Arterial/Collector road network average Pavement Condition Index (PCI) is 75.3 as of January 11, 2022.

Local road network average PCI is 73.3 as of January 11,2022. 2022/23
Project Title:

Annual Pavement Rehabilitation Project
Project Description Estimated Project Schedule Estimated Useful Life Technology, Climate Change, and Complete Streets Considerations Street Name From To
CACTUS AVE WALNUT AVE 679'' N/O WALNUT AVE
Engineering Design:

CEDAR AVE MERRILL AVE RANDALL AVE 4th Quarter 2020 to 3rd Quarter 2021 CEDAR AVE FOOTHILL BLVD RIALTO AVE Construction:

CEDAR AVE ETIWANDA AVE FOOTHILL BLVD 4th Quarter 2021 to 2nd Quarter 2022

RIALTO AVE MAPLE AVE LINDEN AVE

CASA GRANDE DR ALDER AVE LOCUST AVE

LINDEN AVE RIVERSIDE AVE PERSIMMON AVE
LINDEN AVE (E 1/2) 150' N / NORWOOD ST CASMALIA ST

LOCUST AVE STONEHURST DR VINEYARD AVE

LOCUST AVE BUENA VISTA DR CASA GRANDE DR

LOCUST AVE VINEYARD AVE CASMALIA ST

LOCUST AVE RIVERSIDE AVE BUENA VISTA DR

LOCUST AVE CASA GRANDE DR TUDOR ST

LOCUST AVE TUDOR ST LOWELL ST

LOCUST AVE CASMALIA ST BRIDGE

MAPLE AVE BASELINE RD ETIWANDA AVE

MAPLE AVE WEST COAST BLVD SUMMIT AVE

MERRILL AVE SYCAMORE AVE EUCALYPTUS AVE

MERRILL AVE RIVERSIDE AVE SYCAMORE AVE

SANTA ANA AVE LILAC AVE WILLOW AVE

SANTA ANA AVE WILLOW AVE RIVERSIDE AVE

ACACIA AVE MERRILL AVE RIALTO AVE

BOHNERT AVE AYALA DR SPRUCE AVE

BOHNERT AVE SPRUCE AVE CACTUS AVE

BOHNERT AVE CEDAR AVE AYALA DR
EASTON ST BRAMPTON AVE 125' E/ BRAMPTON AVE

EASTON ST
PVMT CHNGE 160' W/ ARROWHEAD AVE

BRAMPTON AVE

ETIWANDA AVE LILAC AVE WILLOW AVE

ETIWANDA AVE MAPLE AVE LINDEN AVE

ETIWANDA AVE SYCAMORE AVE ACACIA AVE

ETIWANDA AVE CACTUS AVE LILAC AVE

ETIWANDA AVE LINDEN AVE CEDAR AVE

ETIWANDA AVE ACACIA AVE EUCALYPTUS AVE

EUCALYPTUS AVE RIALTO AVE MERRILL AVE

EUCALYPTUS AVE ETIWANDA AVE FOOTHILL BLVD

EUCALYPTUS AVE WALNUT AVE BASELINE RD

EUCALYPTUS AVE MERRILL AVE CITY LIMIT

LILAC AVE CHAPARRAL ST HEATHER ST

LILAC AVE VALLEY BLVD SOUTH END

LILAC AVE SANTA ANA AVE MAYWOOD ST

LILAC AVE SLOVER AVE SANTA ANA AVE

LILAC AVE HEATHER ST WALNUT AVE

LILAC AVE TAHOE ST CHAPARRAL ST

LILAC AVE FOOTHILL BLVD RIALTO AVE

MERIDIAN AVE BASELINE RD SOUTH CITY LIMIT

RANDALL AVE RIVERSIDE AVE SYCAMORE AVE

SANTA ANA AVE RIVERSIDE AVE EAST END

SUMMIT AVE MAPLE AVE LINDEN AVE

SUMMIT AVE LINDEN AVE APPLE AVE

SYCAMORE AVE ROSEWOOD ST FOOTHILL BLVD

SYCAMORE AVE ETIWANDA AVE ROSEWOOD ST

SYCAMORE AVE WILSON ST MERRILL AVE
Supplementary Information:

The City uses a Pavement Management Program to evaluate pavement condition and prioritize pavement rehabilitation projects. During the engineering design phase, the structural pavement section is evaluated and the most cost effective rehabilitation method is determined.

Project Location

1. Pavement rehabilitation of the indicated
existing street segments using one or more of
the following methods: (1) Cold Milling and
Asphalt Concrete (AC) Surface Course; (2) Full
Depth AC removal and re-construction; (3) Full
Depth Reclamation including in-place
pulverization and mixing of the existing
pavement to create a stablized base, followed
by construction of AC Base and Surface Course;
(4) Cold In-Place Recycling of existing
pavement, followed by construction of an AC
Surface Course.

2. Addition of new and/or repair/upgrade of
curbs and gutters, cross gutters, catch basins,
and culverts.

3. Addition of new and/or repair/upgrade of
ADA curb ramps; and addition of new sidewalks
and/or repair/replacement of damaged
sidewalks.

4. Replacing/Upgrading traffic striping and
pavement markings.

For projects using
cold mill and AC
surface course the
estimated useful life
is 7 to 10 years.

For projects using full
depth reconstruction
the estimated useful
life is 20 years.

1. Technology and Material Recycling - Asphalt mix designs will incorporate reclaimed asphalt pavement (RAP) thereby recycling this material and reducing the cost and energy required to process new mineral aggregates.

2. Technology and Material Recycling - Projects using in-place pulverization and cold in-place recycling will incorporate the existing pavement in the new street construction thereby reducing the cost and energy associated with hauling away existing materials and transporting new construction materials to the project location.

3. Climate Change - Pavement rehabilitation and repair/upgrade of curbs and gutters, cross gutters, and catch basins will better adapt the asset to withstand the negative effects of climate change including the increase in rainfall and stormwater flow.

4. Complete Streets - Projects will improve the quality of pedestrian facilities and improve safety by (a) adding new and/or repairing/upgrading ADA curb ramps; (b) adding new sidewalks and/or repairing/replacing damaged sidewalks; and (c) replacing/upgrading traffic striping and pavement markings.

SB-1 Project List

City Name:

City of Rialto

Project Lead and Dept. Contact Information:

Marcus Fuller, Acting City Engineer

Engineering Services

335 W. Rialto Ave., Rialto, CA 92376

Phone: (909) 820-2528

Email: [email protected]

Legislative Districts:

State Assembly - District 47

State Senate - District 20
Average Network PCI and date/year of measurement: