City of Rialto
Bid Results for Project State Route 210 / Alder Avenue Interchange Improvements, 200808 (23-025) Issued on 12/08/2022
Bid Due on January 10, 2023 3:00 PM (PST)
Exported on 01/10/2023
Item No. Description Unit of Measure Quantity Ortiz Enterprises, Inc.

Riverside Construction
Company, Inc.

Beador Construction
Company, Inc.
1 Lead Compliance Plan LS 1 $20,000.00 $7,500.00 $5,500.00 2 Construction Area Signs LS 1 $100,000.00 $35,000.00 $60,000.00 3 Traffic Control System LS 1 $160,000.00 $280,000.00 $888,584.10 4 Type II Barricade EA 5 $1,125.00 $1,750.00 $375.00
5 Type III Barricade EA 2 $500.00 $1,000.00 $150.00
6 Temporary Pavement Marking (Paint) SF 351 $3,861.00 $3,510.00 $3,510.00 7 Temporary Traffic Stripe (Paint) LF 12794 $25,588.00 $19,191.00 $20,470.40 8 Channelizer (Surface Mounted) EA 63 $4,095.00 $5,040.00 $2,961.00 9 Temporary Pavement Marker EA 273 $1,501.50 $1,365.00 $1,638.00 10 Temporary Pedestrian Access Route LS 1 $17,000.00 $40,000.00 $10,500.00 11 Portable Changeable Message Sign EA 2 $13,400.00 $20,000.00 $21,000.00 12 Temporary Barrier System LF 4280 $214,000.00 $85,600.00 $68,480.00 13 Temporary Crash Cushion Module EA 123 $27,675.00 $31,365.00 $25,830.00 14 Temporary Traffic Screen LF 3520 $14,080.00 $17,600.00 $13,024.00 15 Job Site Management LS 1 $20,000.00 $35,000.00 $35,000.00 16 Prepare Storm Water Pollution Prevention Plan LS 1 $29,000.00 $5,000.00 $2,000.00 17 Storm Water Annual Report EA 2 $1,120.00 $2,000.00 $4,000.00 18 Temporary Hydraulic Mulch (Bonded Fiber Matrix) SY 1072 $3,752.00 $2,144.00 $1,072.00 19 Temporary Drainage Inlet Protection EA 19 $2,375.00 $6,365.00 $2,945.00 20 Temporary Fiber Roll LF 950 $5,700.00 $9,500.00 $12,350.00 21 Temporary Construction Entrance EA 2 $12,000.00 $13,000.00 $9,600.00 22 Street Sweeping LS 1 $33,000.00 $50,000.00 $65,000.00 23 Temporary Concrete Washout LS 1 $5,000.00 $7,000.00 $20,000.00 24 Remove Yellow Painted Traffic Stripe (Hazardous Waste) LF 644 $1,932.00 $1,288.00 $1,159.20 25 Treated Wood Waste LB 3920 $4,900.00 $3,920.00 $5,096.00 26 Contractor-Supplied Biologist LS 1 $25,000.00 $25,000.00 $32,500.00 27 Noise Monitoring LS 1 $2,000.00 $3,000.00 $10,500.00 28 Remove Concrete (Miscellaneous) (Rock Blanket) SF 12712 $50,848.00 $76,272.00 $25,424.00 29 Clearing and Grubbing LS 1 $165,000.00 $250,000.00 $65,000.00 30 Roadway Excavation CY 2670 $253,650.00 $267,000.00 $293,700.00 31 Structure Excavation (Culvert) (F) CY 53 $80,560.00 $132,500.00 $10,494.00 32 Structure Excavation (Retaining Wall) (F) CY 2802 $140,100.00 $336,240.00 $308,220.00 33 Structure Backfill (Culvert) (F) CY 48 $5,952.00 $86,400.00 $12,480.00 34 Structure Backfill (Retaining Wall) (F) CY 1224 $79,560.00 $391,680.00 $189,720.00 35 Pervious Backfill Material (Retaining Wall) (F) CY 56 $5,600.00 $9,520.00 $21,000.00 36 Ditch Excavation CY 119 $11,900.00 $17,850.00 $17,850.00 37 Rock Blanket SF 7479 $186,975.00 $134,622.00 $134,622.00 38 Soil Amendment CY 39 $4,095.00 $780.00 $819.00
39 Packet Fertilizer EA 2071 $2,071.00 $1,035.50 $621.30 40 Slow-Release Fertilizer LB 246 $1,377.60 $369.00 $418.20 Item No. Description Unit of Measure Quantity Ortiz Enterprises, Inc.

