City 4A and Chino 2 Emergency Repair Project

FINAL CONSTRUCTION WORK AUTHORIZATION

EMERGENCY REPAIR OF CITY WELL 4A AND REHABILITATION OF
CHINO WELL 2 PROJECT

Project
Disconnect existing wiring from MCC, rebuild the MCC at the shop, provide and install new breakers and other electrical components, fabricate new internal back planes and shelves, perform FAT and complete ArcFlash study and install the rebuilt MCC and bring City Well 4A online.

Remove the existing oil lubrication system from Chino Well 2 and replace with a water lubricating system, similar to Miro Well 2 and Rialto Well 3.

Scope of Work
City Well 4A: On September 28, 2022, there was a catastrophic failure of the internal main feeder wiring. The main feeders had a direct short across all phases, destroying all components and wiring inside the MCC. Due to this, the existing MCC NEMA 3R enclosure was damaged and all internal components (breakers, wiring etc.) destroyed. Since City Well 4A is a critical well supplying water, Rialto Water Services-Veolia Personnel immediately contacted the local electrical on-call contractor, Big Sky Electric who came onsite on September 29th and inspected the panel. City Utilities Manager, Tom Crowley also inspected the damaged panel. This panel was stripped and shipped to Big Sky’s repair workshop on 10/4/2022 and is anticipated to be rebuilt and shipped back in 6-7 weeks (mid to late November 2022). Upon completion of rebuilding, this panel will be ArcFlash tested and certified prior to being placed into service on a T&M Not to Exceed basis.

Additionally, Rialto Water Services-Veolia is working with Tri County Pump Company to ship the existing damaged motor to Tri County’s repair workshop where Tri County will disassemble, inspect, test, recondition, clean, dip and bake stator windings, clean and bake out rotor assembly, dynamically balance the rotating assembly, reseal oil level standpipe, weld and repair broken fan cover, clean, prime and paint all parts, reassemble and perform a full voltage no load test. Upon completion of the repairs, Tri County personnel will come onsite and reinstall the pump motor and perform startup.

City 4A and Chino 2 Emergency Repair Project
Finally, RWS-Veolia will contract with Prime System (the on-call Instrumentation & Controls contractor) to load the backup program into the new PLC system, establish communication with the main SCADA system, test and re-commission the site. An allowance for this work is included in the proposal, which will be performed on Time & Material not to exceed basis (NTE) by Prime Systems.

The MCC in City Well 4A was installed in the 1990s and has been in continuous operation since it was installed.

Chino 2 Well: Currently, the pump in Chino Well 2 is lubricated with Oil instead of being lubricated by water. Due to normal operation of this system, the water table has about 2' of oil on top. There are bag filters installed, which collect the oil, however this pump puts oil on the water table, which is not recommended. This project would replace the system from an Oil lubricated system to water lubricated system, similar to Miro 3 and Rialto Well 3 Veolia shall provide procurement support, Project Management, Construction Management, inspection support oversight, and will coordinate all onsite installation, testing and commissioning.

Cost Estimate
See Attachment 1 – Final Cost Sheet with total cost of $684,304.89 and breakdown costs, which includes a City contingency of $78,958.26. All unused contingencies shall revert to the City Schedule
Date for substantial & final completion for City Well 4A is December 31, 2022 and for Chino Well 2 is March 31, 2023.

Contractor Firm Proposals

Big Sky Electric - See Attachment 2 (For City Well 4A)
Tri County Pump Company - See attachment 3 (For City Well 4A) Tri County Pump Company - See attachment 4 (For Chino 2)

City 4A and Chino 2 Emergency Repair Project

Approved By Rialto City Council/Rialto Utility Authority:

Date: Tab Item No. _____

Issued by:

Rialto Utility Authority

By: ______________________

Name: Thomas J. Crowley, P.E.,

Title: Utilities Manager

Date: _____________________

Received by:

