Attachment 2 - 2023 Active Transportation Program Metropolitan Planning Organization Component Commission Staff Recommendations.pdf

Rialto City Council
August 22, 2023

Document
Attachment 2 - 2023 Active Transportation Program Metropolitan Planning Organization Component Commission Staff Recommendations.pdf
Meeting
August 22, 2023
Body
Rialto City Council
Pages
6
Original file
10.7 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

2. The Regional Council defers approval of any further minor revision and administrative amendments to the 2023 SCAG Regional Active Transportation Program to SCAG’s Executive Director.

PASSED, APPROVED , AND ADOPTED by the Regional Council of the Southern California Association of Governments at its regular meeting this 6th day of April, 2023.

Jan C. Harnik
President, SCAG
Riverside County Transportation Commission

Attested by:

Kome Ajise
Executive Director

Approved as to Form:

Michael R.W. Houston
Chief Counsel

Metropolitan Planning Organization Component
($ in thousands)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46

A B C D E F G H I J K L M N O P Q R S T U V
MPO Application ID County State
Score
CTC
Score Project Title Total Project Cost
(1000)
ATP Request
(1000)
23-24 Funds
(1000)
24-25 Funds
(1000)
25-26 Funds
(1000) 26-27 Funds (1000) PA&ED PS&E ROW CON CON NI Fund totals Project Type DAC SRTS BA
SCAG 11-Calipatria, City of-1 IMP 48 68 City of Calipatria - Bonita Place Pedestrian Safety Project $ 997 $ 997 $ 88 $ 909 Small Infrastructure X
$ 20 $ 68 $ 909 $ 997 $ -
SCAG 11-El Centro, City of-1 IMP 56 76 City of El Centro Pedestrian Improvement Project $ 1,300 $ 1,200 $ 1,200 Small Infrastructure X
$ 1,200 $ 1,200
$ -
SCAG 11-Imperial County
Transportation Commission-1 IMP 59.5 79.5 Pedestrian Improvementsfor the Calexico Intermodal Transportation Center $ 1,173 $ 1,073 $ 1,073 Small Infrastructure X
$ 1,073 $ 1,073
$ -
SCAG 7-Los Angeles, City of-8 LA 89 99 Boyle Heights Community Connectivity Project $ 37,725 $ 32,019 $ 3,395 $ 2,886 $ 25,738 Large Infrastructure X X X
$ 3,395 $ 2,037 $ 849 $ 2,184 $ 8,465 $ 23,554 $ 23,554
SCAG 7-Pasadena, City of-1 LA 88 98 North Lake Avenue Pedestrian and Safety Enhancement Project $ 10,116 $ 9,938 $ 120 $ 702 $ 9,116 Large Infrastructure X
$ 120 $ 672 $ 30 $ 9,116 $ 9,938 $ -
SCAG 7-Huntington Park, City of-1 LA 87 97 Huntington Park’s Safe Routes for Students and Seniors $ 4,761 $ 4,261 $ 55 $ 320 $ 3,886 Medium Infrastructure X X
$ 55 $ 320 $ 3,886 $ 4,261 $ -
SCAG 7-San Gabriel Valley Council
of Governments-1 LA 87 97 Pomona Safe and Active: Bike/Ped Safety Improvements & Gap Closure $ 9,998 $ 5,976 $ 418 $ 5,558 Medium Infrastructure X
$ 299 $ 119 $ 5,558 $ 5,976 $ -
SCAG 7-Los Angeles County-4 LA 89 94 Rosewood/West Rancho Dominguez Vision Zero Traffic Safety Enhancement Project $ 25,163 $ 10,730 $ 766 $ 1,150 $ 8,814 Large Infrastructure X X
$ 766 $ 1,150 $ 8,814 $ 10,730 $ -
SCAG 7-Artesia, City of-1 LA 87 94 Pioneer Boulevard Improvements Project, City of Artesia $ 3,549 $ 2,755 $ 116 $ 306 $ 2,333 Medium Infrastructure X X
$ 116 $ 306 $ 2,333 $ 2,755 $ -
SCAG 7-Paramount, City of-1 LA 85 94 West Paramount Utility Easement Multi-Use Path - Phase 1 $ 9,661 $ 9,661 $ 10 $ 765 $ 8,886 Medium Infrastructure X
$ 10 $ 750 $ 15 $ 8,886 $ 9,661 $ -
SCAG 7-Los Angeles County-5 LA 83 93 Walnut Park Pedestrian Plan Implementation $ 8,395 $ 2,446 $ 175 $ 262 $ 2,009 Medium Infrastructure X
$ 175 $ 262 $ 2,009 $ 2,446 $ -
SCAG 7-Los Angeles, City of-10 LA 83 93 SRTS Center City Schools Neighborhood Safety & Climate Resilience Project $ 36,238 $ 30,766 $ 3,296 $ 2,198 $ 25,272 Large Infrastructure X X X
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
X
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
6/5/2023 C:\Users\s151700\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\0TGAN2S7\2023 ATP MPO Programming Spreadsheet - SCAG Revised 06.01.2023 + Metro reprog v2.xlsx 1 of 4 Metropolitan Planning Organization Component
($ in thousands)
1 A B C D E F G H I J K L M N O P Q R S T U V
MPO Application ID County State
Score
CTC
Score Project Title Total Project Cost
(1000)
ATP Request
