Exhibit A - Page 1 of 4
SB-1 Project List
City Name: City of Rialto
Project Lead and Dept. Contact Information: Jeffrey T. Schafer, P.E.

Public Works Department - Engineering Division
335 W. Rialto Ave., Rialto, CA 92376
Phone: (909) 820-2531
Email: [email protected]
gislative Districts: State Assembly - District
ate Senate - District 2
verage Network PCI and date/year of measurement: Arterial/Collector road network average Pavement Condition Index (PCI) is 75.3 as of February 10, 202 ocal road network average PCI is 73.3 as of February 10, 202 Fiscal Year: 2021/22 Project Title: Annual Pavement Rehabilitation Project Supplementary Information: The City uses a Pavement Management Program to evaluate pavement condition and prioritize pavement rehabilitation projects. During the engineering design phase, the structural pavement section is evaluated and the most cost effective rehabilitation method is determined.

Project Location Project Description Estimated Project Schedule Estimated Useful Life Technology, Climate Change, and Complete Streets Considerations Street Name From To
Zone 3: Local Streets 1. Pavement rehabilitation of the indicated Engineering Design: or projects usin 1. Technology and Material Recycling - Asphalt mix designs will CAMPHOR AVE MESA DR BASELINE RD existing street segments using one or more of 4th Quarter 2020 to 3rd Quarter 2021 Old mill and Al corporate reclaimed asphalt pavement (RAP) thereby recycling th CHURCH AVE CHURCH AVE END the following methods: (1) Cold Milling and Construction: surface course the aterial and reducing the cost and energy required to process ne CHURCH AVE GROVE ST END Asphalt Concrete (AC) Surface Course; (2) Full 4th Quarter 2021 to 2nd Quarter 2022 estimated useful life mineral aggregates.

CORNELL DR SYCAMORE AVE RIVERSIDE AVE Depth AC removal and re-construction; (3) Full is 7 to 10 years. L. Technology and Material Recycling - Projects using in-place DATE AVE ROSEWOOD ST GROVE ST Depth Reclamation including in-place For projects using ful pulverization and cold in-place recycling will incorporate the existing GROVE ST CEDAR AVE LARCH AVE pulverization and mixing of the existing depth reconstructior pavement in the new street construction thereby reducing the cost HOLLY ST RIVERSIDE AVE DATE AVE pavement to create a stablized base, followed the estimated useful and energy associated with hauling away existing materials and HOLLY ST PALM AVE RIVERSIDE AVE by construction of AC Base and Surface Course; life is 20 years. transporting new construction materials to the project location.

MARTIN ST WEDGEWOOD CT DRIFTWOOD AVE (4) Cold In-Place Recycling of existing 3. Climate Change - Pavement rehabilitation and repair/upgrade of MESA DR ELMWOOD AVE pavement, followed by construction of an AC curbs and gutters, cross gutters, and catch basins will better adapt the

OAKWOOD AVE
-Surface Course. asset to withstand the negative effects of climate change including the

MILLARD AVE GROVE ST END
- 2. Addition of new and/or repair/upgrade of increase in rainfall and stormwater flow.

MORGAN ST WILLOW AVE RIVERSIDE AVE
curbs and gutters, cross gutters, catch basins, 4. Complete Streets - Projects will improve the quality of pedestrian

OAKDALE AVE RAMONA DR ROSEWOOD ST
-and culverts. facilities and improve safety by (a) adding new and/or

RAMONA DR RAMONA DR END

3. Addition of new and/or repair/upgrade of repairing/upgrading ADA curb ramps; (b) adding new sidewalks and/or

RAMONA DR OLIVE AVE SYCAMORE AVE
ADA curb ramps; and addition of new sidewalks repairing/replacing damaged sidewalks; and (c) replacing/upgrading RAMONA DR SYCAMORE AVE SAGE AVE Land/or repair/replacement of damaged traffic striping and pavement markings.

RAMONA DR SAGE AVE ACACIA AVE
sidewalks.

