Water Subcommittee
City of Rialto
Regular Meeting - Final
Rialto City Hall, Council Chambers, 150 S. Palm
Ave. Rialto CA 92376
10:00 AMWednesday, March 23, 2022

CALL TO ORDER

ROLL CALL

PUBLIC COMMENTS

REVIEW/APPROVAL OF MINUTES
WS-22-257 Minutes from the February 23, 2022 Meeting

DISCUSSION ITEMS
1 WS-22-274 Review of Water and Wastewater Capital Improvement Projects and Financial Options
2 WS-22-275 Consider a Santa Ana River Habitat Conservation Plan Well Site at Rialto’s Wastewater Treatment Plant.
3 WS-22-268 Extraterritorial Wastewater Service Agreement with Bloomington Hills, LLC, for the property located at 11279 Cedar Avenue, Bloomington, CA, Assessor’s Parcel Number 0257-101-09-0000.
4 WS-22-277 Review EPA Bipartisan Infrastructure Bill.
5 WS-22-278 Review Water and Wastewater Plan Review Process.

UPDATES/OTHER ITEMS FOR DISCUSSION

FUTURE MEETINGS

ADJOURNMENT

Page 1 ends

1 City of Rialto
Legislation Text
File #: WS-22-257, Version: 1, Agenda #:

For Water Subcommittee Meeting [March 23, 2022]
TO: Water Subcommittee Members
FROM: Thomas J. Crowley, P.E., Utilities Manager
Minutes from the February 23, 2022 Meeting
City of Rialto Printed on 3/18/2022Page 1 of 1
powered by Legistar™
2 Water Subcommittee Meeting Minutes
February 23, 2022
Via Zoom

Mayor Robertson called meeting to order: 10:05 am

Subcommittee Members / City Staff:

Mayor Deborah Robertson
Mayor Pro Tem Ed Scott
Marcus Fuller, City Manager
Robert Messinger, Assistant City Attorney
Tom Crowley, Utilities Manager
Angela Perry, Council & City Manager’s Executive Assistant

Other Attendees
Steve Dopudja, Consultant
Rolf Ohlemutz, RWS
Sonia Axter, Ullico
Evan Kominsky, Ullico
Megan Matson, Table Rock

Public Comments: None

Minutes: January 26, 2021, minutes – Accepted for the record.

1. WS-22-162 Present Master Schedule for Grant Applications and Final Design for the Lake Rialto Project
Tom began presentation going through the schedule.

Committee Comments/Recommendations
Mayor Robertson said she took the concept to the Bureau of Reclamation a few years ago. She is concerned about the infrastructure funds availability; she hopes to go back and look when there is a timeframe to look at anything that can be submitted to the Bureau of Reclamation. She has requested information and other activities regarding the Bureau of Reclamation to Jamie Jones.

Mayor Robertson asked, have we come up with a total estimated cost to deliver the Lake Rialto project? Tom responded, $8,000,000. What about the septic to sewer? Tom said he met with Supervisor Baca’s staff yesterday. Tom mentioned the preliminary study and its phasing approach, like the first phase being about $2.5 m. The County was willing to use some of their ARPA funds, $1,000,000, to help us on the project. Tom said that we have to make a decision when submitting the grant, either submit for the full $8 m illion project or we can go for the phase approach. If we decide to submit full cost of the project, we will have to be competing for the $14 million SAWPA funds with everybody else. For 3 the phase approach, Tom said, we can use some of the County ARPA funds and maybe identify some additional funds on our end to help meet the costs along with the grant funds.

Mayor remembers about some residential parcels on septic in the IEUA territory. Should we also be partnering with IEUA? Tom said, we should start recognizing where those septic systems are in the IEUA service area. More specifically, that service area located on our western edge had many disadvantage community areas. Mayor Robertson agreed with Tom.

MPT Scott said why is he having meetings with the County Supervisor without an Elected Official with them ? He told City Manager that protocol is elected to elected. Mr. Baca shouldn’t do that.

Mayor said she is excited about the IEUA and they should be able to come to the table.

Mayor said she wou ld hope that we get together with Stephen, Tom, Mayor/MPT and Marcus. Mayor said there are better coordination that needs to be had.

2. WS-22-163 Final Construction Work Authorization to Rialto Water Services in the amount of $270,907 for Rialto Biosolids Upgrade Study, Plant 1&2 Demolition Design and GMP Preparation, and Additional Electrical Design for the Microgrid Project.

Tom gave the presentation. Megan added information to his presentation.

Committee Comments/Recommendations
Mayor Robertson said, I want to make sure that as we do this, know that we also are going to be able to handle different types of other solids and wastes. She was not aware we can use it in the process of a microgrid project. She wants to understand more regarding the biosolids. She said MPT Scott brought up to her organic waste can be used in our process in the digester. She said with the organic waste must extract from the landfill and it can be used in the microgrid to cover/add to our operation.

MPT Scott said it’s clear that Burrtec doesn’t have a plan. He doesn’t know how they are going to handle the material. He said, we should sit down with Anaergia and have a discussion about whether or not we want to put a processing equipment on the City’s site.

However, the bigger question becomes who’s going to process it. Is there an opportunity to bring that material to us? He wonders how Burrtec is going to succeed. The grocery store bags for produce are what’s being used. These skimpy thin bags rip easily when they are put into a green waste container. When it gets to the other end, how are they going to sort it. MPT mentioned that he already asked Burrtec about these issues , and he still not getting a straight answer.

Anaergia is out buying this material from other places or looking for it from other places that don’t have a solid contract with Burrtec or Athens. He feels that it’s an opportunity to focus on Rialto to get that material. MPT wants to have a conversation about the location of the processing equipment down on our site.
4 The quality of fog is sketchy, and the better solution is the organic waste. MPT suggested for next meeting to have a discussion with Anaergia or have a separate meeting outside of this forum. Mayor Robertson said when we had Anaergia in those meetings, they were still working out bugs. They have the equipment and operat e fully now. She mentioned on one of her visits to Anaergia with IEUA, they were very clear that they were operating on these sites. They were also planned to replicate that to almost 200 sites throughout California. She said, state mandates that the waste has to go to a specific destination not to the landfill. Moreover, we can’t let it flow down in the ocean.

MPT added when this material is ground up there has to be water used in it. Maybe another opportunity for us to use some of the affluent that isn’t going to be sold the IEUA to help process this material. He thinks that there is an advantage for us there. He said the company that we permitted to grind up the bottles has a plant that does that in San Bernardino. It might be worth talking to them, the plan t has been operating for a while.

They are buying material from Athens and trying to buy material from Burrtec. Mayor said she would like to sit down with Anaergia and find out if they would have a processor that can handle our organic waste. Also, reaching out to our neighbors to secure their organic waste. Megan said talked about their visit to Anaergia site, back in 2012.

Mayor Robertson said, the City Manager and staff need to give them an assessment of what is happening around the region. Mayor said that this is not on SCAG’s radar. MPT Scott asked if it ha d been discussed at SBCTA. She said absolutely not. He said that the county should be taking the lead on this. He said, the real problem with this is that it has to be done by hand. It will require high wages to be able to attract people to perform that kind of work. Mayor said when the meeting with Anaergia is setup to include Megan and Peter. MPT believes that Waste Management is ahead of Burrtec. He mentioned that Montclair is already doing it, they work with Waste Management. He said we need to educate residents to learn how to separate this material. He said other countries, such Korea, have been doing this for a long time. We need to follow their example. He added, we should be supplying bins or bag to facilitate the work for recycling to our residents.

MPT mentioned another issue during the process of this material is the high amount of nitrate that has to be extracted. Mayor is also concerned about the transportation of nitrate. Tom said Anaergia does its discharges to the brine line . The material that they can’t process or return to the front of the plant, is discharge to the brine line. Mayor asked about Niagara . Tom said that Niagara truck s its brine to the City of San Bernardino connection point. Mayor wants to know if we truck off our solid waste from the plant. He said, yes, that goes out to AZ to be reused in agriculture.

MPT mentioned that Anaergia only wants to buy processed material. He said that these companies buy from multiple places, they can’t get a long -term contract. He said that Waste Management may be one of them. Megan said that one of the issues from these models with no long-term contracts is that you can’t long -term finance. Marcus said we should look back at the FOG method. It may be a more practical approach for the organic waste.
5 Mayor wants to know where Burrtec is disposing their waste. Somehow, we get an annual refund from CalRecycle. She asked if someone could chart what those dollars have been over that last 10 years, based on the products and materials that we used to recycle.

Subcommittee said to prepare and take to Council.