(1000)
23-24 Funds
(1000)
24-25 Funds
(1000)
25-26 Funds
(1000) 26-27 Funds (1000) PA&ED PS&E ROW CON CON NI Fund totals Project Type DAC SRTS BA
47 48
49 50
51 52
53 54
55 56
57 58
59 60
61 62
63 64
65 66
67 68
69 70
71 72
73 74
75 76
77 78
79 80
81 82
83 84
85 86
87 88
89 90
$ - $ - $ - $ 3,296 $ 2,198 $ 25,272 $ 30,766 SCAG 7-Glendale, City of-2 LA 83 92 Phase 1 of Citywide Pedestrian Master Plan $ 10,000 $ 9,000 $ 9,000 Medium Infrastructure X X
$ 9,000 $ 9,000
$ -
SCAG 7-West Covina, City of-1 LA 88 91 West Covina Safe Routes to School & Pedestrian Safety Project $ 2,561 $ 2,561 $ 10 $ 180 $ 2,371 Small Infrastructure X X
$ 10 $ 180 $ 2,371 $ 2,561 $ -
SCAG 7-Lancaster, City of-1 LA 86 91 City of Lancaster 5th Street Corridor School Connections Project $ 8,332 $ 6,655 $ 471 $ 711 $ 5,473 Medium Infrastructure X X
$ 471 $ 711 $ 5,473 $ 6,655 $ -
SCAG 7-South Gate, City of-2 LA 81 91 WSAB LRT Stations First-Last Mile Bikeway Safety and Access Project $ 3,375 $ 3,375 $ 3,375 Small Infrastructure X X
$ 3,375 $ 3,375
$ -
SCAG 7-Santa Monica, City of-1 LA 82 89 Wilshire Active Transportation Safety Project $ 5,957 $ 4,765 $ 4,765 Medium Infrastructure X
$ 4,765 $ 4,765
$ -
SCAG 7-South El Monte, City of-1 LA 83 88 Merced Avenue Greenway $ 3,488 $ 2,561 $ 2,561 Small Infrastructure X
$ 2,561 $ 2,561
$ -
SCAG 7-Avalon, City of-1 LA 86 87 Tremont Five Corners School Safety Roundabouts $ 4,092 $ 3,238 $ 3,238 Medium Combo X X $ 3,210 $ 28 $ 3,238 $ -
SCAG 7-Diamond Bar, City of-1 LA 85 87 Diamond Bar Boulevard Complete Streets Project $ 7,047 $ 3,936 $ 3,936 Medium Infrastructure
$ 3,936 $ 3,936
$ -
SCAG 7-South Gate, City of-1 LA 82 87 Tweedy Boulevard Complete Streets, Phase II $ 6,594 $ 5,257 $ 5,257 Medium Infrastructure X X
$ 5,257 $ 5,257
$ -
SCAG 7-Downey, City of-1 LA 83 85 South Downey Safe Routes to School Phase II Project $ 1,145 $ 1,145 $ 165 $ 120 $ 860 Small Combo X X $ 65 $ 120 $ 860 $ 100 $ 1,145 $ -
SCAG 7-Pomona, City of-1 LA 82 85 San Jose Creek Multi-Use Bikeway in the City of Pomona $ 13,123 $ 11,623 $ 11,623 Large Combo X X State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
Federal (FTF) funds
State funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
State funds
Federal (FTF) funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
6/5/2023 C:\Users\s151700\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\0TGAN2S7\2023 ATP MPO Programming Spreadsheet - SCAG Revised 06.01.2023 + Metro reprog v2.xlsx 2 of 4 Metropolitan Planning Organization Component
($ in thousands)
1 A B C D E F G H I J K L M N O P Q R S T U V
MPO Application ID County State
Score
CTC
Score Project Title Total Project Cost
(1000)
ATP Request
(1000)
23-24 Funds
(1000)
24-25 Funds
(1000)
25-26 Funds
(1000) 26-27 Funds (1000) PA&ED PS&E ROW CON CON NI Fund totals Project Type DAC SRTS BA
91 92
93 94
95 96
97 98
99 100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
$ 11,305 $ 318 $ 11,623 $ -
SCAG 7-La Puente, City of-1 LA 79 82 City of La Puente's Safe Routes for Students Improvement Project $ 4,389 $ 4,384 $ 325 $ 4,059 Medium Infrastructure X X
$ 300 $ 25 $ 4,059 $ 4,384 $ -
SCAG 7-Signal Hill, City of-1 LA 79 81 E. Burnett Street Historical District Pedestrian and Bike Enhancement Project $ 2,894 $ 2,785 $ 192 $ 306 $ 2,287 Small Infrastructure X
$ 192 $ 306 $ 2,287 $ 2,785 $ -
SCAG 7-Los Angeles County-1 LA 77.5 81 Los Nietos Pedestrian Access Improvements $ 6,542 $ 5,233 $ 561 $ 374 $ 4,298 Medium Combo X $ 561 $ 374 $ 4,298 $ 5,233 $ -
SCAG 7-Cudahy, City of-1 LA 68 78 Salt Lake Avenue Pedestrian Accessibility Project $ 7,125 $ 7,125 $ 275 $ 632 $ 675 $ 5,543 Medium Infrastructure X X
$ 275 $ 632 $ 675 $ 5,543 $ 7,125 $ -
SCAG 7-Carson, City of-2 LA 75 78 City of Carson City-wide Community Safety Improvements $ 3,467 $ 3,451 $ 30 $ 175 $ 3,246 Small Infrastructure X
$ 30 $ 175 $ 3,246 $ 3,451 $ -
SCAG 7-San Gabriel Valley Council
of Governments-3 LA 58 66 East San Gabriel Valley Sustainable Multimodal Improvement Project $64,829 $100 $100 Large
Infrastructure X X
$100 $100
$-
SCAG 7-Maywood, City of-1 LA 58 63 Randolph Street Bike and Facilities Improvement Project $1,375 $145 $15 $130 Small
