6789 Quail Hill Parkway, #421 • Irvine, California 92603
Existing uses – demand related to current customers, including system uses/losses. Planned future uses – demands related to projects that are expected to be complete, or likely to begin construction during the period under consideration.
Task 2 Summary: The preliminary results will be provided in figure and table format. The results will be discussed with City staff and refinements made as appropriate.
Task 3. Perform Water Supply Analysis
The objective of this task is to determine if the total available water supply is sufficient for the proposed Specific Plan Update. The analysis will evaluate normal, single-dry, and multiple-dry years. Single-dry and multiple-dry year conditions will be established from historic hydrologic records for the watershed. The analysis will be performed using detailed water supply and demand data to assess water supply sufficiency over a 20-year projection.
Dopudja & Wells will collaborate with City staff prior to finalizing the criteria used to establish dry year estimates.
Task 3 Summary: The preliminary results will be provided in figure and table format. The results will be discussed with City staff and refinements made as appropriate. The task includes a phone call/virtual meeting to discuss preliminary results.
Task 4. Develop a Water Supply Assessment Report for the Specific Plan Update Using the results of the prior tasks, Dopudja & Wells will prepare a WSA Report in accordance with SB 610 evaluating whether sufficient water supply is available for the proposed Specific Plan Update. The WAS Report will include the following sections:
Description of the water service provider, including current and projected population, climate, and other demographic factors affecting the City’s water management planning. Projections will be in five-year increments to 20 years, or as far as data is available. Identify existing and planned sources of available water supplies, including future opportunities for exchanges and/or transfers if applicable.
Identify existing and future projected water demands among the various land use categories. Describe water demand management measures being implemented and scheduled to be implemented. Describe the reliability of water supplies under normal, single-dry, and multiple-dry years.
A draft report will be submitted for review and comment. A final report will be submitted in both hard copy and electronic formats after all comments have been addressed. Dopudja & Wells may submit individual draft report sections throughout the effort to gain feedback from City staff in advance of preparing deliverables.
Task 4 Summary: Submit the Draft and Final WSA for the Specific Plan Update. 103
Tom Crowley, P.E.
August 11, 2023
6789 Quail Hill Parkway, #421 • Irvine, California 92603
Task 5. Project Control
Project control activities include coordination of project activities with City staff, management of internal project staff, monitoring of schedule and budget, and internal review of work products (QA/QC).
Task 5 Summary: Dopudja & Wells will provide project status and schedule updates via email, as well as monthly work summaries attached to invoices.
Proposed Fee
The tasks in the Scope of Work described above will be performed on a time and materials basis, with the total fee not to exceed $66,470. The task-level details of this fee are provided in Attachment A. Dopudja & Wells will not exceed the fee shown in Attachment A without written authorization from the City of Rialto.
Schedule
Dopudja & Wells will provide the draft WSA report approximately six weeks from Notice to Proceed. Dopudja & Wells is ready to start immediately and understands that the final report needs to be complete by October 12, 2023, or sooner.
Dopudja & Wells understands the importance of this project to the City of Rialto, and we look forward to partnering on a rapid and successful evaluation. Please do not hesitate to contact Stephen Dopudja via email at [email protected] or at 949-842-4370 if there are any questions.
Sincerely,
Dopudja & Wells Consulting
Stephen Dopudja, P.E.