3. WS-22-164 Update on the Payment Trends during the City’s Local Emergency due to the COVID-19 Pandemic.

Tom gave presentation – used graphs from Council staff report – delinquent accounts

Committee Comments/Recommendations
MPT commented on Tom’s presentation, he told him that the council instructed him to look at Edison’s model and use their payment plan. He said that Edison does not turn off customers’ electricity, they put them on a payment plan without asking. They give two options to their users, either pay the full amount or stay on the payment plan. Mayor asked, have we been shutting off water – no. She wants to know how people know that we are in a moratorium. Mayor wants to know if customers have received any type of communication regarding their past due bills. She asked if there was a report done on what Rolf chose to do after council asked to implement Edison’s plan? MPT thought that we were going to just roll the plan out. Rolf said that they are coming back now to get direction. MPT said unless other utilities like Edison start shutting off, we shouldn’t do that.

MPT said to just roll -in customers into the payment plan and avoid waiting time. MPT said to send a letter or bill to users to inform them that they are in a payment plan and offer them options. Mayor said go back and see how many people have been using the CARES Act funds. Marcus said it will be a good time to add the QR Code. He said we also talked about waiving the penalty fees. What would be do with those. MPT said that the answer is to roll out the payment plan . Tom said there has not been any penalties and late fees assessed to any customers . MPT said that another question for Edison.

Marcus asked, a re they expecting anything for the nex t Council meeting? MPT asked Robert, do we have to get approval from the Council for Veolia to just automatically roll out a payment plan or can we do it and just inform the council? He believes that it should go to Council for ratification.

Side note
MPT said Council members need to get a summary of the subcommittee meetings, so they know what projects are being worked on.

4. WS-22-165 List of Capital Improvement Projects for Water and Wastewater Systems.

Tom gave presentation - Hydrant replacements.

Committee Comments/Recommendations
Mayor wants the exact number of replace versus repaired. He said the chart does not show new. MPT asked about 99 Cents Store leak. Tom said the issue is on the store’s 6 end, and they will get back with them. Why is there no procedure in place to deal with a leak? He said there is a draft and when finalized will be implemented immediately. MPT asked Marcus – we have employees (PW, Fire, PD) driving down Cedar watching that leak for two years. You would think they would see the leak and report it. Marcus asked Tom to put a SOP together. Marcus said that all our staff should be reporting issues.

MPT said that’s probably part of our Landscape District.

Mayor asked how we assist the community when these leaks are reported, because of the leak. She suggested to coordinate with the sweeping group to eliminate carrying the debris and trash all the way down to Foothill. How long does it take to do the repairs and how long is the wa ter off? Tom said if it’s service line an hour or so. If it’s a mainline repair, it could affect multiple residents, when that happens, Veolia delivers water to them.

Mayor asked Rolf to have a mainline chart/list. She’s asked, have we finished with anything that was brought up in the beginning?
Mayor said, we need to have a conversation with two elected members from West Valley and our staff and make it very clear about the major investment on Riverside Ave.

Tom went to the Valves repair/replace chart.

UPDATES:

Tom said that he has been working with West Valley staff regarding the paving project north of baseline. Service laterals need to relocate down to below the elevation we need to the paving product. Tom said, t hey do have a 6’ water line on the west side of the street that runs underneath the curb and sidewalk between Baseline to Walnut, it is an old line. He added, it only serves 6 parcels, they are going to disconnect it from the system and moving those 6 connecting points over to the 10’ line. Tom said that the y presented this to the paving contractors . They have 25 service laterals that they have to lower or reconnect to the 10’ line and 6’ line. All the fire hydrants are all well below grade. Mayor said to put it in writing.

Mayor said the liability falls with the board not with the staff. She doesn’t think th at the information is not getting to the board. MPT talked about the condition of patch paving on Riverside, they are not good. MPT asked Marcus where is our standard Public Works signage that we post regarding the projects. Mayor suggested to install camaras to keep track of the progress for construction projects.

Tom talked about the maintenance report on Riverside by the entrance into where Cork’s restaurant is. West Valley closed the line and when they did, it damaged the line. Our guys went out turned the line off and water stopped. West Valley will pay the cost of the damaged line. Mayor asked how mu ch water was lost. He said it ran for about 6 hours before we were contacted. Tom will find out what that quantity was. She asked if we have an incident report and wants it shared with the rest of the Council.

Mayor would like to get alerts, what they are going to be doing that day.

Next Water Subcommittee Meetings
7 March 23, 2022
April 27, 2022

Adjournment: 12:08 pm.
8 City of Rialto
Legislation Text
File #: WS-22-274, Version: 1, Agenda #: 1
For Water Subcommittee Meeting [March 23, 2022]
TO: Water Subcommittee Members
FROM: Thomas J. Crowley, P.E., Utilities Manager
Review of Water and Wastewater Capital Improvement Projects and Financial Options

BACKGROUND
At the November 2021 Water Subcommittee meeting staff was directed to comeback with a revised and more thorough water and wastewater Capital Improvement Plan that consider the Master Plan revisions, Annual Asset Management Plan, Citywide Development Plan, paving projects, and the WIFIA application.

The list of projects is broken down by the core wastewater projects and the core water projects by fiscal year. In addition, we have included a list of Special Projects that have been identified. Special projects are not identified by fiscal year since they are tied to grants, loans, or special financing. See attached spread sheet with more detailed information.

Rialto Water Services will provide a presentation on the plan and the sources of funds; WIFIA, RWS/other sources, grants, incentive programs, or repayment through the rates.

In addition, RWS is requesting to create a $1.5 million emergency Operating Repair and Replacement (OR&R) program over the next 5 years to stay pace with the OR&R projects within the wastewater fund. This would ensure an effective balance between planned and emergency OR&R projects. We would budget an additional $300,000 per year for emergency purposes only so the planned projects can be completed as planned. Over the last couple of years some of the planned projects have been delayed due to emergency projects taking priority. Use of funds would be subject to the same OR&R review and approval process used for planned OR&R projects. Water OR&R fund is stable and does not require an emergency fund.

RECOMMENDATION
Receive presentation and provide direction.

City of Rialto Printed on 3/18/2022Page 1 of 1
powered by Legistar™
9 Fiscal Year Source Asset Description Reason for Inclusion Condition Rank Estimated Cost Total Year Cost5 Year Cost
Summary Comments
DV Sycamore Sewer Lift Station
Required to expand the capacity of the lift station for the Lytle Creek development. Lift station is in need of an upgrade and generator.

N/A $1,056,875 N/A N/A Under construction.
2023 MP/PV Upsizing Sewer Mains in Sycamore Ave. (Master Plan) Upsizing sewer mains downstream of the Sycamore Sewer Lift Station to meet current and future flows for the east side of the sewer service area.

N/A $7,500,000
Sycamore Ave. has an existing 8" sewer line that does not meet the existing and future flows. This project will install a 12" to 18" sewer line to operate as a transmission line.
2023 AM Digester 1 and 2 Transition, Cleaning, and Rehabilitation Activation of Digester #1, transition from Digester #2 to #1, cleaning and rehabilitation of Digester #2, and Digester #2 Dystor lid replacement
4 $1,800,000 Cleaning of Digester #2 and replacement of the Dystor lid are beyond the OEM timelines for said actions.
2023 AM Belt Press 1 Replacement Equipment has been non-functional for years and is obsolete 5 $1,000,000 In addition to being obsolete, this equipment is not adequately sized to handle current levels of sludge.
2023 AM Belt Press 2 Replacement Equipment has exceeded its design life and is obsolete 5 $1,500,000 With BP #1 being non-functional, BP #2 must run continuously as there is no redundancy.
2023 AM Gravity Belt Thickener 1 Equipment has exceeded its design life 4 $1,500,000 2023 AM Gravity Belt Thickener 2 Equipment has exceeded its design life 4 $1,500,000 2023 AM North Holding Tank Repair & Lid Replacement Tank requires repairs and lid needs to be replaced due its critical condition. 4.5 $3,000,000
Dependent on repairing vs replacing the tank. In addition, it is possible the lid may not be required to be replaced (pending AQMD's approval). In addition, dependent on a structural engineer's assessment. Minimum cost $1.2 M
2024 DV Agua Mansa Sewer Lift Station Lift station is in need of an upgrade and emergency back up generator. N/A $1,650,000 Required to expand the capacity of the lift station for development south of Santa Ana Avenue.
2024 AM Repair/Replacement of Aging Spencer Aeration BlowersAging blowers have been in service for many years and require major overhaul or replacement 4.5 $750,000
2024 AM Manhole Replacement and Rehabilitation PM inspections 5 $200,000 This will be updated once we have reviewed all of the condition scores along with the CCTV videos for the identified segments. 2024 AM Aged Sewer Main Replacement History of HOT LIST and past pipe segment replacements 5 $1,200,000 This will be updated once we have reviewed all of the condition scores along with the CCTV videos for the identified segments. 2025 AM Plant 5 Aeration Basins 1 & 2 Overhaul Overhaul need to maintain NPDES Permit Compliance 4 $600,000 Air supply system to the basins (similar to Basin 3).

