Cities Index.
Attachment 1 - FY 22-23 LLMD No. 2 Annexation 9 Report.pdf

Rialto City Council
January 24, 2023

Document
Attachment 1 - FY 22-23 LLMD No. 2 Annexation 9 Report.pdf
Meeting
January 24, 2023
Body
Rialto City Council
Original file
1.7 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

Engineer’s Report
Fiscal Year 2022‐2023

City of Rialto
Landscaping and Lighting Maintenance District No. 2
Annexation of:

PPD 2019‐0010 (CIVF V ‐ CA1M03 ‐ M04 LLC);
PPD 2021‐0020 (MULBERRY PARTNERS, LLC)
Prepared For
January 2023

Table of Contents

Sections
Section i.  Engineer’s Statement _________________________________________________ i Section 1.  Plans and Specifications ______________________________________________ 5 Section 2.  Cost Estimate  ______________________________________________________ 7 Section 3.  Method of Apportionment ____________________________________________ 9 Section 4.  Proposed Assessment _______________________________________________ 14

Tables
Table i‐1.  Summary of Assessments _____________________________________________ iv Table 2‐1.  Landscape Cost Estimate for Maintenance  _______________________________ 7 Table 2‐2.  Zone L Lighting Cost Estimate for Maintenance  ___________________________ 8 Table 3‐1.  Zone L EBU Factor __________________________________________________ 12

Appendices
Appendix A.  Annexation Territory Assessment Roll _________________________________  A‐1 Appendix B.  Annexation Territory Assessment Diagram _____________________________  B‐1

i. Engineer’s Statement

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023   i

AGENCY:  CITY OF RIALTO

TO: CITY COUNCIL
CITY OF RIALTO
STATE OF CALIFORNIA

PROJECT:  RIALTO LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT NO. 2 ANNEXATION FISCAL YEAR 2022‐2023
PPD 2019‐0010 (CIVF V ‐ CA1M03 ‐ M04 LLC);
PPD 2021‐0020 (MULBERRY PARTNERS, LLC, FORMERLY OWNED BY LORD/MAURER LLC)

Report Pursuant to "Landscaping and Lighting Act of 1972" Pursuant  to  direction  from  the  City  of  Rialto  City  Council  (the  “City  Council”),  submitted  herewith  is  the "Report," consisting of the following parts, pursuant to the provisions of Division 15, Part 2 of the Streets and Highways  Code  of  the  State  of  California,  being  the  "Landscape  and  Lighting  Act  of  1972,"  (the  “Act”)  as amended, commencing with Section 22500 and Article XIIID of the California Constitution (Proposition 218), and which  is  in  accordance  with  Resolution  No.  8028,  adopted  by  the  City  of  Rialto  City  Council,  San  Bernardino County,  California  ordering  the  preparation  of  the  Engineer’s  Report  for  the  annexation  of  territory  (the “Annexation Territory”) into Rialto Landscaping and Lighting Maintenance District No. 2 (hereinafter referred to as the “District” or “LLMD No. 2”), and the  levy and collection of Assessments for Fiscal  Year 2022‐2023. This "Report" is applicable for the ensuing 12‐month period, being the Fiscal Year commencing July 1, 2022, to June 30,  2023.  The  City  will  conduct  a  property  owner  protest  ballot  proceeding  (hereafter  referred  to  as  “Ballot Proceeding”)  for  the  proposed  levy  of  new  assessments  for  these  developments.  In  addition  to  this  Ballot Proceeding, the City Council will conduct a public hearing to consider public testimonies, comments and written protests regarding the annexations, and the levy of the new assessments. Upon conclusion of the public hearing, property owner ballots received will be opened and tabulated to determine whether a majority protest exists:
“A majority protest exists if, upon the conclusion of the hearing, ballots submitted in opposition to  the  assessment  exceed  the  ballots  submitted  in  favor  of  the  assessment.  In  tabulating  the ballots,  the  ballots  shall  be  weighted  according  to  the  proportional  financial  obligation  of  the affected property.”
The area proposed to be annexed to this District has been conditioned as part of its development agreement to provide for a means to finance the ongoing maintenance of related public improvements either by annexation to this District or by other means. For purposes of determining majority protest, the ballot for this development will be tabulated and based on the results of the ballot tabulation, the City Council may adopt and approve the Engineer’s  Report  (hereafter  referred  to  as  “Report”)  as  amended,  order  the  annexation  of  the  Annexation Territory,  approve  the  related  assessment  diagrams,  and  confirm  the  assessments.  The  assessments  and annexation  as  approved  shall  be  made  part  of,  and  incorporated  as  part  of,  the  District’s  annual  Engineer’s Report for Fiscal Year 2023‐2024 and together with the assessments for other properties within the District shall be finalized, approved and submitted to the County Auditor/Controller for inclusion on the property tax roll for each affected parcel(s) as part of the annual approval process. i. Engineer’s Statement

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023   ii

SECTION 1  PLANS AND SPECIFICATIONS of the improvements to be maintained and/or improved for Fiscal Year 2022‐2023. The plans and specifications show and describe the existing improvements and are sufficient  in  showing  and  describing  the  general  nature,  location,  and  extent  of  the improvements.

