Riverside Avenue Central Water Line Project
Limits: Railroad Tracks on the North to San Bernardino Ave on the South

Background Observations & Assumptions:

The existing 8”/10” mainline on Riverside Ave between the Railroad tracks on the North and San Bernardino Ave in the south was installed in the 1960s.

Barring a couple of leaks, there have not been major problems with the mainline to date. Based on discussions with the City, the only section of mainline pipe recommended to be replaced is the 8” ACP between the Railroad tracks to approx. South street.

Based on depths measured on the valve stem, it appears that the mainline is approx. 40” or greater deep throughout the section between the Railroad track and San Bernardino Avenue – so it appears the main line may not hinder the paving project, which is being designed by AECOM.

The scope of the proposed project includes potholing for locating main water lines, replace and lower service laterals, replace fire hydrants and fire hydrant laterals, replace fire service lines, replace isolating valves on the main line and on side streets.

Relocate the PRV station at the intersection of Riverside Avenue and Randall Ave into the sidewalk area just south of the southeast corner to enable safe operation & maintenance of the valves and avoid traffic-related concerns.

Veolia measured the depth of the valves at Randall-Riverside and in multiple other locations to approximate the depth of the water main. The average depth of the main water lines is 40 inches.

Segment 1 – Bonnie View Dr to Merrill Avenue
Bonnie View to Merrill N/S 1964 Asbestos Concrete Pipe (ACP) to South Street transitioning to 1964 8” Steel pipe from South Street to Merrill. (Segments A, B & C of Map in Appendix)
Scope of Work:

Details
Qty
Notes
Map Color
Galvanized Service – Long
1 1” Service
Blue
Galvanized Service – Short
8 7X1” Service; 1X3” Service
Blue
Fire Services – Long
1 4” connection
Red
Fire Services – Short
1 10” connection
Red
Hydrant Laterals
5 Short Laterals
Valves
17 Segment 2 – Merrill Avenue to Randall Ave
Merrill N/S to Randall N/S 1956-1964 10” Steel pipe.
(Segments D, E & F of Map in Appendix)
Scope of Work:

Details
Qty
Notes
Map Color
Galvanized Service – Long
16 14X1” Service; 2X2” Service
Blue
Galvanized Service – Short
10 10X1” Service
Blue
Poly Service
4 4X2” Service
Yellow
Fire Services – Long
1 6” connection
Red
Fire Services – Short
0 NA
NA
Hydrant Laterals
5 Short Laterals
Valves
22 Segment 3 – Randall Ave to San Bernardino Ave
Randall N/S to San Bernardino Ave N/S 1956 10” Steel pipe. (Segments G, H, I & J of Map in Appendix)
Scope of Work:

Details
Qty
Notes
Map Color
Galvanized Service – Long
4 4X1” Service
Blue
Galvanized Service – Short
4 4X1” Service
Blue
PVC Service
2 2X2” Service
Yellow
Fire Services – Long
3 8” fire lines ran off of service lines
Red
Fire Services – Short
2 6” fire lines ran off of service lines
NA
Hydrant Laterals
6 Short Laterals
Valves
24 Additional Isolation Valve Details:

Scope of Work:

Qty
Size
Location
Tie Into
1 12”
W Randall and S Riverside PRV
Steel
1 10”
S Riverside and E Randall PRV
Steel
1 10”
E Grant and S Riverside Ave
ACP
1 10”
E Grant and S Riverside (New Valve)
Steel
1 6”
W Alru
ACP
1 4”
E Alru
Steel
1 4”
W Vodden
Steel/ACP
1 8”
E James
ACP
1 8”
S Riverside, Bloomington, Merrill North
Steel
1 10”
S Riverside and E South
ACP
1 10”
S Riverside and W South
ACP
1 4”
S Riverside and E Wilson
Steel
1 8”
S Riverside and E Bonnie View
ACP

Engineer’s Estimated Costs:

Scope of Work
Unit Price
Qty
Total Price
Notes
Potholing for Locating Water Lines & Services and permanent paving $100,000.00
1 $100,000.00
Based on Riverside Ave North project.

Lower Service Laterals as needed
$75,000.00
1 $75,000.00
This $75K is based on Riverside Ave North costs
Relocate Fire Hydrants as needed
$20,000.00
10 $60,000.00
Estimating $20K per fire hydrant (same as last project) Mobilization
$30,000.00
1 $30,000.00
Bonds & Insurance
$12,500.00
1 $12,500.00
Traffic Control Plan
$35,000.00
1 $35,000.00
Install 8" Pipe (975LF)
$179.00
975
$174,525.00
Galvanized Service Long
$6,500.00
21 $136,500.00
Galvanized Service Short
$4,500.00
22 $99,000.00
PVC Sch 40
$4,500.00
2 $9,000.00
Poly Services
$4,500.00
4 $18,000.00
Fire Services Long
$17,500.00
5 $87,500.00
Fire Services Short
$12,500.00
3 $37,500.00
Hydrant Laterals (Short Laterals)
$10,500.00
16 $168,000.00
Furnish and Install Valves
$6,000.00
63 $378,000.00
Isolation Valves
$7,500.00
13 $97,500.00
See previous sheet for breakdown of quantity
Construct Tie Ins
$6,000.00
10 $60,000.00
Relocate PRV Station
$250,000.00
1 $250,000.00
Estimated lumpsum
Install Temp Paving (LF)
$20.00
6,600
$132,000.00
Maintain Paving Throughout Work
$5,000.00
1 $5,000.00
Testing and Chlorination
$10,000.00
1 $10,000.00
Demobilization
$5,000.00
1 $5,000.00
Close Out Docs/As Builts
$2,000.00
1 $2,000.00
Compaction Testing
$800.00
45 $36,000.00
Every other day visit. $800/visit
Subtotal
$2,018,025.00
Veolia CM (20%) including ERSCI design – estimated at $80,000 $403,605.00
City Contingency (30%)
$605,410
Total Project Construction Estimated Costs
$3,027,040

Appendix
Map Segments A thru J in the North to South direction from Bonnie View Ave to San Bernardino Ave