City of Rialto
Bid Results for Project Various Streets Reconstruction, 210804 (23‐017) Issued on 10/10/2022
Bid Due on November 08, 2022  3:00 PM (PST)
Item
Number Section Description
Unit of
Measure Quantity
Matich
Corporation
All American
Asphalt
R.J. Noble
Company
SULLY‐MILLER

CONTRACTING
CO.
1 Base  Bid ‐ Bid Schedule A Mobilization LS 1 $358,000.00 $390,000.00 $600,000.00 $204,000.00 2 Base  Bid ‐ Bid Schedule A Water  Pollution Control LS 1 $23,000.00 $16,000.00 $125,000.00 $75,000.00 3 Base  Bid ‐ Bid Schedule A Traffic  Control LS 1 $289,000.00 $523,000.00 $500,000.00 $486,000.00 4 Base  Bid ‐ Bid Schedule A Construct  Driveway Approach EA 1 $10,000.00 $13,000.00 $12,000.00 $15,000.00 5 Base  Bid ‐ Bid Schedule A Construct  Access Ramp EA 32 $243,200.00 $224,000.00 $288,000.00 $227,200.00 6 Base  Bid ‐ Bid Schedule A Construct  4" Sidewalk SF 1628 $22,792.00 $30,932.00 $52,096.00 $27,676.00 7 Base  Bid ‐ Bid Schedule A Remove  Existing and Construct 4" Sidewalk SF 4410 $66,150.00 $83,790.00 $74,970.00 $77,175.00 8 Base  Bid ‐ Bid Schedule A Cold  Mill Existing Asphalt Concrete Pavement SF 33750 $12,487.50 $25,312.50 $28,687.50 $28,687.50 9 Base  Bid ‐ Bid Schedule A Unclassified  Excavation (F) CY 15270 $763,500.00 $778,770.00 $1,527,000.00 $1,175,790.00 10 Base  Bid ‐ Bid Schedule A Portland  Cement for CSPB TON 1090 $223,450.00 $246,340.00 $245,250.00 $233,260.00 11 Base  Bid ‐ Bid Schedule A Full  Depth Reclamation ‐ Cement CY 13200 $138,600.00 $435,600.00 $950,400.00 $356,400.00 12 Base  Bid ‐ Bid Schedule A Rubberized  Hot Mix Asphalt‐Gap Graded TON 9075 $1,052,700.00 $1,243,275.00 $1,225,125.00 $1,216,050.00 13 Base  Bid ‐ Bid Schedule A Hot  Mix Asphalt (Type A) TON 19770 $1,502,520.00 $2,115,390.00 $2,075,850.00 $1,897,920.00 14 Base  Bid ‐ Bid Schedule A Remove  and Construct 8‐inch Curb and Gutter LF 374 $33,660.00 $43,010.00 $37,400.00 $42,636.00 15 Base  Bid ‐ Bid Schedule A Remove  Existing and Construct Cross Gutter and Spandrel (RSC) SF 9300 $223,200.00 $213,900.00 $353,400.00 $306,900.00 16 Base  Bid ‐ Bid Schedule A Adjust  Water Valve Frame and Cover to Grade EA 84 $73,920.00 $107,016.00 $109,200.00 $12,600.00 17 Base  Bid ‐ Bid Schedule A Adjust  Monitoring Water Frame and Cover to Grade EA 1 $1,190.00 $1,274.00 $1,300.00 $1,200.00 18 Base  Bid ‐ Bid Schedule A Adjust  Manhole Frame and Cover to Grade EA 41 $41,000.00 $64,780.00 $53,300.00 $45,100.00 19 Base  Bid ‐ Bid Schedule A Remove  Damage Parkway Drain Cover and Replace In‐Kind SF 15 $4,500.00 $6,195.00 $7,500.00 $6,375.00 20 Base  Bid ‐ Bid Schedule A Detectable  