SECTION 2  A  COST  ESTIMATE  of  the  improvements  to  be  maintained  and/or  improved  for  the  mentioned Fiscal Year.

SECTION 3  A  METHOD  OF  APPORTIONMENT  showing  the  proportionate  amount  of  the  assessment  to  be charged  in  proportion  to  the  benefit  received  by  each  lot  or  parcel  within  the  Annexation Territory boundaries as shown in Appendix B.

SECTION 4  The PROPOSED  ASSESSMENTS contain the total costs and expense of the proposed improvements for Fiscal Year 2022‐2023 upon each parcel of land within the Annexation Territory within LLMD No. 2, in proportion to the estimated benefit received by such parcels from said improvements, is set forth upon the assessment roll filed herewith and made a part hereof.

I, Matthew E. Webb, a Professional Civil Engineer (employed at Albert A. Webb Associates and retained through an agreement between Webb Municipal Finance, LLC and my employer), acting on behalf of the City of Rialto, pursuant  to  the  Act  do  hereby  assess  and  apportion  the  total amount  of  the  costs  and  expenses  upon  the
parcels of land within Landscaping and Lighting Maintenance District No. 2 Annexation Territory, liable therefore and benefited thereby, in proportion to the estimated benefits that each parcel receives, respectively, from said maintenance, works of improvement, and appurtenances.

ALBERT A. WEBB ASSOCIATES

MATTHEW E. WEBB
PROFESSIONAL CIVIL ENGINEER NO. 37385
ENGINEER OF WORK
CITY OF RIALTO
STATE OF CALIFORNIA

Executed this   day of   , 2023.

i. Engineer’s Statement

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023   iii

Final approval, confirmation and levy of the annual assessment and all matters in the Engineer's "Report" were made on the _______ day of _____________, 2023, by adoption of Resolution No. _________ by City Council.

CITY CLERK
CITY OF RIALTO
STATE OF CALIFORNIA

A copy of the Assessment Roll and Engineer's "Report" were filed in the City Clerk’s Office on the _______ day of _______________, 2023.

CITY CLERK
CITY OF RIALTO
STATE OF CALIFORNIA

i. Engineer’s Statement

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023   iv

WHEREAS, on January 10, 2023, the City Council of the City of Rialto (the “City”), State of California, under the Act, adopted its Resolution Initiating Proceedings for annexing the territory into LLMD No. 2 and the Levy and Collection of Assessments. The area(s) of the annexation shall be known as: “Annexation Territory” or (the “Annexation”).

WHEREAS, the Resolution of Initiation directed Webb Municipal Finance, LLC to prepare and file a report presenting plans and specifications describing the general nature, location, and extent of the improvements to be maintained, an estimate of the costs of the maintenance, operations and servicing of the improvements for the Annexation to LLMD No. 2 for the referenced fiscal year, a diagram for the Annexation within LLMD No. 2 showing the area and properties to be assessed, and an assessment of the estimated costs of the maintenance, operations and servicing of the improvements, assessing the net amount upon all assessable lots and/or parcels within the Annexation to LLMD No. 2 in proportion to the special benefit received.

NOW  THEREFORE,  the  following  assessments  are  intended  to  fund  the  estimated  costs  of  maintenance, operation, and servicing of said improvements to be paid by the assessable real property within the Annexation Territory to LLMD No. 2 in proportion to the special benefit received on such parcels by the improvements:

Table i‐1
Summary of Assessments

Zone 32 Assessments
Annexation  Total Assessment  Assessment Rate per EBU
PPD 2019‐0010  $9,654.49   $1.63

Zone 33 Assessments
Annexation  Total Assessment  Assessment Rate per EBU
PPD 2021‐0020  $1,739.21   $1.63

Zone L Assessments
Annexation  Total Assessment  Assessment Rate per EBU
PPD 2019‐0010  $414.54   $13.74
PPD 2021‐0020  $60.34   $13.38

1. Plans and Specification

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023   5

Description of the Boundaries of the Annexation Territory to LLMD No. 2 The annexation territory consists of the following developments that are located within the boundaries of the City of Rialto.

