APN 014-282-28-0000

O TRATA SENE ON TOP REMOVE (E)CHAINLINK FENCE
389 5633V
W/6' CHANLINK FENCE ON TOP
INLINK FENCE ON TOP 7

PROUTER
105 0. 44202-18-800
(P)PCI SIDEWAL
E 24051)
APN 0153- OWN APAN 0269-12-01-0800

ESTORY PELO I BING
(P)6" CURB -

PA GUTTER

1.(P)4 SIDEW 160.00 (P)4' SIDEWALK

RKWAY DRAIN
(E)SCE EASEMENT PER
NSI. 2013-32029 0.
279.0 279.028 LINK F

JOIN (E)SIDEWALK PROTEC IN POSE
32(P) VENAY
- (E)EDGE OF PAVEMENT 43205-030015
(E)EDGE OF PAVEMENT ECI IN PLACE (E)PP

ACE (E)PF

BASELINE ROAD
N89°56'33"E
CALL TOLL FREE Underground Service Alert
811
PROJECT: CIVIL ENGINEER: COTECHNICAL: REVISIONS:

CONCEPTUAL SITE PLAN Gil Zulueta Mendoza Associates, Inc Checked GZN ORATE TERRACE CIRCLE, SUITE 101 SOILS SOUTHWEST, INC.

NIC BASELINA TO, CA 956
Engineer GZM 897 VIA LATA, SUITE N
F 815 425 8582
Sheet No. 2393-0100 Job No. File 239301 PCP COLTON, CA 92324 Project: American Tow Group Corporate Office P: 909.370.0474 & 909.370.0481 11/21/23 SAN BERNARDNO, 2A 92402 = 900 370 15
323.864.6896 Z. MENDOZA, R.C.E. C53454 E: [email protected] AS NOTED E: americantowaroup [email protected]