Exhibit B - Page 1 of 1
SB-1 Project List
City Name: City of Rialto
Project Lead and Dept. Contact Information: Jeffrey T. Schafer, P.E.
Public Works Department - Engineering Division
335 W. Rialto Ave., Rialto, CA 92376
Phone: (909) 820-2531
Email: [email protected]
Legislative Districts: State Assembly - District 47
State Senate - District 20
Average Network PCI and date/year of measurement: Arterial/Collector road network average Pavement Condition Index (PCI) is 75.3 as of February 10, 2020.
Local road network average PCI is 73.3 as of February 10, 2020.
Fiscal Year: 2020/21 Project Title: Annual Pavement Rehabilitation Project Supplementary Information: The City uses a Pavement Management Program to evaluate pavement condition and prioritize pavement rehabilitation projects. During the engineering design phase, the structural pavement section is evaluated and the most cost effective rehabilitation method is determined.
Project Location Project Description Estimated Project Schedule Estimated Useful Life Technology, Climate Change, and Complete Streets Considerations Street Name From To
1. Pavement rehabilitation of the indicated For projects using cold 1. Technology and Material Recycling - Asphalt mix designs will Bohnert Ave. Linden Ave. Cactus Ave. existing street segments using one or more of Engineering Design: mill and AC surface incorporate reclaimed asphalt pavement (RAP) thereby recycling this Casmalia St. the following methods: (1) Cold Milling and 4th Quarter 2020 to 3rd Quarter 2021 course the estimated material and reducing the cost and energy required to process new Laurel Ave. Locust Ave.
Asphalt Concrete (AC) Surface Course; (2) Full useful life is 7 to 10 mineral aggregates.
Riverside Ave. Bridge (210 FWY) Foothill Blvd. Depth AC removal and re-construction; (3) Full Construction: years. 2. Technology and Material Recycling - Projects using in-place Depth Reclamation including in-place For projects using full pulverization and cold in-place recycling will incorporate the existing Maple Ave. Baseline Rd. Etiwanda Ave. - pulverization and mixing of the existing 4th Quarter 2021 to 2nd Quarter 2022 depth reconstruction pavement in the new street construction thereby reducing the cost Cedar Ave. Baseline Rd. Foothill Blvd. pavement to create a stablized base, followed the estimated useful and energy associated with hauling away existing materials and by construction of AC Base and Surface Course; life is 20 years. transporting new construction materials to the project location.
Sycamore Ave. Madrona St. Foothill Blvd. _(4) Cold In-Place Recycling of existing 3. Climate Change - Pavement rehabilitation and repair/upgrade of pavement, followed by construction of an AC curbs and gutters, cross gutters, and catch basins will better adapt Etiwanda Ave. Maple Ave. Cedar Ave. Surface Course. the asset to withstand the negative effects of climate change Etiwanda Ave. Cactus Ave. Willow Ave. 2. Addition of new and/or repair/upgrade of including the increase in rainfall and stormwater flow. curbs and gutters, cross gutters, catch basins, 4. Complete Streets - Projects will improve the quality of pedestrian Etiwanda Ave. Sycamore Ave. Acacia Ave. and culverts. facilities and improve safety by (a) adding new and/or
3. Addition of new and/or repair/upgrade of repairing/upgrading ADA curb ramps; (b) adding new sidewalks -ADA curb ramps; and addition of new sidewalks and/or repairing/replacing damaged sidewalks; and (c) and/or repair/replacement of damaged replacing/upgrading traffic striping and pavement markings. sidewalks.
_4. Replacing/Upgrading traffic striping and
pavement markings.