Rialto Water Services, LLC

By: ______________________

Name: ___________________

Title: ____________________

Date: _____________________

City 4A and Chino 2 Emergency Repair Project

ATTACHMENT 1 – Cost Breakdown Sheet

ITEM ENTITY SCOPE BASIS COST
1 Big Sky Electric City Well 4A electrical rebuild of MCC and replacement of associated electrical components. Lump Sum $217,148.00
2 Tri County Pumps Repair City Well 4A motor repair. Lump Sum $15,554.00 3 Big Sky Electric Complete ArcFlash study and issue report for City Well 4A panel. T&M (NTE) $5,000.00 4 Prime Systems Provide and install new PLC, wireless modem and integrate City Well 4A SCADA system into the overall Water SCADA system. T&M (NTE) $25,000.00 $262,702.00
5 Tri County Pumps Replace the lubrication system for Chino Well 2 from oil lubricating system to water lubricating system Lump Sum $263,686.38 $263,686.38
$526,388.38
6 Veolia Veolia Mark up of 15% for Procurement, PM-CM, Design coordination and OH&P Lump Sum $78,958.26
$605,346.64
7 15% Project Contingency for unforseen conditions. Allowances $78,958.26 $684,304.89
PROJECT COST FOR CITY 4A EMERGENCY REPAIRS and CHINO 2 REHABILITATION Total Construction Costs
Project Costs for Design, Construction and Project Management Services Total Cost for Well Improvements
Subtotal for City Well 4A
Subtotal for Chino Well 2

City 4A and Chino 2 Emergency Repair Project

ATTACHMENT 2 – Big Sky Electric Quote for City Well 4A

Big Sky Electric, Inc.
(909) 694 -0432 phone • (909) 694 -0433 fax • www.bigskyelectric.com CA License No. 925689 • NV License No. 0081491 • CO License No. EC.0100972

310 McArthur Way , Suite A • Upland , California 917 86

Rialto/Veolia
City Well #4
MCC Refurbishment

Date Sent: 10/24/2022

Att: Andrew,

Big Sky Electric is pleased to provide the costs associated with the referenced work above. The work was required after a catastrophic failure of the internal main feeder wiring. The main feeders had a direct short across all phases, destroying all components and wiring inside the MCC. The MCC will be rebuilt to like new condition using the existing NEMA 3R structure.

The following are included in this work:

Project Specifics:
• Inspection and evaluation of site and electrical equipment and components. • Steam power wash MCC and surrounding area to remove soot. • Disconnect all electrical conduits and wiring external to the MCC. • As-built and tag all electrical circuits.
• Disconnect all internal wiring.
• Provide crane to remove shade cover and MCC. Set MCC on Trailer. • Transport to repair shop. Provide reachlift to remove from trailer and move inside shop. • Compile a Bill of Materials and Components for replacement. • Purchase all required components from BOM.
• Disassemble MCC and remove all components inside.
• Clean and sandblast inside and outside of the MCC.
• Fabricate new internal back planes and shelves that were destroyed by the explosion. • Paint MCC to original color (Desert Sand).
• Install new components. Wire all components.
• Once complete, perform FAT test at shop facility, including telemetry section. Owner to coordinate Prime Systems for FAT test.
• Test all breakers over 100 amps. Provide certified test report. • Move MCC back to sight. Provide reachlift to move from shop to transport trailer.

Big Sky Electric, Inc.
(909) 694 -0432 phone • (909) 694 -0433 fax • www.bigskyelectric.com CA License No. 925689 • NV License No. 0081491 • CO License No. EC.0100972

310 McArthur Way , Suite A • Upland , California 917 86

• Once on sight, provide crane to move MCC from trailer to site location. Set and anchor MCC in place.
• Reinstall field conduits and wiring back into MCC.
• Rep[lace field wiring that was burned in fire.
• Provide and install new wiring from MCC to motor. Test wiring once installed. • Provide and install 120 volt solenoid valve for oiler at motor. • Paint existing beams on shade cover.
• Provide startup assistance and commissioning of MCC, including programming of new soft starter.
• Provide as-built drawings for Owners use.

Exclusions:
• Telemetry programming. BSE will provide hardware only that matches existing.

The major components that are being replaced are a 400 amp soft starter, main breaker for the MCC, transformer, panel board, breakers, entire telemetry section, DVR for security system, all required fuses, contactors, relays, terminal blocks and internal wiring. This will be a full rebuilt and tested MCC with supporting documents.

Cost: $217,148.00

Thank you for the opportunity to be involved with your project.

