City of Rialto
Bid Results for Project Rialto Cemetery Rehabilitation Project, 210209 (22‐010 Issued on 06/10/2022
Bid Due on July 14, 2022 3:00 PM (PDT)
Item
Num Description Unit of Measure Quantity
Roadway Engineering
& Construction Corp. Three Peaks Corp All American Asphalt Gentry General
Engineering, Inc.
Environmental
Construction, Inc. DOJA INC
1 Mobilization LS 1 $47,000.0 0 $45,000.00 $95,000.00 $10,500.00 $22,000.00 $45,000.00 2 Traffic Control LS 1 $10,000.0 0 $25,000.00 $25,000.00 $17,500.00 $17,000.00 $16,000.00 3 Clearing and Grubbing LS 1 $10,000.0 0 $30,000.00 $14,150.00 $8,400.00 $181,115.00 $82,000.00 4 Water Pollution Control Program LS 1 $10,000.0 0 $20,000.00 $4,500.00 $11,400.00 $30,000.00 $9,000.00 5 Project Information Sign LS 1 $900.00 $2,000.0 0 $6,150.00 $2,800.00 $3,500.00 $8,000.00 6 Remove Existing Concrete Rolled Curb LF 280 $6,440.0 0 $5,600.00 $11,200.00 $8,960.00 $5,600.00 $3,360.00 7 Remove Existing Concrete Curb and Gutter LF 65 $1,495.0 0 $1,560.00 $1,625.00 $1,885.00 $1,625.00 $1,625.00 8 Unclassified Excavation CY 560 $19,040.0 0 $53,200.00 $47,180.00 $54,880.00 $68,320.00 $61,600.00 9 Remove and Relocate Existing "Assembly B" Signs and Posts EA 2 $500.00 $1,000.0 0 $504.00 $572.00 $2,000.0 0 $9,000.00 10 Remove Existing Concrete Sidewalk SF 1400 $4,200.0 0 $11,200.00 $7,924.00 $8,400.00 $9,800.00 $11,200.00 11 Adjust Existing Water Meter to Grade EA 2 $800.00 $2,200.0 0 $3,364.00 $970.00 $800.00 $2,000.0 0 12 Sandblasting Existing Striping LF 90 $201.60 $450.00 $225.00 $225.00 $990.00 $4,050.0 0 13 Remove Existing Tree EA 1 $4,500.0 0 $6,000.00 $3,141.00 $3,600.00 $5,060.00 $1,000.00 14 Grind Existing Tree Root 8" Below Finished Surface EA 6 $3,360.0 0 $4,800.00 $2,688.00 $3,048.00 $3,300.00 $4,800.00 15 Construct PCC Curb Ramp, Type 1, Case B EA 2 $8,000.0 0 $18,000.00 $12,844.00 $17,800.00 $12,634.00 $32,000.00 16 Construct PCC Type E, Rolled Curb LF 540 $24,300.0 0 $25,380.00 $37,800.00 $41,040.00 $24,300.00 $17,280.00 17 Construct 4" Thick PCC Sidewalk SF 973 $5,838.0 0 $12,649.00 $14,595.00 $10,703.00 $13,622.00 $11,676.00 18 Construct 2" Thick Asphalt Concrete Pavement C2‐PG 64‐10 SF 263 $2,630.0 0 $4,997.00 $5,260.00 $2,893.00 $1,052.00 $7,101.00 19 Construct 3" Thick Asphalt Concrete Pavement B‐PG 64‐10 SF 263 $2,104.0 0 $6,575.00 $5,260.00 $3,419.00 $1,052.00 $7,101.00 20 Construct 4" Thick Crushed Aggregate Base SF 263 $1,315.0 0 $2,367.00 $6,575.00 $1,315.00 $1,052.00 $5,523.00 21 Construct 3" Thick Asphalt Concrete Pavement C2‐PG 64‐10 TON 1150 $155,250.0 0 $178,250.00 $121,900.00 $243,800.00 $120,750.00 $148,350.00 22 Construct Concrete Cross Gutter SF 258 $2,580.0 0 $6,966.00 $10,320.00 $8,514.00 $5,676.00 $28,380.00 23 Furnish and Install "Assembly C" Sign and Post EA 2 $900.00 $1,600.0 0 $900.00 $1,016.0 0 $1,650.00 $4,000.00 24 Install Striping and Legends LS 1 $2,700.0 0 $4,500.00 $2,750.00 $3,100.00 $6,022.00 $9,000.00 25 Grade Existing Ground to Drain SF 102 $1,020.0 0 $1,530.00 $2,958.00 $2,142.00 $1,020.00 $11,220.00 26 Construct Connection to Water Main, Water Meter, Back Flow Preventor and PVC Waterline for Bathroom LS 1 $13,200.00 $23,000.00 $55,000.00 $99,000.00 $34,459.00 $42,000.00 27 All Other Work as Required by the Plans and Specifications LS 1 $50,000.0 0 $25,000.00 $12,000.00 $44,250.00 $196,000.00 $32,000.00 28 Field Orders LS 1 $30,000.0 0 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $418,273.60 $548,824.00 $540,813.00 $642,132.00 $800,399.00 $644,266.00 29 Mobilization LS 1 $50,000.0 0 $25,000.00 $45,000.00 $23,000.00 $19,000.00 $35,000.00 30 Site Preparation LS 1 $44,800.0 0 $15,000.00 $90,000.00 $51,000.00 $45,000.00 $27,000.00 31 Install 3/4" PVC Pipe LF 2800 $16,296.0 0 $8,400.00 $12,572.00 $19,600.00 $28,000.00 $47,600.00 32 Install 1" PVC Pipe LF 4200 $25,872.0 0 $13,650.00 $21,420.00 $29,400.00 $46,200.00 $113,400.00 33 Install 1‐1/4" PVC Pipe LF 3200 $20,800.0 0 $12,800.00 $18,304.00 $24,000.00 $38,400.00 $99,200.00 34 Install 1‐1/2" PVC Pipe LF 2000 $13,880.0 0 $10,000.00 $12,560.00 $16,000.00 $26,000.00 $54,000.00 35 Install 2" PVC Pipe LF 3000 $22,860.0 0 $18,000.00 $22,050.00 $25,500.00 $45,000.00 $126,000.00 36 Install 2‐1/2" PVC Pipe LF 1800 $15,120.0 0 $12,600.00 $18,774.00 $17,100.00 $30,600.00 $93,600.00 37 Install 3" PVC Pipe LF 2000 $20,160.0 0 $20,000.00 $24,120.00 $23,000.00 $40,000.00 $64,000.00 38 Install Hunter PROS‐06‐PRS30‐CV Spray EA 60 $1,747.2 0 $1,800.00 $3,030.00 $1,980.00 $1,920.00 $2,520.00 39 Install Hunter PROS‐06‐PRS30‐CV MP Rotator EA 250 $10,080.0 0 $8,750.00 $13,750.00 $11,500.00 $10,250.00 $16,000.00 40 Install Hunter I‐20‐06‐SS Rotor EA 260 $14,560.0 0 $14,300.00 $17,680.00 $16,640.00 $14,300.00 $10,920.00 41 Install 4" Nibco F‐6190SON Gate Valve EA 1 $2,464.0 0 $2,500.00 $2,800.00 $2,800.00 $700.00 $1,600.0 0 42 Install 3" Nibco T‐580‐70 Ball Valve EA 6 $10,550.4 0 $3,600.00 $9,600.00 $12,000.00 $7,200.00 $16,200.00 43 Install 1" Hunter HQ‐44‐LRC Quick Coupling Valve EA 16 $5,376.0 0 $4,000.00 $8,640.00 $6,080.00 $4,000.00 $4,800.00 44 Install 1‐1/2" Hunter ICV Valve EA 12 $5,779.2 0 $5,400.00 $10,200.00 $6,600.00 $4,320.00 $3,600.00 45 Install 2" Hunter ICV Valve EA 35 $20,580.0 0 $19,250.00 $33,600.00 $23,450.00 $13,650.00 $14,560.00 46 Install CALSENSE Double Controller Assembly CS3‐8‐SD/CS3‐8STA KIT (5) / CS3‐GR‐KIT/CS3‐MSSE‐KIT(2)/CS3‐FL(2)/COMM‐5YR‐2/FM‐2/FM‐2 EA 1 $47,768.00 $25,000.00 $32,000.00 $54,000.00 $27,000.00 $2,700.00 47 Install 3" Superior 3300 Master Valve EA 2 $4,950.4 0 $6,000.00 $5,000.00 $5,600.00 $4,000.00 $10,600.00 48 Install CALSENSE FM‐2 Flow Meter EA 2 $2,598.4 0 $4,000.00 $6,750.00 $3,000.00 $1,800.00 $3,400.00 49 Install 3" Class 315 PVC Irrigation Pressure Main Line LF 2600 $61,152.0 0 $65,000.00 $36,608.00 $70,200.00 $83,200.00 $83,200.00 50 Install 4" Class 315 PVC Irrigation Pressure Main Line LF 200 $7,504.0 0 $6,000.00 $4,208.00 $8,600.00 $8,800.00 $7,800.00 51 Install 6" Schedule 40 PVC Mainline Irrigation Sleeve LF 200 $13,440.0 0 $7,000.00 $4,712.00 $15,200.00 $11,600.00 $3,600.00 52 Install 4" Schedule 40 PVC Control Wire Sleeve LF 200 $2,464.0 0 $6,000.00 $2,918.00 $2,800.00 $7,000.00 $6,400.00 53 Install 1‐1/2" Schedule 40 PVC Lateral Line Sleeve LF 100 $4,312.0 0 $2,000.00 $606.00 $4,900.0 0 $2,200.00 $3,600.00 54 Install 2‐1/2" Schedule 40 PVC Lateral Line Sleeve LF 120 $5,376.0 0 $3,000.00 $1,260.00 $6,120.00 $3,240.00 $4,080.00 55 Install 6" Schedule 40 PVC Lateral Line Sleeve LF 120 $5,241.6 0 $4,200.00 $2,880.00 $6,000.00 $6,360.00 $5,040.00 56 Install 14 GA UF Wire for Controller "A" System EA 23000 $9,890.0 0 $46,000.00 $11,500.00 $11,500.00 $23,000.00 $57,500.00 57 Install 14 GA UF Wire for Controller "B" System EA 16000 $6,880.0 0 $32,000.00 $8,000.00 $8,000.00 $16,000.00 $40,000.00 58 Re‐sod Trenches SF 30000 $120,900.0 0 $90,000.00 $50,400.00 $135,000.00 $63,000.00 $90,000.00 59 All Other Work as Required by the Plans and Specifications LS 1 $47,286.4 0 $25,000.00 $150,000.00 $54,000.00 $400.00 $42,000.0 0 60 Field Orders LS 1 $40,000.0 0 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $680,687.60 $556,250.00 $720,942.00 $734,570.00 $672,140.00 $1,129,920.00 $1,098,961.20 $1,105,074.00 $1,261,755.00 $1,376,702.00 $1,472,539.00 $1,774,186.00