05 52 13 - 1 PIPE AND TUBE RAILINGS 9/14/2023
05 55 00 - 1 STAIR TREADS AND NOSINGS 9/14/2023
05 58 00 - 1 FORMED METAL FABRICATIONS 9/14/2023
05 70 00 - 1 DECORATIVE METAL 9/14/2023
05 73 13 - 1 GLAZED DECORATIVE METAL RAILINGS 9/14/2023 DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
06 10 53 - 1 MISCELLANEOUS ROUGH CARPENTRY 9/14/2023
06 40 16 - 1 INTERIOR ARCHITECTURAL WOODWORK 9/14/2023
06 41 19 - 1 PLASTIC LAMINATE-CLAD WOOD CASEWORK 9/14/2023 DIVISION 07 THERMAL AND MOISTURE PROTECTION 9/14/2023
07 13 27 - 1 HDPE SHEET WATERPROOFING 9/14/2023
07 21 50 - 1 BUILDING ENCLOSURE INSULATION 9/14/2023
07 26 13 - 1 BELOW-GRADE VAPOR RETARDERS 9/14/2023
07 27 27 - 1 FLUID-APPLIED SILICONE AIR BARRIER 9/14/2023 07 42 13 - 1 FORMED METAL PANELS 9/14/2023
07 42 18 - 1 METAL COMPOSITE WALL PANELS 9/14/2023
07 54 23 - 1 TPO ROOFING 9/14/2023
07 62 00 - 1 SHEET METAL FLASHING AND TRIM 9/14/2023
07 65 26 - 1 SASM FLASHING 9/14/2023
07 84 00 - 1 FIRESTOPPING 9/14/2023
07 92 00 - 1 JOINT SEALANTS 9/14/2023
DIVISION 08 OPENINGS
08 12 13 - 1 STANDARD HOLLOW METAL FRAMES 9/14/2023
08 12 16 - 1 ALUMINUM FRAMES 9/14/2023
08 13 13 - 1 STANDARD HOLLOW METAL DOORS 9/14/2023
08 14 16 - 1 FLUSH WOOD DOORS 9/14/2023
08 31 16 - 1 ACCESS PANELS 9/14/2023
08 33 23 - 1 OVERHEAD COILING DOORS 9/14/2023
08 34 78 - 1 VERTICAL SLIDING ACOUSTICAL DOORS 9/14/2023 08 41 13 - 1 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 9/14/2023 08 42 14 - 1 INTERIOR ALUMINUM-FRAMED ENTRANCES 9/14/2023 08 42 29 - 1 AUTOMATIC ENTRANCES 9/14/2023
08 43 36 - 1 FOLDING STOREFRONTS 9/14/2023
08 62 33 - 1 TUBULAR SKYLIGHTS 9/14/2023
08 71 00 - 1 DOOR HARDWARE 9/14/2023
08 71 13 - 1 AUTOMATIC DOOR OPERATORS 9/14/2023
08 81 00 - 1 GLASS GLAZING 9/14/2023
08 83 13 - 1 MIRRORED GLASS 9/14/2023
08 87 16 - 1 DECORATIVE GLAZING FILM 9/14/2023
DIVISION 09 FINISHES 9/14/2023
09 05 16 - 1 PREPARATION OF CONCRETE SUBSTRATES FOR FINISH FLOORING 9/14/2023 09 21 16 - 1 GYPSUM BOARD SHAFT WALL ASSEMBLIES 9/14/2023 09 22 16 - 1 LIGHTGAGE METAL FRAMING 9/14/2023
09 22 26 - 1 METAL SUSPENSION SYSTEMS 9/14/2023
09 28 15 - 1 GMF GYPSUM TILE BACKING BOARD 9/14/2023
09 29 00 - 1 GYPSUM BOARD 9/14/2023
09 30 00 - 1 TILING 9/14/2023
09 51 13 - 1 ACOUSTICAL PANEL CEILINGS 9/14/2023
09 51 26 - 1 ACOUSTICAL WOOD CEILINGS 9/14/2023
09 65 13 - 1 RESILIENT BASE AND ACCESSORIES 9/14/2023
09 65 16 - 1 RESILIENT SHEET FLOORING 9/14/2023
09 65 19 - 1 RESILIENT TILE FLOORING 9/14/2023
09 65 66 - 1 RESILIENT ATHLETIC FLOORING 9/14/2023
09 68 13 - 1 TILE CARPETING 9/14/2023
09 68 17 - 1 COMMERCIAL SHEET CARPETING 9/14/2023
09 72 10 - 1 CONTRACT WALL COVERINGS 9/14/2023
09 72 43 - 1 GRAPHIC FILM WALL COVERINGS 9/14/2023
09 77 33 - 1 FRP WALL PANELS 9/14/2023
09 81 33 - 1 ACOUSTICAL INSULATION, SEALANTS, AND ACCESSORIES 9/14/2023 09 84 33 - 1 SOUND-ABSORBING WALL UNITS 9/14/2023
09 91 00 - 1 PAINTING 9/14/2023
PAINT PRODUCTS SCHEDULE - 1
09 96 29 - 1 GRAFFITI-RESISTANT FILM 9/14/2023
09 96 53 - 1 ELASTOMERIC COATINGS 9/14/2023
09 96 56 - 1 EPOXY COATINGS 9/14/2023
09 97 13 - 1 HIGH-PERFORMANCE STEEL COATINGS 9/14/2023
09 97 23 - 1 PENETRATING CONCRETE FLOOR SEALER 9/14/2023 COVER SHEET SPECIFICATIONS VOLUME 2 OF 2: DIVISION 10 TO 33 9/14/2023 00 01 10 - 1 TABLE OF CONTENTS 9/14/2023
DIVISION 10 SPECIALTIES
10 11 23 - 1 TACK BOARDS 9/14/2023
10 14 13 - 1 REGULATORY SIGNAGE 9/14/2023
10 21 13 - 1 TOILET COMPARTMENTS 9/14/2023
10 26 00 - 1 WALL PROTECTION 9/14/2023
10 28 13 - 1 COMMERCIAL TOILET ACCESSORIES 9/14/2023
10 44 00 - 1 FIRE PROTECTION SPECIALTIES 9/14/2023
10 51 23 - 1 PLASTIC LAMINATE LOCKERS 9/14/2023
10 71 13 - 1 FIXED SUN SHADES 9/14/2023
10 75 00 - 1 Flagpoles 9/14/2023
DIVISION 11 EQUIPMENT
11 18 00 - 1 SECURITY EQUIPMENT 9/14/2023
11 19 00 - 1 DETENTION EQUIPMENT 9/14/2023
11 19 50 - 1 BALLISTIC PROTECTION EQUIPMENT 9/14/2023
11 24 32 - 1 FALL RESTRAINT BRACKETS 9/14/2023
11 31 00 - 1 RESIDENTIAL APPLIANCES 9/14/2023
11 81 19 - 1 VACUUM CLEANING SYSTEMS 9/14/2023
DIVISION 12 FURNISHINGS
12 24 13 - 1 ROLLER WINDOW SHADES 9/14/2023
12 36 16 - 1 STAINLESS STEEL COUNTERTOPS 9/14/2023
12 36 63 - 1 SOLID SURFACE MATERIAL COUNTERTOPS 9/14/2023 12 48 13 - 1 ENTRANCE FLOOR MATS 9/14/2023
12 48 16 - 1 ENTRANCE FLOOR GRILLES 9/14/2023
12 93 16 - 1 BICYCLE ROOM RACKS 9/14/2023
DIVISION 22 PLUMBING
220130-1 COMMON WORK RESULTS FOR PLUMBING 9/14/2023
220517-1 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 9/14/2023 220519-1 METERS AND GAUGES FOR PLUMBING PIPING 9/14/2023 220523-1 GENERAL-DUTY VALVES FOR PLUMBING PIPING 9/14/2023 220529-1 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 9/14/2023 220548-1 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT 9/14/2023 220553-1 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 9/14/2023 220716-1 PLUMBING EQUIPMENT INSULATION 9/14/2023
220719-1 PLUMBING PIPING INSULATION 9/14/2023
221005-1 PLUMBING PIPING 9/14/2023
221006-1 PLUMBING PIPING SPECIALTIES 9/14/2023
223000-1 PLUMBING EQUIPMENT 9/14/2023
224000-1 PLUMBING FIXTURES 9/14/2023
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING 9/14/2023 230500-1 COMMON WORK RESULTS FOR HVAC 9/14/2023
230548-1 VIBRATION AND SEISMIS CONTROLS FOR HVAC 9/14/2023 230553-1 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 9/14/2023 230593-1 TESTING, ADJUSTING, AND BALANCING FOR HVAC 9/14/2023
230713-1 HVAC DUCT INSULATION 9/14/2023
230719-1 HVAC PIPING INSULATION 9/14/2023
230800-1 COMMISSIONING OF HVAC 9/14/2023
230913-1 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC 9/14/2023 230923-1 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC 9/14/2023 232300-1 REFRIGERANT PIPING 9/14/2023
233100-1 HVAC DUCTS AND CASINGS 9/14/2023
233300-1 AIR DUCT ACCESSORIES 9/14/2023
233319-1 DUCT SILENCERS 9/14/2023
233423-1 HVAC POWER VENTILATORS 9/14/2023
233600-1 AIR TERMINAL UNITS 9/14/2023
233700-1 AIR OUTLETS AND INLETS 9/14/2023
234000-1 HVAC AIR CLEANING DEVICES 9/14/2023
237413-1 PACKAGED OUTDOOR HEAT PUMP UNITS 9/14/2023
237433-1 DEDICATED OUTDOOR AIR UNITS 9/14/2023
238125-1 COMPUTER ROOM AIR CONDITIONERS – CEILING MOUNTED 9/14/2023 238126-1 SPLIT-SYSTEM AIR CONDITIONERS 9/14/2023
238129-1 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS 9/14/2023 DIVISION 26 ELECTRICAL
26 00 00 - 1 GENERAL ELECTRICAL SPECIFICATIONS 9/14/2023 DIVISION 27 COMMUNICATIONS 9/14/2023
27 10 00 - 1 STRUCTURED CABLING SYSTEM 9/14/2023
27 41 00 - 1 AUDIOVISUAL SYSTEMS SPECIFICATIONS 9/14/2023 DIVISION 28 ELECTRONIC SAFETY AND SECURITY 9/14/2023
28 05 13 - 1 SECURITY WIRE AND CABLE 9/14/2023
28 10 00 - 1 ACCESS CONTROL AND ALARM MONITORING SYSTEM 9/14/2023 28 30 00 - 1 SECURITY VIDEO MANAGEMENT SYSTEM 9/14/2023 DIVISION 31 EARTHWORK
311000-1 SITE CLEARING 9/14/2023
312200-1 GRADING 9/14/2023
312316-1 EXCAVATION 9/14/2023
312316.13-1 TRENCHING 9/14/2023
DIVISION 32 EXTERIOR IMPROVEMENTS 9/14/2023
320190-1 LANDSCAPE MAINTENANCE 9/14/2023
321123-1 AGGREGATE BASE COURSES 9/14/2023
321216-1 ASPHALT PAVING 9/14/2023
321313-1 CONCRETE PAVING 9/14/2023
321373-1 PAVEMENT JOINT SEALERS 9/14/2023
321413-1 PRECAST CONCRETE UNIT PAVING 9/14/2023
321500-1 DECOMPOSED GRANITE SURFACING 9/14/2023
321713-1 PARKING BUMPERS
321723-1 PAVEMENT MARKINGS 9/14/2023
32 17 26 - 1 TACTILE WARNING SURFACING 9/14/2023
32 31 14 - 1 SECURITY CHAIN LINK FENCES AND GATES 9/14/2023 323119-1 TUBE STEEL FENCES AND GATES 9/14/2023
323125-1 AMERISTAR MONTAGE II 9/14/2023
32 31 43 - 1 AUTOMATIC GATE OPERATORS 9/14/2023
323300-1 SITE FURNISHINGS 9/14/2023
323353-1 ARCHITECTURAL SITE CONCRETE 9/14/2023
328400-1 LANDSCAPE IRRIGATION 9/14/2023
329300-1 LANDSCAPE WORK 9/14/2023
DIVISION 33 UTILITIES
331416-1 SITE WATER UTILITY DISTRIBUTION PIPING 9/14/2023 333113-1 SITE SANITARY SEWERAGE GRAVITY PIPING 9/14/2023 334211-1 STORMWATER GRAVITY PIPING 9/14/2023
APPENDIX 9/14/2023
BLANK SHEET
LEED v4 for BD+C: New Construction and Major Renovation 3/28/2023
BLANK SHEET
PWBO 1 OF 2 HydroFit 4510R MODEL HydroFit HOSPITAL SEISMIC 3+ PWBO 2 OF 2 HydroFit 4510R MODEL HydroFit HOSPITAL SEISMIC 3+ PLAN VIEW HydroFit 4510R MODEL HydroFit HOSPITAL SEISMIC 3+ ELEVATION 1 HydroFit 4510R MODEL HydroFit HOSPITAL SEISMIC 3+ HALL FIXTURES HydroFit 4510R MODEL HydroFit HOSPITAL SEISMIC 3+
BLANK SHEET
10. Jobwalk Photos
11. As built drawings
Existing PD Building
