Š‹‰Š‡”Ǧއ˜‡Ž
‡‹••‹‘• ”‡•–”‹
–‹‘• ‘ –Ї ’”‘†—
‡”• ‘ˆ –Ї•‡ ‡‡”‰› •‘—”
‡•Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
–
™‘—ކ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
– ‘ ƒ’’Ž‹
ƒ„އ

”‡†—
–‹‘ ’Žƒ•ǡ ƒ† –Ї
”‘Œ‡
–ǯ•
‘–”‹„—–‹‘ –‘
——Žƒ–‹˜‡ ‰Ž‘„ƒŽ
Ž‹ƒ–‡
Šƒ‰‡ ‹’ƒ
–• ™‘—ކ ‘– „‡

——Žƒ–‹˜‡Ž›
‘•‹†‡”ƒ„އǤ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͺ„ Ȃ ‘—ކ –Ї ”‘Œ‡
–
‘ˆŽ‹
– ™‹–Š ƒ› ƒ’’Ž‹
ƒ„އ ’Žƒǡ ’‘Ž‹
›ǡ ‘” ”‡‰—Žƒ–‹‘
ƒ†‘’–‡† ˆ‘” –Ї ’—”’‘•‡ ‘ˆ ”‡†—
‹‰ –Ї ‡‹••‹‘• ‘ˆ ‰”‡‡Š‘—•‡ ‰ƒ•‡•ǫ

 ʹͲͲ͸ǡ –Ї ƒŽ‹ˆ‘”‹ƒ –ƒ–‡ އ‰‹•Žƒ–—”‡ ƒ†‘’–‡†  ͵ʹȄЇ ƒŽ‹ˆ‘”‹ƒ Ž‘„ƒŽ ƒ”‹‰ ‘Ž—–‹‘• 
–Ǥ  ͵ʹ †‹”‡
–• –Ї •–ƒ–‡ –‘ ”‡†—
‡ ƒŽ‹ˆ‘”‹ƒ
‡‹••‹‘• –‘ ͳͻͻͲ އ˜‡Ž• „›
ʹͲʹͲǤ
– ‹•–”—
–•  –‘ ‡•–ƒ„Ž‹•Š ƒ ’”‘‰”ƒ ‘ˆ ”‡‰—Žƒ–‘”› ƒ† ƒ”‡– ‡ Šƒ‹•• –‘
ƒ
Š‹‡˜‡

”‡†—
–‹‘• ƒ† –‘ ‹’އ‡– ƒ ƒ†ƒ–‘”›

”‡’‘”–‹‰ ƒ† ˜‡”‹ˆ‹
ƒ–‹‘
’”‘‰”ƒǤ
 ƒ

‘”†ƒ
‡ ™‹–Š  ͵ʹǡ –Ї Ž‹ƒ–‡ Šƒ‰‡ 
‘’‹‰ Žƒ ሺ
‘’‹‰ Žƒሻ ‘—–Ž‹‡•
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-64

Initial Study
ƒŽ‹ˆ‘”‹ƒǯ• •–”ƒ–‡‰› ˆ‘” ƒ
Š‹‡˜‹‰ –Ї ʹͲʹͲ

‡‹••‹‘• Ž‹‹– ‘—–Ž‹‡† —†‡” –Ї Žƒ™Ǥ Ї
ʹͲʹʹ 
‘’‹‰ Žƒ ™ƒ• —’†ƒ–‡† ™‹–Š ‡™ •–”ƒ–‡‰‹‡• –‘ ƒ
Š‹‡˜‡
ƒ”„‘ ‡—–”ƒŽ‹–› „› ʹͲͶͷ
ሺƒŽ‹ˆ‘”‹ ‹” ‡•‘—”
‡• ‘ƒ”† ʹͲʹʹሻǤ Ї ”‘Œ‡
– ™‘—ކ ‰‡‡”ƒ–‡

• ˆ”‘ ‡Ž‡
–”‹
‹–›
—•‡ ƒ†
‘„—•–‹‘ ‘ˆ ‰ƒ•‘Ž‹‡Ȁ†‹‡•‡Ž ˆ—‡Ž•ǡ ‡ƒ
Š ‘ˆ ™Š‹
Š ‹• ”‡‰—Žƒ–‡† ‡ƒ” –Ї –‘’ ‘ˆ –Ї
•—’’Ž›
Š
ƒ
ƒ‹Ǥ • •—
Šǡ ‡ƒ
Š
‹–‹œ‡ ‘ˆ ƒŽ‹ˆ‘”‹ƒ ሺ‹
Ž—†‹‰ –Ї ‘’‡”ƒ–‘” ‘ˆ –Ї ”‘Œ‡
–ሻ ™‹ŽŽ
Šƒ˜‡ ‘
Š‘‹
‡ „—– –‘ ’—”
Šƒ•‡ ‡Ž‡
–”‹
‹–› ƒ† ˆ—‡Ž• ’”‘†—
‡† ‹ ƒ ™ƒ› –Šƒ– ‹• ƒ

‡’–ƒ„އ –‘
–Ї ƒŽ‹ˆ‘”‹ƒ ƒ”‡–Ǥ Š—•ǡ ”‘Œ‡
–

‡‹••‹‘• ™‹ŽŽ „‡
‘•‹•–‡– ™‹–Š –Ї ”‡Ž‡˜ƒ– ’Žƒ
ሺ‹Ǥ‡Ǥǡ  ͵ʹ 
‘’‹‰ ŽƒሻǤ
”‘Œ‡
–

‡‹••‹‘• އ˜‡Ž• ’”‡•‡–‡† ‹ ƒ„އ ͵ǤͶǤͺǦͳ ƒ„‘˜‡ ƒ”‡ ’”‹ƒ”‹Ž› ˆ‘” †‹• Ž‘•—”‡
’—”’‘•‡• „‡
ƒ—•‡ ‹’ƒ
– ƒƒŽ›•‹• ˆ‘” –Ї ”‘Œ‡
– ˆ‘ŽŽ‘™• –Ї ƒ’’”‘ƒ
Š
‡”–‹ˆ‹‡† „› ‘—–Š
‘ƒ•– ‹” —ƒŽ‹–› ƒƒ‰‡‡– ‹•–”‹
– ሺሻ ‹ –Ї ‹ƒŽ ‡‰ƒ–‹˜‡ ‡
Žƒ”ƒ–‹‘ ˆ‘” –Ї
Š‹ŽŽ‹’• ͸͸ ‘• ‰‡Ž‡• ‡ˆ‹‡”› ƒ”•‘ Žƒ– Ȃ ”—†‡ ‹Ž –‘”ƒ‰‡ ƒ’ƒ ‹–› ”‘Œ‡
– ‘
‡
‡„‡” ͳʹǡ ʹͲͳͶǤ Ї ƒ’’”‘ƒ
Š —•‡† „› ‘—–Š ‘ƒ•–  –‘ ƒ••‡••

‹’ƒ
–• ˆ”‘
–Šƒ– ”‘Œ‡
– ”‡
‘‰‹œ‡• –Šƒ–
‘•—‡”• ‘ˆ ‡Ž‡
–”‹
‹–› ƒ† –”ƒ•’‘”–ƒ–‹‘ ˆ—‡Ž• ƒ”‡ǡ ‹ ‡ˆˆ‡
–ǡ
”‡‰—Žƒ–‡† „› ”‡“—‹”‹‰ ’”‘˜‹†‡”• ƒ† ‹’‘”–‡”• ‘ˆ ‡Ž‡
–”‹
‹–› ƒ† ˆ—‡Ž –‘ ’ƒ”–‹
‹’ƒ–‡ ‹ –Š

ƒ’Ǧƒ†Ǧ”ƒ†‡ ”‘‰”ƒ ƒ† ‘–Ї” ”‘‰”ƒ• ሺ‡Ǥ‰Ǥǡ Ž‘™
ƒ”„‘ ˆ—‡Ž •–ƒ†ƒ”†ǡ ”‡‡™ƒ„Ž
‡
‡
’‘”–ˆ‘Ž‹‘ •–ƒ†ƒ”†ǡ ‡–
ǤሻǤ ƒ
Š •—
Š •‡
–‘”Ǧ™‹†‡ ’”‘‰”ƒ ‡š‹•–• ™‹–Š‹ –Ї ˆ”ƒ‡™‘” ‘ˆ 
͵ʹ ƒ† ‹–• †‡•
‡†ƒ– Žƒ™•ǡ –Ї ’—”’‘•‡ ‘ˆ ™Š‹
Š ‹• –‘ ƒ
Š‹‡˜‡

‡‹••‹‘• ”‡†—
–‹‘•

‘•‹•–‡– ™‹–Š –Ї  ͵ʹ 
‘’‹‰ ŽƒǤ
• ‘–‡† ‹
’ƒ
– ͓͵ǤͶǤͺƒ ƒ„‘˜‡ǡ –Ї ”‘Œ‡
– ™‘—ކ ‘– ‰‡‡”ƒ–‡
——Žƒ–‹˜‡Ž›
‘•‹†‡”ƒ„އ

‹’ƒ
–•ǡ ‘” ™‘—ކ ‹–
‘ˆŽ‹
– ™‹–Š ƒ› ƒ’’Ž‹
ƒ„އ ’Žƒǡ ’‘Ž‹
›ǡ ‘” ”‡‰—Žƒ–‹‘ ƒ†‘’–‡† ˆ‘”
–Ї ’—”’‘•‡ ‘ˆ ”‡†—
‹‰ –Ї ‡‹••‹‘• ‘ˆ

•Ǥ Ї ”‘Œ‡
– ™‹ŽŽ ‘– ”‡•—Ž– ‹ –Ї ‡‹••‹‘•
‘ˆ Š›†”‘ˆŽ—‘”‘
ƒ”„‘• ሺ
ሻǡ ’‡”ˆŽ—‘”‘
ƒ”„‘• ሺ ሻǡ ‘” •—Žˆ—” Š‡šƒˆŽ—‘”‹†‡ ሺ ͸ሻǡ –Ї
‘–Ї” ‰ƒ•‡• ‹†‡–‹ˆ‹‡† ƒ•

‹ ͵ʹǤ Ї ’”‘’‘•‡† ”‘Œ‡
– ™‹ŽŽ „‡ •—„Œ‡
– –‘ ƒ›
”‡‰—Žƒ–‹‘• †‡˜‡Ž‘’‡† —†‡” ͵ʹ ƒ• †‡–‡”‹‡† „› Ǥ —” –Ї”‘”‡ǡ –Ї ”‘Œ‡ – ™‹ŽŽ „‡
”‡“—‹”‡† –‘ ‹’އ‡– ‡‡”‰›
‘•‡”˜ƒ–‹‘ ”‡‰—Žƒ–‹‘• ሺƒŽ
”‡‡
‘†‡•ǣ‹–އ ʹͶሻ ƒ† ”‡‡
—‹Ž†‹‰ ‘†‡ •–ƒ†ƒ”†•Ǥ Ї”‡ˆ‘”‡ǡ ”‘Œ‡
– ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-65

Initial Study

3.4.9 - HAZARDS AND HAZARDOUS

MATERIALS
‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ  ‡ƒ ‡ ƒ •‹‰‹ ‹
ƒ Šƒœƒ † Ї „Ž‹
Ї
‡˜‹”‘‡– –Š”‘—‰Š –Ї ”‘—–‹‡ –”ƒ•’‘”–ǡ
—•‡ǡ ‘” †‹•’‘•ƒŽ ‘ˆ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ•ǫ
„Ǥ  ‡ƒ ‡ ƒ •‹‰‹ ‹
ƒ Šƒœƒ † Ї „Ž‹
Ї
‡˜‹”‘‡– –Š”‘—‰Š ”‡ƒ•‘ƒ„Ž› ˆ‘”‡•‡‡ƒ„އ
—’•‡– ƒ† ƒ

‹†‡–
‘†‹–‹‘• ‹˜‘Ž˜‹‰ –Ї
”‡Ž‡ƒ•‡ ‘ˆ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ• ‹–‘ –Ї
‡˜‹”‘‡–ǫ

Ǥ ‹– Šƒœƒ †‘—• ‡‹••‹‘• ‹˜‘Ž˜‡
Šƒ†Ž‹‰ Šƒœƒ”†‘—• ‘” ƒ
—–‡Ž› Šƒœƒ”†‘—•
ƒ–‡”‹ƒŽ•ǡ •—„•–ƒ
‡•ǡ ‘” ™ƒ•–‡ ™‹–Š‹ ‘‡Ǧ
“—ƒ”–‡” ‹Ž‡ ‘ˆ ƒ ‡š‹•–‹‰ ‘” ’”‘’‘•‡†
•
Š‘‘Žǫ
†Ǥ ‡ Ž‘
ƒ–‡†  ƒ •‹–‡ Šƒ ‹• ‹
Ž—†‡† ‘ ƒ Ž‹•–
Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ• •‹–‡•
‘’‹Ž‡† ’—”•—ƒ–
–‘ ‘˜‡”‡– ‘†‡ ‡
–‹‘ ͸ͷͻ͸ʹǤͷ ƒ†ǡ ƒ•
ƒ ”‡•—Ž–ǡ ™‘—ކ ‹–
”‡ƒ–‡ ƒ •‹‰‹ˆ‹
ƒ– Šƒœƒ”†
–‘ –Ї ’—„Ž‹
‘” –Ї ‡˜‹”‘‡–ǫ
‡Ǥ ƒ ”‘Œ‡
– Ž‘
ƒ–‡† ™‹–Š‹  ƒ‹ Žƒ†
—•‡ ’Žƒ ‘”ǡ ™Š‡”‡ •—
Š ƒ ’Žƒ Šƒ• ‘– „‡‡
ƒ†‘’–‡†ǡ ™‹–Š‹ –™‘ ‹Ž‡• ‘ˆ
ƒ
ƒ ’—„Ž‹
ƒ‹”’‘”–
‘” ’—„Ž‹
—•‡ ƒ‹”’‘”–ǡ ™‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž–
‹ ƒ •ƒˆ‡–› Šƒœƒ”† ‘” ‡š
‡••‹˜‡ ‘‹•‡ ˆ‘”
’‡‘’އ ”‡•‹†‹‰ ‘” ™‘”‹‰ ‹ –Ї ”‘Œ‡
–
ƒ”‡ƒǫ
ˆǤ
’ƒ‹” ‹ އ‡–ƒ–‹‘ ǡ ’Š›•‹
ƒŽŽ›
‹–‡”ˆ‡”‡ ™‹–Šǡ ƒ ƒ†‘’–‡† ‡‡”‰‡
›
”‡•’‘•‡ ’Žƒ ‘” ‡‡”‰‡
› ‡˜ƒ
—ƒ–‹‘ ’Žƒǫ
‰Ǥ š’‘•‡ ’‡‘’އ •–”—
”‡•ǡ ‡‹–Ї †‹”‡
–Ž›
‘” ‹†‹”‡
–Ž›ǡ –‘ ƒ •‹‰‹ˆ‹
ƒ– ”‹• ‘ˆ Ž‘••ǡ
‹Œ—”›ǡ ‘” †‡ƒ–Š ‹˜‘Ž˜‹‰ ™‹Ž†Žƒ† ˆ‹”‡•ǫ
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-66

Initial Study
Discussion

’ƒ
– ͓͵ǤͶǤͻƒ Ȃ ‘—ކ –Ї ”‘Œ‡
–
”‡ƒ–‡ ƒ •‹‰‹ˆ‹
ƒ– Šƒœƒ”† –‘ –Ї ’—„Ž‹
‘” –Ї
‡˜‹”‘‡– –Š”‘—‰Š –Ї ”‘—–‹‡ –”ƒ•’‘”–ǡ —•‡ǡ ‘” †‹•’‘•ƒŽ ‘ˆ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ•ǫ  ”‡˜‹‡™ ‘ˆ –Ї ˜‹”‘–‘” †ƒ–ƒ„ƒ•‡ ƒ† –Ї ‡ ‘–”ƒ
‡” †ƒ–ƒ„ƒ•‡ †‹† ‘– ‹†‡–‹ˆ› ƒ› ƒ
–‹˜‡
Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ •‹–‡ ‘” Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ
އƒ—’ •‹–‡ ‹ ’”‘š‹‹–› –‘ –Ї ”‘Œ‡
– •‹–‡
ሺƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘š‹
—„•–ƒ
‡• ‘–”‘Ž ʹͲʹͶǡ –ƒ–‡ ƒ–‡” ‡•‘—”
‡• ‘–”‘Ž
‘ƒ”† ʹͲʹͶሻǤ
Construction
‘•–”—
–‹‘ ‘ˆ –Ї ”‘Œ‡
– ™‘—ކ ‹˜‘Ž˜‡ –Ї –‡’‘”ƒ”› –”ƒ•’‘”– ƒ† —•‡ ‘ˆ ‹‘” “—ƒ–‹–‹‡• ‘ˆ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ• •—
Š ƒ• ˆ—‡Ž•ǡ ‘‹Ž•ǡ Ž—„”‹
ƒ–•ǡ Š›†”ƒ—Ž‹
ˆŽ—‹†•ǡ ’ƒ‹–•ǡ ƒ†
•‘Ž˜‡–•Ǥ ‡” –Ї ƒŽ‹ˆ‘”‹ƒ
‡ƒŽ–Š ƒ† ƒˆ‡–› ‘†‡ ƒ† ǡ ƒ
ƒœƒ”†‘—• ƒ–‡”‹ƒŽ• —•‹‡••
Žƒ ሺ
ሻ ™‘—ކ „‡ •—„‹––‡† –‘ –Ї ƒŽ‹ˆ‘”‹ƒ ˜‹”‘‡–ƒŽ ‡’‘”–‹‰ ›•–‡ ሺሻ ‹ˆ
‘•–”—
–‹‘
”‡™• Šƒ†Ž‡† ƒ Ž‹•–‡† Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ ƒ„‘˜‡ ƒ
‡”–ƒ‹ –Š”‡•БކǤ ’‡
‹ˆ‹

Šƒœƒ”†‘—•
Ї‹
ƒŽ• ”‡’‘”–‡† –‘ –Ї  ƒ† –Ї ‡”–‹ˆ‹‡† ‹ˆ‹‡† ”‘‰”ƒ ‰‡ ›
ሺሻǡ ƒ† ’”‘
‡†—”‡• •’‡
‹ˆ‹‡† ‹ –Ї ’‹ŽŽ ”‡˜‡–‹‘ ‘’Ž‹ƒ
‡ Žƒ ሺሻ ™‘—ކ
’”‘˜‹†‡ ƒ •›•–‡ ‘ˆ ƒ††”‡••‹‰ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ• Šƒ†Ž‡† „› –Ї ”‘Œ‡ –Ǥ Ї ƒ–‡”‹ƒŽ
–Š”‡•Бކ ˆ‘” –Š‹• ’”‘‰”ƒ ‹• ͷͷ ‰ƒŽŽ‘• ‘ˆ Ž‹“—‹†ǡ ͷͲͲ ’‘—†• ‘ˆ •‘Ž‹†ǡ ʹͲͲ —„‹
ˆ‡‡– ‘ˆ

‘’”‡••‡† ‰ƒ•ǡ ƒ†Ȁ‘” ƒ’’Ž‹
ƒ„އ –ƒ–‡Ȁˆ‡†‡”ƒŽ –Š”‡•Бކ “—ƒ–‹–› ˆ‘” ‡š–”‡‡Ž›
Šƒœƒ”†‘—• ƒ–‡”‹ƒŽǤ


‘•‹•–• ‘ˆ –Ї ˆ‘ŽŽ‘™‹‰ ‹–‡•ǣ „—•‹‡•• ƒ
–‹˜‹–‹‡•ǡ
‹†‡–‹ˆ‹
ƒ–‹‘ǡ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ• ‹˜‡–‘”› •–‘”‡† ƒ†Ȁ‘” ‰‡‡”ƒ „—•‹‡•• ‘™‡”Ȁ‘’‡”ƒ–‘”
–‡†ǡ ˆƒ
‹Ž‹–› •‹–‡ ƒ’ǡ
‡‡”‰‡
› ”‡•’‘•‡Ȁ
‘–‹‰‡
› ’Žƒ ˆ‘” ’”‘
‡†—”‡• ‹ –Ї ‡˜‡– ‘ˆ ƒ ”‡Ž‡ƒ•‡ ‘” –Š”‡ƒ–‡‡†
”‡Ž‡ƒ•‡ ‘ˆ ƒ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽȀ™ƒ•–‡ǡ ‡’Ž‘›‡‡ ’Žƒǡ ™Š‹ Š ‹
Ž—†‡• Šƒœƒ”†‘—•

‘—‹
ƒ–‹‘•Ȁ•ƒˆ‡–› †ƒ–ƒ •Ї‡–• ሺሻǡ ƒ—ƒŽ
–”ƒ‹‹‰
–”ƒ‹‹‰ ”‡ˆ”‡•Ї”
‘—”•‡•ǡ ƒ† •ƒˆ‡–›
’”‘
‡†—”‡• ‹ –Ї ‡˜‡– ‘ˆ ƒ ”‡Ž‡ƒ•‡ ‘” –Š”‡ƒ–‡‡† ”‡Ž‡ƒ•‡ ‘ˆ ƒ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽȀ™ƒ•–‡ǡ ‡–
Ǥ

‘™‡˜‡”ǡ –Ї –›’‡• ƒ† “—ƒ–‹–‹‡• ‘ˆ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ• ƒ–‹ ‹’ƒ–‡† –‘ „‡ —•‡† ƒ† •–‘”‡†
‘Ǧ•‹–‡ †—”‹‰
‘•–”—
–‹‘ ™‘—ކ ‘– „‡ ‘ˆ ƒ •‹‰‹ˆ‹
ƒ– ƒ‘—– –‘
”‡ƒ–‡ ƒ ”‡ƒ•‘ƒ„Ž›
ˆ‘”‡•‡‡ƒ„އ —’•‡– ‘” ƒ

‹†‡–
‘†‹–‹‘Ǥ Ї Šƒ†Ž‹‰ ƒ† –”ƒ•’‘”– ‘ˆ ƒŽŽ Šƒœƒ”†‘—•
ƒ–‡”‹ƒŽ• ‘Ǧ•‹–‡ ™‘—ކ „‡ ’‡”ˆ‘”‡† ‹ ƒ

‘”†ƒ
‡ ™‹–Š ƒŽŽ ƒ’’Ž‹
ƒ„އ ˆ‡†‡”ƒŽǡ –ƒ–‡ǡ ƒ†
Ž‘
ƒŽ Žƒ™• ƒ† ”‡‰—Žƒ–‹‘•Ǥ ‡•‹‰ƒ–‡† –”—
 ”‘—–‡• •—””‘—†‹‰ –Ї ‹–› ‹
Ž—†‡ Ǧͻͻǡ Ǧ
ʹͲͳǡ ƒ† Ǧ͸͵ ሺ ‡†‡”ƒŽ ‘–‘” ƒ””‹‡” ƒˆ‡–› †‹‹•–”ƒ–‹‘ ʹͲʹͶሻǤ Ї ‡‡†Ž‡› ‹”‡ ‡’ƒ”–‡– ሺ ሻ ™‘—ކ ”‡•’‘† –‘ ƒ› Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ• ‹ ‹†‡–ǡ ƒ† ƒ††‹–‹‘ƒŽ ˆ‹”‡
†‡’ƒ”–‡– —‹–• ™‘—ކ ”‡•’‘† ƒ• ‡
‡••ƒ”›Ǥ • ƒ ”‡•—Ž– ‘ˆ ƒ —–—ƒŽ ƒ‹† ƒ‰”‡‡‡–
„‡–™‡‡ –Ї   ƒ† ”‡•‘ ‘—–› ‹”‡ ”‘–‡
–‹‘ ‹•–”‹
– ሺ  ሻǡ   ƒ› „‡
”‡“—‡•–‡† –‘ ’”‘˜‹†‡ ‡‡”‰‡
› „ƒ
—’ •‡”˜‹
‡ –‘ –Ї ‹–›Ǥ
‹‘” ƒ‘—–• ‘ˆ Šƒœƒ”†‘—• ƒ† ‘ǦŠƒœƒ”†‘—• ƒ–‡”‹ƒŽ• ƒ† ™ƒ•–‡• ™‘—ކ Ž‹‡Ž› „‡ –”ƒ•’‘”–‡† –‘ ƒ† ˆ”‘ –Ї ”‘Œ‡
– •‹–‡ †—”‹‰ –Ї
‘•–”—
–‹‘ ’Šƒ•‡ ‘ˆ –Ї ’”‘’‘•‡†
”‘Œ‡
–Ǥ › Šƒœƒ”†‘—• ™ƒ•–‡ ‘” †‡„”‹• –Šƒ– ‹• ‰‡‡”ƒ–‡† †—”‹‰ –Ї ‘•–”—
–‹‘ ‘ˆ –Ї
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-67

Initial Study
’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ „‡
‘ŽŽ‡
–‡† ƒ† –”ƒ•’‘”–‡† ƒ™ƒ› ˆ”‘ –Ї •‹–‡ ƒ† †‹•’‘•‡† ‘ˆ ƒ– ƒ ƒ’’”‘˜‡† ‘ˆˆǦ•‹–‡ Žƒ†ˆ‹ŽŽ ‘” ‘–Ї” •—
Š ˆƒ
‹Ž‹–‹‡•Ǥ
 ƒ††‹–‹‘ǡ •ƒ‹–ƒ”› ™ƒ•–‡ ‰‡‡”ƒ–‡†
†—”‹‰
‘•–”—
–‹‘ ™‘—ކ „‡ ƒƒ‰‡† –Š”‘—‰Š ’‘”–ƒ„އ –‘‹Ž‡–•ǡ ™Š‹
Š ™‘—ކ „‡ Ž‘
ƒ–‡† ƒ–
”‡ƒ•‘ƒ„Ž› ƒ

‡••‹„އ ‘Ǧ•‹–‡ Ž‘
ƒ–‹‘•Ǥ
ƒœƒ”†‘—• ƒ–‡”‹ƒŽ• •—
Š ƒ• ’ƒ‹–ǡ „އƒ
Šǡ ™ƒ–‡”
–”‡ƒ–‡–
Ї‹
ƒŽ•ǡ ‰ƒ•‘Ž‹‡ǡ ‘‹Žǡ ‡–
Ǥǡ ƒ› „‡ —•‡† †—”‹‰
‘•–”—
–‹‘Ǥ Ї•‡ ƒ–‡”‹ƒŽ• ƒ”‡
•–‘”‡† ‹ ƒ’’”‘’”‹ƒ–‡ •–‘”ƒ‰‡ Ž‘
ƒ–‹‘• ƒ†
‘–ƒ‹‡”• ‹ –Ї ƒ‡” •’‡
‹ˆ‹‡† „› –Ї
ƒ—ˆƒ
–—”‡” ƒ† †‹•’‘•‡† ‘ˆ ‹ ƒ

‘”†ƒ
‡ ™‹–Š Ž‘
ƒŽǡ ˆ‡†‡”ƒŽǡ ƒ† –ƒ–‡ ”‡‰—Žƒ–‹‘•Ǥ
‡•‹†‡–‹ƒŽ ƒ†
‘‡”
‹ƒŽ
‘•–”—
–‹‘ ‰‡‡”ƒŽŽ› —–‹Ž‹œ‡• ˆ‡™‡” Šƒœƒ”†‘—•
Ї‹
ƒŽ• ‘”

Ї‹
ƒŽ• ‹ ”‡Žƒ–‹˜‡Ž› •ƒŽŽ “—ƒ–‹–‹‡• ƒ†
‘
‡–”ƒ–‹‘•
‘’ƒ”‡† –‘ ‹†—•–”‹ƒŽ —•‡•Ǥ ‘
•‹‰‹ˆ‹
ƒ– Šƒœƒ”† –‘ –Ї ’—„Ž‹
‘” –Ї ‡˜‹”‘‡– –Š”‘—‰Š –Ї ”‘—–‹‡ –”ƒ•’‘”–ǡ —•‡ǡ ‘” †‹•’‘•ƒŽ ‘ˆ Šƒœƒ”†‘—• ™ƒ•–‡ †—”‹‰ –Ї
‘•–”—
–‹‘ ‘” ‘’‡”ƒ–‹‘ ‘ˆ –Ї ‡™ ”‡•‹†‡–‹ƒŽ
†‡˜‡Ž‘’‡– ™‘—ކ ‘

—”Ǥ
Operations

‡
‘•–”—
–‡†ǡ –Ї —•‡ ‘ˆ •—
Š ƒ–‡”‹ƒŽ• ƒ• ’ƒ‹–ǡ „އƒ
Šǡ ƒ† Žƒ™ ˆ‡”–‹Ž‹œ‡” ‹•
‘•‹†‡”‡†

‘‘ ˆ‘” ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡–•Ǥ
– ™‘—ކ „‡ —Ž‹‡Ž› ˆ‘” •—
Š ƒ–‡”‹ƒŽ• –‘ „‡ •–‘”‡†
‘” —•‡† ‹ •—
Š “—ƒ–‹–‹‡• –Šƒ– ™‘—ކ „‡
‘•‹†‡”‡† ƒ •‹‰‹ˆ‹
ƒ– Šƒœƒ”†Ǥ ›’‹
ƒŽ Š‘—•‡Š‘ކ
Šƒœƒ”†‘—• ™ƒ•–‡ ‰‡‡”ƒ–‡† †—”‹‰ ‘’‡”ƒ–‹‘ ™‘—ކ „‡ †‹•’‘•‡† ‘ˆ –Š”‘—‰Š –Ї ‘—–› ‘ˆ ”‡•‘ ‡•‹†‡–‹ƒŽ
ƒœƒ”†‘—• ƒ•–‡ ˆ”‡‡ †”‘’Ǧ‘ˆˆ Ž‘
ƒ–‹‘• ‘” –Š”‘—‰Š ‹† ƒŽŽ‡› ‹•’‘•ƒŽ

‘ŽŽ‡
–‹‘ •‡”˜‹
‡• ሺ ”‡•‘ ‘—–› ʹͲʹͶǡ ‹† ƒŽŽ‡› ‹•’‘•ƒŽ ʹͲʹͶሻǤ Ї —•‡ ‘ˆ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ• ™‹ŽŽ „‡ Ž‹‹–‡† ‹ “—ƒ–‹–‹‡• ƒ† †—”ƒ–‹‘ǡ ƒ† ‹ˆ •’‹ŽŽ‡†ǡ ™‘—ކ „‡ Ž‘ ƒŽ‹œ‡†Ǥ
ƒ•‡† ‘ –Ї ƒƒŽ›•‹• ƒ„‘˜‡ǡ ”‘Œ‡
–
‘•–”—
–‹‘ ƒ† ‘’‡”ƒ–‹‘ ƒ”‡ ‘– ƒ–‹
‹’ƒ–‡† –‘ ”‡•—Ž–
‹ •‹‰‹ˆ‹
ƒ– ‹’ƒ
–• †—‡ –‘ –Ї –”ƒ•’‘”–ƒ–‹‘ǡ —•‡ǡ ‘” †‹•’‘•ƒŽ ‘ˆ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ•Ǥ Ї”‡ˆ‘”‡ǡ ”‘Œ‡
– ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͻ„ Ȃ ‘—ކ –Ї ”‘Œ‡
–
”‡ƒ–‡ ƒ •‹‰‹ˆ‹
ƒ– Šƒœƒ”† –‘ –Ї ’—„Ž‹
‘”
‡˜‹”‘‡– –Š”‘—‰Š ”‡ƒ•‘ƒ„Ž› ˆ‘”‡•‡‡ƒ„އ —’•‡– ƒ† ƒ

‹†‡–
‘†‹–‹‘• ‹˜‘Ž˜‹‰
–Ї
–Ї
”‡Ž‡ƒ•‡ ‘ˆ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ• ‹–‘ –Ї ‡˜‹”‘‡–ǫ
‡‡
’ƒ
– ͓͵ǤͶǤͻƒǡ ƒ„‘˜‡Ǥ
‡” –Ї ‡’ƒ”–‡– ‘ˆ ‘š‹
—„•–ƒ
‡• ‘–”‘Ž ሺሻ ˜‹”‘•–‘” †ƒ–ƒ„ƒ•‡ǡ –Ї
”‘Œ‡
– •‹–‡ ‹• ‘– Ž‘
ƒ–‡† ‘ ‘” ™‹–Š‹ ’”‘š‹‹–› –‘ ƒ Ž‹•–‡† Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ•Ȁ™ƒ•–‡ ˆƒ
‹Ž‹–› ሺ
ƒŽ‹ˆ‘”‹ƒ
ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘š‹
—„•–ƒ
‡• ‘–”‘Ž ʹͲʹͶሻǤ ††‹–‹‘ƒŽŽ›ǡ –Ї”‡ ƒ”‡ ‘
”‡
‘”†• ‘ˆ ƒ އƒ‹‰ —†‡”‰”‘—† •–‘”ƒ‰‡ –ƒ ‘ –Ї ”‘Œ‡ – •‹–‡ ሺ–ƒ–‡ ƒ–‡” ‡•‘—”
‡•
‘–”‘Ž ‘ƒ”† ʹͲʹͶሻǤ —”–Ї”ǡ –Ї”‡ ƒ”‡ ‘ ƒ
–‹˜‡ ‡‘Ž‘‰‹
‡”‰› ƒƒ‰‡‡– ‹˜‹•‹‘
ሺƒŽ
ሻ ‹†‡–‹ˆ‹‡† ‘‹Ž ‘” ‰ƒ• ˆ‹‡Ž†• ™‹–Š‹ –Ї ”‘Œ‡
– •‹–‡ ሺƒŽ
 ʹͲʹͶሻǤ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-68
Initial Study
• ‘–‡† ‹
’ƒ
– ͓͵ǤͶǤ͹„ ƒ† ‹’‘•‡† ƒ•   Ǧͳǡ –Ї ”‘Œ‡
– ™‘—ކ „‡ ”‡“—‹”‡† –‘
’”‡’ƒ”‡ ƒ† ‹’އ‡– ƒ  —†‡” –Ї  ’‡”‹– ˆ‘” ‘•–”—
–‹‘ •‹–‡• ‘˜‡” ‘‡
ƒ
”‡Ǥ Ї  ‹†‡–‹ˆ‹‡• ’‘–‡–‹ƒŽ •‘—”
‡• ‘ˆ ’‘ŽŽ—–‹‘ ˆ”‘ –Ї ”‘Œ‡
– –Šƒ– ƒ› ƒˆˆ‡
– –Ї
“—ƒŽ‹–› ‘ˆ •–‘”™ƒ–‡” †‹•
Šƒ”‰‡ ƒ† ”‡“—‹”‡• –Šƒ– • „‡ ‹’އ‡–‡† –‘ ’”‡˜‡–
ƒ– –Ї •‘—”
‡Ǥ › ‹’އ‡–‹‰ • †—”‹‰
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ
ƒ

‹†‡–ƒŽ •’‹ŽŽ• ‘ˆ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ• ™‘—ކ „‡
‘–ƒ‹‡†ǡ ƒ† •‘‹Ž ƒ† ‰”‘—†™ƒ–‡”

‘–ƒ‹ƒ–‹‘

‘–ƒ‹ƒ–‹‘ ™‘—ކ „‡ ‹‹‹œ‡† ‘” ’”‡˜‡–‡†Ǥ
‘•‡“—‡–Ž›ǡ –Ї ”‘Œ‡
– ‹• ‘– ƒ–‹
‹’ƒ–‡† –‘
”‡ƒ–‡ •‹‰‹ˆ‹
ƒ– Šƒœƒ”† –‘ –Ї ’—„Ž‹
‘” –Ї
‡˜‹”‘‡– –Š”‘—‰Š ”‡ƒ•‘ƒ„Ž› ˆ‘”‡•‡‡ƒ„އ —’•‡–
ƒ
ƒ† ƒ

‹†‡–
‘†‹–‹‘•Ǥ • †‹•
—••‡†
ƒ„‘˜‡ǡ –Ї”‡ ‹• ‘ ‡˜‹†‡
‡ ‘ˆ ƒ •‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ
‘†‹–‹‘ ‘ –Ї ”‘Œ‡
– •‹–‡ –Šƒ–

‘—ކ ’‘–‡–‹ƒŽŽ› ”‡•—Ž– ‹ ƒ •‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ Ї”‡ˆ‘”‡ǡ ƒ• †‹•
—••‡† ƒ„‘˜‡ǡ •Š‘—ކ ƒ
’”‡˜‹‘—•Ž› —‹†‡–‹ˆ‹‡†
‘†‹–‹‘ „‡ ‹†‡–‹ˆ‹‡†ǡ –Šƒ–
‘—ކ ”‡•—Ž– ‹ ƒ —’•‡– ‘” ƒ

‹†‡–ƒŽ
Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ •’‹ŽŽǡ ”‡‰—Žƒ–‘”› ’”‘
‡†—”‡•ǡ ‹
Ž—†‹‰ ’”‘’‡” ƒ„ƒ†‘‡–Ȁ”‡‘˜ƒŽ ‘ˆ
–Ї
‘†‹–‹‘ǡ ™‘—ކ „‡ ˆ‘ŽŽ‘™‡†ǡ ƒ† –Ї ”‘Œ‡
– ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
M

’އ‡–ƒ–‹‘ ‘ˆ 

ITIGATION MEASURE(S)
ǦͳǤ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‹– ‘
‘” ‘ ƒ– Ǥ –  ‹ ” ‹– ‹‰ƒ–‹ ’ ‡†

’ƒ
’ƒ
– ͓͵ǤͶǤͻ
Ȃ ‘—ކ –Ї ”‘Œ‡
– ‡‹– Šƒœƒ”†‘—• ‡‹••‹‘• ‘” ‹˜‘Ž˜‡ Šƒ†Ž‹‰ Šƒœƒ”†‘—• ‘” ƒ
—–‡Ž› Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ•ǡ •—„•–ƒ
‡•ǡ ‘” ™ƒ•–‡ ™‹–Š‹ ‘‡Ǧ“—ƒ”–‡” ‹Ž‡ ‘ˆ ƒ ‡š‹•–‹‰
‘” ’”‘’‘•‡† •
Š‘‘Žǫ
‡‡
’ƒ
–• ͓͵ǤͶǤ͵
ǡ ͵ǤͶǤͻƒ ƒ† „ǡ ƒ„‘˜‡Ǥ
Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ƒ†Œƒ
‡– –‘ ‹Žƒ• ƒ”–•
Š 
Š‘‘ŽǤ ‹Žƒ• ƒ”–•
Š 
Š‘‘Ž ‹• ƒ
–”ƒ•‹–‹‘ƒŽ ‹†‡”‰ƒ”–‡ –‘ ͺ–ŠǦ‰”ƒ†‡ •
Š‘‘Ž ™‹–Š‹ –Ї ‹‰• ƒ›‘ ‹ˆ‹‡† 
Š‘‘Ž
‹•–”‹
–Ǥ ‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• ‘ˆ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‹ŽŽ ”‡•—Ž– ‹ –Ї –‡’‘”ƒ”› —•‡ ‘ˆ
•ƒŽŽ ƒ‘—–• ‘ˆ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ• ƒ† ‘” •—„•–ƒ
‡•ǡ •—
Š ƒ• Ž—„”‹
ƒ– ƒ† †‹‡•‡Ž ˆ—‡Žǡ

†—”‹‰
‘•–”—
–‹‘Ǥ • †‡•
”‹„‡† ‹
’ƒ
– ͓͵ǤͶǤ͵
ƒ† ƒ„އ ͵ǤͶǤ͵Ǧͻǡ ƒ ƒ••‡••‡– ‘ˆ

ЇƒŽ–Š ”‹• ™ƒ•
‘†—
–‡† ƒ• ’ƒ”– ‘ˆ –Ї 
 ሺ’’‡†‹š ሻǡ –‘ †‡–‡

ƒ••‘
‹ƒ–‡† ™‹–Š
 ‡‹••‹‘• ”‡•—Ž–‹‰ ˆ”‘
‘•–”—
–‹‘ ‡“—‹’‡
”‹‡ ЇƒŽ–Š ”‹•
– —•‡ ‘ ‡ƒ”„›

•‡•‹–‹˜‡ ”‡
‡’–‘”•Ǥ Ї ЇƒŽ–Š ”‹• ƒ••‘
‹ƒ–‡† ™‹–Š
 ‡‹••‹‘• ™ƒ• †‡–‡”‹‡† –‘ „‡
„‡Ž‘™ •‹‰‹ˆ‹
ƒ
‡ –Š”‡•Бކ• ‡•–ƒ„Ž‹•Ї† „› 
Ǥ Ї”‡ˆ‘”‡ǡ ”‘Œ‡
–
‘•–”—
–‹‘
™‘—ކ ‘– ‡‹– Šƒœƒ”†‘—• ‡‹••‹‘• –Šƒ– ™‘—ކ ƒ†˜‡”•‡Ž› ƒˆˆ‡ –
–Ї
–Ї ‡ƒ”„› •
Š‘‘ŽǤ 
‡

‘•–”—
–‡†ǡ –Ї ‘’‡”ƒ–‹‘ ‘ˆ –Ї ”‘Œ‡
–
‘’‘‡–• ™‘—ކ ‘– —–‹Ž‹œ‡ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ•
‹ ‡š
‡•• ‘ˆ –›’‹
ƒŽ Š‘—•‡Š‘ކ —•‡Ǥ Ї”‡ˆ‘”‡ǡ –Ї ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-69

Initial Study

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͻ† Ȃ ‘—ކ –Ї ”‘Œ‡
– „‡ Ž‘
ƒ–‡† ‘ ƒ •‹–‡ –Šƒ– ‹• ‹
Ž—†‡† ‘ ƒ Ž‹•– ‘ˆ Šƒœƒ”†‘—•
ƒ–‡”‹ƒŽ• •‹–‡•
‘’‹Ž‡† ’—”•—ƒ– –‘ ‘ ˜‡”‡– ‘†‡ ‡
–‹‘ ͸ͷͻ͸ʹǤͷ ƒ†ǡ ƒ• ƒ ”‡•—Ž–ǡ
™‘—ކ ‹–
”‡ƒ–‡ ƒ •‹‰‹ˆ‹
ƒ– Šƒœƒ”† –‘ –Ї ’—„Ž‹
‘” –Ї ‡˜‹”‘‡–ǫ
‡‡
’ƒ
– ͵ǤͶǤͻ„ǡ ƒ„‘˜‡Ǥ
 ‘Ž‹‡ •‡ƒ”
Š ™ƒ•
‘†—
–‡† –‘ ‹†‡–‹ˆ› Šƒœƒ”†‘—• ™ƒ•–‡ Ž‘
ƒ–‹‘• ‘ ‘” ‡ƒ” –Ї ”‘Œ‡
–
•‹–‡Ǥ Ї •‡ƒ”
Š ‹†‹
ƒ–‡† –Šƒ– –Ї”‡ ƒ”‡ ‘ ”‡’‘”–‡† Šƒœƒ”†‘—• ‘” –‘š‹
•‹–‡• ™‹–Š‹ ‘” ‹