Infrastructure X
$15 $130 $145
$-
SCAG 7-California State Polytechnic
University, Pomona-1 LA 87 96 Cal Poly Pomona Campuswide Active Transportation Plan $ 299 $ 299 $ 299 Plan X X $ 299 $ 299
$ -
SCAG 7-Pico Rivera, City of-1 LA 85 95 Pico Rivera Active Transportation Master Plan $ 411 $ 411 $ 411 Plan X $ 411 $ 411
$ -
SCAG 7-Los Angeles County-6 LA 83 93 Unincorporated Los Angeles County Safe Routes to School Plan $ 750 $ 750 $ 750 Plan X X $ 750 $ 750
$ -
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
Federal (FTF) funds
State funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
6/5/2023 C:\Users\s151700\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\0TGAN2S7\2023 ATP MPO Programming Spreadsheet - SCAG Revised 06.01.2023 + Metro reprog v2.xlsx 3 of 4 Metropolitan Planning Organization Component
($ in thousands)
1 A B C D E F G H I J K L M N O P Q R S T U V
MPO Application ID County State
Score
CTC
Score Project Title Total Project Cost
(1000)
ATP Request
(1000)
23-24 Funds
(1000)
24-25 Funds
(1000)
25-26 Funds
(1000) 26-27 Funds (1000) PA&ED PS&E ROW CON CON NI Fund totals Project Type DAC SRTS BA
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
SCAG 7-Los Angeles County-10 LA 80 90 Pedestrian Plans for Five High-Collision Disadvantaged Communities in LA County $ 1,968 $ 1,968 $ 1,968 Plan X $ 1,968 $ 1,968
$ -
SCAG 7-Carson, City of-1 LA 80 90 City of Carson Master Bicycle Plan $ 897 $ 897 $ 897 Plan X $ 897 $ 897
$ -
SCAG 7-Los Angeles County-9 LA 70 80 Lennox Vision Zero Traffic Safety Enhancements $ 1,141 $ 1,141 $ 1,141 n/a n/a $ 1,141 $ 1,141
$ -
SCAG 7-Santa Clarita, City of-2 LA 76 77 Orchard Village Road Protected Pedestrian and Bicycle Facility $ 764 $ 764 $ 764 n/a n/a $ 764 $ 764
$ -
SCAG
12-Orange County
Transportation Authority
(OCTA) - 1
ORA 67 82 Next STEP (Safe Travels Education Program) $ 850 $ 850 $ 850 $ - $ - $ - NI Only X $ - $ - $ - $ - $ 850 $ 850 $ - $ - $ - $ - $ - $ - SCAG 12-Anaheim, City of - 1 ORA 88 108 Rio Vista Safe Routes to School Project $ 1,312 $ 1,312 $ 40 $ 293 $ 979 $ - Small Infrastructure X x
$ 40 $ 173 $ 120 $ 979 $ - $ 1,312 $ - $ - $ - $ - $ - $ - SCAG 12- Santa Ana, City of - 16 ORA 88 105 Mendez lnt Advance Learning Santiago ES Sierra Int SRTS $ 9,987 $ 9,987 $ 50 $ 900 $ 9,037 Medium Infrastructure X x
$ 50 $ 900 $ - $ 9,037 $ - $ 9,987 $ - $ - $ - $ - $ - $ - SCAG 12-Santa Ana, City of - 20 ORA 85 105 Memory Lane and Flower Street Bikeway $ 6,264 $ 5,000 $ - $ 450 $ - $ 4,550 Medium Infrastructure X
$ - $ 450 $ - $ 4,550 $ - $ 5,000 $ - $ - $ - $ - $ - $ - SCAG 12-Santa Ana, City of -15 ORA 87.5 104.5 MacArthur Intermediate and Taft Elementary SRTS $ 4,900 $ 4,900 $ 50 $ 650 $ - $ 4,200 Medium Infrastructure X x
$ 50 $ 650 $ - $ 4,200 $ - $ 4,900 $ - $ - $ - $ - $ - $ - SCAG 12-Buena Park, City of, - 1 ORA 81 101 Dale / Whitaker Complete Streets Project $ 4,595 $ 4,368 $ 765 $ 3,603 $ - $ - Medium Infrastructure X
$ 100 $ 665 $ 130 $ 3,473 $ - $ 4,368 $ - $ - $ - $ - $ - $ - SCAG 12-Santa Ana, City of - 1 ORA 84 17 Santa Ana High School and Heninger Elementary School SRTS $ 8,222 $ 8,222 $ 120 $ 1,200 $ - $ 6,902 Medium Infrastructure X x
$ 120 $ 1,200 $ - $ 6,902 $ - $ 8,222 $ - $ - $ - $ - $ - $ - SCAG 12-Santa Ana, City of - 5 ORA 84 101 Jackson Elementary and Diamond Elementary SRTS $ 8,262 $ 8,262 $ 100 $ 850 $ - $ 7,312 Medium Infrastructure X x
$ 100 $ 850 $ - $ 7,312 $ - $ 8,262 $ - $ - $ - $ - $ - $ - State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
Federal (FTF) funds
State funds
State (SHA & RMRA) funds
Federal (FTF) funds
State (SHA & RMRA) funds
Federal (FTF) funds
State (SHA & RMRA) funds
Federal (FTF) funds
State (SHA & RMRA) funds
Federal (FTF) funds
State (SHA & RMRA) funds
Federal (FTF) funds
State (SHA & RMRA) funds
Federal (FTF) funds
State (SHA & RMRA) funds
Federal (FTF) funds
State (SHA & RMRA) funds
Federal (FTF) funds
6/5/2023 C:\Users\s151700\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\0TGAN2S7\2023 ATP MPO Programming Spreadsheet - SCAG Revised 06.01.2023 + Metro reprog v2.xlsx 4 of 4 Tahoe Metropolitan Planning Organization