Regards,

Denny Doyle

City 4A and Chino 2 Emergency Repair Project

ATTACHMENT 3 – Tri County Pump Company Quote for City Well 4A

October 14, 1902
$1,065.00
$1,775.00
Estimated Shop Labor:
$6,015.00
Estimated Materials:
$6,160.00
$8,855.00
$6,160.00
$539.00
Total Estimate $15,554.00
We appreciate this opportunity to be of service and look forward to working with you. We trust that this estimate will suffice for your needs, and should any additional information be required, please do not hesitate to contact us.

This estimate is valid for thirty (30) days from the above date, and subject to review thereafter.

Sincerely,
Dennis Skinner
Use PO # ______________ Signed ___________________ Date: _________________ Please fax this authorization to 909 888-3653 or email [email protected] SKF Bearings, oil level sight glass, oil fill plug, 115 volt space heaters, misc. material, freight.

Travel to and from jobsite; Install motor and perform start up.

Disassemble, inspect, test. Recondition, clean, dip and bake stator windings. Clean and bake out rotor assembly. Dynamically balance the rotating assembly. Reseal oil level standpipe. Weld up and repair broken fan cover. Clean, prime and paint all parts. Reassemble and perform a full voltage no load test.

Veolia
325 W. Rialto Ave
Rialto, CA 92376
Attention: Mr. Andrew Coleman
Subject: City Well 4A
Quote Number: 101822-1DS
Travel to and from jobsite; Pull existing motor and transport to TCP.

Estimated Material
Estimated Tax @ 8.75%
In Response to your request, Tri County Pump Company is pleased to offer the following for your consideration.

Pull, Repair, install motor and perform start up.

Estimated Field Labor:

Estimated Labor

Page 1 of 1 ends

City 4A and Chino 2 Emergency Repair Project

ATTACHMENT 4 – Tri County Pump Company Quote for Chino 2 September 29, 2022
Estimated Field Labor:
$26,880.00
$26,880.00
$2,400.00
$13,000.00
Estimated Shop Labor:
$1,200.00
$400.00
Estimated Materials:
$1,315.00
$1,560.00
$590.00
$3,360.00
$2,070.00
$94,770.00
$1,120.00
$43,200.00
$80.00
$16,800.00
$1,230.00
$5,100.00
$1,680.00
$1,500.00
$1,850.00
$2,325.00
1 - Lot; Estimated Incoming Freight. $500.00
$70,760.00
$179,050.00
$13,876.38
Total Estimate $263,686.38
550' 1/4" SS Airline
Travel to and from jobsite; video log (2).
(1) 1 15/16" x 99-3/8" 416 SS Head Shaft
Travel to and from jobsite; pull pump equipment and perform start up.

Travel to and from jobsite; install pump equipment and perform start up. (12) Intermediate Bowl Bearing
1 - Lot; Misc. Materials ( Motor Bolts, 1-1/2" Nut and Key, Steady Bushing, Vic Rubber, etc. ). (1) New Packing Box
(12) Bowl Seal Rings
(2) 10” x 59-1/4” T&C Butt Column NSF-61
(2) 1-15/16” x 5’ 416 SS Line shaft with 304 SS Coupling Veolia Water
325 W. Rialto Ave
Rialto, CA 92376
Attention: Mr. Andrew Coleman
Subject: Chino Well 2
Quote Number: 092922-1DS
Sandblast Head and Packing Box
(2) Suction and Discharge Bowl Bearing
(56) 1" x 10' Flush Thread Pipe
(54) 10” x 119-1/4” T&C Butt Column NSF-61
(54) 1-15/16” x 10’ 416 SS Line Shaft with 304 SS Coupling (1) 1-15/16" 304 SS Coupling
Travel to and from jobsite; brush and bail.
(56) 1-15/16” x 10” Complete Retainer with Rubber Inserts Roll Off and Brush Rental
Estimated Material
Estimated Tax @ 7.75%
In Response to your request for quotation, Tri County Pump Company is pleased to offer the following for your consideration.

Estimated Labor
Clean and assemble and load all equipment
(1) 1-11/16" x 150" 416SS Bowl Shaft

Page 1 of 2 ends

We appreciate this opportunity to be of service and look forward to working with you. We trust that this estimate will suffice for your needs, and should any additional information be required, please do not hesitate to contact us.

This estimate is valid for thirty (30) days from the above date, and subject to review thereafter.

Sincerely,
Dennis Skinner
Use PO # ______________ Signed ___________________ Date: _________________ Please fax this authorization to 909 888-3653 or email [email protected]