Ž‘•‡ ’”‘š‹‹–› –‘ –Ї ”‘Œ‡
– •‹–‡ ሺƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘š‹
—„•–ƒ
‡• ‘–”‘Ž ʹͲʹͶሻǤ
Ї”‡ ‹• ‘ †ƒ–ƒ ‹†‡–‹ˆ›‹‰ ƒ› ˆƒ
‹Ž‹–‹‡• ‹ –Ї ˜‹
‹‹–› –Šƒ– ‹‰Š– ”‡ƒ•‘ƒ„Ž› „‡ ƒ–‹
‹’ƒ–‡†
–‘ ‡‹– Šƒœƒ”†‘—• ƒ‹” ‡‹••‹‘• ‘” Šƒ†Ž‡ Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ•ǡ •—„•–ƒ ‡•ǡ ‘” ™ƒ•–‡• –Šƒ–
‹‰Š– ƒˆˆ‡
– –Ї ’”‘’‘•‡† ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡–Ǥ Ї”‡ˆ‘”‡ǡ ‹’ƒ –• ™‘—ކ „‡ އ•• –Šƒ
•‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͻ‡ Ȃ ‘” ƒ ”‘Œ‡
– Ž‘
ƒ–‡† ™‹–Š‹ ƒ ƒ‹”’‘”– Žƒ† —•‡ ’Žƒ ‘”ǡ ™Š‡”‡ •—
Š ƒ ’Žƒ
Šƒ• ‘– „‡‡ ƒ†‘’–‡†ǡ ™‹–Š‹ –™‘ ‹Ž‡• ‘ˆ ƒ ’—„Ž‹
ƒ‹”’‘”– ‘” ’—„Ž‹
—•‡ ƒ‹”’‘”–ǡ ™‘—ކ
”‡•—Ž– ‹ ƒ •ƒˆ‡–› Šƒœƒ”† ‘” ‡š
‡••‹˜‡ ‘‹•‡ ˆ‘” ’‡‘’އ ”‡•‹†‹‰ ‘” ™‘”‹‰ ‹
–Ї
”‘ –Ї
”‘
Œ
Œ
‡
–
‡
– ƒ”‡ƒǫ
Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ƒ’’”‘š‹ƒ–‡Ž› ͶǤͷ ‹Ž‡• •‘—–Š ‘ˆ ‡‡†Ž‡› —‹
‹’ƒŽ ‹”’‘”–Ǥ Ї
”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ‘—–•‹†‡ ‘ˆ –Ї ƒ‹”’‘”– ‹ˆŽ—‡
‡ ƒ”‡ƒǡ ƒ• ‹†‡–‹ˆ‹‡† ‹ –Ї ”‡•‘ ‘—–›
‹”’‘”– ƒ† •‡ ‘’ƒ–‹„‹Ž‹–› Žƒ ሺሻ ሺ ”‡•‘ ‘—–› ‹”’‘”– ƒ† •‡ ‘‹••‹‘ ʹͲʹ͵ሻǤ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ‹• ‘– ™‹–Š‹ –™‘ ‹Ž‡• ‘ˆ ƒ ƒ‹”’‘”– ƒ† ™‘—ކ ‘– ”‡•—Ž– ‹ ƒ •ƒˆ‡–› Šƒœƒ”† ‘” ‡š
‡••‹˜‡ ‘‹•‡ ˆ‘” ’‡‘’އ ™‘”‹‰ ‹ –Ї ”‘Œ‡
– ƒ”‡ƒǤ • •—
Šǡ –Ї”‡ ™‘—ކ
„‡ ‘ ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-70

Initial Study

’ƒ
– ͓͵ǤͶǤͻˆ Ȃ ‘—ކ –Ї ”‘Œ‡
– ‹’ƒ‹” ‹’އ‡–ƒ–‹‘ ‘ˆǡ ‘” ’Š›•‹
ƒŽŽ› ‹–‡”ˆ‡”‡ ™‹–Šǡ
ƒ ƒ†‘’–‡† ‡‡”‰‡
› ”‡•’‘•‡ ’Žƒ ‘” ‡‡”‰‡
› ‡˜ƒ
—ƒ–‹‘ ’
Ї ʹͲʹͶ ”‡•‘ ‘—–› —Ž–‹Ǧ
—”‹•†‹
–‹‘ƒŽ
ƒœƒ”† ‹–‹‰ƒ–‹‘
Žƒǫ
Žƒ ሺ

ሻ ‹†‡–‹ˆ‹‡•
Šƒœƒ”†• ’”‡•‡– ™‹–Š‹ –Ї ‘—–›ǡ ’”‘˜‹†‡• ƒ ”‹• ƒ••‡••‡– ˆ‘” –Ї ”‡•’‡ –‹˜‡ Šƒœƒ”†ǡ ƒ†
ƒ†‘’–• ‹–‹‰ƒ–‹‘ •–”ƒ–‡‰‹‡• –‘ ”‡†—
‡ ”‹•Ǥ
 ƒ††‹–‹‘ –‘ –Ї ”‡•‘ ‘—–› 

ǡ –Ї
”‘Œ‡
– ™‹ŽŽ „‡ ”‡“—‹”‡† –‘
‘’Ž› ™‹–Š ‹–› •ƒˆ‡–› ”‡“—‹”‡‡–• ƒ†‘’–‡† ‹ –Ї ‹”‡ ‘†‡ ƒ† ‘–Ї”
‘†‡ ”‡“—‹”‡‡–• ˆ‘” ‡‡”‰‡
› ”‡•’‘•‡Ǥ Ї•‡ ”

‡‡–‹‰ ‹‹— ‡‡”‰‡
› ƒ

‡•• ”‡“—‹”‡‡–• ƒ† ˆ‹”‡ •—’’
‡“—‹”‡‡–• ™‹ŽŽ ‹
Ž—†‡
”‡••‹‘ ”‡“—‹”‡‡–•Ǥ

Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– ‹Š‹„‹– –Ї ƒ„‹Ž‹–› ‘ˆ Ž‘
ƒŽ ”‘ƒ†™ƒ›• –‘ ƒ

‘‘†ƒ–‡
‡‡”‰‡
› ”‡•’‘•‡ ƒ† ‡˜ƒ
—ƒ–‹‘ ƒ
–‹˜‹–‹‡•Ǥ —”–Ї”ǡ –Ї ”‘Œ‡
– ‹
Ž—†‡• –Ї
‘•–”—
–‹‘
”‘Œ‡
– ™‘—ކ Šƒ˜‡
‘ˆ ƒ•– ‘”–Š ˜‡—‡ǡ ™Š‹
Š ™‘—ކ ‹
”‡ƒ•‡ ‡‡”‰‡
› ƒ

‡•• –‘ –Ї •‹–‡Ǥ Ї”‡ˆ‘”‡ǡ –Ї
ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͻ‰ Ȃ ‘—ކ –Ї ”‘Œ‡
– ‡š’‘•‡ ’‡‘’އ ‘” •–”—
–—”‡•ǡ ‡‹–Ї” †‹”‡
–Ž› ‘” ‹†‹”‡
–Ž›ǡ
–‘ ƒ •‹‰‹ˆ‹
ƒ– ”‹• ‘ˆ Ž‘••ǡ ‹Œ—”›ǡ ‘” †‡ƒ–Š ‹˜‘Ž˜‹‰ ™‹Ž†Žƒ† ˆ‹”‡•ǫ 

‘”†‹‰ –‘ ƒ˜ƒ‹Žƒ„އ †ƒ–ƒ ˆ”‘ ƒŽ ‹”‡ǡ –Ї ”‘Œ‡
– •‹–‡ ‹• ™‹–Š‹ ƒ ‘
ƒŽ ‡•’‘•‹„‹Ž‹–›
”‡ƒ ሺሻ œ‘‡† ‹”‡
ƒœƒ”† ‡˜‡”‹–›
‘‡ ሺƒŽ ‹”‡ ʹͲʹͷሻǤ Ї ‡‡”ƒŽ Žƒ ‹
Ž—†‡•
‰‘ƒŽ• ƒ† ’‘Ž‹
‹‡• –Šƒ– ™‘—ކ ’”‘–‡
– –Ї ”‘Œ‡
– ƒ† –Ї
‘—‹–› ˆ”‘ ˆ‹”‡ †ƒ‰‡”• –Šƒ–
™‘—ކ „‡ ˆ‘ŽŽ‘™‡† †—”‹‰ –Ї
‘•–”—
–‹‘ ƒ† ‘’‡”ƒ–‹‘ ‘ˆ –Ї ”‘Œ‡
–Ǥ Ї•‡ ’‘Ž‹
‹‡•
‹
Ž—†‡ ƒ‹–ƒ‹‹‰ ”‡ƒ•‘ƒ„އ އ˜‡Ž• ‘ˆ ƒ

‡••‹„‹Ž‹–› ƒ† ‹ˆ”ƒ•–”—
–—”‡ •—’’‘”– ˆ‘” ˆ‹”‡
•—’’”‡••‹‘ ƒ† ‡ˆ‘”
‹‰ –Ї Žƒ–‡•– ‹”‡ ‘†‡Ǥ
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• ƒ† –Ї ”‘Œ‡
– ‘’‡”ƒ–‹‘ ƒ”‡ ‘– ‡š’‡
–‡† –‘ ‹
”‡ƒ•‡ –Ї ”‹• ‘ˆ
™‹Ž†ˆ‹”‡• ‘ ƒ† ƒ†Œƒ
‡– –‘ –Ї ”‘Œ‡
– •‹–‡Ǥ Ї ”‘Œ‡
– ™‹ŽŽ
‘’Ž› ™‹–Š ƒŽŽ ƒ’’Ž‹
ƒ„އ –ƒ–‡
ƒ† Ž‘
ƒŽ •–ƒ†ƒ”†• ƒ• ”‡“—‹”‡† „› Ž‘
ƒŽ ˆ‹”‡
‘†‡•Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ އ••Ǧ
–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–•Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-71

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.10 - HYDROLOGY AND WATER QUALITY
‘ ކ Ї  ‘Œ‡
–ǣ
ƒǤ ‹‘Žƒ–‡ ƒ› ™ƒ–‡” ƒŽ‹–› •–ƒ†ƒ”†•
™ƒ
•–‡ †‹•
Šƒ”‰‡ ”‡“—‹”‡‡–• ‘” ‘–Ї”™‹•‡

•—„•–ƒ–‹ƒŽŽ› †‡‰”ƒ†‡ •—”ˆƒ
‡ ™ƒ–‡” “—ƒŽ‹–›ǫ

„Ǥ —„•–ƒ–‹ƒŽŽ› †‡
”‡ƒ•‡ ‰”‘—†™ƒ–‡”

•—’’Ž‹‡• ‘” ‹–‡”ˆ‡”‡ •—„•–ƒ–‹ƒŽŽ› ™‹–Š

‰”‘—†™ƒ–‡” ”‡
Šƒ”‰‡ •—
Š –Šƒ– –Ї ”‘Œ‡
–

ƒ› ‹’‡†‡ •—•–ƒ‹ƒ„އ ‰”‘—†™ƒ–‡”

ƒƒ‰‡‡– ‘ˆ –Ї „ƒ•‹ǫ

Ǥ —„•–ƒ–‹ƒŽŽ› ƒŽ–‡” Ї ‡š‹•–‹‰ †”ƒ‹ƒ‰‡

’ƒ––‡” ‘ˆ –Ї •‹–‡ ‘” ”‡ƒǡ ‹
Ž—†‹‰ –Š”‘—‰Š

–Ї ƒŽ–‡”ƒ–‹‘ ‘ˆ –Ї
‘—”•‡ ‘ˆ ƒ •–”‡ƒ ‘”

”‹˜‡” ‘” –Š”‘—‰Š –Ї
ƒ
ƒ††‹–‹‘ ‘ˆ ‹’‡”˜‹‘—•

•—”ˆƒ
‡•ǡ ‹ ƒ ƒ‡” ™Š‹
Š ™‘—ކǣ

‹Ǥ ‡•—Ž ‹ •—„•–ƒ–‹ƒŽ ‡”‘•‹‘ •‹Ž–ƒ–‹‘ Ǧ

‘” ‘ˆˆǦ•‹–‡ǫ

‹‹Ǥ —„• ƒ ‹ƒŽŽ› ‹
”‡ •‡ –Ї ”ƒ–‡ ƒ‘—–

•—”ˆƒ
‡ ”—‘ˆˆ ‹
ƒ
ƒ ƒ‡” ™Š‹
Š ™‘—ކ

”‡•—Ž– ˆŽ‘‘†‹‰ ‘Ǧ ‘” ‘ˆˆǦ•‹–‡ǫ

‹‹‹Ǥ ”‡ƒ–‡
‘–”‹„ –‡ — ™ƒ–‡” ™Š‹
Š

™‘—ކ ‡š
‡‡† –Ї
ƒ’ƒ
‹–› ‘ˆ ‡š‹•–‹‰ ‘”

’Žƒ‡† •–‘”™ƒ–‡” †”ƒ‹ƒ‰‡ •›•–‡• ‘”

’”‘˜‹†‡ •—„•–ƒ–‹ƒŽ ƒ††‹–‹‘ƒŽ •‘—”
‡• ‘ˆ

’‘ŽŽ—–‡† ”—‘ˆˆǢ ‘”

‹˜Ǥ
’‡†‡ ”‡†‹ ‡
– ˆŽ‘‘† ˆŽ‘™•ǫ
†Ǥ
 Ž † Šƒœƒ †ǡ • ƒ‹ǡ •‡‹
Ї œ ‡•ǡ

”‹• ”‡Ž‡ƒ•‡ ‘ˆ ’‘ŽŽ—–ƒ–• †—‡ –‘ ”‘Œ‡
–

‹—†ƒ–‹‘ǫ

‡Ǥ ‘ˆŽ‹
– ‹–Š „•–”—
‹’އ‡–ƒ–‹‘
ƒ ™ƒ–‡” “—ƒŽ‹–›
‘–”‘Ž ’Žƒ ‘” •—•–ƒ‹ƒ„އ

‰”‘—†™ƒ–‡” ƒƒ‰‡‡– ’Žƒǫ

Ї ƒƒŽ›•‹• ‹ –Š‹• •‡
–‹‘ ‹• •—„•–ƒ–‹ƒ–‡† ‹ ’ƒ”– „› –Ї ƒ–‡” —’’Ž› ••‡••‡– ሺሻሺ ʹͲʹͷ
ሻ ’”‡’ƒ”‡† ˆ‘” –Ї ”‘Œ‡
– ƒ† ƒ––ƒ
Ї† ƒ• ’’‡†‹š Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-72

Initial Study
Discussion

’ƒ
– ͓͵ǤͶǤͳͲƒ Ȃ ‘—ކ –Ї ”‘Œ‡
– ˜‹‘Žƒ–‡ ƒ› ™ƒ–‡” “—ƒŽ‹–› •–ƒ†ƒ”†• ‘” ™ƒ•–‡ †‹•
Šƒ”‰‡
”‡“—‹”‡‡–• ‘” ‘–Ї”™‹•‡ •—„•–ƒ–‹ƒŽŽ› †‡‰”ƒ†‡ •—”ˆƒ
‡ ™ƒ–‡” “—ƒŽ‹–›ǫ
‡‡ ƒŽ•‘
’ƒ
– ͓͵ǤͶǤ͹„Ǥ Ї ’”‘’‘•‡† ”‘Œ‡
–
‘•–”—
–‹‘ ƒ† ”‘—†„”‡ƒ‹‰ ƒ
–‹˜‹–‹‡•
Šƒ˜‡ – ’‘–‡–‹ƒŽ –‘
ƒ—•‡ ‡”‘•‹‘ǡ •‡†‹‡–ƒ–‹‘ǡ ƒ† †‹•
Šƒ”
‰
‰‡ ‘ˆ
‘•–”—
–‹‘ †‡„”‹•
ˆ”‘ –
Ї
Ї ”‘Œ‡
– •‹–‡Ǥ އƒ”‹‰ ‘ˆ ˜‡‰‡–ƒ–‹‘ ƒ† ‰”ƒ†‹‰ ƒ
–‹˜‹–‹‡•ǡ ˆ‘” ‡šƒ’އǡ
‘—ކ އƒ† –‘
‡š’‘•‡† ‘” •–‘
’‹Ž‡† •‘‹Ž• •—•
‡’–‹„އ –‘ ’‡ƒ •–‘”™ƒ–‡” ”—‘ˆˆ ˆŽ‘™•Ǥ Ž•‘ǡ –Ї

‘’ƒ
–‹‘ ‘ˆ •‘‹Ž• „› Їƒ˜› ‡“—‹’‡– ƒ› ‹‹ƒŽŽ› ”‡†—
‡ –Ї ‹ˆ‹Ž–”ƒ–‹‘
ƒ’ƒ
‹–› ‘ˆ
•‘‹Ž• ሺ‡š’‘•‡† †—”‹‰
‘•–”—
–‹‘ሻ ƒ† ‹
”‡ƒ•‡ ”—‘ˆˆ ƒ† ‡”‘•‹‘ ’‘–‡–‹ƒŽǤ Ї ’”‡•‡
‡
‘ˆ •‹‰‹ˆ‹
ƒ– ƒ‘—–• ‘ˆ ”ƒ™ ƒ–‡”‹ƒŽ• ˆ‘”
‘•–”—
–‹‘ǡ ‹
Ž—†‹‰
‘
”‡–‡ ƒ† ƒ•’ŠƒŽ–ǡ ƒ›
އƒ† –‘ •–‘”™ƒ–‡” ”—‘ˆˆ
‘–ƒ‹ƒ–‹‘Ǥ
ˆ —
‘–”‘ŽŽ‡†ǡ –Ї•‡ ƒ–‡”‹ƒŽ•
‘—ކ އƒ† –‘ ™ƒ–‡”
“—ƒŽ‹–› ’”‘„އ•ǡ ‹
Ž—†‹‰ •‡†‹‡–ǦŽƒ†‡ ”—‘ˆˆǡ ’”‘Š‹„‹–‡† ‘Ǧ•–‘”™ƒ–‡” †‹• Šƒ”‰‡•ǡ
ƒ† —Ž–‹ƒ–‡Ž› –Ї †‡‰”ƒ†ƒ–‹‘ ‘ˆ †‘™•–”‡ƒ ”‡
‡‹˜‹‰ ™ƒ–‡” „‘†‹‡•Ǥ • †‹•
—••‡†
’”‡˜‹‘—•Ž›ǡ –Ї ”‘Œ‡
– ™‘—ކ †‹•–—”„ ‘”‡ –Šƒ ‘‡ ƒ
”‡ ƒ† ™‘—ކ „‡ ”‡“—‹”‡† –‘ ’”‡’ƒ”‡
ƒ  ƒ† ‡•—”‡ ‹’އ‡–ƒ–‹‘ ‘ˆ • –Šƒ– ƒ††”‡•• ’‘–‡–‹ƒŽ ‹••—‡• ”‡Žƒ–‡† –‘ •‘‹Ž ‡”‘•‹‘ ƒ†
‘–ƒ‹ƒ–‡† ”—‘ˆˆǤ
’އ‡–‹‰ • ˆ‘”
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ •—
Š ƒ• –Ї
—•‡ ‘ˆ •–”ƒ™ ™ƒ††Ž‡ •ƒ†„ƒ‰•ǡ •‹Ž– ˆ‡
‹‰ǡ •™ƒŽ‡•ǡ •–”‡‡– •™‡‡’‹‰ǡ ‡–
Ǥǡ ™‹ŽŽ „‡ ‹’އ‡–‡†
ƒ† ™‘—ކ ”‡†—
‡ •–‘”™ƒ–‡” ”—‘ˆˆ –‘ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
– †—”‹‰
‘•–”—
–‹‘
ƒ
–‹˜‹–‹‡•Ǥ
‹–Š ”‡‰ƒ”† –‘ –Ї ‘’‡”ƒ–‹‘ ‘ˆ –Ї ”‘Œ‡
–ǡ –Ї ”‘Œ‡
– ‹
Ž—†‡• –Ї †‡˜‡Ž‘’‡– ‘ˆ ƒ •–‘”
†”ƒ‹ „ƒ•‹ ƒ† ƒ••‘
‹ƒ–‡† •–‘”™ƒ–‡” ‹ˆ”ƒ•–”—
–—”‡Ǥ Ї•‡ ‹’”‘˜‡‡–• ƒ”‡ ‡š’‡
–‡† –‘
„‡ †‡˜‡Ž‘’‡† –‘ ‹–› †‡•‹‰ •–ƒ†ƒ”†• ƒ† ‡‡– ‹–›Ǧƒ†‘’–‡† ™ƒ–‡” “—ƒŽ‹–› •–ƒ†ƒ”†•Ǥ Ї ”‘Œ‡
–ǯ• •—”ˆƒ
‡ ‘” ‰”‘—†™ƒ–‡” “—ƒŽ‹–› ‹’ƒ
–• ƒ”‡ ‡š’‡
–‡† –‘ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–
™‹–Š –Ї ‹
‘”’‘”ƒ–‹‘ ‘ˆ Ǧͳǡ ƒ• –Ї ’”‡’ƒ”ƒ–‹‘ ƒ† ƒ’’”‘˜ƒŽ ‘ˆ ƒ  ™‘—ކ ‡•—”‡ • ˆ‘”
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• ™‘—ކ „‡ ‹’އ‡–‡†Ǥ ‘” ‘’‡”ƒ–‹‘ǡ •–‘”™ƒ–‡” ™‘—ކ „‡ Їކ ‘Ǧ•‹–‡ ˜‹ƒ –Ї ’”‘’‘•‡† •–‘”™ƒ–‡” †”ƒ‹ƒ‰‡ „ƒ•‹ –Šƒ– ‡‡–• ‹–› †‡•‹‰ •–ƒ†ƒ”†•Ǥ Ї ’‘–‡–‹ƒŽ ˆ‘” ™ƒ–‡” “—ƒŽ‹–› ‹’ƒ
–• ‹• ”‡†—
‡† –‘ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ–
‹’ƒ
– ‘ ™ƒ–‡” “—ƒŽ‹–›Ǥ

MITIGATION MEASURE(S)

’އ‡–ƒ–‹‘ ‘ˆ ǦͳǤ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ ‡„ އ•• –Šƒ •‹‰‹ˆ‹
ƒ Š ‘ ‘ Ǥ – ‹–  ‹‰ƒ–‹ ‹ ’ ” ‡† ™ ‹–
‘” ƒ–

’ƒ
– ͓͵ǤͶǤͳͲ„ Ȃ ‘—ކ –Ї ”‘Œ‡
– •—„•–ƒ–‹ƒŽŽ› †‡
”‡ƒ•‡ ‰”‘—†™ƒ–‡” •—’’Ž‹‡• ‘”
‹–‡”ˆ‡”‡ •—„•–ƒ–‹ƒŽŽ› ™‹–Š ‰”‘—†™ƒ–‡” ”‡
Šƒ”‰‡ •—
Š –Šƒ– –Ї ”‘Œ‡
– ƒ› ‹’‡†‡
•—•–ƒ‹ƒ„އ ‰”‘—†™ƒ–‡” ƒƒ‰‡‡– ‘ˆ –Ї „ƒ•‹ǫ
Ї ‹–› Ž‹‡• †‹”‡
–Ž› ‘˜‡” –Ї ‹‰• ƒ•‹ ˆ”‘ ™Š‹
Š –Ї ‹–› ‡š–”ƒ
–• ‹–• †‘‡•–‹
™ƒ–‡”
•—’’Ž› ሺ‹–› ‘ˆ ‡‡†Ž‡› ʹͲͳͶሻ ƒ† †‡’‡†• ‡–‹”‡Ž› ‘ ‰”‘—†™ƒ–‡” ’—’‹‰ ˆ”‘ –Ї ‹‰• VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-73

Initial Study

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳͲ
ሺ‹ሻ Ȃ‘—ކ –Ї ”‘Œ‡
– •—„•–ƒ–‹ƒŽŽ› ƒŽ–‡” –Ї ‡š‹•–‹‰ †”ƒ‹ƒ‰‡ ’ƒ––‡” ‘ˆ
–Ї •‹–‡ ‘” ƒ”‡ƒǡ ‹
Ž—†‹‰ –Š”‘—‰Š –Ї ƒŽ–‡”ƒ–‹‘ ‘ˆ –Ї
‘—”•‡ ‘ˆ ƒ •–”‡ƒ ‘” ”‹˜‡” ‘” –Š”‘—‰Š
–Ї ƒ††‹–‹‘ ‘ˆ ‹’‡”˜‹‘—• •—”ˆƒ
‡•ǡ ‹ ƒ ƒ‡” ™Š‹
Š ™‘—ކ ”‡•—Ž– ‹ •—„•–ƒ–‹ƒŽ ‡”‘•‹‘
‘” •‹Ž–ƒ–‹‘ ‘Ǧ ‘” ‘ˆˆǦ•‹–‡ǫ
Ї †‹•–—”„ƒ
‡ ‘ˆ •‘‹Ž• ‘Ǧ•‹–‡ †—”‹‰
‘•–”—
–‹‘ –Šƒ–
‘—ކ
ƒ—•‡ ‡”‘•‹‘ ‹• ‹‹ƒŽǡ „—–
ƒ› ”‡•—Ž– ‹ –‡’‘”ƒ”›
‘•–”—
–‹‘ ‹’ƒ
–•Ǥ
’ƒ
–• ˆ”‘
‘•–”—
–‹‘ ƒ† ‘’‡”ƒ–‹‘ ƒ”‡
†‹•
—••‡† „‡Ž‘™Ǥ
• †‹•
—••‡† ‹
’ƒ
– ͓͵ǤͶǤͳͲƒǡ ƒ„‘˜‡ǡ ’‘–‡–‹ƒŽ ‹’ƒ
–• ‘ ™ƒ–‡” “—ƒŽ‹–› ƒ”‹•‹‰ ˆ”‘
‡”‘•‹‘ ƒ† •‡†‹‡–ƒ–‹‘ ƒ”‡ ‡š’‡
–‡† –‘ „‡ Ž‘
ƒŽ‹œ‡† ƒ† –‡’‘”ƒ”› †—”‹‰
‘•–”—
–‹‘Ǥ
‘•–”—
–‹‘Ǧ”‡Žƒ–‡† ‡”‘•‹‘ † •‡†‹‡–ƒ–‹‘ ‹’ƒ
–• ƒ• ƒ ”‡•—Ž– ‘ˆ •‘‹Ž †‹•–—”„ƒ
‡
™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–
ƒ
ƒˆ–‡” ‹’އ‡–ƒ–‹‘ ‘ˆ ƒ  ƒ† • ”‡“—‹”‡† „› –Ї Ǥ
Ї ‡š‹•–‹‰ †”ƒ‹ƒ‰‡ ’ƒ––‡” ‘ˆ –Ї •‹–‡ ƒ† ƒ”‡ƒ ™‘—ކ „‡ ƒˆˆ‡ –‡† „› –Ї ”‘Œ‡
–̵•
†‡˜‡Ž‘’‡– „‡
ƒ—•‡ ‘ˆ –Ї ‹
”‡ƒ•‡ ‹ ‹’‡”˜‹‘—• •—”ˆƒ
‡• ƒ– –Ї •‹–‡Ǥ Ї
‘•–”—
–‹‘ ‘ˆ
–Ї ”‘Œ‡
– ‹
Ž—†‡• –Ї †‡˜‡Ž‘’‡– ‘ˆ ƒ ‘Ǧ•‹–‡ •–‘”™ƒ–‡” †”ƒ‹ƒ‰‡ „ƒ•‹ǡ ™Š‹ Š ™‘—ކ
„‡ †‡˜‡Ž‘’‡† —†‡” ‹–› •–ƒ†ƒ”†•Ǥ
Ї ”‘Œ‡
– ™‹ŽŽ
‘’Ž› ™‹–Š Ž‘
ƒŽ ”‡‰—Žƒ–‹‘• ‹ ‘”†‡” –‘ ‹‹‹œ‡ ‹’ƒ
–• †—”‹‰

‘•–”—
–‹‘ ƒ† ’‘•–Ǧ
‘•–”—
–‹‘ ‘ˆ –Ї ”‘Œ‡
–Ǥ Ї ”‘Œ‡
– ™‹ŽŽ ‘– ƒŽ–‡” ƒ •–”‡ƒ ‘” ”‹˜‡”Ǥ
‹–Š ‹’އ‡–ƒ–‹‘ ‘ˆ  Ǧͳǡ • ˆ‘” ‡”‘•‹‘ ‘” •‹Ž–ƒ–‹‘ ‘Ǧ ‘” ‘ˆˆǦ•‹–‡ ™‘—ކ „‡ ‹’އ‡–‡† ƒ† ”‡•—Ž– ‹ ƒ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)

’އ‡–ƒ–‹‘ ‘ˆ ǦͳǤ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‹– ‘
‘” ‘ ƒ– –  ‹ ” ‹– ‹‰ƒ–‹ ’ ‡†Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳͲ
ሺ‹‹ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
– •—„•–ƒ–‹ƒŽŽ› ƒŽ–‡” –Ї ‡š‹•–‹‰ †”ƒ‹ƒ‰‡ ’ƒ––‡” ‘ˆ
–Ї •‹–‡ ‘” ƒ”‡ƒǡ ‹
Ž—†‹‰ –Š”‘—‰Š –Ї ƒŽ–‡”ƒ–‹‘ ‘ˆ –Ї
‘—”•‡ ‘ˆ ƒ •–”‡ƒ ‘” ”‹˜‡” ‘” –Š”‘—‰Š
–Ї ƒ††‹–‹‘ ‘ˆ ‹’‡”˜‹‘—• •—”ˆƒ
‡•ǡ ‹ ƒ ƒ‡” ™Š‹
Š ™‘—ކ •—„•–ƒ–‹ƒŽŽ› ‹
”‡ƒ•‡ –Ї ”ƒ–‡
‘ˆ ƒ‘—– ‘ˆ •—”ˆƒ
‡ ”—‘ˆˆ ‹ ƒ ƒ‡” ™Š‹
Š ™‘—ކ ”‡•—Ž– ˆŽ‘‘†‹‰ ‘Ǧ ‘” ‘ˆˆǦ•‹–‡ǫ
‡‡ ƒŽ•‘
’ƒ
– ͓͵ǤͶǤͳͲ
ሺ‹ሻ ƒ„‘˜‡Ǥ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-76

Initial Study
š‹•–‹‰ †”ƒ‹ƒ‰‡ ’ƒ––‡”• ‘ˆ –Ї •‹–‡ ™‘—ކ „‡ ƒˆˆ‡
–‡† „› –Ї ”‘Œ‡
– †‡˜‡Ž‘’‡– „‡
ƒ—•‡
–Ї ‹
”‡ƒ•‡ ‹ ‹’‡”˜‹‘—• •—”ˆƒ
‡• ƒ– –Ї •‹–‡
ƒ ‹
”‡ƒ•‡ –Ї ’‘–‡–‹ƒŽ ˆ‘” •–‘”™ƒ–‡”
”—‘ˆˆ ƒ† •‘‹Ž ‡”‘•‹‘Ǥ Ї ”‘Œ‡
– •‹–‡ †‘‡• ‘–
‘–ƒ‹ ƒ› ™ƒ–‡” ˆ‡ƒ–—”‡•ǡ •–”‡ƒ•ǡ ‘”
”‹˜‡”•Ǥ —––‘™‹ŽŽ‘™ ‹–
Š ‹• Ž‘
ƒ–‡† ƒŽ‘‰ –Ї ‡ƒ•–‡” ’”‘’‡”–› „‘—†ƒ”› ‘ˆ –Ї ”‘Œ‡
– •‹–‡ǡ
™Š‹
Š ™‹ŽŽ „‡ —†‡”‰”‘—†‡† ’‡” ‹–› ”‡“—‹”‡‡–•Ǥ Ї ”‘Œ‡ – ‹
Ž—†‡• ƒ –™‘Ǧƒ
”‡ —–Ž‘–
 ƒ• ƒ •–‘” †”ƒ‹ „ƒ•‹ –‘ ƒ‹–ƒ‹ •–‘”™ƒ–‡” ‘ •‹–‡Ǥ Ї „ƒ•‹ ™‘—ކ ƒŽŽ‘™ •–‘”™ƒ–‡” –‘ ’‡”
‘Žƒ–‡ „ƒ
 ‹–‘ –Ї —†‡”Ž›‹‰ ƒ“—‹ˆ‡”Ǥ ŽŽ ”‘Œ‡
–
‘’‘‡–• ™‹ŽŽ
‘’Ž› ™‹–Š –Ї
‹–› —‹
‹’ƒŽ ‘†‡ ˆ‘” —”„ƒ •–‘”™ƒ–‡” “—ƒŽ‹–› ƒƒ‰‡‡–Ǥ ††‹–‹‘ƒŽŽ›ǡ ƒ• ‘–‡† ƒ„‘˜‡ǡ ƒ ‘Ǧ•‹–‡ •–‘”™ƒ–‡” †”ƒ‹ƒ‰‡ „ƒ•‹ ‹• ’”‘’‘•‡† ƒ• ’ƒ”– ‘ˆ –Ї ”‘Œ‡ –Ǥ
Ї ”‘Œ‡
– ™‘—ކ ‘–
ƒ—•‡ •—„•–ƒ–‹ƒŽ •—”ˆƒ
‡ ”—‘ˆˆ –Šƒ– ™‘—ކ ”‡•—Ž– ‹ ˆŽ‘‘†‹‰ ‘Ǧ ‘”
‘ˆˆǦ•‹–‡Ǥ Ї”‡ˆ‘”‡ǡ ™‹–Š ‹–‹‰ƒ–‹‘ǡ –Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ
M

’އ‡–ƒ–‹‘ ‘ˆ 

ITIGATION MEASURE(S)
ǦͳǤ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‹– ‘
‘” ‘ ƒ– –  ‹ ” ‹– ‹‰ƒ–‹ ’ ‡†Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳͲ
ሺ‹‹‹ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
– •—„•–ƒ–‹ƒŽŽ› ƒŽ–‡” –Ї ‡š‹•–‹‰ †”ƒ‹ƒ‰‡ ’ƒ––‡” ‘ˆ
–Ї •‹–‡ ‘” ƒ”‡ƒǡ ‹
Ž—†‹‰ –Š”‘—‰Š –Ї ƒŽ–‡”ƒ–‹‘ ‘ˆ –Ї
‘—”•‡ ‘ˆ ƒ •–”‡ƒ ‘” ”‹˜‡” ‘” –Š”‘—‰Š
–Ї ƒ††‹–‹‘ ‘ˆ ‹’‡”˜‹‘—• •—”ˆƒ
‡•ǡ ‹ ƒ ƒ‡” ™Š‹
Š ™‘—ކ
”‡ƒ–‡ ‘”
‘–”‹„—–‡ ”—‘ˆˆ
™ƒ–‡” ™Š‹
Š ™‘—ކ ‡š
‡‡† –Ї
ƒ’ƒ
‹–› ‘ˆ ‡š‹•–‹‰ ‘” ’Žƒ‡† •–‘”™ƒ–‡” †”ƒ‹ƒ‰‡ •›•–‡•
‘” ’”‘˜‹†‡ •—„•–ƒ–‹ƒŽ ƒ††‹–‹‘ƒŽ •‘—”
‡• ‘ˆ ’‘ŽŽ—–‡† ”—‘ˆˆǫ
އƒ•‡ •‡‡
’ƒ
–• ͓͵ǤͶǤͳͲƒ –Š”‘—‰Š
ሺ‹‹ሻ ƒ„‘˜‡Ǥ
• ’”‡˜‹‘—•Ž› †‹•
—••‡†ǡ
‘•–”—
–‹‘ ‘ˆ –Ї ”‘Œ‡
– ‹• ”‡“—‹”‡† –‘
‘’Ž› ™‹–Š •
‹’އ‡–‡† —†‡” –Ї ƒ’’”‘˜‡†  ሺ Ǧͳሻ ƒ† ‡‡’ •–‘”™ƒ–‡” ‘Ǧ•‹–‡ –‘ ”‡†—
‡ –Ї ’‘–‡–‹ƒŽ ˆ‘” ’‘ŽŽ—–ƒ–• ”—‘ˆˆǤ Ї ƒ††‹–‹‘ ‘ˆ ‹’‡”˜‹‘—• •—”ˆƒ ‡• ƒ• ƒ ”‡•—Ž– ‘ˆ
–Ї ”‘Œ‡
– ™‘—ކ „‡ ƒ††”‡••‡† –Š”‘—‰Š –Ї †‡˜‡Ž‘’‡– ‘ˆ •–‘”™ƒ–‡” †”ƒ‹ ‰‡ ‹ˆ”ƒ•–”—
–—”‡ ƒ† ƒ ‘Ǧ•‹–‡ •–‘”™ƒ–‡” †”ƒ‹ƒ‰‡ „ƒ•‹Ǥ Ї•‡ ‹’”‘˜‡‡–• ƒ
ƒ”‡
ƒ–‹
‹’ƒ–‡† –‘ „‡ †‡˜‡Ž‘’‡† ‹
‘’Ž‹ƒ
‡ ™‹–Š ‹–› ƒ†‘’–‡†

•–‘”™ƒ–‡” ƒƒ‰‡‡–Ǥ ††‹–‹‘ƒŽŽ›ǡ –Ї ”‡•‹†‡–‹ƒŽ Ž‘–• ™‘—ކ ‹ Ž—†‡
†‡•‹‰ •–ƒ†ƒ”†• ˆ‘”

–Š”‘—‰Š Žƒ†•
ƒ’‹‰ –‘ ƒŽŽ‘™ ˆ‘” •–‘”™ƒ–‡” ’‡”
‘Žƒ–‹‘Ǥ
’‡”˜‹‘—• •—”ˆƒ
‡

Ї ”‘Œ‡
– ™‘—ކ ‘– •—„•–ƒ–‹ƒŽŽ› ‹
”‡ƒ•‡ –Ї ”ƒ–‡ ‘” ƒ‘—– ‘ˆ •—”ˆƒ
‡ ”—‘ˆˆ ‹ ƒ ƒ‡”
–Šƒ– ™‘—ކ ”‡•—Ž– ‹ ˆŽ‘‘†‹‰ ‘Ǧ ‘” ‘ˆˆǦ•‹–‡ǡ
‘–”‹„—–‡ ”—‘ˆˆ ™ƒ–‡” –Šƒ– ™‘—ކ ‡š
‡‡† –Ї

ƒ’ƒ
‹–› ‘ˆ ‡š‹•–‹‰ ‘” ’Žƒ‡† •–‘”™ƒ–‡” †”ƒ‹ƒ‰‡ •›•–‡•ǡ ‘” ’”‘˜‹†‡ ƒ††‹–‹‘ƒŽ •‘—” ‡•
‘ˆ ’‘ŽŽ—–‡† ”—‘ˆˆǤ Ї”‡ˆ‘”‡ǡ ™‹–Š –Ї ‹’އ‡–ƒ–‹‘ ‘ˆ  Ǧͳǡ –Ї ”‘Œ‡ – ™‘—ކ Šƒ˜‡
ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ
M

’އ‡–ƒ–‹‘ ‘ˆ 

ITIGATION MEASURE(S)
ǦͳǤ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-77

Initial Study

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‹– ‘
‘” ‘ ƒ– Ǥ –  ‹ ” ‹– ‹‰ƒ–‹ ’ ‡†

’ƒ
’ƒ
– ͓͵ǤͶǤͳͲ
ሺ‹˜ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
– •—„•–ƒ–‹ƒŽŽ› ƒŽ–‡” –Ї ‡š‹•–‹‰ †”ƒ‹ƒ‰‡ ’ƒ––‡” ‘ˆ
–Ї •‹–‡ ‘” ƒ”‡ƒǡ ‹
Ž—†‹‰ –Š”‘—‰Š –Ї ƒŽ–‡”ƒ–‹‘ ‘ˆ –Ї
‘—”•‡ ‘ˆ ƒ •–”‡ƒ ‘” ”‹˜‡” ‘” –Š”‘—‰Š
–Ї ƒ††‹–‹‘ ‘ˆ ‹’‡”˜‹‘—• •—”ˆƒ
‡•ǡ ‹ ƒ ƒ‡” ™Š‹
Š ™‘—ކ ‹’‡†‡ ‘” ”‡†‹”‡
– ˆŽ‘‘†
ˆŽ‘™•ǫ
‡‡
’ƒ
– ͓͵ǤͶǤͶ
ƒ†
’ƒ
–• ͓͵ǤͶǤͳͲƒ –Š”‘—‰Š
ሺ‹‹ሻ ƒ„‘˜‡
Ї”‡ ƒ”‡ ‘ ™ƒ–‡”• ‘ˆ –Ї ǤǤ ‘” ‘–Ї” ™ƒ–‡” ˆ‡ƒ–—”‡• ™‹–Š‹ –Ї „‘—†ƒ”‹‡• ‘ˆ –Ї ”‘Œ‡ –
’”‘’‡”–› „‘—†ƒ”› ‘ˆ –Ї ”‘Œ‡
– •‹–‡Ǥ •
•‹–‡ ‹–•‡ŽˆǤ • ‘–‡† ‹
’ƒ
– ͓͵ǤͶǤͶ
ǡ –Ї —––‘™‹ŽŽ‘™ ‹–
Š ‹• Ž‘
ƒ–‡† ƒŽ‘‰ –Ї ™‡•–‡”Ž›
ƒ ’ƒ”– ‘ˆ –Ї ”‘Œ‡
–ǡ –Š‹• „Ž—‡Ž‹‡ †”ƒ‹ƒ‰‡ ™‹ŽŽ „‡
—†‡”‰”‘—†‡† –‘ ‡‡– ‹–› ”‡“—‹”‡‡–•Ǥ Ї ”‘Œ‡
– •‹–‡ ‹• ™‹–Š‹ ƒ  ƒ”‡ƒ ‘ˆ ‹‹ƒŽ
ˆŽ‘‘† Šƒœƒ”† ሺ  ʹͲʹͶሻǡ
Ї ”‘Œ‡
– ‹• ˆŽƒ– ™‹–Š
ƒ† ƒ• •—
Šǡ –Ї ”‘Œ‡
– ™‹ŽŽ ‘– ‹’‡†‡ ‘” ”‡†‹”‡
– ˆŽ‘‘† ˆŽ‘™•Ǥ
Ž‹––އ –‘ ‘ –‘’‘‰”ƒ’Š‹
˜ƒ”‹ƒ–‹‘ ƒ† ™‘—ކ ‘– •‹‰‹ˆ‹
ƒ–Ž› ƒŽ–‡”
‡š‹•–‹‰ †”ƒ‹ƒ‰‡ ’ƒ––‡”• ‘” –Ї
‘—”•‡ ‘ˆ ƒ •–”‡ƒ ‘” ”‹˜‡”Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‹ŽŽ Šƒ˜‡
ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳͲ† Ȃ ‘—ކ –Ї ”‘Œ‡
–ǡ ‹ ˆŽ‘‘† Šƒœƒ”†ǡ –•—ƒ‹ǡ ‘” •‡‹
Ї œ‘‡•ǡ ”‹• ”‡Ž‡ƒ•‡
‘ˆ ’‘ŽŽ—–ƒ–• †—‡ –‘ ”‘Œ‡
– ‹—†ƒ–‹‘ǫ
• ‘–‡† ƒ„‘˜‡ǡ –Ї ”‘Œ‡
– •‹–‡ ‹• ‘– Ž‘
ƒ–‡† ™‹–Š‹ ƒ ˆŽ‘‘† Šƒœƒ”† œ‘‡ ሺ  ʹͲʹͶሻǤ Ї
”‘Œ‡
– •‹–‡ ‹• ‘– Ž‘
ƒ–‡† ‡ƒ” –Ї ‘
‡ƒ ‘” ƒ •–‡‡’ –‘’‘‰”ƒ’Š‹
ˆ‡ƒ–—”‡ ሺ‹Ǥ‡Ǥǡ ‘—–ƒ‹ǡ Š‹ŽŽǡ
„Ž—ˆˆǡ ‡–
ǤሻǤ •—ƒ‹• ƒ”‡ ™ƒ˜‡• ‰‡‡”ƒ–‡† ‹ ‘
‡ƒ• ˆ”‘ •‡‹•‹
ƒ
–‹˜‹–›Ǥ —‡ –‘ –Ї ‹Žƒ†
Ž‘
ƒ–‹‘ ‘ˆ –Ї •‹–‡ǡ –•—ƒ‹• ƒ”‡ ‘–
‘•‹†‡”‡† ƒ Šƒœƒ”† ˆ‘” –Ї •‹–‡Ǥ Ї”‡ˆ‘”‡ǡ –Ї”‡ ‹• ‘ ’‘–‡–‹ƒŽ ˆ‘” –Ї •‹–‡ –‘ „‡ ‹—†ƒ–‡† „› ƒ –•—ƒ‹ ‘” —†ˆŽ‘™Ǥ  •‡‹
Ї ‹• ƒ ™ƒ˜‡ ‰‡‡”ƒ–‡† „› –Ї ’‡”‹‘†‹
‘•
‹ŽŽƒ–‹‘ ‘ˆ ƒ „‘†› ‘ˆ ™ƒ–‡” ™Š‘•‡ ’‡”‹‘† ‹• ƒ
ˆ—
–‹‘ ‘ˆ –Ї ”‡•‘ƒ–
Šƒ”ƒ
–‡”‹•–‹
• ‘ˆ –Ї
‘–ƒ‹‹‰ „ƒ•‹ ƒ•
‘–”‘ŽŽ‡† „› ‹–• ’Š›•‹
ƒŽ
†‹‡•‹‘•Ǥ Ї”‡ ‹• ‘ „‘†› ‘ˆ ™ƒ–‡” ™‹–Š‹ –Ї ˜‹
‹‹–› ‘ˆ –Ї ”‘Œ‡
– •‹–‡Ǥ Ї”‡ ‹• ‘
’‘–‡–‹ƒŽ ˆ‘” –Ї ‹—†ƒ–‹‘ ‘ˆ –Ї ”‘Œ‡
– •‹–‡ „› •‡‹
ЇǤ
Ї ”‡•‘ ‘—–› ʹͲʹͶ ‘’”‡Š‡•‹˜‡ ‡‡”ƒŽ Žƒ ‡˜‹‡™ ƒ† ‡˜‹•‹‘ǡ ’”‘˜‹†‡• ƒ —’†ƒ–‡† ‡˜ƒŽ—ƒ–‹‘ ‘ˆ ‹—†ƒ–‹‘ Šƒœƒ”†• †—‡ –‘ †ƒ ˆƒ‹Ž—”‡Ǥ Ї ‹–›ǡ ‹ Ž—†‹‰ –Ї ”‘Œ‡
–
•‹–‡ ‹• Ž‘
ƒ–‡† ‘—–•‹†‡ †ƒ ‹—†ƒ–‹‘ Šƒœƒ”†•Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡ – ™‘—ކ ‘– „‡ •—„Œ‡
–
–‘ ”‡Ž‡ƒ•‡ ‘ˆ ’‘ŽŽ—–ƒ–• †—‡ –‘ ‹—†ƒ–‹‘ ƒ• ƒ ”‡•—Ž– ‘ˆ ƒ †ƒ ˆƒ‹Ž—”‡Ǥ VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-78
Initial Study
• –Ї ”‘Œ‡
– ‹• ‘– Ž‘
ƒ–‡† ‹ ƒ ˆŽ‘‘† Šƒœƒ”† œ‘‡ ‘” †ƒ ‹—†ƒ–‹‘ Šƒœƒ”† œ‘‡ǡ ƒ† ™‘—ކ ‘– „‡ •—„Œ‡
– –‘ –•—ƒ‹ ‘” •‡‹
Ї œ‘‡ Šƒœƒ”†•Ǥ ”‘Œ‡
– ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ
•‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳͲ‡ Ȃ ‘ˆŽ‹
– ™‹–Š ‘” ‘„•–”—
– ‹’އ‡–ƒ–‹‘ ‘ˆ ƒ ™ƒ–‡” “—ƒŽ‹–›
‘–”‘Ž ’Žƒ
‘” •—•–ƒ‹ƒ„އ ‰”‘—†™ƒ–‡” ƒƒ‰‡‡– ’Žƒǫ
‡‡
’ƒ
–• ͓͵ǤͶǤͳͲƒǦ„ǡ ƒ„‘˜‡Ǥ
• †‹•
—••‡† ’”‡˜‹‘—•Ž›ǡ –Ї ™ƒ–‡” †‡ƒ† ˆ”‘ –Ї
‘•–”—
–‹‘ ƒ† ‘’‡”ƒ–‹‘ ‘ˆ –Š‹•
”‘Œ‡
– ™‘—ކ ‘– •‹‰‹ˆ‹
ƒ–Ž› †‡’އ–‡ ‰”‘—†™ƒ–‡” ”‡•‘—”
‡• ‘” ‹–‡”ˆ‡”‡
‡ ™‹–Š
‰”‘—†™ƒ–‡” ”‡
Šƒ”‰‡Ǥ Ї ”‘Œ‡
– ™‘—ކ ‘– ‡š’ƒ† ™ƒ–‡” †‡ƒ† „‡›‘† ƒ ”‡ƒ•‘ƒ„އ
ƒ‘—– •—’’Ž‹‡† –‘ •‹‹Žƒ”Ǧ•‹œ‡† ‡†—
ƒ–‹‘ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ ƒ† ‹ ˆƒ
–ǡ ™‹ŽŽ ‹’އ‡– ™ƒ–‡”