1967-07 Police Facilities BuildinG
A-1 PLOT PLANT & SITE DETAILS 7/1/1967
A-2 BASEMENT PLAN, EXTERIOR ELEVATION AND CROSS SECTION 7/1/1967 A-3 FIRST FLOOR PLAN, ROOM FINISH SCHEDULE & DOOR SCHEDULE 7/1/1967 A-4 ROOF PLAN AND EAVE SECTIONS & MISC SECTIONS 7/1/1967 A-5 INTERIOR ELEVATIONS 7/1/1967
A-6 PISTOL RANGE SECTION, INTERIOR ELEVATIONS & DETAILS 7/1/1967 A-7 DOOR, WINDOW & MISC DETAILS 7/1/1967
A-8 CABINET SECTIONS & DETAILS 7/1/1967
A-9 REFLECTED CEILING PLANS & DETAILS 7/1/1967
E-1 SITE PLAN, SYMBOLS & LIGHTING FIXTURE SCHEDULE 7/1/1967 E-2 BASEMENT LIGHTING PLAN, PANEL SCHEDULES & SECTIONS 7/1/1967 E-3 BASEMENT POWER & COMMUNICATIONS PLAN & DETAILS 7/1/1967 E-4 FIRST FLOOR LIGHTING PLAN, PANEL SCHEDULES & DETAILS 7/1/1967 E-5 FIRST FLOOR POWER PLAN & SINGLE LINE DIAGRAM 7/1/1967 E-6 FIRST FLOOR COMMUNICATIONS PLAN & DETAILS 7/1/1967
M-2 FIRST FLOOR PLAN AND DETAILS 7/1/1967
P-1 PLUMBING PLOT PLAN, LEGEND, SCHEDULES & DETAILS 7/1/1967 P-2 PLUMBING FLOOR PLANS & EQUIPTMENT SCHEDULE 7/1/1967 FS-1 FIRE SPRINKLER PLANS 7/1/1967
S1 GENERAL NOTES & TYPICAL DETAILS 7/1/1967
S2 FOUNDATION BASEMENT & FIRST FLOOR PLANS 7/1/1967
S3 ROOF FRAMING PLAN, SECTIONS & DETAILS 7/1/1967
S4 WALL ELEVATIONS 7/1/1967
S5 SECTIONS 7/1/1967
S6 SECTIONS 7/1/1967
Rialto Police - S1
S1 GENERAL NOTES & TYPICAL DETAILS 7/1/1967
Rialto Police - S2
S2 FOUNDATION BASEMENT & FIRST FLOOR PLANS 7/1/1967
Rialto Police - S3
S3 ROOF FRAMING PLAN, SECTIONS & DETAILS 7/1/1967
Rialto Police - S4
S4 WALL ELEVATIONS 7/1/1967
Rialto Police - S5
S5 SECTIONS 7/1/1967
Rialto Police - S6
S6 SECTIONS 7/1/1967
Existing PV Panels
Pages 1 - 7 Existing PV panels
12. Existing Modular Structures Relocation
OPTION B PHASING & LOGISTICS: SB-B 7/12/2022
Trailer relocation markup
Modular Relocation Drawing + Spec Package 10/3/2023
13. Existing PV Panels Salvaging
Pages 1 - 7 Existing PV panels
IMG_0144
PD Solar plans
PV-1 COVERSHEET SHEET 12/17/2018
PV-2.1 REVISED GENERAL SITE PLAN 12/13/2018
PV-2.1 REVISED GENERAL SITE PLAN 12/17/2018
E-1 ELECTRICAL LEGENDS & NOTES 10/29/2018
E-2 SINGLE LINE DIAGRAM 10/29/2018
E-3 PV SYSTEM DATA & FEEDER SCHEDULES 10/29/2018
E-4 TITLE 24 COMPLIANCE DOCUMENTS 10/29/2018
E-5 ELECTRICAL SITE PLAN 10/19/2018
E-6 SITE LIGHTING PLAN 10/29/2018
E-7 SITE LIGHTING PHOTOMETRICS 10/29/2018
E-8 ELECTRICAL DETAILS 11/14/2019
E-9 ELECTRICAL DETAILS 10/29/2018
E-10 ELECTRICAL CUTSHEETS 10/29/2018
E-11 ELECTRICAL SPECIFICATIONS 10/16/2018
E-12 ELECTRICAL SPECIFICATIONS 10/16/2018
SHEET 1 OF 5 GENERAL INFORMATION 2/8/2018
SHEET 2 OF 5 CAR PORT #1 2/8/2018
SHEET 3 OF 5 CAR PORT #1 CROSS SECTION 2/8/2018
SHEET 4 OF 5 SOLAR DETAILS 2/8/2018
SHEET 5 OF 5 GENERAL DETAILS 2/8/2018
CBC-S2
SA-1 FOUNDATION PLAN & DETAILS 3/28/2018
SA-2 DETAILS PLAN 3/28/2018
ADA COMPLIANCE VERIFICATION RIALTO POLICE DEPARTMENT FOR DS ENERGY 3/13/2018 PV-6.0 PRODUCT DATA INFORMATION 10/16/2018
PV-6.01 PRODUCT DATA INFORMATION 10/16/2018
PV Panels relocation
OPTION B Rialto Police Station - Phasing _ Logistics - Sheet - SB-B - OPTION B 7/12/2022
Exhibit F
4872-5819-4561 v1
EXHIBIT F
Project Schedule
Activity ID Activity Name OD ACD RD Start Finish
Rialto Police Station - P07A - Design Update - 10/16/23 (PRECON) Rialto Police Station - P07A - Design Update - 10/16/23 (PRECON) 892d 892d 737d 18-Jan-23 A 05-Aug-26 Summary Summary 892d 892d 737d 18-Jan-23 A 05-Aug-26
SUM-1010 Preconstruction Duration 469d 491d 271d 18-Jan-23 A 22-May-24 SUM-1190 City Issue NTP 0d 0d 0d 15-Jan-24
SUM-1180 Overall Project Duration (CD's) 900d 900d 900d 15-Jan-24 02-Jul-26 SUM-1160 Package 1 - Early Work permit (Relocations, Demo) 0d 0d 0d 23-Jan-24 SUM-1150 Construction Start 0d 0d 0d 27-Feb-24
SUM-1120 Phase 1 - Relocate Modulars and PV Parking (CDs) 114d 114d 114d 27-Feb-24 19-Jun-24 SUM-1030 Construction Duration (CDs) 857d 857d 857d 27-Feb-24 02-Jul-26 SUM-1140 Package 2 - Receive Grading, Utilities & Foundation Permit 0d 0d 0d 22-May-24 SUM-1050 Phase 2.2 - Support Building Duration (CDs) 457d 457d 457d 20-Jun-24 19-Sep-25 SUM-1020 Package 3 - Building Permit 0d 0d 0d 16-Jul-24 SUM-1040 Phase 2.1 - Headquarters Building Duration (CDs) 536d 536d 536d 26-Jul-24 12-Jan-26 SUM-1170 SCE Permanent Power 0d 0d 0d 14-Aug-25
SUM-1060 Phase 2.1 - Headquarters Building TCO 0d 0d 0d 12-Jan-26 SUM-1070 Phase 3 - Demo (E) Police Bldg and Site (CDs) 157d 157d 157d 13-Jan-26 18-Jun-26 SUM-1080 Weather Allowance 10d 10d 10d 19-Jun-26 02-Jul-26 SUM-1090 Substantial Completion / TCO 0d 0d 0d 02-Jul-26* SUM-1100 Closeout Duration 34d 34d 34d 03-Jul-26 05-Aug-26 SUM-1110 Final Completion 0d 0d 0d 05-Aug-26
Precon Precon 192d 192d 222d 10-Oct-23 A 16-Jul-24
Pre-Development Phase 1 Pre-Development Phase 1 64d 64d 94d 10-Oct-23 A 15-Jan-24 CEQA CEQA 30d 30d 75d 10-Oct-23 A 08-Nov-23
PRECON-1200 CEQA Public Comment Period 30d 30d 75d 10-Oct-23 A 08-Nov-23 GMP GMP 56d 56d 56d 20-Oct-23 15-Jan-24
PRECON-1170 Developer GMP, Financing & Development Agreement (D A) 18d 18d 18d 20-Oct-23* 14-Nov-23 PRECON-1180 City Council Approve DA and Financing Structure 10d 10d 10d 01-Nov-23 14-Nov-23 PRECON-1300 Financing 38d 38d 38d 15-Nov-23 12-Jan-24
PRECON-1240 City Issue NTP 1d 1d 1d 15-Jan-24* 15-Jan-24* Development Phase 2 Development Phase 2 166d 166d 166d 15-Nov-23 16-Jul-24 Package 1 - Relocations Package 1 - Relocations 44d 44d 44d 15-Nov-23 23-Jan-24 Construction Documents Construction Documents 16d 16d 16d 15-Nov-23 08-Dec-23 PRECON-1280 Prepare and Submit 100% CDs (DD's were Sufficient) 1d 1d 1d 15-Nov-23 15-Nov-23 PRECON-1290 Review 100% CDs 15d 15d 15d 16-Nov-23 08-Dec-23 Permitting Permitting 42d 42d 42d 17-Nov-23 23-Jan-24
PRECON-1320 Submit Package for Permit 1d 1d 1d 17-Nov-23 17-Nov-23 PRECON-1330 City Review # 1 20d 20d 20d 20-Nov-23 19-Dec-23 PRECON-1340 Revise and Resubmit # 1 10d 10d 10d 20-Dec-23 05-Jan-24 PRECON-1350 City Review # 2 10d 10d 10d 08-Jan-24 22-Jan-24 PRECON-1360 Issue Permit 1d 1d 1d 23-Jan-24 23-Jan-24
Package 1.1 - Demolition Package 1.1 - Demolition 43d 43d 43d 15-Nov-23 22-Jan-24 Construction Documents Construction Documents 20d 20d 20d 15-Nov-23 14-Dec-23 PRECON-1370 Prepare and Submit 100% CDs 5d 5d 5d 15-Nov-23 21-Nov-23 PRECON-1380 Review 100% CDs 15d 15d 15d 22-Nov-23 14-Dec-23 Permitting Permitting 37d 37d 37d 27-Nov-23 22-Jan-24
PRECON-1390 Submit Package for Permit 1d 1d 1d 27-Nov-23 27-Nov-23 PRECON-1400 City Review # 1 15d 15d 15d 28-Nov-23 18-Dec-23 PRECON-1410 Revise and Resubmit # 1 10d 10d 10d 19-Dec-23 04-Jan-24 PRECON-1420 City Review # 2 10d 10d 10d 05-Jan-24 19-Jan-24 PRECON-1430 Issue Permit 1d 1d 1d 22-Jan-24 22-Jan-24
Package 2 - Grading, Utilities & Foundations Package 2 - Grading, Utilities & Foundations 129d 129d 129d 15-Nov-23 22-May-24 Construction Documents Construction Documents 102d 102d 102d 15-Nov-23 15-Apr-24 PRECON-1530 Architect Update DWGs Per Narratives 16d 16d 16d 15-Nov-23 08-Dec-23 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
2024 2025 2026 2027
Preconstruction Duration
City Issue NTP
Overall Project Duration (CD's)
Package 1 - Early Work permit (Relocations, Demo)
Construction Start
Phase 1 - Relocate Modulars and PV Parking (CDs)
Construction Duration (CDs)
Package 2 - Receive Grading, Utilities & Foundation Permit Phase 2.2 - Support Building Duration (CDs)
Package 3 - Building Permit
Phase 2.1 - Headquarters Building Duration (CDs)
SCE Permanent Power
Phase 2.1 - Headquarters Building TCO
Phase 3 - Demo (E) Police Bldg and Site (CDs)
Weather Allowance
Substantial Completion / TCO
Closeout Duration
Final Completion
CEQA Public Comment Period
Developer GMP, Financing & Development Agreement (D A)
City Council Approve DA and Financing Structure
Financing
City Issue NTP
Prepare and Submit 100% CDs (DD's were Sufficient)
Review 100% CDs
Submit Package for Permit
City Review # 1
Revise and Resubmit # 1
City Review # 2
Issue Permit
Prepare and Submit 100% CDs
Review 100% CDs
Submit Package for Permit
City Review # 1
Revise and Resubmit # 1
City Review # 2
Issue Permit
Architect Update DWGs Per Narratives
Remaining Level of Effort
Impact
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Rialto Police Station - P07A - Design Update - 10/16/23 Remaining Activities
Data Date: 26-Aug-23
Print Date: 17-Oct-23
TASK filter: Remaining.