PPD  2019‐0010:  This  proposed  non‐residential  development  is  located  south  of  West  San  Bernardino  Avenue between south Lilac Avenue and South Willow Avenue.

PPD 2021‐0020: This proposed non‐residential development is located south of Santa Ana Avenue and west of South Willow Avenue.

Assessment Diagram
The Assessment Diagram for the Annexation Territory is attached. The lines and dimensions shown on the map of the County Assessor of the County of San Bernardino for the current year are incorporated by reference in Appendix B herein and made part of this Report.

Zones of Benefit
For Fiscal Year 2022‐2023, all Annexation Territory shall be identified and grouped into zones of benefit referred to  as  Zones.  These  Zones  identify  specific  parcels  and  developments  that  receive  special  benefit  from  the maintenance, operation, and servicing of various District improvements. Each Zone reflects the improvements (street lighting and/or landscaping) associated with the development of properties in that Zone in order to fairly and  equitably  apportion  the  net  cost  of  providing  those  improvements  to  the  properties  that  receive  special benefit  from  the  maintenance  and  operation  of  such  improvements.  By  establishing  and  utilizing  a  Zone structure, similar properties with similar types of improvements will be assessed a proportional amount for the total  annual  expenses  related  to  the  maintenance,  operation,  and  servicing  of  the  improvements  provided  by the  District  and  for  which  the  properties  receive  special  benefits.  The  following  is  a  brief  description  of  the District Zones to which the Annexation Territory is proposed to be annexed:

Zones 32 and 33: These Zones include developments and parcels that are classified as non‐residential properties for which the District provides the maintenance, operation, and servicing of:
•  Parkway landscaping on the perimeter of the development within the public right‐of‐way or easement (face of curb to property line), that was installed as part of developing the associated properties or was previously installed, but necessary for the development of such property; and/or •  Median‐island landscaping near or adjacent to the development that was installed as part of developing the  properties  within  that  particular  development  or  was  previously  installed,  but  necessary  for  the development of such property.

Zone  L:  This  Zone  includes  developments  and  parcels  for  which  the  District  provides  the  maintenance, operation, and servicing of street lighting adjacent to and/or in close proximity to the development or property.

Annexation Territory for Fiscal Year 2022‐2023
As  directed  by  the  City  Council,  this  Report  addresses  the  proposed  annexation  of  additional  non‐residential territory  to  the  District  for  Fiscal  Year  2022‐2023,  consisting  of  the  following  development(s)  including  all  the lots, parcels, and subdivisions of land therein and generally described as:

PPD 2019‐0010: This development consists of three (3) parcels proposed for an industrial development on 7.9 acres of land. This development is being annexed to the District as Zone 32 and part of Zone L for Fiscal Year 2022‐2023 to provide funding for the landscaping and lighting associated with the development.

1. Plans and Specification

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023   6

PPD 2021‐0020: This development consists of one parcel proposed for an industrial development on 2.0 acres of land. This development is being annexed to the District as Zone 33 and part of Zone L for Fiscal Year 2022‐2023 to provide funding for the landscaping and lighting associated with the development.

Improvements and Services
Landscape Improvements
The landscape improvements for the District may include, but are not limited to, various streetscape landscaping including parkways and medians as well as public landscaped areas within or adjacent to the properties within a particular  development  such  as  landscaped  slopes,  irrigated  and  non‐irrigated  open  space  areas,  landscaped detention  or  retention  basins,  and  neighborhood  greenbelts,  trails,  or  parks.  These  landscape  improvements may  include  turf,  ground  cover,  plants  and  shrubs,  trees,  irrigation  and  drainage  systems,  ornamental  lighting structures, masonry walls or other fencing, entryway monuments, and associated appurtenant facilities located within the various dedicate easements, rights‐of‐way or public properties associated with the landscaped areas.

The  following  outlines  the  location  and  extent  of  the  landscape  improvements  associated  with  the  properties and developments within Zones 32 and 33 of the  District.  The  detailed plans and specifications of the District Improvements are on file in the office of the City Public Works Department and by reference are made part of this Report.

Annexation Territory:

Zone  32  (PPD  2019‐0010):  Approximately  5,923  square  feet  along  West  San  Bernardino  Avenue  and  South Willow Avenue.

Zone 33 (PPD 2021‐0020): Approximately 1,067 square feet along Santa Ana Avenue.

Public Street Lighting Improvements
The street lighting improvements for the District may include but are not limited to, electrical energy and the maintenance,  repair  or  replacement  of  the  lighting  fixtures,  poles,  meters,  conduits,  electrical  cable  and associated appurtenant facilities associated with the public street lighting benefiting and serving the Annexation Territory of Zone L.