February 21, 2023

Mitch Weiss, Executive Director
California Transportation Commission
1120 N Street, MS 52
Sacramento, CA 95814

Attn: Laurie Waters

RE: 2023 ATP MPO Component Project Recommendations

Dear Mr. Weiss:

Please find attached the Tahoe Metropolitan Planning Organization (TMPO) 2023 Active Transportation Program (ATP) Metropolitan Planning Organization (MPO) project recommendations for your review and approval. On April 28, 2023, the TMPO Governing Board adopted by resolution the 2023 Active Transportation Program Tahoe Metropolitan Planning Organization Program of Projects.

The submittal package includes:
• List of members in the multidisciplinary advisory group • Description of unbiased project selection method
• Board resolution approving projects
• Completed programming spreadsheet
• A list of all projects evaluated and regional competition scores • Updated Project Programming Requests
• Copies of any applications not submitted through the state process that are recommended for funding

If you have any questions regarding this submittal, please contact Judy Weber at (775) 589-5203 or [email protected].

Sincerely,

Nick Haven
Department Manager
Long Range and Transportation Planning Department

Attachments

Tahoe Metropolitan Planning Organization
2023 ATP MPO Component - Multidisciplinary Advisory Group

Working Group Committee:

Shannon Friedman Senior Planner, Environmental Improvement Program Kira Smith Senior Transportation Planner, TRPA
Rebecca Cremeen Associate Transportation Planner, Long Range & Transportation Planning Rachael Shaw Assistant Transportation Planner, Long Range & Transportation Planning Ryan Murray Associate Transportation Planner, Long Range & Transportation Planning Judy Weber Associate Transportation Planner, TRPA

Advisory Members:

Michelle Glickert Principle Transportation Planner, TRPA Nick Haven Division Manager, Long Range and Transportation Planning, TRPA Julie Regan Executive Director, TRPA
Tahoe Metropolitan Planning Organization
Project Selection Method – 2023 ATP MPO Component

Initial Screening Criteria
TMPO staff conducted an initial screening to determine if an application will proceed forward to the evaluation process. Project applications were screened for the following:
• Consistency with the adopted 2020 RTP. Project must be listed in the 2020 RTP constrained project list.
• Consistent with appropriate fund eligibility requirements. • Required amount of local non-federal match for funding source. *Not relevant when applying for ATP only funding.
• Identified public outreach on project.
• Acknowledgement of required Master Agreement with Caltrans. • Project is fully funded with application request or has provided documentation of other funding to achieve 100% funded status.
• Application requesting construction funds must have environmental, engineering, and right-of- way completed by the time funds are recommended for award.

Project Evaluation Criteria & Scoring
Once screened, applications were reviewed and scored on the following evaluation criteria. Maximum points an application could score was 100 points (times 4 evaluators) for a total of 400 points.

CRITERIA POINTS
Work Plan and Timeline. Application clearly illustrated the scope of the project or program, phase and task to be funded, the delivery work plan, funding plan, and a detailed timeline with key milestones demonstrating the capacity to deliver in a timely manner.

15 Points
Demonstrated Need and Benefits. Project or program delivers multiple benefits and significant positive impacts, connects to local area plans, and is a sound investment of resources.
15 Points
Public Participation and Planning. Identifies the local community public participation process developed for the proposed project or program. Shows how the participation process identified the project as a priority and responded to input from public participation process. Includes a letter of support. 10 Points
Performance Assessment. Assessment evaluates how a project or program best meets the overall Regional Plan goals and policies, those identified as priorities in the Regional Transportation Plan, and if located within a disadvantaged community. Download the Project or Program Performance Assessment and complete the questions within each category and all supplemental questions. 30 Points
Potential for Success. Applicant’s ability to carry out project or program based on:
▪ Long Term Management (LT); LT management plan, maintenance, and monitoring
▪ Demonstrating Agency Success; examples of implementing similar projects within 5 years
▪ Commitment to complete; Project or program is fully funded with request.

10 Points
Matching Funds. Applicant has provided confirmation of non-federal secured funds. *ATP funds do not require match.
5 Points
Regional or Local Priority. Please provide justification for project or program priority and indication of regional significance. 15 Points
100 POINTS

Project Selection Process
A committee of evaluators comprised of TRPA staff, with the oversight of TRPA leadership, reviewed, evaluated, and scored all eligible applications. The committee met to review and discuss the cumulative application scores and select projects for recommendation. Applications were recommended for funding based on eligibility and score.

You can view the 2023 Regional Grant Program guidelines here: 2023-RGP_Guidelines_Final.pdf (trpa.gov)

TAHOE METROPOLITAN PLANNING ORGANIZATION
TMPO RESOLUTION NO. 2023 –

ADOPTION OF THE 2023 ACTIVE TRANSPORTATION PROGRAM

METROPOLITAN PLANNING ORGANIZATION PROGRAM OF PROJECTS

WHEREAS, the Tahoe Metropolitan Planning Organization (TMPO) is the designated metropolitan planning organization (MPO) for the Lake Tahoe Region as defined by the Transportation Equity Act for the 21st Century; and

WHEREAS, the TMPO, is required to prepare and adopt a Transportation Improvement Program which includes federal funds; and

WHEREAS, the TMPO is responsible for allocating state and federal funding through the Federal Highway Administration available to the Lake Tahoe Region; and

WHEREAS, the California State Legislature passed into law Senate Bill 99 (Chapter 359, Statutes 2013) and Assembly Bill 101 (Chapter 354, Statues of 2013), to encourage increased use of active modes of transportation, such as biking and walking, establishing the Active Transportation Program (ATP); and

WHEREAS, the Tahoe Region received a 2023 ATP Urban Region Distribution of $2,901,000 for a four- year period covering 2023-2024 through 2026-2027; and

WHEREAS, per the 2023 ATP State Guidelines (MPO Competitive Project Selection, Page 19), TMPO elected to have a supplemental ATP MPO specific call for projects consistent with the ATP State guidelines adopted by the Commission; and

WHEREAS, per the ATP State Guidelines, TMPO, in collaboration with the California Transportation Commission (Commission), developed the Tahoe ATP MPO Guidelines that are incorporated in the 2023 Regional Grant Program (RGP) Guidelines; and

WHEREAS, the TMPO released a call for projects for ATP MPO funds in conjunction with the 2023 Regional Grant Program; and

WHEREAS, an advisory committee evaluated applications and recommended projects for ATP funding, based on the criteria within the ATP MPO guidelines, for the 2023 ATP MPO Program of Projects ; and

WHEREAS, TMPO has prepared the 2023 ATP MPO Program of Projects including the two recommended projects; Pioneer Trail Pedestrian Improvement Project Phase II ($1,200,000) and Apache Avenue Pedestrian Safety and connectivity Project ($1,701,000); and will submit the adopted list to the Commission for approval June 2023; and

NOW, THEREFORE, BE IT RESOLVED, that the Governing Board of the Tahoe Metropolitan Planning Organization adopts this resolution approving the 2023 ATP MPO Program of Projects.