This assists with NPDES compliance, provide better process control management, and potential electrical efficiency 2025 AM Plant 5 Secondary Effluent Clarifiers A&B Overhaul Overhaul required to maintain NPDES permit regulatory compliance 3 $500,000 Each clarifier will costs approximately $250k 2025 MP Upsizing Sewer Mains in Willow (Master Plan) Upsizing sewer main in Willow Ave. meet current and future flows. N/A 2025 AM Manhole Replacement and Rehabilitation PM Inspection 5 $200,000 This will be updated once we have reviewed all of the condition scores along with the CCTV videos for the identified segments. 2025 AM Aged Sewer Main Replacement History of HOT LIST and past pipe segment replacements 5 $1,200,000 This will be updated once we have reviewed all of the condition scores along with the CCTV videos for the identified segments. 2026 AM Manhole Replacement and Rehabilitation PM Inspection 5 $200,000 This will be updated once we have reviewed all of the condition scores along with the CCTV videos for the identified segments. 2026 AM Aged Sewer Main Replacement History of HOT LIST and past pipe segment replacements 5 $1,200,000 This will be updated once we have reviewed all of the condition scores along with the CCTV videos for the identified segments. 2027 AM Equalization Basin Rehabilitation Rehabilitation of basin, control gates, and pumping equipment 5 $500,000 2027 AM Manhole Replacement and Rehabilitation PM Inspection 5 $200,000 This will be updated once we have reviewed all of the condition scores along with the CCTV videos for the identified segments. 2027 AM Aged Sewer Main Replacement History of HOT LIST and past pipe segment replacements 5 $1,200,000 This will be updated once we have reviewed all of the condition scores along with the CCTV videos for the identified segments. $17,800,000
$3,800,000
$2,500,000
$1,400,000
$1,900,000

CORE WASTEWATER PROJECTS
$26,000,000
10 Fiscal Year Asset Description Reason for Inclusion Condition Rank Estimated Cost Total Year Cost5 Year Cost
Summary Comments
PV Riverside (North) Water Main Replacement Project - Phase I Riverside paving project and 5 year moratorium N/A $2,241,120 N/A N/A Completed 2023 PV/AM Aged Water Main Replacement Merrill from Sycamore to Eucalyptus (Pavement Project) History of frequent leaks and adjacent to replaced segment 5 $4,400,000 2023 PV/AM Aged Water Main Replacement Etiwanda from Riverside to Eucalyptus (Pavement Project)
History of frequent leaks and adjacent to replaced segment.

Several ongoing leaks in the extremely aged service lines and main line.
5 $6,700,000 This covers Sycamore to Acacia and Acacia to Eucalyptus, 2023 PV/AM Aged Water Main Replacement Sycamore from Etiwanda to Foothill (Pavement Project) Deteriorated line and history of frequent leaks 5 $2,400,000 3 aged mains that need to be replaced (1930s - 1950s). This area covers Rosewood to Foothill and from Etiwanda to
Rosewood.
2023 PV
Riverside (Central) Water Main Replacement Project - Phase III (Pavement Project) Riverside paving project and 5 year moratorium N/A $5,500,000 New project do to City's restoration of Riverside Ave Paving (Central phase). Due to the tentative schedule for this project, we have placed it in 2023. This project includes the relocation of a PRV station (corner of Randall & Riverside).
2024 MP Pressure Relief Valves (PRVs) Zone 2 to Zone 3 Provide for the movement of water between Zone 2 and 3 N/A $250,000 2024 AM Service line replacements on South Alice, South Palm, West Godden and Alu St.

Several ongoing leaks in the extremely aged service lines and main line. 4 $1,200,000
2024 AM Main and service line replace; Bonnie View between Acacia and Eucalyptus
Several ongoing leaks in the extremely aged service lines and main line. 5 $2,400,000
2024 AM Mainline Valve Replacements PM Inspection and Valve Turning 5 $250,000 These replacements are identified when the valve is being exercised and because OR&R is a list of planned and budgeted projects, setting aside CIP funds to replace valves is the most appropriate.
2025 AM Cedar Reservoir 2, Overhaul, and Dome Preservation PM Inspection, Asset Renewal, and Life Cycle Extension 4.5 $1,000,000 2025 AM 4” South Oakdale and South Marcella between East Rialto Ave and Allen St
Several ongoing leaks in the extremely aged service lines and main line. 5 $3,000,000
2025 AM Mainline Valve Replacements PM Inspection and Valve Turning 5 $250,000 These replacements are identified when the valve is being exercised and because OR&R is a list of planned and budgeted projects, setting aside CIP funds to replace valves is the most appropriate.
2026 AM
Mainline and Service Line, Hydrant Laterals, and Mainline Replacement Below Etiwanda between Lilac and Sycamore
Streets: Cornell and Victoria
History of frequent leaks and adjacent to replaced segment 4.5 $2,500,000 2026 AM Service Line Replacement, Hydrant Lateral for Woodcrest, Yucca, Miramonte, Arrowhead, and Althea History of frequent leaks and adjacent to replaced segment 4.5 $1,300,000 2026 AM Mainline Valve Replacements PM Inspection and Valve Turning 5 $250,000 These replacements are identified when the valve is being exercised and because OR&R is a list of planned and budgeted projects, setting aside CIP funds to replace valves is the most appropriate.
2027 AM
Service Line Replacement between Cedar and Larch below
Etiwanda on Streets Victoria, Cornell, Rosewood, Church, and Folk
History of frequent leaks and adjacent to replaced segment 4.5 $1,200,000 2027 AM Service Line Replacement, Hydrant Laterals for Palm, Orange, Olive, Date Between Foothill to Train Tracks (Part 1)History of frequent leaks and adjacent to replaced segment 4.5 $2,500,000 2027 AM Mainline Valve Replacements PM Inspection and Valve Turning 5 $250,000 These replacements are identified when the valve is being exercised and because OR&R is a list of planned and budgeted projects, setting aside CIP funds to replace valves is the most appropriate.
$19,000,000
$4,100,000
$4,250,000
$4,050,000
$3,950,000
$31,100,000

CORE WATER PROJECTS
11 Fiscal Year Asset Description Reason for Inclusion Condition Rank Estimated Cost Total Cost Comments
SP Microgrid / Cogen N/A $14,200,000
SP Demolish Plants 1 and 2 Demo of Plants 1 & 2 to make way for the construction of solar panels. N/A $2,200,000
SP Electrical Upgrade Upgrade electrical at the WWTP to make way for the Microgrid project. N/A $3,000,000
SP Lake Rialto Environmental, recreational and operational improvement to the WWTP and the SAR HCP. N/A $8,000,000 $8,000,000 In final design. Received $1.05 M for the SWRCB Earmark funds.

SP Septic to Sewer SDAC Identified a SDAC in the Shamrock and Meridian Neighborhood. N/A $3,150,000 $3,150,000 Submitting a grant application to SAWPA Prop 1 Round 2, requesting the full amount due to being a SDAC.

SP SCADA Upgrades to Lift Stations
Provide lift station monitoring and control to better manage lift station operation, more easily identify and address maintenance issues
N/A $750,000 $750,000
SP Installation of fourth Disk Filter Filtration system lacks internal redundancy necessary to maintain capacity N/A $350,000 $350,000
By installing a fourth disk filter, this would provide redundancy to ensure preventative maintenance on the other disk filters to prolong life span
SP Backup generators for Cactus, Lilac, and Ayala Lift StationsBackup generators provide an assurance that collection system wastewater pumping will be provided during power outagesN/A $750,000 $750,000 SP Automatic Meter Infrastructure (AMI) Install Automatic Meter Infrastructure and upgrade remaining meters. N/A $6,700,000 $6,700,000 Waiting for the results of a $2 M grant from the BOR Water Smart Grant.

SP Security for Water and Wastewater Provide security at all water an wastewater facilities. N/A $2,500,000 $2,500,000 Currently preparing an RFP to implement the security system.

SP Septic to Sewer Larger Project Provide security at all water an wastewater facilities. N/A $33,800,000 $33,800,000 Portion identified in the WIFIA application.