‘•‡”˜ƒ–‹‘ ‡–Š‘†• „› ‹•–ƒŽŽ‹‰ ‘”‡ ‡ˆˆ‹
‹‡– ƒ’’Ž‹ƒ
‡• •—
Š ƒ• Ž‘™ǦˆŽ‘™ –‘‹Ž‡–•ǡ ƒ†
ˆƒ—
‡–•ǡ ƒ† —•‡ †”‹’ ‹””‹‰ƒ–‹‘ ƒ† †”‘—‰Š–Ǧ–‘އ”ƒ– ’Žƒ–• ‘” ƒ”–‹ˆ‹ ‹ƒŽ –—”ˆ ˆ‘” Žƒ†•
ƒ’‹‰ǡ
ƒ• ‹• ˆ‡ƒ•‹„އǤ
• –Ї ”‘Œ‡
– •‹–‡ —•‡ Šƒ• „‡‡ †‡–‡”‹‡† –‘ „‡
‘•‹•–‡– ™‹–Š –Ї ǡ –Ї ’”‘’‘•‡†
”‘Œ‡
– ™‹ŽŽ ‘– •—„•–ƒ–‹ƒŽŽ› †‡’އ–‡ “—‹ˆ‡” •—’’Ž‹‡• ‘” ‹–‡”ˆ‡”‡ •—„•–ƒ–‹ƒŽŽ› ™‹–Š ‰”‘—†™ƒ–‡” ”‡
Šƒ”‰‡ ‘” •‹‰‹ˆ‹
ƒ–Ž› ƒŽ–‡” Ž‘
ƒŽ ‰”‘—†™ƒ–‡” •—’’Ž‹‡•ǡ ‘” †‡’އ–‡ –Ї
™ƒ–‡” •—’’Ž› ‘” •‹‰‹ˆ‹
ƒ–Ž› ‹
”‡ƒ•‡ ™
ƒ
ƒ–‡” †‡ƒ† –Šƒ– ™‘—ކ
‘ˆŽ‹
– ™‹–Š –Ї Ǥ
Ї”‡ˆ‘”‡ǡ ‘ ƒ††‹–‹‘ƒŽ ”‡“—‹”‡‡–• ‘” ‹’އ‡–ƒ–‹‘ ‡ƒ•—”‡• ƒ”‡ ƒ’’Ž‹ ƒ„އ
Ї ”‘Œ‡
– ™‹ŽŽ ƒŽ•‘
‘’Ž› ™‹–Š ƒŽŽ ƒ’’Ž‹
ƒ„އ Ž‘
ƒŽ ƒ† –ƒ–‡ •–ƒ†ƒ”†• †—”‹‰
‘•–”—
–‹‘
ƒ† ‘’‡”ƒ–‹‘ ‹
Ž—†‹‰ ’”‡’ƒ”ƒ–‹‘ ƒ† ƒ’’”‘˜ƒŽ ‘ˆ ƒ  ƒ• ’‡”  ǦͳǤ Ї ”‘Œ‡ – ‹•
‘– ƒ–‹
‹’ƒ–‡† –‘ —•‡ ‘” •—„•–ƒ–‹ƒŽŽ› †‡’އ–‡ ‰”‘—†™ƒ–‡” •—’’Ž‹‡• ‘” ‘ˆŽ‹
– ™‹–Š ƒ›
ƒ†‘’–‡† ‰”‘—†™ƒ–‡” ƒƒ‰‡‡– ’Žƒǡ ƒ• ‘–‡† ƒ„‘˜‡Ǥ Ї”‡ˆ‘”‡ǡ ”‘Œ‡ – ‹’ƒ
–• ™‘—ކ
„‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ– ™‹–Š ‹–‹‰ƒ–‹‘ ‹
‘”’‘”ƒ–‡†Ǥ

MITIGATION MEASURE(S)

’އ‡–ƒ–‹‘ ‘ˆ ǦͳǤ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‰ ‹‘ 
‘” ‘ ƒ– Ǥ – ‹–‹ ‹ ” ‹– ƒ– ’ ‡†
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-79

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.11 - LAND USE AND PLANNING
‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ Š›•‹
ƒŽŽ› †‹˜‹†‡ ƒ ‡•–ƒ„Ž‹•Ї†

‘—‹–›ǫ

„Ǥ ƒ—•‡ ƒ •‹‰‹ˆ‹
ƒ ‡˜‹” ‡ ƒŽ ‹’
–

†—‡ –‘ ƒ
‘ˆŽ‹
– ™‹–Š ƒ› Žƒ† —•‡ ’Ž
ƒ
ƒǡ

’‘Ž‹
›ǡ ‘” ”‡‰—Žƒ–‹‘ ƒ†‘’–‡† ˆ‘” –Ї

’—”’‘•‡ ‘ˆ ƒ˜‘‹†‹‰ ‘” ‹–‹‰ƒ–‹‰ ƒ

‡˜‹”‘‡–ƒŽ ‡ˆˆ‡
–ǫ
Discussion

’ƒ
– ͓͵ǤͶǤͳͳƒ Ȃ ‘—ކ –Ї ”‘Œ‡
– ’Š›•‹
ƒŽŽ› †‹˜‹†‡ ƒ ‡•–ƒ„Ž‹•Ї†
‘—‹–›ǫ
Ї ”‘Œ‡
– ‹• —†‡˜‡Ž‘’‡† Žƒ† ’”‘’‘•‡† ƒŽ‘‰ –Ї ‡ƒ•–‡” ‡†‰‡ ‘ˆ –Ї ‹–› ‘”’‘”ƒ–‡ Ž‹‹–•Ǥ
Ї ƒ”‡ƒ ‹• ’”‘‰”‡••‹˜‡Ž› †‡˜‡Ž‘’‹‰ ™‹–Š ”‡•‹†‡–‹ƒŽ –”ƒ –• ƒ• ƒ ƒ–—”ƒŽ ’”‘‰”‡••‹‘ ‘ˆ –Ї
‹–›ǯ• „—‹Ž†‘—– ‘ˆ –Ї ‡‡”ƒŽ ŽƒǤ Ї ’”‘’‘•‡† ”‘Œ‡
– •‹–‡ ™‘—ކ ‘–
”‡ƒ–‡ ƒ †‹˜‹•‹‘
„‡–™‡‡ ƒ› ‡•–ƒ„Ž‹•Ї†
‘—‹–‹‡•Ǥ Ї ”‘Œ‡
– ™‘—ކ
‘‡
– –‘ ‡š‹•–‹‰ ’—„Ž‹
”‹‰Š–•Ǧ
‘ˆǦ™ƒ› ƒ† ™‘—ކ ‘– ’Š›•‹
ƒŽŽ› †‹˜‹†‡ ƒ ‡•–ƒ„Ž‹•Ї†
‘—‹–›Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
–
™‹ŽŽ Šƒ˜‡ ‘ ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ

’ƒ
– ͓͵ǤͶǤͳͳ„ Ȃ ‘—ކ –Ї ”‘Œ‡
–
ƒ—•‡ ƒ •‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‹’ƒ
– †—‡ –‘ ƒ

‘ˆŽ‹
– ™‹–Š ƒ› Žƒ† —•‡ ’Žƒǡ ’‘Ž‹
›ǡ ‘” ”‡‰—Žƒ–‹‘ ƒ†‘’–‡† ˆ‘” –Ї ’—”’‘•‡ ‘ˆ ƒ˜‘‹†‹‰ ‘” ‹–‹‰ƒ–‹‰ ƒ ‡˜‹”‘‡–ƒŽ ‡ˆˆ‡
–ǫ
Ї ”‘Œ‡
– ’”‘’‘•‡• –‘ ƒ‡† –Ї Žƒ† —•‡ †‡•‹‰ƒ–‹‘ ‘ˆ ƒ ͵ǤͷǦƒ ”‡ ’‘”–‹‘ ‘ˆ –Ї ‘˜‡”ƒŽŽ
”‘Œ‡
– •‹–‡ –‘ „‡
‘•‹•–‡– ™‹–Š –Ї ”‡ƒ‹‹‰ ͵ͲǤͷ ƒ
”‡• ‘ˆ –Ї ”‘Œ‡
– •‹–‡Ǥ ‹–Š ƒ’’”‘˜ƒŽ
‘ˆ –Ї ’”‘’‘•‡† ‡ ‡”ƒŽ Žƒ ‡†‡– ƒ’’Ž‹
ƒ–‹‘ǡ –Ї ”‘Œ‡
– †‘‡• ‘–
”‡ƒ–‡ ƒ
‘ˆŽ‹
–
™‹–Š ƒ› Žƒ† —•‡ ’Žƒǡ ’‘Ž‹
›ǡ ‘” ”‡‰—Žƒ–‹‘Ǥ • –Ї ’”‘’‘•‡† ‡ ‡”ƒŽ Žƒ ‡†‡– ‹• ”‡“—‡•–‹‰ –‘ ƒ‡† –Ї Žƒ† —•‡ †‡•‹‰ƒ–‹‘ ‘ˆ ƒ ͵ǤͷǦƒ ”‡ ’‘”–‹‘ ˆ”‘
‹‰Š ‡•‹–›
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-80

Initial Study
‡•‹†‡–‹ƒŽ –‘ ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽǡ
‘•‹•–‡
› ‘ˆ –Ї ”‘Œ‡
– ™‹ŽŽ ƒ’’Ž‹
ƒ„އ ’‘Ž‹
‹‡• ˆ‘”
‘™ ‡•‹–› ‡•‹†‡–‹ƒŽ —•– „‡
‘•‹†‡”‡†Ǥ Ї ”‘Œ‡
– ™‹ŽŽ „‡
‘•‹•–‡– ™‹–Š –Ї
ˆ‘ŽŽ‘™‹‰
‡‡”ƒŽ Žƒ ’‘Ž‹
‹‡• ˆ‘” ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽǣ
x  ʹǤ͹Ǥͳሺ„ሻǣ ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽ ሺͶǦͺ †™‡ŽŽ‹‰ —‹–• ’‡” ‰”‘•• ƒ ”‡ሻ Ȃ Ї ‘™
‡•‹–› ‡•‹†‡–‹ƒŽ †‡•‹‰ƒ–‹‘ ‹• ‹–‡†‡† ˆ‘” •‹‰Ž‡Ǧˆƒ‹Ž› †‡–ƒ Ї† ”‡•‹†‡–‹ƒŽ
†‡˜‡Ž‘’‡–ǡ ƒ––ƒ
Ї† •‹‰Ž‡ ˆƒ‹Ž›ǡ ƒ† Ž‘™ †‡•‹–› —Ž–‹Ǧˆƒ‹Ž› —•‡•Ǥ Ї ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽ †‡•‹‰ƒ–‹‘ ‹• –Ї ’”‡†‘‹ƒ– ”‡•‹†‡–‹ƒŽ †‡•‹‰ƒ–‹‘ ‹ –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ Š‹• Žƒ† —•‡
ƒ–‡‰‘”› ƒ

‘‘†ƒ–‡• –Ї –›’‹
ƒŽ ”‡•‹†‡–‹ƒŽ •—„†‹˜‹•‹‘
‹ ‡‡†Ž‡›Ǥ
x  ʹǤ͹Ǥʹǣ ‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– ’”‘Œ‡
–• •ŠƒŽŽ ƒ
Š‹‡˜‡ –Ї ‹‹— †‡•‹–›
”‡“—‹”‡‡–• ƒ• †‡•‹‰ƒ–‡† „› –Ї ‡ ‡”ƒŽ Žƒ ƒ† •‡ ƒ’Ǥ x  ʹǤ͹Ǥ͸ǣ •—”‡ –Šƒ– ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– ‘

—”• ‹ ƒ”‡ƒ• –Šƒ– Šƒ˜‡ •—ˆˆ‹
‹‡–
‹ˆ”ƒ•–”—
–—”‡ –‘ ƒ

‘‘†ƒ–‡ –Ї †‡•‹–› ‘ˆ ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– „‡‹‰
’”‘’‘•‡†Ǥ
Ї †‡•‹–› ‘ˆ –Ї ”‘Œ‡
– ™‹ŽŽ „‡ ͷǤͳͻ †™‡ŽŽ‹‰ —‹–• ’‡” ƒ
”‡ ƒ† ‡‡–• –Ї ‹‹—
†‡•‹–› ”‡“—‹”‡‡–• ‘ˆ –Ї ‘™ ‡•‹–› ‡•‹†‡–‹ƒŽ Žƒ† —•‡ †‡•‹‰ƒ–‹‘ ‡•–ƒ„Ž‹•Ї† ‹ ‘Ž‹
›  ʹǤ͹Ǥͳሺ„ሻ ƒ† ƒ• ”‡“—‹”‡† —†‡” ‘Ž‹
›  ʹǤ͹ǤʹǤ ‹–Š ”‡‰ƒ”† –‘ ‘Ž‹
›  ʹǤ͹Ǥ͸ǡ –Ї
”‘Œ‡
– ‹• ƒ–‹
‹’ƒ–‡† –‘ „‡ •‡”˜‹
‡† „› ‹–› ™ƒ–‡”ǡ ™ƒ•–‡™ƒ–‡”ǡ ƒ† •–‘”™ƒ–‡” †”ƒ‹ƒ‰‡
ˆƒ
‹Ž‹–‹‡•Ǥ ‹–› •‡”˜‹
‡• ƒ”‡ ƒ˜ƒ‹Žƒ„އ ƒ† ™‹ŽŽ Šƒ˜‡ –Ї
ƒ’ƒ
‹–› –‘ •‡”˜‹
‡ –Ї ”‘Œ‡
–Ǥ ‘
•—’’އ‡– •‡”˜‹
‡ ‹’ƒ
–•ǡ –Ї ‹–› ”‡“—‹”‡• ’ƒ›‡– ‘ˆ †‡˜‡Ž‘’‡” ‹’ƒ
– ˆ‡‡• –‘ ‡•—”‡
–Šƒ– ƒ†‡“—ƒ–‡ ˆ—†• ƒ”‡
‘ŽŽ‡
–‡† –‘ ‘’‡”ƒ–‡ǡ ƒ‹–ƒ‹ ‡š‹•–‹‰ ˆƒ
‹Ž‹–‹‡•ǡ ƒ†
‘•–”—
– ‡™
ˆƒ
‹Ž‹–‹‡•Ǥ Ї ”‘Œ‡
– ™‹ŽŽ ’ƒ› –Ї ƒ’’”‘’”‹ƒ–‡ †‡˜‡Ž‘’‡– ‹’ƒ
– ˆ‡‡• ‹
‘’Ž‹ƒ
‡ ™‹–Š

‡‡”ƒŽ Žƒ ’‘Ž‹
› ƒ† ™‹ŽŽ Šƒ˜‡ •—ˆˆ‹
‹‡– ‹ˆ”ƒ•–”—
–—”‡ –‘ ƒ

‘‘†ƒ–‡ –Ї ’”‘’‘•‡†
”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡–Ǥ
Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ƒ••‹•– –Ї ‹–› ‹ ‡‡–‹‰ ‹–• ‡‰‹‘ƒŽ
‘—•‹‰ ‡‡†• ŽŽ‘
ƒ–‹‘
ሺ
ሻ ‘ˆ ͳǡͶ͸͵ ˆ‘” –Ї ʹͲʹ͵ǦʹͲ͵ͳ ’Žƒ‹‰ ’‡”‹‘† ሺ ”‡•‘ ‘— ‹Ž ‘ˆ ‘˜‡”‡– • ʹͲʹʹሻǤ
Š‹• –‘–ƒŽ ‹• ˆ—”–Ї”
Žƒ••‹ˆ‹‡† „› ͶͲ͵ ˜‡”› Ž‘™Ǧ‹
‘‡ Š‘—•‹‰ —‹–•ǡ ͳͺ͵ Ž‘™Ǧ‹
‘‡
Š‘—•‹‰ —‹–•ǡ ʹͳͳ ‘†‡”ƒ–‡Ǧ‹
‘‡ —‹–•ǡ ƒ† ͸͸͸ ƒ„‘˜‡ ‘†‡”ƒ–‡Ǧ‹
‘‡ Š‘—•‹‰ —‹–•Ǥ
Ї ”‘Œ‡
– ™‹ŽŽ ”‡•—Ž– ‹ ’”‘˜‹†‹‰ ͳ͸͸ •‹‰Ž‡Ǧˆƒ‹Ž› ”‡•‹†‡–‹ƒŽ —‹–• ƒ– –Ї ‘†‡”ƒ–‡ ‘” ƒ„‘˜‡ ‘†‡”ƒ–‡Ǧ‹
‘‡ އ˜‡ŽǤ 
 ‹• „ƒ•‡† ‘
‘—–›™‹†‡ Š‘—•‹‰ ”‘Œ‡
–‹‘• †‡˜‡Ž‘’‡†
„› –Ї ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ
‘—•‹‰ ƒ† ‘—‹–› ‡˜‡Ž‘’‡– ሺ
ሻǤ
 ™‘”•
™‹–Š –Ї ”‡‰‹‘ƒŽ ‘—
‹Ž ‘ˆ ‘ ˜‡”‡–• –‘ †‡–‡”‹‡ –Ї ƒ‘—– ‘ˆ Š‘—•‹‰ ‡‡†‡† ™‹–Š‹ –Ї ”‡‰‹‘Ǥ • •—
Šǡ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘–
‘ˆŽ‹
– ™‹–Š ƒ› ƒ’’Ž‹
ƒ„އ Žƒ† —•‡
’Žƒǡ ’‘Ž‹
›ǡ ‘” ”‡‰—Žƒ–‹‘ ‘ˆ ƒ ƒ‰‡
› ™‹–Š Œ—”‹•†‹
–‹‘ ‘˜‡” –Ї ”‘Œ‡
–Ǥ Ї”‡ˆ‘”‡ǡ –Ї
”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-81

Initial Study

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-82

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.12 - MINERAL RESOURCES
‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ ‡•—Ž ‹ –Ї Ž‘•• ƒ˜ƒ‹Žƒ„‹Ž‹–› ƒ ‘™

‹‡”ƒŽ ”‡•‘—”
‡ –Šƒ– ™‘—ކ „‡ ‘ˆ ˜ƒŽ—‡

–Ї ”‡‰‹‘ ƒ† –Ї ”‡•‹†‡–• ‘ˆ –Ї •–ƒ–‡ǫ
–‘

„Ǥ ‡• Ž ‹ Ї Ž •• ƒ ƒ‹Žƒ„‹Ž‹–› ƒ Ž‘
ƒŽŽ›

‹’‘”–ƒ– ‹‡”ƒŽ ”‡•‘—”
‡ ”‡
‘˜‡”› •‹–‡

†‡Ž‹‡ƒ–‡† ‘ ƒ Ž‘
ƒŽ ‰‡‡”ƒŽ ’Žƒǡ •’‡
‹ˆ‹

’Žƒǡ ‘” ‘–Ї” Žƒ† —•‡ ’Žƒǫ

Discussion

’ƒ
– ͓͵ǤͶǤͳʹƒ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ –Ї Ž‘•• ‘ˆ ƒ˜ƒ‹Žƒ„‹Ž‹–› ‘ˆ ƒ ‘™ ‹‡”ƒŽ ”‡•‘—”
‡ –Šƒ– ™‘—ކ „‡ ‘ˆ ˜ƒŽ—‡ –‘ –Ї ”‡‰‹‘ ƒ† –Ї ”‡•‹†‡–• ‘ˆ –Ї •–ƒ–‡ǫ Ї ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘•‡”˜ƒ–‹‘ǡ ‡‘Ž‘‰ ‹
ƒŽ —”˜‡›ǡ
Žƒ••‹ˆ‹‡• Žƒ†• ‹–‘
‰‰”‡‰ƒ–‡ ƒ† ‹‡”ƒŽ ‡•‘—”
‡
‘‡• ሺ
ሻ ƒ•‡† ‘ ‰—‹†‡Ž‹‡• ƒ†‘’–‡† „› –Ї ƒŽ‹ˆ‘”‹ƒ
–ƒ–‡ ‹‹‰ ƒ† ‡‘Ž‘‰› ‘ƒ”†ǡ ƒ• ƒ†ƒ–‡†
„
„› –Ї —”ˆƒ
‡ ‹‹‰ ƒ† ‡
Žƒƒ–‹‘ 
– ‘ˆ
ͳͻ͹ͶǤ Ї•‡ 
• ‹†‡–‹ˆ› ™Š‡–Ї” ‘™ ‘” ‹ˆ‡””‡† •‹‰‹ˆ‹
ƒ– ‹‡”ƒŽ ”‡•‘—”
‡• ƒ”‡
’”‡•‡– ‹ ƒ”‡ƒ•Ǥ ‡ƒ† ƒ‰‡
‹‡• ƒ”‡ ”‡“—‹”‡† –‘ ‹
‘”’‘”ƒ–‡ ‹†‡–‹ˆ‹‡† 
• ”‡•‘—”
‡ ƒ”‡ƒ•
†‡Ž‹‡ƒ–‡† „› –Ї –ƒ–‡ ‹–‘ –Ї‹” ‡ ‡”ƒŽ Žƒ•Ǥ Ї ”‡•‘ ‘—–› ‡ ‡”ƒŽ Žƒ ƒ ‰”‘—†
‡’‘”– ‹†‹
ƒ–‡• –Šƒ– –Ї ‹–› ‘ˆ ‡‡†Ž‡› ‹• ‘– Ž‘
ƒ–‡† ™‹–Š‹ ƒ 
ሺ ”‡•‘ ‘—–› ʹͲͲͲሻǤ
Ї ”‘Œ‡
– •‹–‡ ‹• ‘– Ž‘
ƒ–‡† ‹ ƒ ‹†‡–‹ˆ‹‡† ƒŽ  ‰ƒ• ‘” ‘‹Žˆ‹‡Ž†ǡ ƒ† –Ї”‡ ƒ”‡ ‘ ‘™ ™‡ŽŽ• Ž‘
ƒ–‡† ‘ –Ї •‹–‡Ǥ Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– ”‡•—Ž– ‹ –Ї Ž‘•• ‘ˆ ƒ˜ƒ‹Žƒ„‹Ž‹–› ‘ˆ
‹‡”ƒŽ ”‡•‘—”
‡•ǡ ƒ• –Ї ”‘Œ‡
– †‘‡• ‘– ’”‘’‘•‡ –Ї ‡š–”ƒ
–‹‘ ‘ˆ ‹‡”ƒŽ ”‡•‘—”
‡•Ǥ
Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– ”‡•—Ž– ‹ –Ї Ž‘•• ‘ˆ ƒ˜ƒ‹Žƒ„‹Ž‹–› ‘ˆ ƒ ‘™ ‹‡”ƒŽ ”‡•‘—” ‡
–Šƒ– ™‘—ކ „‡ ‘ˆ ˜ƒŽ—‡ –‘ –Ї ”‡‰‹‘ ƒ† –Ї ”‡•‹†‡–• ‘ˆ –Ї –ƒ–‡Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡ – ™‹ŽŽ
Šƒ˜‡ ‘ ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-83

Initial Study

’ƒ
– ͓͵ǤͶǤͳʹ„ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ –Ї Ž‘•• ‘ˆ ƒ˜ƒ‹Žƒ„‹Ž‹–› ‘ˆ ƒ Ž‘
ƒŽŽ› ‹’‘”–ƒ–
‹‡”ƒŽ ”‡•‘—”
‡ ”‡
‘˜‡”› •‹–‡ †‡Ž‹‡ƒ–‡† ‘ ƒ Ž‘
ƒŽ ‰‡‡”ƒŽ ’Žƒǡ •’‡
‹ˆ‹
’Žƒǡ ‘” ‘–Ї” Žƒ†
—•‡ ’Žƒǫ
Ї ’”‘’‘•‡† ”‘Œ‡
– ‹• ‘– †‡•‹‰ƒ–‡† ƒ• ƒ ‹‡”ƒŽ ”‡
‘˜‡”› ”‡ƒ ƒ† – ”‘Œ‡
– ™‘—ކ ‘–
ƒŽ–‡” ƒ› ‡š‹•–‹‰ ’Žƒ• –Šƒ– ’”‘–‡
– ‹‡”ƒŽ ”‡•‘—”
‡•Ǥ •
ƒ
ƒ ”‡•—Ž–ǡ –
Ї
Ї ’”‘’‘•‡† ”‘Œ‡
–
™‘—ކ ‘– ‹–‡”ˆ‡”‡ ™‹–Š ‘™ ‹‹‰ ‘’‡”ƒ–‹‘• ƒ† ™‘—ކ ‘– ”‡•—Ž– ‹ –Ї Ž‘•• ‘ˆ Žƒ† †‡•‹‰ƒ–‡† ˆ‘” ‹‡”ƒŽ ƒ† ’‡–
Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘–
”‘އ—Ǥ
”‡•—Ž– ‹ –Ї Ž‘•• ‘ˆ ƒ˜ƒ‹Žƒ„‹Ž‹–› ‘ˆ ƒ Ž‘
ƒŽŽ› ‹’‘”–ƒ–
‹‡”ƒŽ ”‡•‘—”
‡ ”‡
‘˜‡”› •‹–‡ †‡Ž‹‡ƒ–‡† ‘ ƒ Ž‘
ƒŽ ‰‡‡”ƒŽ ’Žƒǡ •’‡
‹ˆ‹
’Žƒǡ ‘” ‘–Ї” Žƒ†
—•‡ ’ŽƒǤ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‹ŽŽ Šƒ˜‡ ‘ ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-84

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.13 - NOISE
‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ǣ
ƒǤ ‡ ‡”ƒ–‹‘ ƒ •—„•–ƒ–‹ƒŽ –‡’‘”ƒ ›
’‡”ƒ‡– ‹
”‡ƒ•‡ ‹ ƒ„‹‡– ‘‹•‡ އ˜‡Ž•
‹ –Ї ˜‹
‹‹–› ‘ˆ –Ї ”‘Œ‡
– ‹ ‡š
‡•• ‘ˆ
•–ƒ†ƒ”†• ‡•–ƒ„Ž‹•Ї† ‹ ƒ Ž‘
ƒŽ ‰‡‡”ƒŽ ’Žƒ
‘” ‘‹•‡ ‘”†‹ƒ
‡ ‘” ƒ’’Ž‹
ƒ„އ •–ƒ†ƒ”†•
‘ˆ ‘–Ї” ƒ‰‡
‹‡•ǫ
„Ǥ ‡‡”ƒ–‹‘ ‡š
‡••‹˜‡ ‰”‘—†Ǧ„‘”‡
˜‹„”ƒ–‹‘ ‘” ‰”‘—†Ǧ„‘”‡ ‘‹•‡ އ˜‡Ž•ǫ

Ǥ ƒ ”‘Œ‡
– Ž‘
ƒ–‡† ™‹–Š‹ Ї ‹
‹‹–› ƒ
’”‹˜ƒ–‡ ƒ‹”•–”‹’ ‘” ƒ ƒ‹”’‘”– Žƒ† —•‡ ’Žƒ
‘”ǡ ™Š‡”‡ •—
Š ƒ ’Žƒ Šƒ• ‘– „‡‡ ƒ†‘’–‡†ǡ
™‹–Š‹ –™‘ ‹Ž‡• ‘ˆ ƒ ’—„Ž‹
ƒ‹”’‘”– ‘” ’—„Ž‹

—•‡ ƒ‹”’‘”–ǡ ™‘—ކ –Ї ”‘Œ‡
– ‡š’‘•‡ ’‡‘’އ
”‡•‹†‹‰ ‘” ™‘”‹‰ ‹ –Ї ”‘Œ‡
– ƒ”‡ƒ –‘
‡š
‡••‹˜‡ ‘‹•‡ އ˜‡Ž•ǫ
Discussion
Ї ƒƒŽ›•‡• ‹ –Š‹• •‡
–‹‘ ƒ”‡ „ƒ•‡† ‘ ƒ 
‘—•–‹
ƒŽ ƒŽ›•‹• ሺ
 
‘—•–‹
• ʹͲʹͶሻ
ƒ––ƒ
Ї† ƒ• ’’‡†‹š Ǥ

’ƒ
– ͓͵ǤͶǤͳ͵ƒ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ ‰‡‡”ƒ–‹‘ ‘ˆ ƒ •—„•–ƒ–‹ƒŽ –‡’‘”ƒ”› ‘”
’‡”ƒ‡– ‹
”‡ƒ•‡ ‹ ƒ„‹‡– ‘‹•‡ އ˜‡Ž• ‹ –Ї ˜‹
‹‹–› ‘ˆ –Ї ”‘Œ‡
– ‹ ‡š
‡•• ‘ˆ
•–ƒ†ƒ”†• ‡•–ƒ„Ž‹•Ї† ‹ ƒ Ž‘
ƒŽ ‰‡‡”ƒŽ ’Žƒ ‘” ‘‹•‡ ‘”†‹ƒ
‡ ‘” ƒ’’Ž‹
ƒ„އ •–ƒ†ƒ”†• ‘ˆ
‘–Ї” ƒ‰‡
‹‡•ǫ
Ї ‹–› ‡‡”ƒŽ Žƒ ‘‹•‡ އ‡– •‡–• ‘‹•‡
‘’ƒ–‹„‹Ž‹–› •–ƒ†ƒ”†• ˆ‘” „‘–Š
–”ƒ•’‘”–ƒ–‹‘ ƒ† ‘Ǧ–”ƒ•’‘”–ƒ–‹‘ ሺ•–ƒ–‹‘ƒ”›ሻ ‘‹•‡ •‘—” ‡•Ǥ Ї ‡‡”ƒŽ Žƒ •‡–•
‘‹•‡
‘’ƒ–‹„‹Ž‹–› •–ƒ†ƒ”†• ˆ‘” –”ƒ•’‘”–ƒ–‹‘ ‘‹•‡ •‘—”
‡• ‹ –‡”• ‘ˆ –Ї ƒ›Ǧ‹‰Š–
˜‡”ƒ‰‡ ‡˜‡Ž ሺ†ሻǤ Ї † ”‡’”‡•‡–• –Ї –‹‡Ǧ™‡‹‰Š–‡† ‡‡”‰› ƒ˜‡”ƒ‰‡ ‘‹•‡ އ˜‡Ž ˆ‘” ƒ ʹͶǦŠ‘—” †ƒ›ǡ ™‹–Š ƒ ͳͲ † ’‡ƒŽ–› ƒ††‡† –‘ ‘‹•‡ އ˜‡Ž• ‘

—””‹‰ †—”‹‰ –Ї ‹‰Š––‹‡ Š‘—”•
ሺͳͲǣͲͲ’ǤǤǦ͹ǣͲͲ ƒǤǤሻǤ Ї † ”‡’”‡•‡–•
——Žƒ–‹˜‡ ‡š’‘•—”‡ –‘ ‘‹•‡ ‘˜‡” ƒ ‡š–‡†‡†
’‡”‹‘† ‘ˆ –‹‡ ƒ† ƒ”‡ –Ї”‡ˆ‘”‡
ƒŽ
—Žƒ–‡† „ƒ•‡† —’‘ ƒ—ƒŽ ƒ˜‡”ƒ‰‡
‘†‹–‹‘•Ǥ Ї
‡‡”ƒŽ Žƒ ‘‹•‡ އ‡– ’”‘˜‹†‡• ƒ ‡š–‡”‹‘” ‘‹•‡ •–ƒ†ƒ”† ‘ˆ ͸Ͳ † † ƒ† ƒ ‹–‡”‹‘” ‘‹•‡ •–ƒ†ƒ”† ‘ˆ Ͷͷ † †ǡ ˆ‘” ‘‹•‡Ǧ•‡•‹–‹˜‡ Žƒ† —•‡• ‡š’‘•‡† –‘ –”ƒ•’‘”–ƒ–‹‘ ‘‹•‡ •‘—”
‡•ǡ ƒ• •Š‘™ ‹ ƒ„އ ͵ǤͶǤͳ͵ǦͳǤ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-85

Initial Study
Operational Noise Impacts

EXTERIOR NOISE EXPOSURE
Ї ‹–› ‘‹•‡ އ‡– ‡•–ƒ„Ž‹•Ї• ƒ ͸Ͳ † 
ሺ„ƒ
›ƒ”†•ሻ ‘ˆ •‹‰Ž‡Ǧˆƒ‹Ž› Š‘‡•Ǥ Ї ”‘Œ‡
– •‹–‡ –”ƒˆˆ‹
‘‹•‡ ‡š’‘•—”‡ ˆ‘” ˆ—–—”‡ ሺʹͲͶ͸ሻ
†
”‹–‡”‹‘ ™‹–Š‹ ‘—–†‘‘” ƒ
–‹˜‹–› ƒ”‡ƒ•
–”ƒˆˆ‹

‘†‹–‹‘• ™ƒ•
ƒŽ
—Žƒ–‡† –‘ „‡ ƒ’’”‘š‹ƒ–‡Ž› ͸Ͳ † † ™‹–Š‹ –Ї
Ž‘•‡•– Ž‘–• ƒŽ‘‰
‘—– —––‘™‹ŽŽ‘™ ˜‡—‡Ǥ Ї ‹
Ž—•‹‘ ‘ˆ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• Ǧͳǡ ™Š‹
Š ”‡“—‹”‡• –Ї

‘•–”—
–‹‘ ‘ˆ ƒ •‘—† ™ƒŽŽ ƒŽ‘‰ –Ї ”‘Œ‡
– ”‘ƒ†™ƒ› ˆ”‘–ƒ‰‡ ƒŽ‘‰ ‘—–Š —––‘™‹ŽŽ‘™
˜‡—‡ǡ ™‘—ކ ’”‘˜‹†‡ ƒ
‘—•–‹
ƒŽ ‘‹•‡ •Š‹‡Ž†‹‰ ™‹–Š‹ –Ї ‡ƒ”‡•– „ƒ
›ƒ”†• –‘ –Ї
”‘ƒ†™ƒ› ƒ† ”‡†—
‡ ‡š–‡”‹‘” ‘‹•‡ އ˜‡Ž ‡š’‘•—”‡ –‘ ͷͶ † †Ǥ

INTERIOR NOISE EXPOSURE
Ї ‹–› ‘ˆ ‡‡†Ž‡› ‹–‡”‹‘” ‘‹•‡ އ˜‡Ž •–ƒ†ƒ”† ‹• Ͷͷ † †Ǥ Ї ™‘”•–Ǧ ƒ•‡ ‘‹•‡ ‡š’‘•—”‡
™‹–Š‹ –Ї ’”‘’‘•‡† ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– ™‘—ކ „‡ ƒ’’”‘š‹ƒ–‡Ž› ͸Ͳ † † ሺʹͲͶ͸

‘†‹–‹‘•ሻǤ Š‹• ‡ƒ• –Šƒ– –Ї ’”‘’‘•‡† ”‡•‹†‡–‹ƒŽ
‘•–”—
–‹‘ —•– „‡
ƒ’ƒ„އ ‘ˆ
’”‘˜‹†‹‰ ƒ ‹‹— ‘—–†‘‘”Ǧ–‘Ǧ‹†‘‘” ‘‹•‡ އ˜‡Ž ”‡†—
–‹‘ ሺሻ ‘ˆ ƒ’’”‘š‹ƒ–‡Ž› ͳͷ
† ሺ͸ͲǦͶͷൌͳͷሻǤ
– ƒ› „‡ ƒ••—‡† –Šƒ– ”‡•‹†‡–‹ƒŽ
‘•–”—
–‹‘ ‡–Š‘†•
‘’Ž›‹‰ ™‹–Š

—””‡– „—‹Ž†‹‰
‘†‡ ”‡“—‹”‡‡–• ™‹ŽŽ ”‡†—
‡ ‡š–‡”‹‘” ‘‹•‡ އ˜‡Ž• „› ƒ’’”‘š‹ƒ–‡Ž› ʹͷ †
‹ˆ ™‹†‘™• ƒ† †‘‘”• ƒ”‡
Ž‘•‡†ǡ ”‡“—‹”‹‰ –Šƒ– ‹– „‡ ’‘••‹„އ ˆ‘” ™‹†‘™• ƒ† †‘‘”• –‘

Ž‘•‡† ˆ‘” •‘—† ‹•—Žƒ–‹‘Ǥ Ї ‹•–ƒŽŽƒ–‹‘ ‘ˆ ƒ‹”
‘†‹–‹‘‹‰ ‘” ‡
Šƒ‹
ƒŽ
˜‡–‹Žƒ–‹‘ ‹• ‹
Ž—†‡† ƒ• ’ƒ”– ‘ˆ –Ї ”‘Œ‡
– ƒ† ™‘—ކ ‡•—”‡ ™‹†‘™• ƒ† †‘‘”•
ƒ
”‡ƒ‹
”‡ƒ‹
Ž‘•‡† ˆ‘” •‘—† ‹•—Žƒ–‹‘Ǥ
‹–Š ‹’އ‡–ƒ–‹‘ ‘ˆ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡ Ǧͳǡ Ž‘‰Ǧ–‡” ‘’‡”ƒ–‹‘ƒŽ ‹’ƒ –• ™‘—ކ „‡
”‡†—
‡† –‘ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– އ˜‡ŽǤ

MITIGATION MEASURE(S)
 Ǧͳǣ  •‘—† ™ƒŽŽ •ŠƒŽŽ „‡
‘•–”—
–‡† –‘ ƒ ‹‹— Ї‹‰Š– ‘ˆ ͸ ˆ‡‡– ƒŽ‘‰ –Ї ‘—–Š
—––‘™‹ŽŽ‘™ ˜‡—‡ ”‘Œ‡
– •‹–‡ ˆ”‘–ƒ‰‡Ǥ Ї •‘—† ™ƒŽŽ •ŠƒŽŽ „‡ –—”‡† ‹™ƒ”† ƒ– ‘– ͳǡ ‘– ͻͺǡ ‘– ͻͻǡ ƒ† ‘– ͳͲͻǤ —‹–ƒ„އ
‘•–”—
–‹‘ ƒ–‡”‹ƒŽ• ‹
Ž—†‡
‘
”‡–‡ „Ž‘
•ǡ
ƒ•‘”›ǡ ‘” •–—

‘ ‘ „‘–Š •‹†‡• ‘ˆ ƒ ™‘‘† ‘” •–‡‡Ž •–—† ™ƒŽŽǤ ”‹‘” –‘ –Ї ‹••—ƒ ‡ ‘ˆ „—‹Ž†‹‰
’‡”‹–•ǡ ’Žƒ• ƒ† •’‡
‹ˆ‹
ƒ–‹‘• •ŠƒŽŽ ‹
Ž—†‡ –Ї ‹†‡–‹ˆ‹
ƒ–‹‘ ‘ˆ –Ї ”‡“—‹”‡† •‘—† ™ƒŽŽ
Ž‘
ƒ–‹‘ǡ Ї‹‰Š–ǡ ƒ†
‘•–”—
–‹‘ ƒ–‡”‹ƒŽ•Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ Š ‘ ‘ – ‹–  ‹‰ƒ–‹ ‹ ’ ” ‡† ™ ‹–
‘” ƒ– Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-88

Initial Study

’ƒ
– ͓͵ǤͶǤͳ͵„ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ ‰‡‡”ƒ–‹‘ ‘ˆ ‡š
‡••‹˜‡ ‰”‘—†Ǧ„‘”‡
˜‹„”ƒ–‹‘ ‘” ‰”‘—†Ǧ„‘”‡ ‘‹•‡ އ˜‡Ž•ǫ
Construction
Ї †‘‹ƒ– •‘—”
‡• ‘ˆ ƒǦƒ†‡ ˜‹„”ƒ–‹‘ ƒ”‡ •‘‹
„‘‘•ǡ „Žƒ•–‹‰ǡ ’‹Ž‡ †”‹˜‹‰ǡ
’ƒ˜‡‡– „”‡ƒ‹‰ǡ †‡‘Ž‹–‹‘ǡ †‹‡•‡Ž Ž‘
‘‘–‹˜‡•ǡ ƒ† ”ƒ‹ŽǦ
ƒ”
‘—’Ž‹‰Ǥ ‘‡ ‘ˆ –Ї•‡
ƒ
–‹˜‹–‹‡• ‹• ƒ–‹
‹’ƒ–‡† –‘ ‘

—” ™‹–Š –Ї
‘•–”—
–‹‘ ‘” ‘’‡”ƒ–‹‘ ‘ˆ –Ї ’”‘’‘•‡† ”‘Œ‡
–Ǥ
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•ǡ ‹ ‰‡‡”ƒŽǡ
ƒ Šƒ˜‡ –Ї ’‘–‡–‹ƒŽ –‘
”‡ƒ–‡ ‰”‘—†Ǧ„‘”‡ ˜‹„”ƒ–‹‘•Ǥ