BE IT FUTHER RESOLVED, that TMPO staff is hereby directed and authorized to work with the Commission, Caltrans, and Federal Highway Administration, to make whatever technical changes or corrections are needed to the format and organization of the document to obtain its approval by these agencies.

PASSED AND ADOPTED by the Governing Board of the Tahoe Metropolitan Planning Organization this Wednesday, April 26, 2023 by the following vote:

Ayes:

Nays:

Absent:

___________________________________
Cindy Gustafson, Chair
Tahoe Metropolitan Planning Organization
Governing Board

Tahoe Regional Planning Agency
2023 Regional Grant Program Project Applications
Total Points
(400) Rank Applicant Project Name ATP Requested Phase of Work ATP
Recommended
338 1 Placer Kings Beach Western Approach 2,100,000$ RW, CON -$ 335 2 El Dorado Apache Avenue Pedestrian Safety and Connectivity Project 2,100,000$ CON 1,701,000$ 331 3 El Dorado Pioneer Trail/ U.S. Highway 50 Intersection Safety Improvement Project 500,000$ CON -$ 326 4 City SLT Pioneer Trail Pedestrian Improvement Project Phase II 1,200,000$ CON 1,200,000$ 318 6 Placer North Tahoe Shared-Use Trail 1,500,000$ CON -$ 317 7 TTD US5 South Shore Community Revitalization Project 2,901,000$ PE, RW, CON -$ 302 9 City SLT Dennis Machida Memorial Trail - Greenway Phase 1C 748,000$ RW -$ 302 9 El Dorado Meyers Bikeway Connector – Greenway from Pioneer Trail To Elks Club Project 350,000$ PE, RW -$ 277 13 Placer Flick Point II Multi-Benefit Improvement Project 700,000$ CON -$ 2,901,000$
Footnotes:

Rank #1 - Kings Beach Western Approach is ineligible for ATP Rank #3 - Pioneer Trail/US Highway 50 Intersection Safety Improvement Project (roundabout) will be recommended for STBG funds as a better eligible fit

TAHOE METROPOLITAN PLANNING ORGANIZATION
TMPO RESOLUTION NO. 2023 – 03

ADOPTION OF THE 2023 ACTIVE TRANSPORTATION PROGRAM

METROPOLITAN PLANNING ORGANIZATION PROGRAM OF PROJECTS

WHEREAS, the Tahoe Metropolitan Planning Organization (TMPO) is the designated metropolitan planning organization for the Lake Tahoe Region as defined by the Transportation Equity Act for the 21st Century; and

WHEREAS, the TMPO, is required to prepare and adopt a Transportation Improvement Program which includes federal funds; and

WHEREAS, the TMPO is responsible for allocating state and federal funding through the Federal Highway Administration available to the Lake Tahoe Region; and

WHEREAS, the California State Legislature passed into law Senate Bill 99 (Chapter 359, Statutes 2013) and Assembly Bill 101 (Chapter 354, Statues 2013), establishing the Active Transportation Program; and

WHEREAS, the Active Transportation Program (ATP) Metropolitan Planning Organization (MPO) fund estimate is $2,901,000 for the 4-year cycle 2023-2024 through 2026-2027 for the Tahoe Region; and

WHEREAS, the TMPO elected to administer the ATP MPO component through the competitive Regional Grant Program; and

WHEREAS, the TMPO has developed program guidelines for the ATP MPO funding distribution process that are consistent with and complement the California Transportation Commission’s (Commission) 2023 ATP Guidelines; and

WHEREAS, the 2023 ATP MPO guidelines and criteria were adopted by the TMPO Governing Board on May 25, 2022 and approved by the Commission on June 29, 2022 to be used for the competitive selection of the ATP MPO programming; and

WHEREAS, the Pioneer Trail Pedestrian Improvement Project Phase II and Apache Avenue Pedestrian Safety and Connectivity Project were recommended for ATP MPO funding based on the 2023 ATP MPO guideline criteria and consistency with the Regional Transportation Plan; and

WHEREAS, TMPO has prepared the 2023 ATP MPO Program of Projects and will submit the adopted project recommendations to the California Transportation Commission for approval at the June 2023 meeting; and

NOW, THEREFORE, BE IT RESOLVED, that the Governing Board of the Tahoe Metropolitan Planning Organization adopts this resolution approving the 2023 ATP MPO Program of Projects for Pioneer Trail Pedestrian Improvement Project Phase II and Apache Avenue Pedestrian Safety and Connectivity Project.

BE IT FURTHER RESOLVED, that TMPO staff is hereby directed and authorized to work with the Commission, Caltrans, and the Federal Highway Administration, and the Federal Transit Administration to make technical changes or corrections as needed to the format and organization of the grant application to obtain its approval by these agencies.