AM Asset Management Report
PV Paving Projects
MP Required from Sewer Master Plan
MP Required from Water Master Plan
DV Required for Existing and Future Development Demands SP Special Projects
LEGEND
$19,400,000

SPECIAL PROJECTS
$75,400,000
12 Rialto Utility Authority5-Year CIP Plan 2023-2027MEETING WATER & WASTEWATER CIP NEEDS 2023-2027 13 Reconciliation, Prioritization of City Plans (2023-2027)The Following inputs were evaluated, reconciled and prioritized in developing the attached water & wastewater 5-year CIP plan (2023-2027) 1.Master Plan Revision (Dopudja Wells)2.Annual Asset Management Plan (Veolia)3.Citywide Development Plan (Planning)4.City Paving Plan (Public Works)5.WIFIA Application (RWS) 14 5-Year CIP Plan Water & WastewaterCore CIP Water Wastewater Total2023$19.0$17.8 $36.82024$4.1$3.8 $7.92025$4.3$2.5 $6.82026$4.1$1.4 $5.52027$4.0$1.9 $5.9$35 $27.4 $62.8Special Projects$75.3Total $138.1 5-Year CIP PlanCore CIP +Special Projects ($ MM’s)
15 $19.0$4.1$4.3$4.1$4.0$17.8$3.8$2.5$1.4$1.9$0.0$5.0$10.0$15.0$20.02023 2024 2025 2026 2027Core CIP Plan 2023-2027$MMWaterWastewater 16 Sources of Funds-RepaymentUse of WIFIA and SRF is optimized to achieve lowest cost of capitalBackfill from RWS/Other sources completes fundingLooking back to October presentation water utility requires a 2.5% to 3.0% annual rate increase over 5-years to support capital projectsWastewater does appear to require a rate increase at this timeNeed to watch inflation which may impact utility budgetsSpecial projects are addressed separately from Core InfrastructureTotal size of program matches WIFIA application noting discretionary nature of Special Projects Sources of FundsWIFIA 49.0% 30-year loan (provisionaly approved)SRF 31.0% 30-year loan (requires new application)RWS/Other 20.0% RWS is prepared to back fill as needed100.0%Source of RepaymentCore InfrastructureWater $35.4 Annual increase (5 Years) 2.5% to 3%Wastewater $27.4 Existing cash flow (no rate increase required)$62.8Special ProjectsMicrogird $14.2 Self funds via savingsDemolish Plants 1 and 2 $2.2 Self funds via savingsElectrical Upgrade $3.0 Self funds via savingsLake Rialto $8.0 Grant fundingSeptic to Sewer $3.2 Grant fundingSCADA Upgrades to Lift Stations $0.8 Existing cash flow (no rate increase required)Installation of fourth Disk Filter $0.4 Existing cash flow (no rate increase required)Backup generators for Cactus, Lilac, and Ayala Lift Stations $0.8 Existing cash flow (no rate increase required)Automatic Meter Infrastructure (AMI) $6.7 Grant funding, operating Savings, water ratesBalance of Septic to Sewer $33.8 Requires new revenue planProvide security at all water an wastewater facilities.$2.5 Requires new revenue plan$75.4$138.1 17 Looking Back at the October 2021 PresentationConditions are essentially the sameExcept for potential inflation impactsNeed to maintain awareness of cost escalation in water and wastewater 18 - 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 - 5,000,000 10,000,000 15,000,000 20,000,000 25,000,000 30,000,0002013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 (Budget) Add MicrogirdWastewater Utility Data 2012-2022$MMExpensesRevenuesRev Over(Under) ExpensesWastewater appears stable, without the need for additional revenue at this timeWe’ve seen modest growth in revenue due to the economic success of the airport project. There are no examples during the life of the Concession where revenue has been under expenses. And wastewater revenue is fixed with delinquencies' collected via a tax roll process. The financial outlook in wastewater is favorable.

WW RevenueWW ExpensesRev Over Expenses
Revenue Expense Axis
Rev Over Axis
19 Decline in water consumption (-14.5% vs. average), lost revenue, cost escalation, negative OPEX net marginReserves are being used to meet financial requirements. Reserve draw down is not sustainable. Additional revenue is needed to support operations and 5-year CIP program 2023-2027. 0.000.501.001.502.002.503.003.504.004.505.00-2.00.02.04.06.08.010.012.014.016.02013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22(Budget)Water Utility Data 2012-2022$MM, HCF MMExpenseRevenueRev Over (Under) ExpensesWater HCFUse of ReservesReserves ReturnedHCF, Reserves, Over (Under) Axis Revenue Expense AxisW Consumption HCFW Use of ReservesW ReservesReturnedRev Over (Under) ExpensesW RevenuesW Expenses 20 Rate Increase Implications 2023-2027NOTESARPA funds meet water coverage for 2022, 2023 and 2024Water requires a rate increase to meet coverage and CIPWastewater does not require a rate increase at this timeNeed to monitor inflation impactsRecommending preventive inflation rate adjustments starting in 2023Rate Increase Implications 2023-2027Annual 5-YearsWater CIP 2.4-3.0% 12-15%Water Coverage 2.5% 12.5%Wastewater CIP 0% 0%Wastewater Coverage* 0% 0%Address need for ongoing inflation adjustments in water & wastewater 21 Requesting up to $1.5 MM Emergency ORR Fund for WastewaterCarry over S1 MM ORR combined with emergency projects in wastewater are crowding out regular planned ORR. To ensure an effective balance between planned and emergency ORR we are requesting support for up to $1.5 MM emergency ORR fund in wastewater ($300,000 annually for five years). Use of the fund would be subject to the same ORR review and approval process used for planned ORR. Water ORR is stable and does not require an emergency ORR fund. Justification for Emergency ORR Fund ORR Historical Performance 2018-2019 to 2020-2021Water Wastewater ORR20/21 Completed all planned projets and met budget requirementsPlanned 11 projects $525 k. Completed 0 planned projects. Spent $685 k on emergncy unplanned projects19/20 Completed all planned projets and met budget requirementsPlanned $525 k. Completed 50% of planned projects. Emergency projects required $600 k in capital18/19 Completed all planned projects and met budget requirementsRequested $919 k for planned projects. City authorized $525 k. Deferred a number of projects to the next year. 22 Subcommittee Action Items1.Approve Core CIP 5-Year Investment Plan as recommended2.Provide guidance on Special Projects timing and funding3.Approve application processes for WIFIA and SRF target completion November 20224.Anticipate RWS/Other funding backfill as needed5.Approve use of $5 MM water CIP carryover funds in 20226.Plan for rate increases in water and inflation adjustments going forward7.Approve $1.5 MM 5-Year Emergency ORR Budget for Wastewater in an effort to avoid crowding out of regular wastewater ORR. Emergency ORR is crowding out regular ORR in 2020, 2021 and 2022. 23 City of Rialto
Legislation Text
File #: WS-22-275, Version: 1, Agenda #: 2
For Water Subcommittee Meeting [March 23, 2022]
TO: Water Subcommittee Members
APPROVAL: Thomas J. Crowley, P.E., Utilities Manager
Consider a Santa Ana River Habitat Conservation Plan Well Site at Rialto’sWastewater Treatment Plant.

BACKGROUND:

As part of the IEUA Principles of Agreement, IEUA agreed to “…fund a maximum of $1 million (2019 cost estimate) the construction of one groundwater well adjacent to the Santa Ana River or the construction of a gravity pipeline from the bottom of the future Lake Rialto, with a preferred location within the City’sproperty; the purpose of the project is to provide cold water for the benefit of the native species while the Rialto water is diverted to the IEUA recycled water distribution system”.

Cost over the $1 million contribution would be the responsibility of the City, or other agencies.

ANALYSIS/DISCUSSION:

There is concurrent an interest by the San Bernardino Municipal Water District (SBVMWD) to also identify and provide cold water for the benefit of the native species within the Santa Ana River Habitat Conservation Plan (HCP). A similar well concept had been previously discussed. However, until the City and IEUA approved the Principles of Agreement, detailed exploration of a potential well facility was not prudent. Now that the Principles of Agreement is approved, exploration of the well is timely and necessary. Potential synergies could ultimately reduce the cost to the City. Staff from SBVMWD have requested an opportunity to explore these synergies. This effort was anticipated and included under Task 2 “Evaluation of the need for a supplemental well” of Dopudja & Wells scope of work.

FINANCIAL IMPACT:

No financial impact identified at this time.

RECOMMENDATION:

Discuss and provide direction.

City of Rialto Printed on 3/18/2022Page 1 of 1
powered by Legistar™
24 City of Rialto
Legislation Text
File #: WS-22-268, Version: 2, Agenda #: 3
For Water Subcommittee Meeting [March 23, 2022]
TO: Water Subcommittee Members
APPROVAL: Thomas J. Crowley, P.E., Utilities Manager
Extraterritorial Wastewater Service Agreement with Bloomington Hills, LLC, for the property located at 11279 Cedar Avenue, Bloomington, CA, Assessor’s Parcel Number 0257-101-09-0000.

BACKGROUND:

Bloomington Hills, LLC, (BH) a California Limited Liability Company, is the owner of the property located at 11279 Cedar Avenue in Bloomington, CA. This property is at the northeast corner of Cedar and Jurupa Avenues in an unincorporated area of San Bernardino County. The Assessor’s Parcel Number is 0257-101-09-0000. Bloomington Hills is developing a proposed gas station, convenience store, drive thru restaurant and car wash at this location. Due to the car wash, the Regional Water Quality Control Board (RWQCB) and San Bernardino County are requiring Bloomington Hills to connect to a sewer system at the closets possible connection point. A copy of a location map and site plan showing the property is included.

