Exhibit D - Page 1 of 1
SB-1 Project List
City Name: City of Rialto
Project Lead and Dept. Contact Information: Jeffrey T. Schafer, P.E.
Public Works Department - Engineering Division
335 W. Rialto Ave., Rialto, CA 92376
Phone: (909) 820-2531
Email: [email protected]
egislative Districts: State Assembly - District 4:
state Senate - District 21
Average Network PCI and date/year of measurement: Arterial/Collector road network average Pavement Condition Index (PCI) is 75.3 as of February 10, 202 ocal road network average PCI is 73.3 as of February 10, 202 Fiscal Year: 2018/19 Project Title: Annual Pavement Rehabilitation Project Supplementary Information: The City uses a Pavement Management Program to evaluate pavement condition and prioritize pavement rehabilitation projects. During the engineering design phase, the structural pavement section is evaluated and the most cost effective rehabilitation method is determined.
Project Location Project Description Estimated Project Schedule Estimated Useful Life Technology, Climate Change, and Complete Streets Considerations Street Name From To
1. Pavement rehabilitation of the indicated For projects using 1. Technology and Material Recycling - Asphalt mix designs will Lilac Ave. Tahoe St. Walnut Ave. Engineering Design: cold mill and AC incorporate reclaimed asphalt pavement (RAP) thereby recycling existing street segments using one or more of
Linden Ave. Riverside Ave. 155'S/0 Candelwood Ave. the following methods: (1) Cold Milling and 4th Quarter 2020 to 3rd Quarter 2021 surface course the this material and reducing the cost and energy required to process Asphalt Concrete (AC) Surface Course; (2) Full estimated useful life new mineral aggregates.
Linden Ave. 374' S/O Persimmon Ave. Casmalia St. Depth AC removal and re-construction; (3) Full Construction: is 7 to 10 years. 2. Technology and Material Recycling - Projects using in-place Depth Reclamation including in-place For projects using full pulverization and cold in-place recycling will incorporate the existing Locust Ave. Riverside Ave. Casa Grande Dr. 4th Quarter 2021 to 2nd Quarter 2022 pulverization and mixing of the existing depth reconstruction pavement in the new street construction thereby reducing the cost Locust Ave. Lowell St. Casmalia St. pavement to create a stablized base, followed the estimated useful and energy associated with hauling away existing materials and by construction of AC Base and Surface Course; life is 20 years. transporting new construction materials to the project location.
Pepper Ave. Baseline Rd. Etiwanda Ave. (4) Cold In-Place Recycling of existing 3. Climate Change - Pavement rehabilitation and repair/upgrade of pavement, followed by construction of an AC curbs and gutters, cross gutters, and catch basins will better adapt Pepper Ave. Foothill Blvd. 2nd St.
the asset to withstand the negative effects of climate change Summit Ave. Maple Ave. Apple Ave. 2. Addition of new and/or repair/upgrade of including the increase in rainfall and stormwater flow. urbs and gutters, cross gutters, catch basins 4. Complete Streets - Projects will improve the quality of pedestrian Willow Ave. Walnut Ave. Chaparral St. and culverts facilities and improve safety by (a) adding new and/or
3. Addition of new and/or repair/upgrade of repairing/upgrading ADA curb ramps; (b) adding new sidewalks ADA curb ramps; and addition of new sidewalks and/or repairing/replacing damaged sidewalks; and (c) and/or repair/replacement of damaged replacing/upgrading traffic striping and pavement markings. sidewalks.
4. Replacing/Upgrading traffic striping and
pavement markings.