Warning Surface SF 38 $4,180.00 $3,762.00 $2,660.00 $2,546.00 21 Base  Bid ‐ Bid Schedule A Traffic  Striping, Signage & Markings LS 1 $97,000.00 $103,000.00 $100,000.00 $98,000.00 22 Base  Bid ‐ Bid Schedule A Traffic  Detector Loops EA 94 $29,140.00 $33,840.00 $32,900.00 $33,840.00 23 Base  Bid ‐ Bid Schedule A Pedestrian  Push Buttons LS 1 $35,000.00 $20,000.00 $20,000.00 $20,000.00 24 Base  Bid ‐ Bid Schedule A All  other work as required by the plans and specifications LS 1 $105,000.00 $52,000.00 $50,000.00 $500.00 25 Base  Bid ‐ Bid Schedule A Field  Orders LS 1 $300,000.00 $300,000.00 $300,000.00 $300,000.00 $5,653,189.50 $7,074,186.50 $8,772,038.50 $6,889,855.50 26 Additive  #1 ‐ Bid Schedule B Mobilization LS 1 $382,000.00 $370,000.00 $600,000.00 $190,000.00 27 Additive  #1 ‐ Bid Schedule B Water  Pollution Control LS 1 $21,000.00 $15,000.00 $150,000.00 $75,000.00 28 Additive  #1 ‐ Bid Schedule B Traffic  Control LS 1 $329,000.00 $450,000.00 $460,752.50 $319,000.00 29 Additive  #1 ‐ Bid Schedule B Construct  Access Ramp EA 56 $425,600.00 $392,000.00 $504,000.00 $341,600.00 30 Additive  #1 ‐ Bid Schedule B Construct  Access Ramp (RSC) EA 5 $45,000.00 $40,000.00 $65,000.00 $35,500.00 31 Additive  #1 ‐ Bid Schedule B Remove  Existing and Construct 4" Sidewalk SF 1134 $17,010.00 $21,546.00 $19,278.00 $19,278.00 32 Additive  #1 ‐ Bid Schedule B Cold  Mill Existing Asphalt Concrete Pavement SF 61010 $24,404.00 $45,757.50 $36,606.00 $48,808.00 33 Additive  #1 ‐ Bid Schedule B Unclassified  Excavation (F) CY 12440 $696,640.00 $634,440.00 $1,244,000.00 $883,240.00 34 Additive  #1 ‐ Bid Schedule B Portland  Cement for CSPB TON 1290 $274,770.00 $291,540.00 $290,250.00 $276,060.00 35 Additive  #1 ‐ Bid Schedule B Full  Depth Reclamation ‐ Cement CY 14720 $153,088.00 $441,600.00 $912,640.00 $353,280.00 36 Additive  #1 ‐ Bid Schedule B Rubberized  Hot Mix Apshalt ‐ Gap Graded (RHMA‐G) TON 9000 $1,062,000.00 $1,233,000.00 $1,215,000.00 $1,323,000.00 37 Additive  #1 ‐ Bid Schedule B Hot  Mix Asphalt (Type A) TON 14130 $1,116,270.00 $1,511,910.00 $1,483,650.00 $1,624,950.00 38 Additive  #1 ‐ Bid Schedule B Remove  and Construct AC Dike LF 20 $1,620.00 $360.00 $9,000.00 $700.00 39 Additive  #1 ‐ Bid Schedule B Remove  and Construct 8‐inch Curb and Gutter LF 155 $13,950.00 $18,290.00 $16,275.00 $17,825.00 40 Additive  #1 ‐ Bid Schedule B Remove  Existing and Construct Cross Gutter and Spandrel (RSC) SF 14570 $349,680.00 $335,110.00 $553,660.00 $466,240.00 41 Additive  #1 ‐ Bid Schedule B Adjust  Water Valve Frame and Cover to Grade EA 91 $80,080.00 $115,934.00 $118,300.00 $13,650.00 42 Additive  #1 ‐ Bid Schedule B Adjust  Manhole Frame and Cover to Grade EA 52 $52,000.00 $82,160.00 $67,600.00 $57,200.00 43 Additive  #1 ‐ Bid Schedule B Detectable  Warning Surface SF 25 $2,750.00 $2,475.00 $1,750.00 $1,500.00 44 Additive  #1 ‐ Bid Schedule B Traffic  Striping, Signage & Markings LS 1 $82,000.00 $87,000.00 $85,000.00 $83,000.00 45 Additive  #1 ‐ Bid Schedule B Traffic  Detector Loops EA 32 $9,920.00 $11,520.00 $11,200.00 $11,200.00 46 Additive  #1 ‐ Bid Schedule B Pedestrian  Push Buttons LS 1 $38,000.00 $17,000.00 $16,000.00 $20,000.00 47 Additive  #1 ‐ Bid Schedule B All  other work as required by the plans and specifications LS 1 $164,000.00 $45,000.00 $50,000.00 $500.00 48 Additive  #1 ‐ Bid Schedule B Field  Orders LS 1 $290,000.00 $290,000.00 $290,000.00 $290,000.00 $5,630,782.00 $6,451,642.50 $8,199,961.50 $6,451,531.00 49 Additive  #2 ‐ Bid Schedule C Mobilization LS 1 $559,000.00 $500,000.00 $400,000.00 $193,000.00 50 Additive  #2 ‐ Bid Schedule C Water  Pollution Control LS 1 $19,600.00 $20,000.00 $232,000.00 $95,000.00 51 Additive  #2 ‐ Bid Schedule C Traffic  Control LS 1 $344,000.00 $600,000.00 $350,000.00 $310,000.00 52 Additive  #2 ‐ Bid Schedule C Railroad  Coordination LS 1 $27,400.00 $132,000.00 $35,000.00 $50,000.00 53 Additive  #2 ‐ Bid Schedule C Construct  Driveway Approach EA 3 $30,000.00 $39,000.00 $45,000.00 $66,000.00 54 Additive  #2 ‐ Bid Schedule C Construct  Access Ramp EA 107 $813,200.00 $749,000.00 $963,000.00 $946,950.00 55 Additive  #2 ‐ Bid Schedule C Construct  Access Ramp (RSC) EA 1 $9,000.00 $8,000.00 $13,000.00 $10,000.00 56 Additive  #2 ‐ Bid Schedule C Construct  4" Sidewalk SF 592 $8,288.00 $11,248.00 $18,944.00 $17,760.00 57 Additive  #2 ‐ Bid Schedule C Remove  Existing and Construct 4" Sidewalk SF 3752 $56,280.00 $71,288.00 $63,784.00 $112,560.00 58 Additive  #2 ‐ Bid Schedule C Cold  Mill Existing Asphalt Concrete Pavement SF 87087 $27,867.84 $65,315.25 $60,960.90 $87,087.00 59 Additive  #2 ‐ Bid Schedule C Unclassified  Excavation (F) CY 16280 $341,880.00 $830,280.00 $1,709,400.00 $2,849,000.00 60 Additive  #2 ‐ Bid Schedule C Pulverized  Asphalt Base (PAB) CY 13300 $247,380.00 $704,900.00 $585,200.00 $545,300.00 61 Additive  #2 ‐ Bid Schedule C Pulverizing  of Existing AC, AB (Depth Per Plan) SF 997542 $69,827.94 $249,385.50 $59,852.52 $548,648.10 62 Additive  #2 ‐ Bid Schedule C Rubberized  Hot Mix Asphalt‐Gap Graded (RHMA‐G) TON 14300 $1,673,100.00 $1,959,100.00 $1,930,500.00 $2,731,300.00 63 Additive  #2 ‐ Bid Schedule C Hot  Mix Asphalt (Type A) TON 