ANALYSIS/DISCUSSION:

The closets connection point to the City’ssewer system is at the intersection of Cedar and Santa Ana Avenues. To connect, the developer will be required to construct a privately owned and operated sewer lift station and associated force main along Cedar Ave. The City’s sewer line and the wastewater treatment plant have sufficient capacity to accept the proposed sewer connection for the proposed project.

It should be noted that an Extraterritorial Service Agreement is required to be approved by the City Council and the Local Area Formation Commission prior to the project being completed. This agreement describes the duties and responsibilities of the City of Rialto, and the property owner.

There are no costs to the City to construct this project.

FINANCIAL IMPACT:

To connect to the City’s Wastewater system, the developer will be required to make a one-time Development Impact Fee payment at the Extraterritorial Rate of 1.3 times the standard rate. The required connection fees are determined by the planned use of the facility and are estimated at $101,648.39 for both Wastewater Collection and Treatment fees. The calculations are shown in Table 1 below.

Table 1
City of Rialto Printed on 3/18/2022Page 1 of 2
powered by Legistar™
25 File #: WS-22-268, Version: 2, Agenda #: 3
Operating Budget Impact
Rialto Water Services will bill the property owner for service at the subject property at 1.3 times the standard applicable sewer rate and the Rialto Utility Authority will absorb the operating costs to serve the property, within the Concession Agreement.

RECOMMENDATION:

Staff requests the Water Subcommittee recommend the City Council adopt a Resolution and Rialto Utility Authority Resolution, approving an Extraterritorial Wastewater Service Agreement with Bloomington Hills, LLC, for the property located at 11279 Cedar Avenue, Bloomington, CA, Assessor’s Parcel Number 0257-101-09-0000.

City of Rialto Printed on 3/18/2022Page 2 of 2
powered by Legistar™
26 Bloomington Hills LLC
11279 Cedar Avenue, Bloomington, CA
AM/PM Gas Station, Carwash and Drive Thru Restaurant

VACINITY MAP

Santa Ana Interseptor
Project Force Main
Project Location
27 25.0'SETBACK

22.4'20.5'

36.6'19.0' StoreBLDG. HGT.+24'-6"PAD=100.00CarWashGas PumpsCanopy 654
9 DRIVE THRU
87Drive Thru321Restaurant
Convenience"QSR"30.4'36.8'19.0'8.9'

12.0'

19.0'26.0'8.1'

13.3'
BLDG. HGT.+15'-0"PAD=100.00
BLDG. HGT.+20'-8"PAD=100.00

26.0'10.0'

5.0'

LANDSCAPELANDSCAPELANDSCAPELANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

CAR WASH DRIVE THRU
PAD=100.00BLDG. HGT.+17'-0"
1 DRIVE AISLELANDSCAPE
432 7891011121314151617

LOADING

LOADING
123456
891011

OUTSIDE DINING
14151620211712
2345678910
18 CAR WASH DRIVE THRU
LANDSCAPE12.0'40.7'5.0'19.0'28.0'19.0'

17.2'5.0'19.0'26.0'19.0'35.0'

34.8'

45.0'

32.0'32.0'12.5'30.3' 35.0'

17.2'101.3'

32.0'12.5'

9.9'50.0'24.0'

84.7'

48.0'
19 19
614
2126 1720111522
11 26
15 211418
1323
23 23
21 211244
10 10
7892627
18 24412
1079134

7.0'

12.0'TYPICAL
1 1656

STRIPEDAREADESIGNATEDNO PARKING
3 3
5 56
12 2624
25 25
2226 21244
Model 38007.1'

68.0'15.0'33.0'5.0'StorageBldgBLDG. HGT.+15'-0"PAD=100.00 87 OCT. UNLEADED20,000 GAL.91 OCT. 12,000 GAL.210,000 GAL.DIESELUNL. PREM.

15.0'12.0'FUTURE DEDICATION

10.0'

7.2'

81.3' SETBACK
44212

26.0'15.0'48.3'

38.0'CANOPY ROOF115.7' CANOPY ROOF

52.0' (FUTURE)45.0'7.0'FUTURERIGHTOF WAY

25.0'SETBACK
13 52.0' 30.0'TRUCK DELIVERY PATH - ENTRY
TRUCK DELIVERY PATH - EXIT28
2829
29 32
3334
7 181936359 9
37 212441 6

26.0'17.3'8.7'
SCALE:1" = 30.00'1 PROPOSED ARCHITECTURAL SITE PLAN
DEVELOPER:HARRY SIDHUAPPLICANT/1240 E. WASHINGTON ST.COLTON, CA [email protected]:ARCHIMETRICSJAY NELSON1177 IDAHO STREET, SUITE 200REDLANDS, CA 92374PHONE (909) 322-7582PREPARATION DATE:FEBRUARY 18, 2021PROJECT DESCRIPTION:CONSTRUCT NEW CONVENIENCE STORE, GAS PUMP CANOPY,CARWASH, & DRIVE THRU RESTAURANT FACILITIES WITH SITEIMPROVEMENTSASSESSOR'S PARCEL NO.:0257-101-09LEGAL DESCRIPTION:Lot: 393 District: 08 Abbreviated Description: LOT:393 DIST:08CITY:FONTANASUBD:THE SEMI TROPIC LAND & WATERCOMPANY S T L AND W CO S B L W 374 FT S 1/2 W 1/2 LOT 393EX STS City/Muni/Twp: FONTANAPROJECT ADDRESS:11279 CEDAR AVENUEBLOOMINGTON, CA 92316GENERAL PLAN:RESIDENTIAL VACANT LANDSPECIFIC PLAN:N/AUTILITIES:WATER -WEST VALLEY WATER DISTRICTDISTRICTTELEPHONE - VERIZON COGAS -SOUTHERN CALIFORNIA GAS COELECTRIC -SOUTHERN CALIFORNIA EDISONSEWER -WEST VALLEY WATER DISTRICTBUILDING HEIGHT:CONVENIENCE STORE24'-6"PUMP CANOPY17'-0"CAR WASH15'-6"DRIVE THRU RESTAURANT20'-8"SITE AREA 2.31 AC. (100,447 SQ. FT.)COVERAGE AREAS:AREA OF USES.F.REQUIRED%PROVIDED%BUILDINGS12,428---12,428 SF(12.4%)PARKING/PAVED59,883---59,883 SF(59.6%)LANDSCAPING28,136 20,599 SF(20%)28,136 SF(28.0%)

VICINITY MAP
PROJECT DATA:

PROPOSED ARCHITECTURAL SITEPLAN1.0NORTH CEDAR AVENUE

VALLEY BLVD
1177 IDAHO STREET, STE 200AREDLANDS, CALIF. 92374909 322-7582 ARCO AM/PM (NO. 00000)MR. HARRY SIDHU11279 CEDAR AVENUEBLOOMINGTON, CA 92316- ARCHITECT & ASSOCIATESSTEVEN PAUL MURRAYA R C H I T E C T1177 Idaho Street, Suite 200Redlands, Ca 92374Phone (909) 307-0146Fax (909) 307-0148

SLOVER AVENUESANTA ANA AVENUEJURUPA AVENUEPROJECTLOCATIONLOCUST AVENUE 1617181920
89101112131415
KEYNOTES123ACCESIBLE PATH OF TRAVEL FROM PUBLIC WAY - 5% MAX. SLOPEACCESSIBLE PATH OF TRAVEL - 5% MAX. SLOPE"UNAUTHORIZED PARKING IN ACCESSIBLE SPACES..." SIGNAGEYELLOW TRUNCATED DOMESACCESSIBLE PARKING SIGNAGE WITH "VAN ACCESSIBLE"SIGNAGE AND MINIMUM FINE SIGNAGEACCESSIBLE PARKING SIGNAGE WITH MINIMUM FINESIGNAGEACCESSIBLE VAN PARKING STALLACCESSIBLE PARKING STALLACCESSIBLE ACCESS AISLEBUILDING ACCESSIBLE ENTRY SIGNAGENEW TRASH ENCLOSURESTRIPED WALKWAY AT DRIVE AISLE2 BICYCLE PARKINGNEW DRIVE WAYLOADING SPACE - 15' X 19'UNDERGROUND FUEL TANK LOCATIONMENU BOARDDELIVERY TRUCK TURNING RADIUSINDICATES TANKER DELIVERY PATHINDICATES VEHICLE LENGTH (20'-0")MONUMENT SIGNAGEDRIVE THRU ENTRANCECONCRETE WHEEL STOP, TYPICALCARWASH SELECTION BOARDDRIVE THRU EXITASPHALT PAVING TYPICALCONCRETE PAVING AT CANOPY AREASIGNAGE - RIGHT IN-RIGHT OUT ONLYDRIVEWAY STRIPINGEXISTING SIGNALIZED INTERSECTIONEXISTING CONCRETE MEDIANINSTALL SIGN "NO TRAILER ENTRANCE ALLOWED"FACING NB TRAFFICINSTALL SIGN "NO TRAILER TRUCK EXIT"INSTALL SIGN WITH NO RIGHT TURN SYMBOL (R3-1) ANDTRUCK SYMBOL (M4-4) FACING WB TRAFFICACCESSIBLE CHARGING STATIONCHARGING STATIONCLEAN AIR VEHICLE PARKING 4567
21222324252627
PARKING SUMMARYDESCRIPTIONBLDG. S.F.RATIOREQUIREDPROVIDEDCONVENIENCE STORE & QSR5,000 SF1 SP/250 SF 2018GAS PUMP CANOPY - SF1 PER PUMPISLAND 8CAR WASH STATION2,634 SF3 REQUIRED 3 10STORAGE BLDG2,244 SFN/ADRIVE THRU RESTAURANT2,550 SF1 SP/100 SF 2523TOTAL 48 51STALLS PROVIDEDREGULAR STALL 9X1848 STALLSACCESSIBLE STALL 9X18 3 STALLSLOADING STALL15X19 2 STALLSBICYCLE 4 PROPOSED 2829
CURB RETURNS AND SIDEWALK RAMPS - CURB RETURNSAND SIDEWALK RAMPS SHALL BE DESIGNED PERCOUNTY STANDARD 110 AND CALTRANS STANDARD A88A.ADEQUATE EASEMENT SHALL BE PROVIDED TO ENSURESIDEWALK IMPROVMENTS ARE WITHIN PUBLICRIGHT-OF-WAY.SIDEWALKS - DESIGN SIDEWALKS PER COUNTYSTANDARD 109 TYPE "C".DRIVEWAY APPROACH - DESIGN DRIVEWAY APPROACHPER SAN BERNARDINO COUNTY STANDARD 129B, ANDLOCATED PER SAN BERNARDINO COUNTY STANDARD130.ROAD DEDICATION - A 7 FOOT GRANT OF EASEMENT ISREQUIRED TO PROVIDE A HALF-WIDTH RIGHT-OF-WAY OF52 FEET.STREET IMPROVEMENTS - DESIGN CURB AND GUTTERWITH MATCH UP PAVING 40 FEET FROM CENTERLINE.

CIVIL NOTES
3031323334353637
28 City of Rialto
Legislation Text
File #: WS-22-277, Version: 1, Agenda #: 4
For Water Subcommittee Meeting [March 23, 2022]
TO: Water Subcommittee Members
APPROVAL: Thomas J. Crowley, P.E., Utilities Manager
Review EPA Bipartisan Infrastructure Bill.

BACKGROUND:

Staff was provided a presentation on the Bipartisan Infrastructure Law and asked to place this presentation on the agenda for review and discussion.

The new infrastructure law appropriates to the EPA more than $60 Billion over the next five fiscal years. This bipartisan law represents a historic investment in the mission of the agency that will have significant impact on the health and environment in communities across the Nation. EPA is dedicated to implanting and managing these resources with transparency, efficiency, and effectiveness to achieve the results for the American People.

FINANCIAL IMPACT:

No financial impact identified at this time.

RECOMMENDATION:

Discuss and provide direction.

City of Rialto Printed on 3/18/2022Page 1 of 1
powered by Legistar™
29 www.uswateralliance.org
PRELIMINARY- LAST UPDATED 2/28/2022
Preliminary- Last updated 2/28/2022 Briefing Materials
30 INTRODUCTION
• The new infrastructure law appropriates to the EPA more than $60 billion over the next five fiscal years.
• This bipartisan law represents a historic investment in the mission of the agency that will have significant impact on the health and environment in communities across the Nation. • EPA is dedicated to implementing and managing these resources with transparency, efficiency, and effectiveness in order to achieve the results for the American people. 31 DRAFT -- DELIBERATIVE

EARLY IMPLEMENTATION ACCOMPLISHMENTS
 Sent SRF letter to governors outlining IIJA aspirations and announcing $7.4 billion in allocations
 Announced $1 billion in funding to clear 49 Superfund backlog sites at an event in Philadelphia
 Announced stronger lead regulations with the Vice President  Hosted multiple listening sessions that reached 3,000+ stakeholders including tribal representatives, schools, state water officials, and community members.
 Announced how $1B will be invested in the Great Lakes to accelerate clean-up at long-standing Areas of Concern
 Submitted our first Clean School Bus report to Congress on January 31st
 Transmitted EPA’s spend plan ahead of the 90-day statutory deadline
$1B Superfund
Announcement
Lead Pipes Action
Plan
Water State
Allocations
Agency
Spend Plan
This is a subset of activity over the past two months and not comprehensive of all our work 32 • The IIJA supports and enhances EPA programs and also starts new efforts to address existing or emerging issues:
• $23.4 billion to traditional Clean Water and Drinking Water State Resolving Funds • $15 billion dedicated to lead pipe replacement
• $10 billion to addressing emerging contaminants like PFAS • $5 billion for Superfund and Brownfields
• $5 billion for Clean School Buses
• $1.7 billion across 12 geographic water programs
• $375 million for solid waste infrastructure and battery recycling programs • $267 million for other water quality programs
• $100 million for the Pollution Prevention program
PRELIMINARY- LAST UPDATED 2/28/2022

OVERVIEW OF EPA IIJA RESOURCES
33 PRELIMINARY- LAST UPDATED 2/28/2022

ALL PROGRAMS WILL MAKE SIGNIFICANT ADVANCEMENTS THIS YEAR Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Announce and publicize P2 grant
recipients (Rolling basis)
Competitive grants
application open
EPA reviews IUPs
Continue obligation of funds to new and ongoing construction projects when needed Begin design for additional sites to be funded in the next 2-5 years EPA drafts &
finalizes SRF memo
Rebate application open
Announce site plans,
funding, and timing for
new starts
Competitive
grants open
Grant application and review period
Stakeholder engagement on
solid waste infrastructure grants
Brownfields
SRFs
Clean
School
Buses
Solid Waste
Infrastructure
Superfund
Capitalization
grants
Activity
Award rebates
Pollution
Prevention
First round of targeted
assessment awards
SWIFR and Reduce, Reuse, Recycle
Grant guidance posted
Year 1
Grant Awards
Additional Programs Not Shown: [Office of Water] Geographic and Estuary programs to obligate funds through existing grants, contracts, and IAs on a rolling basis. Implementation planning underway for WIIN grants, UIC, and Class VI Wells programs. [Office of Land and Emergency Management] EPA is developing best practices for battery collection and a new voluntary labeling program for batteries to facilitate safe recycling. Draft voluntary battery labeling guidelines will be posted for public comment this summer.
34 AGENDA
PRELIMINARY- LAST UPDATED 2/28/2022
Land Programs
Clean School Bus Program
Water Programs
Pollution Prevention Program
35 PRELIMINARY- LAST UPDATED 2/28/2022
LAND & EMERGENCY MANAGEMENT – IIJA INVESTMENTS
1,500
3,500Superfund
350
Brownfields
Total
Solid Waste &
Recycling Grants
and Education
& Outreach
Batteries 25
5,375
Opportunity to address the backlog of 49 National Priority List sites with projects awaiting new construction funding
Direct grants and technical assistance to assess and clean up Brownfield sites, train and place people in environmental jobs, and assist hundreds of communities.

New grant programs focused on funding innovative approaches to solid waste management and recycling education and outreach
New funding to accelerate innovations in battery recycling and develop best practices for battery collection
$, Millions
36 PRELIMINARY- LAST UPDATED 2/28/2022
SUPERFUND: YEAR 1 IMPLEMENTATION PLAN
EPA approved funding for new cleanup
construction projects at 49 Superfund National
Priority List sites that will clear the entire backlog
of sites awaiting remedial construction funding to
start work.

Sites are in all 10 EPA regions, 24 states and
territories.

Maine 1
Vermont 2
Connecticut 1
New Jersey 7
New York 3
Puerto Rico 1
Virginia 1
Pennsylvania 2
North Carolina 4
Florida 5
Tennessee 3
Mississippi 1
Michigan 4
Ohio 1
Wisconsin 1
Indiana 1
Louisiana 2
New Mexico 2
Kansas 1
Nebraska 1
Missouri 2
Utah 1
California 1
Oregon 1
Philadelphia Superfund
Announcement
37 PRELIMINARY- LAST UPDATED 2/28/2022
BROWNFIELDS: YEAR 1 IMPLEMENTATION PLAN

MULTIPURPOSE
GRANTS
● $150 Million; up to $10 Million per grant
● First Round of proposals due July 2022. Projects awarded Nov 2022.