Zone L Lighting Improvements ‐ Annexation Territory:

PPD 2019‐0010: Six (6) 185‐watt streetlights on West San Bernardino Avenue and one (1) 127‐watt streetlight on Willow Avenue.

PPD 2021‐0020: one (1) 185‐watt streetlight on Santa Ana Avenue.

2. Cost Estimate

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023   7

The cost of servicing, maintaining, repairing, and replacing the actual improvements of the Annexation Territory as described in the Plans and Specifications are summarized as follows:

Table 2‐1
Landscape Cost Estimate for Maintenance
Landscaping and Lighting Maintenance District No. 2, Fiscal Year 2022‐2023

BUDGET ITEM
Zone 32
(PPD 2019‐0010)
Zone 33
(PPD 2021‐0020)
DIRECT COSTS
Landscape & Street Light Maintenance  $4,700.38   $846.75 Other Services and Supply Expenses  $539.67   $97.22
Utilities  $641.45   $115.55
Subtotal Direct Costs  $5,881.50   $1,059.52

ADMINISTRATION COSTS
City Personnel & Miscellaneous Administrative Services  $782.61   $140.98 Consultant Services  $28.55   $5.14
Subtotal Administration Costs  $811.16   $146.13

TOTAL DIRECT AND ADMINISTRATION COSTS  $6,692.66   $1,205.65

LEVY ADJUSTMENTS
Reserve Fund Collection/(Contribution)  $2,961.83   $533.56 Subtotal Levy Adjustments  $2,961.83   $533.56

TOTAL ASSESSMENT  $9,654.49   $1,739.21

DISTRICT STATISTICS
Total Parcels  3  4
Total EBUs Fiscal Year 2022/2023  5,923.00  1,067.00
Fiscal Year 2022/2023 Rate per EBU  $1.63   $1.63
Fiscal Year 2022/2023 Maximum Rate per EBU  $1.63   $1.63

Maximum Assessable Amount  $9,654.49   $1,739.21

2. Cost Estimate

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023   8

Table 2‐2
Zone L Lighting Cost Estimate for Maintenance
Landscaping and Lighting Maintenance District No. 2, Fiscal Year 2022‐2023

BUDGET ITEM  PPD 2019‐0010  PPD 2021‐0020
DIRECT COSTS
Light Maintenance  $626.16   $91.20
Other Services and Supply Expenses  $0.00   $0.00
Personnel Services  $0.00   $0.00
Subtotal Direct Costs  $626.16   $91.20

ADMINISTRATION COSTS
District Administration  $15.65   $2.28
County Administration Fee  $0.00   $0.00
Miscellaneous Administration Expenses  $0.00   $0.00
Subtotal Administration Costs  $15.65   $2.28

TOTAL DIRECT AND ADMINISTRATION COSTS

LEVY ADJUSTMENTS
General Benefit Contribution  ($540.31)  ($78.70)
Reserve Fund Collection/(Contribution)  $313.04   $45.56 Subtotal Levy Adjustments  ($227.27)  ($33.14)

TOTAL ASSESSMENT  $414.54   $60.34

DISTRICT STATISTICS
Total Parcels  3  1
Number of Lights  7  1
Total EBUs Fiscal Year 2022/2023  30.17  4.51
Fiscal Year 2022/2023 Rate per EBU  $13.74   $13.38
Fiscal Year 2022/2023 Maximum Rate per EBU  $13.74   $13.38

Maximum Assessable Amount  $414.54   $60.34

3. Method of Apportionment

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023   9

Proposition 218 Compliance
On November 5, 1996, California voters approved Proposition 218 entitled “Right to Vote on Taxes Act” which added Article XIIID to the California Constitution. While its title refers only to taxes, Proposition 218 establishes new procedural requirements for the formation and administration of assessment districts. Proposition 218 also requires that with certain specified exceptions, which are described below, all existing assessment districts must be ratified by the property owners within the District using the new procedures.

Some of these exceptions include:

Any  assessment  imposed  exclusively  to  finance  the  capital  cost  or  maintenance  and  operation  expenses  for streets.

Any  assessments  levied  pursuant  to  a  petition  signed  by  the  persons  owning  all  of  the  parcels  subject  to  the assessment at the time the assessment was initially imposed.

However, even if assessments are initially exempt from Proposition 218, if the assessments are increased in the future,  the  City  will  need  to  comply  with  the  provisions  of  Proposition  218  for  that  portion  of  the  increased assessment formula (e.g., CPI increase).

Proposition  218  does  not  define  the  term  “streets”,  however,  based  on  the  opinions  of  the  public  agency officials,  attorneys,  assessment  engineers  and  Senate  Bill  919,  it  has  been  determined  that  streets  include  all public  improvements  located  within  the  street  right‐of‐way.  This  would  include  median  and  parkway landscaping, traffic signals, safety lighting and street lighting.