PASSED AND ADOPTED by the Governing Board of the Tahoe Metropolitan Planning Organization this Wednesday, April 26, 2023 by the following vote:

Ayes: Ms. Aldean, Mr. Aguilar, Ms. Conrad-Saydah, Ms. Diss, Ms. Faustinos, Ms. Gustafson, Ms. Hill, Mr. Hoenigman, Ms. Laine, Mr. Rice, Mr. Settelmeyer, Ms. Williamson

Absent: USFS Representative

Abstain: Mr. Friedrich

_________ __________________________
Cindy Gustafson, Chair
Tahoe Metropolitan Planning Organization
Governing Board

Metropolitan Planning Organization Component
($ in thousands)
MPO Application ID County Project Title Total Project Cost (1000)
ATP Request
(1000)
23-24 Funds
(1000)
24-25 Funds
(1000)
25-26 Funds
(1000)
26-27 Funds
(1000) PA&ED PS&E ROW CON CON
NI Fund totals Project Type DAC SRTS BA Agency Comments Lake
Tahoe
TMPO
3-South Lake Tahoe, City of-1 EDC Pioneer Trail Pedestrian Improvement Project Phase II $ 4,980 $ 1,200 $ 1,200 $ - $ - $ - Medium Infrastructure X X
$ 1,200 $ 1,200 Con phase funded with Sta funds. Project is federalized. Programming funds in 2023/24 $ - $ - Lake
Tahoe
TMPO
3-El Dorado County-6 EDC Apache Avenue Pedestrian Safety and Connectivity Project $ 3,502 $ 1,701 $ 1,701 $ - $ - $ - Medium Infrastructure X
$ 1,189 $ 1,189 Con phase funded with Sta and FTF funds. Project is federalized. Programming funds in 2023/24 $ 512 $ 512
Total $ 8,482 $ 2,901 $ 2,901 $ - $ - $ - FTF STATE Total
$512 $2,389 $2,901
512$ 2,389$ 2,901$
$0 $0 $0
Program funding totals (agency
Over or Under Estimate amount
TMPO Fund estimate totals
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
6/5/2023 S:\ATP\2023 ATP\MPO Component\Staff Recommendations\TMPO - Ready for adoption\FINAL\FINAL 2023 ATP MPO Programming Spreadsheet_TMPO.xlsx 1 of 1 Tulare County Association of Governments

210 North Church St. Suite B.

Visalia, California 93291
Phone (559)623-0450
Fax (559)733-6720
www.tularecog.org

Dinuba Exeter Farmersville Lindsay Porterville Tulare Visalia Woodlake County of Tulare

April 21, 2023

Ms. Tanisha Taylor, Interim Executive Director
California Transportation Commission
1120 N Street, MS-52
Sacramento, CA 95814

Dear Tanisha,

The Tulare County Association of Governments (TCAG) is pleased to present its final recommendations for the 2023 Active Transportation Program (ATP) MPO Component for consideration by the California Transportation Commission.

Per the Amended 2023 ATP fund estimate adopted by the Commission on August 17, 2022, $8,847,000 was made available to TCAG to program projects through its MPO component. With agencies contributing $4,054,000 in matching funds, a total of $12,901,000 in ATP projects will be programmed in the TCAG region through the 2023 ATP MPO Component. A supplemental call for projects was not conducted. The projects were evaluated and scored by a multi- disciplinary committee in accordance with the Statewide and TCAG MPO Component Project Selection Guidelines. The scoring committee recommended funding four projects. The TCAG Board of Directors approved the adoption of the scoring committee’s recommendations at their February 27, 2023 meeting. The projects recommended for funding will provide a broad spectrum of projects to benefit pedestrians and bicyclists, including students walking and bicycling to and from school.

The projects not recommended for funding will be placed on a contingency project list. In the event of project delivery failure and/or cost savings from the recommended projects, projects on the contingency list could be offered ATP funding starting with the highest scoring non- funded project. The contingency list will remain active until the beginning of the next ATP cycle.

TCAG’s MPO component funding recommendations meet the statewide ATP guideline requiring that at least 25% of a region’s funds benefit disadvantaged communities. Under this cycle, 100% of the funds available to the region will benefit disadvantaged communities.

Should you have any questions, please feel free to contact Gabriel Gutierrez at (559) 623-0465 or by email at [email protected].

Sincerely,

Ted Smalley, Executive Director
Dinuba Exeter Farmersville Lindsay Porterville Tulare Visalia Woodlake County of Tulare cc: Laurie Waters, Associate Deputy Director
Beverley Newman-Burckhard, Assistant Deputy Director
Elika Changizi, Program Analyst
Attachments:

Attachment 1: List of Multi-Disciplinary Advisory Group Members Attachment 2: Description of Unbiased Project Selection Methodology Attachment 3: TCAG Board Resolution Approving MPO Component Funding Recommendations
Attachment 4: Programming Spreadsheet
Attachment 5: List of All Projects and Scores
Attachment 6: Contingency List
Attachment 7: Updated Project Programming Request Forms Attachment 8: Updated Part A4: Project Details Forms
Attachment 9: Additional Materials Requested
Attachment 1
List of Multi-Disciplinary Advisory Group Members
TCAG 2023 ATP MPO Component
List of Members from the
Multidisciplinary Advisory Group

As required by the State ATP Guidelines, the projects were scored by the ATP Project Selection Committee. The Committee members were as follows:

Name Affiliation Expertise
Ted Smalley Tulare County Association of
Governments
Transportation
Finance and
Programming
Ben Giuliani Tulare County Association of
Governments
Transportation
Programming and
Planning
Mark Wall
Chairperson of the Tulare County
Active Transportation Advisory
Committee
Bicycle and
Pedestrian Advocate

Attachment 2
Description of Unbiased Project Selection Methodology
TCAG 2023 ATP MPO Component
Description of Unbiased Project Selection Method

Agencies in Tulare County submitted 19 projects for funding consideration in the 2023 ATP Statewide Component. Four projects were recommended for funding under the Statewide Component. They are the:
• City of Dinuba, Building Dinuba’s Active Transportation Future, ATP Award:
$13,147,000, Total Project Cost: $17,235,00. The City of Dinuba’s project encompasses six smaller segments that were each separately submitted for ATP funding consideration. As such, all of Dinuba’s ATP grant application submittals in the 2023 ATP Program were approved for funding.
• City of Visalia, Houston Community Connectivity Project, ATP Award and Total Project Cost: $2,385,000
• City of Porterville, HAWK Pedestrian Crossings Project, ATP Award:
$1,519,000, Total Project Cost: $1,859,000
The remaining 10 unfunded applications were evaluated and scored by the multidisciplinary advisory group for consideration of funding in the MPO component. Each member of the advisory group was provided a copy of each application and briefed on the scoring criteria and scoring process. The final score for each project was determined by averaging the total score submitted by each advisory group member. This score was then added to the total score for the criteria evaluated by TCAG staff.

