Cities Index.
Attachment 4 - Bemis SRTS Draft Engineering and Operational Improvements Map.pdf

Rialto City Council
November 14, 2023

Document
Attachment 4 - Bemis SRTS Draft Engineering and Operational Improvements Map.pdf
Meeting
November 14, 2023
Body
Rialto City Council
Original file
484 KB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

Eucalyptus Ave
Van
Koevering St
Holly
St
Holly
St
Cornell Dr
Burney
Ave
Rosalind
Ave
Evaline Ct
Pampas
Ave
Primrose
Ave
Primrose Ave
Madrona St
Acacia Ave
Lamar St
Primrose Ave
Birch St
Vict
oria St
Valencia St
Pine Ave
Birch A
ve
Etiwanda
Ave
Wabash St
Van Koevering St
Morgan St
Chestnut Ave
Mulberry Ave
Ash Ave
Birch Ave
Lamarr St
Pepper Ave
Pampas Ave
Victoria Ave
Holly St
Primrose Ave
Pampas Ave
Valenc
ia St
Vi
ctoria
St
Chestnut Ave
Mulberry Ave

A B C D
City of RialtoCity of Rialto
City of San BernardinoCity of San Bernardino
General Note: Stop lines within the school zone to be
restriped and placed a minimum of 4 ft before the crosswalk at controlled intersections.
1/4 Mile
350 700
Feet
0 ¯
Draft Engineering & Operational Improvement Callouts April 28, 2017 A Install bulbouts and curb ramps at all corners of
intersection. Install sharrows and R4-11 signs along
Etiwanda Avenue to designate existing Class III Bike
Route per Etiwanda Corridor Plan. Restripe all existing crosswalks with high visibility paint (ladder style).

B
C
Install curb ramps at each corner of the intersection.

Restripe all crosswalks with high visibility paint (ladder style). Install SW24-1(CA) Assembly A 500 ft from
all approaches at Eucalyptus Avenue and Etiwanda Avenue.

D
Install R1-5 sign for eastbound and westbound traffic.

Install yield lines for eastbound and westbound traffic.

Remove and replace existing (not functioning) in road
flashers with RRFB’s for eastbound and westbound
traffic, with advanced warning. Install W16-6P with
S1-1 on Chestnut Avenue.

Install traffic signal at intersection, pending passed signal warrant. Install curb ramps at intersection. Restripe
existing crosswalks with high visibility paint (ladder style).

Install sidewalk leading to southeast corner of intersection.

Install curb ramps at various locations.

BEMIS ELEMENTARY SCHOOL - ENGINEERING & OPERATIONAL IMPROVEMENTS MAP LEGEND
SchoolS
Class IIBike Lane
Class III
Bike Route
ProposedExisting
Proposed
Sidewalk
School Attendance
Boundary
School Crosswalk
School Access Location
ADA Curb Ramp
Signalized Intersection
School Signage
Rectangular Rapid
Flashing Beacon
Summary RecommendationA
For Class II Bike Lanes, install R81(CA) and R7-9 signs along lane. For Class III Bike Routes,
install R4-11 signs.

← All documents from this meeting