Proposition  218  defines  “assessment”  as  “any  levy  or  charge  upon  real  property  by  an  agency  for  a  special benefit conferred upon the real property.” Cal. Const., art. XIIID, §2(b). A special assessment, sometimes called a “benefit assessment,” is a charge generally levied upon parcels of real property to pay for benefits the parcels receive from local improvements. Special assessments are levied according to statutory authority granted by the Legislature  or,  in  some  instances,  local  charters.  Distinguishing  among  taxes,  fees  and  assessments  can  be difficult and often depends on the context in which the distinction is made. For example, taxes, assessments and property‐related fees all may be imposed on property. The key feature that distinguishes an assessment from a tax,  fee  or  charge  is  the  existence  of  a  special  benefit  to  real  property.  Without  identifying  a  special  benefit, there can be no assessment.

Distinguishing General and Special Benefit
Proposition  218  added  a  set  of  procedures  and  requirements  that  a  local  government  must  follow  to  levy  an assessment.  In  addition  to  notice,  hearing  and  assessment  ballot  proceedings,  Proposition  218  provides  that “only special benefits are assessable” and requires a local government to “separate the general benefits from the special benefits conferred on a parcel.”
By  its  nature  most  every  public  improvement  financed  through  an  assessment  district  contains  an  element  of public benefit. The test is: does there exist, with relation to the improvement, a special benefit to the property assessed? The law requires that portion of the cost of the improvement which benefits the public generally, to be  separated  from  that  portion  of  the  cost  of  the  improvement  which  specially  benefits  assessed  properties.

Proposition 218 provides the following definition of “special benefit”:
“Special  benefit”  means  a  particular  and  distinct  benefit  over,  and  above  general  benefits  conferred  on  real property  located  in  the  district  or  to  the  public  at  large.  General  enhancement  of  property  value  does  not constitute “special benefit”.

3. Method of Apportionment

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023

10 General Benefit
Although the landscape improvements provided by the District include public easements, rights‐of‐way, streets and other amenities available or visible to the public at large, it has been determined that the construction and installation of these landscape improvements were only necessary for the development of properties within the District  and  were  not  required  nor  necessarily  desired  by  any  properties  or  developments  outside  the  District boundaries.  Furthermore,  similar  landscape  improvements  and  services  associated  with  other  developments within the City of Rialto are provided and funded by similar assessment districts or are maintained privately by the individual property owners or associations. Therefore, it has been determined that public access or use of the  landscape  improvements  by  others  is  incidental  and  there  is  no  measurable  general  benefit  to  properties outside  the  District  or  to  the  public  at  large  and  the  landscape  improvements  provided  by  the  District  are entirely  a  special  benefit  to  the  developments  and  properties  therein  that  required  the  installation  of  such improvements.

The street light improvements maintained by the District in Zone L were installed as a condition of approval for new  development  annexing  into  the  District.  Although  necessary  for  the  development  of  these  specific properties, the improvements also provide a general benefit to the pass‐through traffic on the streets on which the lights have been installed. Based upon the most current average daily trip (ADT) information available, the pass‐through  traffic  represents,  on  average,  86.29%  of  the  total  daily  traffic,  resulting  in  a  general  benefit contribution of 86.29% of the total street light maintenance cost in Zone L for FY 2020‐21. The general benefit contribution may be adjusted for future Annexations or Annual Engineer’s Reports as more current information becomes available.

Method of Apportionment
Pursuant  to  the  Landscaping  and  Lighting  Act  of  1972  and  Article  XIII  D  of  the  Constitution  of  the  State  of California,  all  parcels  that  have  special  benefit  conferred  upon  them  as  a  result  of  the  maintenance  and operation of improvements shall be identified and the proportionate special benefit derived by each identified parcel  shall  be  determined  in  relationship  to  the  entire  cost  of  the  maintenance  and  operation  of  the improvements.  Only  parcels  that  receive  direct  special  benefit  are  assessed,  and  each  parcel  is  assessed  in proportion to the estimated benefit received.

The  method  of  apportionment  for  this  District  and  the  Annexation  Territory  calculates  the  receipt  of  special benefit from the respective improvements based on the land use of the parcels. The special benefit received by each lot or parcel is equated to the overall land use of the parcels benefiting from the improvements provided based on each parcel’s actual land use or proposed planned development as compared to other properties. This comparison  is  reliant  upon  the  special  benefit  received  from  the  specific  type  of  improvements  and  services provided or planned within each respective Zone of the District.