President/CEO
RCE #65187
SAD
104
ATTACHMENT A
Lad Pivovaroff
Dopudja /
Wells
Project
Engineer
Project
Manager
Technical
QA/QC
Total
Labor
Total
Labor Expenses Subconsultant
Task
Total
180$ 275$ 295$ Hours $ $ $ $ Task 1 Identify Existing and Future Water Supplies 24 16 1 41 9,015$ -$ -$ 9,015$ Review water contracts, agreements, and develop summary of supplies 24 16 1 41 9,015$ 9,015$ Task 2 Establish Current and Determine Future Water Demands 28 16 8 52 11,800$ -$ -$ 11,800$ Determine current and planned future water demands 20 8 4 32 6,980$ 6,980$ Evaluate project specific demands 8 8 4 20 4,820$ 4,820$ Task 3 Perform Water Supply Analysis 12 10 2 24 5,500$ -$ -$ 5,500$ Prepare data and perform supply/demand assessment 12 10 2 24 5,500$ 5,500$ Task 4 Develop a Water Supply Assessment Report 120 50 4 174 36,530$ -$ -$ 36,530$ Develop Draft Report 80 40 2 122 25,990$ 25,990$
Develop Final Report 40 10 2 52 10,540$ 10,540$
Task 5 Project Control 3 8 3 14 3,625$ -$ -$ 3,625$ Project Management 3 6 0 9 2,190$ 2,190$
QA/QC 0 2 3 5 1,435$ 1,435$
Total, Hours 187 100 18 305
Total, $ 33,660$ 27,500$ 5,310$ 66,470$ -$ -$ 66,470$ Rialto Foothill Central Specific Plan Update - Water Supply Assessment Task Fee Detail
105
City of Rialto
Legislation Text
File #: WS-23-772, Version: 1, Agenda #:
FOR: Water Subcommittee Meeting [August 29, 2023]
TO: Honorable Water Subcommittee Members
APPROVAL: Thomas J. Crowley, P.E., Utilities Manager
First Amendment to Professional Services Agreement with Enplanners for Additional CEQA Services for the WIFIA Application and the Rialto Habitat Nature Center. (ACTION)
BACKGROUND:
On Jun 15, 2022, the City entered into an agreement with Enplanners to develop an Initial Study and Mitigated Negative Declaration (IS/MND) for the Rialto Habitat Nature Center (RHNC). Enplanners provided an update on the CEQA process for the RHNC at the July Water Subcommittee meeting.
Now that they are well underway with completing this CEQA process for the RHNC we are ready to move to the development of an IS/MND for the 5-Year Water/Wastewater Capital Improvement Plan (CIP) and Special Projects to support the Water Infrastructure Finance and Innovation Act (WIFIA) loan application.
ANALYSIS/DISCUSSION:
The Amendment to the Professional Services Agreement with Enplanners includes:
1. Preparation of a CEQA Plus IS/MND for the projects included in the City’s WIFIA loan application,
2. Preparation of supporting technical studies and Tribal consultation assistance for the WIFIA projects,
3. Tribal consultation assistance for the RHNC project, and
4. Additional tasks for the RHNC project related to coordination with agencies regarding RHNC operational benefits.
The following table summarizes the additional cost estimates for each task along with the revised cost per the provisions of this amendment:
City of Rialto Printed on 8/25/2023Page 1 of 3
powered by Legistar™
106
File #: WS-23-772, Version: 1, Agenda #:
See the attached Proposal for more detail in the scope of work.
FINANCIAL IMPACT:
The tasks described above will be performed on a time-and-material basis and billed monthly with a not to exceed amount of $119,586.00 in accordance with the original proposal to prepare an IS/MND for the RHNC. Total amendment includes $45,100 in Enplanners fees and $73,486 in subconsultant charges and $1,000 in reimbursable expenses.
Total contract amount is $187,661.
RECOMMENDATION
Staff request the Water Subcommittee recommend the City Council/Rialto Utility Authority approve City of Rialto Printed on 8/25/2023Page 2 of 3
powered by Legistar™
107
File #: WS-23-772, Version: 1, Agenda #:
Staff request the Water Subcommittee recommend the City Council/Rialto Utility Authority approve the First Amendment to Professional Services Agreement with Enplanners for Additional CEQA Services for the WIFIA Application and the Rialto Habitat Nature Center.