17280 $1,382,400.00 $1,848,960.00 $1,814,400.00 $2,764,800.00 64 Additive  #2 ‐ Bid Schedule C Construct  8‐inch Curb and Gutter LF 66 $5,940.00 $7,656.00 $8,910.00 $13,266.00 65 Additive  #2 ‐ Bid Schedule C Remove  and Construct 8‐inch Curb and Gutter LF 256 $23,040.00 $28,928.00 $25,600.00 $51,200.00 66 Additive  #2 ‐ Bid Schedule C Remove  Existing and Construct Cross Gutter and Spandrel (RSC) SF 20420 $490,080.00 $469,660.00 $775,960.00 $918,900.00 67 Additive  #2 ‐ Bid Schedule C Adjust  Water Valve Frame and Cover to Grade EA 112 $98,560.00 $142,688.00 $145,600.00 $19,040.00 68 Additive  #2 ‐ Bid Schedule C Adjust  Monitoring Water Frame and Cover to Grade EA 1 $1,190.00 $1,274.00 $1,300.00 $1,550.00 69 Additive  #2 ‐ Bid Schedule C Adjust  Manhole Frame and Cover to Grade EA 82 $82,000.00 $129,560.00 $106,600.00 $109,055.90 70 Additive  #2 ‐ Bid Schedule C Detectable  Warning Surface SF 44 $4,840.00 $4,356.00 $3,080.00 $7,920.00 71 Additive  #2 ‐ Bid Schedule C Traffic  Striping, Signage & Markings LS 1 $58,000.00 $61,000.00 $60,000.00 $76,000.00 72 Additive  #2 ‐ Bid Schedule C Traffic  Detector Loops EA 16 $4,960.00 $5,760.00 $5,600.00 $7,200.00 73 Additive  #2 ‐ Bid Schedule C Pedestrian  Push Buttons LS 1 $9,800.00 $4,000.00 $3,500.00 $5,000.00 74 Additive  #2 ‐ Bid Schedule C All  other work as required by the plans and specifications LS 1 $204,000.00 $60,000.00 $50,000.00 $25,000.00 75 Additive  #2 ‐ Bid Schedule C Field  Orders LS 1 $280,000.00 $280,000.00 $280,000.00 $280,000.00 $6,871,633.78 $8,983,358.75 $9,747,191.42 $12,841,537.00 76 Additive  #3 ‐ Bid Schedule D Mobilization LS 1 $514,000.00 $450,000.00 $400,000.00 $175,000.00 77 Additive  #3 ‐ Bid Schedule D Water  Pollution Control LS 1 $19,600.00 $20,000.00 $240,000.00 $65,000.00 78 Additive  #3 ‐ Bid Schedule D Traffic  Control LS 1 $347,000.00 $500,000.00 $300,000.00 $470,000.00 79 Additive  #3 ‐ Bid Schedule D Railroad  Coordination LS 1 $36,000.00 $110,000.00 $35,000.00 $125,000.00 80 Additive  #3 ‐ Bid Schedule D Construct  Access Ramp EA 83 $630,800.00 $581,000.00 $747,000.00 $747,000.00 81 Additive  #3 ‐ Bid Schedule D Construct  Access Ramp (RSC) EA 7 $63,000.00 $56,000.00 $91,000.00 $70,000.00 82 Additive  #3 ‐ Bid Schedule D Remove  Existing and Construct 4" Sidewalk SF 2997 $44,955.00 $53,946.00 $50,949.00 $83,916.00 83 Additive  #3 ‐ Bid Schedule D Cold  Mill Existing Asphalt Concrete Pavement SF 82961 $28,206.74 $62,220.75 $62,220.75 $79,642.56 84 Additive  #3 ‐ Bid Schedule D Unclassified  Excavation (F) CY 12590 $352,520.00 $642,090.00 $1,259,000.00 $2,392,100.00 