The method of apportionment (method of assessment) developed for this District and the Annexation Territory is based on the premise that each of the property to be assessed receives a direct and special benefit from the improvements, services and facilities to be financed by the District assessments.

Equivalent Benefit Units
To  proportionally  and  equitably  assess  the  special  benefits  to  each  parcel,  it  is  necessary  to  correlate  each property’s  proportional  benefit  to  other  properties  that  benefit  from  the  improvements  and  services  being funded. The Equivalent Benefit Unit method of apportionment uses a basic unit (base value) of assessment that is  common  to  all  properties  benefiting  from  the  improvements  and  services  provided  and  assigns  a  weighted value to each parcel based on an assessment formula that equates the property’s specific development status, type of development (land use), and size of the property, as compared to the base value.

3. Method of Apportionment

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023

11 For this District, Zones 32 and 33 are comprised of properties that are proposed non‐residential developments and  the base unit of  comparison is a factor  that is  based  upon the  total acreage of the  development  and  the total  square  footage  of  the  landscaped  area  associated  with  that  development.  Zone  L  is  comprised  of properties, both residential and non‐residential, benefiting from streetlight improvements and the base unit of comparison is a factor that is based upon the acreage of the development and/or the number of planned parcels and or units of the development and the number and wattage of the lights associated with that development.

The following provides a description of the various land use designations and apportionments associated with the improvements provided in the District’s Zones 32, 33 and Zone L.

EBU Application for Properties in Zones 32 and 33
Non‐Residential  –  This  land  use  is  defined  as  any  property  or  properties  that  have  been  developed  or  will  be developed  (vacant  land)  for  non‐residential  use  including  but  not  limited  to  commercial  properties,  office buildings  (public  or  private),  industrial  properties,  churches  or  other  non‐profit  organizations;  and  the improvements and services associated with the parcel have been accepted or will be accepted by the City for maintenance in the fiscal year. The EBU calculated for each parcel is based on the parcel’s proportional benefit from the landscape improvements identified herein and directly associated the property.

This land use type is assigned an EBU that is calculated by dividing the total square footage of the landscaped area  associated  with  that  development;  by  the  total  acreage  of  all  properties  within  the  development  to establish a base value of benefit (landscape square footage per acre). The resulting base value of benefit is then multiplied by each parcel’s specific acreage resulting in the parcel’s proportionate EBU.

EBU Application for Properties in Zone L
In  order  to  account  for  the  various  wattages  used  in  the  streetlights  each  development  is  bringing  into  the District,  a  Light  EBU  Factor  is  assigned  to  each  wattage  category  using  41  Watts  as  the  base  unit,  which  is assigned a Light EBU Factor of one (1).  Each higher wattage category is then assigned a Light EBU Factor based on its relation to the base unit of 41 watts.

Non‐Residential ‐  For  each  non‐residential  development  annexed  into  Zone  L,  the  total  number  of  Light  EBU Factors  for  that  development  shall  be  calculated  by  determining  the  number  of  lights  within  each  Wattage Category and multiplying that number by the corresponding Light EBU Factor for each Wattage Category. The summation  of  the  calculation  for  each  Wattage  Category  will  be  the  total  Light  EBU  Factor  for  the  annexing development. The total Light EBU Factors are then divided by the total acreage of the development to attain the Light  EBU  Factor  per  acre.  The  resulting  Light  EBU  Factor  per  acre  is  then  multiplied  by  each  parcel’s  specific acreage resulting in the parcel’s proportionate share of the Light EBU Factor.

Residential ‐  For each residential development annexed into Zone L, the total number of Light EBU Factors for that  development  shall  be  calculated  by  determining  the  number  of  lights  within  each  Wattage  Category  and multiplying that number by the corresponding Light EBU Factor for each Wattage Category. The summation of the calculation for each Wattage Category will be the total Light EBU Factor for the annexing development. The total Light EBU Factors are then divided by the total number of proposed or actual residential units at buildout to attain the Light EBU Factor per unit.

3. Method of Apportionment

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023

12 The following are the EBU Factors applied to various streetlight wattage:

Table 3‐1
Zone L EBU Factors
Watts  Light EBU Factor  Unit
41  1  Per Light
58  1.41  Per Light
127  3.10  Per Light
185  4.51  Per Light

Calculation of Assessments
Zones 32 and 33: The benefit formula applied to parcels within these zones is based on the preceding Equivalent Benefit Unit (EBU) discussion. Each parcel's EBU correlates to the parcel’s special benefit received as compared to all other parcels benefiting from the improvements. The following formula is used to calculate each parcel’s EBU (proportional benefit).