ASSESSMENT
GRANTS
● $600 Million; up to $10 Million per grant
● First Round of proposals due July 2022. Projects awarded Nov 2022.

CLEANUP GRANTS
● $160 Million; up to $10 Million per grant
● First Round of proposals due July 2022. Projects awarded Nov 2022.

REVOLVING LOAN

FUND (RLF) GRANTS
● $150 Million; up to $10 Million per grant
● Supplemental requests from existing grantees due April 2022. Projects awarded August 2022.

JOB TRAINING
GRANTS
● $30 Million; up to $1 Million per grant
● First Round of proposals due July 2022. Projects awarded Nov 2022.

COOPERATIVE AGREEMENTS

TO STATE & TRIBAL RESPONSE

PROGRAMS
● $300 Million; up to $60 Million per year
● FY22 requests due July 2022. Projects awarded Nov 2022.

TECHNICAL

ASSISTANCE
● $110 Million
● Projects awarded on a rolling bases
● First round of Targeted Brownfields Assessments funding obligated April 2022. 38 PRELIMINARY- LAST UPDATED 2/28/2022
WASTE AND RECYCLING: OVERVIEW OF FUNDING
(NEW) Solid Waste
Infrastructure for
Recycling Grants
● $275,000,000 for grants under section 302(a) of the Save Our Seas 2.0 Act (55M/yr). ● Year 1 milestones will be to issue a Request for Information, conduct stakeholder outreach, develop the program, and issue the Request for Applications and Program Guidance. (NEW) Reduce,
Reuse, Recycle
Education and
Outreach Grants
● $75,000,000 ($15M/yr from FY22-26).
● Year 1 milestones will be to issue a Request for Information, conduct stakeholder outreach to develop the toolkit,while at the same time developing the grant program and issuing the Request for Applications.

Battery
Collection Best
Practices
Voluntary Battery
Labeling
Guidelines
● $10,000,000 for fiscal year 2022, available to be expended until September 30, 2026. ● Year 1 milestones will be toissue a Request for Information on existing battery collection practices, conduct an international survey of battery collection best practices, and outline the report requested. ● $15,000,000 for fiscal year 2022, available to be expended until September 30, 2026. ● Year 1 milestones will be toissue a Request for Information on voluntary labeling information and conduct an international survey of voluntary battery labelling.
39 AGENDA
PRELIMINARY- LAST UPDATED 2/28/2022
Land Programs
Clean School Bus Program
Water Programs
Pollution Prevention Program
40 PRELIMINARY- LAST UPDATED 2/28/2022
AIR & RADIATION– IIJA INVESTMENTS
$5 billion to decarbonize the nation’s school
bus fleet through:
 $500M annually for zero emission school buses
 $500M annually for clean school buses and zero
emission school buses
Zero emission school buses are defined as a
vehicle that does not emit any pollutant under section
108(a) of the Clean Air Act or any greenhouse gas.

Clean school buses are defined as zero emission
school buses or a bus that reduces emissions while
using natural gas, hydrogen, propane, or biofuels.

There are approximately 500,000 school buses in
the United States that transport over 20 million students to and from school.
• Less than 2,000 school buses are currently electric
• Studies show students in school buses can be exposed
to air pollution that significantly exceed ambient levels Electric school buses save money over the long-
term, but school districts often need assistance meeting up-front capital requirements.

Through a mix of rebates and competitive grants we
will be able to accelerate school bus decarbonization while targeting efforts to reduce emissions in vulnerable
communities.
41 • State or local governmental entities responsible
for:
• Providing school bus service to one or more
public school systems; or
• Purchase of school buses
• Eligible contractor
• For profit, not-for-profit, or nonprofit entity that
has the capacity to:
• Sell clean school buses, zero emission
buses, charging or fueling infrastructure,
or other equipment needed to charge, fuel,
or maintain
clean/zero emission school
buses; or
• Arrange financing for such a sale
• Nonprofit school transportation association
• Indian Tribe
PRELIMINARY- LAST UPDATED 2/28/2022

IMPLEMENTATION CONSIDERATIONS
13 • Up to 100% the cost of the replacement bus and
charging / fueling infrastructure
• Competitive grants and rebates to eligible
recipients for bus replacement
• Contracts to eligible contractors to provide
rebates for bus replacement
• Limitation: no state shall receive more than 10%
of a fiscal year’s available funds
• Lowest overall cost of bus replacement
• Local conditions, including length of bus route
and weather conditions
• Technologies that most reduce emissions
• Whether funds will bring new technologies to
scale or promote cost parity between old and
new technology
Eligible entities Funding Mechanisms
Considerations
42  Objectives for Year 1:
 Award BIL rebates in FY 2022
 Establish an outreach and engagement structure to reach underserved communities within 120 days  Design a competitive grant program that can begin awarding funds in FY 2023  Milestones for Year 1:
 December 15: Stakeholder listening session with school districts, manufacturers/vendors, utilities, community organizations, clean air organizations
 January 31: Submit initial report to Congress
 April: Launch rebate application
 ~June: Close rebate application
 ~September: Announce initial rebate awards
 Fall: Release RFA for competitive grant program
PRELIMINARY- LAST UPDATED 2/28/2022
TIMELINE FOR YEAR 1 – FY 2022
43 AGENDA
PRELIMINARY- LAST UPDATED 2/28/2022
Land Programs
Clean School Bus Program
Water Programs
Pollution Prevention Program
44 PRELIMINARY- LAST UPDATED 2/28/2022
WATER – IIJA INVESTMENTS
Drinking Water SRF -
Lead Service Lines
1,000
Clean Water SRF
Drinking Water SRF
Clean Water SRF -
Emerging Contaminants
WIIN Grants –
Emerging Contaminants
Drinking Water SRF -
Emerging Contaminants
50,410
Underground Injection
Control
Place-based programs
(Geos, Estuaries, Hypoxia)
Total
11,713
11,713
15,000
4,000
5,000
1,909
75 $, Millions
Grants to states, tribes, and territories through the existing State Revolving Fund program to support clean water and drinking water objectives New appropriations towards the ~$45B requested to replace lead service pipes New appropriations that fully fund the President’s $10B request for emerging contaminants such as PFAS
Additional funding for 12 geographic programs (e.g., Chesapeake Bay); 28 National Estuary Programs, Gulf Hypoxia Task Force
New funding to support EPA and state permitting primacy applications for sub- surface CCS
45  Target resources to disadvantaged communities. Prioritize funding to underserved communities. Leverage the 49% of SRF funds eligible to be grants/fully forgivable loans.
 Make rapid progress on lead-free water for all. Maximize the $15 billion dedicated to lead service line removal, as well as other funding streams, towards President Biden’s 100% goal. Leverage the 49% of SRF funds eligible to be grants/fully forgivable loans.
 Tackle forever chemicals. Leverage the $10 billion in the BIL to provide relief to communities on the frontlines of contamination by PFAS and other emerging contaminants. All of these funds will be grants or fully forgivable loans.

PRELIMINARY- LAST UPDATED 2/28/2022
SRF: PRIMARY GOALS IN YEAR 1
46 PRELIMINARY- LAST UPDATED 2/28/2022
SRF: STREAMS OF ACTIVITIES AND WORK IN YEAR ONE
Office of Wate
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
2021 2022
OMB: Apportionment & allotments
EPA HQ: Draft and finalize SRF
implementation memo
States: Solicit project applications, identify source of state match States: Develop IUPs, public comment, submit application to EPA* EPA reviews applications,
including IUPs

CAPITALIZATION
Community Assistance: Identify existing providers and build capacity via contracts/grants to help disadvantaged communities develop applications. *States have until the end of FY23 to obtain the FY22 cap grant awards from EPA; however, EPA is encouraging early submission of applications to avoid delays. FY22 will be a year of capacity building to help states and communities. 47  Target Date: February/March 2022
 Top Line Messages: Reinforce goals in governors’ letter with a focus on how to operationalize priorities
 Engagement: Dialogues with regional water divisions; state, local, utility, association stakeholders to address key issues (eligibilities for lead and PFAS, flexibilities and barriers, Build America, Buy American Act implementation, project pipeline and tools to reach disadvantaged communities, etc.)
 Outreach & Technical Assistance: Rollout to build support and awareness; engagements and training on the implementation memo; ramp up robust technical assistance program to help communities apply.

PRELIMINARY- LAST UPDATED 2/28/2022
NEXT SRF MILESTONE: IMPLEMENTATION MEMO
48 Challenge
 Some state SRF programs are already at capacity, understaffed, or face statutory and political hurdles to expanding their internal capacity.  Some states may struggle to manage the scale of BIL allotments, and to manage an influx of many more, smaller applications from small and disadvantaged communities.  Approach
 States can increase staffing and capacity through BIL state administrative funds.  Trainings, webinars, playbooks and best practices.
 Dialogues with state programs to understand unique hurdles and build a tailored, state- by-state approach to supporting SRFs.
 EPA can provide implementation support through contractors that can relieve burdens on state programs.