City of Rialto Printed on 8/25/2023Page 3 of 3
powered by Legistar™
108
PO BOX 960 LAKE ARROWHEAD, CA 92352 (951) 289-5233 [email protected] WWW.ENPLANNERS.COM 8/14/23 (CIRIA2202 Lake Rialto Contract Amend 1 08-14-23.docx) August 14, 2023 Thomas J. Crowley, P.E. Utilities Manager City of Rialto 150 S. Palm Avenue, Rialto, CA 92376 Via email: [email protected] Subject: Contract Amendment for Professional Services Related to Preparing an Initial Study/Mitigated Negative Declaration and Supporting Technical Studies for the Rialto Habitat Nature Center Project (Project CIRIA2202) Dear Mr. Crowley: Enplanners submits this contract amendment request for the Rialto Habitat Nature Center (RHNC) Project previously named the Lake Rialto Habitat Management and Community Open Space Project. This request includes preparation of environmental documents for the additional various water and wastewater replacement and improvement projects identified in the City’s 5-year Water/Wastewater Capital Improvement Plan (CIP) included in the City’s Water Infrastructure Finance and Innovation Act (WIFIA) loan application. Specifically, this contract amendment includes: 1) preparation of a CEQA Plus IS/MND for the projects included in the City’s WIFIA loan application; 2) preparation of supporting technical studies and Tribal consultation assistance for the WIFIA projects; 3) Tribal consultation assistance for the RHNC Project; and 4) additional tasks for the RHNC Project related to coordination with agencies regarding RHNC operational benefits. The following scope of work, cost estimate, and schedule summarizes these efforts. 109
Contract Amendment Rialto Habitat Nature Center Project 8/14/23 (CIRIA2202 Lake Rialto Contract Amend 1 08-14-23.docx) 2 SCOPE OF WORK The tasks described below will be performed in accordance with the “Proposal to Prepare an Initial Study/Mitigated Negative Declaration for the Lake Rialto Habitat Management and Community Open Space Project” dated May 19, 2022, authorized June 15, 2022. The following task numbers for this contract amendment expand upon the original task numbers contained in Exhibit “A” of the executed agreement with the City. Task 1: Project Initiation and Project Definition 1.1: WIFIA Projects The Enplanners team will meet with City Staff and other members of the Project team to discuss project history, the project description, specific project issues, anticipated technical reports, and schedule. The City will provide a preliminary list, design and concept plans for the Project. Enplanners will prepare the draft project description and schedule and submit both to the City for review. Ray Hussey will perform the duties as Project Manager and will be the primary contact for the City. Deliverable: A project description and project schedule. Meeting: Attendance at one kick-off meeting. Stop here 1.2: RHNC Project Coordination The Enplanners team will participate in discussions with affected agencies regarding future habitat and maintenance benefits the RHNC Project could produce. These benefits may involve additional environmental analysis and review not included as part of the proposed Project. Nonetheless, the Enplanners team will participate and assist in discussions with other agencies such as the San Bernardino Valley Municipal Water District (SBVMWD) regarding future benefits of the Project. Deliverable: Agency coordination. Meetings: To be determined. Task 2: Technical Studies Task 2.5: WIFIA Air Quality and Greenhouse Gas Impact Analysis [Urban Crossroads (UC)] 2.5.1: Air Quality Report • Evaluate the existing conditions of the project study area; this will include gathering background air quality data, local wind patterns in the study area and identifying applicable rules, plans and thresholds of significance. • Identify construction-related air quality impacts from associated construction activities at the project site which may include demolition, import/export of fill dirt, mass grading, building construction, paving, concrete pouring, etc. • Evaluate operational emissions for the proposed project, based upon trip generation projections provided as part of the traffic study. In addition, emissions from other operational sources such as heaters, air conditioners, water heaters, consumer products, cargo handling equipment (CHE), and lawn care equipment will also be considered. 110
Contract Amendment Rialto Habitat Nature Center Project 8/14/23 (CIRIA2202 Lake Rialto Contract Amend 1 08-14-23.docx) 3 • A screening-level carbon monoxide (CO) Hotspot analysis of future conditions at key intersections located in the project study area will be prepared. It is anticipated that a qualitative discussion on CO Hotspot potential and rationale as to why more detailed modeling of CO Hotspot analysis is not required. • Perform Construction Localized Significance Threshold (LST) analysis as recommended by the South Coast Air Quality Management District (SCAQMD) for construction and operational activity. • Evaluate potential odor impacts resulting from the proposed project. Identify applicable mitigation measures and regulatory requirements that the project must comply with to minimize odors. For purposes of this evaluation a qualitative assessment of odors and odor controls is