Landscape Square Footage/Total Acre = Landscape EBU per Acre Parcel’s Acres x Landscape EBU per Acre = Paracel EBU

Zone L: The benefit formula applied to parcels within Zone L is based on the preceding Equivalent Benefit Unit (EBU) discussion. Each parcel's EBU correlates to the
parcel’s special benefit received as compared to all other parcels  benefiting  from  the  improvements.  The  following  formula  is  used  to  calculate  each  parcel’s  EBU (proportional benefit).

Light EBU Factor x Number of Lights/Unit or Acre* = Parcel Light EBU *Units for developed residential parcels or Acres for undeveloped and non‐residential parcels.

For each Zone of the District, the total number of calculated Equivalent Benefit Units (EBUs) for the Fiscal Year equals the sum of all individual EBU applied to parcels in that Zone. An assessment amount per EBU (Rate) for the improvements is established by taking the total cost of the improvements (amount budgeted) and dividing that amount by the total number of EBUs of all parcels to be assessed. This Rate is then applied back to each parcel’s  individual  EBU  to  determine  the  parcel’s  proportionate  benefit  and  assessment  obligation  for  the improvements.

Total Assessment Amount (for the Zone) / Total EBU(s) = Levy per EBU Levy per EBU x Parcel EBU = Parcel Levy Amount

Exempt Properties: Properties classified as Exempt Properties (exempt from assessment) may include but is not limited to lots or parcels identified as public streets and other roadways (typically not assigned an APN by the County);  dedicated  public  easements,  rights‐of‐way,  public  greenbelts  and  parkways;  utility  rights‐of‐ways; common areas, sliver parcels and bifurcated lots; or any other property the City has determined that the parcel cannot be developed or is a publicly owned property that is part of the District improvements or that has little or

3. Method of Apportionment

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023

13 no  improvement  value.  These  types  of  parcels  are  considered  to  receive  little  or  no  benefit  from  the improvements and are therefore exempted from assessment and are assigned 0.00 EBU.

Special  Cases:  As  with  any  assessment  district,  there  may  be  a  specific  property  or  properties  that  the  typical land  use  classifications  and  method  of  apportionment  does  not  completely  reflect  the  proportional  special benefits  received  as  compared  to  other  parcels.  Usually,  this  type  of  issue  arises  from  property  specific development  issues  in  which  either  the  use  of  that  property  is  significantly  restricted  or  limited  compared  to other properties, or the timing of the City accepting the specific improvements associated with that property as compared to other properties and developments. In these cases, the assessment engineer may determine that an  appropriate  calculation  of  proportional  benefit  would  be  better  reflected  by  applying  a  reduced  weighting factor that accounts for the property’s reduced benefit. Because a district’s method of apportionment ultimately establishes not only the assessment for each parcel, but the proportional benefit between parcels, identifying any  parcel  as  a  “Special  Case”  and  deviating  from  the  standard  method  of  apportionment  applied  to  other properties in the district ultimately effects the proportional assessment of those other properties.

Assessment Range Formula
Any  new  or  increased  assessment  requires  certain  noticing  and  meeting  requirements  by  law.  Prior  to  the passage of Proposition 218 (California Constitution Articles XIIIC and XIIID), legislative changes in the Brown Act defined  a  "new  or  increased  assessment"  to  exclude  certain  conditions.  These  conditions  included  "any assessment  that  does  not  exceed  an  assessment  formula  or  range  of  assessments  previously  adopted  by  the agency or approved by the voters in the area where the assessment is imposed." This definition and conditions were later confirmed through Senate Bill 919 (the Proposition 218 implementing legislation).

The purpose of establishing an assessment range formula is to provide for reasonable increases and inflationary adjustment to annual assessments without requiring costly noticing and mailing procedures, which could add to the  District  costs  and  assessments.  As  part  of  the  District  formation,  balloting  of  property  owners  is  required pursuant to Article XIIID Section 4. The property owner ballots include an Assessment to be approved, as well as the approval of an assessment range formula.

For this District, the Maximum Assessment is equal to the initial Assessment Rate approved by property owners adjusted  annually  by  the  percentage  increase  of  the  Local  Consumer  Price  Index  (“CPI”)  for  the  Riverside‐San Bernardino‐Ontario Area for All Urban Consumers from January to January. As of January 2018, the Bureau of Labor  Statistics  (“BLS”)  split  the  Los  Angeles/Riverside/Orange  County  Area  for  All  Urban  Consumers  to  Los Angeles‐Long‐Beach‐ Anaheim Area and Riverside‐San Bernardino‐Ontario Area. Each Fiscal Year, the Maximum Assessment will be recalculated, and a new Maximum Assessment established.