Riverside Construction
Company, Inc.

Beador Construction
Company, Inc.
41 Plant (Group A) EA 1918 $21,098.00 $19,180.00 $19,180.00 42 Plant (Group U) EA 24 $7,440.00 $7,200.00 $7,800.00
43 Maintain Existing Planted Areas LS 1 $15,000.00 $10,000.00 $10,500.00 44 Plant Establishment Work LS 1 $6,000.00 $10,000.00 $10,500.00 45 Gravel Mulch SF 800 $3,200.00 $3,200.00 $3,600.00
46 Wood Mulch CY 225 $20,250.00 $22,500.00 $22,050.00
47 Check and Test Existing Irrigation Facilities LS 1 $10,000.00 $7,500.00 $8,400.00 48 Operate Existing Irrigation Facilities LS 1 $15,000.00 $7,500.00 $8,400.00 49 Remove Irrigation Facility LS 1 $15,000.00 $7,500.00 $8,400.00 50 Control and Neutral Conductors LS 1 $34,000.00 $31,000.00 $43,000.00 51 1" Remote Control Valve EA 9 $4,950.00 $4,950.00 $5,220.00 52 2" Galvanized Steel Pipe (Supply Line) (F) LF 93 $6,975.00 $4,650.00 $5,208.00 53 Tree Well Sprinkler Assembly EA 52 $3,120.00 $3,016.00 $3,120.00 54 Riser Sprinkler Assembly EA 563 $28,150.00 $16,890.00 $16,890.00 55 2" Gate Valve EA 1 $1,100.00 $680.00 $730.00
56 3/4" Plastic Pipe (Schedule 40) (Supply Line) (F) LF 1295 $10,360.00 $9,065.00 $8,806.00 57 1" Plastic Pipe (Schedule 40) (Supply Line) (F) LF 4185 $33,480.00 $29,295.00 $29,295.00 58 2" Plastic Pipe (Schedule 40) (Supply Line) (F) LF 800 $8,800.00 $5,600.00 $5,600.00 59 2" Plastic Pipe (Class 315) (Supply Line) (F) LF 70 $7,000.00 $7,000.00 $7,350.00 60 1" Pressure Relief Valve EA 10 $8,100.00 $1,000.00 $1,050.00 61 Check Valve EA 5 $750.00 $700.00 $1,050.00
62 12" Corrugated Steel Pipe Conduit (.064" Thick) LF 93 $13,485.00 $11,625.00 $11,160.00 63 2" Welded Steel Pipe Conduit LF 93 $9,765.00 $11,625.00 $10,230.00 64 Finishing Roadway LS 1 $7,000.00 $50,000.00 $31,500.00 65 Class 2 Aggregate Base CY 1440 $158,400.00 $165,600.00 $280,800.00 66 Lean Concrete Base CY 165 $29,700.00 $138,600.00 $80,025.00 67 Prime Coat TON 1 $8,500.00 $8,500.00 $8,900.00
68 Hot Mix Asphalt (Type A) TON 1934 $328,780.00 $324,912.00 $328,780.00 69 Place Hot Mix Asphalt Dike (Type D) LF 551 $13,224.00 $13,224.00 $13,224.00 70 Place Hot Mix Asphalt Dike (Type E) LF 25 $600.00 $600.00 $625.00 71 Place Hot Mix Asphalt Dike (Type F) LF 46 $1,104.00 $1,104.00 $1,150.00 72 Place Hot Mix Asphalt (Miscellaneous Area) SY 22 $7,700.00 $7,920.00 $8,360.00 73 Tack Coat TON 1 $1,100.00 $1,035.00 $1,150.00
74 Remove Asphalt Concrete Dike LF 684 $5,472.00 $5,472.00 $7,524.00 75 Cold Plane Asphalt Concrete Pavement SY 2314 $25,454.00 $34,710.00 $34,710.00 76 Jointed Plain Concrete Pavement CY 322 $260,820.00 $193,200.00 $177,100.00 77 Jointed Plain Concrete Pavement (RSC) CY 127 $114,300.00 $140,970.00 $139,700.00 78 Remove Concrete Pavement SY 492 $39,360.00 $51,660.00 $12,792.00 79 Structural Concrete (F) CY 6 $32,400.00 $27,000.00 $12,900.00 80 Structural Concrete, Retaining Wall (F) CY 506 $435,160.00 $708,400.00 $442,750.00 81 Structural Concrete, Box Culvert (F) CY 45 $95,850.00 $112,500.00 $106,875.00 82 Structural Concrete, Drainage Inlet (F) CY 15 $42,000.00 $69,000.00 $31,500.00 83 Minor Concrete (Minor Structure) (F) CY 27 $24,030.00 $48,600.00 $39,825.00 84 Drill and Bond Dowel LF 77 $1,694.00 $11,550.00 $3,234.00 85 Architectural Treatment (F) SF 1679 $41,975.00 $45,333.00 $75,555.00 86 Bar Reinforcing Steel (F) LB 10684 $22,436.40 $22,436.40 $29,915.20 Item No. Description Unit of Measure Quantity Ortiz Enterprises, Inc.