expected. • Qualitatively discuss cumulative impacts within the context of planned and foreseeable projects for short-term construction and long-term operational activity. A “list” approach per CEQA will be utilized when discussing cumulative impacts using the list of cumulative projects identified in the traffic report. Since the basin is in non-attainment the determination of significance will likely be based on whether or not the Project results in a substantial incremental increase. • Identify and recommended mitigation measures that are feasible to implement and that will reduce any potential impacts to the maximum extent possible. Prepare an air quality report that incorporates the findings and all supporting calculations. • Prepare an air quality report that incorporates the findings and all supporting calculations. 2.5.2: Air Quality Response to Comments • Revise the air quality study report based on comments provided by the Client and Lead agency for up to 1 review cycle. • Assist the CEQA preparer with preparation of response to comments on the draft CEQA Plus IS/MND document. 2.5.3: Greenhouse Gas Analysis • Evaluate applicable federal and state regulatory requirements (i.e., AB32, SCAQMD, CARB thresholds). Qualitatively discuss the effects of GHG emissions on regional air quality. • Evaluate applicable GHG emissions associated with heavy-duty construction equipment combustion that will likely occur during the various phases of construction. Data available from the project team and technical air quality analysis will be utilized in characterizing GHG-generating activities. • Evaluate operational GHG emissions for the proposed project which will include emissions from mobile sources, heaters, air conditioners, water heaters, consumer products, cargo handling equipment (CHE), and lawn care equipment will also be considered. • Evaluate project significance based on an applicable Climate Action Plan or direction provided by the Project CEQA preparer and/or the lead agency. 111
Contract Amendment Rialto Habitat Nature Center Project 8/14/23 (CIRIA2202 Lake Rialto Contract Amend 1 08-14-23.docx) 4 • Identify and recommend mitigation measures that are feasible to implement and that will reduce any potential impacts to the maximum extent possible. Prepare a greenhouse gas report that incorporates the findings and all supporting calculations. 2.5.4: Greenhouse Gas Response to Comments • Revise the greenhouse gas study report based on comments provided by the Client and Lead agency for up to 1 review cycle. • Assist the CEQA preparer with preparation of response to comments on the draft CEQA Plus IS/MND document. Task 2.6: WIFA Biological Resources Study [Carlson Strategic Land Solutions (CSLS)] 2.6.1: Biological Resources Assessment • To meet the requirements of CEQA, a Biological Resources Assessment will be prepared. The report will include database review, field inspections, habitat mapping, documentation of any sensitive biological resources exist onsite, Jurisdictional Delineation, and calculation and analysis of impacts. For budget purposes, the Biological Resource Report includes a field survey for the 38 projects included within the CIP, a single field survey of “Well City 3A”, which appears to occur within natural environment, and conducting a general biological virtual review (Google Earth). The Biological Resource Assessment will specify vegetation and or existing conditions on each of the Projects and determine the potential for sensitive species on the site. Impacts will be calculated and determined the potential for significant impacts under CEQA. 2.6.2: CEQA Plus IS/MND Review • This task includes review of the Biological Section written for the CEQA Plus IS/MND. 2.6.3: Meetings, Conference Calls, Coordination • This task includes budget for phone calls, emails, and meetings as necessary Task 2.7: WIFIA Cultural Resources Study (Duke CRM) 2.7.1: Research • A records search would be completed at the South Central Coastal Information Center (SCCIC), located at California State University, Fullerton. The SCCIC is the regional office of the California Historical Resources Information System (CHRIS), the State-designated repository for records concerning known historic and archaeological resources and prior cultural resource studies in San Bernardino County. DUKE CRM staff will examine the Built Environment Resources Directory (BERD) that includes the NRHP, CRHR, California Historical Landmarks (CHL), and California Points of Historical Interest (CPHI). The majority of the Projects are within City right-of-way, the records search will, focus on the previously identified prehistoric and historic archaeological resources within the City boundary and all cultural resources within ½ mile search radius to the two facilities, the Waste Water Treatment Plant and Well City “3A”. • On-line research and examination of in-house resources will be conducted. This research will focus on history of Rialto, historical USGS and Sanborn maps, and aerial imagery. Certain documents from the City may be requested. 112
Contract Amendment Rialto Habitat Nature Center Project 8/14/23 (CIRIA2202 Lake Rialto Contract Amend 1 08-14-23.docx) 5