The multidisciplinary advisory group members provided scores for the following scoring criteria:
• Potential for Increased Walking and Bicycling
• Potential for reducing the Number of Pedestrian and Bicycling Fatalities and Injuries
• Public Participation and Planning
• Scope Plan and Consistency
TCAG staff provided a score for the following scoring criteria:
• Disadvantaged Communities
• Leveraging
• Past Performance
• Project Need
The multidisciplinary advisory group and TCAG staff evaluated and scored the projects in accordance with the adopted Statewide and MPO Component ATP Guidelines. Based on the scores provided by the Committee, staff developed a list of recommended projects beginning with the highest scoring project and continuing down the list until the available $8.847 million of MPO Component ATP funds was exhausted. The following table lists the scores received by each of the projects.
2023 ATP Cycle
Tulare County Association of Governments
MPO Component Scoring Results
Agency Project Name
(in $1,000's)
Project
Type
Total
Score2
Total
Project
Cost
ATP
Request
Woodlake West Sequoia Avenue Multi-modal
Improvements Project $2,922 $2,532 I-S 100.33
Tulare County Poplar Pedestrian Connectivity Project $3,182 $2,539 I-S 94.67 TCAG Tule River Tribe Complete Streets and
Two Pedestrian Bridges Project, Phase 1 $2,981 $2,981 I+NI-S 94.00 Visalia Goshen – Visalia Corridor (GVC)
Improvement Project, Phase 1 $3,816 $7951 I-M 92.00
Tulare County Cutler-Orosi Pedestrian Improvements
Project $9,505 $9,029 I-M 91.33
Porterville Tule River Parkway Solar Lighting Project $1,861 $1,529 I-S 89.67 Tulare County Earlimart Intermodal Enhancement
Project $2,309 $1,994 I-M 89.33
Tulare County East Porterville Pedestrian Improvements
Project $8,414 $8,195 I-M 87.33
Visalia Santa Fe Cycle Track - Class IV Bike
Route $5,021 $4,221 I-M 86.00
Tulare County Strathmore Pedestrian Improvements
Project $3,092 $3,092 I-S 77.00
Projects recommended for MPO Component Funding
1 Visalia requested $3 million in ATP funds for its Goshen-Visalia Corridor (GVC) Improvement Project. However, after fully funding the first three highest-scoring projects, only $795k of ATP funds remained. The City was offered and accepted the remaining ATP funds. In addition to the ATP funds, a combination of other fund sources will be used to fully fund the project. 2 As described in the TCAG MPO Component Project Selection Guidelines, additional points can be awarded to projects for various scoring criteria categories. For this reason, there is one project that had a total score greater than 100.

Attachment 3
TCAG Board Resolution Approving MPO Component Funding
Recommendations