85 Additive  #3 ‐ Bid Schedule D Pulverized  Asphalt Base (PAB) CY 10480 $209,600.00 $555,440.00 $419,200.00 $398,240.00 86 Additive  #3 ‐ Bid Schedule D Pulverizing  of Existing AC, AB (Depth Per Plan) SF 716364 $50,145.48 $186,254.64 $42,981.84 $394,000.20 87 Additive  #3 ‐ Bid Schedule D Rubberized  Hot Mix Asphalt‐Gap Graded (RHMA‐G) TON 10200 $1,203,600.00 $1,397,400.00 $1,377,000.00 $1,989,000.00 88 Additive  #3 ‐ Bid Schedule D Hot  Mix Asphalt (Type A) TON 14470 $1,143,130.00 $1,548,290.00 $1,519,350.00 $2,271,790.00 89 Additive  #3 ‐ Bid Schedule D Remove  and Construct 6‐inch Curb LF 20 $1,740.00 $2,940.00 $3,000.00 $1,440.00 90 Additive  #3 ‐ Bid Schedule D Remove  8‐inch Curb LF 40 $3,600.00 $1,200.00 $4,800.00 $640.00 91 Additive  #3 ‐ Bid Schedule D Construct  8‐inch Curb and Gutter LF 32 $2,880.00 $3,136.00 $3,840.00 $6,400.00 92 Additive  #3 ‐ Bid Schedule D Remove  and Construct 8‐inch Curb and Gutter LF 164 $14,760.00 $19,516.00 $18,040.00 $32,800.00 93 Additive  #3 ‐ Bid Schedule D Remove  Existing and Construct Cross Gutter and Spandrel (RSC) SF 18740 $449,760.00 $431,020.00 $712,120.00 $937,000.00 94 Additive  #3 ‐ Bid Schedule D Adjust  Water Valve Frame and Cover to Grade EA 125 $110,000.00 $159,250.00 $162,500.00 $18,750.00 95 Additive  #3 ‐ Bid Schedule D Adjust  Manhole Frame and Cover to Grade EA 75 $75,000.00 $118,500.00 $97,500.00 $99,746.25 96 Additive  #3 ‐ Bid Schedule D Parkway  Drain Structure LS 1 $4,500.00 $32,000.00 $9,000.00 $40,000.00 97 Additive  #3 ‐ Bid Schedule D Traffic  Striping, Signage & Markings LS 1 $82,000.00 $87,000.00 $85,000.00 $109,000.00 98 Additive  #3 ‐ Bid Schedule D Traffic  Detector Loops EA 10 $3,100.00 $3,600.00 $3,500.00 $4,500.00 99 Additive  #3 ‐ Bid Schedule D Pedestrian  Push Buttons LS 1 $9,800.00 $4,000.00 $3,500.00 $5,000.00 100 Additive  #3 ‐ Bid Schedule D All  other work as required by the plans and specifications LS 1 $214,000.00 $50,000.00 $50,000.00 $15,000.00 101 Additive  #3 ‐ Bid Schedule D Field  Orders LS 1 $340,000.00 $340,000.00 $340,000.00 $340,000.00 $5,953,697.22 $7,414,803.39 $8,036,501.59 $10,870,965.01 102 Additive  #4 ‐ Bid Schedule E Mobilization LS 1 $398,000.00 $340,000.00 $400,000.00 $125,000.00 103 Additive  #4 ‐ Bid Schedule E Water  Pollution Control LS 1 $23,000.00 $14,000.00 $155,000.00 $65,000.00 104 Additive  #4 ‐ Bid Schedule E Traffic  Control LS 1 $287,000.00 $430,000.00 $300,000.00 $265,000.00 105 Additive  #4 ‐ Bid Schedule E Construct  Access Ramp EA 22 $167,200.00 $154,000.00 $198,000.00 $231,000.00 106 Additive  #4 ‐ Bid Schedule E