– ‹• —Ž‹‡Ž› –Šƒ– ƒ› „Žƒ•–‹‰ ‘” ’‹Ž‡Ǧ†”‹˜‹‰ ™‘—ކ „‡ ”‡“—‹”‡† ‹ ‘‡
–‹‘ ™‹–Š –Ї

‘•–”—
–‹‘ ‘ˆ –Ї ”‘Œ‡
–Ǥ ‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• ‘•– Ž‹‡Ž› –‘
ƒ—•‡ ˜‹„”ƒ–‹‘ ‹
Ž—†‡
Їƒ˜›
‘•–”—
–‹‘ ‡“—‹’‡–Ǥ Ї”‡ˆ‘”‡ǡ –Ї ’‘–‡–‹ƒŽ ˆ‘” ‰”‘—†Ǧ„‘”‡ ˜‹„”ƒ–‹‘• –‘ ‘

—”
ƒ• ’ƒ”– ‘ˆ –Ї
‘•–”—
–‹‘ ‘ˆ –Ї ”‘Œ‡
– ‹•
‘•‹†‡”‡† ‹‹ƒŽǤ
Ї ‡† ‡”ƒŽ ”ƒ•‹– †‹‹•–”ƒ–‹‘ ሺ  ሻ Šƒ• ’—„Ž‹•Ї† •–ƒ†ƒ”† ˜‹„”ƒ–‹‘ ˜‡Ž‘ ‹–‹‡• ˆ‘”

‘•–”—
–‹‘ ‡“—‹’‡– ‘’‡”ƒ–‹‘• ሺ ‡†‡”ƒŽ
‹‰Š™ƒ› †‹‹•–”ƒ–‹‘ ሺ
ሻǡ ǤǤ
‡’ƒ”–‡– ‘ˆ ”ƒ•’‘”–ƒ–‹‘ ʹͲͳ͹ሻǤ
 ‰‡‡”ƒŽǡ –Ї  ƒ”
Š‹–‡
–—”ƒŽ †ƒƒ‰‡
”‹–‡”‹‘ ˆ‘”

‘–‹—‘—• ˜‹„”ƒ–‹‘• ሺ‹Ǥ‡Ǥǡ ͲǤʹ ‹
ŠȀ•‡
‘†ሻ ƒ’’‡ƒ”• –‘ „‡
‘•‡”˜ƒ–‹˜‡ ‡˜‡ ˆ‘” •—•–ƒ‹‡†
’‹Ž‡ †”‹˜‹‰Ǥ —‹Ž†‹‰ †ƒƒ‰‡
ƒ „‡
‘•‡–‹
‘” •–”—
–—”ƒŽǤ ”†‹ƒ”› „—‹Ž†‹‰• –Šƒ– ƒ”‡ ‘–
’ƒ”–‹
—Žƒ”Ž› ˆ”ƒ‰‹Ž‡ ™‘—ކ ‘– ‡š’‡”‹‡
‡ ƒ›
‘•‡–‹
†ƒƒ‰‡ ሺ‡Ǥ‰Ǥǡ ’Žƒ•–‡”
”ƒ
•ሻ ƒ–
†‹•–ƒ
‡• „‡›‘† ͵Ͳ ˆ‡‡–Ǥ Š‹• †‹•–ƒ
‡
ƒ ˜ƒ”› •—„•–ƒ–‹ƒŽŽ› †‡’‡†‹‰ ‘ –Ї •‘‹Ž

‘’‘•‹–‹‘ ƒ† –Ї —†‡”‰”‘—† ‰‡‘Ž‘‰‹
ƒŽ Žƒ›‡” „‡–™‡‡ –Ї ˜‹„”ƒ–‹‘ •‘—”
‡ ƒ†
”‡
‡‹˜‡”Ǥ
 ƒ††‹–‹‘ǡ ‘– ƒŽŽ „—‹Ž†‹‰• ”‡•’‘† •‹‹Žƒ”Ž› –‘ ˜‹„”ƒ–‹‘ ‰‡‡”ƒ–‡† „›

‘•–”—
–‹‘ ‡“—‹’‡–Ǥ Ї –›’‹
ƒŽ ˜‹„”ƒ–‹‘ ’”‘†—
‡† „›
‘•–”—
–‹‘ ‡“—‹’‡– ‹•
‹ŽŽ—•–”ƒ–‡† ‹ –Ї –ƒ„އ „‡Ž‘™Ǥ
ƒ„އ ͵ǤͶǤͳ͵ǦͶ
›’‹
ƒŽ ‹„”ƒ–‹‘ ‡˜‡Ž• ˆ‘” ‘•–”—
–‹‘ “—‹’‡–
‡ˆ‡ ‡
‡ ‡ƒ ƒ”–‹
އ  š‹ƒ–‡ ‡ƒ ƒ”–‹
އ
“—‹’‡– ˜‡Ž‘
‹–› ƒ– ʹͷ ˆ‡‡– ˜‡Ž‘
‹–› ƒ– ͳͲͲ ˆ‡‡–
ሺ‹
Ї•Ȁ•‡
‘†ሻͳ ሺ‹
Ї•Ȁ•‡
‘†ሻʹ
‘ƒ†‡†
• ͲǤͲ͹͸ ͲǤͲͳͲ

‹„ ƒ–‘”› ͲǤʹͳͲ ͲǤͲʹ͸

‘’ƒ
–‘”Ȁ”‘ŽŽ‡”
‘–‡•ǣ
ͳ Ȃ ‡† ‡”ƒŽ ”ƒ•‹– †‹‹•–”ƒ–‹‘ǡ ”ƒ•‹– ‘‹•‡ ƒ† ‹„”ƒ–‹‘ ’ƒ
– ••‡••‡– —‹†‡Ž ‹‡•ǡ ƒ„އ ͳʹǦʹǤ
ʹ Ȃ ƒŽ
—Žƒ–‡† —•‹‰ –Ї ˆ‘ŽŽ‘™‹‰ ˆ‘”—Žƒǣ
 ‡“—‹’ ൌ ”‡ˆ š ሺʹͷȀሻͳǤͷ
™Š‡”‡ǣ  ሺ‡“—‹’ሻ ൌ –Ї ’‡ƒ ’ƒ”–‹
އ ˜‡Ž‘
‹–› ‹ ‹
Ї•Ȁ•‡
‘† ‘ˆ –Ї ‡“—‹’‡– ƒ†Œ—•–‡† ˆ‘” –Ї †‹•–ƒ
‡  ሺ”‡ˆሻ
ൌ –Ї ”‡ˆ‡”‡
‡ ˜‹„”ƒ–‹‘ އ˜‡Ž ‹ ‹
Ї•Ȁ•‡
‘† ˆ”‘ ƒ„އ ͳʹǦʹ ‘ˆ –Ї  ”ƒ•‹– ‘‹•‡ ƒ† ‹„”ƒ–‹‘ ’ƒ
–
••‡••‡– —‹† ‡Ž‹‡•
 ൌ Ї †‹•–ƒ
‡ ˆ”‘ –Ї ‡“—‹’‡– –‘ –Ї ”‡
‡‹˜‡”
• ‹†‹
ƒ–‡† ƒ„‘˜‡ǡ „ƒ•‡† ‘ –Ї  †ƒ–ƒǡ ˜‹„”ƒ–‹‘ ˜‡Ž‘
‹–‹‡• ˆ”‘ –›’‹
ƒŽ Їƒ˜›

‘•–”—
–‹‘ ‡“—‹’‡– –Šƒ– ™‘—ކ „‡ —•‡† †—”‹‰ ”‘Œ‡
–
‘•–”—
–‹‘ ”ƒ‰‡ ˆ”‘ ͲǤͲ͹͸ –‘
ͲǤʹͳͲ ‹
ŠǦ’‡”Ǧ•‡
‘† ’‡ƒ ’ƒ”–‹
އ ˜‡Ž‘
‹–› ሺሻ ƒ– ʹͷ ˆ‡‡– ˆ”‘ –Ї •‘—”
‡ ‘ˆ ƒ
–‹˜‹–›Ǥ Ї
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-89

Initial Study

Ž‘•‡•– •‡•‹–‹˜‡ ”‡
‡’–‘”• ƒ”‡ –Š‘•‡ ‡š‹•–‹‰ ‘Ǧ•‹–‡ •‹‰Ž‡Ǧˆƒ‹Ž› ”‡•‹†‡ ‡•Ǥ Ї ”‡ƒ‹‹‰
•‹‰Ž‡Ǧˆƒ‹Ž› ”‡•‹†‡
‡• ƒ”‡ Ž‘
ƒ–‡† ƒ’’”‘š‹ƒ–‡Ž› ͷͷ ˆ‡‡– ˆ”‘ –Ї ”‘Œ‡
– „‘—†ƒ”›Ǥ ‹–Š
”‡‰ƒ”† –‘ –Ї ’”‘’‘•‡† ”‘Œ‡
–ǡ ‰”‘—†Ǧ„‘”‡ ˜‹„”ƒ–‹‘ ™‘—ކ „‡ ‰‡‡”ƒ–‡† †—”‹‰ •‹–‡

އƒ”‹‰ ƒ† ‰”ƒ†‹‰ ƒ
–‹˜‹–‹‡• ‘Ǧ•‹–‡ǡ ˆƒ
‹Ž‹–ƒ–‡† „› –Ї ‹’އ‡–ƒ–‹‘ ‘ˆ –Ї ’”‘’‘•‡†
”‘Œ‡
–Ǥ
– •Š‘—ކ „‡ ‘–‡† –Šƒ– ͲǤʹ ‹
ŠǦ’‡”Ǧ•‡
‘†  ‹• ƒ
‘•‡”˜ƒ–‹˜‡ –Š”‡•Бކǡ • –Šƒ–
‹• –Ї
‘•–”—
–‹‘ ˜‹„”ƒ–‹‘ †ƒƒ‰‡
”‹–‡”‹ƒ ˆ‘” ‘Ǧ‡‰‹‡‡”‡† –‹„‡” ƒ† 
ƒ
ƒ•‘”›
„—‹Ž†‹‰•Ǥ —‹Ž†‹‰• ™‹–Š‹ –Ї ”‘Œ‡
– ƒ”‡ƒ ™‘—ކ „‡ „‡––‡” ”‡’”‡•‡–‡† „› –Ї ͲǤͷ ‹
ŠǦ’‡”Ǧ
•‡
‘†  •‹‰‹ˆ‹
ƒ
‡ –Š”‡•Бކ ሺ
‘•–”—
–‹‘ ˜‹„”ƒ–‹‘ †ƒƒ‰‡
”‹–‡”‹ƒ ˆ‘” ”‡‹ˆ‘”
‡†

‘
”‡–‡ǡ •–‡‡Žǡ ‘” –‹„‡” „—‹Ž†‹‰•ሻǤ Ї”‡ˆ‘”‡ǡ ˜‹„”ƒ–‹‘ ‹’ƒ –• ƒ••‘
‹ƒ–‡† ™‹–Š

‘•–”—
–‹‘ ƒ”‡ ƒ–‹
‹’ƒ–‡† –‘ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
Operation

‡
‘•–”—
–‡†ǡ –Ї ”‘Œ‡
– ™‘—ކ ‘– ”‡•—Ž– ‹ ƒ› ƒ
–‹˜‹–‹‡• –Šƒ– ™‘—ކ
”‡ƒ–‡ ‰”‘—†Ǧ
„‘”‡ ˜‹„”ƒ–‹‘•Ǥ Š—•ǡ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– ”‡•—Ž– ‹ –Ї ‡š’‘•—”‡ ‘ˆ ’‡”•‘• –‘
•‡•‹–‹˜‡ ”‡
‡’–‘”• ‘” ‰‡‡”ƒ–‡ ‡š
‡••‹˜‡ ‰”‘—†Ǧ„‘”‡ ˜‹„”ƒ–‹‘ ‘” ‰”‘—†Ǧ„‘”‡ ‘‹•‡
އ˜‡Ž•Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳ͵
Ȃ ‘” ƒ ”‘Œ‡
– Ž‘
ƒ–‡† ™‹–Š‹ –Ї ˜‹
‹‹–› ‘ˆ ƒ ’”‹˜ƒ–‡ ƒ‹”•–”‹’ ‘” ƒ ”’‘”–
Žƒ† —•‡ ’Žƒ ‘”ǡ ™Š‡”‡ •—
Š ƒ ’Žƒ Šƒ• ‘– „‡‡ ƒ†‘’–‡†ǡ ™‹–Š‹ –™‘ ‹Ž‡• ‘ˆ ƒ ’—„Ž‹

ƒ‹
ƒ‹”’‘”–
‘” ’—„Ž‹
—•‡ ƒ‹”’‘”–ǡ ™‘—ކ –Ї ”‘Œ‡
– ‡š’‘•‡ ’‡‘’އ ”‡•‹†‹‰ ‘” ™‘”‹‰ ‹ –Ї ”‘Œ‡
–
ƒ”‡ƒ –‘ ‡š
‡••‹˜‡ ‘‹•‡ އ˜‡Ž•ǫ
‹”’‘”–Ǧ”‡Žƒ–‡† ‘‹•‡ އ˜‡Ž• ƒ”‡ ’”‹ƒ”‹Ž› ƒ••‘
‹ƒ–‡† ™‹–Š ƒ‹”
”ƒˆ– ‡‰‹‡Ǧ”‡Žƒ–‡† ‘‹•‡ ƒ†‡
™Š‹Ž‡ ƒ‹”
”ƒˆ– ƒ”‡ –ƒ‹‰ ‘ˆˆǡ Žƒ†‹‰ǡ ‘” ‹†Ž‹‰ –Ї‹” ‡‰‹‡• ™Š‹Ž‡ •–‹ŽŽ ‘ –Ї ‰”‘—†Ǥ Ї

Ž‘•‡•– ƒ‹”’‘”– –‘ –Ї ’”‘’‘•‡† •‹–‡ ‹• ‡‡†Ž‡› —‹
‹’ƒŽ ‹”’‘”–ǡ Ž‘
ƒ–‡†
ƒ’’”‘š‹ƒ–‡Ž› ͶǤ͸ ‹Ž‡• ‘”–Š ‘ˆ –Ї
”‘Œ‡
–
”‘Œ‡
– •‹–‡Ǥ Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ‘—–•‹†‡ ‘ˆ –Ї ͸ͷ
† ‘—‹–› ‘‹•‡ “—‹˜ƒŽ‡– ‡˜‡Ž ሺሻ ƒ‹”’‘”– ‘‹•‡ ‹’ƒ – œ‘‡ ƒ† ‹• ‘– ™‹–Š‹
–Ї ƒ‹”’‘”– ‹ˆŽ—‡
‡ ƒ”‡ƒ ሺ‹–› ‘ˆ ‡‡†Ž‡› ʹͲͳͶǡ ”‡•‘ ‘—–› ‹”’‘”– ƒ† •‡ ‘‹••‹‘ ʹͲʹ͵ሻǤ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‘—ކ ‘– „‡ ƒ†˜‡”•‡Ž› ƒˆˆ‡
–‡† „›
ƒ‹”’‘”–Ȁƒ‹”ˆ‹‡Ž† ‘‹•‡ǡ ‘” ™‘—ކ –Ї ”‘Œ‡
–
‘–”‹„—–‡ –‘ ‘” ”‡•—Ž– ‹ ƒ†˜‡”•‡
ƒ‹”’‘”–Ȁƒ‹”ˆ‹‡Ž† ‘‹•‡ ‹’ƒ
–•Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-90

Initial Study

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-91

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.14 - POPULATION AND HOUSING
‘—ކ –Ї ”‘Œ‡
–
ƒǤ
†—
‡ •—„•–ƒ–‹ƒŽ ’Žƒ‡† ‘’—Žƒ–‹‘

‰”‘™–Š ‹ ƒ ƒ”‡ƒǡ ‡‹–Ї” †‹”‡
–Ž› ሺˆ‘”

‡šƒ’އǡ „› ’”‘’‘•‹‰ ‡™ Š‘‡• ƒ†

„—•‹‡••‡•ሻ ‘” ‹†‹”‡
–Ž› ሺˆ‘” ‡šƒ’އǡ

–Š”‘—‰Š ‡š–‡•‹‘ ‘ˆ ”‘ƒ†• ‘” ‘–Ї”

‹ˆ”ƒ•–”—
–—”‡ሻǫ

„Ǥ ‹• Žƒ
‡ • „• ƒ ‹ƒŽ  „‡ • ‡š‹• ‹‰

’‡‘’އ ‘” Š‘—•‹‰ǡ ‡
‡••‹–ƒ–‹‰ –Ї

‘•–”—
–‹‘ ‘ˆ ”‡’Žƒ
‡‡– Š‘—•‹‰

‡Ž•‡™Š‡”‡ǫ
Discussion

’ƒ
– ͓͵ǤͶǤͳͶƒ Ȃ ‘—ކ –Ї ”‘Œ‡
– ‹†—
‡ •—„•–ƒ–‹ƒŽ —’Žƒ‡† ’‘’—Žƒ–‹‘ ‰”‘™–Š ‹ ƒ
ƒ”‡ƒǡ ‡‹–Ї” †‹”‡
–Ž› ሺˆ‘” ‡šƒ’އǡ „› ’”‘’‘•‹‰ ‡™ Š‘‡• ƒ† „—•‹‡••‡•ሻ ‘” ‹†‹”‡ –Ž›
ሺˆ‘” ‡šƒ’އǡ –Š”‘—‰Š ‡š–‡•‹‘ ‘ˆ ”‘ƒ†• ‘” ‘–Ї” ‹ˆ”ƒ•–”— –—”‡ሻǫ
• ‹†‹
ƒ–‡† ‹ –Ї ‡ ‡”ƒŽ Žƒǡ –Ї ”‘Œ‡
– •‹–‡ ‹• †‡•‹‰ƒ–‡† ˆ‘” ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡–Ǥ
• ’ƒ”– ‘ˆ –Ї ”‘Œ‡
–ǡ –Ї ’”‘’‘•ƒŽ ‹
Ž—†‡• ƒ ‡‡”ƒŽ Žƒ ‡†‡– –‘
Šƒ‰‡ –Ї Žƒ†
—•‡ †‡•‹‰ƒ–‹‘ ‘ˆ ƒ’’”‘š‹ƒ–‡Ž› ͵Ǥͷ ƒ
”‡• ˆ”‘
‹‰Š ‡•‹–› ‡•‹†‡–‹ƒŽ –‘ ‘™ ‡•‹–›
‡•‹†‡–‹ƒŽ ƒ† †‘‡• ‘– •‹‰‹ˆ‹
ƒ–Ž›
Šƒ‰‡ –Ї ‹–‡– ˆ‘” †‡˜‡Ž‘’‡– ‘ˆ –Š‹• ’‘”–‹‘ ‘ˆ
–Ї ‹–›Ǥ • ’”‡˜‹‘—•Ž› ‘–‡†ǡ –Ї ”‘Œ‡
– ™‘—ކ ”‡•—Ž– ‹ –Ї †‡˜‡Ž‘’‡– ‘ˆ ‡™ •‹‰Ž‡Ǧ
ˆƒ‹Ž› ”‡•‹†‡
‡• ƒ† ‹
Ž—†‡• –Ї †‡˜‡Ž‘’‡– ‘ˆ –Ї ƒ••‘
‹ƒ–‡† •–”‡‡– ‹’”‘˜‡‡–• ƒ†
—–‹Ž‹–› ‹ˆ”ƒ•–”—
–—”‡ –‘ ‡‡– ‹–› ”‡“—‹”‡‡–• ƒ† ’”‘˜‹†‡ ƒ††‹–‹‘ƒŽ Š‘—•‹‰ ‘’’‘”–—‹–‹‡• ˆ‘” –Ї ‹–›ǯ•
—””‡– ƒ† ˆ—–—”‡ ”‡•‹†‡–•Ǥ Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‹
Ž—†‡
’‘’—Žƒ–‹‘ ‰”‘™–Š ƒ• ’Žƒ‡† ƒ† ‡š’‡
–‡† „› –Ї ‡‡”ƒŽ Žƒ ƒ† ƒŽŽ‘™ –Ї ‹–› –‘ ‡‡–
‹–• 
 ƒŽŽ‘
ƒ–‹‘ ‰‘ƒŽ•Ǥ Ї”‡ˆ‘”‡ǡ ƒŽ–Š‘—‰Š ’‘’—Žƒ–‹‘ ‰”‘™–Š ™‘—ކ ‘

—” ƒ• ƒ ”‡•—Ž– ‘ˆ
–Ї ”‘Œ‡
–ǡ –Š‹• ‰”‘™–Š ‹• ‘– —’Žƒ‡† ƒ† ™‘—ކ ”‡•—Ž– ‹ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹ ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-92

Initial Study

’ƒ
– ͓͵ǤͶǤͳͶ„ Ȃ ‘—ކ –Ї ”‘Œ‡
– †‹•’Žƒ
‡ •—„•–ƒ–‹ƒŽ —„‡”• ‘ˆ ‡š‹•–‹‰ ’‡‘’އ ‘”
Š‘—•‹‰ǡ ‡
‡••‹–ƒ–‹‰ –Ї
‘•–”—
–‹‘ ‘ˆ ”‡’Žƒ
‡‡– Š‘—•‹‰ ‡Ž•‡™Š‡”‡ǫ
Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ‘ ƒ
—””‡–Ž› ˜ƒ
ƒ– •‹–‡ ƒ† †‘‡• ‘– ’”‘’‘•‡ –Ї †‡‘Ž‹–‹‘ ‘”
”‡‘˜ƒŽ ‘ˆ ‡š‹•–‹‰ ’‡‘’އ ‘” Š‘—•‹‰Ǥ Ї ”‘Œ‡
– •‹–‡ ™‹ŽŽ ‘– †‹•’Žƒ
‡ ‡š‹•–‹‰ ’‡‘’އ ‘”
Š‘—•‹‰ǡ ‡
‡••‹–ƒ–‹‰ –Ї
‘•–”—
–‹‘ ‘ˆ ”‡’Žƒ
‡‡– Š‘—•‹‰ ‡Ž•‡™Š‡”‡Ǥ Ї”‡ˆ‘”‡ǡ –Ї
”‘Œ‡
– ™‘—ކ Šƒ˜‡ ‘ ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE
Ї”‡ ™‘—ކ „‡ ‘ ‹ ƒ
– ’ Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-93

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.15 - PUBLIC SERVICES
‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ ‡•—Ž– ‹

‹’ƒ
–• ƒ••‘
‹ƒ–‡† ™‹–Š –Ї ’”‘˜‹•‹‘ ‘
•—„•–ƒ ‹ƒŽ ƒ†˜‡”•‡ ’Š›•‹
ƒŽ

ˆ ‡™

‘” ’Š›•‹
ƒŽŽ› ƒŽ–‡”‡† ‰‘˜‡”‡–ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ

‡‡† ˆ‘” ‡™ ‘” ’Š›•‹
ƒŽŽ› ƒŽ–‡”‡†

‰‘˜‡”‡–ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ –Ї
‘•–”—
–‹‘ ‘ˆ

™Š‹
Š
‘—ކ
ƒ—•‡ •‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ

‹’ƒ
–•ǡ ‹ ‘”†‡” –‘ ƒ‹–ƒ‹ ƒ

‡’–ƒ„އ

•‡”˜‹
‡ ”ƒ–‹‘•ǡ ”‡•’‘•‡ –‹‡•ǡ ‘” –‘ ‘–Ї”

’‡”ˆ‘”ƒ
‡ ‘„Œ‡
–‹˜‡• ˆ‘” ƒ› ‘ˆ –Ї ’—„Ž‹

•‡”˜‹
‡•ǣ

ሺ‹ሻ ‹”‡ –‡
‹ ǫ
ሺ‹‹ሻ ‘Ž‹
‡ ‘–‡
–‹‘ǫ
ሺ‹‹‹ሻ 
Š‘‘Ž•ǫ
ሺ‹ ሻ ƒ”•ǫ
ሺ ሻ –Ї „Ž‹
ˆƒ
‹Ž‹–‹‡•ǫ
Discussion

’ƒ
– ͓͵ǤͶǤͳͷƒሺ‹ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ’Š›•‹
ƒŽ ‹’ƒ
–•
ƒ••‘
‹ƒ–‡† ™‹–Š –Ї ’”‘˜‹•‹‘ ‘ˆ ‡™ ‘” ’Š›•‹
ƒŽŽ› ƒŽ–‡”‡† ‰‘˜‡”‡–ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ ‡‡† ˆ‘”
‡™ ‘” ’Š›•‹
ƒŽŽ› ƒŽ–‡”‡† ‰‘˜‡”‡–ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ –Ї
‘•–”—
–‹‘ ‘ˆ ™Š‹
Š
‘—ކ
ƒ—•‡
•‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‹’ƒ
–•ǡ ‹ ‘”†‡” –‘ ƒ‹–ƒ‹ ƒ

‡’–ƒ„އ •‡”˜‹
‡ ”ƒ–‹‘•ǡ ”‡•’‘•‡
–‹‡•ǡ ‘” –‘ ‘–Ї” ’‡”ˆ‘”ƒ
‡ ‘„Œ‡
–‹˜‡• ˆ‘” ƒ› ‘ˆ –Ї ’—„Ž‹
•‡”˜‹
‡• Ǧ ‹”‡ ”‘–‡
–‹‘ǫ
• ‘–‡† ’”‡˜‹‘—•Ž›ǡ –Ї   ‹• –Ї ’”‹ƒ”› ˆ‹”‡ ’”‘–‡
–‹‘ ’”‘˜‹†‡” ™‹–Š‹ –Ї ‹–›ǡ ƒ† –Ї
  ’”‘˜‹†‡• ˆ‹”‡ ’”‘–‡
–‹‘ –‘ –Ї —‹
‘”’‘”ƒ–‡† ’‘”–‹‘• ‘ˆ –Ї Žƒ‹‰ ”‡ƒǤ • ƒ
”‡•—Ž– ‘ˆ ƒ —–—ƒŽ ƒ‹† ƒ‰”‡‡‡– „‡–™‡‡ –Ї –™‘ ƒ‰‡
‹‡•ǡ –Ї ‹–›ǯ• ‹”‡ ‡’ƒ”–‡– ƒ›
„‡ ”‡“—‡•–‡† –‘ ’”‘˜‹†‡ ‡‡”‰‡
› „ƒ
—’ •‡”˜‹
‡ ‹ –Ї —‹
‘”’‘”ƒ–‡† ƒ”‡ƒǡ ƒ† ”‡• ‘
‘—–› ƒ› „‡ ”‡“—‡•–‡† –‘ ’”‘˜‹†‡ ‡‡”‰‡
› „ƒ
—’ •‡”˜‹
‡ –‘ –Ї ‹–›Ǥ Ї ‡ƒ”‡•– ‹–›
‹”‡ ‡’ƒ”–‡– •–ƒ–‹‘ ‹• Ž‘
ƒ–‡† ƒ’’”‘š‹ƒ–‡Ž› ͲǤͻ ‹Ž‡• ™‡•– ‘ˆ –Ї ”‘Œ‡
– •‹–‡ ƒ– ͳͲ͸Ͳ
 –”‡‡–ǡ ‡‡†Ž‡›ǡ Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-94

Initial Study
Ї   ”‡
‡‹˜‡• ˆ—†‹‰ –Š”‘—‰Š ƒ ’—„Ž‹
•ƒˆ‡–› •ƒŽ‡• –ƒš ‘˜‡””‹†‡ǡ ™Š‹
Š •—’’‘”–• •–ƒˆˆ‹‰ǡ
ˆƒ
‹Ž‹–› ƒ‹–‡ƒ
‡ ƒ† ‡“—‹’‡– ’—”
Šƒ•‡ǡ ƒ† ƒŽ•‘ ”‡
‡‹˜‡• ˆ—†‹‰ ˆ”‘ †‡˜‡Ž‘’‡–
‹’ƒ
– ˆ‡‡•ǡ ™Š‹
Š ƒ› „‡ —•‡† ˆ‘” –Ї ’—”
Šƒ•‡ ‘ˆ Žƒ† ƒ†
‘•–”—
–‹‘ ‘ˆ ‡™ ˆƒ
‹Ž‹–‹‡•Ǥ
Ї ‡‡”ƒŽ Žƒ Šƒ• ƒ†‘’–‡† ’‘Ž‹
‹‡• ƒ† ƒ
–‹‘• –Šƒ– ”‡“—‹”‡ ƒ†‡“—ƒ–‡ ‹ˆ”ƒ•–”—
–—”‡ ˆ‘”
ˆ‹”‡ •—’’”‡••‹‘ǡ ƒ† ‡™ †‡˜‡Ž‘’‡– ‹• ’”‘˜‹†‡ ‘” ’ƒ› ˆ‘” ‹–• ˆƒ‹” •Šƒ”‡ ‘ˆ ’—„Ž‹ ˆƒ
‹Ž‹–›
ƒ† ‹ˆ”ƒ•–”—
–—”‡ ‹’”‘˜‡‡–•Ǥ ††‹–‹‘ƒŽŽ›ǡ †‡˜‡Ž‘’‡– ‹• ‡š’‡
–‡† –‘
‘’Ž› ™‹–Š
ƒ’’Ž‹
ƒ„އ  ˆ‹”‡
‘†‡ ƒ† ƒŽŽ ƒ’’Ž‹
ƒ„އ †‡˜‡Ž‘’‡– ”‡‰—Žƒ–‹‘• ƒ† ’ƒ› ƒŽŽ ”‡“—‹”‡†
‹’ƒ
– ˆ‡‡•Ǥ
‹”‡ Š›†”ƒ–• ™‘—ކ ƒŽ•‘ „‡ Ž‘
ƒ–‡† ƒ† ‹•–ƒŽŽ‡† ’‡” –Ї ‹–› •–ƒ†ƒ”†•Ǥ Ї ”‘Œ‡
– ™‘—ކ
‹•–ƒŽŽ –Ї ”‡“—‹”‡† ‹ˆ”ƒ•–”—
–—”‡ –‘ ‡‡– ™ƒ–‡” •—’’Ž› †‡ƒ†• ˆ‘” —‹
‹’ƒŽ ˆ‹”‡
’”‘–‡
–‹‘ •‡”˜‹
‡•Ǥ Ї•‡ †‡•‹‰ •–ƒ†ƒ”†•ǡ
‘—’އ† ™‹–Š ‡š‹•–‹‰ ˆ‹”‡ ’”‘–‡
–‹‘
‹ˆ”ƒ•–”—
–—”‡ǡ ™‘—ކ ’”‘˜‹†‡ ˆ‘” ’”‘’‡” ˆ‹”‡ •—’’”‡••‹‘ •‡”˜‹
‡• ‘Ǧ•‹–‡Ǥ › ‡‡–‹‰ –Ї•‡
•–ƒ†ƒ”†• ƒ† ‹
‘”’‘”ƒ–‹‰ ‡‡†‡† †‡•‹‰ ˆ‡ƒ–—”‡• ‹ –Ї ”‘Œ‡
– †‡•‹‰ǡ ‘ ƒ††‹–‹‘ƒŽ ˆ‹”‡
’”‘–‡
–‹‘ •‡”˜‹
‡• ™‘—ކ „‡ ”‡“—‹”‡†Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‘—ކ ‘– ‹
”‡ƒ•‡ –Ї ‡‡†
ˆ‘” •—
Š •‡”˜‹
‡• „‡›‘† –Ї „ƒ•‡Ž‹‡
‘†‹–‹‘Ǥ Ї
‘•–”—
–‹‘ ƒ† ‘’‡”ƒ–‹‘ ‘ˆ –Ї
’”‘’‘•‡† ”‘Œ‡
– ‹• ‘– ‡š’‡
–‡† –‘ ‹
”‡ƒ•‡ –Ї ”‹• ‘ˆ ˆ‹”‡• ‘ ƒ† ƒ†Œƒ
‡– –‘ –Ї ”‘Œ‡
–
•‹–‡ ƒ† ‹• ‘– ‡š’‡
–‡† –‘ ”‡“—‹”‡ –Ї ’”‘˜‹•‹‘ ‘ˆ ‡™ ‘” ƒŽ–‡”‡† ˆ‹”‡ ’”‘–‡ –‹‘ ˆƒ
‹Ž‹–‹‡•Ǥ
Ї”‡ˆ‘”‡ǡ –Ї ‹’ƒ
– ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳͷƒሺ‹‹ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ’Š›•‹
ƒŽ ‹’ƒ
–•
ƒ••‘
‹ƒ–‡† ™‹–Š –Ї ’”‘˜‹•‹‘ ‘ˆ ‡™ ‘” ’Š›•‹
ƒŽŽ› ƒŽ–‡”‡† ‰‘˜‡”‡–ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ ‡‡† ˆ‘”
‡™ ‘” ’Š›•‹
ƒŽŽ› ƒŽ–‡”‡† ‰‘˜‡”‡–ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ –Ї
‘•–”—
–‹‘ ‘ˆ ™Š‹
Š
‘—ކ
ƒ—•‡
•‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‹’ƒ
–•ǡ ‹ ‘”†‡” –‘ ƒ‹–ƒ‹ ƒ

‡’–ƒ„އ •‡”˜‹
‡ ”ƒ–‹‘•ǡ ”‡•’‘•‡
–‹‡•ǡ ‘” –‘ ‘–Ї” ’‡”ˆ‘”ƒ
‡ ‘„Œ‡
–‹˜‡• ˆ‘” ƒ› ‘ˆ –Ї ’—„Ž‹
•‡”˜‹
‡• Ȃ ‘Ž‹
‡ ”‘–‡
–‹‘ǫ
Ї ‡‡†Ž‡› ‹–› ‘Ž‹
‡ ‡’ƒ”–‡– ሺሻ ’”‘˜‹†‡• Žƒ™ ‡ˆ‘”
‡‡– •‡”˜‹
‡• –‘ –Ї ‹–›ǡ
ƒ† –Ї ”‡•‘ ‘—–› Ї”‹ˆˆǯ• ‡’ƒ”–‡– ’”‘˜‹†‡• •‡”˜‹ ‡ ‹ –Ї —‹
‘”’‘”ƒ–‡† ƒ”‡ƒ•
•—””‘—†‹‰ –Ї ‹–›Ǥ Ї ‡ƒ”‡•– ’‘Ž‹
‡ •–ƒ–‹‘ –‘ –Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ƒ’’”‘š‹ƒ–‡Ž›
ͳǤʹ ‹Ž‡• ™‡•– ‘ˆ –Ї ”‘Œ‡
– •‹–‡Ǥ
Ї ”‘Œ‡
– ™‹ŽŽ ‹
”‡ƒ•‡ –Ї Ž‘
ƒŽ ’‘’—Žƒ–‹‘ „› †‡˜‡Ž‘’‹‰ ƒ ͳ͸͸ǦŽ‘– •‹‰Ž‡Ǧˆƒ‹Ž›
”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡–Ǥ Ї ”‡•—Ž–‹‰ ‹’ƒ
–• ‘  •‡”˜‹
‡• ”‡Žƒ–‡† –‘ ƒ

‡’–ƒ„އ
•‡”˜‹
‡ ”ƒ–‹‘•ǡ ”‡•’‘•‡ –‹‡•ǡ ‘” ‘–Ї” ’‡”ˆ‘”ƒ
‡ ‘„Œ‡
–‹˜‡• ‘ˆ ’‘Ž‹
‡ ’”‘–‡
–‹‘ •‡”˜‹
‡•
ƒ”‡ ƒ–‹
‹’ƒ–‡† –‘ „‡ ‹’ƒ
–‡†Ǥ
‘™‡˜‡”ǡ †‡˜‡Ž‘’‡– ‹’ƒ
– ˆ‡‡• ’ƒ‹† „› –Ї ”‘Œ‡
–
†‡˜‡Ž‘’‡” ™‘—ކ •‡”˜‡ –‘ ‹–‹‰ƒ–‡ ƒ› ‹
”‡‡–ƒŽ ‹’ƒ
–
ƒ—•‡† „› –Ї ”‘Œ‡
–Ǥ • •—
Šǡ
‹’ƒ
–• ”‡Žƒ–‡† –‘ ’‘Ž‹
‡ ’”‘–‡
–‹‘ ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-95

Initial Study

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳͷƒሺ‹‹‹ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ’Š›•‹
ƒŽ ‹’ƒ
–•
ƒ••‘
‹ƒ–‡† ™‹–Š –Ї ’”‘˜‹•‹‘ ‘ˆ ‡™ ‘” ’Š›•‹
ƒŽŽ› ƒŽ–‡”‡† ‰‘˜‡”‡–ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ ‡‡† ˆ‘”
‡™ ‘” ’Š›•‹
ƒŽŽ› ƒŽ–‡”‡† ‰‘˜‡”‡–ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ –Ї
‘•–”—
–‹‘ ‘ˆ ™Š‹
Š
‘—ކ
ƒ—•‡
•‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‹’ƒ
–•ǡ ‹ ‘”†‡” –‘ ƒ‹–ƒ‹ ƒ

‡’–ƒ„އ •‡”˜‹
‡ ”ƒ–‹‘•ǡ ”‡•’‘•‡
–‹‡•ǡ ‘” –‘ ‘–Ї” ’‡”ˆ‘”ƒ
‡ ‘„Œ‡
–‹˜‡• ˆ‘” ƒ› ‘ˆ –Ї ’—„Ž‹
•‡”˜‹
‡• Ȃ 
Š‘‘Ž•ǫ
—„Ž‹
‡Ž‡‡–ƒ”› ƒ† •‡
‘†ƒ”› ‡†—
ƒ–‹‘ ‹ –Ї
‘—‹–› ‹• ’”‘˜‹†‡† „› –Ї ‹‰•
ƒ›‘ ‹ˆ‹‡† 
Š‘‘Ž ‹•–”‹
– ሺሻǤ ‹–Š‹ –Ї ‹–›ǡ –Ї ƒŒ‘”‹–› ‘ˆ –Ї ƒ”‡ƒ ‹• •‡”˜‹ ‡†
‹• ™‹–Š‹ –Ї Žƒ› ‹‘
„› Ǥ Ї”‡ ‹• ƒ •ƒŽŽ ’‘”–‹‘ ‘ˆ –Ї •–—†› ƒ”‡ƒ ƒ– –Ї •‘—–Š™‡•– ‘”‡” ‘ˆ –Ї ‹–› –Šƒ–
 
Š‘‘Ž ‹•–”‹
–Ǥ Ї ‡ƒ”‡•– •
Š‘‘Ž ‹• ‹Žƒ• ƒ”–•
Š 
Š‘‘Ž ሺǦͺሻǡ
Ž‘
ƒ–‡† ‹‡†‹ƒ–‡Ž› ‡ƒ•– ‘ˆ –Ї ”‘Œ‡
– •‹–‡Ǥ Ї ǤǤ ‡•—• ‹†‹
ƒ–‡• –Šƒ– –Ї ƒ˜‡”ƒ‰‡
Š‘—•‡Š‘ކ •‹œ‡ ‹• ͵ǤͶͺ ሺǤǤ ‡•—• —”‡ƒ— ʹͲʹ͵ሻǤ ••—‹‰ –™‘ ’ƒ”‡–• ™‹–Š‹ –Ї Š‘—•‡Š‘ކǡ ƒ ‡•–‹ƒ–‡† ʹͶ͸ •–—†‡–• ሺͳǤͶͺ š ͳ͸͸ —‹–•ሻ ‘—ކ „‡ ‰‡‡”ƒ–‡† ƒ• ƒ ”‡•—Ž– ‘ˆ
–Ї ”‘Œ‡
–Ǥ
Ї ‹
”‡ƒ•‡† ’‘’—Žƒ–‹‘ ‰‡‡”ƒ–‡† „› –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‹
”‡ƒ•‡ –Ї —„‡” ‘ˆ
•–—†‡–• ƒ––‡†‹‰ Ž‘
ƒŽ •
Š‘‘Ž• ƒ†
‘—ކ ”‡•—Ž– ‹ •‹‰‹ˆ‹
ƒ– ‹’ƒ
–• –‘ –Ї•‡ ˆƒ
‹Ž‹–‹‡• „›
”‡“—‹”‹‰ ‡™ ˆƒ
‹Ž‹–‹‡•Ǥ Ї †‡˜‡Ž‘’‡” ™‹ŽŽ „‡ ”‡“—‹”‡† –‘ ’ƒ› –Ї ƒ’’”‘’”‹ƒ–‡ • Š‘‘Ž ‹’ƒ
–
ˆ‡‡• ‹ ‘”†‡” –‘ ”‡
‡‹˜‡ „—‹Ž†‹‰ ’‡”‹–•Ǥ 

‘”†‹‰ –‘ ‘˜ ‡”‡– ‘†‡ ‡
–‹‘ ͸ͷͻͻ͸ǡ –Ї
†‡˜‡Ž‘’‡– ˆ‡‡• ƒ—–Š‘”‹œ‡† „›  ͷͲ ƒ”‡ †‡‡‡† Dzˆ—ŽŽ ƒ† ‘’އ–‡ •
Š‘‘Ž ˆƒ
‹Ž‹–‹‡•
‹–‹‰ƒ–‹‘Ǥdz 
Š‘‘Ž †‹•–”‹
–• ™‘—ކ —–‹Ž‹œ‡ –Ї ‡ ‡”ƒŽ Žƒ ƒ†
‘†‡• –‘ ‡•–ƒ„Ž‹•Š ‡™ •
Š‘‘Ž
•‹–‡• ƒ† ƒ‡ †‡
‹•‹‘• ‘ •
Š‘‘Ž ƒ‡‹–‹‡• ƒ† ˆƒ
‹Ž‹–› •‹œ‡Ǥ • •—
Šǡ –Ї ’ƒ›‡– ‘ˆ •
Š‘‘Ž
‹’ƒ
– ˆ‡‡• ™‘—ކ ‹–‹‰ƒ–‡ ƒ› ‹
”‡ƒ•‡† ‹’ƒ
– ‘ •
Š‘‘Ž ˆƒ
‹Ž‹–‹‡•ǡ ƒ† –Ї ‹’ƒ
–• ™‘—ކ
„‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ Ǥ–

’ƒ
’ƒ
– ͓͵ǤͶǤͳͷƒሺ‹˜ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ’Š›•‹
ƒŽ ‹’ƒ
–•
ƒ••‘
‹ƒ–‡† ™‹–Š –Ї ’”‘˜‹•‹‘ ‘ˆ ‡™ ‘” ’Š›•‹
ƒŽŽ› ƒŽ–‡”‡† ‰‘˜‡”‡–ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ ‡‡† ˆ‘”
‡™ ‘” ’Š›•‹
ƒŽŽ› ƒŽ–‡”‡† ‰‘˜‡”‡–ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ –Ї
‘•–”—
–‹‘ ‘ˆ ™Š‹
Š
‘—ކ
ƒ—•‡
•‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‹’ƒ
–•ǡ ‹ ‘”†‡” –‘ ƒ‹–ƒ‹ ƒ

‡’–ƒ„އ •‡”˜‹
‡ ”ƒ–‹‘•ǡ ”‡•’‘•‡
–‹‡•ǡ ‘” –‘ ‘–Ї” ’‡”ˆ‘”ƒ
‡ ‘„Œ‡
–‹˜‡• ˆ‘” ƒ› ‘ˆ –Ї ’—„Ž‹
•‡”˜‹
‡• Ȃ ƒ”•ǫ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-96

Initial Study
Ї ‘’‡”ƒ–‡• ƒ† ƒƒ‰‡• ƒ’’”‘š‹ƒ–‡Ž› ͹ʹ ƒ
”‡• ‘ˆ †‡˜‡Ž‘’‡† ’ƒ” ƒ† –”ƒ‹Ž•Ǥ
Ї
‹–›
‹–› ’Žƒ• ˆ‘” ’ƒ”Žƒ† ‡‡†• „ƒ•‡† ‘ ƒ •–ƒ†ƒ”† ‘ˆ ˆ‘—” ƒ ”‡• ‘ˆ ’ƒ”
Žƒ†
Žƒ† ’‡” ͳǡͲͲͲ
”‡•‹†‡–•Ǥ —””‡–Ž›ǡ –Ї ‘—‹–› ‡”˜‹
‡• ‡’ƒ”–‡– ƒƒ‰‡• ’ƒ”Žƒ†• –Šƒ– ‹ –‘–ƒŽ

‘•–‹–—–‡ ƒ„‘—– ʹǤ͹ͷ ƒ
”‡• ‘ˆ ’ƒ”Žƒ† ’‡” ͳǡͲͲͲ ”‡•‹†‡–•Ǥ
Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ
‘•–”—
– ƒ ͳ͸͸ǦŽ‘– •‹‰Ž‡Ǧˆƒ‹Ž› ”‡•‹†‡–‹ƒŽ •—„†‹˜‹•‹‘ –Šƒ–