ATTACHMENT 1
TCAG 2023 ATP MPO Component
Recommended Funding and Contingency Project List
Pro
jects Recommended for MPO Component Funding
Project
Sponsor Project Title
MPO Component
Funding
Recommendation
Project
Score
Woodlake West Sequoia Avenue Multi-modal
Improvements Project $2,532,000 100.33
Tulare
County
Poplar Pedestrian Connectivity
Project $2,539,000 94.67
TCAG
Tule River Tribe Complete Streets and Two
Pedestrian Bridges Project, Phase 1 $2,981,000 94.00
Visalia Goshen-Visalia Corridor (GVC)
Improvement Project, Phase 1 $795,000 92.00
Reco
mmended Contingency List
Project
Sponsor Project Title
MPO
Component
Funding
Request
Project
Score
Tulare
County
Cutler-Orosi Pedestrian Improvements
Project $9,029,000 91.33
Porterville Tule River Parkway Solar Lighting Project $1,529,000 89.67 Tulare
County
Earlimart Intermodal Enhancement
Project $1,994,000 89.33
Tulare
County
East Porterville Pedestrian Improvements
Project $8,195,000 87.33
Visalia Santa Fe Cycle Track - Class IV Bike
Route $4,221,000 86.00
Tulare
County
Strathmore Pedestrian Improvements
Project $3,092,000 77.00
Attachment 4
Programming Spreadsheet
Metropolitan Planning Organization Component
($ in thousands)
MPO Application ID County Project Title Total Project Cost (1000)
ATP Request
(1000)
23-24 Funds
(1000)
24-25 Funds
(1000)
25-26 Funds
(1000)
26-27 Funds
(1000) PA&ED PS&E ROW CON CON
NI Fund totals Project Type DAC SRTS BA Agency Comments TCAG 6-Woodlake-1 TUL West Sequoia Avenue Multi-Modal Improvements Project $ 2,922 $ 2,532 $ - $ 2,532 $ - $ - Small Infrastructure X X
$ 2,532 $ 2,532
$ -
TCAG 6-Tulare County-2 TUL Poplar Pedestrian Connectivity Project $ 3,182 $ 2,539 $ 485 $ 2,054 Small Infrastructure X X
$ 200 $ 285 $ 1,483 $ 1,968 $ 571 $ 571
TCAG 6-TCAG-1 TUL Tule River Tribe Complete Streets and Two Pedestrian Bridges Project, Phase 1 $ 2,981 $ 2,981 $ 168 $ 397 $ 2,416 Small Combo X X $ 168 $ 357 $ 1,621 $ 40 $ 2,186 $ 795 $ 795
TCAG 6-Visalia-1 TUL Goshen - Visalia Corridor (GVC) Improvement Project, Phase 1 $ 3,816 $ 795 $ 795 Small Infrastructure X X
$ 795 $ 795
$ -
Total $ 12,901 $ 8,847 $ 168 $ 4,209 $ 2,416 $ 2,054 FTF STATE Total
$1,366 $7,481 $8,847
1,366$ 7,481$ 8,847$
$0 $0 $0
Blue column heading indicates the column data is a drop down menu to select project type Do not fill the shaded cells, they are auto-populated cells State funds
Federal (FTF) funds
Over or Under Estimate amount
TCAG Fund estimate totals
Program funding totals
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
4/21/2023 E:\Programming & Trans Bills\ATP\ATP Cycle 6\MPO Component\MPO Component Submittal (CTC)\Programming Spreadsheet\2023 ATP MPO Programming Spreadsheet.xlsx 1 of 1 Attachment 5
List of All Projects and Scores
TCAG 2023 ATP MPO Component
List of Projects and Scores
Project
Sponsor Project Title
MPO Component
Funding
Requested
Project
Score1
Woodlake West Sequoia Avenue Multi-modal
Improvements Project $2,532,000 100.33
Tulare
County
Poplar Pedestrian Connectivity
Project $2,539,000 94.67
TCAG
Tule River Tribe Complete Streets and Two
Pedestrian Bridges Project, Phase 1 $2,981,000 94.00
Visalia Goshen-Visalia Corridor (GVC)
Improvement Project, Phase 1 $3,000,000 92.00
Tulare
County
Cutler-Orosi Pedestrian
Improvements Project $9,029,000 91.33
Porterville Tule River Parkway Solar Lighting
Project $1,529,000 89.67
Tulare
County
Earlimart Intermodal Enhancement
Project $1,994,000 89.33
Tulare
County
East Porterville Pedestrian
Improvements Project $8,195,000 87.33
Visalia Santa Fe Cycle Track - Class IV Bike
Route $4,221,000 86.00
Tulare
County
Strathmore Pedestrian
Improvements Project $3,092,000 77.00
1As described in the TCAG MPO Component Project Selection Guidelines, additional points can be awarded to projects for various scoring criteria categories. For this reason, there is one project that had a total score greater than 100.

Attachment 6
Contingency List
TCAG 2023 ATP MPO Component
Contingency Project List

The contingency project list consists of the projects not recommended for funding under TCAG’s 2023 ATP MPO Component. In the event of project delivery failure and/or cost savings from the recommended projects, projects on the contingency list will be offered ATP funding starting with the highest scoring non-funded project. The contingency project list will remain active until the beginning of next ATP funding cycle.

Project
Sponsor Project Title
MPO
Component
Funding
Request
Score
Tulare
County
Cutler-Orosi Pedestrian
Improvements Project $9,029,000 91.33
Porterville Tule River Parkway Solar Lighting
Project $1,529,000 89.67
Tulare
County
Earlimart Intermodal Enhancement
Project $1,994,000 89.33
Tulare
County
East Porterville Pedestrian
Improvements Project $8,195,000 87.33
Visalia Santa Fe Cycle Track - Class IV Bike
Route $4,221,000 86.00
Tulare
County
Strathmore Pedestrian
Improvements Project $3,092,000 77.00
Metropolitan Planning Organization Component
($ in thousands)
MPO Application ID County Project Title Total Project Cost (1000)
ATP Request
(1000)
23-24 Funds
(1000)
24-25 Funds
(1000)
25-26 Funds
(1000)
26-27 Funds
(1000) PA&ED PS&E ROW CON CON
NI Fund totals Project Type DAC SRTS BA Agency Comments TCAG 6-Woodlake, City of-1 TUL West Sequoia Avenue Multi-Modal Improvements Project $ 2,922 $ 2,532 $ - $ 2,532 $ - $ - Small Infrastructure X X
$ 2,532 $ 2,532
$ -
TCAG 6-Tulare County-2 TUL Poplar Pedestrian Connectivity Project $ 3,182 $ 2,539 $ 485 $ 2,054 Small Infrastructure X X
$ 200 $ 285 $ 1,483 $ 1,968 $ 571 $ 571 TCAG 6-Tulare County Association of
Governments-1 TUL Tule River Tribe Complete Streets and Two Pedestrian Bridges Project, Phase 1 $ 2,981 $ 2,981 $ 168 $ 397 $ 2,416 Small Combo X X $ 168 $ 357 $ 1,621 $ 40 $ 2,186 $ 795 $ 795 TCAG 6-Visalia, City of-1 TUL Goshen - Visalia Corridor (GVC) Improvement Project, Phase 1 $ 3,816 $ 795 $ 795 Small Infrastructure X X
$ 795 $ 795 $ -
Total $ 12,901 $ 8,847 $ 168 $ 4,209 $ 2,416 $ 2,054 FTF STATE Total
$1,366 $7,481 $8,847
1,366$ 7,481$ 8,847$
$0 $0 $0
Blue column heading indicates the column data is a drop down menu to select project type Do not fill the shaded cells, they are auto-populated cells State funds
Federal (FTF) funds
Over or Under Estimate amount
TCAG Fund estimate totals
Program funding totals
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
State funds
Federal (FTF) funds
6/5/2023 S:\ATP\2023 ATP\MPO Component\Staff Recommendations\TCAG - Ready for adoption\FINAL\2023 ATP MPO Programming Spreadsheet.xlsx 1 of 1