Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

City of Rialto
Jeffrey T. Schafer, P.E.

Public Works Department - Engineering Division
335 W. Rialto Ave., Rialto, CA 92376
Phone: (909) 820-2531
Email: [email protected]
State Assembly - District 47
State Senate - District 20
Arterial/Collector road network average Pavement Condition Index (PCI) is 75.3 as of February 10, 2020.

Local road network average PCI is 73.3 as of February 10, 2020. 2021/22 Project Title:Annual Pavement Rehabilitation Project Project Description Estimated Project ScheduleEstimated Useful LifeTechnology, Climate Change, and Complete Streets Considerations Street Name From To
Zone 3: Local Streets Engineering Design:

CAMPHOR AVEMESA DR BASELINE RD 4th Quarter 2020 to 3rd Quarter 2021 CHURCH AVE CHURCH AVE END Construction:

CHURCH AVE GROVE ST END 4th Quarter 2021 to 2nd Quarter 2022

CORNELL DR SYCAMORE AVE RIVERSIDE AVE

DATE AVE ROSEWOOD ST GROVE ST

GROVE ST CEDAR AVE LARCH AVE

HOLLY ST RIVERSIDE AVE DATE AVE

HOLLY ST PALM AVE RIVERSIDE AVE

MARTIN ST WEDGEWOOD CT DRIFTWOOD AVE

MESA DR ELMWOOD AVE OAKWOOD AVE

MILLARD AVEGROVE ST END

MORGAN ST WILLOW AVE RIVERSIDE AVE

OAKDALE AVERAMONA DR ROSEWOOD ST

RAMONA DR RAMONA DR END

RAMONA DR OLIVE AVE SYCAMORE AVE

RAMONA DR SYCAMORE AVE SAGE AVE

RAMONA DR SAGE AVE ACACIA AVE

RAMONA DR LILAC AVE WILLOW AVE

RAMONA DR END RAMONA DR

ROSEWOOD STASPEN AVE CEDAR AVE

ROSEWOOD STLARCH AVE END

ROSEWOOD STDATE AVE SYCAMORE AVE

ROSEWOOD STDATE AVE RIVERSIDE AVE

SAGE AVE END ETIWANDA AVE

SHAMROCK STVERDE AVE LILAC AVE
SB-1 Project List
The City uses a Pavement Management Program to evaluate pavement condition and prioritize pavement rehabilitation projects. During the engineering design phase, the structural pavement section is evaluated and the most cost effective rehabilitation method is determined.

Project Location

1. Pavement rehabilitation of the indicated
existing street segments using one or more of
the following methods: (1) Cold Milling and
Asphalt Concrete (AC) Surface Course; (2) Full
Depth AC removal and re-construction; (3) Full
Depth Reclamation including in-place
pulverization and mixing of the existing
pavement to create a stablized base, followed
by construction of AC Base and Surface Course;
(4) Cold In-Place Recycling of existing
pavement, followed by construction of an AC
Surface Course.

2. Addition of new and/or repair/upgrade of
curbs and gutters, cross gutters, catch basins,
and culverts.

3. Addition of new and/or repair/upgrade of
ADA curb ramps; and addition of new sidewalks
and/or repair/replacement of damaged
sidewalks.

4. Replacing/Upgrading traffic striping and
pavement markings.

For projects using
cold mill and AC
surface course the
estimated useful life
is 7 to 10 years.

For projects using full
depth reconstruction
the estimated useful
life is 20 years.

1. Technology and Material Recycling - Asphalt mix designs will incorporate reclaimed asphalt pavement (RAP) thereby recycling this material and reducing the cost and energy required to process new mineral aggregates.

2. Technology and Material Recycling - Projects using in-place pulverization and cold in-place recycling will incorporate the existing pavement in the new street construction thereby reducing the cost and energy associated with hauling away existing materials and transporting new construction materials to the project location.

3. Climate Change - Pavement rehabilitation and repair/upgrade of curbs and gutters, cross gutters, and catch basins will better adapt the asset to withstand the negative effects of climate change including the increase in rainfall and stormwater flow.

4. Complete Streets - Projects will improve the quality of pedestrian facilities and improve safety by (a) adding new and/or
repairing/upgrading ADA curb ramps; (b) adding new sidewalks and/or repairing/replacing damaged sidewalks; and (c) replacing/upgrading traffic striping and pavement markings.

City Name:

Project Lead and Dept. Contact Information:

Legislative Districts:

Average Network PCI and date/year of measurement:

Fiscal Year:

Supplementary Information:

Street Name From To

SHAMROCK STCLIFFORD AVE VISTA AVE

SHAMROCK STVISTA AVE VERDE AVE

SHAMROCK STWILLOW AVE CLIFFORD AVE

SYCAMORE AVEEND SYCAMORE AVE

TEAKWOOD AVEVALENCIA ST WEDGEWOOD CT

TEAKWOOD AVEWEDGEWOOD CT ETIWANDA

VALENCIA ST PALM AVE RIVERSIDE AVE

VAN KOEVERING STWILLOW AVE RIVERSIDE AVE

VERDE AVE ETIWANDA AVE HOLLY ST

VICTORIA ST CORNELL AVE ACACIA AVE

VICTORIA ST WILLOW AVE RIVERSIDE AVE

WABASH ST IDYLLWILD AVE END

WABASH ST RIVERSIDE AVE PALM AVE

WEDGEWOOD CTIDYLLWILD AVE TEAKWOOD AVE
Zone 2: Local Streets

ALICE AVE EASTON ST END

ALICE AVE CHAPARRAL ST EASTON ST

ALICE AVE VALLEY BLVD END

ALTHEA AVE MARIANA ST WALNUT AVE

ARBETH ST OAKDALE AVE DATE AVE

ARBETH ST DATE AVE RIVERSIDE AVE OH

ARROWHEAD AVEVALENCIA ST IDYLLWILD AVE

CASCADE DR RIVERSIDE AVE PALM AVE

CERRITOS ST MARCELLA AVE ACACIA AVE

CHAPARRAL STOAKDALE AVE MARCELLA AVE

CHAPARRAL STMARCELLA AVE ACACIA AVE

CLIFFORD AVETAHOE ST EASTON ST

CONDOR DR CONDOR DR END

CONDOR DR SYCAMORE AVE RIVERSIDE AVE OH

CROMWELL STSYCAMORE AVE OAKDALE AVE

DATE AVE CHAPARRAL ST END

FITZGERALD AVEAYALA DR BASELINE RD

GARDENA AVELURELANE ST END

HEATHER ST SYCAMORE AVE END

HEATHER ST SYCAMORE AVE JOYCE AVE

HEATHER ST LILAC AVE VERDE AVE

HEATHER ST VERDE AVE VISTA AVE

HEATHER ST WILLOW AVE VISTA AVE

HEATHER ST WILLOW AVE ALICE AVE

HOME ST OLIVE AVE SYCAMORE AVE

IRIS AVE MARIANA ST END

JOYCE AVE END VIRGINIA ST

JOYCE AVE MARIANA ST HEATHER ST

LEISKE DR FITZGERALD AVE AYALA DR

LURELANE ST LILAC AVE VISTA AVE
Project Location
Street Name From To

LURELANE ST ALICE AVE WILLOW AVE

MAGNOLIA AVEVIRGINIA ST HOME ST

MARCELLA AVESCOTT ST CERRITOS ST

MARGARITA RDMARGARITA RD END

MARGARITA RDROSALIND AVE TERRACE RD

MARIANA ST END SYCAMORE AVE

MARIANA ST OAKDALE AVE ACACIA AVE

OAKDALE AVEEND ARBETH ST

OAKDALE AVEMARIANA ST HEATHER ST

OAKDALE AVECROMWELL ST CHAPARRAL ST

OLIVE AVE CERRITOS ST WINCHESTER DR

OLIVE AVE HOME ST VIRGINIA ST

ORANGE AVE CASMALIA ST WILLOW AVE

PALM AVE WILLOW AVE CASMALIA ST

PALM AVE CASCADE DR ALLEY

PRIMROSE AVEHOME ST END

RIVERSIDE AVE OHMEADOW LN POMEGRANATE AVE

RIVERSIDE AVE OHPOMEGRANATE AVEARBETH ST

RIVERSIDE AVE OHEND MEADOW LN

SAGE AVE CHAPARRAL ST END

SCOTT ST ACACIA AVE PINE AVE

SCOTT ST SYCAMORE AVE END

SYCAMORE AVEARBETH ST CONDOR DR

TIBBOT AVE SPRUCE AVE END

VERDE AVE END HEATHER ST

VISTA AVE HEATHER ST END

VISTA AVE HEATHER ST END

WINCHESTER AVEYUCCA AVE LILAC AVE

WINCHESTER DRSYCAMORE AVE OLIVE AVE

YUCCA AVE MARIANA ST END
Zone 1: Local Streets

ALTHEA AVE NORWOOD ST END

APPLE AVE COLUMBINE AVE CACTUS AVE

CARPENTER STEND MAPLE AVE

CEDAR AVE APPLE AVE RIVERSIDE AVE

CHERRY AVE APPLE AVE RIVERSIDE AVE OH

CHESHIRE ST AYALA DR CEDAR AVE

CHESHIRE ST AYALA DR CHESHIRE ST

CHURCH AVE APPLE AVE PALM AVE

COLUMBINE AVEMILOR AVE APPLE AVE

COLUMBINE AVEAPPLE AVE RIVERSIDE AVE OH

COMPTON STNORWOOD ST END

CRAIG ST BRIERWOOD AVE END

DRIFTWOOD AVEORANGE AVE APPLE AVE

FILLMORE AVEBOHNERT AVE FILLMORE AVE
Project Location
Street Name From To

GALWAY ST PARK AVE CASMALIA ST

IRIS AVE NORWOOD ST END

JOYCE AVE EASTON ST END

KOA AVE MEADOW LN END

LA GLORIA DRSPRUCE AVE ARROWHEAD AVE

LEWIS ST ASPEN AVE END

LOWELL ST LOCUST AVE END

MILOR AVE NORWOOD ST COLUMBINE AVE

MILOR AVE COLUMBINE AVE END

NORWOOD STQUINCE AVE AYALA DR

NORWOOD STARROWHEAD AVE MESA ST

ORANGE AVE QUINCE AVE DRIFTWOOD AVE

PALM AVE COLUMBINE AVE END

PALM AVE CHERRY AVE END

PALM AVE DALEWOOD AVE END

QUINCE AVE CHESHIRE ST LA GLORIA DR

RIVERSIDE AVE OHCHERRY AVE END

RIVERSIDE AVE OHEND CHERRY AVE
STONEHURST DR. LOCUST AVE END

YUCCA AVE YUCCA AVE END

YUCCA AVE MILOR AVE NORWOOD ST