‘—ކ ‹
”‡ƒ•‡ –Ї †‡ƒ† ˆ‘” ’ƒ” •‡”˜‹
‡• ƒ† ‡ƒ”„› ”‡
”‡ƒ–‹‘ƒŽ ˆƒ
‹Ž‹–‹‡•Ǥ
‘™‡˜‡”ǡ –Ї
’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ „‡ ”‡“—‹”‡† –‘ ’ƒ› †‡˜‡Ž‘’‡– ‹’ƒ
– ˆ‡‡• ˆ‘” ’ƒ” ƒ† ”‡
”‡ƒ–‹‘
ˆƒ
‹Ž‹–‹‡• ’—”•—ƒ– –‘ ‡‡”ƒŽ Žƒ ‘Ž‹
›  ͶǤͳͺǤʹ ƒ† –Ї ‹–›ǯ• —‹
‹’ƒŽ ‘†‡ ƒ– –Ї
–‹‡ „—‹Ž†‹‰ ’‡”‹–• ƒ”‡ ‘„–ƒ‹‡†Ǥ Ї”‡ˆ‘”‡ǡ –Ї ’”‘’‘•‡† ”‘Œ‡ – ™‘—ކ ‘– ”‡•—Ž– ‹ ƒ
•—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ‹’ƒ
– ƒ••‘
‹ƒ–‡† ™‹–Š –Ї ’”‘˜‹•‹‘ ‘ˆ ƒ††‹–‹‘ƒŽ ’ƒ” ˆƒ
‹Ž‹–‹‡•ǡ ƒ†
‹’ƒ
–• –‘ ’ƒ”• ™‘—ކ ”‡’”‡•‡– ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳͷƒሺ˜ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ’Š›•‹
ƒŽ ‹’ƒ
–•
ƒ••‘
‹ƒ–‡† ™‹–Š –Ї ’”‘˜‹•‹‘ ‘ˆ ‡™ ‘” ’Š›•‹
ƒŽŽ› ƒŽ–‡”‡† ‰‘˜‡”‡–ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ ‡‡† ˆ‘”
‡™ ‘” ’Š›•‹
ƒŽŽ› ƒŽ–‡”‡† ‰‘˜‡”‡–ƒŽ ˆƒ
‹Ž‹–‹‡•ǡ –Ї
‘•–”—
–‹‘ ‘ˆ ™Š‹
Š
‘—ކ
ƒ—•‡
•‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‹’ƒ
–•ǡ ‹ ‘”†‡” –‘ ƒ‹–ƒ‹ ƒ

‡’–ƒ„އ •‡”˜‹
‡ ”ƒ–‹‘•ǡ ”‡•’‘•‡
–‹‡•ǡ ‘” –‘ ‘–Ї” ’‡”ˆ‘”ƒ
‡ ‘„Œ‡
–‹˜‡• ˆ‘” ƒ› ‘ˆ –Ї ’—„Ž‹
•‡”˜‹
‡• Ȃ –Ї” —„Ž‹

ƒ
‹Ž‹–‹‡•ǫ
‡‡
’ƒ
– ͓͵ǤͶǤͳͷƒሺ‹ሻ
Ї
Ž‘•‡•– Ž‹„”ƒ”› –‘ –
–Š”‘—‰Š ሺ‹˜ሻ ƒ„‘˜‡Ǥ
Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡ ƒ’’”‘š‹ƒ–‡Ž † › ‘‡ ‹Ž‡ ™‡•– ‘ˆ –Ї ”‘Œ‡
–
•‹–‡Ǥ Ї ‡ƒ”‡•– Š‘•’‹–ƒŽ –‘ –Ї ”‘Œ‡
– •‹–‡ ƒ”‡ Ž‘
ƒ–‡† ͳǤ͵ ‹Ž‡• ‘”–Š™‡•–Ǥ
• ‘–‡† ‹
’ƒ
– ͓͵ǤͶǤͳͶƒǡ –Ї ”‘Œ‡
– †‘‡• ‘– ’”‘‘–‡ —’Žƒ‡† ‰”‘™–Š ‘”
†‡˜‡Ž‘’‡–Ǥ • •—
Šǡ –Ї †‡˜‡Ž‘’‡– ‘ˆ –Ї ”‘Œ‡
– ™‹ŽŽ ‹‹ƒŽŽ› ‹
”‡ƒ•‡ –Ї †‡ƒ†
ˆ‘” ‘–Ї” ’—„Ž‹
•‡”˜‹
‡•ǡ •—
Š ƒ• Ž‹„”ƒ”‹‡• ƒ† ЇƒŽ–Š •‡”˜‹
‡•Ǥ
‘™‡˜‡”ǡ –Ї ‹
”‡ƒ•‡ ‹
†‡ƒ† †‘‡• ‘–ǡ ‹ ‹–•‡Žˆǡ ”‡“—‹”‡ –Ї
‘•–”—
–‹‘ ‘ˆ ƒ††‹–‹‘ƒŽ ˆƒ
‹Ž‹–‹‡•Ǥ • •—
Šǡ ‹’ƒ
–•
™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-97

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.16 - RECREATION
‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ

‡ƒ•‡ Ї •‡ ‡š‹• ‹‰ ‡‹‰Š„ Š †

ƒ† ”‡‰‹‘ƒŽ ’ƒ”• ‘” ‘–Ї” ”‡
”‡ƒ–‹‘ƒ

ˆƒ
‹Ž‹–‹‡• •—
Š –Šƒ– •—„•–ƒ–‹ƒŽ ’Š›•‹
ƒ
Ž
Ž

†‡–‡”‹‘”ƒ–‹‘ ‘ˆ –Ї ˆƒ
‹Ž‹–› ™‘—ކ ‘

—” ‘” „‡

ƒ

‡Ž‡”ƒ–‡†ǫ
„Ǥ

Ž—†‡ ”‡
”‡ƒ–‹‘ƒŽ ƒ
‹Ž‹–‹‡• ‡ —‹”‡ Ї

‘•–”—
–‹‘ ‘” ‡š’ƒ•‹‘ ‘ˆ ”‡
”‡ƒ–‹‘ƒŽ

ˆƒ
‹Ž‹–‹‡• –Šƒ– ‹‰Š– Šƒ˜‡ ƒ ƒ†˜‡”•‡ ’Š›•‹
ƒŽ

‡ˆˆ‡
– ‘ –Ї ‡˜‹”‘‡–ǫ
Discussion

’ƒ
– ͓͵ǤͶǤͳ͸ƒ Ȃ ‘—ކ –Ї ”‘Œ‡
– ‹
”‡ƒ•‡ –Ї —•‡ ‘ˆ ‡š‹•–‹‰ ‡‹‰Š„‘”Š‘‘† ƒ† ”‡‰‹‘ƒŽ
’ƒ”• ‘” ‘–Ї” ”‡
”‡ƒ–‹‘ƒŽ ˆƒ
‹Ž‹–‹‡• •—
Š –Šƒ– •—„•–ƒ–‹ƒŽ ’Š›•‹
ƒŽ †‡–‡”‹‘”ƒ–‹‘ ‘ˆ –Ї
ˆƒ
‹Ž‹–› ™‘—ކ ‘

—” ‘” „‡ ƒ

‡Ž‡”ƒ–‡†ǫ
• ‘–‡† ƒ„‘˜‡ǡ –Ї ’”‘’‘•‡† ”‘Œ‡
– ‹–‡†• –‘ †‡˜‡Ž‘’ ƒ ͳ͸͸ǦŽ‘– •‹‰Ž‡Ǧˆƒ‹Ž› ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡– –Šƒ– ™‘—ކ ”‡•—Ž– ‹ –Ї ‹
”‡ƒ•‡ —•‡ ‘ˆ ‡š‹•–‹‰ ‡‹‰Š„‘”Š‘‘† ƒ† ”‡‰‹‘ƒŽ
’ƒ”• ƒ• ƒ ‹
”‡ƒ•‡ ‹ Ž‘
ƒŽ ’‘’—Žƒ–‹‘ ™‘—ކ ‘

—”Ǥ ‡˜‡Ž‘’‡– ‘ˆ –Ї ’”‘’‘•‡† ”‘Œ‡
–
™‘—ކ ”‡“—‹”‡ ’ƒ›‡– ‘ˆ ‹ǦŽ‹‡— ˆ‡‡• ˆ‘” ’ƒ”Žƒ† †‡†‹ ƒ–‹‘ –‘ –Ї ‡
”‡ƒ–‹‘ ƒ† ƒ”
‹•–”‹
– ‹
‘’Ž‹ƒ
‡ ™‹–Š ‘˜‡”‡– ‘†‡ ‡
–‹‘ ͸͸Ͷ͹͹ ሺ—‹„› 
–ሻǡ ™Š‹
Š ™‘—ކ
”‡†—
‡ ’‘–‡–‹ƒŽ ‹’ƒ
–• –‘ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– އ˜‡Ž•Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳ͸„ Ȃ ‘—ކ –Ї ”‘Œ‡
– ‹
Ž—†‡ ”‡
”‡ƒ–‹‘ƒŽ ˆƒ
‹Ž‹–‹‡• ‘” ”‡“—‹”‡ –Ї

‘•–”—
–‹‘ ‘” ‡š’ƒ•‹‘ ‘ˆ ”‡
”‡ƒ–‹‘ƒŽ ˆƒ
‹Ž‹–‹‡• –Šƒ– ‹‰Š– Šƒ˜‡ ƒ ƒ†˜‡”•‡ ’Š›•‹
ƒŽ ‡ˆˆ‡
–
‘ –Ї ‡˜‹”‘‡–ǫ
‡‡
’ƒ
– ͓͵ǤͶǤͳ͸ƒ ƒ„‘˜‡Ǥ
’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–ǡ ƒ† ‘ ‹–‹‰ƒ–‹‘ ‹•
”‡“—‹”‡†Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-98

Initial Study

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-99

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.17 - TRANSPORTATION
‘—ކ –Ї ” Œ‡
–ǣ
ƒǤ   Ž‹
‹ Š ƒ ‰ ƒǡ Žƒǡ †‹ƒ
‡

’‘Ž‹
› ƒ††”‡••‹‰ –Ї
‹”
—Žƒ–‹‘ •›•–‡ǡ

‹
Ž—†‹‰ –”ƒ•‹–ǡ ”‘ƒ†™ƒ›ǡ „‹
›
އ ƒ†

’‡†‡•–”‹ƒ ˆƒ
‹Ž‹–‹‡•ǫ

„Ǥ ‘ˆŽ‹
– „‡ ‹
‘•‹•–‡ ™‹–Š 

—‹†‡ Ž‹‡• •‡
–‹‘ ͳͷͲ͸ͶǤ͵ǡ •—„†‹˜‹•‹‘ ሺ„ሻǫ

Ǥ —„•–ƒ–‹ƒŽŽ› ‹
”‡ƒ•‡ Šƒœƒ”†• †—‡ ƒ

‰‡‘‡–”‹
†‡•‹‰ ˆ‡ƒ–—”‡ ሺ‡Ǥ‰Ǥǡ •Šƒ”’
—”˜‡•

‘” †ƒ‰‡”‘—• ‹–‡”•‡
–‹‘•ሻ ‘” ‹
‘’ƒ–‹„އ

—•‡• ሺ‡Ǥ‰Ǥǡ ˆƒ” ‡“—‹’‡–ሻǫ

†Ǥ ‡•—Ž– ‹ ‹ƒ†‡“—ƒ–‡ ‡‡”‰‡
› ƒ

‡••ǫ
Discussion
Ї †‹•
—••‹‘ „‡Ž‘™ ‹• „ƒ•‡† ‘ –Ї ”ƒˆˆ‹
–—†›
‘’އ–‡† ˆ‘” –Ї ”‘Œ‡
–ǡ ƒ––ƒ
Ї† ƒ•
’’‡†‹š  ሺ—‡––‰‡”• ƒ† 
Зއ” ʹͲʹͷሻǤ

’ƒ
– ͓͵ǤͶǤͳ͹ƒ Ȃ ‘—ކ –Ї ”‘Œ‡
–
‘ˆŽ‹
– ™‹–Š ƒ ’”‘‰”ƒǡ ’Žƒǡ ‘”†‹ƒ
‡ ‘” ’‘Ž‹
›
ƒ††”‡••‹‰ –Ї
‹”
—Žƒ–‹‘ •›•–‡ǡ ‹
Ž—†‹‰ –”ƒ•‹–ǡ ”‘ƒ†™ƒ›ǡ „‹
›
އ ƒ† ’‡†‡•–”‹ƒ
ˆƒ
‹Ž‹–‹‡•ǫ
Transit
Ї ‹–› ‘ˆ ‡‡†Ž‡› Šƒ• —Ž–‹’އ ’—„Ž‹
–”ƒ•’‘”–ƒ–‹‘ ‘’–‹‘•ǡ ‹
Ž—†‹‰ǣ
x Ї ‹–› ‘ˆ ‡‡†Ž‡›ǯ• ‘—‹–› ‡”˜‹
‡• ‡’ƒ”–‡– ”—• ƒ ƒ†˜ƒ
‡ ”‡•‡”˜ƒ–‹‘
˜ƒǡ ƒ† ‘Ǧ
ƒŽŽ †‘‘”Ǧ–‘Ǧ†‘‘” ˜ƒ •‡”˜‹
‡Ǥ Ї –™‡Ž˜‡Ǧ’ƒ••‡‰‡” ˜ƒ• ‘’‡”ƒ–‡
‘†ƒ› –Š”‘—‰Š ”‹†ƒ› „‡–™‡‡ –Ї Š‘—”• ‘ˆ ͹ǣ͵Ͳ ƒǤǤ –‘ Ͷǣ͵Ͳ ’ǤǤ Ї•‡ ˜ƒ• ’”‘˜‹†‡ •‡”˜‹
‡ –‘ –Ї †‘™–‘™ •–‘”‡• ƒ† ‘ˆˆ‹
‡• ሺ‹
Ž—†‹‰ ‹–›
ƒŽŽǡ ‘•– ˆˆ‹
‡
ƒ† ‹„”ƒ”›ሻǡ –Ї
‘– ‡ƒŽ• ’”‘‰”ƒ ƒ– –Ї ‘—‹–› ‡–‡”ǡ –Ї •Š‘’’‹‰
‡–‡”•
ƒ– —––‘™‹ŽŽ‘™ ƒ† ƒ‹‰ ˜‡—‡•ǡ –Ї †˜‡–‹•– ‡†‹ ƒŽ ‡–‡”
‘•’‹–ƒŽ ƒ† –Ї
‘–Ї” Ž‘
ƒ–‹‘• ™‹–Š‹ ƒ –™‘Ǧ‹Ž‡ ”ƒ†‹—• ‘ˆ ‡‡†Ž‡›Ǥ Ї ˜ƒ• ƒ”‡ ƒŽ•‘ —•‡† –‘ –”ƒ•’‘”–
Ћކ”‡ ˆ”‘ Š‘—•‡ –‘ •
Š‘‘ŽǤ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-100

Initial Study
x ‡‡†Ž‡› ‘ŽŽ‡‰‡ ‘’‡”ƒ–‡• ƒ „—• ™Š‹
Š
‘‡
–• ƒ‰‡”ǡ ‘™ އ”ǡ ‡Žƒǡ ƒ† ƒ”Ž‹‡”
™‹–Š –Ї ‘ŽŽ‡‰‡Ǥ Ї ‹‰• ƒ›‘ ‹ˆ‹‡† 
Š‘‘Ž ‹•–”‹
– ƒŽ•‘ ’
™‹–Š‹ ‹–• •‡”˜‹
‡ ƒ”‡ƒǤ
‘™‡˜‡”ǡ „‘–Š ‘’‡”ƒ–‹‘• ƒ”‡ Ž‹‹–‡† •
”‘˜‹†‡• „—• •‡”˜‹
‡
‘އޛ –‘ •–—†‡–•Ǥ
x ”‡•‘ ‘—–› ‡‰‹‘ƒŽ ”ƒ•’‘”–ƒ–‹‘ —–Š‘”‹–› ሺ ሻ ‘’‡”ƒ–‡• ”ƒ‰‡ ‘˜‡ ”ƒ•‹–ǡ ƒ „—• •‡”˜‹
‡ –Šƒ– ”—• ‘†ƒ› –Š”‘—‰Š ”‹† ƒ›ǡ –™‹
‡ ƒ †ƒ› ‡ƒ
Š ™ƒ›ǡ ˆ”‘
”ƒ‰‡ ‘˜‡ –‘ –Ї ‹–› ‘ˆ ”‡•‘Ǥ Ї”‡ ƒ”‡ –Š”‡‡ •–‘’• ‹ –Ї ‹–› ‘ˆ ‡‡†Ž‡› ƒ– ƒ‹‰ ƒ† —––‘™‹ŽŽ‘™ǡ ƒ•– ƒ† ’”‹‰ˆ‹‡Ž†ǡ ƒ† ƒ‹‰ ƒ† ‡‡†Ǥ x ‹—„ƒ ”‡ƒ ‡‰‹‘ƒŽ ”ƒ•‹– ሺሻ ‘’‡”ƒ–‡• ƒ „—• –Šƒ– ”—• ˆ”‘ ‡‡†Ž‡› ‘ŽŽ‡‰‡ǡ †˜‡–‹•– ‡†‹
ƒŽ ‡–‡”
‘•’‹–ƒŽǡ ƒ† ƒŽ ‹ŽŽƒ‰‡ –‘ –Ї ‹—„ƒ ”ƒ•‹– ‡–‡”Ǥ Ї •‡”˜‹
‡ ‘’‡”ƒ–‡• ƒ– †‹ˆˆ‡”‡– –‹‡•ǡ ”ƒ‰‹‰ ˆ”‘ ˆ‹˜‡ –‹‡• ƒ †ƒ› †—”‹‰ –Ї • Š‘‘Ž
›‡ƒ” –‘ •‡˜‡ –‹‡• ƒ †ƒ› ‹ –Ї •—‡”Ǥ
‘” ”‡ˆ‡”‡
‡ǡ –Ї ƒ‹‰ ƒ† —––‘™‹ŽŽ‘™ •–‘’ ˆ‘” –Ї  •‡”˜‹ ‡ ‹• Ž‘
ƒ–‡†
ƒ’’”‘š‹ƒ–‡Ž› ͲǤ͵ ‹Ž‡• ‘”–Š ‘ˆ –Ї ”‘Œ‡
– •‹–‡Ǥ
Bicycle/Pedestrian Facilities
Ї 
–‹˜‡ ”ƒ•’‘”–ƒ–‹‘ ƒ† ƒ”™ƒ› Žƒ ሺ‹–› ‘ˆ ‡‡†Ž‡› ʹͲʹͶሻ ƒ† –Ї ‹” —Žƒ–‹‘
އ‡– ‘ˆ –Ї ‡‡”ƒŽ Žƒ ƒ† –Ї ‹–› ƒ†‘’–‡† –Ї ‹
›
އ ƒ† ‡†‡•–”‹ƒ ‘„‹Ž‹–› Žƒ
ሺ‹–› ‘ˆ ‡‡†Ž‡› ʹͲͳͻሻ
‘•‹•–• ‘ˆ ƒ ƒ••‡••‡– ƒ† ’Žƒ –‘ †‡˜‡Ž‘’ ƒ „‹‡™ƒ›
’‡†‡•–”‹ƒ •›•–‡ –Šƒ–
ƒ „‡•– •ƒ–‹•ˆ› –Ї ‡‡†• ‘ˆ ‹–• ”‡•‹†‡–• ‹ ƒ ‡ˆˆ‹
‹‡– ƒ† ‡ˆˆ‡
–‹˜‡
ƒ‡”Ǥ Ї ‹–› ‘ˆ ‡‡†Ž‡› Šƒ• –Š”‡‡
Žƒ••‹ˆ‹
ƒ–‹‘• ‘ˆ „‹‡™ƒ›•ǣ „‹‡ ’ƒ–Š•ǡ „‹‡ Žƒ‡•ǡ
ƒ†
ƒ†
„‹‡ ”‘—–‡•ǡ „ƒ•‡† ‘ –Ї †‡‰”‡‡ ‘ˆ ‡š
Ž—•‹˜‹–› ™‹–Š ™Š‹
Š –Ї ˆƒ
‹Ž‹–› ‹• ’”‡•‡”˜‡† ˆ‘” „‹
›
އ
—•‡ǣ
‹‡ ƒ–Š Ȃ ‹• ƒ Žƒ•• ͳ ˆƒ
‹Ž‹–›ǡ ™Š‹
Š ‹• ƒ •’‡
‹ƒŽ ’ƒ–Š™ƒ› ˆƒ
‹Ž‹–› ˆ‘” –Ї ‡š
Ž—•‹˜‡ —•‡ ‘ˆ
„‹
›
އ•ǡ •‡’ƒ”ƒ–‡† ˆ”‘ ‘–‘” ˜‡Š‹
އ ˆƒ
‹Ž‹–‹‡• „› •’ƒ
‡ ‘” ƒ ’Š›•‹
ƒŽ „ƒ””‹‡”Ǥ  „‹‡ ’ƒ–Š
ƒ› „‡ Ž‘
ƒ–‡† ‘ ƒ ’‘”–‹‘ ‘ˆ ƒ •–”‡‡– ‘” Š‹‰Š™ƒ› ”‹‰Š–Ǧ‘ˆǦ™ƒ› ‘– ”‡Žƒ–‡† –‘ ƒ ‘–‘” ˜‡Š‹ އ
ˆƒ
‹Ž‹–›Ǣ ‹– ƒ› „‡ ‰”ƒ†‡ •‡’ƒ”ƒ–‡† ‘” Šƒ˜‡ •–”‡‡–
”‘••‹‰• ƒ– †‡•‹‰ƒ–‡† Ž‘
ƒ–‹‘•Ǥ  „‹‡
’ƒ–Š ‹• ‹†‡–‹ˆ‹‡† ™‹–Š ‰—‹†‡ •‹‰‹‰ ƒ† ƒ› ƒŽ•‘ Šƒ˜‡ ’ƒ˜‡‡– ƒ”‹‰•Ǥ  ‡šƒ’އ ‘ˆ ƒ Žƒ•• ͳ ˆƒ
‹Ž‹–› ‹• –Ї ‡‡†Ž‡› ƒ‹Ž ”ƒ‹ŽȀƒ”™ƒ›ǡ ™Š‹
Š ’”‘˜‹†‡• ƒ •‡’ƒ”ƒ–‡ „‹‡ ƒ†
’‡†‡•–”‹ƒ –”ƒ‹ŽǤ
‹‡ ƒ‡ Ȃ ‹• ƒ Žƒ•• ʹ ˆƒ
‹Ž‹–›ǡ ™Š‹
Š ‹• ƒ Žƒ‡ ‘ ’ƒ˜‡† ƒ”‡ƒ ‘ˆ ”‘ƒ† ˆ‘” ’”‡ˆ‡”‡–‹ƒŽ „‹
›
އ
—•‡Ǥ
– ‹• —•—ƒŽŽ› Ž‘
ƒ–‡† ƒŽ‘‰ –Ї ”‹‰Š– ‡†‰‡ ‘ˆ
ƒ
ƒ ’ƒ˜‡† ”‘ƒ† ƒ”‡ƒ ‘” „‡–™‡‡ –Ї ’ƒ”‹‰
Žƒ‡ ƒ† –Ї ˆ‹”•– ‘–‘” ˜‡Š‹
އ Žƒ‡Ǥ  „‹‡ Žƒ‡ ‹• ‹†‡–‹ˆ‹‡† „› Dz‹‡ ƒ‡dz ‘” Dz‹‡ ‘—–‡dz ‰—‹†‡ •‹‰‹‰ǡ •’‡
‹ƒŽ Žƒ‡ Ž‹‡•ǡ ƒ† ‘–Ї” ’ƒ˜‡‡– ƒ”‹‰•Ǥ ‹
›
އ• Šƒ˜‡ ‡š
Ž—•‹˜‡ —•‡
‘ˆ –Ї „‹‡ Žƒ‡ǡ „—– —•– •Šƒ”‡ –Ї ˆƒ
‹Ž‹–› ™‹–Š ‘–‘” ˜‡Š‹
އ• ƒ† ’‡†‡•–”‹ƒ•
”‘••‹‰ ‹–Ǥ
‹‡ ‘—–‡ Ȃ ‹• ƒ ”‡
‘‡†‡† ”‘—–‡ ˆ‘” „‹
›
އ –”ƒ˜‡Ž ƒŽ‘‰ ƒ ‡š‹•–‹‰ ”‹‰Š–Ǧ‘ˆǦ™ƒ› ™Š‹
Š
‹• •‹‰‡† „—– ‘– •–”‹’‡†Ǥ

 ƒ††‹–‹‘ –‘ –Ї ‹–› ‹
›
އ ”ƒ•’‘”–ƒ–‹‘ Žƒǡ –Ї ‘—–› ‘ˆ ”‡•‘ ƒ†‘’–‡† ƒ —’†ƒ–‡ ‘ˆ –Ї ”‡•‘ ‘—–› ‡‰‹‘ƒŽ ‹
›
އ ƒ•–‡” Žƒ –‘ ’”‘˜‹†‡ ”‡‰‹‘ƒŽ
‘‡
–‹˜‹–› –‘ –Ї
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-101

Initial Study
—‹
‘”’‘”ƒ–‡† ƒ”‡ƒ• ‘ˆ ”‡•‘ ‘—–›Ǥ Ї ”‡•‘ ‘—–› ‡‰‹‘ƒŽ ‹ ›
އ ƒ•–‡” Žƒ
‹†‡–‹ˆ‹‡• ˆ‘—” „‹‡™ƒ› ”‘—–‡• ƒˆˆ‡
–‹‰ ‡‡†Ž‡›ǡ ™Š‹
Š ƒ”‡ Ž‘
ƒ–‡† ‘” ’”‘’‘•‡† –‘ „‡ Ž‘
ƒ–‡†
‘ ƒ‹‰ ˜‡—‡ ‘””‹†‘”ǡ –Ї ‹‰• ‹˜‡” ‘‘’ ”ƒ‹Ž ‘””‹†‘”ǡ ‡‡† ‹‡™ƒ›ǡ ƒ† –Ї ‡‡†Ž‡› ”ƒ‹Ž ƒŽ‘‰ –Ї ‘ކ Ƭ ”ƒ‹Ž
‘””‹†‘”Ǥ ‘‡ ‘ˆ –Ї•‡ ˆƒ
‹Ž‹–‹‡• ™‘—ކ „‡ ‹’ƒ
–‡†
„› ”‘Œ‡
– †‡˜‡Ž‘’‡–Ǥ
†‡” –Ї ‹–› ‹
›
އ ƒ† ‡†‡•–”‹ƒ ‘„‹Ž‹–› Žƒǡ Žƒ••

„‹‡™ƒ› ሺ‹‡ ƒ‡•ሻ ƒ”‡
’Žƒ‡† ˆ‘” Ǥ —––‘™‹ŽŽ‘™ ˜‡—‡ ™‡•– ‘ˆ –Ї ”‘Œ‡
– •‹–‡ ƒ† Ǥ ’”‹‰ˆ‹‡Ž† ˜‡—‡ –‘ –Ї
•‘—–ŠǤ Ї ”‘Œ‡
– ‹• ‘– ƒ–‹
‹’ƒ–‡† –‘
‘ˆŽ‹
– ™‹–Š –Ї ƒ–‹
‹’ƒ–‡† ‹’”‘˜‡‡–• ˆ‘” „‹‡
ƒ† ’‡†‡•–”‹ƒ ˆƒ
‹Ž‹–‹‡• ƒ• ’”‘’‘•‡† —†‡” –Ї ‹–›ǯ• ‹
›
އ ƒ† ‡†‡•–”‹ƒ ‘„‹Ž‹–› ŽƒǤ
Roadways
Ї ’”‡’ƒ”‡† ”ƒˆˆ‹
–—†› ‡˜ƒŽ—ƒ–‡† –Ї ’‘–‡–‹ƒŽ –”ƒˆˆ‹
‹’ƒ
– ‘ˆ –Ї ’”‘’‘•‡† ”‡•‹†‡–‹ƒŽ
†‡˜‡Ž‘’‡– ‘ ‹–› ”‘ƒ†™ƒ› ƒ† ‹–‡”•‡
–‹‘•Ǥ  –‘–ƒŽ ‘ˆ ‹‡ ‹–‡”•‡
–‹‘• ƒ”‡ ‡˜ƒŽ—ƒ–‡†
‹ –Ї ”ƒˆˆ‹
–—†› ƒƒŽ›•‹•Ǥ
Ї ‡š‹•–‹‰ ”‘ƒ†™ƒ›• ’”‘˜‹†‹‰ ƒ‹
‹”
—Žƒ–‹‘ ‹ –Ї ˜‹
‹‹–› ‘ˆ –Ї ”‘Œ‡
– ‹
Ž—†‡
–Ї ˆ‘ŽŽ‘™‹‰ ƒ• †‡•‹‰ƒ–‡† —†‡”
–Ї
–Ї ‹–› ‘ˆ ‡‡†Ž‡› ‡‡”ƒŽ Žƒ ‹”
—Žƒ–‹‘ އ‡–ǣ
x —––‘™‹ŽŽ‘™ ˜‡—‡ ‹• ƒ ‘”–ŠǦ•‘—–Š ƒŒ‘” ƒ”–‡”‹ƒŽ –Šƒ– ‡š–‡†• –Š”‘—‰Š‘—– –Ї ™‡•–‡” ’‘”–‹‘ ‘ˆ –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ
 –Ї ˜‹
‹‹–› ‘ˆ –Ї ’”‘Œ‡
–ǡ –Ї”‡ ‡š‹•–• ƒ –™‘Ǧ
Žƒ‡ ”‘ƒ†™ƒ› –Šƒ– ’”‘˜‹†‡• ƒ

‡•• –‘ ƒ‰”‹
—Ž–—”ƒŽ ƒ† ”‡•‹†‡–‹ƒŽ Žƒ† —•‡•Ǥ
x ‘Ž—„‹ƒ ˜‡—‡ ‹• ƒ ’”‹ƒ”‹Ž› ‘”–ŠǦ•‘—–Š ƒ”–‡”‹ƒŽ –Šƒ– ‡š–‡†• •‘—–Š ˆ”‘ ƒ‹‰ ˜‡—‡ ‹ –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ
 –Ї ˜‹
‹‹–› ‘ˆ –Ї ’”‘Œ‡
–ǡ ‹– ‡š‹•–• ƒ• ƒ ˆ‘—”ǦŽƒ‡
”‘ƒ†™ƒ› ƒ† ’”‘˜‹†‡• ƒ

‡•• –‘
‘‡”
‹ƒŽ ƒ† ”‡•‹†‡–‹ƒŽ Žƒ† —•‡•Ǥ
x ‹—„ƒ ˜‡—‡ ‹• ƒ ‡ƒ•–Ǧ™‡•– ƒ”–‡”‹ƒŽ –Šƒ– ‡š–‡†• –Š”‘—‰Š –Ї •‘—–Ї” ’‘”–‹‘ ‘ˆ –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ
 –Ї ˜‹
‹‹–› ‘ˆ –Ї ’”‘Œ‡
–ǡ –Ї”‡ ‡š‹•–• ƒ –™‘ǦŽƒ‡ ”‘ƒ†™ƒ› –Šƒ–
’”‘˜‹†‡• ƒ

‡•• –‘ ‹†—•–”‹ƒŽ ƒ† ”‡•‹†‡–‹ƒŽ Žƒ† —•‡•Ǥ
x ƒ•– ˜‡—‡ ‹• ƒ ‘”–ŠǦ•‘—–Š
‘ŽŽ‡
–‘” –Šƒ– ‡š–‡†• ˆ”‘ ƒ‹‰ ˜‡—‡ –‘ ‹—„ƒ
˜‡—‡ ‹ –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ
 –Ї ˜‹
‹‹–› ‘ˆ –Ї ’”‘Œ‡
–ǡ ‹– ‡š‹•–• ƒ• ƒ –™‘ǦŽƒ‡
”‘ƒ†™ƒ› ƒ† ’”‘˜‹†‡• ƒ

‡•• –‘ ”‡•‹†‡–‹ƒŽ Žƒ† —•‡•Ǥ
x ƒ‹‰ ˜‡—‡ ‹• ƒ ‡ƒ•–Ǧ™‡•– ƒŒ‘” ƒ”–‡”‹ƒŽ –Šƒ– ‡š–‡†• –Š”‘—‰Š‘—– –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ
 –Ї ˜‹
‹‹–› ‘ˆ –Ї ’”‘Œ‡
–ǡ ‹– ‡š‹•–• ƒ• ƒ –™‘ǦŽƒ‡ ”‘ƒ†™ƒ› ƒ† ’”‘˜‹†‡•
ƒ

‡•• –‘ ƒ‰”‹
—Ž–—”ƒŽǡ
‘‡”
‹ƒŽǡ ƒ† ”‡•‹†‡–‹ƒŽ Žƒ† —•‡•Ǥ
x ‘”–Š ˜‡—‡ ‹• ƒ ‡ƒ•–Ǧ™‡•–
‘ŽŽ‡
–‘” –Šƒ– ‡š–‡†• ˆ”‘ ‡‡† ˜‡—‡ ‹ –Ї ‹–› ‘ˆ
‡‡†Ž‡›Ǥ
 –Ї ˜‹
‹‹–› ‘ˆ –Ї ’”‘Œ‡
–ǡ ‹– ‡š‹•–• ƒ• ƒ –™‘ǦŽƒ‡ ”‘ƒ†™ƒ› ƒ† ’”‘˜‹†‡•
ƒ

‡•• –‘ ƒ‰”‹
—Ž–—”ƒŽǡ
‘‡”
‹ƒŽǡ ‡†—
ƒ–‹‘ƒŽǡ ƒ† ”‡•‹†‡–‹ƒŽ Žƒ† —•‡•Ǥ
x ’”‹‰ˆ‹‡Ž† ˜‡—‡ ‹• ƒ ‡ƒ•–Ǧ™‡•–
‘ŽŽ‡
–‘” –Šƒ– ‡š–‡†• ˆ”‘ ƒ•– ˜‡—‡ –‘
—––‘™‹ŽŽ‘™ ˜‡—‡ ‹ –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ
 –Ї ˜‹
‹‹–› ‘ˆ –Ї ”‘Œ‡
–ǡ ‹– ‡š‹•–• ƒ•
ƒ –™‘ǦŽƒ‡ ”‘ƒ†™ƒ› ƒ† ’”‘˜‹†‡• ƒ

‡•• –‘ ”‡•‹†‡–‹ƒŽ Žƒ† —•‡•Ǥ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-102

Initial Study
x ‘„— ˜‡—‡ ‹• ƒ ˆ—–—”‡ ‘”–ŠǦ•‘—–Š
‘ŽŽ‡
–‘” –Šƒ– ‡š–‡†• –Š”‘—‰Š –Ї ‡ƒ•–‡”
’‘”–‹‘ ‘ˆ –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ
– ‹• ’”‘’‘•‡† –‘ ’”‘˜‹†‡ ƒ

‡•• –‘ ”‡•‹†‡–‹ƒŽ Žƒ† —•‡•Ǥ
x
—™ƒŽ– ˜‡—‡ ‹• ƒ ‘”–ŠǦ•‘—–Š ƒ”–‡”‹ƒŽ –Šƒ– ‡š–‡†• –Š”‘—‰Š‘—– –Ї ‡ƒ•–‡” ’‘”–‹‘ ‘ˆ –Ї ‹–› ‘ˆ ‡‡†Ž‡›Ǥ
 –Ї ˜‹
‹‹–› ‘ˆ –Ї ”‘Œ‡
–ǡ ‹– ‡š‹•–• ƒ• ƒ –™‘ǦŽƒ‡
”‘ƒ†™ƒ› ƒ† ’”‘˜‹†‡• ƒ

‡•• –‘ ƒ‰”‹
—Ž–—”ƒŽ ƒ† ”‡•‹†‡–‹ƒŽ Žƒ† —•‡•Ǥ
Ї ˆ‘ŽŽ‘™‹‰ ‹–‡”•‡
–‹‘• ™‡”‡ ‡˜ƒŽ—ƒ–‡† ƒ• ’ƒ”– ‘ˆ –Ї ”ƒˆˆ‹
–—†›ǣ
x Ǥ ƒ•– ˜‡—‡ ƒ† ƒ‹‰ ˜‡—‡

x Ǥ ‘Ž—„‹ƒ ˜‡—‡ ƒ† ƒ‹‰ ˜‡—‡

x Ǥ —––‘™‹ŽŽ‘™ ˜‡—‡ ƒ† ƒ‹‰ ˜‡—‡

x ‘„— ˜‡—‡ ƒ† ƒ‹‰ ˜‡—‡

x Ǥ —––‘™‹ŽŽ‘™ ˜‡—‡ ‘”–Š ˜‡—‡

x
—™ƒŽ– ˜‡—‡ ƒ† ‘”–Š ˜‡—‡

x Ǥ ˜‡—‡ Ǥ ’”‹‰ˆ‹‡Ž† ˜‡—‡

x Ǥ
—––‘™‹ŽŽ‘™
—––‘™‹ŽŽ‘™ ˜‡—‡
ƒ†
ƒ†
ƒ† ‹—„ƒ ˜‡—‡

x ”‘Œ‡
– –”ƒ
‡ ƒ† ‘”–Š ˜‡—‡

”‘Œ‡
– –”‹’ ‰‡‡”ƒ–‹‘ ˜‘Ž—‡• ™‡”‡ ‡•–‹ƒ–‡† —•‹‰ –Ї
•–‹–—–‡ ‘ˆ ”ƒ•’‘”–ƒ–‹‘
‰‹‡‡”• ሺ
ሻ ”‹’ ‡‡”ƒ–‹‘ ƒ—ƒŽǡ ͳͳ–Š †‹–‹‘Ǥ ”‹’ ”ƒ–‡•ǡ ‡“—ƒ–‹‘• ƒ† †‹”‡ –‹‘ƒŽ
•’Ž‹–• ˆ‘”
 ƒ† •‡ ‘†‡ ʹͳͲ ሺ‹‰Ž‡Ǧ ƒ‹Ž› ‡–ƒ
Ї†
‘—•‹‰ሻ ™‡”‡ —•‡† –‘ ‡•–‹ƒ–‡
”‘Œ‡
– –”‹’• ˆ‘” ™‡‡†ƒ› ’‡ƒ Š‘—”• ‘ˆ ƒ†Œƒ
‡– •–”‡‡– –”ƒˆˆ‹
„ƒ•‡† ‘ ”‘Œ‡
– ‹ˆ‘”ƒ–‹‘Ǥ
Ї –”‹’ ‰‡‡”ƒ–‹‘ ˜‘Ž—‡• ƒ”‡ •—ƒ”‹œ‡† ‹ ƒ„އ ͵ǤͶǤͳ͹Ǧͳ „‡Ž‘™Ǥ ƒ„އ ͵ǤͶǤͳ͹Ǧͳ
”‹’ ‡‡ ”ƒ–‹‘
‡˜‡Ž ‡– ƒ”‹ƒ„އ ƒ‹Ž› ”‹’•  ‡ƒ
”‹’•  ‡ƒ
”‹’•

›’‡ ሺ
 ‘†‡ሻ

  ƒ ‡
Ψ — Ψ ƒ ‡
Ψ — Ψ
ƒ–‡ ’Ž‹– Ȁ ’Ž‹– Ȁ ’Ž‹– Ȁ ’Ž‹– Ȁ
”‹’• ”‹’• ”‹’• ”‹’•
‹‰Ž‡Ǧ ƒ‹Ž› ͳ͸͸ ‡“ ͳǡ͸Ͳͺ ‡“ ʹͷΨ Ȁ ͹ͷΨ Ȁ ‡“ ͸͵Ψ Ȁ ͵͹Ψ Ȁ †‡–ƒ
Ї† ™‡ŽŽ‹‰ ͵Ͳ ͺͺ ͳͲͳ ͷͻ

‘—•‹‰ ሺʹͳͲሻ ‹–•
‘—”
‡ǣ ’’‡†‹š 
Ž–Š‘—‰Š –Ї –ƒ–‡ ‘ˆ ƒŽ‹ˆ‘”‹ƒ †‘‡• ‘– ”‡
‘‰‹œ‡ –”ƒˆˆ‹

‘‰‡•–‹‘ ƒ† †‡Žƒ› ƒ• ƒ
‡˜‹”‘‡–ƒŽ ‹’ƒ
– ’‡” ǡ –Ї ‹–› ‡‡” ƒŽ Žƒ ‹”
—Žƒ–‹‘ އ‡– †‡•‹‰ƒ–‡• އ˜‡Ž
‘ˆ •‡”˜‹
‡ ሺሻ –Š”‡•Бކ ‘ˆ  ‘” „‡––‡”ǤDz‡˜‡Ž ‘ˆ ‡”˜‹
‡dz ሺሻ ‹• ƒ †‡•
”‹’–‹‘ ‘ˆ –Ї
ƒ
ƒ„‹Ž‹–›
‘ˆ ƒ •–”‡‡– •‡‰‡– ‘” ‹–‡”•‡
–‹‘ –‘ ƒ

‘‘†ƒ–‡ އ˜‡Ž• ‘ˆ –”ƒˆˆ‹
†‡ƒ†Ǥ  ‹• ƒ
“—ƒŽ‹–ƒ–‹˜‡ ‡ƒ•—”‡ ‘ˆ –”ƒˆˆ‹
‘’‡”ƒ–‹‰
‘†‹–‹‘•ǡ ™Š‡”‡„› ƒ އ––‡” ‰”ƒ†‡ Dzdz –Š”‘—‰Š Dz dz ‹•
ƒ••‹‰‡† –‘ ƒ ‹–‡”•‡
–‹‘ ‘” ”‘ƒ†™ƒ› •‡‰‡– ”‡’”‡•‡–‹‰ ™‘”•‡‹‰ ”‡’”‡•‡–‹‰ ’”‘‰”‡••‹˜‡Ž› ™‘”•‡‹‰ –”ƒˆˆ‹

‘†‹–‹‘•  ǡ –›’‹
ƒŽŽ› ”‡’”‡•‡–• —”‡•–”‹
–‡† ˆ”‡‡ ˆŽ‘™
‘ˆ –”ƒˆˆ‹
ƒ† ‡š
‡ŽŽ‡–
‘ˆ‘”– ˆ‘” ‘–‘”‹•–•ǡ –‘  ǡ ™Š‹
Š ”‡’”‡•‡–• Š‹‰ŠŽ›
‘‰‡•–‡†
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-103

Initial Study
‡˜‡Ž‘’‡– ‘ˆ –Ї ”‘Œ‡
– •‹–‡ ‹• ”‡“—‹”‡† –‘
‘’Ž› ™‹–Š ‹–› •–ƒ†ƒ”†• ˆ‘” †”‹˜‡™ƒ›
†‡˜‡Ž‘’‡–Ǥ ‘•–”—
–‹‘Ǧ”‡Žƒ–‡† –”ƒˆˆ‹
‹• ƒ–‹
‹’ƒ–‡† –‘ „‡ •Š‘”–Ǧ–‡” ƒ† ™‘—ކ ‘–
•‹‰‹ˆ‹
ƒ–Ž› ‹’ƒ
– ‡š‹•–‹‰ ‘” ’Žƒ‡†
‹”
—Žƒ–‹‘ ‹ˆ”ƒ•–”—
–—”‡Ǥ Ї ’”‘’‘•‡† ‘’‡”ƒ–‹‘
‘ˆ –Ї ”‘Œ‡
– †‘‡• ‘– ”‡“—‹”‡ ‘Ǧ•‹–‡ ‡’Ž‘›‡‡• ƒ† ™‘—ކ Šƒ˜‡ ‹‹ƒŽ ‹’ƒ – ‘ –Ї
‹–›ǯ•
‹”
—Žƒ–‹‘ •›•–‡Ǥ Ї ’”‘’‘•‡† ”‘Œ‡
– ™‹ŽŽ ‘–
‘ˆŽ‹
– ™‹–Š ƒ ’”‘‰”ƒǡ ’Žƒǡ
‘”†‹ƒ
‡ǡ ‘” ’‘Ž‹
› ƒ††”‡••‹‰ –Ї
‹”
—Žƒ–‹‘ •›•–‡ǡ ‹
Ž—†‹‰ –”ƒ•‹–ǡ ”‘ƒ†™ƒ›ǡ „‹
›
އǡ
ƒ† ’‡†‡•–”‹ƒ ˆƒ
‹Ž‹–‹‡•Ǥ Ї”‡ˆ‘”‡ǡ ™‹–Š ‹’އ‡–ƒ–‹‘ ‘ˆ  Ǧͳ ƒ† ’ƒ›‡– ‘ˆ ‹–‡”•‡
–‹‘• –‘ ‘’‡”ƒ–‡ ƒ– ƒ
ƒ’’Ž‹
ƒ„އ –”ƒ•’‘”–ƒ–‹‘ †‡˜‡Ž‘’‡– ‹’ƒ
– ˆ‡‡•ǡ –Ї ”‘Œ‡
– ™‘—ކ ƒŽŽ‘™ ‹–›
ƒ