2.7.2: Field Survey • A windshield survey of up to 18 Type A projects and 18 Type B projects infrastructure upgrades and replacement locations throughout the City. • A pedestrian survey of the two facilities will be conducted in order to document and photograph the historic resources (facilities) within the Waste Water Treatment Plant and Well City “3A”. 2.7.3: AB-52 Support • Duke CRM will send out 1 round of notification letters via US Certified mail to Tribes included on the City's list of consulting Tribes or the NAHC list. Up to two attempts to follow up by phone/email will be conducted. Any actual consultation will be led by the City, with DUKE CRM's support, if requested. 2.7.4: Report Preparation • A technical cultural resources Report will be prepared that will follow the ARMR guidelines (SHPO compliant). • The technical report will include a Historic Evaluation which would consists of data compiled from research and surveys to evaluate the two (2) facilities within the cities of Rialto and San Bernardino for eligibility to the CRHR and the NRHP. This will include preparation of two (2) DPR 523 Series site records, including a Primary Record; a Building, Structure, Object Record, Continuation Sheet for each and maps. 2.7.5: Stipulations/Exceptions • Additional acreage or offsite improvements will require additional budget to cover addition field work. • Negative results; if there are any cultural resources discovered within the project additional budget will be required for recordation and possible evaluation. • We will prepare one draft report for Enplanners to review and provide comments, one draft for the City to review and provide comments, and one draft and final report for SWRCB to review and provide comments. A final report will be prepared and provided electronically. • We did not include NHPA level consultation as we anticipate they will either tag along to the City’s efforts or conduct their own consultation. • Attendance at any meetings is not included. • Enplanners will arrange provide any requested background documentation, if available. • Enplanners will provide a project description with depths and quantities of excavation. Task 3: CEQA Plus Initial Study/Mitigated Negative Declaration (IS/MND) Task 3.4: WIFIA Administrative Draft IS/MND Enplanners will prepare an Administrative Draft CEQA Plus Initial Study (IS) based on the current CEQA and NEPA Guidelines. Enplanners will summarize adopted/completed reports and studies where relevant to the Project's environmental analysis, including the studies included in this scope of work. Enplanners will join a conference call with City staff to discuss the Administrative Draft 113
Contract Amendment Rialto Habitat Nature Center Project 8/14/23 (CIRIA2202 Lake Rialto Contract Amend 1 08-14-23.docx) 6 IS and the recommended CEQA Plus documentation. Should additional documentation be required beyond an MND, the consultant shall immediately brief the City. Additional expenses under these circumstances shall be negotiable. Deliverable: An Administrative Draft CEQA Plus IS for review by City staff. Meeting: Participation in a conference call to discuss review findings; identification of new studies, surveys, and/or technical reports if any. Task 3.5: WIFIA Draft IS/MND Enplanners will prepare a Draft CEQA Plus IS/MND as appropriate based on the review of the Administrative Draft CEQA Plus IS by the City. Enplanners will join a conference call with City staff to discuss the Draft CEQA Plus IS. Should additional documentation be required beyond an MND, Enplanners will immediately brief the City. Additional expenses under these circumstances shall be negotiable. Deliverable: Three (3) hard copies and one (1) electronic copy of Draft CEQA Plus IS/MND. Meeting: Enplanners will participate in a conference call to discuss review findings. Task 3.6: WIFIA Public Review IS/MND and Notice of Intent (NOI) Upon receipt of the City's comments on the Draft CEQA Plus IS, Enplanners will address the City's revisions and comments and will prepare the CEQA Plus IS/MND for public release. Enplanners will develop the mailing list for document distribution. Enplanners will distribute copies of the document to the State Clearinghouse and other responsible public agencies per the State CEQA and NEPA Guidelines (up to 20 total hard copies). Enplanners will assist the City with preparation and filing of all required notices including the NOI for the MND and will provide the City with a list of all mailings for the record. Deliverable: Up to 20 hard copies of the CEQA Plus IS/MND (15 delivered to the State Clearinghouse and 5 to District). Notice of Completion (NOC) to the State Clearinghouse. Prepare Notice of Intent to Adopt a Mitigated Negative Declaration (NOI) and file with County Clerk. Identify, process and mail public notification to up to 1,500 adjacent property owners. Task 4: Responses to Comments and Final CEQA Plus IS/MND Task 4.1: WIFIA Responses to Comments and Final CEQA Plus IS/MND Enplanners will respond to public comments received on the CEQA Plus IS/MND and prepare a Responses to Comments document for the Final CEQA Plus document. Consultant will provide responses to public comments in the form of a memorandum to the City for review and approval. Although CEQA does not require a Lead Agency to provide responses to commenting agencies or individuals, it is recommended that the City provide responses to all commenting parties ten days prior to the public hearing to consider approval of the CEQA document and Project. We have budgeted 24 hours of staff time to address comments, should excessive comments be submitted a contract amendment may be needed. Deliverable: One (1) memorandum will be emailed containing proposed responses to public comments. Task 5: Mitigation Monitoring and Reporting Program (MMRP) 114