PRELIMINARY- LAST UPDATED 2/28/2022
SRF: SUPPORTING STATES
49  Primary Goal in Year 1: Provide grant funding to small and disadvantaged communities to address emerging contaminants (including PFAS) from drinking water.
 Implementation Approach:
 Develop allocation formula, considering: Congressional intent to prioritize PFAS, focus of the funding to small and disadvantaged communities, and available data on emerging contaminants, population in poverty, etc.  Engage state programs and stakeholders (including non-profit organizations) to ground-truth potential implementation challenges and build a tailored approach to support states and their respective small and disadvantaged communities.  Engage EPA regions, states, and stakeholders throughout the implementation process and assist in grant implementation.  Implementation Activities and Year 1 Milestones:
 Plan to finalize allocation formula for FY22 funding by Spring ‘22 and release implementation document by Summer ‘22.  Provide technical assistance to states and support, in collaboration with state associations and local organizations, to communities targeted for funding and assist in preparing, planning, scoping activities in grant applications.  Coordinate with DWSRF technical assistance effort and outreach to small and disadvantaged communities. These systems would also be eligible for funding under the DWSRF.

PRELIMINARY- LAST UPDATED 2/28/2022
WIIN EMERGING CONTAMINANTS FUNDS IN YEAR 1
50  EPA Place-based Programs include: 12 Geographic Programs and 28 National Estuary Programs  Implementation approaches will be informed by and seek to achieve the goals of each program’s unique governing authorities:
 Geographic Programs: Various statutory authorities, interstate agreements, and governing councils (e.g. Chesapeake Bay Watershed Agreement; Great Lakes Restoration Initiative; Lake Champlain Opportunities for Action)  NEPs: Implementation of each Estuary Program’s Comprehensive Conservation Management Plan (CCMP). OW to release BIL NEP Guidance in Spring 2022.
 Focus areas for BIL EPM funds include, among program-specific activities, planning and implementation of projects that:
 Build coastal/estuarine climate adaptation and resilience  Address mission-relevant needs and opportunities in
underserved communities
 Monitor and improve water quality
 Support outreach, education, and local capacity building  Year 1 Milestones:
 Engagement with federal, state, Tribal, interstate, local, and NGO partners on BIL implementation opportunities.  Guidance and priority memos issued (where applicable).  Announcements for competitive and non-competitive funding opportunities. Timing of announcements and awards will vary widely by program. In most cases, anticipate RFA and funding announcements in second half of FY22, with most awards beginning in FY23.

PRELIMINARY- LAST UPDATED 2/28/2022
GEOGRAPHIC AND NATIONAL ESTUARY PROGRAMS IN YEAR 1
 Restore ecosystems
 Reduce nutrient and nonpoint source pollution
 Coordinate EPA place-based activities and investments with other federal agencies, states, and Tribes
 Use BIL place-based funding to leverage other resources 51  New Program: Gulf Hypoxia Program
 Implementation approach: as directed by Congress, support actions under the Gulf Hypoxia Action Plan, including implementing state nutrient reduction strategies.  Priorities for Gulf Hypoxia funds include:
 Supporting states as they implement and scale their nutrient reduction strategies
 Supporting tribes in leveraging nutrient reduction strategies  Ensuring benefits are realized by disadvantaged communities  Advancing water quality actions with climate resilience co-benefits  Year 1 Milestones:
 Engagement with Hypoxia Task Force partners on opportunities to advance the goals of Gulf Hypoxia Action Plan  Guidance for grants to states in 2nd quarter FY22.
 Considering guidance for other Gulf Hypoxia Action Plan partners in 3rd quarter; eligible entities could include tribes, interstate organizations, and Land Grant University consortia.

PRELIMINARY- LAST UPDATED 2/28/2022
GULF HYPOXIA PROGRAM IN YEAR 1
 Advancing multi-state collaboration
 Communicating progress at the basin scale to the public  Advancing research in support of nutrient reduction
strategies
 Leveraging federal, state, non-governmental, and Tribal programs to advance nutrient reduction strategies
52 AGENDA
PRELIMINARY- LAST UPDATED 2/28/2022
Land Programs
Clean School Bus Program
Water Programs
Pollution Prevention Program
53 PRELIMINARY- LAST UPDATED 2/28/2022
CHEMICAL SAFETY AND POLLUTION PREVENTION – IIJA INVESTMENTS $100 million to expand the Pollution
Prevention (P2) program
 P2 Grants provide technical assistance to
businesses to help them develop and adopt source
reduction practices that reduce toxic pollutants, the
use of water, energy and other raw materials, while
also lowering business costs.
 P2 grants are awarded to States, state-sponsored
colleges and universities, and federally-recognized
tribes and intertribal consortia.

IIJA provides a significant increase in annual
funding that will be used to both increase the number
and size of awards.

The significant increase in funding will accelerate
our engagement in disadvantaged
communities and across P2 National
Emphasis Areas that include:
 Food and Beverage Manufacturing and
Processing
 Chemical Manufacturing, Processing and
Formulation
 Automotive Manufacturing and Maintenance
 Aerospace Product and Parts Manufacturing
and Maintenance
 Metal Manufacturing and Fabrication; and
 A new National Emphasis Area to support P2
technical assistance among businesses in
Indian Country
54  BIL funds for EPA’s P2 Grant program will deliver technical assistance to businesses to identify and adopt source reduction practices (and technologies) that benefit businesses, communities, and local economies.  P2 Grants will benefit the environment and communities by preventing pollution at the source, and reduce exposure to pollutants by individuals, communities, and the environment. P2 has also proven to be cost-saving and support jobs and local economies.
 EPA is developing specific metrics, measures, and accounting tools to provide additional oversight. In addition to OIG oversight the P2 Program plans to conduct program evaluation for the BIL initiatives associated with P2 Grants.

PRELIMINARY- LAST UPDATED 2/28/2022

VISION FOR THE PROGRAMS
55  P2 Grant funds will be awarded through competitive grants to eligible entities:
states, Tribes, and state/Tribe sponsored institutions (e.g.,colleges and universities)  EPA will develop a portfolio of grants, leveraging the current P2 Grant framework and introduce two additional grant programs to focus on P2 for facilities in disadvantaged communities and increasing their access to safer/sustainable products and services
 BIL removes the matching requirement for P2 Grants (which would otherwise be 50%), increasing access to P2 Grants.

PRELIMINARY- LAST UPDATED 2/28/2022

HOW FUNDS WILL BE DEPLOYED
56  Q1FY22: finalize RFA for sector-based P2 Grants– two-year grants  Q2FY22: Issue RFA for sector-based P2 Grants
 Q3FY22: Review/evaluate P2 Grant applicants for sector-based grants  Q4FY22: Award sector-based P2 Grants
PRELIMINARY- LAST UPDATED 2/28/2022
TIMELINE FOR YEAR 1 – FY 2022
57 City of Rialto
Legislation Text
File #: WS-22-278, Version: 1, Agenda #: 5
For Water Subcommittee Meeting [March 23, 2022]
TO: Water Subcommittee Members
APPROVAL: Thomas J. Crowley, P.E., Utilities Manager
Review Water and Wastewater Plan Review Process.

BACKGROUND:

Currently there are procedures in place to review water and wastewater improvements plans provided by developers and project applicates. Below is a summary of the procedures for onsite and off-site improvements.

On Site Improvements
· If a project is being submitted for On-Site Improvements, plans are routed to Building, Planning, Engineering, Fire, and Utilities for review and comments. Once comments have been received and all departments have approved the plans, the applicant is notified that the plans have completed the plan check process and is ready for the permit issuance phase. · Once the fees are paid, a permit is issued to begin work. As the work progress inspections are provided. Departments that may be involved in the inspection process are Building, Planning, Engineering, Fire, Police, Health, Public Works, and Utilities. Once the work is completed and all departments have concurred the project is complete a Certificate of Occupancy is issued, and the permit is closed out.

Off-Site Improvements Only
· If the wok only pertains to the Off-Site Improvements that take place in the Public Right of Way, the project plans would be routed through the Engineering Department for plan check review and approval. If Utilities are being impacted, then plans will be route to Utilities for review and comment. Once comments have been received and all departments affected have approved the plans, the applicant is notified that the plans have completed the plan check process and is ready for the issuance of an encroachment permit.
· Once the fees are paid, an encroachment permit is issued to enter the right of way to install the improvements. Departments that may be involved in the inspection process are Engineering, Public Works, and Utilities. Once the work is completed and all departments have concurred that the project is complete, a final acceptance is issued and the permit is closed out.

FINANCIAL IMPACT:

No financial impact identified at this time.

RECOMMENDATION:

Discuss and provide direction.

City of Rialto Printed on 3/18/2022Page 1 of 1