EXHIBIT F - PROJECT SCHEDULE
Activity ID Activity Name OD ACD RD Start Finish
PRECON-1440 Prepare and Submit 100% CDs 71d 71d 71d 11-Dec-23 25-Mar-24 PRECON-1450 Review 100% CDs 15d 15d 15d 26-Mar-24 15-Apr-24 Permitting Permitting 42d 42d 42d 26-Mar-24 22-May-24
PRECON-1460 Submit Package for Permit 1d 1d 1d 26-Mar-24 26-Mar-24 PRECON-1470 City Review # 1 20d 20d 20d 27-Mar-24 23-Apr-24 PRECON-1480 Revise and Resubmit # 1 10d 10d 10d 24-Apr-24 07-May-24 PRECON-1490 City Review # 2 10d 10d 10d 08-May-24 21-May-24 PRECON-1500 Issue Permit 1d 1d 1d 22-May-24 22-May-24
Package 3 - Building Package 3 - Building 128d 128d 128d 16-Jan-24 16-Jul-24 Construction Documents Construction Documents 101d 101d 101d 16-Jan-24 06-Jun-24 PRECON-1070 Prepare and Submit 50% CDs 40d 40d 40d 16-Jan-24 12-Mar-24 PRECON-1090 Review 50% CDs 15d 15d 15d 13-Mar-24 02-Apr-24 PRECON-1080 Prepare and Submit 100% CDs 45d 45d 45d 14-Mar-24 15-May-24 PRECON-1100 Review 100% CDs 15d 15d 15d 16-May-24 06-Jun-24 Permitting Permitting 42d 42d 42d 16-May-24 16-Jul-24
PRECON-1110 Submit Package for Permit 1d 1d 1d 16-May-24 16-May-24 PRECON-1120 City Review # 1 20d 20d 20d 17-May-24 14-Jun-24 PRECON-1130 Revise and Resubmit # 1 10d 10d 10d 17-Jun-24 28-Jun-24 PRECON-1210 City Review # 2 10d 10d 10d 01-Jul-24 15-Jul-24 PRECON-1150 Issue Permit 1d 1d 1d 16-Jul-24 16-Jul-24
PD Review Process PD Review Process 10d 10d 10d 16-May-24 30-May-24 A1000 PD Review CD 10d 10d 10d 16-May-24 30-May-24
SoCal Edison SoCal Edison 340d 340d 340d 06-Mar-24 10-Jul-25 SoCalEd.1000 Electrical Drawings Finalized 15d 15d 15d 06-Mar-24 26-Mar-24 SoCalEd.1010 SCE Application Process 10d 10d 10d 27-Mar-24 09-Apr-24 SoCalEd.1020 Develop SCE Prelim Drawings 30d 30d 30d 10-Apr-24 21-May-24 SoCalEd.1030 SCE Preliminary Drawings Released 0d 0d 0d 22-May-24 22-May-24 SoCalEd.1040 Owner Pay Application Fees 5d 5d 5d 22-May-24 29-May-24 SoCalEd.1050 Switchgear Review / Approve 10d 10d 10d 30-May-24 12-Jun-24 SoCalEd.1060 Develop SCE Final Drawings 30d 30d 30d 30-May-24 11-Jul-24 SoCalEd.1070 Switchgear Release 1d 1d 1d 13-Jun-24 13-Jun-24 SoCalEd.1080 Switchgear Procurement 200d 200d 200d 14-Jun-24 02-Apr-25 SoCalEd.1090 Final SCE Drawings Released 1d 1d 1d 12-Jul-24 12-Jul-24 SoCalEd.1130 SCE Pre-Con Meeting 1d 1d 1d 15-Jul-24 15-Jul-24 SoCalEd.1100 Switchgear Install / Land & Terminate 5d 5d 5d 03-Apr-25 09-Apr-25 SoCalEd.1110 Switchgear Inspection and Sign-Off - IOR 2d 2d 2d 10-Apr-25 11-Apr-25 SoCalEd.1140 Schedule SCE Mobilization 45d 45d 45d 14-Apr-25 16-Jun-25 SoCalEd.1150 SCE Mobilization 1d 1d 1d 17-Jun-25 17-Jun-25 SoCalEd.1160 SCE Completes Work 10d 10d 10d 18-Jun-25 01-Jul-25 SoCalEd.1170 SCE Meter Sign-Off 5d 5d 5d 02-Jul-25 09-Jul-25 SoCalEd.1180 Building Energized 1d 1d 1d 10-Jul-25 10-Jul-25 Subcontract, Submittals & Procurement Subcontract, Submittals & Procurement 358d 358d 358d 16-Jan-24 16-Jun-25 A15780 Priority 1 Trade Release Bid 15d 15d 15d 16-Jan-24 05-Feb-24 A15790 Priority 2 Trade Release Bid 20d 20d 20d 16-May-24 13-Jun-24 Priority 1 Early Work - Relocations, Demo, Grading, Utilities & Foundation Priority 1 Early Work - Relocations, Demo, Grading, Utilities & Foundation 343d 343d 343d 06-Feb-24 16-Jun-25 Surveying Surveying 42d 42d 42d 06-Feb-24 04-Apr-24
A17210 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A17220 Submittals - Prep 10d 10d 10d 21-Feb-24 05-Mar-24 A17230 Submittals - Review # 1 5d 5d 5d 06-Mar-24 12-Mar-24 A17240 Submittals - Revise 2d 2d 2d 13-Mar-24 14-Mar-24 A17250 Submittals - Review # 2 5d 5d 5d 15-Mar-24 21-Mar-24 A17260 Procurement 10d 10d 10d 22-Mar-24 04-Apr-24
Earthwork Earthwork 42d 42d 42d 06-Feb-24 04-Apr-24
A17270 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
2024 2025 2026 2027
Prepare and Submit 100% CDs
Review 100% CDs
Submit Package for Permit
City Review # 1
Revise and Resubmit # 1
City Review # 2
Issue Permit
Prepare and Submit 50% CDs
Review 50% CDs
Prepare and Submit 100% CDs
Review 100% CDs
Submit Package for Permit
City Review # 1
Revise and Resubmit # 1
City Review # 2
Issue Permit
PD Review CD
Electrical Drawings Finalized
SCE Application Process
Develop SCE Prelim Drawings
SCE Preliminary Drawings Released
Owner Pay Application Fees
Switchgear Review / Approve
Develop SCE Final Drawings
Switchgear Release
Switchgear Procurement
Final SCE Drawings Released
SCE Pre-Con Meeting
Switchgear Install / Land & Terminate
Switchgear Inspection and Sign-Off - IOR
Schedule SCE Mobilization
SCE Mobilization
SCE Completes Work
SCE Meter Sign-Off
Building Energized
Priority 1 Trade Release Bid
Priority 2 Trade Release Bid
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Remaining Level of Effort
Impact
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Rialto Police Station - P07A - Design Update - 10/16/23 (PRECON) Remaining Activities
Data Date: 26-Aug-23
Print Date: 17-Oct-23
TASK filter: Remaining.