The  Maximum  Assessment  is  adjusted  annually  and  is  calculated  independent  of  the  annual  budgets  and proposed assessments established for each Zone of the District. Any proposed annual assessment (rate per EBU) less than or equal to this Maximum Assessment (for each Zone) is not considered an increased assessment, even if the proposed assessment is much greater than the assessment applied in the prior Fiscal Year.

4. Proposed Assessment

City of Rialto Landscaping and Lighting Maintenance District No. 2 Engineer’s Annexation Report Fiscal Year 2022-2023

14 The  actual  assessment  and  the  amount  of  the  assessment  for  the  Fiscal  Year  2022‐2023  apportioned  to  each parcel  as  shown  on  the  latest  equalized  roll  at  the  County  Assessor’s  office  are  listed  in  Appendix  A  of  this Report.   The description of each lot or parcel is part of the records of the County of San Bernardino Assessor’s Office and such records are, by reference, made part of this Report.

APPENDIX A
Annexation Territory Assessment Roll

Zone EBU Maximum
Rate per EBU
Maximum
Assessment Zone EBU Maximum
Rate per EBU
Maximum
Assessment
0254021310000 PPD 2019‐0010 CIVF V ‐ CA1M03 ‐ M04 LLC 2.03 32 1,520.66 $1.63 $2,478.67 L 7.75 $13.74 $106.43 0254021320000 PPD 2019‐0010 CIVF V ‐ CA1M03 ‐ M04 LLC 2.03 32 1,520.66 $1.63 $2,478.67 L 7.75 $13.74 $106.43 0254021340000 PPD 2019‐0010 CIVF V ‐ CA1M03 ‐ M04 LLC 3.85 32 2,881.68 $1.63 $4,697.14 L 14.68 $13.74 $201.68 0258111370000 PPD 2021‐0020 MULBERRY PARTNERS, LLC 2.00 33 1,067.00 $1.63 $1,739.21 L 4.51 $13.38 $60.34 Lighting
APN Project  ID Owner Acres/Units
Landscape

APPENDIX B
Annexation Territory Assessment Diagram

SBCFCD CH

SAN BERNARDINO AVE

TULLOCK STLILAC AVE
W
ILLO
W
AVE

MANZANITA ST
0254-021-34-0000 0254-021-31-00000254-021-32-0000

THIS ASEESMENT DIAGRAM CORRECTLY SHOWS EACH SEPARATE LOT

OR PARCEL OF LAND INCLUDED WITHIN THE BOUNDARIES OF THE LANDSCAPING AND LIGHTING DISTRICT. FOR DETAILS CONCERNING

THE LINES AND DIMENSIONS OF LOTS OR PARCELS REFER TO THE COUNTY ASSESSOR'S MAPS FOR FISCAL YEAR 2022-2023.

PROJECT

LOCATION

SLOVER AVE

RIVERSIDE AVE

SANTA ANA AVE
W
ILLOW
AV

CACTUS AV
10 RIALTO LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT NO. 2 ANNEXATION BOUNDARY MAP - PPD 2019-0010

VICINITY MAP

NOT TO SCALE
0 500 1,000
Feet
LEGEND

PARCEL BOUNDARY

ANNEXATION BOUNDARY

RIALTO BOUNDARY

ASSESSOR'S PARCEL NUMBERXXXX-XXX-XX-XXXX
M:\GIS-Assessment\Rialto\LLMD_No_2_Annex9_PPD_2019-0010_Boundary.mxd Not to Scale
W
ILLOW
AVE

SANTA ANA AVE
0258-111-37-0000

THIS ASEESMENT DIAGRAM CORRECTLY SHOWS EACH SEPARATE LOT

OR PARCEL OF LAND INCLUDED WITHIN THE BOUNDARIES OF THE LANDSCAPING AND LIGHTING DISTRICT. FOR DETAILS CONCERNING

THE LINES AND DIMENSIONS OF LOTS OR PARCELS REFER TO THE COUNTY ASSESSOR'S MAPS FOR FISCAL YEAR 2022-2023.

PROJECT

LOCATION

SLOVER AVE

RIVERSIDE AVE

SANTA ANA AVE
W
ILLOW
AV

CACTUS AV
10 RIALTO LANDSCAPING AND LIGHTING MAINTENANCE DISTRICT NO. 2 ANNEXATION BOUNDARY MAP - PPD 2021-0020

VICINITY MAP

NOT TO SCALE
0 500 1,000
Feet
LEGEND

PARCEL BOUNDARY

ANNEXATION BOUNDARY

RIALTO BOUNDARY

ASSESSOR'S PARCEL NUMBERXXXX-XXX-XX-XXXX
M:\GIS-Assessment\Rialto\LLMD_No_2_Annex9_PPD_2021-0020_Boundary.mxd Not to Scale

← All documents from this meeting