RAMONA DR LILAC AVE WILLOW AVE

4. Replacing/Upgrading traffic striping and
RAMONA DR END RAMONA DR avement markings

ROSEWOOD ST ASPEN AVE CEDAR AVE

ROSEWOOD ST LARCH AVE END

ROSEWOOD ST DATE AVE SYCAMORE AVE

ROSEWOOD ST DATE AVE RIVERSIDE AVE
Exhibit A - Page 2 of 4

SAGE AVE END ETIWANDA AVE

SHAMROCK ST VERDE AVE LILAC AVE
SHAMROCK ST CLIFFORD AVE [VISTA AVE

SHAMROCK ST VISTA AVE VERDE AVE

SHAMROCK ST WILLOW AVE CLIFFORD AVE

SYCAMORE AVE END SYCAMORE AVE

TEAKWOOD AVE VALENCIA ST WEDGEWOOD CT

TEAKWOOD AVE WEDGEWOOD CT ETIWANDA

VALENCIA ST PALM AVE RIVERSIDE AVE

VAN KOEVERING WILLOW AVE RIVERSIDE AVE

VERDE AVE ETIWANDA AVE HOLLY ST

VICTORIA ST CORNELL AVE ACACIA AVE

VICTORIA ST WILLOW AVE RIVERSIDE AVE

WABASH ST IDYLLWILD AVE END

WABASH ST RIVERSIDE AVE PALM AVE

WEDGEWOOD CT IDYLLWILD AVE TEAKWOOD AVE
Zone 2: Local Streets

ALICE AVE EASTON ST END

ALICE AVE CHAPARRAL ST EASTON ST

ALICE AVE VALLEY BLVD END

ALTHEA AVE MARIANA ST WALNUT AVE

ARBETH ST OAKDALE AVE DATE AVE

ARBETH ST DATE AVE RIVERSIDE AVE OH

ARROWHEAD AVEVALENCIA ST IDYLLWILD AVE

CASCADE DR RIVERSIDE AVE PALM AVE

CERRITOS ST MARCELLA AVE ACACIA AVE

CHAPARRAL ST OAKDALE AVE MARCELLA AVE

CHAPARRAL ST MARCELLA AVE ACACIA AVE

CLIFFORD AVE TAHOE ST EASTON ST

CONDOR DR CONDOR DR END

CONDOR DR SYCAMORE AVE RIVERSIDE AVE OH

CROMWELL ST SYCAMORE AVE OAKDALE AVE

DATE AVE CHAPARRAL ST END

FITZGERALD AVE AYALA DR BASELINE RD

GARDENA AVE LURELANE ST END

HEATHER ST SYCAMORE AVE END

HEATHER ST SYCAMORE AVE JOYCE AVE

HEATHER ST LILAC AVE VERDE AVE

HEATHER ST VERDE AVE VISTA AVE

HEATHER ST WILLOW AVE VISTA AVE

HEATHER ST WILLOW AVE ALICE AVE

HOME ST OLIVE AVE SYCAMORE AVE

URIS AVE MARIANA ST END

JOYCE AVE END VIRGINIA ST

JOYCE AVE MARIANA ST HEATHER ST
Exhibit A - Page 3 of 4

LEISKE DR FITZGERALD AVE AYALA DR

LURELANE ST LILAC AVE VISTA AVE

LURELANE ST ALICE AVE WILLOW AVE
MAGNOLIA AVE [VIRGINIA ST HOME ST

MARCELLA AVE SCOTT ST CERRITOS ST

MARGARITA RD MARGARITA RD END

MARGARITA RD ROSALIND AVE TERRACE RD

MARIANA ST END SYCAMORE AVE

MARIANA ST OAKDALE AVE ACACIA AVE

OAKDALE AVE END ARBETH ST

OAKDALE AVE MARIANA ST HEATHER ST

OAKDALE AVE CROMWELL ST CHAPARRAL ST

OLIVE AVE CERRITOS ST WINCHESTER DR

OLIVE AVE HOME ST VIRGINIA ST

ORANGE AVE CASMALIA ST WILLOW AVE

PALM AVE WILLOW AVE CASMALIA ST

PALM AVE CASCADE DR ALLEY

PRIMROSE AVE HOME ST END

RIVERSIDE AVE OHMEADOW LN POMEGRANATE AVE

RIVERSIDE AVE OHPOMEGRANATE AVE ARBETH ST

RIVERSIDE AVE OHEND MEADOW LN

SAGE AVE CHAPARRAL ST END

SCOTT ST ACACIA AVE PINE AVE

SCOTT ST SYCAMORE AVE END

SYCAMORE AVE ARBETH ST CONDOR DR

TIBBOT AVE SPRUCE AVE END

VERDE AVE END HEATHER ST

VISTA AVE HEATHER ST END

VISTA AVE HEATHER ST END

WINCHESTER AVEYUCCA AVE LILAC AVE

WINCHESTER DR SYCAMORE AVE OLIVE AVE

YUCCA AVE MARIANA ST END
Zone 1: Local Streets

ALTHEA AVE NORWOOD ST END

APPLE AVE COLUMBINE AVE CACTUS AVE

CARPENTER ST END MAPLE AVE

CEDAR AVE APPLE AVE RIVERSIDE AVE

CHERRY AVE APPLE AVE RIVERSIDE AVE OH

CHESHIRE ST AYALA DR CEDAR AVE

CHESHIRE ST AYALA DR CHESHIRE ST

CHURCH AVE APPLE AVE PALM AVE

COLUMBINE AVE MILOR AVE APPLE AVE

COLUMBINE AVE APPLE AVE RIVERSIDE AVE OH

COMPTON ST NORWOOD ST END
[CRAIG ST BRIERWOOD AVE IEND
Exhibit A - Page 4 of 4

DRIFTWOOD AVE ORANGE AVE APPLE AVE

FILLMORE AVE BOHNERT AVE FILLMORE AVE

GALWAY ST PARK AVE CASMALIA ST

IRIS AVE NORWOOD ST END

JOYCE AVE EASTON ST END

KOA AVE MEADOW LN END

LA GLORIA DR SPRUCE AVE ARROWHEAD AVE

LEWIS ST ASPEN AVE END

LOWELL ST LOCUST AVE END

MILOR AVE NORWOOD ST COLUMBINE AVE

MILOR AVE COLUMBINE AVE END

NORWOOD ST QUINCE AVE AYALA DR

NORWOOD ST ARROWHEAD AVE MESA ST

ORANGE AVE QUINCE AVE DRIFTWOOD AVE

PALM AVE COLUMBINE AVE END

PALM AVE CHERRY AVE END

PALM AVE DALEWOOD AVE END

QUINCE AVE CHESHIRE ST LA GLORIA DR

RIVERSIDE AVE OHCHERRY AVE END

RIVERSIDE AVE OHEND CHERRY AVE
STONEHURST DR. LOCUST AVE END

YUCCA AVE YUCCA AVE END

YUCCA AVE MILOR AVE NORWOOD ST