Activity ID Activity Name OD ACD RD Start Finish
A17280 Submittals - Prep 10d 10d 10d 21-Feb-24 05-Mar-24 A17290 Submittals - Review # 1 5d 5d 5d 06-Mar-24 12-Mar-24 A17300 Submittals - Revise 2d 2d 2d 13-Mar-24 14-Mar-24 A17310 Submittals - Review # 2 5d 5d 5d 15-Mar-24 21-Mar-24 A17320 Procurement 10d 10d 10d 22-Mar-24 04-Apr-24
Demolition & Grading Demolition & Grading 42d 42d 42d 06-Feb-24 04-Apr-24 A15202 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A15212 Submittals - Prep 10d 10d 10d 21-Feb-24 05-Mar-24 A15222 Submittals - Review # 1 5d 5d 5d 06-Mar-24 12-Mar-24 A15232 Submittals - Revise 2d 2d 2d 13-Mar-24 14-Mar-24 A15242 Submittals - Review # 2 5d 5d 5d 15-Mar-24 21-Mar-24 A15252 Procurement 10d 10d 10d 22-Mar-24 04-Apr-24
SWPPP SWPPP 45d 45d 45d 06-Feb-24 09-Apr-24
T emp Fencing T emp Fencing 14d 14d 14d 06-Feb-24 26-Feb-24 A15725 Subcontractor Buyout 5d 5d 5d 06-Feb-24 12-Feb-24 A15735 Submittals - Prep 2d 2d 2d 13-Feb-24 14-Feb-24
A15745 Submittals - Review # 1 2d 2d 2d 15-Feb-24 16-Feb-24 A15755 Submittals - Revise 1d 1d 1d 20-Feb-24 20-Feb-24 A15765 Submittals - Review # 2 1d 1d 1d 21-Feb-24 21-Feb-24 A15775 Procurement 3d 3d 3d 22-Feb-24 26-Feb-24
T railers T railers 45d 45d 45d 06-Feb-24 09-Apr-24
A15820 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A15830 Submittals - Prep 10d 10d 10d 21-Feb-24 05-Mar-24 A15840 Submittals - Review # 1 5d 5d 5d 06-Mar-24 12-Mar-24 A15850 Submittals - Revise 5d 5d 5d 13-Mar-24 19-Mar-24 A15860 Submittals - Review # 2 5d 5d 5d 20-Mar-24 26-Mar-24 A15870 Procurement 10d 10d 10d 27-Mar-24 09-Apr-24
Site Utilities Site Utilities 60d 60d 60d 06-Feb-24 30-Apr-24 A15152 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A15162 Submittals - Prep 20d 20d 20d 21-Feb-24 19-Mar-24 A15172 Submittals - Review # 1 10d 10d 10d 20-Mar-24 02-Apr-24 A15182 Submittals - Revise 5d 5d 5d 03-Apr-24 09-Apr-24 A15192 Submittals - Review # 2 5d 5d 5d 10-Apr-24 16-Apr-24 A15592 Procurement 10d 10d 10d 17-Apr-24 30-Apr-24
Concrete Tilt-up Walls Concrete Tilt-up Walls 128d 128d 128d 06-Feb-24 06-Aug-24 A1230 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A1310 Submittals - Prep 10d 10d 10d 21-Feb-24 05-Mar-24 A1380 Submittals - Review # 1 10d 10d 10d 06-Mar-24 19-Mar-24 A1450 Submittals - Revise 5d 5d 5d 20-Mar-24 26-Mar-24
A1510 Submittals - Review # 2 10d 10d 10d 27-Mar-24 09-Apr-24 A1580 Procurement 15d 15d 15d 17-Jul-24 06-Aug-24
Rebar Rebar 80d 80d 80d 06-Feb-24 29-May-24
A15890 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A15900 Submittals/Shop Drawing Revisions 20d 20d 20d 21-Feb-24 19-Mar-24 A15910 Submittals - Review # 1 10d 10d 10d 20-Mar-24 02-Apr-24 A15920 Submittals - Revise 10d 10d 10d 03-Apr-24 16-Apr-24 A15930 Submittals - Review # 2 10d 10d 10d 17-Apr-24 30-Apr-24 A15940 Procurement 20d 20d 20d 01-May-24 29-May-24
Masonry Masonry 80d 80d 80d 06-Feb-24 29-May-24
A1290 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A1370 Submittals/Shop Drawing Revisions 20d 20d 20d 21-Feb-24 19-Mar-24 A1490 Submittals - Review # 1 10d 10d 10d 20-Mar-24 02-Apr-24 A1560 Submittals - Revise 10d 10d 10d 03-Apr-24 16-Apr-24 A1810 Submittals - Review # 2 10d 10d 10d 17-Apr-24 30-Apr-24 A1980 Procurement 20d 20d 20d 01-May-24 29-May-24
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
2024 2025 2026 2027
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals/Shop Drawing Revisions
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals/Shop Drawing Revisions
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Remaining Level of Effort
Impact
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Rialto Police Station - P07A - Design Update - 10/16/23 (PRECON) Remaining Activities
Data Date: 26-Aug-23
Print Date: 17-Oct-23
TASK filter: Remaining.
Activity ID Activity Name OD ACD RD Start Finish
Structural Steel Structural Steel 173d 173d 173d 06-Feb-24 09-Oct-24 A1260 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A1340 Submittals/Shop Drawing Revisions 25d 25d 25d 21-Feb-24 26-Mar-24 A1520 Submittals - Review # 1 10d 10d 10d 27-Mar-24 09-Apr-24 A1600 Submittals - Revise 10d 10d 10d 10-Apr-24 23-Apr-24 A1830 Submittals - Review # 2 10d 10d 10d 24-Apr-24 07-May-24 A1990 Procurement 60d 60d 60d 17-Jul-24 09-Oct-24
Wate rproofing Wate rproofing 80d 80d 80d 06-Feb-24 29-May-24 A15950 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A15960 Submittals/Shop Drawing Revisions 20d 20d 20d 21-Feb-24 19-Mar-24 A15970 Submittals - Review # 1 10d 10d 10d 20-Mar-24 02-Apr-24 A15980 Submittals - Revise 10d 10d 10d 03-Apr-24 16-Apr-24 A15990 Submittals - Review # 2 10d 10d 10d 17-Apr-24 30-Apr-24 A16000 Procurement 20d 20d 20d 01-May-24 29-May-24
Glass & Glazing Glass & Glazing 225d 225d 225d 06-Feb-24 26-Dec-24 A1780 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A1960 Submittals - Prep 30d 30d 30d 21-Feb-24 02-Apr-24 A2210 Submittals - Review # 1 10d 10d 10d 03-Apr-24 16-Apr-24 A2390 Submittals - Revise 5d 5d 5d 17-Apr-24 23-Apr-24
A2490 Submittals - Review # 2 10d 10d 10d 24-Apr-24 07-May-24 A2660 Procurement - Glass and Glazing 160d 160d 160d 08-May-24 26-Dec-24 Modular Office Relocation Modular Office Relocation 80d 80d 80d 06-Feb-24 29-May-24 A16010 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A16020 Submittals/Shop Drawing Revisions 20d 20d 20d 21-Feb-24 19-Mar-24 A16030 Submittals - Review # 1 10d 10d 10d 20-Mar-24 02-Apr-24 A16040 Submittals - Revise 10d 10d 10d 03-Apr-24 16-Apr-24 A16050 Submittals - Review # 2 10d 10d 10d 17-Apr-24 30-Apr-24 A16060 Procurement 20d 20d 20d 01-May-24 29-May-24
Detention Systems Detention Systems 80d 80d 80d 06-Feb-24 29-May-24 A16070 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A16080 Submittals/Shop Drawing Revisions 20d 20d 20d 21-Feb-24 19-Mar-24 A16090 Submittals - Review # 1 10d 10d 10d 20-Mar-24 02-Apr-24 A16100 Submittals - Revise 10d 10d 10d 03-Apr-24 16-Apr-24 A16110 Submittals - Review # 2 10d 10d 10d 17-Apr-24 30-Apr-24 A16120 Procurement 20d 20d 20d 01-May-24 29-May-24
Elevators Elevators 200d 200d 200d 06-Feb-24 15-Nov-24
A1770 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A1950 Submittals/Shop Drawing Revisions 30d 30d 30d 21-Feb-24 02-Apr-24 A2200 Submittals - Review # 1 10d 10d 10d 03-Apr-24 16-Apr-24 A2380 Submittals - Revise 5d 5d 5d 17-Apr-24 23-Apr-24
A2560 Submittals - Review # 2 5d 5d 5d 24-Apr-24 30-Apr-24 A2730 Procurement 140d 140d 140d 01-May-24 15-Nov-24
Plumbing Plumbing 253d 253d 253d 06-Feb-24 06-Feb-25
A1730 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A1920 Submittals - Prep 30d 30d 30d 21-Feb-24 02-Apr-24 A2170 Submittals - Review # 1 10d 10d 10d 03-Apr-24 16-Apr-24 A2350 Submittals - Revise 5d 5d 5d 17-Apr-24 23-Apr-24
A2460 Submittals - Review # 2 10d 10d 10d 24-Apr-24 07-May-24 A2630 Procurement 140d 140d 140d 17-Jul-24 06-Feb-25
Mechanical Mechanical 313d 313d 313d 06-Feb-24 02-May-25 A1280 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A1360 Submittals - Prep 20d 20d 20d 21-Feb-24 19-Mar-24 A1480 Submittals - Review # 1 10d 10d 10d 20-Mar-24 02-Apr-24 A1550 Submittals - Revise 5d 5d 5d 03-Apr-24 09-Apr-24
A1640 Submittals - Review # 2 10d 10d 10d 10-Apr-24 23-Apr-24 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
2024 2025 2026 2027
Subcontractor Buyout
Submittals/Shop Drawing Revisions
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals/Shop Drawing Revisions
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement - Glass and Glazing
Subcontractor Buyout
Submittals/Shop Drawing Revisions
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals/Shop Drawing Revisions
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals/Shop Drawing Revisions
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Remaining Level of Effort
Impact
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Rialto Police Station - P07A - Design Update - 10/16/23 (PRECON) Remaining Activities
Data Date: 26-Aug-23
Print Date: 17-Oct-23
TASK filter: Remaining.
Activity ID Activity Name OD ACD RD Start Finish
A1880 Procurement (In or Above Ceilings) 60d 60d 60d 17-Jul-24 09-Oct-24 A1890 Procurement - (Rooftop) 200d 200d 200d 17-Jul-24 02-May-25 Electrical Electrical 343d 343d 343d 06-Feb-24 16-Jun-25 A1270 Subcontractor Buyout 10d 10d 10d 06-Feb-24 20-Feb-24 A1350 Submittals - Prep 20d 20d 20d 21-Feb-24 19-Mar-24 A1470 Submittals - Review # 1 10d 10d 10d 20-Mar-24 02-Apr-24 A1540 Submittals - Revise 5d 5d 5d 03-Apr-24 09-Apr-24
A1610 Submittals - Review # 2 10d 10d 10d 10-Apr-24 23-Apr-24 A1840 Procurement - UG 10d 10d 10d 24-Apr-24 07-May-24
A1860 Procurement - (In or Above Ceilings) 100d 100d 100d 17-Jul-24 06-Dec-24 A1870 Procurement - Equipment - Gear (Allowance) 230d 230d 230d 17-Jul-24 16-Jun-25 Priority 2 Priority 2 250d 250d 250d 14-Jun-24 12-Jun-25 Metal Decking Metal Decking 210d 210d 210d 14-Jun-24 16-Apr-25 A16130 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16140 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16150 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16160 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16170 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16180 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Misc Steel Misc Steel 210d 210d 210d 14-Jun-24 16-Apr-25 A16190 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16200 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16210 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16220 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16230 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16240 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Framing and Drywall/ Insulation Framing and Drywall/ Insulation 250d 250d 250d 14-Jun-24 12-Jun-25 A1750 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A2010 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A2550 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A2840 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A2940 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A3190 Procurement 140d 140d 140d 19-Nov-24 12-Jun-25
Sheetmetal Sheetmetal 210d 210d 210d 14-Jun-24 16-Apr-25 A16250 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16260 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16270 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16280 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16290 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16300 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Firestopping Firestopping 210d 210d 210d 14-Jun-24 16-Apr-25 A16310 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16320 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16330 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16340 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16350 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16360 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Caulking and Sealants Caulking and Sealants 210d 210d 210d 14-Jun-24 16-Apr-25 A16370 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16380 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16390 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16400 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16410 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16420 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Roofing Roofing 220d 220d 220d 14-Jun-24 30-Apr-25
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
2024 2025 2026 2027
Procurement (In or Above Ceilings)
Procurement - (Rooftop)
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement - UG
Procurement - (In or Above Ceilings)
Procurement - Equipment - Gear (Allowance)
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Remaining Level of Effort
Impact
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Rialto Police Station - P07A - Design Update - 10/16/23 (PRECON) Remaining Activities
Data Date: 26-Aug-23
Print Date: 17-Oct-23
TASK filter: Remaining.