‡’–ƒ„އ  ƒ† ”‡•—Ž– ‹ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
 Ǧͳǣ Ї ”‘Œ‡
– ’”‘’‘‡– •ŠƒŽŽ ’ƒ› ‹–• ‡“—‹–ƒ„އ •Šƒ”‡
‘•– ’‡”
‡–ƒ‰‡ ˆ‘”
‹–‡”•‡
–‹‘ ‹’”‘˜‡‡–• ƒ– – Ž‹•–‡† ‹–‡”•‡
–‹‘Ǥ ƒ›‡– ƒ‘—– ‘ˆ –Ї ‡“—‹–ƒ„އ •Šƒ”‡

‘•–• •ŠƒŽŽ „‡ †‡–‡”‹‡† „› –
Ї
Ї ‹–› ‘ˆ ‡‡†Ž‡› ƒ† ’ƒ‹† ’”‹‘” –‘ –Ї ‹••—ƒ
‡ ‘ˆ „—‹Ž†‹‰
’‡”‹–•Ǥ
ƒǤ ‹‰ƒŽ‹œƒ–‹‘ ‘ˆ ‘—–Š —––‘™‹ŽŽ‘™ ˜‡—‡ ƒ† ‘”–Š ˜‡—‡ǣ ʹͲǤͷͳ ’‡” ‡–Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‹– ‘
‘” ‘ ƒ– Ǥ –  ‹ ” ‹– ‹‰ƒ–‹ ’ ‡†

’ƒ
’ƒ
– ͓͵ǤͶǤͳ͹„ Ȃ ‘—ކ –Ї ”‘Œ‡
–
‘ˆŽ‹
– ‘” „‡ ‹
‘•‹•–‡– ™‹–Š  —‹† ‡Ž‹‡•
•‡
–‹‘ ͳͷͲ͸ͶǤ͵ǡ •—„†‹˜‹•‹‘ ሺ„ሻǫ
Vehicle Miles Traveled (VMT) Evaluation
Ї  —‹†‡Ž‹‡•
”‹–‡”‹ƒ ˆ‘” †‡–‡”‹‹‰ –Ї •‹‰‹ˆ‹
ƒ
‡ ‘ˆ –”ƒ•’‘”–ƒ–‹‘ ‹’ƒ
–• ƒ”‡
’”‹ƒ”‹Ž› ˆ‘
—•‡† ‘ ”‘Œ‡
–• ™‹–Š‹ –”ƒ•‹– ’”‹‘”‹–› ƒ”‡ƒ• ƒ† •Š‹ˆ– –Ї ˆ‘
—• ˆ”‘ †”‹˜‡”
†‡Žƒ› –‘ ƒ ”‡†—
–‹‘ ‘ˆ ‰”‡‡Š‘—•‡ ‰ƒ• ‡‹••‹‘•ǡ
”‡ƒ–‹‘ ‘ˆ —Ž–‹‘†ƒŽ ‡–™‘”•ǡ ƒ†
’”‘‘–‹‘ ‘ˆ ƒ ‹š ‘ˆ Žƒ† —•‡•Ǥ ‡Š‹
އ ‹Ž‡• ”ƒ˜‡Ž‡†ǡ ‘” ǡ ‹• ƒ ‡ƒ•—”‡ ‘ˆ –Ї –‘–ƒŽ
—„‡” ‘ˆ ‹Ž‡• †”‹˜‡ –‘ ‘” ˆ”‘ ƒ †‡˜‡Ž‘’‡– ƒ† ‹• •‘‡–‹‡• ‡š’”‡••‡† ƒ• ƒ ƒ˜‡”ƒ‰‡ ’‡” –”‹’ ‘” ’‡” ’‡”•‘Ǥ
Ї  ƒƒŽ›•‹• ™ƒ•
‘†—
–‡† ‹ ƒ

‘”†ƒ
‡ ™‹–Š ” ‘ ‘—–  ͹Ͷ͵ –ƒ ‘ ‡•  ›
’އ‡  –‹
‡‰‹‘ƒŽ —‹†‡Ž‹ ‡•
ሺ’’‡†‹š ሻǤ Ї  ƒƒŽ›•‹• ‹˜‘Ž˜‡†
‘’ƒ”‹‰ ƒ ‡•–‹ƒ–‡ ‘ˆ 
ƒ––”‹„—–ƒ„އ –‘ –Ї ”‘Œ‡
– –‘ –Ї  –Š”‡•Бކ•
‘–ƒ‹‡† ‹ –Ї ” ‘ › 
‡•  ‘—– ͹Ͷ͵

’އ‡–ƒ–‹‘ ‡‰‹‘ƒŽ —‹†‡Ž‹‡•  ƒ ƒ••‡••‹‰ † ™Š‡–Ї” –Ї ”‘Œ‡ –  ™‘—ކ ”‡•—Ž– ‹
ƒ •‹‰‹ˆ‹
ƒ– –”ƒ•’‘”–ƒ–‹‘ ‹’ƒ
– —†‡” Ǥ Ї  –Š”‡•Бކ ˆ‘” ”‡•‹†‡–‹ƒŽ —•‡ ‹• –Ї ‡š
‡‡†ƒ
‡ ‘ˆ ͳ͵ ’‡”
‡– „‡Ž‘™ –Ї ‡š‹•–‹‰ ”‡‰‹‘ƒŽ ƒ˜‡”ƒ‰‡ ‘” ͺ͹ ’‡”
‡– ‘ˆ –Ї ”‡‰‹‘ƒŽ
 ƒ˜‡”ƒ‰‡Ǥ ƒ„އ ͵ǤͶǤͳ͹Ǧ͸ ’”‘˜‹†‡• –Ї ”‡•—Ž–• ‘ˆ –Ї  ƒƒŽ›•‹•Ǥ VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-107

Initial Study
ƒ„އ ͵ǤͶǤͳ͹Ǧ͸
 ƒŽ›•‹• ‡•—Ž–•
ƒ† •‡  ‡” ƒ’‹–ƒ ‹‰‹ˆ‹
ƒ ‡†—
–‹‘
‡‰‹‘ƒŽ Š”‡•Бކ ”‘Œ‡
–
’ƒ
– ‡‡†‡†
‡•‹†‡–‹ƒŽ ͳ͹ǤͶ ͳ͸Ǥͳ ͳͶǤͲ ‘ ǦͳͷǤͲΨ
‘—”
‡ǣ ’’‡†‹š 
• •Š‘™ ‹ ƒ„އ ͵ǤͶǤͳ͹Ǧ͸ǡ –Ї ”‘Œ‡
–  ’‡”
ƒ’‹–ƒ ‹• އ•• –Šƒ –Ї •‹‰‹ˆ‹
ƒ
‡ –Š”‡•БކǤ
Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‘—ކ ”‡•—Ž– ‹ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ–  ‹’ƒ
–ǡ ™‘—ކ ‘–
‘ˆŽ‹
–
‘” „‡ ‹
‘•‹•–‡– ™‹–Š  —‹†‡Ž‹‡• ‡
–‹‘ ͳͷͲ͸ͶǤ͵ǡ •—„†‹˜‹•‹‘ ሺ„ሻǤ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳ͹
Ȃ ‘—ކ –Ї ”‘Œ‡
– •—„•–ƒ–‹ƒŽŽ› ‹
”‡ƒ•‡ Šƒœƒ”†• †—‡ –‘ ƒ ‰‡‘‡–”‹

†‡•‹‰ ˆ‡ƒ–—”‡ ሺ‡Ǥ‰Ǥǡ •Šƒ”’
—”˜‡• ‘” †ƒ‰‡”‘—• ‹–‡”•‡
–‹‘•ሻ ‘” ‹
‘’ƒ–‹„އ —•‡• ሺ‡Ǥ‰Ǥǡ
ˆƒ” ‡“—‹’‡–ሻǫ
”‘Œ‡
–
‘•–”—
–‹‘ ‹• ‘– ƒ–‹
‹’ƒ–‡† –‘ ”‡•—Ž– ‹ ƒ ‹
”‡ƒ•‡† Šƒœƒ”† ”‡Žƒ–‡† –‘ –”ƒˆˆ‹
ƒ†
–”ƒ•’‘”–ƒ–‹‘Ǥ Ї ”‘Œ‡
– ™‘—ކ „‡ ”‡“—‹”‡† –‘ ƒ’’Ž› ˆ‘” ƒ ”‡
‡‹˜‡ –Ї ƒ’’”‘’”‹ƒ–‡
’‡”‹–• ˆ‘” ƒ› ™‘” –‘ ‘

—” ™‹–Š‹ ‹–› ”‹‰Š–•Ǧ‘ˆǦ™ƒ› ƒ† „‡ ‡š’‡
–‡† –‘
‘’Ž› ™‹–Š ƒ›

‘†‹–‹‘• –‘ ‹‹‹œ‡
‘•–”—
–‹‘ –”ƒˆˆ‹
”‡Žƒ–‡† Šƒœƒ”†•Ǥ Ї ‹–› ƒŽ•‘ ”‡“—‹”‡• –Ї
”‘Œ‡
– –‘ †‡˜‡Ž‘’ ƒ•– ‘”–Š ˜‡—‡ –Šƒ– ™‘—ކ ‡˜‡–—ƒŽŽ›
‘‡
– –‘ –Ї ˆ—–—”‡ ƒŽ‹‰‡–
‘ˆ ‘„— ˜‡—‡ –‘ –Ї ™‡•–Ǥ
Ї ”‘Œ‡
– ™‹ŽŽ ‘– ‹
Ž—†‡ ƒ› ‰‡‘‡–”‹
†‡•‹‰ ˆ‡ƒ–—”‡• ‘” ‹
‘’ƒ–‹„އ —•‡• –Šƒ– ™‘—ކ
•—„•–ƒ–‹ƒŽŽ› ‹
”‡ƒ•‡ Šƒœƒ”†•Ǥ ŽŽ ”‘ƒ† ‹’”‘˜‡‡–• ™‘—ކ „‡
‘•–”—
–‡† ƒ

‘”†‹‰ –‘
‹–› ”‘ƒ† †‡•‹‰ ƒ†
‘•–”—
–‹‘ •–ƒ†ƒ”†•Ǥ ††‹–‹‘ƒŽŽ›ǡ –Ї ”‘Œ‡
– ‹• •—„Œ‡
– –‘ ”‡˜‹‡™ „›
‹–› •–ƒˆˆǡ ‡•—”‹‰ –Šƒ– –Ї ”‘Œ‡
– †‡•‹‰
‘’Ž‹‡• ™‹–Š ƒ’’Ž‹
ƒ„އ ”‘ƒ†™ƒ› †‡•‹‰
•–ƒ†ƒ”†•Ǥ
Ї”‡ˆ‘”‡ǡ –Ї
‘•–”—
–‹‘ ƒ† ‘’‡”ƒ–‹‘ ‘ˆ –Ї ”‘Œ‡
– ™‹ŽŽ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ–
‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-108

Initial Study

’ƒ
– ͓͵ǤͶǤͳ͹† Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ ‹ƒ†‡“—ƒ–‡ ‡‡”‰‡
› ƒ

‡••ǫ
Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ „‡ ”‡“—‹”‡† –‘
‘’Ž› ™‹–Š ƒŽŽ ‡‡”‰‡
› ƒ

‡•• ”‡“—‹”‡‡–•
ƒ†‘’–‡† ƒ† •‡– ˆ‘”–Š ‹ –Ї ‹–› —‹
‹’ƒŽ ‘†‡Ǥ ”‘Œ‡
– •‹–‡ †‡˜‡Ž‘’‡– ™‹ŽŽ „‡ ”‡“—‹”‡†
–‘
‘’Ž› ™‹–Š ƒ’’Ž‹
ƒ„އ ‡‡”‰‡
› ƒ

‡•• •–ƒ†ƒ”†• ˆ”‘ Ž‘
ƒŽ ƒ† –ƒ–‡ ƒ—–Š‘”‹–‹‡•Ǥ
”‘Œ‡
–Ǧ”‡Žƒ–‡† –”ƒˆˆ‹
™‘—ކ ‘– ƒˆˆ‡
– ‡‡”‰‡
› ƒ

‡•• –‘ –Ї ”‘Œ‡
– •‹–‡ ‘” ƒ› ‘–Ї”
•—””‘—†‹‰ Ž‘
ƒ–‹‘•Ǥ Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– ”‡“—‹”‡ ’‡”ƒ‡–
Ž‘•—”‡• ‘ˆ
’—„Ž‹
”‘ƒ†•ǡ ™Š‹
Š
‘—ކ ‹Š‹„‹– ƒ

‡•• „› ‡‡”‰‡
› ˜‡Š‹
އ•Ǥ ‘” –Ї•‡ ”‡ƒ•‘•ǡ

‘•–”—
–‹‘ ƒ† ‘’‡”ƒ–‹‘ ™‘—ކ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
– ‘ ‡‡”‰‡
› ƒ

‡••Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-109

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.18 - TRIBAL CULTURAL RESOURCES
‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ ƒ—•‡ ƒ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡
Šƒ‰‡ ‹ –Ї
•‹‰‹ˆ‹
ƒ
‡ ‘ˆ ƒ –”‹„ƒŽ
—Ž–—”ƒŽ ”‡•‘—”
‡ǡ
†‡ˆ‹‡† ‹ —„Ž‹
‡•‘—”
‡• ‘†‡ ‡
–‹‘
ʹͳͲ͹Ͷ ƒ• ‡‹–Ї” ƒ •‹–‡ǡ ˆ‡ƒ–—”‡ǡ ’Žƒ
‡ǡ
—Ž–—”ƒŽ
Žƒ†•
ƒ’‡ –Šƒ– ‹• ‰‡‘‰”ƒ’Š‹
ƒŽŽ› †‡ˆ‹‡† ‹
–‡”• ‘ˆ –Ї •‹œ‡ ƒ† •
‘’‡ ‘ˆ –Ї Žƒ†•
ƒ’‡ǡ
•ƒ
”‡† ’Žƒ
‡ǡ ‘” ‘„Œ‡
– ™‹–Š
—Ž–—”ƒŽ ˜ƒŽ—‡ –‘ ƒ
ƒŽ‹ˆ‘”‹ƒ ƒ–‹˜‡ ‡”‹
ƒ –”‹„‡ǡ ƒ† –Šƒ– ‹•ǣ
‹•–‡† ‡Ž‹‰‹„އ Ž‹•–‹‰ ‹ –Ї ƒŽ‹ˆ‘”‹ƒ
‡‰‹•–‡” ‘ˆ
‹•–‘”‹
ƒŽ ‡•‘—”
‡•ǡ ‘” ‹ ƒ Ž‘
ƒŽ
”‡‰‹•–‡” ‘ˆ Š‹•–‘”‹
ƒŽ ”‡•‘—”
‡• ƒ• †‡ˆ‹‡† ‹
—„Ž‹
‡•‘—”
‡• ‘†‡ ‡
–‹‘ ͷͲʹͲǤͳሺሻǡ ‘”
 ‡•
‡ †‡ ‡ ‹‡† „› Ї ‡ƒ† ‰‡
›ǡ ‹
‹–• †‹•
”‡–‹‘ ƒ† •—’’‘”–‡† „› •—„•–ƒ–‹ƒŽ
‡˜‹†‡
‡ǡ–‘ „‡ •‹‰‹ˆ‹
ƒ– ’—”•—ƒ––‘
”‹–‡”‹ƒ
•‡– ˆ‘”–Š ‹ •—„†‹˜‹•‹‘ ሺ
ሻ ‘ˆ —„Ž‹

‡•‘—”
‡• ‘†‡ ‡
–‹‘ ͷͲʹͶǤͳǤ
 ƒ’’Ž›‹‰
–Ї
”‹–‡”‹ƒ •‡– ˆ‘”–Š ‹ •—„†‹˜‹•‹‘ ሺ
ሻ ‘ˆ
—„Ž‹
‡•‘—”
‡ ‘†‡ ‡
–‹‘ ͷͲʹͶǤͳǡ –Ї
‡ƒ† ‰‡
› •ŠƒŽŽ
‘•‹†‡” –Ї •‹‰‹ˆ‹
ƒ
‡ ‘ˆ
–Ї ”‡•‘—”
‡ –‘ ƒ ƒŽ‹ˆ‘”‹ƒ ƒ–‹˜‡ ‡”‹
ƒ
–”‹„‡Ǥ
Discussion
Ї †‹•
—••‹‘ „‡Ž‘™ ‹• „ƒ•‡† ‘ –Ї —Ž–—”ƒŽ ‡•‘—”
‡• ‡’‘”–
‘’އ–‡† ˆ‘” –Ї ”‘Œ‡
–ǡ
ƒ––ƒ
Ї† ƒ• ’’‡†‹š  ሺ ʹͲʹͷ„ሻǤ

’ƒ
– ͓͵ǤͶǤͳͺƒሺ‹ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
–
ƒ—•‡ ƒ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡
Šƒ‰‡ ‹ –Ї
•‹‰‹ˆ‹
ƒ
‡ ‘ˆ ƒ –”‹„ƒŽ
—Ž–—”ƒŽ ”‡•‘—”
‡ǡ †‡ˆ‹‡† ‹ —„Ž‹
‡•‘—”
‡• ‘†‡ ‡
–‹‘ ʹͳͲ͹Ͷ ƒ•
‡‹–Ї” ƒ •‹–‡ǡ ˆ‡ƒ–—”‡ǡ ’Žƒ
‡ǡ
—Ž–—”ƒŽ Žƒ†•
ƒ’‡ –Šƒ– ‹• ‰‡‘‰”ƒ’Š‹
ƒŽŽ› †‡ˆ‹‡† ‹ –‡”• ‘ˆ –Ї
•‹œ‡ ƒ† •
‘’‡ ‘ˆ –Ї Žƒ†•
ƒ’‡ǡ •ƒ
”‡† ’Žƒ
‡ǡ ‘” ‘„Œ‡
– ™‹–Š
—Ž–—”ƒŽ ˜ƒŽ—‡ –‘ ƒ ƒŽ‹ˆ‘”‹ƒ
ƒ–‹˜‡ ‡”‹
ƒ –”‹„‡ǡ ƒ† –Šƒ– ‹• Ȃ Ž‹•–‡† ‘” ‡Ž‹‰‹„އ ˆ‘” Ž‹•–‹‰ ‹ –Ї ƒŽ‹ˆ‘”‹ƒ ‡‰‹•–‡” ‘ˆ

‹•–‘”‹
ƒŽ ‡•‘—”
‡•ǡ ‘” ‹ ƒ Ž‘
ƒŽ ”‡‰‹•–‡” ‘ˆ Š‹•–‘”‹
ƒŽ ”‡•‘—”
‡• ƒ• †‡ˆ‹‡† ‹ —„Ž‹

‡•‘—”
‡• ‘†‡ ‡
–‹‘ ͷͲʹͲǤͳሺሻǫ
‡‡ –Ї †‹•
—••‹‘ ’”‡•‡–‡† ‹  ͵ ‡
–‹‘ ǤͶǤͷ Ǧ —Ž–—”ƒŽ —” ‡•‘
‡•ǡ
’ƒ
–• ͓͵ǤͶǤͷ –Š”‘—‰Š ƒ
͵ǤͶǤͷ
Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-110

Initial Study
 ’”‹Ž ʹͶǡ ʹͲʹͷǡ ’—”•—ƒ– –‘ —„Ž‹
‡•‘—”
‡• ‘†‡ ȚʹͳͲͺͲǤ͵Ǥͳ ƒ† ‘˜ ‡”‡– ‘†‡
Ț͸ͷ͵ͲͲ ‡– •‡“ǡ އ––‡”• ™‡”‡ •‡– –‘ ‡ƒ
Š ‘ˆ –Ї ƒ–‹˜‡ ‡”‹
ƒ –”‹„‡• ™‹–Š‹ –Ї ‰‡‘‰”ƒ’Š‹

ƒ”‡ƒ ƒ• ‹†‡–‹ˆ‹‡† „› –Ї 
 ሺ•‡‡ ’’‡†‹š ሻǤ Ї އ––‡”• ‹
Ž—†‡† ƒ ”‘Œ‡
– †‡•
”‹’–‹‘
ƒ† Ž‘
ƒ–‹‘ ƒ’•Ǥ ‡ ”‡•’‘•‡ Šƒ• „‡‡ ”‡
‡‹˜‡† ˆ”‘ –Ї ƒ„އ ‘—–ƒ‹ ƒ
Ї”‹ƒǡ
†‡
Ž‹‹‰
‘•—Ž–ƒ–‹‘Ǥ
’‘ ƒ› ‰”‘—†Ǧ„”‡ƒ‹‰ ƒ
–‹˜‹–›ǡ –Ї”‡ ‹• –Ї ’‘••‹„‹Ž‹–› ‘ˆ —
‘˜‡”‹‰ ƒ ‘„Œ‡
– ‘ˆ
—Ž–—”ƒŽ
˜ƒŽ—‡Ǥ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• Ǧͳ –Š”‘—‰Š Ǧ͵ •ŠƒŽŽ „‡ ‹’އ‡–‡† ‹ˆ ƒ› ƒ”–‹ˆƒ –• ‘”
Š—ƒ ”‡ƒ‹• ƒ”‡ †‹•
‘˜‡”‡†Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ–
‹’ƒ
– ™‹–Š ‹–‹‰ƒ–‹‘ ‹
‘”’‘”ƒ–‡†Ǥ

MITIGATION MEASURE(S)

’އ‡–ƒ–‹‘ ‘ˆ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• Ǧͳ –Š”‘—‰Š Ǧ͵Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‹– ‘
‘” ‘ ƒ– –  ‹ ” ‹– ‹‰ƒ–‹ ’ ‡†Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳͺƒሺ‹‹ሻ Ȃ ‘—ކ –Ї ”‘Œ‡
–
ƒ—•‡ ƒ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡
Šƒ‰‡ ‹ –Ї
•‹‰‹ˆ‹
ƒ
‡ ‘ˆ ƒ –”‹„ƒŽ
—Ž–—”ƒŽ ”‡•‘—”
‡ǡ †‡ˆ‹‡† ‹ —„Ž‹
‡•‘—”
‡• ‘†‡ ‡
–‹‘ ʹͳͲ͹Ͷ ƒ•
‡‹–Ї” ƒ •‹–‡ǡ ˆ‡ƒ–—”‡ǡ ’Žƒ
‡ǡ
—Ž–—”ƒŽ Žƒ†•
ƒ’‡ –Šƒ– ‹• ‰‡‘‰”ƒ’Š‹
ƒŽŽ› †‡ˆ‹‡† ‹ –‡”• ‘ˆ –Ї
•‹œ‡ ƒ† •
‘’‡ ‘ˆ –Ї Žƒ†•
ƒ’‡ǡ •ƒ
”‡† ’Žƒ
‡ǡ ‘” ‘„Œ‡
– ™‹–Š
—Ž–—”ƒŽ ˜ƒŽ—‡ –‘ ƒ ƒŽ‹ˆ‘”‹ƒ
ƒ–‹˜‡ ‡”‹
ƒ –”‹„‡ǡ ƒ† –Šƒ– ‹• Ȃ ƒ ”‡•‘—”
‡ †‡–‡”‹‡† „› –Ї ‡ƒ† ‰‡
›ǡ ‹ ‹–•
†‹•
”‡–‹‘ ƒ† •—’’‘”–‡† „› •—„•–ƒ–‹ƒŽ ‡˜‹†‡
‡ǡ –‘ „‡ •‹‰‹ˆ‹
ƒ– ’—”•—ƒ– –‘ ‹– •‡–
ˆ‘” ‹ •—„†‹˜‹•‹‘ ሺ
ሻ ‘ˆ —„Ž‹
‡•‘—”
‡• ‘†‡ ‡
–‹‘ ͷͲʹͶǤͳǤ
 ƒ’’Ž›‹‰ –Ї

”

”‹–
‡”‹ƒ
‡”‹ƒ •‡–
ˆ‘”
–Š
–Š ‹ •—„†‹˜‹•‹‘ ሺ
ሻ ‘ˆ —„Ž‹
‡•‘—”
‡• ‘†‡ ‡
–‹‘ ͷͲʹͶǤͳǡ –Ї ‡ƒ† ‰‡
› •ŠƒŽŽ

‘•‹†‡” –Ї •‹‰‹ˆ‹
ƒ
‡ ‘ˆ –Ї ”‡•‘—”
‡ –‘ ƒ ƒŽ‹ˆ‘”‹ƒ ƒ–‹˜‡ ‡”‹
ƒ –”
‡‡ †‹•
—••‹‘ ˆ‘”
’ƒ
–• ͓͵ǤͶǤͷƒ –Š”‘—‰Š͓͵ǤͶǤͷ
ƒ†
’ƒ
– ͓͵ǤͶǤͳͺƒሺ‹ሻ
‹„‡Ǥ
ƒ„‘˜‡Ǥ

MITIGATION MEASURE(S)

’އ‡–ƒ–‹‘ ‘ˆ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• Ǧͳ –Š”‘—‰Š Ǧ͵Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ ™ Š ‹– ‘
‘” ‘ ƒ– –  ‹ ” ‹– ‹‰ƒ–‹ ’ ‡†Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-111

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.19 - UTILITIES AND SERVICE SYSTEMS
‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ ‡“ ‹”‡ ‡•—Ž ‹ Ї ‡Ž‘
ƒ–‹‘

‘•–”—
–‹‘ ‘ˆ ‡™ ‘” ‡š’ƒ†‡† ™ƒ–‡”ǡ
™ƒ•–‡™ƒ–‡” –”‡ƒ–‡–ǡ ‘” •–‘”™ƒ–‡”
†”ƒ‹ƒ‰‡ǡ ‡Ž‡
–”‹
’‘™‡”ǡ ƒ–—”ƒŽ ‰ƒ•ǡ ‘”
–‡Ž‡
‘—‹
ƒ–‹‘• ˆƒ
‹Ž‹–‹‡•ǡ –Ї

‘•–”—
–‹‘ ‘” ”‡Ž‘
ƒ–‹‘ ‘ˆ ™Š‹
Š
‘—ކ

ƒ—•‡ •‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‡ˆˆ‡
–•ǫ
„Ǥ
ƒ˜‡ •—ˆˆ‹
‹‡ ™ƒ–‡” •—’’Ž‹‡• ƒ˜ƒ‹Žƒ„އ
•‡”˜‡ –Ї ”‘Œ‡
– ƒ† ”‡ƒ•‘ƒ„Ž› ˆ‘”‡•‡‡ƒ„އ
ˆ—–—”‡ †‡˜‡Ž‘’‡– †—”‹‰ ‘”ƒŽǡ †”› ƒ†
—Ž–‹’އ †”› ›‡ƒ”•ǫ

Ǥ ‡•—Ž– ‹ ƒ †‡–‡”‹ƒ–‹‘ „› Ї ƒ•–‡™ƒ–‡”
–”‡ƒ–‡– ’”‘˜‹†‡” –Šƒ– •‡”˜‡• ‘” ƒ› •‡”˜‡
–Ї ”‘Œ‡
– –Šƒ– ‹– Šƒ• ƒ†‡“—ƒ–‡
ƒ’ƒ
‹–› –‘
•‡”˜‡ –Ї ”‘Œ‡
–ǯ• ”‘Œ‡
–‡† †‡ƒ† ‹
ƒ††‹–‹‘ –‘ –Ї ’”‘˜‹†‡”ǯ• ‡š‹•–‹‰

‘‹–‡–•ǫ
†Ǥ ‡ ‡”ƒ–‡ •‘Ž‹† ƒ•–‡ ‹ ‡š
‡•• –ƒ–‡
Ž‘
ƒŽ •–ƒ†ƒ”†•ǡ ‘” ‹ ‡š
‡•• ‘ˆ –Ї
ƒ’ƒ
‹–› ‘ˆ
Ž‘
ƒŽ ‹ˆ”ƒ•–”—
–—”‡ǡ ‘” ‘–Ї”™‹•‡ ‹’ƒ‹” –Ї
ƒ––ƒ‹‡– ‘ˆ •‘Ž‹† ™ƒ•–‡ ”‡†—
–‹‘ ‰‘ƒŽ•ǫ
‡Ǥ ‘’Ž› ‹–Š ˆ‡†‡”ƒŽǡ •–ƒ–‡ǡ ƒ† Ž‘
ƒŽ
ƒƒ‰‡‡– † ”‡†—
–‹‘ •–ƒ–—–‡• ƒ†
”‡‰—Žƒ–‹‘• ”‡Ž
ƒ
ƒ–‡† –‘ •‘Ž‹† ™ƒ•–‡ǫ
Discussion

’ƒ
– ͓͵ǤͶǤͳͻƒ Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡“—‹”‡ ‘” ”‡•—Ž– ‹ –Ї ”‡Ž‘
ƒ–‹‘ ‘”
‘•–”—
–‹‘ ‘ˆ
‡™ ‘” ‡š’ƒ†‡† ™ƒ–‡”ǡ ™ƒ•–‡™ƒ–‡” –”‡ƒ–‡–ǡ ‘” •–‘”™ƒ–‡” †”ƒ‹ƒ‰‡ǡ ‡Ž‡ –”‹
’‘™‡”ǡ
ƒ–—”ƒŽ ‰ƒ•ǡ ‘” –‡Ž‡
‘—‹
ƒ–‹‘• ˆƒ
‹Ž‹–‹‡•ǡ –Ї
‘•–”—
–‹‘ ‘” ”‡Ž‘
ƒ–‹‘ ‘ˆ ™Š‹
Š
‘—ކ

ƒ—•‡ •‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‡ˆˆ‡
–•ǫ
Wastewater
ƒ•–‡™ƒ–‡” •‡™ƒ‰‡ •‡”˜‹
‡• ˆ‘” –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ „‡ ’”‘˜‹†‡† „› –Ї ‹–› ‘ˆ

‡‡†Ž‡›Ǥ Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ
‘‡
– –‘ –

‹ˆ”ƒ•–”—
–—”‡Ǥ ƒ•–‡™ƒ–‡” ˆ”‘ –Ї ”‘Œ‡
– •‹–‡ ™‘—ކ „
Ї ‡š‹•–‹‰ ™ƒ•–‡™ƒ–‡” •‡”˜‹
‡

‘ŽŽ‡
” ’‘” ‘ Š
VTSM 6497 – Westhaven 2 Project
‹–› ‘ˆ ‡‡†Ž‡› ™ƒ•–‡™ƒ–‡” –”‡ƒ–‡– ’Žƒ– ሺሻ
‡ ‡† ƒ†– –
Ǥ Ї  Šƒ• ƒ –”
ƒ•
‡ƒ–
‡† ‡
August 2025
– – –
‡–
ƒ’ƒ
‹–›
City of Reedley Page 3-112
Initial Study
‘ˆ –‘ ͹ǤͲ ‹ŽŽ‹‘ ‰ƒŽŽ‘• ’‡” †ƒ› ሺ‰†ሻǤ ‘ •‹‰‹ˆ‹
ƒ– ‹
”‡ƒ•‡ ‹ ™ƒ•–‡™ƒ–‡” ˆŽ‘™• ‹•
ƒ–‹
‹’ƒ–‡† ƒ• ƒ ”‡•—Ž– ‘ˆ
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡• ‘ –Ї ”‘Œ‡
– •‹–‡Ǥ ƒ‹–ƒ”› •‡”˜‹
‡• †—”‹‰

‘•–”—
–‹‘ ™‘—ކ „‡ ’”‘˜‹†‡† „› ’‘”–ƒ„އ –‘‹Ž‡– ˆƒ
‹Ž‹–‹‡•ǡ ™Š‹
Š –”ƒ•’‘”– ™ƒ•–‡ ‘ˆˆǦ•‹–‡
ˆ‘” –”‡ƒ–‡– ƒ† †‹•’‘•ƒŽǤ ƒ•‡† ‘ ‡•–‹ƒ–‡† ™ƒ–‡”
‘•—’–‹‘ ˆ‘” –Ї ”‘Œ‡
–ǡ
™ƒ•–‡™ƒ–‡” ‰‡‡”ƒ–‹‘ ‹• ‡•–‹ƒ–‡† –‘ „‡ ͳͷ͸ ‰ƒŽŽ‘• ’‡” ƒ’‹–ƒȀ†ƒ› ‘ ƒ˜‡”ƒ‰‡Ǥ ƒ•‡† ‘
–Ї
ƒ’ƒ
‹–› ‘ˆ ‡š‹•–‹‰ ‹ˆ”ƒ•–”—
–—”‡ǡ ™ƒ•–‡™ƒ–‡” ‰‡‡”ƒ–‹‘ ƒ••‘
‹ƒ–‡† ™‹–Š –Ї ’”‘’‘•‡†
”‘Œ‡
– ‹• ‘– ƒ–‹
‹’ƒ–‡† –‘ ‡š
‡‡† ™ƒ•–‡™ƒ–‡” –”‡ƒ–‡– ”‡“—‹”‡‡–• ‘” ‡š
‡‡† –Ї
ƒ˜ƒ‹Žƒ„އ
ƒ’ƒ
‹–› –‘ ƒ

‘‘†ƒ–‡ –Ї ‹
”‡ƒ•‡† ™ƒ•–‡™ƒ–‡” ˆŽ‘™• ˆ”‘ –Ї ’”‘’‘•‡†
”‘Œ‡
–Ǥ Ї ”‘Œ‡
– ™‘—ކ „‡ ƒ†‡“—ƒ–‡Ž› •‡”˜‡† „› –Ї
ƒ’ƒ
‹–› ƒ† –Ї ‡š‹•–‹‰ ™ƒ•–‡™ƒ–‡”

‘˜‡›ƒ
‡ •›•–‡Ǥ Ї ”‘Œ‡
– ƒ’’Ž‹
ƒ– ™‘—ކ „‡ ”‡“—‹”‡† –‘
‘˜‡” ’ƒ›‡– ‘ˆ ƒ›
ƒ’’Ž‹
ƒ„އ
‘‡
–‹‘
Šƒ”‰‡• ƒ†Ȁ‘” ˆ‡‡• ƒ† ‡š–‡•‹‘ ‘ˆ •‡”˜‹
‡• ‹ ƒ ƒ‡” –Šƒ– ‹•

‘’Ž‹ƒ– ™‹–Š –Ї ‹–›ǯ• •–ƒ†ƒ”†•ǡ •’‡
‹ˆ‹
ƒ–‹‘•ǡ ƒ† ’‘Ž‹
‹‡•Ǥ • •—
Šǡ –Ї ’”‘’‘•‡†
”‘Œ‡
– ™‘—ކ ‘– ‡
‡••‹–ƒ–‡ ‡™ ‘” ‡š’ƒ†‡† ™ƒ•–‡™ƒ–‡” ˆƒ
‹Ž‹–‹‡•ǡ –Ї ‹–› ™‘—ކ „‡ ƒ„އ
–‘ ƒ

‘‘†ƒ–‡ –Ї ‹
”‡ƒ•‡† †‡ƒ† ˆ‘” ™ƒ•–‡™ƒ–‡” •‡”˜‹
‡•ǡ ƒ† ‹’ƒ
–• ™‘—ކ „‡ އ••
–Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
Stormwater
Ї ”‘Œ‡
– ’”‘’‘•‡• –Ї †‡˜‡Ž‘’‡– ‘ˆ ƒ ‡™ ͳ͸͸ǦŽ‘– •‹‰Ž‡Ǧˆƒ‹Ž› ”‡•‹†‡–‹ƒŽ †‡˜‡Ž‘’‡–Ǥ Ї ’”‘’‘•‡† †‡˜‡Ž‘’‡– ™‘—ކ ‹
Ž—†‡ –Ї —•‡ ‘ˆ ƒ –™‘Ǧƒ
”‡ ‘Ǧ•‹–‡
•–‘”™ƒ–‡” „ƒ•‹ –Šƒ– ™‘—ކ ƒ‹–ƒ‹ •–‘”™ƒ–‡” ‘ •‹–‡ ƒ† ƒŽŽ‘™ ™ƒ–‡” –‘ ’‡” ‘Žƒ–‡ „ƒ

‹–‘ –Ї —†‡”Ž›‹‰ ƒ“—‹ˆ‡”ǡ ™Š‹
Š ™‘—ކ ”‡†—
‡ ’‘–‡–‹ƒŽ •–”ƒ‹ ‘ ‹–› ‹ˆ”ƒ•–”—
–—”‡ ƒ†
”‘Œ‡
– ‹’ƒ
–• ƒ”‡ ƒ–‹
‹’ƒ–‡† –‘ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
Water
• ‘–‡† ‹
’ƒ
– ͓͵ǤͶǤͳͲ„ǡ ™ƒ–‡” ‡‡†‡† ˆ‘”
‘•–”—
–‹‘ ™‹ŽŽ „‡ ‘„–ƒ‹‡† ˆ”‘ –Ї ‹–›ǡ
™Š‹
Š ‘„–ƒ‹• ‰”‘—†™ƒ–‡” ˆ”‘ ™‡ŽŽ• Ž‘
ƒ–‡† ‘ Žƒ† ™‹–Š‹ –Ї ‹–›Ǥ Ї
—””‡– ™ƒ–‡”
†‹•–”‹„—–‹‘ •›•–‡ ‹• ƒ†Œƒ
‡– –‘ –Ї ”‘Œ‡
– •‹–‡Ǥ Ї
‘•–”—
–‹‘ ’”‘
‡•• ‹• ‡•–‹ƒ–‡† –‘
–ƒ‡ ƒ’’”‘š‹ƒ–‡Ž› Ͷͺ ‘–Š•Ǥ ‘•–”—
–‹‘ ™ƒ–‡” †‡ƒ†• ƒ”‡ ‡•–‹ƒ–‡† –‘ „‡
ƒ’’”‘š‹ƒ–‡Ž› ʹʹͷ ‰’†Ȁƒ
”‡ ˆ‘” –Ї †—”ƒ–‹‘ ‘ˆ
‘•–”—
–‹‘ ‘” ͳʹǤʹͳ ƒ
”‡Ǧˆ‡‡–ǡ ™Š‹
Š ‹•
‡“—‹˜ƒŽ‡– –‘ ƒ’’”‘š‹ƒ–‡Ž› ͵ǡͻ͹ͺǡͲͲͲ ‰ƒŽŽ‘•Ǥ ‘––އ† †”‹‹‰ ™ƒ–‡” ™‹ŽŽ „‡ ’”‘˜‹†‡† ˆ‘”

”‡™• †—”‹‰
‘•–”—
–‹‘ ƒ
–‹˜‹–‹‡•Ǥ

‹–‹ƒŽ
‘•–”—
–‹‘ ™ƒ–‡” —•ƒ‰‡ ™‹ŽŽ „‡ ‹ •—’’‘”– ‘ˆ •‹–‡ ’”‡’ƒ”ƒ–‹‘ ƒ† ‰”ƒ†‹‰ ƒ –‹˜‹–‹‡•Ǥ
—”‹‰ ‡ƒ”–Š™‘” ˆ‘” ‰”ƒ†‹‰ ‘ˆ ƒ

‡•• ”‘ƒ† ˆ‘—†ƒ–‹‘•ǡ „—‹Ž†‹‰ ˆ‘—†ƒ–‹‘•ǡ ƒ† ”‘Œ‡
–

‘’‘‡–•ǡ –Ї ’”‹
‹’ƒŽ —•‡ ‘ˆ ™ƒ–‡” ™‘—ކ „‡ ˆ‘”
‘’ƒ
–‹‘ ƒ† †—•–
‘–”‘ŽǤ ƒŽŽ‡”
“—ƒ–‹–‹‡• ™‘—ކ „‡ ”‡“—‹”‡† ˆ‘” –Ї ’”‡’ƒ”ƒ–‹‘ ‘ˆ –Ї ‘
”‡–‡ ”‡“—‹”‡† ˆ‘” ˆ‘—†ƒ–‹‘•
ƒ† ‘–Ї” ‹‘” —•‡•Ǥ ˆ–‡” –Ї ‡ƒ”–Š™‘” ƒ
–‹˜‹–‹‡•ǡ ™ƒ–‡” ™‹ŽŽ „‡ —•‡† ˆ‘” †—•– •—’’”‡••‹‘
ƒ† ‘”ƒŽ
‘•–”—
–‹‘ ™ƒ–‡” ”‡“—‹”‡‡–• –Šƒ– ƒ”‡ ƒ••‘
‹ƒ–‡† ™‹–Š –Ї
‘•–”—
–‹‘ ‘ˆ
–Ї „—‹Ž†‹‰•ǡ ‹–‡”ƒŽ ƒ

‡•• ”‘ƒ†•ǡ ƒ† ”‡˜‡‰‡–ƒ–‹‘Ǥ
Ї Ž‘‰Ǧ–‡” ƒ˜‡”ƒ‰‡ †ƒ› ‘’‡”ƒ–‹‘ƒŽ ™ƒ–‡” †‡ƒ† ™‹ŽŽ „‡ ˆ‘” –Ї ”‡•‹†‡–‹ƒŽ —•‡”• ƒ† ‹• ƒ–‹
‹’ƒ–‡† –‘ „‡ ƒ’’”‘š‹ƒ–‡Ž› ͵ͷǤͲͺ ‹ŽŽ‹‘ ‰ƒŽŽ‘• ’‡” ›‡ƒ” ‘” ͳͲ͹Ǥ͸Ͷ ƒ ”‡Ǧˆ‡‡– ’‡” ›‡ƒ”
ˆ‘” –Ї –‘–ƒŽ „—‹Ž† ‘—– ‘ˆ –Ї ”‘Œ‡
–Ǥ Š‹• ‹• „ƒ•‡† ‘ ‡ƒ
Š ”‡•‹†‡–‹ƒŽ —‹– Šƒ˜‹‰ ƒ ƒ˜‡”ƒ‰‡
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-113

Initial Study
†ƒ› ™ƒ–‡” †‡ƒ† ‘ˆ ͷͶ͸ ‰ƒŽŽ‘• ’‡” †ƒ› ƒ
”‘•• –Ї ‡–‹”‡ „—‹Ž†‘—– ‘ˆ ͳ͹͸ —‹–• ˆ‘” –Ї
”‘Œ‡
–Ǥ
• †‡–‡”‹‡† ‹
’ƒ
– ͓͵ǤͶǤͳͲ„ǡ –Ї ™ƒ–‡” ƒ˜ƒ‹Žƒ„‹Ž‹–› †‡–‡”‹‡† ‹ –Ї ǡ ™ƒ–‡” •—’’Ž› ƒ† †‡ƒ† —†‡” ƒ ‘”ƒŽ ›‡ƒ”ǡ ƒ •‹‰Ž‡ †”› ›‡ƒ”ǡ ƒ† —Ž–‹’އ †”› ›‡ƒ” • ‡ƒ”‹‘•
™‘—ކ „‡ ƒ†‡“—ƒ–‡ –‘ •—’’Ž› –Ї ‹–›ǯ• ‡‡†•Ǥ —” –Ї”‘”‡ǡ –Ї †‡˜‡Ž‘’‡– ‘ˆ –Ї ”‘Œ‡ –
™‘—ކ ‘– ”‡“—‹”‡ –Ї ”‡Ž‘
ƒ–‹‘ ‘”
‘•–”—
–‹‘ ‘ˆ ‡™ —–‹Ž‹–› ‹ˆ”ƒ•–”—
–—”‡ǡ ™Š‹
Š
‘—ކ