Riverside Construction
Company, Inc.

Beador Construction
Company, Inc.
87 Bar Reinforcing Steel (Retaining Wall) (F) LB 49433 $86,507.75 $79,092.80 $93,922.70 88 24" Reinforced Concrete Pipe LF 53 $12,455.00 $17,490.00 $18,285.00 89 36" Reinforced Concrete Pipe Riser LF 24 $1,920.00 $15,600.00 $18,720.00 90 Abandon Culvert LF 140 $3,080.00 $9,800.00 $15,400.00 91 Remove Reinforced Concrete Box Culvert CY 13 $10,400.00 $16,250.00 $18,200.00 92 Remove Inlet EA 2 $1,500.00 $5,400.00 $6,800.00
93 Remove Concrete (Channel) CY 27 $2,025.00 $33,750.00 $13,095.00 94 Cap Inlet EA 1 $1,200.00 $5,100.00 $4,200.00
95 Sand Backfill CY 17 $1,972.00 $3,910.00 $13,090.00
96 Rock Slope Protection (60lb, Class II, Method B) CY 42 $13,860.00 $11,550.00 $15,750.00 97 Rock Slope Protection Fabric (Class 8) SY 63 $693.00 $252.00 $2,520.00 98 Minor Concrete (Gutter) CY 9 $8,100.00 $15,300.00 $18,360.00 99 Detectable Warning Surface SF 265 $3,180.00 $21,200.00 $6,625.00 100 Minor Concrete (Miscellaneous Construction) CY 265 $185,500.00 $238,500.00 $262,350.00 101 Remove Concrete Sidewalk and Driveway CY 148 $20,868.00 $31,080.00 $23,680.00 102 Remove Concrete (Curb and Gutter) LF 1427 $14,270.00 $21,405.00 $21,405.00 103 Pre/Post Construction Surveys EA 8 $18,400.00 $28,000.00 $16,800.00 104 Miscellaneous Iron and Steel (F) LB 1075 $9,675.00 $5,375.00 $5,160.00 105 Hand Railing LF 100 $4,400.00 $14,500.00 $15,500.00 106 SBC Flood Control District Channel Wall Fence (F) LF 12 $3,240.00 $1,680.00 $1,680.00 107 Chain Link Fence (Type CL-6) LF 337 $9,436.00 $18,535.00 $18,535.00 108 12' Chain Link Gate (Type CL-6) EA 1 $1,600.00 $3,100.00 $3,150.00 109 Remove Chain Link Fence LF 64 $2,560.00 $704.00 $704.00 110 Remove Pavement Marker EA 580 $1,740.00 $1,160.00 $638.00 111 Delineator (Class 1) EA 84 $5,040.00 $7,140.00 $4,200.00 112 Guard Railing Delineator EA 10 $390.00 $450.00 $500.00 113 Pavement Marker (Retroreflective) EA 664 $3,984.00 $3,320.00 $3,652.00 114 Concrete Barrier Marker EA 11 $66.00 $1,100.00 $286.00 115 Treatment Best Management Practice Marker EA 4 $100.00 $1,000.00 $620.00 116 Remove Roadside Sign EA 33 $5,610.00 $4,455.00 $4,290.00 117 Furnish Single Sheet Aluminum Sign (0.063"-Unframed) SF 290 $3,190.00 $7,250.00 $8,700.00 118 Furnish Single Sheet Aluminum Sign (0.080"-Unframed) SF 234 $2,808.00 $4,212.00 $7,020.00 119 Furnish Single Sheet Aluminum Sign (0.063"-Framed) SF 260 $4,680.00 $10,400.00 $7,800.00 120 Metal (Roadside Sign) LB 240 $3,120.00 $2,880.00 $2,400.00 121 Roadside Sign - One Post EA 46 $21,850.00 $23,000.00 $20,240.00 122 Roadside Sign - Two Post EA 6 $8,400.00 $12,000.00 $5,940.00 123 Midwest Guardrail System (Steel Post) LF 100 $6,500.00 $4,500.00 $4,600.00 124 Chain Link Railing (Type 7) (F) LF 23 $8,050.00 $3,220.00 $3,335.00 125 Cable Railing (F) LF 289 $23,120.00 $15,606.00 $16,762.00 126 Transition Railing (Type WB-31) EA 2 $14,000.00 $10,000.00 $10,500.00 127 End Cap (Type TC) EA 2 $500.00 $930.00 $1,050.00
128 Alternative In-Line Terminal System EA 2 $11,600.00 $10,000.00 $10,500.00 129 Concrete Barrier (Type 60MD) LF 267 $34,710.00 $38,715.00 $28,035.00 130 Concrete Barrier (Type 732SW) (F) LF 23 $9,200.00 $10,695.00 $14,950.00 131 Remove Concrete Barrier LF 23 $4,600.00 $5,750.00 $7,820.00 132 Remove Metal Railing LF 22 $3,080.00 $1,540.00 $3,630.00 Item No. Description Unit of Measure Quantity Ortiz Enterprises, Inc.