Contract Amendment Rialto Habitat Nature Center Project 8/14/23 (CIRIA2202 Lake Rialto Contract Amend 1 08-14-23.docx) 7 Task 5.1: WIFIA Mitigation Monitoring and Reporting Program (MMRP) Enplanners will prepare a draft and final MMRP for inclusion in the Final CEQA Plus document, pursuant to Section 1081.6 of the Public Resources Code. Enplanners will submit to City for review and approval. Deliverable: One (1) electronic copy of the MMRP. Task 6: Findings and Filings Task 6.1: WIFIA Findings and Filings Enplanners will prepare all necessary CEQA findings for inclusion in the adoption of the CEQA document and use by cross cutter agencies. Enplanners will submit to City for review and approval. Enplanners shall include all required filing fees in this proposal and process the Notice of Determination or final permits to receipt of the client. Deliverable: One (1) electronic copy in Word of CEQA findings, process of final documents. Task 7: Project Management and Meetings with City Task 7.1: WIFIA Project Management and Meetings with City Enplanners will participate in phone calls and email communication as needed and up to 3 in person meetings. The City may add meetings with an amendment to the scope and budget. Enplanners shall also work with the City to develop State grant required documentation relative to the consultant's team and background, related work products, schedules, fees, and other documentation. Task 8: Public Hearings Task 8.1: WIFIA Public Hearings Enplanners will also attend required Committee and Council meetings, up to two (2) total, to answer any questions that may arise about the CEQA analysis. 115
Contract Amendment Rialto Habitat Nature Center Project 8/14/23 (CIRIA2202 Lake Rialto Contract Amend 1 08-14-23.docx) 8 COST ESTIMATE The tasks described above will be performed on a time-and-materials basis and billed monthly not to exceed $119,586.00, in accordance with the “Proposal to Prepare an Initial Study/Mitigated Negative Declaration for the Lake Rialto Habitat Management and Community Open Space Project” dated May 19, 2022, authorized June 15, 2022. Total charges include $45,100.00 in Enplanners fees and $73,486.00 in subconsultant charges. The task numbers for this contract amendment expand upon the original task numbers contained in Exhibit “A” of the executed agreement. The following table summarizes the additional cost estimates for each task along with the revised cost per the provisions of this amendment. Task Cost Estimate Task 1: Project Initiation and Project Definition 16,000.00 Task 1.1: WIFIA Project Initiation and Project Definition 8,000.00 Task 1.2: RHNC – SBVWD Coordination1 8,000.00 Task 2: Technical Studies 69,486.00 Task 2.5: WIFIA Air Quality and GHG Study (UC) 16,400.00 Task 2.6: WIFIA Biological Resources Study (CSLS) 15,960.00 Task 2.7: WIFIA Cultural Resources Study (Duke CRM) 37,126.00 Task 3: IS/MND 15,600.00 Task 3.4: WIFIA Administrative Draft IS/MND 12,000.00 Task 3.5: WIFIA Draft IS/MND 5,500.00 Task 3.6: WIFIA Public Review IS/MND and NOI 3,200.00 Task 4: Responses to Comments and Final IS/MND 3,200.00 Task 4.1: WIFIA Responses to Comments and Final IS/MND 3,200.00 Task 5: MMRP 1,200.00 Task 5.1: WIFIA MMRP 1,200.00 Task 6: Findings and Filings 800.00 Task 6.1: WIFIA Findings and Filings 800.00 Task 7: Project Management and Meetings with City 4,800.00 Task 7.1: WIFIA Project Management and Meetings with City 4,800.00 Task 8: Public Hearings 2,400.00 Task 8.1: WIFIA Public Hearings 2,400.00 Total Enplanners Fees $45,100.00 Total Subconsultant Costs $73,486.00 Reimbursable Expenses 1,000.00 Totals $119,586.00 Original Contract Totals $68,075.00 Original plus Amendment Totals $187,661.00 1 Includes $4,000 for CSLS assistance. 116
Contract Amendment Rialto Habitat Nature Center Project 8/14/23 (CIRIA2202 Lake Rialto Contract Amend 1 08-14-23.docx) 9 SCHEDULE Enplanners and our subconsultants can begin work upon your authorization. If you find this acceptable, please sign below and return it to Enplanners. Upon receipt of NTP, work will start immediately. If you have questions or need additional information, please feel free to contact me at (951) 289-5233 or [email protected]. Sincerely, Raymond V. Hussey, AICP President The above-stated terms re: “Contract Amendment for Professional Services Related to Preparing an Initial Study/Mitigated Negative Declaration and Supporting Technical Studies for the Rialto Habitat Nature Center Project (Project CIRIA2202)” (Project No. CIRIA2022) ($119,586.00) are hereby accepted and authorized. CONSULTANT: CLIENT: Enplanners, Inc. City of Rialto
Authorized Signature Authorized Signature Raymond V. Hussey Thomas Crowley Print Name Print Name President Utilities Manager Title August 14, 2023 Title Date Date
117