Activity ID Activity Name OD ACD RD Start Finish
A1800 Subcontractor Buyout 10d 10d 10d 14-Jun-24 27-Jun-24 A1970 Submittals/Shop Drawing Revisions 20d 20d 20d 28-Jun-24 26-Jul-24 A2050 Submittals - Review # 1 10d 10d 10d 29-Jul-24 09-Aug-24 A2220 Submittals - Revise 10d 10d 10d 12-Aug-24 23-Aug-24 A2400 Submittals - Review # 2 10d 10d 10d 26-Aug-24 09-Sep-24 A2570 Procurement - Roofing 160d 160d 160d 10-Sep-24 30-Apr-25 Site Concrete Site Concrete 210d 210d 210d 14-Jun-24 16-Apr-25 A16430 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16440 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16450 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16460 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16470 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16480 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Asphalt Paving Asphalt Paving 210d 210d 210d 14-Jun-24 16-Apr-25 A16490 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16500 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16510 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16520 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16530 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16540 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Landscape and Irrigation Landscape and Irrigation 210d 210d 210d 14-Jun-24 16-Apr-25 A16550 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16560 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16570 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16580 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16590 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16600 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Doors and Frames Doors and Frames 145d 145d 145d 14-Jun-24 13-Jan-25 A1720 Subcontractor Buyout 10d 10d 10d 14-Jun-24 27-Jun-24 A1910 Submittals - Prep 10d 10d 10d 28-Jun-24 12-Jul-24 A2000 Submittals - Review # 1 10d 10d 10d 15-Jul-24 26-Jul-24 A2040 Submittals - Revise 5d 5d 5d 29-Jul-24 02-Aug-24
A2130 Submittals - Review # 2 10d 10d 10d 05-Aug-24 16-Aug-24 A2290 Procurement - Frames 40d 40d 40d 19-Aug-24 14-Oct-24 A2300 Procurement - Doors 100d 100d 100d 19-Aug-24 13-Jan-25 Millwork & Furniture Millwork & Furniture 185d 185d 185d 14-Jun-24 12-Mar-25 A1740 Subcontractor Buyout 10d 10d 10d 14-Jun-24 27-Jun-24 A1930 Submittals - Prep 30d 30d 30d 28-Jun-24 09-Aug-24 A2180 Submittals - Review # 1 10d 10d 10d 12-Aug-24 23-Aug-24 A2360 Submittals - Revise 5d 5d 5d 26-Aug-24 30-Aug-24
A2470 Submittals - Review # 2 10d 10d 10d 03-Sep-24 16-Sep-24 A2640 Procurement 120d 120d 120d 17-Sep-24 12-Mar-25
Tile and Stone Tile and Stone 210d 210d 210d 14-Jun-24 16-Apr-25 A16610 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16620 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16630 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16640 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16650 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16660 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Acoustical Ceilings Acoustical Ceilings 210d 210d 210d 14-Jun-24 16-Apr-25 A16670 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16680 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16690 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16700 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16710 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
2024 2025 2026 2027
Subcontractor Buyout
Submittals/Shop Drawing Revisions
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement - Roofing
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement - Frames
Procurement - Doors
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Remaining Level of Effort
Impact
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Rialto Police Station - P07A - Design Update - 10/16/23 (PRECON) Remaining Activities
Data Date: 26-Aug-23
Print Date: 17-Oct-23
TASK filter: Remaining.
Activity ID Activity Name OD ACD RD Start Finish
A16720 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Flooring Flooring 210d 210d 210d 14-Jun-24 16-Apr-25
A16730 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16740 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16750 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16760 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16770 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16780 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Painting Painting 210d 210d 210d 14-Jun-24 16-Apr-25
A16790 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16800 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16810 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16820 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16830 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16840 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Signage Signage 210d 210d 210d 14-Jun-24 16-Apr-25
A16850 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16860 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16870 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16880 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16890 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16900 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Specialties Specialties 210d 210d 210d 14-Jun-24 16-Apr-25 A16910 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16920 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16930 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A16940 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A16950 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A16960 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Window Treatments Window Treatments 210d 210d 210d 14-Jun-24 16-Apr-25 A16970 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A16980 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A16990 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A17000 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A17010 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A17020 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Site Furnishings Site Furnishings 210d 210d 210d 14-Jun-24 16-Apr-25 A17030 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A17040 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A17050 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A17060 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A17070 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A17080 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Fencing Fencing 210d 210d 210d 14-Jun-24 16-Apr-25
A17090 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A17100 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A17110 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A17120 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 A17130 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A17140 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Misc Items Misc Items 210d 210d 210d 14-Jun-24 16-Apr-25 A17150 Subcontractor Buyout 20d 20d 20d 14-Jun-24 12-Jul-24 A17160 Submittals - Prep 40d 40d 40d 15-Jul-24 09-Sep-24 A17170 Submittals - Review # 1 20d 20d 20d 10-Sep-24 07-Oct-24 A17180 Submittals - Revise 10d 10d 10d 08-Oct-24 21-Oct-24 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
2024 2025 2026 2027
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Submittals - Review # 2
Procurement
Subcontractor Buyout
Submittals - Prep
Submittals - Review # 1
Submittals - Revise
Remaining Level of Effort
Impact
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Rialto Police Station - P07A - Design Update - 10/16/23 (PRECON) Remaining Activities
Data Date: 26-Aug-23
Print Date: 17-Oct-23
TASK filter: Remaining.
Activity ID Activity Name OD ACD RD Start Finish
A17190 Submittals - Review # 2 20d 20d 20d 22-Oct-24 18-Nov-24 A17200 Procurement 100d 100d 100d 19-Nov-24 16-Apr-25
Construction Construction 614d 614d 614d 27-Feb-24 05-Aug-26 Phase 1 - Relocate T railers Phase 1 - Relocate T railers 81d 81d 81d 27-Feb-24 19-Jun-24 Mobilization Mobilization 41d 41d 41d 27-Feb-24 23-Apr-24 MOB-1000 Site Prep and Mobilization 15d 15d 15d 27-Feb-24 18-Mar-24 MOB-1010 Temp Trailer Set Up 10d 10d 10d 10-Apr-24 23-Apr-24 Demo Demo 50d 50d 50d 10-Apr-24 19-Jun-24
HEAD-1000 Relocate Trailers, Parking & Operations 20d 20d 20d 10-Apr-24 07-May-24 HEAD-1010 Remove / Relocate Solar Panel Canopy 25d 25d 25d 08-May-24 12-Jun-24 HEAD-1020 Demo Site of Parking Lot 20d 20d 20d 22-May-24 19-Jun-24 Modular Relocations Modular Relocations 20d 20d 20d 24-Apr-24 21-May-24 MOD.R-1000 Modular Relocations 20d 20d 20d 24-Apr-24 21-May-24 Phase 2.1 - Headquarters Building Phase 2.1 - Headquarters Building 390d 390d 390d 20-Jun-24 12-Jan-26 Police Headquarters Police Headquarters 390d 390d 390d 20-Jun-24 12-Jan-26 Earthwork Earthwork 33d 33d 33d 20-Jun-24 06-Aug-24
HEAD-1220 Overex for Contaminated Soils 25d 25d 25d 20-Jun-24 25-Jul-24 HEAD-1030 Grade and Certify Pad 8d 8d 8d 26-Jul-24 06-Aug-24 Foundations Foundations 30d 30d 30d 07-Aug-24 18-Sep-24 HEAD-1040 F / R / P Foundations 10d 10d 10d 07-Aug-24 20-Aug-24 A15880 Underground Utilities 30d 30d 30d 07-Aug-24 18-Sep-24 Structure Structure 152d 152d 152d 21-Aug-24 01-Apr-25
Tilt-up Walls Tilt-up Walls 75d 75d 75d 21-Aug-24 06-Dec-24 HEAD-1050 Tilt-up Precast Walls (Includes Casting Slabs) 75d 75d 75d 21-Aug-24 06-Dec-24 Steel Steel 45d 45d 45d 09-Dec-24 13-Feb-25
HEAD-1060 Steel, Bolt, Weld 25d 25d 25d 09-Dec-24 15-Jan-25 HEAD-1070 Decking and Welding 20d 20d 20d 16-Jan-25 13-Feb-25 SOMD SOMD 32d 32d 32d 14-Feb-25 01-Apr-25
Level 2 Level 2 7d 7d 7d 14-Feb-25 25-Feb-25
HEAD-1080 SOMD Level 2 7d 7d 7d 14-Feb-25 25-Feb-25
Roof Roof 25d 25d 25d 26-Feb-25 01-Apr-25
HEAD-1090 SOMD Roof 15d 15d 15d 26-Feb-25 18-Mar-25
HEAD-1100 F/R/B Curbs 10d 10d 10d 19-Mar-25 01-Apr-25
Exterior Exterior 80d 80d 80d 02-Apr-25 24-Jul-25
HEAD-1110 Exterior Finishes 80d 80d 80d 02-Apr-25 24-Jul-25 Roofing Roofing 35d 35d 35d 02-Apr-25 20-May-25
HEAD-1120 Roofing 20d 20d 20d 02-Apr-25 29-Apr-25
HEAD-1150 Install Units 15d 15d 15d 30-Apr-25 20-May-25 Interior Buildout Interior Buildout 140d 140d 140d 02-Apr-25 17-Oct-25 Level 1 Level 1 125d 125d 125d 02-Apr-25 26-Sep-25
HEAD-1130 Framing and MEP Rough 60d 60d 60d 02-Apr-25 25-Jun-25 HEAD-1160 Finishes 70d 70d 70d 19-Jun-25 26-Sep-25
Level 2 Level 2 135d 135d 135d 09-Apr-25 17-Oct-25
HEAD-1140 Framing and MEP Rough 60d 60d 60d 09-Apr-25 02-Jul-25 HEAD-1170 Finishes 70d 70d 70d 11-Jul-25 17-Oct-25
Exterior Electrical - Conduit Runs to (N) Xformer/Generator Conduit Runs Exterior Electrical - Conduit Runs to (N) Xformer/Generator Conduit Runs 25d 25d 25d 19-Sep-24 23-Oct-24 EXTELEC.1160 Survey slabboxes 1d 1d 1d 19-Sep-24 19-Sep-24 EXTELEC.1000 Layout Electrical Runs per Edison Drawings 3d 3d 3d 19-Sep-24 23-Sep-24 EXTELEC.1140 Excavate for Slab boxes/bedding 3d 3d 3d 20-Sep-24 24-Sep-24 EXTELEC.1150 Set slab boxes 2d 2d 2d 25-Sep-24 26-Sep-24 EXTELEC.1050 Conduit trenching 3d 3d 3d 25-Sep-24 27-Sep-24 A4540 UG 4" Conduit 7d 7d 7d 27-Sep-24 07-Oct-24
EXTELEC.1060 *INSP* Trench Bedding (Edison) 1d 1d 1d 30-Sep-24 30-Sep-24 EXTELEC.1070 Install UG Conduit Runs 10d 10d 10d 01-Oct-24 14-Oct-24 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
2024 2025 2026 2027
Submittals - Review # 2
Procurement
Site Prep and Mobilization
Temp Trailer Set Up
Relocate Trailers, Parking & Operations
Remove / Relocate Solar Panel Canopy
Demo Site of Parking Lot
Modular Relocations
Overex for Contaminated Soils
Grade and Certify Pad
F / R / P Foundations
Underground Utilities
Tilt-up Precast Walls (Includes Casting Slabs)
Steel, Bolt, Weld
Decking and Welding
SOMD Level 2
SOMD Roof
F/R/B Curbs
Exterior Finishes
Roofing
Install Units
Framing and MEP Rough
Finishes
Framing and MEP Rough
Finishes
Survey slabboxes
Layout Electrical Runs per Edison Drawings
Excavate for Slab boxes/bedding
Set slab boxes
Conduit trenching
UG 4" Conduit
*INSP* Trench Bedding (Edison)
Install UG Conduit Runs
Remaining Level of Effort
Impact
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Rialto Police Station - P07A - Design Update - 10/16/23 (PRECON) Remaining Activities
Data Date: 26-Aug-23
Print Date: 17-Oct-23
TASK filter: Remaining.