Riverside Construction
Company, Inc.

Beador Construction
Company, Inc.
133 Thermoplastic Pavement Marking (Enhanced Wet Night Visability) SF 3602 $28,816.00 $21,612.00 $21,612.00 134 Preformed Thermoplastic Pavement Markings SF 450 $17,100.00 $6,750.00 $7,200.00 135 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 18-12) LF 1934 $3,868.00 $1,934.00 $1,934.00 136 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 6-1) LF 611 $1,222.00 $611.00 $733.20 137 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 36-12) LF 2630 $5,260.00 $2,630.00 $3,156.00 138 Paint Traffic Stripe (1-Coat) LF 2303 $2,303.00 $2,303.00 $1,151.50 139 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) LF 11400 $17,100.00 $17,100.00 $18,240.00 140 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) LF 2626 $5,252.00 $5,252.00 $5,777.20 141 Remove Painted Traffic Stripe LF 24600 $24,600.00 $24,600.00 $18,450.00 142 Remove Thermoplastic Pavement Marking SF 800 $12,000.00 $8,000.00 $8,000.00 143 Temporary Electrical Systems LS 1 $140,000.00 $145,000.00 $180,000.00 144 Modifying Signal and Lighting Systems LS 1 $656,000.00 $675,000.00 $690,000.00 145 Modifying Ramp Metering Systems LS 1 $99,300.00 $105,000.00 $88,000.00 146 Modifying Interconnection Conduit and Cable LS 1 $34,700.00 $35,000.00 $31,000.00 147 Mobilization LS 1 $160,000.00 $200,000.00 $660,000.00 148 Resident Engineer's Office LS 1 $150,000.00 $115,000.00 $50,000.00 149 Field Orders LS 1 $100,000.00 $100,000.00 $100,000.00 Total $5,767,076.25 $7,073,097.70 $7,186,700.00