ƒ—•‡ ƒ •‹‰‹ˆ‹
ƒ– ‡˜‹”‘‡–ƒŽ ‡ˆˆ‡
–Ǥ • •—
Šǡ ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
Electricity and Telecommunications
އ
–”‹
‹–› •‡”˜‹
‡• ™‘—ކ „‡ ’”‘˜‹†‡† „› –Ї ƒ
‹ˆ‹
ƒ• ƒ† އ
–”‹
‘’ƒ› ሺ
Ƭሻ ƒ†
™‘—ކ „‡ •—’’Ž‹‡† –Š”‘—‰Š
‘‡
–‹‘• –‘ ‡š‹•–‹‰ •‡”˜‹
‡ ‹ˆ”ƒ•–”—
–—”‡Ǥ
‡Ž‡
‘—‹
ƒ–‹‘ •‡”˜‹
‡• ˆ‘” –Ї ”‘Œ‡
– ™‘—ކ „‡ ’”‘˜‹†‡† „› ‡‹–Ї” Ƭ ‘” ‘
ƒ•–Ǥ
އ
–”‹
’‘™‡” ƒ† –‡Ž‡
‘—‹
ƒ–‹‘ ˆƒ
‹Ž‹–‹‡• ™‘—ކ ”‡“—‹”‡
‘‡
–‹‘• –‘ –Ї ”‘Œ‡
–
•‹–‡Ǥ
‘™‡˜‡”ǡ „‡
ƒ—•‡ –Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ™‹–Š‹ ƒ —”„ƒ‹œ‡† ƒ”‡ƒ ™‹–Š ‡š‹•–‹‰
ˆƒ
‹Ž‹–‹‡• ‹
Ž‘•‡ ’”‘š‹‹–›ǡ
‘‡
–‹‘ –‘ –Ї•‡ ˆƒ
‹Ž‹–‹‡• ™‘—ކ ‘–
ƒ—•‡ •‹‰‹ˆ‹
ƒ–
‡˜‹”‘‡–ƒŽ ‡ˆˆ‡
–•Ǥ • ƒ ”‡•—Ž–ǡ –Ї ”‘Œ‡
– ™‘—ކ ”‡•—Ž– ‹ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–
”‡Žƒ–‡† –‘ –Ї ”‡Ž‘
ƒ–‹‘ ‘”
‘•–”—
–‹‘ ‘ˆ ‡™ ‘” ‡š’ƒ†‡† —–‹Ž‹–‹‡•Ǥ
Natural Gas
‘—–Ї” ƒŽ‹ˆ‘”‹ƒ ƒ• ‘’ƒ› ሺ‘ƒŽ ƒ•ሻ ‹• –Ї ƒ”‡ƒ ’”‘˜‹†‡” ‘ˆ ƒ–—”ƒŽ ‰ƒ• ሺ‘—–Ї” ƒŽ‹ˆ‘”‹ƒ ƒ• ‘’ƒ› ʹͲʹͷሻǤǤ
‘™‡˜‡”ǡ –Ї ”‘Œ‡
– ™‹ŽŽ —–‹Ž‹œ‡ ƒŽŽ ‡Ž‡
–”‹
ƒ’’Ž‹ƒ
‡•ǡ ƒ†
‘ ƒ–—”ƒŽ ‰ƒ• ™‹ŽŽ „‡ ‡‡†‡†Ǥ Ї”‡ ™‘—ކ „‡ ‘ ”‘Œ‡
– ‹’ƒ
–• ƒ–‹
‹’ƒ–‡† ”‡Žƒ–‡† –‘
ƒ–—”ƒŽ ‰ƒ• —•ƒ‰‡Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ Ǥ–

’ƒ
’ƒ
– ͓͵ǤͶǤͳͻ„ Ȃ ‘—ކ –Ї ”‘Œ‡
– Šƒ˜‡ •—ˆˆ‹
‹‡– ™ƒ–‡” •—’’Ž‹‡• ƒ˜ƒ‹Žƒ„އ –‘ •‡”˜‡ –Ї
”‘Œ‡
– ƒ† ”‡ƒ•‘ƒ„Ž› ˆ‘”‡•‡‡ƒ„އ ˆ—–—”‡ †‡˜‡Ž‘’‡– †—”‹‰ ‘”ƒŽǡ †”›ǡ ƒ† —Ž–‹’އ †”› ›‡ƒ”•ǫ
• ‘–‡† ‹
’ƒ
– ͓͵ǤͶǤͳͲ„ǡ –Ї  ‹†‹
ƒ–‡• –Ї ‹–› †‘‡• ‘– ‡š’‡
– –‘ Šƒ˜‡ ƒ ™ƒ–‡”
•—’’Ž› •Š‘”–ƒ‰‡ –Š”‘—‰Š ʹͲͶͷ —†‡” ‘”ƒŽ ‘” —†‡” †”‘—‰Š– ‘†‹–‹‘•Ǥ Ї ‹–›ǯ• ‘˜‡”ƒŽŽ
™ƒ–‡” •—’’Ž‹‡• ሺ™‡ŽŽ•ሻ ƒ”‡ ”‡•‹Ž‹‡– –‘ ™ƒ–‡” †”‘—‰Š–• ƒ† –‘ ™ƒ–‡” “—ƒŽ‹–› ‹••—‡•Ǥ Ї  ’”‡’ƒ”‡† ˆ‘” –Ї ”‘Œ‡
– Šƒ• ’”‘˜‹†‡† –Ї †ƒ–ƒ ƒ† ƒƒŽ›•‹• ‡‡†‡† –‘ ˜‡”‹ˆ› –Šƒ– ƒ •—ˆˆ‹ ‹‡–
”‘Œ‡
– •—’’Ž› ‹• ’Š›•‹
ƒŽŽ› ƒ˜ƒ‹Žƒ„އǡ ƒ† –Šƒ– –Ї ”‘Œ‡
– ™ƒ–‡” •—’’Ž› ‹• ‹
ƒ

‘”†ƒ
‡ ™‹–Š  ͸ͳͲǯ• ‘”ƒŽ ›‡ƒ”Ȁ†”› ›‡ƒ”Ȁ—Ž–‹’އ †”› ›‡ƒ” ”‡“—‹”‡‡–•Ǥ Ї ”‘Œ‡
–
™ƒ–‡”
™ƒ–‡” †‡ƒ† ‹• ’”‘Œ‡
–‡† –‘ ‹
”‡ƒ•‡ „› ͵ͷǤͲͺ 
ƒ† ‹• ƒ’’”‘š‹ƒ–‡Ž› ͳǤʹͷ
’‡”
‡– ‘ˆ –Ї ‹–›ǯ• ƒ˜ƒ‹Žƒ„އ ™ƒ–‡” •—’’Ž›Ǥ Ї”‡ˆ‘”‡ǡ
‘’Ž‹ƒ
‡ ™‹–Š ‡š‹•–‹‰ ”‡‰—Žƒ–‹‘•
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-114
Initial Study
ƒ† ™‹–Š  ”‡
‘‡†ƒ–‹‘• ƒ† ˆ‹†‹‰• ™‹ŽŽ ‡•—”‡ –Ї ”‡•—Ž–ƒ– އ˜‡Ž ‘ˆ ‹’ƒ –
ˆ”‘ †‡˜‡Ž‘’‡– ‘ˆ –Ї ”‘Œ‡
– ™‘—ކ „‡ ƒ‹–ƒ‹‡† ƒ– ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– އ˜‡ŽǤ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳͻ
Ȃ ‘—ކ –Ї ”‘Œ‡
– ”‡•—Ž– ‹ ƒ †‡–‡”‹ƒ–‹‘ „› –Ї ™ƒ•–‡™ƒ–‡” –”‡ƒ–‡– ’”‘˜‹†‡” –Šƒ– •‡”˜‡• ‘” ƒ› •‡”˜‡ –Ї ”‘Œ‡
– –Šƒ– ‹– Šƒ• ƒ†‡“—ƒ–‡
ƒ’ƒ
‹–› –‘ •‡”˜‡ –Ї
”‘Œ‡
–ǯ• ”‘Œ‡
–‡† †‡ƒ† ‹ ƒ††‹–‹‘ –‘ –Ї ’”‘˜‹†‡”ǯ• ‡š‹•–‹‰
‘‹–‡–•ǫ
‡‡
’ƒ
– ͓͵ǤͶǤͳͻƒ ƒ„‘˜‡Ǥ
ƒ•–‡™ƒ–‡” ‰‡‡”ƒ–‹‘ ƒ••‘
‹ƒ–‡† ™‹–Š –Ї ”‘Œ‡
– ‹• ‘– ƒ–‹
‹’ƒ–‡† –‘ ‡š
‡‡† ™ƒ•–‡™ƒ–‡”
–”‡ƒ–‡– ”‡“—‹”‡‡–• ‘” ‡š
‡‡† –Ї ƒ˜ƒ‹Žƒ„އ
ƒ’ƒ
‹–› –‘ ƒ

‘‘†ƒ–‡ –Ї ‹
”‡ƒ•‡†
™ƒ•–‡™ƒ–‡” ˆŽ‘™• ˆ”‘ –Ї ’”‘’‘•‡† ”‘Œ‡
–Ǥ Ї ”‘Œ‡
– ™‘—ކ „‡ ƒ†‡“—ƒ–‡Ž› •‡”˜‡† „› –Ї

ƒ’ƒ
‹–› ƒ† –Ї ‡š‹•–‹‰ ™ƒ•–‡™ƒ–‡”
‘˜‡›ƒ
‡ •›•–‡Ǥ ††‹–‹‘ƒŽŽ›ǡ –Ї ”‘Œ‡
– ‹• ‘–
‡š’‡
–‡† –‘ ‡š
‡‡† ™ƒ•–‡™ƒ–‡” –”‡ƒ–‡– ”‡“—‹”

—ƒŽ‹–› ‘–”‘Ž ‘ƒ”†Ǥ ‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ
‡‡–• ‘ˆ –Ї ‡–”ƒŽ ƒŽŽ‡› ‡‰‹‘ƒŽ ƒ–‡”

 ƒ††‹–‹‘ǡ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ „‡

•—„Œ‡
– –‘ –Ї ’ƒ›‡– ‘ˆ ƒ› ƒ’’Ž‹
ƒ„އ
‘‡
–‹‘
Šƒ”‰‡• ƒ†Ȁ‘” ˆ‡‡• ƒ† ‡š–‡•‹‘ ‘ˆ

•‡”˜‹
‡• ‹ ƒ ƒ‡” –Šƒ– ‹•
‘’Ž‹ƒ– ™‹–Š –Ї ‹–›ǯ• •–ƒ†ƒ”†•ǡ •’‡
‹ˆ‹
ƒ–‹‘•ǡ ƒ† ’‘Ž‹
‹‡•Ǥ

• •—
Šǡ ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ ‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳͻ† Ȃ ‘—ކ ”‘Œ‡
– ‰‡‡”ƒ–‡ •‘Ž‹† ™ƒ•–‡ ‹ ‡š
‡•• ‘ˆ –ƒ–‡ ‘” Ž‘
ƒŽ
•–ƒ†ƒ”†•ǡ ‘” ‹ ‡š
‡•• ‘ˆ
–Ї
–Ї
ƒ’ƒ
‹–› ‘ˆ Ž‘
ƒŽ ‹ˆ”ƒ•–”—
–—”‡ǡ ‘” ‘–Ї”™‹•‡ ‹’ƒ‹” –Ї
ƒ––ƒ‹‡– ‘ˆ •‘Ž‹† ™ƒ•–‡ ”‡†—
–‹‘ ‰‘ƒŽ•ǫ
—”‹‰
‘•–”—
–‹‘ǡ †‡„”‹• ƒ† ™ƒ•–‡ ‰‡‡”ƒ–‡† –Šƒ– ƒ”‡ ‘– ƒ–‹
‹’ƒ–‡† –‘
‘–ƒ‹
Šƒœƒ”†‘—• ƒ–‡”‹ƒŽ• ™‘—ކ „‡ †‹•’‘•‡† ‘ˆ „› Ž‹
‡•‡† ™ƒ•–‡ Šƒ—އ”• ƒ– –Ї ƒ’’”‘’”‹ƒ–‡
Žƒ†ˆ‹ŽŽǤ

‡
‘•–”—
–‡†ǡ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ’”‘†—
‡ –›’‹
ƒŽ —‹
‹’ƒŽ ”‡ˆ—•‡ ‰‡‡”ƒ–‡†
„› ”‡•‹†‡–‹ƒŽ —•‡•Ǥ ƒ•–‡ ™‘—ކ „‡ ’Žƒ
‡† ‹
‘˜‡”‡† †—’•–‡”• ƒ† ”‡‘˜‡† ‘ ƒ ”‡‰—Žƒ”
„ƒ•‹• ˆ‘” †‹•’‘•ƒŽ „› –Ї
‡”–‹ˆ‹‡† ™ ǦŠƒ†Ž‹‰
‘–”ƒ
–‘” –Šƒ– •‡”˜‹
‡• –Ї ‹–›Ǥ ‹† ƒŽŽ‡›
‹•’‘•ƒŽ ™‘—ކ –ƒ‡ Š‘—•‡Š‘ކ ™
ƒ•–‡
ƒ•–‡ –‘ –Ї ‡”‹
ƒ ˜‡—‡ Žƒ†ˆ‹ŽŽ •‹–‡ǡ ƒ Žƒ••

Žƒ†ˆ‹ŽŽǤ
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-115
Initial Study
Ї ‡”‹
ƒ ˜‡—‡ ƒ†ˆ‹ŽŽ ሺ‹Ǥ‡Ǥǡ ‡”‹
ƒ ˜‡—‡ ‹•’‘•ƒŽ ‹–‡ ͳͲǦǦͲͲͲͻሻ Šƒ• ƒ
ƒš‹— ’‡”‹––‡†
ƒ’ƒ
‹–› ‘ˆ ͵ʹǡ͹ͲͲǡͲͲͲ
—„‹
›ƒ”†• ƒ† ƒ ”‡ƒ‹‹‰
ƒ’ƒ
‹–› ‘ˆ
ʹͻǡ͵ͷͺǡͷ͵ͷ
—„‹
›ƒ”†•ǡ ™‹–Š ƒ ‡•–‹ƒ–‡†
Ž‘•—”‡ †ƒ–‡ ‘ˆ —‰—•– ͵ͳǡ ʹͲ͵ͳǤ Ї ƒš‹—
’‡”‹––‡† –Š”‘—‰Š’—– ‹• ʹǡʹͲͲ –‘• ’‡” †ƒ› ሺƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‡•‘—” ‡• ‡
›
Ž‹‰
ƒ† ‡
‘˜‡”› ʹͲʹͷሻǤ
•‹‰ ƒ •–ƒ†ƒ”† ”‡•‹†‡–‹ƒŽ ‘’‡”ƒ–‹‘ƒŽ ™ƒ•–‡ ‰‡‡”ƒ–‹‘ ”ƒ–‡ ‘ˆ ͸Ǥ͹ ’‘—†•Ȁ”‡•‹†‡–Ȁ†ƒ›ǡ ™Š‹
Š ‹•
ƒŽ
—Žƒ–‡† —•‹‰  ͵Ͷͳǯ• ‡ƒ•—”‡‡– •›•–‡ ƒ† ƒ ”‡
›
Ž‹‰ ”ƒ–‡ ‘ˆ ͵͹ ’‡”
‡–ǡ
‘’‡”ƒ–‹‘ ‘ˆ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‰‡‡”ƒ–‡ ƒ’’”‘š‹ƒ–‡Ž› Ͷͷͻ
—„‹
›ƒ”†• ‘ˆ ™ƒ•–‡
’‡” ›‡ƒ” ሺ͸Ǥ͹ ’‘—†•Ȁ”‡•‹†‡–Ȁ†ƒ› š ͳ͹͸ ”‡•‹†‡–‹ƒŽ —‹–• š ͵ ”‡•‹†‡–• ’‡” Š‘—•‡Š‘ކ ൌ ͵ǡͷ͵͹Ǥ͸ ’‘—†•Ȁ†ƒ› Ȁ ʹǡͲͲͲ ’‘—†•Ȁ–‘ ൌ ͳǤ͹͸ –‘•Ȁ†ƒ› š ͵͸ͷ †ƒ›•Ȁ›‡ƒ” ൌ ͸Ͷʹ –‘•Ȁ›‡ƒ” Ȁ ͳǤͶ ൌ ͶͷͺǤ͸
—„‹
›ƒ”†•Ȁ›‡ƒ”ሻ ሺƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‡•‘—”
‡• ‡
›
Ž‹‰ ƒ†
‡
‘˜‡”› ʹͲͳͻሻǤ Ї ‡”‹
ƒ ˜‡—‡ †‹•’‘•ƒŽ •‹–‡ Šƒ• ƒ’’”‘š‹ƒ–‡
›ƒ”†• ‘ˆ ”‡ƒ‹‹‰
ƒ’ƒ
‹–› ƒ†ǡ –Š—•ǡ
ƒ ƒ

‘‘†ƒ–‡ –Ї ’”‘’‘•‡† ”‘Œ‡
–ǯ• ‘’‡”ƒ–‹‘ƒŽ
Ž› ʹͻǤ͵ͷ ‹ŽŽ‹‘
—„‹

•‘Ž‹† ™ƒ•–‡ ‰‡‡”ƒ–‹‘Ǥ
’ƒ
–• ˆ”‘ –Ї ”‘Œ‡
–
‘•–”—
–‹‘ ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤͳͻ‡ Ȃ ‘—ކ –Ї ”‘Œ‡
–
‘’Ž› ™‹–Š ˆ‡†‡”ƒŽǡ •–ƒ–‡ǡ ƒ† Ž‘
ƒŽ ƒƒ‰‡‡– ƒ†
”‡†—
–‹‘ •–ƒ–—–‡• ƒ† ”‡‰—Žƒ–‹‘• ”‡Žƒ–‡† –‘ •‘Ž‹† ™ƒ•–‡ǫ
‡‡ †‹•
—••‹‘ ˆ‘”
’ƒ
– ͓͵ǤͶǤͳͻ†Ǥ
Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ „‡ ”‡“—‹”‡† –‘ ’”‘˜‹†‡ •‘Ž‹† ™ƒ•–‡ ƒ† ”‡
›
Ž‹‰ •‡”˜‹
‡• ˆ‘”
”‡•‹†‡–• ’—”•—ƒ– –‘ –Ї ƒŽ‹ˆ‘”‹ƒ ‘Ž‹† ƒ•–‡ ‡—•‡ ƒ† ‡ ›
Ž‹‰ 

॥ 
– ‘ˆ ͳͻͻͳǤ
‡™ —‹
‹’ƒŽ ™ƒ•–‡ ƒ† ”‡
›
Ž‹‰ ”‡‰—Žƒ–‹‘•ǡ ’”‹ƒ”‹Ž›  ͳ͵ͺ͵ ˆ‘
—•‡• ‘ ”‡†—
‹‰
•Š‘”–ǦŽ‹˜‡†
Ž‹ƒ–‡ ’‘ŽŽ—–ƒ–•ǡ ’ƒ”–‹
—Žƒ”Ž› ‡–Šƒ‡ ˆ”‘ ‘”‰ƒ‹
™ƒ•–‡ǡ ƒ† ‹
”‡ƒ•‹‰
”‡
›
Ž‹‰ ”ƒ–‡•Ǥ ‹–› ”‡•‹†‡–• ƒ”‡ ”‡“—‹”‡† –‘ •‡’ƒ”ƒ–‡ ‘”‰ƒ‹ ™ƒ•–‡ ሺˆ‘‘† •
”ƒ’•ǡ ›ƒ”†
–”‹‹‰•ǡ ˆ‘‘†Ǧ•‘‹Ž‡† ’ƒ’‡”ǡ ‡–
Ǥሻ ˆ”‘ ‘–Ї” ™ƒ•–‡ ƒ† ‡‹–Ї” •—„•
”‹„‡ –‘
‘ŽŽ‡
–‹‘
•‡”˜‹
‡• ‘” •‡ŽˆǦŠƒ—Ž –‘ ƒ
Š‹• •‡”˜‹
‡ ™‹ŽŽ „‡
’’”‘’”‹ƒ–‡ ˆƒ
‹Ž‹–‹‡•Ǥ
’”‘˜‹†‡† „› ‹† ƒŽŽ‡› ‹•’‘•ƒŽǤ —” –Ї”‘”‡ǡ –Ї ’”‘’‘•‡† ”‘Œ‡ –
™‘—ކ „‡ ”‡“—‹”‡† –‘
‘’Ž› ™‹–Š ƒŽŽ ˆ‡†‡”ƒŽǡ •–ƒ–‡ǡ ƒ† Ž‘
ƒŽ •–ƒ–—–‡• ƒ† ”‡‰—Žƒ–‹‘• ”‡Žƒ–‡†
–‘ –Ї Šƒ†Ž‹‰ ƒ† †‹•’‘•ƒŽ ‘ˆ •‘Ž‹† ™ƒ•–‡Ǥ Ї”‡ˆ‘”‡ǡ ‹’އ‡–ƒ–‹‘ ‘ˆ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ”‡•—Ž– ‹ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-116

Initial Study

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-117

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.20 - WILDFIRE

ˆ Ž‘
ƒ–‡† ‹ ‘” ‡ƒ” •–ƒ–‡ ”‡•’‘•‹„‹Ž‹–› ƒ”‡ƒ• ‘”
Žƒ†•
Žƒ••‹ˆ‹‡† ƒ• ˜‡”› Š‹‰Š ˆ‹”‡ Šƒœƒ”† •‡˜‡”‹–›
œ‘‡•ǡ ™‘—ކ –Ї ”‘Œ‡
–ǣ
ƒǤ —„•–ƒ–‹ƒŽŽ› ‹’ƒ‹” ƒ ƒ† ’–‡† ‡‡”‰‡
›
”‡•’‘•‡ ’Žƒ ‘” ‡‡”‰‡
› ‡˜ƒ
—ƒ–‹‘ ’Žƒǫ
„Ǥ —‡ •Ž‘’‡ǡ ‡˜ƒ‹Ž‹‰ ™‹†•ǡ ƒ† –Ї
ˆƒ
–‘”•ǡ ‡šƒ
‡”„ƒ–‡ ™‹Ž†ˆ‹”‡ ”‹••ǡ ƒ† –Ї”‡„›
‡š’‘•‡ ”‘Œ‡
– ‘

—’ƒ–• –‘ǡ ’‘ŽŽ—–ƒ–

‘
‡–”ƒ–‹‘ ˆ”‘ ƒ ™‹Ž†ˆ‹”‡ ‘” –Ї
—
‘–”‘ŽŽ‡† •’”‡ƒ† ‘ˆ ƒ ™‹Ž†ˆ‹”‡ǫ

Ǥ ‡“ ‹”‡ –Ї ‹•–ƒŽŽƒ–‹‘ ƒ‹–‡ƒ
‡
ƒ••‘
‹ƒ–‡† ‹ˆ”ƒ•–”—
–—”‡ ሺ•—
Š ƒ• ”‘ƒ†•ǡ ˆ—‡Ž
„”‡ƒ•ǡ ‡‡”‰‡
› ™ƒ–‡” •‘—”
‡•ǡ ’‘™‡” Ž‹‡•
‘” ‘–Ї” —–‹Ž‹–‹‡•ሻ –Šƒ– ƒ› ‡šƒ
‡”„ƒ–‡ ˆ‹”‡ ”‹•
‘” –Šƒ– ƒ› ”‡•—Ž– ‹ –‡’‘”ƒ”› ‘” ‘‰‘‹‰
‹’ƒ
–• –‘ –Ї ‡˜‹”‘‡–ǫ
†Ǥ š’‘•‡ ’‡‘’އ •–”—
‡• •‹‰‹ˆ‹
ƒ–
”‹••ǡ ‹
Ž—†‹‰ †‘™•Ž‘’‡ ‘” †‘™•–”‡ƒ
ˆŽ‘‘†‹‰ ‘” Žƒ†•Ž‹†‡•ǡ ƒ• ƒ ”‡•—Ž– ‘ˆ ”—‘ˆˆǡ
’‘•–Ǧˆ‹”‡ •Ž‘’‡ ‹•–ƒ„‹Ž‹–›ǡ ‘” †”ƒ‹ƒ‰‡

Šƒ‰‡•ǫ
Discussion

’ƒ
– ͓͵ǤͶǤʹͲƒ Ȃ
ˆ Ž‘
ƒ–‡† ‹ ‘” ‡ƒ” •–ƒ–‡ ”‡•’‘•‹„‹Ž‹–› ƒ”‡ƒ• ‘” Žƒ†•
Žƒ••‹ˆ‹‡† ƒ• ˜‡”›
Š‹‰Š ˆ‹”‡ Šƒœƒ”† •‡˜‡”‹–› œ‘‡•ǡ ™‘—ކ –Ї ”‘Œ‡
– •—„•–ƒ–‹ƒŽŽ› ‹’ƒ‹” ƒ ƒ†‘’–‡†
‡‡”‰‡
› ”‡•’‘•‡ ’Žƒ ‘” ‡‡”‰‡
› ‡˜ƒ
—ƒ–‹‘ ’Žƒǫ
‡‡ ƒŽ•‘
’ƒ
– ͓͵ǤͶǤͻˆ ”‡‰ƒ”†‹‰ ‡‡”‰‡
› ”‡•’‘•‡Ǥ


‘”†‹‰ –‘ 
ǡ –Ї ”‘Œ‡
– •‹–‡ ‹• Ž‘
ƒ–‡† ™‹–Š‹ ƒ  œ‘‡† †‡•‹‰ƒ–‡† ƒ”‡ƒ
ሺƒŽ ‹”‡ ʹͲͲ͹ሻǤ ‹˜‡ –Š‹• †‡•‹‰ƒ–‹‘ǡ –Ї ”‘Œ‡
– •‹–‡ ‹• ‘—–•‹†‡ ‘ˆ ƒ”‡ƒ• ‹†‡–‹ˆ‹‡† „› 

 ƒ• Šƒ˜‹‰ •—„•–ƒ–‹ƒŽ ‘” ˜‡”› Š‹‰Š ™‹Ž†ˆ‹”‡ ”‹•Ǥ • ‘–‡† ’”‡˜‹‘—•Ž›ǡ –Ї ”‘Œ‡ – ™‹ŽŽ
ƒ†Š‡”‡ –‘ –Ї •–ƒ†ƒ”†• •‡– ˆ‘”–Š ‹ –Ї ‹–› —‹
‹’ƒŽ ‘†‡Ǥ Ї ”‘Œ‡
– ™‘—ކ ƒŽ•‘
‘’Ž›
™‹–Š –Ї ƒ’’”‘’”‹ƒ–‡ Ž‘
ƒŽ ƒ† –ƒ–‡ ”‡“—‹”‡‡–• ”‡‰ƒ”†‹‰ ‡‡”‰‡
› ”‡•’‘•‡ ’Žƒ• ƒ†
ƒ

‡••Ǥ Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– ‹Š‹„‹– –Ї ƒ„‹Ž‹–› ‘ˆ Ž‘
ƒŽ ”‘ƒ†™ƒ›• –‘
‘–‹—‡ –‘
ƒ

‘‘†ƒ–‡ ‡‡”‰‡
› ”‡•’‘•‡ ƒ† ‡˜ƒ
—ƒ–‹‘ ƒ
–‹˜‹–‹‡•Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-118

Initial Study
Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– ‹’ƒ‹” ‹’އ‡–ƒ–‹‘ ‘ˆ ‘” ’Š›•‹
ƒŽŽ› ‹–‡”ˆ‡”‡ ™‹–Š ƒ
ƒ†‘’–‡† ‡‡”‰‡
› ”‡•’‘•‡ ’Žƒ ‘” ‡‡”‰‡
› ‡˜ƒ
—ƒ–‹‘ ’ŽƒǤ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
–
™‘—ކ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤʹͲ„ Ȃ
ˆ Ž‘
ƒ–‡† ‹ ‘” ‡ƒ” •–ƒ–‡ ”‡•’‘•‹„‹Ž‹–› ƒ”‡ƒ• ‘” Žƒ†•
Žƒ••‹ˆ‹‡† ƒ• ˜‡”›
Š‹‰Š ˆ‹”‡ Šƒœƒ”† •‡˜‡”‹–› œ‘‡•ǡ ™‘—ކ –Ї ”‘Œ‡
–ǡ †—‡ –‘ •Ž‘’‡ǡ ’”‡˜ƒ‹Ž‹‰ ™‹†•ǡ ƒ† ‘–Ї”
ˆƒ
–‘”•ǡ ‡šƒ
‡”„ƒ–‡ ™‹Ž†ˆ‹”‡ ”‹••ǡ ƒ† –Ї”‡„› ‡š’‘•‡ ”‘Œ‡
– ‘

—’ƒ–• –‘ǡ ’‘ŽŽ—–ƒ–

‘
‡–”ƒ–‹‘ ˆ”‘ ƒ ™‹Ž†ˆ‹”‡ ‘” –Ї —
‘–”‘ŽŽ‡† •’”‡ƒ† ‘ˆ ƒ ™‹Ž†ˆ‹”‡ǫ
Ї ”‘Œ‡
– •‹–‡ ‹• ‘– Ž‘
ƒ–‡† ™‹–Š‹ ƒ –ƒ–‡ ‡•’‘•‹„‹Ž‹–› ”‡ƒ ሺሻǤ Ї ”‘Œ‡ – •‹–‡ ‹•
Ž‘
ƒ–‡† ƒ’’”‘š‹ƒ–‡Ž› ͹Ǥ͹ͷ ‹Ž‡• ‡ƒ•– ‘ˆ –Ї ‡ƒ”‡•– Ǥ Ї ”‘Œ‡ – ™‹ŽŽ ‹’އ‡– –ƒ–‡
ƒ† Ž‘
ƒŽ ˆ‹”‡
‘†‡ ”‡“—‹”‡‡–•Ǥ • •—
Šǡ –Ї ”‘Œ‡
– ™‘—ކ ‘– ‡šƒ
‡”„ƒ–‡ –Ї ”‹• ‘ˆ
‡š’‘•—”‡ ‘ˆ ”‘Œ‡
– ‘

—’ƒ–• –‘ ™‹Ž†ˆ‹”‡ ƒ† ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤʹͲ
Ȃ
ˆ Ž‘
ƒ–‡† ‹ ‘” ‡ƒ” •–ƒ–‡ ”‡•’‘•‹„‹Ž‹–› ƒ”‡ƒ• ‘” Žƒ†•
Žƒ••‹ˆ‹‡† ƒ• ˜‡”›
Š‹‰Š ˆ‹”‡ Šƒœƒ”† •‡˜‡”‹–› œ‘‡•ǡ ™‘—ކ –Ї ”‘Œ‡
– ”‡“—‹”‡ –Ї ‹•–ƒŽŽƒ–‹‘ ‘” ƒ‹–‡ƒ
‡ ‘ˆ
ƒ••‘
‹ƒ–‡† ‹ˆ”ƒ•–”—
–—”‡ ሺ•—
Š ƒ• ”‘ƒ†•ǡ ˆ—‡Ž „”‡ƒ•ǡ ‡‡”‰‡
› ™ƒ–‡” •‘—”
‡•ǡ ’‘™‡” Ž‹‡•
‘” ‘–Ї” —–‹Ž‹–‹‡•ሻ –Šƒ– ƒ› ‡šƒ
‡”„ƒ–‡ ˆ‹”‡ ”‹• ‘” –Šƒ– ƒ› ”‡•—Ž– ‹ –‡’‘”ƒ”› ‘” ‘‰‘‹‰ ‹’ƒ
–• –‘ –Ї ‡˜‹”‘‡–ǫ
‡‡
’ƒ
–• ͓͵ǤͶǤͻƒ ƒ† ‰ǡ ͓͵ǤͶǤʹͲƒ ƒ† „ ƒ„‘˜‡Ǥ
Ї ”‡•‹†‡–‹ƒŽ •—„†‹˜‹•‹‘ ™‘—ކ „‡ ƒ

‡••‡† ˜‹ƒ ‘—–Š —––‘™‹ŽŽ‘™ ˜‡—‡ ƒ† –Ї
ˆ—–—”‡ ƒ•– ‘”–Š ˜‡—‡Ǥ ŽŽ ”‘ƒ† ‹’”‘˜‡‡–• ™‘—ކ „‡ ‘’އ–‡† ‹ ƒ

‘”†ƒ
‡ ™‹–Š
–Ї ƒ’’Ž‹
ƒ„އ —„Ž‹
‘”• •–ƒ†ƒ”†• •’‡
‹ˆ‹
ƒ–‹‘•Ǥ ††‹–‹‘ƒŽŽ›ǡ –Ї ”‘Œ‡
– ™‘—ކ
‡š–‡† •‡”˜‹
‡ Žƒ–‡”ƒŽ• ˆ‘” ’‘–ƒ„އ ™ƒ–‡”
ƒ†
ƒ† ‘–Ї” —–‹Ž‹–‹‡• ˆ”‘ ‡š‹•–‹‰ Ž‹‡•Ǥ —”–Ї”‘”‡ǡ
–Ї ”‘Œ‡
– ™‘—ކ „‡ ”‡“—‹”‡† –‘ „‡
‘•‹•–‡– ™‹–Š –Ї ƒŽ‹ˆ‘”‹ƒ ‹”‡ ‘†‡ ƒ† ‹–›
—„†‹˜‹•‹‘ ‡‰—Žƒ–‹‘• ሺ‹–އ ͳͳሻǤ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡ – ™‘—ކ ‘– ‡šƒ
‡”„ƒ–‡ ˆ‹”‡ ”‹• ‘”
”‡•—Ž– ‹ –‡’‘”ƒ”› ‘” ‘‰‘‹‰ ‹’ƒ
–• –‘ –Ї ‡˜‹”‘‡–ǡ ƒ† ‹’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ
•‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-119

Initial Study

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ

’ƒ
’ƒ
– ͓͵ǤͶǤʹͲ† Ȃ
ˆ Ž‘
ƒ–‡† ‹ ‘” ‡ƒ” •–ƒ–‡ ”‡•’‘•‹„‹Ž‹–› ƒ”‡ƒ• ‘” Žƒ†•
Žƒ••‹ˆ‹‡† ƒ• ˜‡”›
Š‹‰Š ˆ‹”‡ Šƒœƒ”† •‡˜‡”‹–› œ‘‡•ǡ ™‘—ކ –Ї ”‘Œ‡
– ‡š’‘•‡ ’‡‘’އ ‘” •–”—
–—”‡• –‘ •‹‰‹ˆ‹
ƒ–
”‹••ǡ ‹
Ž—†‹‰ †‘™•Ž‘’‡ ‘” †‘™•–”‡ƒ ˆŽ‘‘†‹‰ ‘” Žƒ†•Ž‹†‡•ǡ ƒ• ƒ ”‡•—Ž– ‘ˆ ”—‘ˆˆǡ ’‘•–Ǧ ˆ‹”‡ •Ž‘’‡ ‹•–ƒ„‹Ž‹–›ǡ ‘” †”ƒ‹ƒ‰‡
Šƒ‰‡•ǫ
‡‡
’ƒ
–• ͓ ͵ǤͶǤͻƒ ƒ† ‰ǡ ͓͵ǤͶǤʹͲƒǡ „ǡ ƒ†
ƒ„‘˜‡Ǥ
Ї ”‘Œ‡
– ‹• ‘– Ž‘
ƒ–‡† ‡ƒ” ƒ  ‘” Žƒ†•
Žƒ••‹ˆ‹‡† ƒ• ˜‡”› Š‹‰Š ˆ‹”‡ Šƒœƒ”† •‡˜‡”‹–›
œ‘‡•Ǥ Ї ‹–› ƒ† –Ї ”‘Œ‡
– •‹–‡ ƒ”‡ –‘’‘‰”ƒ’Š‹
ƒŽŽ› ˆŽƒ– Žƒ†Ǥ Ї”‡ ƒ”‡ ‘ •Ž‘’‡• ‘ ‘”
‡ƒ” –Ї ’”‘’‡”–›ǡ ƒ† –Ї ”‘Œ‡
– ™‘—ކ ‘– ‡š’‘•‡ –Ї ’‡‘’އ ‘” •–”—
–—”‡• –‘ •‹‰‹ˆ‹
ƒ–
”‹•• ˆ”‘ †‘™•Ž‘’‡ ‘” †‘™•–”‡ƒ ˆŽ‘‘†‹‰ ‘” Žƒ†•Ž‹†‡• †—‡ –‘ –Ї ”‡•—Ž– ‘ˆ ”—‘ˆˆǡ ’‘•–Ǧ ˆ‹”‡ ‹•–ƒ„‹Ž‹–›ǡ ‘” †”ƒ‹ƒ‰‡
Šƒ‰‡•Ǥ Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ–
‹’ƒ
–Ǥ

MITIGATION MEASURE(S)
‘ ‹–‹‰ƒ–‹‘ ‹• ”‡“—‹”‡†Ǥ

LEVEL OF SIGNIFICANCE

’ƒ
–• ™‘—ކ „‡ އ•• –Šƒ •‹‰‹ˆ‹
ƒ–Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-120

Initial Study
‡•• –Šƒ
‹‰‹ˆ‹
ƒ–
‘–‡–‹ƒŽŽ› ™‹–Š ‡••Ǧ–Šƒ Ǧ
‹‰‹ˆ‹
ƒ– ‹–‹‰ƒ–‹‘ ‹‰‹ˆ‹
ƒ

– ‘

’ƒ
–

‘”’‘”ƒ–‡†
’ƒ
–
’ƒ
–

3.4.21 - MANDATORY FINDINGS OF

SIGNIFICANCE

ƒǤ ‘‡• Ї ”‘Œ‡
– Šƒ˜‡ Ї ‡ ‹ƒŽ

†‡‰”ƒ†‡ –Ї “—ƒŽ‹–› ‘ˆ –Ї ‡˜‹”‘‡–ǡ

•—„•–ƒ–‹ƒŽŽ› ”‡†—
‡ –Ї Šƒ„‹–ƒ– ‘ˆ ƒ ˆ‹•Š ‘”

™‹Ž†Ž‹ˆ‡ •’‡
‹‡•ǡ
ƒ—•‡ ƒ ˆ‹•Š ‘” ™‹Ž†Ž‹ˆ‡

’‘’—Žƒ–‹‘ –‘ †”‘’ „‡Ž‘™ •‡ŽˆǦ•—•–ƒ‹‹‰

އ˜‡Ž•ǡ –Š”‡ƒ–‡ –‘ ‡Ž‹‹ƒ–‡ ƒ ’Žƒ– ‘”

ƒ‹ƒŽ
‘—‹–›ǡ •—„•–ƒ–‹ƒŽŽ› ”‡†—
‡ –Ї

—„‡” ‘” ”‡•–”‹
– –Ї ”ƒ‰‡ ‘ˆ ƒ ”ƒ”‡ ‘” ‡Ǧ

†ƒ‰‡”‡† ’Žƒ– ‘” ƒ‹ƒŽǡ ‘” ‡Ž‹

‹’‘”–ƒ– ‡šƒ’އ• ‘ˆ –Ї ƒŒ‘” ’‡”‹‘†•
‹ƒ–‡
‘
ˆ

ƒŽ‹ˆ‘”‹ƒ Š‹•–‘”› ‘” ’”‡Š‹•–‘”›ǫ

„Ǥ ‘‡•
‹†‹˜‹†—ƒŽŽ›
Ї  Œ‡
– Šƒ ‡ ‹’ƒ
–• –Šƒ ƒ”‡
Ž‹‹–‡†ǡ „—–
——Žƒ–‹˜‡Ž›

‘•‹†‡”ƒ„އǫ ሺDz——Žƒ–‹˜‡Ž›
‘•‹†‡”ƒ„އdz

‡ƒ• –Šƒ– –Ї ‹
”‡‡–ƒŽ ‡ˆˆ‡
–• ‘ˆ ƒ

”‘Œ‡
– ƒ”‡ •‹‰‹ˆ‹
ƒ– ™Š‡ ˜‹‡™‡† ‹

‘‡
–‹‘ ™‹–Š –Ї ‡ˆˆ‡
–• ‘ˆ ’ƒ•– ”‘Œ‡
–•ǡ

–Ї ‡ˆˆ‡
–• ‘ˆ ‘–Ї”
—””‡– ”‘Œ‡
–•ǡ ƒ† –Ї

‡ˆˆ‡
–• ‘ˆ ’”‘„ƒ„އ ˆ—–—”‡ ”‘Œ‡
–•Ǥሻ

Ǥ ‘‡• Ї  Œ‡
– Šƒ˜‡ ‡ ‹ ‡ ƒŽ ‡ˆˆ‡
–•

–Šƒ– ™‘—ކ
ƒ—•‡ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ‡ˆˆ‡
–•

‘ Š—ƒ „‡‹‰•ǡ ‡‹–Ї” †‹”‡
–Ž› ‘”

‹†‹”‡
–Ž›ǫ

Discussion

’ƒ
– ͓͵ǤͶǤʹͳƒ Ȃ ‘‡• –Ї ”‘Œ‡
– Šƒ˜‡ –Ї ’‘–‡–‹ƒŽ –‘ †‡‰”ƒ†‡ –Ї “—ƒŽ‹–› ‘ˆ –Ї
‡˜‹”‘‡–ǡ •—„•–ƒ–‹ƒŽŽ› ”‡†—
‡ –Ї Šƒ„‹–ƒ– ‘ˆ ƒ ˆ‹•Š ‘” ™‹Ž†Ž‹ˆ‡ •’‡
‹‡•ǡ
ƒ—•‡ ƒ ˆ‹•Š ‘”
™‹Ž†Ž‹ˆ‡ ’‘’—Žƒ–‹‘ –‘ †”‘’ „‡Ž‘™ •‡ŽˆǦ•—•–ƒ‹‹‰ އ˜‡Ž•ǡ –Š”‡ƒ–‡ –‘ ‡Ž‹‹ƒ–‡ ƒ ’Žƒ– ‘” ƒ‹ƒŽ
‘—‹–›ǡ •—„•–ƒ–‹ƒŽŽ› ”‡†—
‡ –Ї —„‡” ‘” ”‡•–”‹
– –Ї ”ƒ‰‡ ‘ˆ ƒ ”ƒ”‡ ‘”
‡†ƒ‰‡”‡† ’Žƒ– ‘” ƒ‹ƒŽǡ ‘” ‡Ž‹‹ƒ–‡ ‹’‘”–ƒ– ‡šƒ’އ• ‘ˆ –Ї ƒŒ‘” ’‡”‹‘†• ‘ˆ ƒŽ‹ˆ‘”‹ƒ Š‹•–‘”› ‘” ’”‡Š‹•–‘”›ǫ
• ‡˜ƒŽ—ƒ–‡† ‹ –Š‹•
Ȁǡ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– •—„•–ƒ–‹ƒŽŽ› †‡‰”ƒ†‡ –Ї
“—ƒŽ‹–› ‘ˆ –Ї ‡˜‹”‘‡–Ǣ •—„•–ƒ–‹ƒŽŽ› ”‡†—
‡ –Ї Šƒ„‹–ƒ– ‘ˆ ƒ ˆ‹•Š ‘” ™‹Ž†Ž‹ˆ‡ •’‡
‹‡•Ǣ
ƒ—•‡
ƒ ˆ‹•Š ‘” ™‹Ž†Ž‹ˆ‡ ’‘’—Žƒ–‹‘ –‘ †”‘’ „‡Ž‘™ •‡ŽˆǦ•—•–ƒ‹‹‰ އ˜‡Ž•Ǣ –Š”‡ –‡ –‘ ‡Ž‹‹ƒ–‡ ƒ ’Žƒ– ‘” ƒ‹ƒŽ
‘—‹–›Ǣ ”‡†—
‡ –Ї —„‡” ‘” ”‡•–”‹
– –Ї ”ƒ‰‡ ‘ˆ
ƒ
ƒ ‡†ƒ‰‡”‡†ǡ ”ƒ”‡ǡ ‘”
–Š”‡ƒ–‡‡† •’‡
‹‡•Ǣ ‘” ‡Ž‹‹ƒ–‡ ‹’‘”–ƒ– ‡šƒ’އ• ‘ˆ –Ї ƒŒ‘” ’‡”‹‘†• ‘ˆ ƒŽ‹ˆ‘”‹ƒ Š‹•–‘”› ‘” ’”‡Š‹•–‘”›Ǥ ‹–Š ‹’އ‡–ƒ–‹‘ ‘ˆ –Ї ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• ”‡ ‘‡†‡† ‹ –Š‹•
VTSM 6497 – Westhaven 2 Project August 2025
City of Reedley Page 3-121
Initial Study
†‘
—‡–ǡ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– Šƒ˜‡ –Ї ’‘–‡–‹ƒŽ –‘ †‡‰”ƒ†‡ –Ї “—ƒŽ‹–› ‘ˆ –Ї ‡˜‹”‘‡–ǡ •‹‰‹ˆ‹
ƒ–Ž› ‹’ƒ
– „‹‘Ž‘‰‹
ƒŽ ”‡•‘—”
‡•ǡ ‘” ‡Ž‹‹ƒ–‡ ‹’‘”–ƒ– ‡šƒ’އ• ‘ˆ
–Ї ƒŒ‘” ’‡”‹‘†• ‘ˆ ƒŽ‹ˆ‘”‹ƒ̵• Š‹•–‘”› ‘” ’”‡Š‹•–‘”›Ǥ Ї”‡ˆ‘”‡ǡ ™‹–Š –Ї ˆ‘ŽŽ‘™‹‰ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡•ǡ –Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–Ǥ