Activity ID Activity Name OD ACD RD Start Finish
A4530 Concrete duct trench 10d 10d 10d 08-Oct-24 21-Oct-24 EXTELEC.1080 *INSP* UG Conduit (Edison) 1d 1d 1d 15-Oct-24 15-Oct-24 EXTELEC.1090 Backfill compaction/Sluury 5d 5d 5d 16-Oct-24 22-Oct-24 EXTELEC.1100 *INSP* Backfill Compaction 1d 1d 1d 23-Oct-24 23-Oct-24 Exterior Utility Pad Exterior Utility Pad 46d 46d 46d 30-Oct-24 08-Jan-25 EXTPADS.1000 Layout Yard (Equipment Pad, Fencing, Footings, etc. ) 5d 5d 5d 30-Oct-24 05-Nov-24 EXTPADS.1010 Excavation 5d 5d 5d 06-Nov-24 12-Nov-24
EXTPADS.1020 Waterproofing 5d 5d 5d 13-Nov-24 19-Nov-24 EXTPADS.1040 Concrete Formwork & Rebar (Footings, Pads) 10d 10d 10d 20-Nov-24 05-Dec-24 EXTPADS.1050 *INPS* Bedding, Pre-Pour 2d 2d 2d 06-Dec-24 09-Dec-24 EXTPADS.1060 Pour Footings, Equipment Pads 3d 3d 3d 10-Dec-24 12-Dec-24 EXTPADS.1070 Pour Slab on Grade 1d 1d 1d 13-Dec-24 13-Dec-24 EXTPADS.1080 Concrete Cure 5d 5d 5d 16-Dec-24 20-Dec-24 EXTPADS.1090 Set SCE Xformer 2d 2d 2d 23-Dec-24 26-Dec-24 EXTPADS.1100 Set Electrical Equipment (Switchboard, etc.) 5d 5d 5d 23-Dec-24 31-Dec-24 EXTPADS.1110 Make SCE and Final Connections 8d 8d 8d 27-Dec-24 08-Jan-25 Cx Cx 110d 110d 110d 03-Jul-25 09-Dec-25
HEAD-1200 Electrical Rm & Gear 30d 30d 30d 03-Jul-25 14-Aug-25 HEAD-1180 Cx Duration 50d 50d 50d 29-Sep-25 09-Dec-25
Punchlist and Finals Punchlist and Finals 55d 55d 55d 20-Oct-25 12-Jan-26 HEAD-1190 Punchlist 15d 15d 15d 20-Oct-25 07-Nov-25
HEAD-1210 Final Inspections / TCO 25d 25d 25d 03-Dec-25 12-Jan-26 Phase 2.2 - Support Building Phase 2.2 - Support Building 320d 320d 320d 20-Jun-24 26-Sep-25 Support Building Support Building 320d 320d 320d 20-Jun-24 26-Sep-25 Demo Demo 5d 5d 5d 20-Jun-24 26-Jun-24
SUPP-1000 Demo Site o Parking Lot 5d 5d 5d 20-Jun-24 26-Jun-24 Earthwork Earthwork 5d 5d 5d 07-Aug-24 13-Aug-24
SUPP-1010 Grade and Certify Pad 5d 5d 5d 07-Aug-24 13-Aug-24 Foundations Foundations 10d 10d 10d 21-Aug-24 04-Sep-24 SUPP-1020 F / R / P Foundations 10d 10d 10d 21-Aug-24 04-Sep-24 Structure Structure 117d 117d 117d 19-Sep-24 11-Mar-25
Tilt-up Walls Tilt-up Walls 55d 55d 55d 19-Sep-24 06-Dec-24 SUPP-1030 Tilt-up Precast Walls (Includes Casting Slabs) 55d 55d 55d 19-Sep-24 06-Dec-24 Steel Steel 25d 25d 25d 16-Jan-25 21-Feb-25
SUPP-1040 Steel, Bolt, Weld 15d 15d 15d 16-Jan-25 06-Feb-25 SUPP-1050 Decking and Welding 10d 10d 10d 07-Feb-25 21-Feb-25 SOMD SOMD 12d 12d 12d 24-Feb-25 11-Mar-25
SUPP-1060 SOMD Roof 7d 7d 7d 24-Feb-25 04-Mar-25
SUPP-1070 F/R/B Curbs 5d 5d 5d 05-Mar-25 11-Mar-25
Exterior Exterior 10d 10d 10d 12-Mar-25 25-Mar-25
SUPP-1080 Exterior Finishes 10d 10d 10d 12-Mar-25 25-Mar-25 Roofing Roofing 35d 35d 35d 12-Mar-25 29-Apr-25
SUPP-1090 Roofing 20d 20d 20d 12-Mar-25 08-Apr-25
SUPP-1110 Install Units 15d 15d 15d 09-Apr-25 29-Apr-25 Interior Buildout Interior Buildout 120d 120d 120d 12-Mar-25 28-Aug-25 Level 1 Level 1 120d 120d 120d 12-Mar-25 28-Aug-25
SUPP-1100 Framing and MEP Rough 60d 60d 60d 12-Mar-25 04-Jun-25 SUPP-1120 Finishes 70d 70d 70d 21-May-25 28-Aug-25
Cx Cx 40d 40d 40d 01-Aug-25 26-Sep-25
SUPP-1130 Cx Duration 40d 40d 40d 01-Aug-25 26-Sep-25
Punchlist and Finals Punchlist and Finals 15d 15d 15d 29-Aug-25 19-Sep-25 SUPP-1140 Punchlist 15d 15d 15d 29-Aug-25 19-Sep-25
Phase 3 - Demo & Site Work Phase 3 - Demo & Site Work 110d 110d 110d 13-Jan-26 18-Jun-26 Demo (E) Police Dept Bldg Demo (E) Police Dept Bldg 40d 40d 40d 13-Jan-26 11-Mar-26 DEMO-1000 Move in to New Building 10d 10d 10d 13-Jan-26 27-Jan-26 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
2024 2025 2026 2027
Concrete duct trench
*INSP* UG Conduit (Edison)
Backfill compaction/Sluury
*INSP* Backfill Compaction
Layout Yard (Equipment Pad, Fencing, Footings, etc. )
Excavation
Waterproofing
Concrete Formwork & Rebar (Footings, Pads)
*INPS* Bedding, Pre-Pour
Pour Footings, Equipment Pads
Pour Slab on Grade
Concrete Cure
Set SCE Xformer
Set Electrical Equipment (Switchboard, etc.)
Make SCE and Final Connections
Electrical Rm & Gear
Cx Duration
Punchlist
Final Inspections / TCO
Demo Site o Parking Lot
Grade and Certify Pad
F / R / P Foundations
Tilt-up Precast Walls (Includes Casting Slabs)
Steel, Bolt, Weld
Decking and Welding
SOMD Roof
F/R/B Curbs
Exterior Finishes
Roofing
Install Units
Framing and MEP Rough
Finishes
Cx Duration
Punchlist
Move in to New Building
Remaining Level of Effort
Impact
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Rialto Police Station - P07A - Design Update - 10/16/23 (PRECON) Remaining Activities
Data Date: 26-Aug-23
Print Date: 17-Oct-23
TASK filter: Remaining.
Activity ID Activity Name OD ACD RD Start Finish
DEMO-1010 Demo (E) Building 15d 15d 15d 28-Jan-26 18-Feb-26 DEMO-1020 Backfill and Grade 15d 15d 15d 19-Feb-26 11-Mar-26 Parking Lot Parking Lot 50d 50d 50d 12-Mar-26 20-May-26 SITE-1000 Parking Lot 50d 50d 50d 12-Mar-26 20-May-26
Site Finishes Site Finishes 60d 60d 60d 26-Mar-26 18-Jun-26 SITE-1010 Site Finishes 60d 60d 60d 26-Mar-26 18-Jun-26 Closeout Closeout 23d 23d 23d 06-Jul-26 05-Aug-26
CLOSE-1000 Closeout 23d 23d 23d 06-Jul-26 05-Aug-26
Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
2024 2025 2026 2027
Demo (E) Building
Backfill and Grade
Parking Lot
Site Finishes
Closeout
Remaining Level of Effort
Impact
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone Rialto Police Station - P07A - Design Update - 10/16/23 (PRECON) Remaining Activities
Data Date: 26-Aug-23
Print Date: 17-Oct-23
TASK filter: Remaining.
Exhibit G
4872-5819-4561 v1
EXHIBIT G
Developer’s Insurance Requirements
Exhibit G
4872-5819-4561 v1
INSURANCE.
I. General
Prior to performing the services under this Agreement, Developer agrees to purchase all required insurance and to deposit with City Certificates of Insurance, including all endorsements required herein, necessary to satisfy City that the insurance provisions of this Agreement have been complied with and to keep such insurance coverage and the certificates therefor on deposit with City during the entire term of this Agreement. City reserves the right to request that Developer provide City with copies of the declarations page showing all endorsements and a copy of the insurance policies.
II. Deductibles and SIRs
All self-insured retentions (SIRs) or deductibles shall be clearly stated on the Certificate of Insurance. If no deductibles or SIRs apply, indicate this on the Certificate of Insurance with a zero (0) by the appropriate line of coverage. Any deductible or self -insured retention (SIR) in an amount in excess of $100,000 ($25,000 for automobile liability), shall specifically be approved by City’s Director of Finance (“Director Of Finance”) upon review of Developer’s latest financial reports. The named insu red shall be responsible for reimbursement of any deductible to the insurer. Upon notice of any actual or alleged claim or loss arising out of the Project, the responsible party for any actual or alleged claim shall immediately ensure a defense is mounted in favor of Developer and any Additional Insured prior to the satisfaction of the full the SIR.
III. Failure to Maintain Insurance
If Developer fails to maintain the required insurance for the full term of this Agreement, then after notice and an opportunity to cure as provided in Section 23, City may terminate this Agreement for cause.