Remove  Existing and Construct 4" Sidewalk SF 214 $3,210.00 $4,494.00 $6,848.00 $6,206.00 107 Additive  #4 ‐ Bid Schedule E Cold  Mill Existing Asphalt Concrete Pavement SF 18173 $10,540.34 $13,629.75 $27,259.50 $22,716.25 108 Additive  #4 ‐ Bid Schedule E Unclassified  Excavation (F) CY 11880 $712,800.00 $605,880.00 $1,188,000.00 $1,211,760.00 109 Additive  #4 ‐ Bid Schedule E Pulverized  Asphalt Base (PAB) CY 3580 $73,032.00 $189,740.00 $161,100.00 $368,740.00 110 Additive  #4 ‐ Bid Schedule E Pulverizing  of Existing AC, AB (Depth Per Plan) SF 641527 $25,661.08 $153,966.48 $38,491.62 $320,763.50 111 Additive  #4 ‐ Bid Schedule E Portland  Cement for CSPB TON 900 $191,700.00 $203,346.00 $202,500.00 $247,500.00 112 Additive  #4 ‐ Bid Schedule E Full  Depth Reclamation ‐ Cement CY 10200 $114,240.00 $336,600.00 $765,000.00 $408,000.00 113 Additive  #4 ‐ Bid Schedule E Rubberized  Hot Mix Asphalt ‐ Gap Graded (RHMA‐G) TON 8420 $985,140.00 $1,153,540.00 $1,136,700.00 $1,515,600.00 114 Additive  #4 ‐ Bid Schedule E Hot  Mix Asphalt (Type A) TON 15540 $1,227,660.00 $1,662,780.00 $1,631,700.00 $2,160,060.00 115 Additive  #4 ‐ Bid Schedule E Remove  and Construct AC Dike LF 1728 $24,192.00 $31,104.00 $24,192.00 $86,400.00 116 Additive  #4 ‐ Bid Schedule E Remove  and Construct 8‐inch Curb and Gutter LF 68 $6,120.00 $7,820.00 $8,840.00 $13,192.00 117 Additive  #4 ‐ Bid Schedule E Remove  Existing and Construct Cross Gutter and Spandrel (RSC) SF 6950 $166,800.00 $159,850.00 $264,100.00 $312,750.00 118 Additive  #4 ‐ Bid Schedule E Adjust  Water Valve Frame and Cover to Grade EA 152 $133,760.00 $193,648.00 $197,600.00 $24,320.00 119 Additive  #4 ‐ Bid Schedule E Adjust  Monitoring Water Frame and Cover to Grade EA 1 $1,190.00 $1,274.00 $1,300.00 $1,570.55 120 Additive  #4 ‐ Bid Schedule E Adjust  Manhole Frame and Cover to Grade EA 81 $81,000.00 $127,980.00 $105,300.00 $107,725.95 121 Additive  #4 ‐ Bid Schedule E Traffic  Striping, Signage & Markings LS 1 $52,000.00 $56,000.00 $55,000.00 $70,000.00 122 Additive  #4 ‐ Bid Schedule E Traffic  Detector Loops EA 47 $14,570.00 $16,920.00 $16,450.00 $21,150.00 123 Additive  #4 ‐ Bid Schedule E Pedestrian  Push Buttons LS 1 $9,800.00 $4,000.00 $3,500.00 $5,000.00 124 Additive  #4 ‐ Bid Schedule E All  other work as required by the plans and specifications LS 1 $106,000.00 $43,000.00 $50,000.00 $15,000.00 125 Additive  #4 ‐ Bid Schedule E Field  Orders LS 1 $280,000.00 $280,000.00 $280,000.00 $280,000.00 $5,094,615.42 $6,183,572.23 $7,216,881.12 $7,884,454.25 $29,203,917.92 $36,107,563.37 $41,972,574.13 $44,938,342.76