MITIGATION MEASURE(S)

’އ‡–ƒ–‹‘ ‘ˆ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡•  
Ǧͳ –Š”‘—‰Š  
Ǧͺǡ  Ǧͳ ƒ† 
Ǧ͵ǡ ƒ†  ǦʹǤ

LEVEL OF SIGNIFICANCE
Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ•‹ ‹ ‹– ƒ– ” ‡† ‰ ˆ‹
ƒ– ’ƒ ™ Š ‰ ‹‘ 
‘ ’ ƒ– ‹
– ‹–‹ ‹ ‘” Ǥ

’ƒ
– ͓͵ǤͶǤʹͳ„ Ǧ ‘‡• –Ї ”‘Œ‡
– Šƒ˜‡ ‹’ƒ
–• –Šƒ– ƒ”‡ ‹†‹˜‹†—ƒŽŽ› Ž‹‹–‡†ǡ „—–

——Žƒ–‹˜‡Ž›
‘•‹†‡”ƒ„އǫ ሺDz——Žƒ–‹˜‡Ž›
‘•‹†‡”ƒ„އdz ‡ƒ• –Šƒ– –Ї ‹
”‡‡–ƒŽ ‡ˆˆ‡
–•
‘ˆ ƒ ”‘Œ‡
– ƒ”‡ •‹‰‹ˆ‹
ƒ– ™Š‡ ˜‹‡™‡† ‹
‘‡
–‹‘ ™‹–Š –Ї ‡ˆˆ‡
–• ‘ˆ ’ƒ•– ”‘Œ‡
–•ǡ –Ї
‡ˆˆ‡
–• ‘ˆ ‘–Ї”
—””‡– ”‘Œ‡
–•ǡ ƒ† –Ї ‡ˆˆ‡
–• ‘ˆ ’”‘„ƒ„އ ˆ—–—”‡ ”‘Œ‡
–•Ǥሻǫ
• †‡•
”‹„‡† ‹ –Ї ‹’ƒ
– ƒƒŽ›•‡• ‹ ‡
–‹‘• ͵ǤͶǤͳ –Š”‘—‰Š ͵ǤͶǤʹͲ ‘ˆ –Š‹•
Ȁǡ ƒ›
’‘–‡–‹ƒŽŽ› •‹‰‹ˆ‹
ƒ– ‹’ƒ
–• ‘ˆ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ „‡ ”‡†—
‡† –‘ ƒ އ••Ǧ–ŠƒǦ
•‹‰‹ˆ‹
ƒ– އ˜‡Ž ˆ‘ŽŽ‘™‹‰ –Ї ‹
‘”’‘”ƒ–‹‘ ‘ˆ –Ї ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• Ž‹•–‡†Ǥ Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– ‘–Ї”™‹•‡
‘„‹‡ ™‹–Š ‹’ƒ
–• ‘ˆ ”‡Žƒ–‡† †‡˜‡Ž‘’‡– –‘ ƒ††

‘•‹†‡”ƒ„Ž› –‘ ƒ›
——Žƒ–‹˜‡ ‹’ƒ
–• ‹ –Ї ”‡‰‹‘Ǥ ‹–Š ‹–‹‰ƒ–‹‘ǡ –Ї ’”‘’‘•‡† ”‘Œ‡
–
™‘—ކ ‘– Šƒ˜‡ ‹’ƒ
–• –Šƒ– ƒ”‡ ‹†‹˜‹†—ƒŽŽ› Ž‹‹–‡† „—–
——Žƒ–‹˜‡Ž›
‘•‹†‡”ƒ„އǤ
Ї”‡ˆ‘”‡ǡ –Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ އ••Ǧ–ŠƒǦ
——Žƒ–‹˜‡Ž›Ǧ
‘•‹†‡”ƒ„އ ‹’ƒ
– ™‹–Š
‹–‹‰ƒ–‹‘ ‹
‘”’‘”ƒ–‡†Ǥ

MITIGATION MEASURE(S)

’އ‡–ƒ–‹‘ ‘ˆ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡•  
Ǧͳ –Š”‘—‰Š  
Ǧͺǡ  Ǧͳ –Š”‘—‰Š
 Ǧ͵ǡ  Ǧ ͳ ƒ†   Ǧʹǡ  Ǧͳǡ ƒ† ǦͳǤ

LEVEL OF SIGNIFICANCE
Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ އ•• •‹ ‹ ‹– ƒ– ” ‡† Ǧ Ǧ ‰ ˆ‹
ƒ– ’ƒ ™ Š ‰ ‹‘ 
‘ ’ ƒ– –Šƒ ‹
– ‹–‹ ‹ ‘” Ǥ

’ƒ
– ͓͵ǤͶǤʹͳ
Ǧ ‘‡• –Ї ”‘Œ‡
– Šƒ˜‡ ‡˜‹”‘‡–ƒŽ ‡ˆˆ‡
–• –Šƒ– ™‘—ކ
ƒ—•‡ •—„•–ƒ–‹ƒŽ
ƒ†˜‡”•‡ ‡ˆˆ‡
–• ‘ Š—ƒ „‡‹‰•ǡ ‡‹–Ї” †‹”‡
–Ž› ‘” ‹†‹”‡
–Ž›ǫ
ŽŽ ‘ˆ –Ї ”‘Œ‡
–ǯ• ‹’ƒ
–•ǡ „‘–Š †‹”‡
– ƒ† ‹†‹”‡
– –Šƒ– ƒ”‡ ƒ––”‹„—–ƒ„އ –‘ –Ї ”‘Œ‡
– ™‡”‡
‹†‡–‹ˆ‹‡† ƒ† ‹–‹‰ƒ–‡†Ǥ Ї ”‘Œ‡
– ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡• ™‹ŽŽ •—„•–ƒ–‹ƒŽŽ› ”‡†—
‡ ‘”
‡Ž‹‹ƒ–‡ –Ї ‹’ƒ
–• ‘ˆ –Ї ”‘Œ‡
–Ǥ Ї”‡ˆ‘”‡ǡ –Ї ’”‘’‘•‡† ”‘Œ‡
– ™‘—ކ ‘– ‡‹–Ї”
†‹”‡
–Ž› ‘” ‹†‹”‡
–Ž›
ƒ—•‡ •—„•–ƒ–‹ƒŽ ƒ†˜‡”•‡ ‡ˆˆ‡
–• ‘ Š—ƒ „‡‹‰• „‡
ƒ—•‡ ƒŽŽ
’‘–‡–‹ƒŽŽ› ƒ†˜‡”•‡ †‹”‡
– ‹’ƒ
–• ‘ˆ –Ї ’”‘’‘•‡† ”‘Œ‡
– ƒ”‡ ‹†‡–‹ˆ‹‡† ƒ• Šƒ˜‹‰ ‘ ‹’ƒ
–ǡ
އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
–ǡ ‘” އ••Ǧ–ŠƒǦ•‹‰‹ˆ‹
ƒ– ‹’ƒ
– ™‹–Š ‹–‹‰ƒ–‹‘Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-122

Initial Study

MITIGATION MEASURE(S)

’އ‡–ƒ–‹‘ ‘ˆ ‹–‹‰ƒ–‹‘ ‡ƒ•—”‡•  
Ǧͳ –Š”‘—‰Š  
Ǧͺǡ  Ǧͳ –Š”‘—‰Š
 Ǧ͵ǡ  Ǧ ͳ ƒ†   Ǧʹǡ  Ǧͳǡ ƒ† ǦͳǤ

LEVEL OF SIGNIFICANCE
Ї ”‘Œ‡
– ™‘—ކ Šƒ˜‡ ƒ އ•• •‹ ‹ ‹– ƒ– ” ‡† Ǧ Ǧ ‰ ˆ‹
ƒ– ’ƒ ™ Š ‰ ‹‘ 
‘ ’ ƒ– –Šƒ ‹
– ‹–‹ ‹ ‘” Ǥ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 3-123

List of Preparers
SECTION 4 - LIST OF PREPARERS
Lead Agency- City of Reedley
x ‘†‡›
‘”–‘ǡ Ǧ ‘—‹–› ‡˜‡Ž‘’‡– ‹”‡
–‘”
x ŽŽ‡ ‘‘”‡ǡ 
 Ȃ ‹–› Žƒ‡”
Consultants –
QK
x
ƒ›‹‡ ”ƒ—‡” Ȃ ”‹
‹’ƒŽ Žƒ‡”

x Š‘ƒ• ‘„ƒ›ƒ•Š‹ Ȃ ‡‹‘” ••‘
‹ƒ–‡ Žƒ‡”

x ƒ˜‡ ƒ›–‘ǡ ”‹
‹’ƒŽ ‹‘Ž‘‰‹•–

x ƒ–– ƒ‹‡Ž Ȃ ‡‹‘” ‹” —ƒŽ‹–› ‰‹‡‡”

x ”‹ƒ 
Š‘‡‡”ǡ ǤǤ Ȃ ‡‹‘” ‰‹‡‡”

x ‘„‡”– Ǥ ƒ””ǡ ǡ Ȃ ‡‹‘” ”
Šƒ‡‘Ž‘‰‹•–

WJV Acoustics, Inc. (Acoustical Analysis)
x ƒŽ–‡”
ƒ
”‘‹‰‡ǡ ”‡•‹†‡–
Ruettgers & Schuler Civil Engineers (Traffic Impact Analysis) x
ƒ ƒ”•ǡ ǤǤ Ǧ ”‹
‹’ƒŽȀ”‘Œ‡
– ƒƒ‰‡”Ȁ‡‹‘” ‰‹‡‡”
x ŠƒŽ‹•ƒ
‘†•‘ǡ ••‹•–ƒ– ‰‹‡‡”
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 4-1

̶

Bibliography
SECTION 5 - BIBLIOGRAPHY
ƒŽ ‹”‡Ǥ ʹͲͲ͹Ǥ ”ƒˆ– ‹”‡
ƒœƒ”† ‡˜‡”‹–›
‘‡• ‹ Ǥ̶ 

‡••‡† ‡
‡„‡” ʹͲʹͶǤ
Š––’•ǣȀȀ͵Ͷ
Ͳ͵ͳˆͺǦ
ͻˆ†ǦͶͲͳͺǦͺ
ͷƒǦͶͳͷͻ
†ˆˆ͸„Ͳ†Ǧ
†Ǧ‡†’‘‹–Ǥƒœ—”‡‡†‰‡Ǥ‡–ȀǦ
Ȁ‡†‹ƒȀ‘•ˆǦ™‡„•‹–‡Ȁ
̶
™Šƒ–Ǧ™‡Ǧ†‘Ȁ
‘—‹–›Ǧ™‹Ž†ˆ‹”‡Ǧ’”‡’ƒ”‡†‡••Ǧƒ†Ǧ
‹–‹‰ƒ–‹‘Ȁˆ‹”‡ǦŠƒœƒ”†
̶
Ǧ•‡˜‡”‹–›Ǧœ‘‡•Ȁˆ‹”‡ǦŠƒœƒ”†Ǧ•‡˜‡”‹–›Ǧœ‘‡•Ǧƒ’Ȁ—’Ž‘ƒ†Ǧ
ʹȀˆŠ•œŽͲ͸̴ͳ̴ƒ’ʹͶǤ’†ˆǤ
ƒŽ ‹”‡Ǥ ʹͲʹͷǤ ”‡•‘ ‘—–› ‹
‘”’‘”ƒ–‡† ǡ ‘
ƒŽ ‡•’‘•‹„‹Ž‹–› ”‡ƒ ‹”‡
ƒœƒ”†
‡˜‡”‹–›
‘‡•Ǥ 

‡••‡†
—Ž› ʹͲʹͷǤ
ƒŽ
Ǥ ʹͲʹͶǤ ‡ŽŽ ‹†‡ Ǥ ” 

‡••‡† ‡
‡„‡” ʹͲʹͶǤ
Š––’•ǣȀȀƒ’•Ǥ
‘•‡”˜ƒ–‹‘Ǥ
ƒǤ‰‘˜Ȁ†‘‰‰”Ȁ™‡ŽŽˆ‹†‡”ȀǤ
ƒŽ‹ˆ‘”‹ ‹” ‡•‘—”
‡• ‘ƒ”†Ǥ ʹͲʹʹǤ ̶ʹͲʹʹ 
‘’‹‰ Žƒ ˆ‘” 
Š‹‡˜‹‰ ƒ”„‘ ‡—–”ƒŽ‹–›Ǥ̶
ƒŽ‹ˆ‘”‹
ƒ
ƒ ‡’ƒ”–‡– ‘ˆ ‘•‡”˜ƒ–‹‘Ǥ ʹͲʹͶƒǤ ƒŽ‹ˆ‘”‹ƒ ƒ”–Š“—ƒ‡ ƒœƒ”†•
‘‡
’’Ž‹
ƒ–‹‘Ǥ 

‡••‡† ‡
‡„‡”
ʹͲʹͶǤ
Š––’•ǣȀȀ™™™Ǥ
‘•‡”˜ƒ–‹‘Ǥ
ƒǤ‰‘˜Ȁ
‰•Ȁ‰‡‘Šƒœƒ”†•Ȁ‡“Ǧœƒ’’Ǥ

ȄǤ ʹͲʹͶǤ ƒŽ‹ˆ‘”‹ƒ
’‘”–ƒ– ƒ”Žƒ† ‹ †‡”Ǥ 

‡••‡† ‡
‡„‡” ʹͲʹͶǤ
Š––’•ǣȀȀƒ’•Ǥ
‘•‡”˜ƒ–‹‘Ǥ
ƒǤ‰‘˜ȀȀ
Ȁ Ǥ
ȄǤ ʹͲʹʹǤ ” ‘ ‘— ›  ƒ”Žƒ  ‡•  –
’‘”–ƒ † – ƒ–ƒ ˜ƒ‹Žƒ„ ʹͲʹ ʹʹ ‹ –›ǡ Ͳ ʹͲ  Ž‹ Ǧ ƒ† •‡ ‘˜‡”•‹‘ ƒ„އǤ 

‡••‡† —‰—•– ʹͲʹͷǤ
Š––’•ǣȀȀ™™™Ǥ
‘•‡”˜ƒ–‹‘Ǥ
ƒǤ‰‘˜Ȁ†Ž”’Ȁˆ’Ȁƒ‰‡•Ȁ ”‡•‘Ǥƒ•’šǤ
ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‡•‘—”
‡• ‡
›
Ž‹‰ ƒ† ‡
‘˜‡”›Ǥ ʹͲͳͻǤ ‡ ƒ’‹–ƒ ‹•’‘•ƒŽ ƒ–‡ ”
•–‹ƒ–‡Ǥ 

‡••‡† ‡„”—ƒ”› ʹͲʹͷǤ
Š––’•ǣȀȀ
ƒŽ”‡
›
އǤ
ƒǤ‰‘˜Ȁ
‡–”ƒŽȀ
‘ƒŽ‡ƒ•—”‡Ȁ‹•’‘•ƒŽƒ–‡Ȁ‘•–‡
‡–Ȁ͓ǣ̱ǣ–
‡š–ൌƒŽ‹ˆ‘”‹ƒΨʹͲŠƒ•ΨʹͲƒΨʹͲ’‘’—Žƒ–‹‘ΨʹͲ‘ˆΨʹͲ͵ͻǤ͹ΨʹͲ‹ŽŽ‹‘ΨʹͲ”‡•‹†‡ –•ǡ‡ƒ•—”‡‡–ΨʹͲ•›•–‡ΨʹͲƒ†ΨʹͲƒΨʹͲ”‡
›
Ž‹‰ΨʹͲ”ƒ–‡ΨʹͲ‘ˆΨʹͲ͵͹ΨʹͷǤ
ȄǤ ʹͲʹͷǤ 

 Ž Ȁ ‡  ƒ – ‹ ƒ Ǥ ‹ ‹ ›  – ‡ ” Š 


‡••‡† ‡„”—ƒ”› ʹͲʹͷǤ
Š––’•ǣȀȀ™™™ʹǤ
ƒŽ”‡
›
އǤ
ƒǤ‰‘˜Ȁ‘Ž‹†ƒ•–‡Ȁ‹–‡Ȁ‡ƒ”
ŠǤ
ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ‘š‹
—„•–ƒ
‡• ‘–”‘ŽǤ ʹͲʹͶǤ ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘š‹
‘ˆ
—„•–ƒ
‡• ‘–”‘Žǡ ˜‹”‘”•–‘”Ǥ 

‡••‡† ‡
‡„‡” ʹͲʹͶǤ
Š––’•ǣȀȀ™™™Ǥ‡˜‹”‘•–‘”Ǥ†–•
Ǥ
ƒǤ‰‘˜Ȁ’—„Ž‹
Ȁƒ’ȀǤ
ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ”ƒ•’‘”–ƒ–‹‘Ǥ ʹͲʹͶǤ ƒŽ‹ˆ‘”‹ƒ ‹‰Š™ƒ› ƒ’’‹‰ 
‡‹
›•–‡Ǥ


‡••‡† ‡
‡„‡” ʹͲʹͶǤ
Š––’•ǣȀȀ
ƒŽ–”ƒ•Ǥƒ’•Ǥƒ
͹
Ͷ͸

ͺ‡ͺͲͷ͹ͳͳ͸ˆͳƒƒ
ƒƒ
”
‰‹•Ǥ
‘Ȁƒ’’•Ȁ™‡„ƒ’’˜‹‡™‡”Ȁ‹†‡šǤŠ–Žǫ‹†ൌͶ͸ͷ†ˆ†͵†ͺͲ
Ǥ
ƒŽ‹ˆ‘”‹ƒ ‡’ƒ”–‡– ‘ˆ ƒ–‡” ‡•‘—”
‡•Ǥ ʹͲʹͷǤ —” ‡– ”‘ ” —†™ƒ–‡” ‡˜‡Ž•Ǥ Ǥ 

‡••‡†
—‰—•– ʹͲʹͷǤ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 5-1

Bibliography
Š––’•ǣȀȀ†™”Ǥƒ’•Ǥƒ”
‰‹•Ǥ
‘Ȁƒ’’•Ȁ†ƒ•Š„‘ƒ”†•Ȁ„ƒ͹ͳ͵Ͷͻ͹ͺͷͺͺͶͷ†Ͳ„ˆ͸Ͳ†ͶͲͲˆͶͳͶ
†ͺ
͵Ǥ
ƒŽ‹ˆ‘”‹ƒ ‡”‰› ‘‹••‹‘Ǥ ʹͲʹͷƒǤ ƒŽ‹ˆ‘”‹ƒ ‡”‰› ‘‹••‹‘ǡ އ –”‹
‹–›
‘•—’–‹‘Ǥ 

‡••‡†
—Ž› ʹͲʹͷǤ Š––’•ǣȀȀ™™™Ǥ‡‡”‰›Ǥ
ƒǤ‰‘˜Ȁ†ƒ–ƒǦ”‡’‘”–•Ȁ‡‡”‰›Ǧ
ƒŽƒƒ
Ȁ
ƒŽ‹ˆ‘”‹ƒǦ‡Ž‡
–”‹
‹–›Ǧ†ƒ–ƒȀ
ƒŽ‹ˆ‘”‹ƒǦ‡‡”‰›Ǧ
‘•—’–‹‘Ǧ†ƒ•Š„‘ƒ”†•ǦͲǤ
ȄǤ ʹͲʹͷ„Ǥ ƒŽ‹ˆ‘”‹ƒ ‹••‹‘ǡ
ƒ•  ‘ ‡”‰› ‘•—’–‹‘  „› –‹–›Ǥ 

‡••‡†
—Ž› ʹͲʹͷǤ
Š––’ǣȀȀ™™™Ǥ‡
†
̶
•Ǥ‡‡”‰›Ǥ
ƒǤ‰‘˜Ȁ‰ƒ•„›—–‹ŽǤƒ•’šǤ
‹–› ‘ˆ ‡‡†Ž‡› Ǥ ʹͲʹʹǤ ‹–› ‘ˆ ‡‡†Ž‡› ʹͲʹͲ ”„ƒ ƒ–‡” ƒƒ‰‡‡– Žƒ Ǥ̶ ƒ” ŠǤ


‡••‡† ‡
‡„‡” ʹͲʹͶǤ Š––’•ǣȀȀ”‡‡†Ž‡›Ǥ
ƒǤ‰‘˜Ȁ™’Ǧ

‘–‡–Ȁ—’Ž‘ƒ†•ȀʹͲʹ͵ȀͳͲȀ
̶
̴‡‡†Ž‡›̴̴ʹͲʹͲǦͳ͸ͻ͹͹ͷͺͺͻ
̶
ʹǤ’†ˆǤ
‹–› ‘ˆ ‡‡†Ž‡›Ǥ ʹͲͳͶǤ ʹͲ͵Ͳ ‹–› ‘ˆ ‡‡†Ž‡› ‡ ‡”ƒŽ Žƒ ̶
Ǥ ‡„”—ƒ”› ͳͺǤ
Š––’•ǣȀȀ”‡‡†Ž‡›Ǥ
ƒǤ‰‘˜Ȁ™’Ǧ
‘–‡–Ȁ—’Ž‘ƒ†•Ȁ”‡‡†Ž‡›™‡„ȀʹͲͳͻȀͳʹȀ‡‡†Ž‡›Ǧ

‡‡”ƒŽǦŽƒ
̶
ǦʹͲ͵Ͳ
̶
Ǧ†‘’–‡†Ǧ ‡„”—ƒ”›ǦͳͺǦʹͲͳͶǦͳǤ’†ˆǤ
‹–› ‘ˆ ‡‡†Ž‡›Ǥ ʹͲʹͶǤ 
–‹˜‡ ”ƒ•’‘”–ƒ–‹‘ ƒ† ƒ
̶
”™ƒ› ƒ•–‡” ŽƒǤ
ȄǤ ʹͲͳͶǤ ‹–› ‘ˆ ‡‡†Ž‡› ʹͲ͵Ͳ
‡‡”ƒŽ Žƒ Ǥ ‡„”—ƒ”›Ǥ 

‡••‡† ‡
‡„‡” ʹͲʹͶǤ
Š––’•ǣȀȀ”‡‡†Ž‡›Ǥ
ƒǤ‰‘˜Ȁ™’Ǧ
‘–‡–Ȁ—’Ž‘ƒ†•Ȁ”‡‡†Ž‡›™‡„ȀʹͲͳͻȀͳʹȀ‡‡†Ž‡›Ǧ

‡‡”ƒŽǦŽƒǦʹͲ͵Ͳ
̶
̶
Ǧ†‘’–‡†Ǧ ‡„”—ƒ”›ǦͳͺǦʹͲͳͶǦͳǤ’†ˆǤ
‹–› ‘ˆ ‡‡†Ž‡›Ǥ ʹͲͳͻǤ ‹–› ‘ˆ ‡‡†Ž‡› ‹
›
އ ƒ† ‡†‡•–”‹ƒ ‘„‹Ž‹–› ŽƒǤ̶
‹–› ‘ˆ ‡‡†Ž‡›Ǥ ʹͲͳ͵Ǥ ‹–› ‘ˆ ‡‡†Ž‡› ‡ ‡”ƒŽ Žƒ ʹͲ͵Ͳ ˜‹”‘‡–ƒŽ ’ƒ
– ‡’‘”–Ǥ̶
‡‡†Ž‡›Ǥ
‡†‡”ƒŽ
‹‰Š™ƒ› †‹‹•–”ƒ–‹‘ ሺ
ሻǡ ǤǤ ‡’ƒ”–‡
̶
– ‘ˆ ”
̴
ƒ•’‘”–ƒ–‹‘Ǥ ʹͲͳ͹Ǥ
̶
‹‰Š™ƒ› ”ƒˆˆ‹
‘‹•‡ ƒŽ›•‹• ƒ† „ƒ–‡‡– ‘Ž‹
› ƒ†
—‹†ƒ
‡Ǥ̶
Š––’•ǣȀȀ™™™ǤˆŠ™ƒǤ†‘–Ǥ‰‘˜Ȁ‡˜‹”‘‡–Ȁ‘‹•‡Ȁ”‡‰—Žƒ–‹‘•̴ƒ† ‰—‹†ƒ ‡ȀǤ
‡†‡”ƒŽ ‘–‘” ƒ””‹‡” ƒˆ‡–› †‹‹•–”ƒ–‹‘Ǥ ʹͲʹͶǤ  ƒ–‹‘ƒŽ ƒœƒ”†‘—• ƒ–‡”ƒ‹Ž•
‘—–‡ ‡‰‹•–”›Ǥ̶ ƒ–‹‘ƒŽ ƒœƒ”†‘—•  ‘—–‡ Ǧ 
ƒ–‡”‹ƒŽ• ‡‰‹•–”› –ƒ–‡ǡ ƒŽ‹ˆ‘” › ‹ƒǤ


‡••‡† ‡
‡„‡” ʹͲʹͶǤ Š––’•ǣȀȀ™™™Ǥˆ
•ƒǤ†‘–Ǥ‰‘˜Ȁ”‡‰—Žƒ–‹‘•ȀŠƒœƒ”†‘—•Ǧ
ƒ–‡”‹ƒŽ•Ȁƒ–‹‘ƒŽǦŠƒœƒ”†‘—•Ǧƒ–‡”‹ƒŽ•Ǧ”‘—–‡Ǧ”‡‰‹•–”›Ǧ•–ƒ–‡Ǥ Ǥ ʹͲʹͶǤ ̵• ƒ–‹‘ƒŽ Ž‘‘†
ƒœƒ”† 
ሻ  ሺ ‹‡™‡”Ǥ 

‡••‡† ‡
‡„‡” ʹͲʹͶǤ
Š––’•ǣȀȀŠƒœƒ”†•Ǧ
ƒ›‡”
ˆ‡ƒǤƒ’•Ǥƒ”
‰‹•Ǥ
‘Ȁƒ’’•Ȁ™‡„
̶
ƒ’’˜‹‡™‡”Ȁ‹†‡šǤŠ–Žǫ‹†ൌͺ„Ͳƒ†„ͷͳͻͻ͸ͶͶͶ†Ͷͺ͹
ͻ͵͵ͺ„ͷͷʹͻƒƒͻ
†Ǥ
”‡•‘ ‘—
‹Ž ‘ˆ ‘˜‡”‡– •Ǥ ʹͲʹʹǤ ͸–Š ›
އ ‡‰‹‘ƒŽ
‘—•‹‰ ‡‡†• ŽŽ‘
ƒ–‹‘ ŽƒǤ̶
‘˜‡„‡”Ǥ 

‡••‡† ‡
‡„‡” ʹͲʹͶǤ Š––’•ǣȀȀ™™™Ǥˆ”‡•‘
‘‰Ǥ‘”‰Ȁ™’Ǧ

‘–‡–Ȁ—’Ž‘ƒ†•ȀʹͲʹʹȀͳͳȀ 
̴
̴—„Ž‹
̴‡˜‹‡™̴ ‹ƒŽ̴‘˜‡„‡”̴ʹͲʹʹ̴‘
’‹Ž‡†Ǥ’†ˆǤ
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 5-2

Bibliography
”‡•‘ ‘—–› ‹”’‘”– ƒ† 
̶
•‡ ‘‹••‹‘Ǥ ʹͲʹ͵Ǥ ̶ ”‡•‘ ‘—–› ‹”’‘”– ƒ† •‡
‘’ƒ–‹„‹Ž‹–› ŽƒǤ 
–‘„‡”Ǥ 

‡••‡† ‡
‡„‡” ʹͲʹͶǤ
Š––’•ǣȀȀ™™™Ǥ†”‘’„‘šǤ
‘Ȁ•
ŽȀˆ‹Ȁ
ŽŠͺ‹Ž–“Ͷˆ͵‡„ͳͲ“›’ͻ͵‹Ȁ ”‡•‘Ǧ’†ƒ–‡†ǦǦ
‡†‡†Ǧ
–ǦʹͲʹ͵Ǥ’†ˆǫ”Ž‡›ൌ‡Ͷƒ‘ͺ‘›͸‹ˆʹ„–‰œ
‹ͻͷ•œ„Ͳ—Ƭ‡ൌ
̶
ͳƬ†ŽൌͲǤ
”‡•‘ ‘—–›Ǥ
̶
ʹͲͲͲǤ ̶ ”‡•‘ ‘—–› ‡‡ ”ƒŽ Žƒ ƒ
‰”‘—†
̶
‡’‘”–Ǥ
ȄǤ ʹͲʹͶǤ
‘—•‡Š‘ކ
ƒœƒ”†‘—• ƒ•–‡ Ǥ 

‡••‡† ‡
‡„‡” ʹͲʹͶǤ
Š––’•ǣȀȀ
އƒ—’ˆ”‡•‘
‘—–›Ǥ
‘ȀŠŠ™ȀǤ
‹† ƒŽŽ‡› ‹•’‘•ƒŽǤ ʹͲʹͶǤ ”‡•‘  Ǧ ‡‡†Ž‡›Ǥ ‘—–› 

‡••‡† ‡
‡„‡ ʹͲʹͶǤ ”
Š––’•ǣȀȀ™™™Ǥ‹†˜ƒŽŽ‡›†‹•’‘•ƒŽǤ
‘ȀŽ‘
ƒ–‹‘•Ȁ”‡‡†Ž‡›ȀǤ
ƒ–—”ƒŽ ‡•‘—”
‡• ‘•‡”˜ƒ–‹‘ ‡”˜‹
‡Ǥ ʹͲʹͶǤ   ‘•‡”˜ ƒ–—”ƒŽ ‡•‘—”  ƒ–‹‘
‡”˜‹
‡Ǥ 

‡••‡† ‡
‡„‡”

‡•
ʹͲʹͶǤ
Š––’•ǣȀȀ™‡„•‘‹Ž•—”
̶
˜‡›Ǥ”
•Ǥ—•†ƒǤ‰‘˜Ȁƒ’’Ȁ‡„‘‹Ž—”˜‡›Ǥƒ•’šǤ
Ǥ ʹͲʹͷƒǤ ‹” —ƒŽ‹–›
’ƒ
– ƒŽ›•‹•ǡ ‡–ƒ–‹˜‡ ”ƒ
– ƒ’ ͸Ͷͻ͹ǡ ‡•–
ƒ˜‡

”‘Œ‡
–Ǥ̶
Ǥ ʹͲʹͷ„Ǥ ̶—Ž–—”ƒŽ ‡•‘—”
‡• ‡’‘”– Ǧ ‡•–Šƒ˜‡ ʹ ‡•‹†‡–‹ƒŽ ”‘Œ‡
–Ǥ̶
Ǥ ʹͲʹͷ
Ǥ ̶ƒ–‡” —’’Ž› ••‡••‡–ǡ ‡–ƒ–‹˜‡ ”ƒ
– ƒ’ ͸Ͷͻ͹Ǧ ‡•–Šƒ˜‡

Ǥ̶
—‡––‰‡”• ƒ† 
Зއ”Ǥ ʹͲʹͷǤ ̶”ƒˆˆ‹
–—†›ǡ  ͸Ͷͻ͹ Ǧ ‡•–Šƒ˜
̶
‡ ʹǤ̶
ƒ
‘ƒ“—‹ ƒŽŽ‡› ‹” ‘ŽŽ—–‹‘ ‘–”‘Ž ‹•–”‹
–Ǥ ʹͲͳͷǤ —‹†ƒ
‡ ˆ‘” ••‡••‹‰ ƒ†
‹–‹‰ƒ–‹‰ ‹” —ƒŽ‹–›
’ƒ
–•Ǥ̶
‘—–Ї” ƒŽ‹ˆ‘”‹ƒ ƒ• ‘’ƒ›Ǥ ʹͲʹͷǤ ̶‘—–Ї” ƒŽ‹ˆ‘”‹ƒ ƒ• ‘’ƒ› ‡„ƒ’Ǥ̶ 

‡••‡† ‡„”—ƒ”› ʹͲʹͷǤ
Š––’•ǣȀȀ•‘
ƒŽ‰ƒ•Ǥƒ’•Ǥƒ”
‰‹•Ǥ
‘Ȁƒ’’•Ȁ™‡„ƒ’’˜‹‡™‡”Ȁ‹†‡šǤŠ–Žǫ‹†ൌ
ͺͷ
‡†ͳʹʹ͹
ƒˆͶ
ͺƒƒ‡ͻ„ͳͻ†͸͹͹ͻ͸ͻ͵͵ͷǤ
–ƒ–‡ ƒ–‡” ‡•‘—”
‡• ‘–”‘Ž ‘ƒ”†Ǥ ʹͲʹͶǤ –ƒ–‡ ƒ–‡” ‡•‘— ‘–”‘Ž  ”
‡•  ‘ƒ”†ǡ
‡‘”ƒ
‡”Ǥ 

‡••‡† ‡
‡„‡” ʹͲʹͶǤ
Š––’•ǣȀȀ‰‡‘–”ƒ
‡”Ǥ™ƒ–‡”„‘ƒ”†•Ǥ
ƒǤ‰‘˜Ȁƒ’ȀǤ
ǤǤ ‡•—• —”‡ƒ—Ǥ ʹͲʹ͵Ǥ Ǥ  —” ƒ—ǡ ‡”‹
ƒ ‘  ˜‡›Ǥ Ǥ ‡•—• ‡  —‹–› —” 

‡••‡†
—‰—•– ʹͲʹͷǤ Š––’•ǣȀȀ†ƒ–ƒǤ
‡•—•Ǥ‰‘˜Ȁ–ƒ„އȀͷ
ʹͲʹ͵ǤͳͳͲͳǫ“ൌ‡‡†Ž‡›ǡ൅Ǥ

 
‘—•–‹
•Ǥ ʹͲʹͶǤ ̶
‘—•–‹
ƒŽ ƒŽ›•‹•ǡ ‡•–Šƒ˜‡

‡•‹†‡–‹ƒŽ ”‘Œ‡
–Ǥ̶
VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 5-3

Mitigation Monitoring and Reporting Program
SECTION 6 - MITIGATION MONITORING AND REPORTING PROGRAM

VTSM 6497 – Westhaven 2 Project August 2025

City of Reedley Page 6-1

APPENDIX A

AIR QUALITY IMPACT ASSESSMENT

APPENDIX B

CULTURAL RESOURCES REPORT

APPENDIX C

WATER SUPPLY ASSESSMENT

APPENDIX D

ACOUSTICAL ANALYSIS

APPENDIX E

TRAFFIC STUDY

APPENDIX A

AIR QUALITY IMPACT ASSESSMENT

AIR QUALITY IMPACT ANALYSIS
TENTATIVE TRACT MAP 6497

WEST HAVEN II PROJECT
FEBRUARY 2025

AIR QUALITY IMPACT ANALYSIS
TENTATIVE TRACT MAP 6497

WEST HAVEN II PROJECT
Prepared for:

D.R. Horton
419 W. Murray Avenue
Visalia, CA 93291
Contact: Matt Tranah
Phone: (559) 636-9850
Consultant:
5080 California Avenue, Suite 220
Bakersfield, CA 93309
Contact: Jaymie Brauer
Phone: (661) 616-2600
Fax: (559) 733-7821
February 2025
© Copyright by Quad Knopf, Inc.

Unauthorized use prohibited.

Project #240227
TTM 6497 West Haven II Project – Air Quality Impact Analysis February 2025 Page i
Table of Contents
List of Acronyms and Abbreviations ............................................................................................................ iv SECTION 1 - Executive Summary ................................................................................................................ 1-1 SECTION 2 - Introduction .............................................................................................................................. 2-1

2.1 - Purpose...........................................................................................................................................................2-1

2.2 - General Project Description...................................................................................................................2-1 SECTION 3 - Setting .......................................................................................................................................... 3-1

3.1 - Air Quality Standards ...............................................................................................................................3-1

3.2 - Existing Air Quality....................................................................................................................................3-5

3.2.1 - Ozone (O3)...................................................................................................................................3-6

3.2.2 - Suspended Particulate Matter (PM10 and PM2.5) .......................................................3-6

3.2.3 - Carbon Monoxide (CO)..........................................................................................................3-7

3.2.4 - Nitrogen Dioxide (NO2) and Hydrocarbons .................................................................3-7

3.2.5 - Sulfur Dioxide............................................................................................................................3-7

3.2.6 - Lead (Pb) and Suspended Sulfate.....................................................................................3-8

3.3 - Climate ............................................................................................................................................................3-8

3.4 - Climate Change and Greenhouse Gases............................................................................................3-9

3.4.1 - Global Climate Change ...........................................................................................................3-9

3.4.2 - Effects of Global Climate Change....................................................................................3-12

3.4.3 - Global Climate Change Regulatory Issues ..................................................................3-14 SECTION 4 - Impact Assessment ................................................................................................................. 4-1

4.1 - Significance Criteria ..................................................................................................................................4-1

4.1.1 - Thresholds Adopted for the Evaluation of Air Quality Impacts under CEQA 4-1

4.1.2 - Threshold for Ambient Air Quality Impacts.................................................................4-2

4.1.3 - Thresholds for Hazardous Air Pollutants......................................................................4-2

4.1.4 - Global Climate Change Thresholds of Significance ...................................................4-3

4.2 - Project Related Emissions ......................................................................................................................4-4

4.2.1 - Short-Term Emissions ...........................................................................................................4-5

4.2.2 - Long-Term Operational Emissions ..................................................................................4-6

4.3 - Potential Impacts on Sensitive Receptors .......................................................................................4-7

4.4 - Potential Impacts to Visibility to Nearby Class 1 Areas ............................................................4-8

4.5 - Potential Impacts from Carbon Monoxide ......................................................................................4-8

4.6 - Predicted Health Impacts .......................................................................................................................4-9

4.7 - Potential Impacts from Valley Fever...............................................................................................4-12

4.8 - Potential Impacts from Asbestos......................................................................................................4-12

4.9 - Odor Impacts and Mitigation .............................................................................................................4-12 TTM 6497 West Haven II Project – Air Quality Impact Analysis February 2025 Page ii

4.10 - Impacts to Ambient Air Quality......................................................................................................4-13

4.11 - Impacts to Greenhouse Gases and Climate Change ...............................................................4-13 SECTION 5 - Cumulative Impacts ................................................................................................................ 5-1

5.1 - Cumulative Regional Air Quality Impacts........................................................................................5-1

5.2 - Cumulative Local Air Quality Impacts...............................................................................................5-3

5.3 - Cumulative Hazardous Air Pollutants ...............................................................................................5-3

5.4 - Cumulative Carbon Monoxide (CO) – Mobile Sources ...............................................................5-3 SECTION 6 - Consistency with the Air Quality Attainment Plan .................................................... 6-1

6.1 - Required Evaluation Guidelines ..........................................................................................................6-1

6.2 - Consistency with the Fresno Council of Government’s Regional Conformity Analysis..6- 2 SECTION 7 - Mitigation and Other Recommended Measures .......................................................... 7-1

7.1 - Applicable PM10 Reduction Measures ...............................................................................................7-1

7.2 - Recommended Measures to Reduce Equipment Exhaust........................................................7-2

7.3 - Recommended Measures to Reduce Equipment Exhaust........................................................7-2 SECTION 8 - Level of Significance After Mitigation ............................................................................. 8-1 SECTION 9 - References .................................................................................................................................. 9-1 Appendices
Appendix A – Existing Air Quality Monitoring Data
Appendix B – Project Emission Calculations
Appendix C – Health Risk Assessment Modeling Files (Electronic) List of Figures
Figure 2-1 Regional Location ..........................................................................................................................2-2 Figure 2-2 Project Location..............................................................................................................................2-3 Figure 2-3 Project Site Topography .............................................................................................................2-4 Figure 3-1 CARB Monitoring Network........................................................................................................3-4 Figure 6-1 City of Fresno Zoning ...................................................................................................................6-4 List of Tables
Table 3-1 Federal and California Standards 3-2
Table 3-2 SJVAB Attainment Status 3-3
Table 3-3 Existing Air Quality Monitoring Data in Project Area 3-5 Table 3-4 Fresno, California Weather Data 3-9
Table 4-1 SJVAPCD CEQA Thresholds of Significance 4-2
TTM 6497 West Haven II Project – Air Quality Impact Analysis February 2025 Page iii
Table 4-2 Measures of Significance – Toxic Air Contaminants 4-3 Table 4-3 Short-Term Project Emissions 4-6
Table 4-4 Post-Project Max Year (Operational Emissions) 4-7 Table 4-5 Sensitive Receptors Located < 1 miles from Project 4-8 Table 4-6 Potential Maximum Impacts Predicted by HARP 4-11 Table 4-7 Estimated Annual GHG Emissions (MT/Year) 4-13 Table 5-1 Comparative Analysis Based on SJVAB 2020 Inventory 5-2 Table 5-2 Emission Inventory SJVAB 2025 Projection – Tons per Year 5-2 Table 5-3 Emission Inventory Fresno County 2025 Projection – Tons per Year 5-2 Table 5-4 2025 Emissions Projections – Proposed Project, Fresno County and SJVAB 5-3

TTM 6497 West Haven II Project – Air Quality Impact Analysis February 2025 Page iv

LIST OF ACRONYMS AND ABBREVIATIONS
°C degrees Celsius
°F degrees Fahrenheit
AAQA Ambient Air Quality Analysis
AB Assembly Bill
AERMOD Air Dispersion Modeling and Risk Assessment Tool AQAP Air Quality Attainment Plans
AQIA Air Quality Impact Analysis
BACT best available control technology
BAU business as usual
BMCM Bulk Material Control Measures
CAAQS California Ambient Air Quality Standards
CalEEMod California Emissions Estimator Model
CalEPA California Environmental Protection Agency
CAPCOA California Air Pollution Control Officers Association CARB California Air Resources Board
CAT Climate Action Team
CCAA California Clean Air Act
CEQA California Environmental Quality Act
CFCs chlorofluorocarbons
CH4 methane
CO carbon monoxide
CO2 carbon dioxide
CO2e CO2 equivalents
EGR exhaust gas recirculation
EIR Environmental Impact Report
EPA Environmental Protection Agency
GAMAQI Guidance for Assessing and Mitigating Air Quality Impacts GHG greenhouse gas
GPA General Plan Amendments
GWP Global Warming Potential
H2S hydrogen sulfide
HAPs hazardous air pollutants
HARP Hotspots Analysis and Reporting Program
HI hazard index
IPCC Intergovernmental Panel on Climate Change
FresnoCOG FresnoCouncil of Governments
LOS Level of Service
M-1 Light Manufacturing
M-2 General Manufacturing
M-3 Heavy Industrial
MMT CO2e million metric tons of CO2 equivalent
N2O nitrous oxide
NAAQS National Ambient Air Quality Standards
TTM 6497 West Haven II Project – Air Quality Impact Analysis February 2025 Page v
NO2 nitrogen dioxide
NOx nitrogen oxides
NSR New Source Review
O3 ozone
OEHHA Office of Environmental Health Hazard Assessment
Pb lead
PM particulate matter
PM10 particulate matter 10 micrometers
PM2.5 particulate matter 2.5 micrometers
PMI point of maximum impact
PSD Prevention of Significant Deterioration
RACM Reasonably Available Control Measures
ROG reactive organic gases
RPS Renewables Portfolio Standard
SB Senate Bill
SIL significant impact levels
SIPs State Implementation Plans
SJVAB San Joaquin Valley Air Basin
SJVAPCD San Joaquin Valley Air Pollution Control District SO2 sulfur dioxide
SOx sulfur oxides
USGCRP United States Global Change Research Program
USGS United States Geological Survey
VDE visible dust emissions
VERA Voluntary Emission Reduction Agreement

Executive Summary

TTM 6497 West Haven II Project – Air Quality Impact Analysis February 2025

Page 1 ends
← All documents from this meeting