Lake RialtoWater Subcommittee UpdateNovember 9, 2022
Lake Rialto – Final Grading and Civil Design
Lake Rialto – Landscaping and Planting Design
Lake Rialto – Landscaping and Planting Design
Landscape palette and quantities have been determined. Local nurseries were contacted regarding contract growing over a 9 to12 month period
Lake Rialto – Proposed Restroom, Picnic Tablesand Package Pump Station Locations Proposed Restroom & Picnic Table Area
Proposed Package Pump Station Location
Proposed Pre-Fabricated Restroom Layout
MECHANICAL
& STORAGE
Sample Vault Configuration
Restroom & Shade – Architectural Alternatives
SAMPLE -Frisbee Park Shade Structure
Lake Rialto – Agua Mansa Parking Alternative
Access
Agua Mansa Parking Alternative
Proposed Street Adjacent Parking with access via the flood control channel access road to the site
Lake Rialto – Conceptual Parking Alternative #3Recommended Alternative Proposed Street Adjacent Parking Area
Location provides approximately 10 to 11 parking stalls
Lake Rialto – CEQA Schedule
Currently Studies are being completed
December - Draft Initial Study/Mitigated Negative Declaration Submitted (IS/MND) for Review Jan/Feb – Draft IS/MND Out for Public Comment
March – Finalize IS/MND
Questions/Direction?