IV. Qualified Insurer
The policy or policies of insurance must be issued by an insurer with a minimum rating of A- (Secure A.M. Best's Rating) and VII (Financial Size Category as determined by the most current edition of the Best's Key Rating Guide/Property -Casualty/United Stat es or ambest.com). The insurer shall be licensed to do business in the state of California (California Admitted Carrier) or be a surplus line carrier that is eligible to issue insurance policies pursuant to California Insurance Code Sections 1765.1 and 176 5.2 (i.e., listed on the California Department of Insurance List of Approved Surplus Line Insurers [http://www.insurance.ca.gov/01-consumers/120-company/07- lasli/lasli.cfm], is an “eligible carrier” [carriers who have met the standards set forth in California Insurance Code Section 1765.1 and the NRRA], or surplus line carriers that are non-U.S. domiciled (“alien”) non-admitted insurers and are listed on the Quarterly Listing of Alien Insurers issued by the NAIC's International Insurers Department ]). If the insurance carrier does not have an A.M.
Best Rating of at least A-/VII, the Director of Finance retains the right to approve or reject a carrier after a review of the company's performance and financial ratings.
Exhibit G
4872-5819-4561 v1
V. Insurance Limits
(a) The policy or policies of insurance maintained by Developer shall provide the minimum limits and coverage as set forth below:
Coverage Minimum Limits
Commercial General Liability $1,000,000 per occurrence
$2,000,000 aggregate
Automobile Liability including converge for
owned, non-owned and hired vehicles
$1,000,000 per occurrence
$2,000,000 aggregate
Workers’ Compensation Statutory
Employers’ Liability Insurance $1,000,000 per occurrence Professional Liability $1,000,000 per claim
$2,000,000 aggregate
(b) The policy or policies of insurance maintained by Developer’s General Contractor shall provide the minimum limits and coverage as set forth below:
Coverage Minimum Limits
Commercial General Liability
Including Contractor’s Pollution Liability and
NODS
$5,000,000 per occurrence
$5,000,000 aggregate
Automobile Liability including converge for
owned, non-owned and hired vehicles
$5,000,000 per occurrence
Workers’ Compensation Statutory
Employers’ Liability Insurance $1,000,000 per occurrence
(c) The policy or policies of insurance maintained by Architect shall provide the minimum limits and coverage as set forth below:
Coverage Minimum Limits
Commercial General Liability $1,000,000 per occurrence
$2,000,000 aggregate
Automobile Liability including converge for
owned, non-owned and hired vehicles
$1,000,000 per occurrence
Workers’ Compensation Statutory
Employers’ Liability Insurance $1,000,000 per occurrence Professional Liability $1,000,000 per claim
$2,000,000 aggregate
Exhibit G
4872-5819-4561 v1
(b) Increased limits of insurance may be met with umbrella/excess coverage provided the policy is written on a Follow Form basis.
VI. Required Coverage Forms
(a) The Commercial General Liability coverage shall be written on Insurance Service Office (ISO) form CG 00 01, or substitute form providing liability coverage as broad.
(b) The Business Auto Liability coverage shall be written on ISO form CA 00 01, CA 00 05, CA 00 12, CA 00 20, or a substitute form providing liability coverage as broad.
VII. Required Endorsements
(a) The Commercial General Liability policy shall contain the following endorsements, which shall accompany the Certification of Insurance:
(1) An Additional Insured endorsement using ISO form CG 20 10 or CG 20 33 or a form at least broad, naming the City of Rialto, their elected and appointed officials, and employees as Additional Insured. (2) A primary non -contributing endorsement evidencing that DEVELOPER’s insurance is primary and any insurance or self -insurance maintained by City shall be excess and non-contributing. (b) The Worker’s Compensation policy shall contain a waiver of subrogation endorsement waiving all rights of subrogation against City and members of the City Council, its elected and appointed officials, officers, and employees. (c) All insurance policies required by this Agreement shall waive all rights of subrogation against City, and members of the City Council, its elected and appointed officials, officers, and employees when acting within the scope of their appointment or employment.
(d) Developer shall notify City in writing within thirty (30) days of any policy cancellation and ten (10) days for non-payment of premium and provide a copy of the cancellation notice to City. Failure to provide written notice of cancellation may constitute a material breach of the contract, upon which City may suspend or terminate this Agreement.
(e) If Developer’s Professional Liability policy is a “claims made” policy, DEVELOPER shall agree to maintain professional liability coverage for two years following completion of this Agreement.
Exhibit G
4872-5819-4561 v1
(f) The Commercial General Liability policy shall contain a severability of interests’ clause, a "separation of insureds" or "severability" clause which treats each insured separately (standard in the ISO CG 001 policy). (g) Insurance certificates and endorsements shall be forwarded to City at the address listed in Section 25.7.
(h) The procuring of such required policy or policies of insurance shall not be construed to limit Developer’s liability hereunder nor to fulfill the indemnification provisions and requirements of this Agreement, nor act in any way to reduce the policy coverage and limits available from the insurer.
VIII. Property Insurance/Builder’s Risk Insurance . Developer shall procure and maintain, or will direct its General Contractor to procure and maintain, for the duration of this Agreement , property insurance in the amount of one hundred percent (100%) of the value of the replacement cost of the Building on the property where the Project is to be constructed on a replacement cost basis. The property insurance shall insure against the perils of fire (with extended coverage), theft, vandalism, malicious mischie f, collapse, flood, water damage, mechanical and electrical breakdown, earthquake, windstorm, and physical loss or damage including, without duplication of coverage, payments for falsework, testing and startup, temporary buildings and debris removal, and shall cover reasonable compensation for Developer’s services and expenses required as a result of such covered reasonable insured loss. The insurance shall include the interest of Authority, City, Developer and its agents (including its consultants and contractors). Such insurance shall be on an all-risk policy form reasonably acceptable to Developer and City. If City directs Developer not to include builder’s risk insurance coverage for the perils of earthquake and/or flood, then City will be deemed to self -insure against such perils and is solely responsible for and will pay (via a Change Order that increases the Project GMP and extends the Developer Obligation Date) Developer for all costs, expenses, and damages arising out of or relating to those perils that City directed Developer not to include in the builder’s risk insurance. The builder’s risk insurance will not cover City’s personal property. City will be responsible for paying the deductibles or self - insured retentions for the builder’s risk insurance.
IX. General Contractor and Subcontractor Insurance . The types and amounts of all policy or policies of liability insurance to be provided by the General Contractor and the subcontractors, and requirements related thereto shall be set forth in the Bid Documents (which are subject to City’s approval) and in the Construction Contracts, and shall be paid by the General Contractor and the subcontractors (but the cost of the insurance will be included in the GMP).
X. City, Developer, and General Contractor waive all rights against each other and all subcontractors or every tier, their agents and employees; separate contractors, if any, and any of their subcontractors; agents and employees of the City; and the Architect and its employees, each of the other, for loss or damage to the extent covered by property insurance applicable to the Project, except such rights as they may have to proceeds of such insurance. City and Developer, as appropriate, shall require of the Architect, General Contractor, all Subcontractors of every tier, separate contractors, if any, and agents and employees of any of them, by appropriate agreements, written where legally required for validity, similar waivers each in favor of the other parties
Exhibit G
4872-5819-4561 v1
enumerated herein. The insurance policies of each person or entity shall provide such waivers of subrogation by endorsement or otherwise. A waiver of subrogation shall be effective as to a person or entity even though that person or entity would otherwis e have a duty of indemnification, contractual or otherwise, did not pay the insurance premium directly or indirectly, and whether or not the person or entity had an insurable interest in the property damaged. Notwithstanding the above, the waiver of subrogation in favor of the Architect, its agents and employees shall not apply to any losses as a result of Architect's, its agents or its employees’ professional negligence.
Exhibit H
4872-5819-4561 v1
EXHIBIT H
Dispute Resolution Procedure
Exhibit H
4872-5819-4561 v1
MEDIATION
Within 10 business days following the delivery of a written notice demanding non -binding mediation pursuant to Section 24, Developer and City shall mutually agree to a mediator, the costs of which shall be shared equally by the parties. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the dispute, with each party bearing the fees and costs of its respective mediator. Mediation shall include, but not be limited to, neutral evaluation, a dispute review board, or other negotiation or evaluation through an independent third party or board. The Developer and the City may mutually agree to waive any individual mediation in writing and proceed to litigation pursuant to this Agreement.
Exhibit I
4872-5819-4561 v1
EXHIBIT I
Developer’s GMP Qualifications, Exclusions, and Allowances
EXHIBIT I – DEVELOPER’S QUALIFICATIONS
RIALTO POLICE STATION
P a g e | 1
October 25, 2023
The Developer’s GMP is based on the following assum ptions:
1. This overall Project GMP remains valid until Januar y 13, 2024 after which time it will be automaticall y deemed rescinded, null and void unless and only if Developer has been issued the duly executed Development Agreement by City and also that a corre sponding Notice to Proceed has been issued by City to Developer on or before January 13, 2024.
2. Existing office furnishings will be removed and dis carded unless removed by Owner prior to start of demolition.
3. The existing modular office buildings will be relocat ed and reset as-is. We assume the modular buildings are structurally sound enough to be moved by profes sionals without damage. The relocated modular office buildings will be treated as a temporary workspace and will be permanently demolished upon completion of the new Police HQ building and support building.
4. Pre-Action fire sprinkler system will be provided a t the Server/Radio room only.
5. Builder’s Risk insurance coverage will be provided per the terms of the Development Agreement.
6. Existing photovoltaic panels and all associated equ ipment will be removed and stored during constructi on.
They will be reinstalled and reconnected into the n ew project. No additional panels or equipment will be provided.
7. Developer will trace down and map all existing copp er fiberoptic network cables and identify a locatio n outside the construction area but near the building s to serve as a main point of connection for the ne w buildings. If there isn’t an existing location near the new buildings that can serve as a main point o f connection this will be identified in the mapping a nd may result in unforeseen costs.
The Developer’s GMP has been adjusted to reflect th e following variances from the approved Plans, made for the purpose of reducing Project cost:
1. In lieu of the Audio/Visual (A/V) systems shown in the approved plans and described in the approved specifications, set up an Allowance of $2,500,000 f or all project A/V. The Project team will work wit h City staff to design and specify the most effective syst em that can be provided within the cost of said Allowance.
2. Where ballistic wall board is specified, the height will be limited to 6” above the ceiling.
3. Telescoping gates will be substituted for bi-foldin g gates.
4. Standard density fireproofing at structural steel w ill be substituted for medium density.
5. Two glass and aluminum 6 ft wide double doors will be substituted for wider bi- parting doors at the Community Room porch.
6. Structural and utility provisions for a possible fu ture 2nd level office expansion are deleted.
7. Decorative mullion extensions at exterior window fr ames are deleted.
8. The canopy at the southeast corner of the main buil ding will be reduced in size by approximately 200 sf.
9. At all interior partitions that are not sound rated , drywall height will be limited to 6” above the ce iling.
10. The Police Memorial water feature and associated in frastructure are deleted.
11. Blast Resistant Window Film installation will be li mited to the locations specifically called out on t he exterior elevations on the approved plans.
12. Anti-graffiti window film is deleted at second floor exterior windows.
13. Tempered Glass heat soaking requirement is deleted from Specifications Section 08800.
14. The existing basement structure will be left in pla ce below the elevation required to allow clearance for construction of new building foundations and underg round utilities. Existing basement slab will be perforated to allow for full drainage.
EXHIBIT I – DEVELOPER’S QUALIFICATIONS
RIALTO POLICE STATION
P a g e | 2
The Developer’s GMP does not include the following scopes of work and/or associated costs:
1. All permit and plan check fees and other agency fee s.
2. All Utility company connection fees and/or assessme nts.
3. Security guards.
4. Any repairs associated with or required to existing systems and/or equipment.
5. Move management or move labor.
6. Underpinning or any other structural support of exi sting structures on adjacent properties.
7. Any traffic signals and road and intersection improve ments.
8. Any fitness equipment.
9. Allowances for unforeseeable conditions.
10. Radio Towers wiring, and cabling, equipment, antenn a and etc.
11. Distributed Antenna System (DAS) for cellphone comm unications.
12. Data network equipment, switches, routers, servers, wireless access points, computers and associated monitors, and local UPS.
13. Public address (PA) system.
14. Traffic impact studies
15. Any CEQA compliance mitigation measures
J-1
EXHIBIT J
Final Project Completion and Acceptance Form
INITIAL AND DATE WHEN COMPLETED
Item Description City A/E Developer
1. Punchlist Completed/Repairs Made _______ _____ ______
2. O & M Manuals Provided _______ _____ ______
3. As-Built Drawings Completed _______ _____ ______
4. Attic Stock Material Provided _______ _____ ______
5. Consent of Surety for Final Payment (G707) _______ _____ ______
6. Final Release of Liens _______ _____ ______
7. Utility Transfers Data (meter reading taken) _______ _____ ______
8. Removal of Temporary Facilities _______ _____ ______
9. Final Change Orders Issued _______ _____ ______
10. Warranty Package Provided _______ _____ ______
11. Final Pay Request Submitted _______ _____ ______
12. Final Certificate of Occupancy Issued _______ _____ ______
13. Owner Training completed and recorded _______ _____ ______
14. Keys accepted and signed for _______ _____ ______ City and Developer acknowledge that the above items are complete and the final Payment Application is approved for payment.
City: Architect: Developer:
______________________ ______________________ _______________________ Name and Title Name and Title Name and Title
Exhibit K
EXHIBIT K
RIALTO POLICE STATION
Special Inspections and Testing
Developer will cause to be provided all of the special inspections and testing that are required by applicable Governmental Requirements, the Detailed Specifications, and the Building Permit, including but not necessarily limited to the following:
Building System Inspecting authority Type of inspect
ions
Geotechnical (soil
compaction)
Deputy inspector
Geotech engineer
Field inspections
Lab testing
Cast-in-place Concrete Deputy inspector
Licensed independent testing
agency
City Building Dept inspector
Field inspections
Lab testing
Structural Steel Licensed independent testing
agency
Deputy inspector
City Building Dept inspector
Fabrication plan
inspections
Field inspections
Lab testing
Metal floor and roof deck Deputy inspector
City Building Dept inspector
Field inspections
Roofing Special consultant
City Building Dept inspector
Field inspections
Interior framing and
drywall
City Building Dept inspector Field inspections
Acoustical ceiling
suspension
City Building Dept inspector Field inspections
Exhibit L
4872-5819-4561 v1
EXHIBIT L
Certificate of Substantial Completion Form
Document G704
TM
– 2000
Certificate of Substantial Completion
AIA Document G704™ – 2000. Copyright © 1963, 1978, 1992 and 2000 by The American Institute of Architects . All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 14:00:47 on 05/07/2012 under Order No.0281566356_1 which expires on 03/18/2013, and is not for resale.
User Notes: (1949453414)
1 PROJECT:
(Name and address)
PROJECT NUMBER: /
CONTRACT FOR: General Construction
CONTRACT DATE:
TO OWNER: TO CONTRACTOR:
(Name and address) (Name and address)
OWNER:
ARCHITECT:
CONTRACTOR:
FIELD:
OTHER:
PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE:
The Work performed under this Contract has been reviewed and found, to the Architect’s best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below:
Warranty Date of Commencement
ARCHITECT BY DATE OF ISSUANCE
A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment.
Cost estimate of Work that is incomplete or defective: $0.00
The Contractor will complete or correct the Work on the list of items attached hereto within Zero (0) days from the above date of Substantial Completion.
CONTRACTOR BY DATE
The Owner accepts the Work or designated portion as substantially complete and will assume full possession at (time) on (date).
OWNER BY DATE
The responsibilities of the Owner and Contractor for security, maintenance, heat, utilities, damage to the Work and insurance shall be as follows:
(Note: Owner’s and Contractor’s legal and insurance counsel should determine and review insurance requirements and coverage.)
Exhibit M
4872-5819-4561 v1
EXHIBIT M
Form of Bonds and Dual Obligee Rider
RIALTO POLICE STATION
EXHIBIT M
Exhibit N
4872-5819-4561 v1
EXHIBIT N
Form of Project Application For Payment
EXHIBIT N
RIALTO POLICE STATION
Griffin|Swinerton, LLC
1 Technology Drive, Building i, Suite 829
Irvine, CA 92618
Monthly Invoice
To: City of Rialto Date: _____
Attn: Angela Perry Project: City of Rialto Police Station 150 S. Palm Avenue Invoice No.:
Rialto, CA 92376 Monthly Development Report and Invoice: #__ Reporting Period:
Budget Category Contract Amount
(After Reallocations) Current Month's Bills Previously Billed Amount Billed to Date
Contract Balance
Remaining
1 A/E SERVICES
1.1 AE Basic Fee - $ - $
-$ -$
2 MISC CONSULTANTS
2.1 Structural Peer Review -$ -$
2.2 Commissioning, Enhanced Commissioning, and MEP peer review -$ -$
2.3 Roofing and Waterproofing peer review -$ -$
2.4 Dry Utility Coordination -$ -$
2.5 As-Built Communications Cabling Infrastructure -$ -$
2.6 ADA Peer Review -$ -$
2.7 Field Revisions Allowance -$ -$ -$ -$
3 GEOTECHNICAL SERVICES
3.1 Design fee for completion of CD's, final reports - $ - $ 4 CONSTRUCTION SERVICES
4.1 Base Project Construction Costs - Buildings and Site -$ -$
4.2 Builder's Risk Insurance -$ -$ 5 TESTING AND INSPECTIONS
5.1 Soils Testing (Geotechnical Inspections) -$ -$
5.2 Materials Testing (Deputy Inspections) -$ -$
5.3 Roofing and Waterproofing Inspections -$ -$
5.4 Lead and Asbestos abatement observation, testing, clearnace report -$ -$ -$ -$
6 FIXTURES, FURNISHINGS, AND EQUIPMENT ALLOWANCE
6.1 Interior Furniture (Desks, Chairs, Files, Appliances) -$ -$ 7 UTILITY COMPANY CONNECTION SERVICES AND FEES
7.1 Electrical -$ -$
8 COUNTY, CITY, AND AGENCY FEES - All permits and fees are excluded
8.1 Development Impact Fees -$ -$ 9 MISC OWNER COSTS
10 DEVELOPMENT AND CONSTRUCTION MANAGEMENT
10.1 Legal -$ -$
10.2 Reimbursables -$ -$
10.3 Developer Overhead -$ -$
10.4 Developer Contingency -$ -$
10.5 Developer Fee -$ -$
10.6 Developer Insurance -$ -$
CITY CONTINGENCY -$ -$
GRAND TOTAL -$ -$ -$ -$ -$ Current Amount To Be Paid -$
1 Exhibit O
4872-5819-4561 v1
EXHIBIT O
Intentionally omitted
Exhibit P
4872-5819-4561 v1
EXHIBIT P
City-Approved Procurement Plan
Page | 1
EXHIBIT P - PROCUREMENT PLAN
RIALTO POLICE STATION
October 23, 2023
TWO PROCUREMENT PACKAGES
• Package #1 – To be bid from 100% DD Documents
• Package #2 – To be bid from permit approved drawings
TRADE CONTRACTOR PROCUREMENT
• Prequalify All Trade Contractors (Swinerton prequalifica*on standard format) • Trade Contractors will be selected based on lowest responsive and responsible bidder. • GC may select individual Trade Contractors based on best value or qualifica*ons only subject to approval by Developer and City on a case-by-case basis.
PROCUREMENT PACKAGE #1
Trades (Procurement Cri&cal):
• SWPPP
• Surveying
• Earthwork
• *Demoli*on
• Site U*li*es
• *Tilt-up Concrete
• Rebar
• Masonry
• Structural Steel
• Waterproofing
• Glass and Glazing
• Modular Office Reloca*on
• Deten*on Systems
• Elevators
• Plumbing
• Mechanical
• Electrical
Design Build
• Steel Stairs
• (Tac*cal) Range Systems
• Solar Canopy
• Fire Sprinklers
• Fire Alarm
BID PACKAGE #1 CONTENT
• 100% DD Drawings
• Narra*ve 1 – Memorial, Basis of design
• Narra*ve 2 – Range, Basis of design
• Narra*ve 3 – Patrol Armory, Basis of design
• Narra*ve 4 – Server Room Cooling, Basis of design
• Narra*ve 5 – Telescoping Gate, Basis of design
• 100% Trade Specifica*ons
Page | 2
• Soils Report
• Project General Requirements
• Trade Contractor Agreement
• Exhibits/A@achments from Trade Contractor Agreement
• Instruc*ons to Bidders and Bid Forms
BID PACKAGE EXHIBITS
• A@achment A – Insurance
• A@achment B – Document List
• A@achment C – Scope of Work
• Aachment D - Contract Recapitulaon
• A@achment E – Billing Procedure
• A@achment F – Project Schedule
• A@achment G - Project Procedures Manual
• A@achment H - Collec*ve Bargaining Agreement
• A@achment I - Safety, Health and Environmental Minimum Performance Standard • Aachment J - MBE/WBE/DVBE
• A@achment K – Trade Contractor Modifica*ons to Standard Documents • A@achment L – Project Labor Agreement ~ pending
• A@achment M - Virtual Design & Construc*on Guidelines • A@achment N - LEED Guidelines
• A@achment O – Not Used
• A@achment P – Phasing and Logis*cs Plans
• A@achment Q – Quality Control Program
BID PACKAGE PROCESS
• Project Team to Prequalify Trade Contractor U*lizing Team Format • Project Team to Distribute Bid Packages to Prequalified Trade Contractors • Project Team to Manage Trade Contractors Bid Process
• Project Team to Receive Trade Contractors Proposals
• Project Team to Review and Level Trade Contractors Proposals • Project Team to Present Trade Leveling Sheets
• Project Team to Award Trade Contractors
PROCUREMENT PACKAGE # 2
Trades:
(Schedule Cri*cal)
• Metal Decking
• Misc Steel
• *Framing and Drywall/Insula*on
• Sheet Metal
• *Firestopping
• Caulking and Sealants
• Roofing
• Site Concrete
• Asphalt Paving
• Landscape and Irriga*on
• *Doors and Frames
Page | 3
• *Millwork
• Tile and Stone
• Acous*cal Ceilings
• Flooring
• Pain*ng
• Signage
• *Special*es
• Window Treatments
• Site Furnishings
• Fencing
• Misc. Items
BID PACKAGE # 2 CONTENT
• Permit Submission Set of Drawings
• 100% Trade Specifica*ons
• Soils Report
• Project General Requirements
• Trade Contractor Agreement Exhibits/A@achments from Trade Contractor Agreement • Instruc*ons to Bidders and Bid Forms
*City Approved Trades below which General Contractor is authorized to bid in accordance with the Development Agreement regarding General Contractors Self Performing Work is as follows:
1. Demoli*on and abatement
2. Concrete
3. Millwork
4. Fire stopping
5. Doors, frames, and hardware
6. Drywall
7. Special*es