Roadway
Engineering &
Item Unit of Construction Leonida Builders Towo Enterprise Hillcrest Number Description Measure Quantity DEARK E&C, INC Corp. Inc. Lee & Inc. Contracting Inc.

Mobilization LS $37,000.00 $60,000.00 $50,000.00
Temporary Traffic Control LS 1 $5,700.00 $10,000.00
Water Pollution Control LS 1 $5,700.00 $10,000.00
Traffic Signing & Markings LS 1 $11,000.00 $22,000.00
Construction Surveying LS $4,000.00 $15,000.00
Clearing, Grubbing, and Removals LS 1 $55,000.00 $120,000.00 Salvage, Store and Reinstall Flag Poles EA 3 $10,500.00 $18,000.00 Unclassified Excavation (Cut) CY 920 $101,200.00 $13,800.00 Parking Lot Lighting and Electrical Systems LS 1 $130,000.00 $70,000.00 10 Furnish and Install Landscape Dripline and Appurtenances SF 2675 $10,700.00 $10,700.00 11 Furnish and Install Remote Control Valve EA $1,650.00 $10,000.00 12 Furnish and Install Quick Coupling Valve EA $1,200.00 $2,000.00 13 Furnish and Install Gate Valve EA $2,200.00 $4,000.00 14 Furnish and Install Master Valve EA 1 $2,200.00 $5,000.00 15 Furnish and Install Flow Sensor EA 1 $2,200.00 $3,000.00 16 Furnish and Install Backflow Preventer EA 1 $6,000.00 17 Furnish and Install New Controller EA 1 $10,000.00 $4,500.00 18 Furnish and Install Schedule 40 PVC Lateral Pipe (all sizes) LF 970 $3,880.00 $24,250.00 19 Furnish and Install Schedule 40 PVC Mainline Pipe (all sizes) LF 134 $536.00 $4,690.00 $1,259.60 20 Furnish and Install Schedule 40 PVC Conduit LF 150 $750.00 Continued 21 Furnish and Install Schedule 40 PVC Sleeve LF 296 $1,480.00 $2,486.40 On 22 Furnish and Install Control Wiring LF 1000 $5,000.00 $1,050.00 $1,685.25 Next Page
23 Furnish and Install Finished Grading SF 2675 $8,025.00 24 Furnish and Install Soil Preparation SF 2675 $5,350.00 $1,685.25 25 Furnish and Install Weed Abatement SF 2675 $2,675.00 26 Furnish and Install 2" Layer Organic Mulch CY 17 $1,700.00 27 Furnish and Install 36" box tree EA 10 $5,000.00
28 Furnish and Install 48" box tree EA 1 $1,000.00 $4,800.00 29 Furnish and Install 5 Gal. Shrub EA 134 $6,700.00 $5,762.00 30 Furnish and Install 4" Pot Groundcover EA 506 $2,530.00 31 Furnish and Install Crushed Rock Steambed Rubble TON 13 $1,950.00 32 Furnish and Install Boulders TON $4,000.00
33 Furnish 90-Day Post Installation Maintenance EA - -N $5,000.00 34 Prepare As-Built Plans LS $2,000.00
Construct Type 1-6" Concrete Curb Per Rialto Std. Plan SC-202 35 (DIM "A" = 6" Unless Specified on Plans) LF 1055 $47,475.00 $58,025.00 $41,672.50 36 Construct 4" Sidewalk Per Rialto Std. Plan SC-203 SF 1350 $16,200.00 $20,250.00 $11,205.00 37 Construct ADA Ramp Per Rialto Std. Plan SC-215 EA $24,000.00 $25,500.00 $33,480.00 38046000
38 Construct 4" Aggregate Base CY $13,950.00
39 Construct 4" Asphalt Concrete TON 551 $154,280.00 $88,160.00 $71,630.00 40 Construct Steel Railing Per SPPWC Std. Plan 606-5 LF 40 $7,200.00 Construct Parkway Drain Per SPPWC Std. Plan 151-2 and Per Detail 41 8 on Sheet 2. EA $40,000.00 $4,500.00
42 Construct Curb Opening Per Detail 2 on Sheet 2 EA 7 $7,000.00 10,500.00 43 Construct 1.5' Wide Concrete Strip, 6" Thick LF 176 $3,520.00 $6,160.00 44 Construct 3' Wide Concrete Pad, 6" Thick SF 190 $2,470.00 $9,500.00 Construct 2" Schedule 80 PVC Conduit With 1" PVC
Communication Conduit Per Trenching Detail on Sheet 2.
45 Terminate at Future EV Location At Proposed #5 Pull Box With LF 400 $32,000.00 $26,400.00 $32,000.00 $12,800.00 $20,000.00 $82,800.00 46 Field Orders LS 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $794,073.00 5808,518.65 $825,171.00 $842,821.60 $934,455.00 $942,135.55 California
Item Unit of C.S. Legacy All American JCE Equipment, Landscape & Aneen Number Description Measure Quantity Construction, Inc. Asphalt AFE Sports Inc. Design, Inc. Construction, Inc.

Mobilization LS 1 $97,200.00 $18,375.00 $92,026.25 $12,000.00 $156,500.00 $62,000.00 2 Temporary Traffic Control LS $7,920.00 $50,000.00 $16,500.00 $15,000.00 $12,300.00 $5,000.00 Water Pollution Control LS $9,729.60 $4,500.00 $16,500.00 $45,000.00 $12,750.00 $10,000.00 Traffic Signing & Markings LS $12,600.00 $9,700.00 $14,505.75 $30,000.00 $10,500.00 $12,000.00 Construction Surveying LS 1 $19,680.00 $18,000.00 $11,000.00 $35,000.00 $9,900.00 $12,000.00 Clearing, Grubbing, and Removals LS $49,200.00 $64,000.00 $101,479.76 $55,000.00 $116,800.00 Salvage, Store and Reinstall Flag Poles EA $6,909.60 $6,600.00 $7,089.36 $12,000.00 $12,300.00 8 Unclassified Excavation (Cut) CY 920 $110,151.60 $161,000.00 $166,888.00 $20,930.00 $136,160.00 $101,200.00 9 Parking Lot Lighting and Electrical Systems LS 1 $237,600.00 $265,000.00 $218,400.00 $311,512.00 $242,300.00 $338,000.00 10 Furnish and Install Landscape Dripline and Appurtenances SF 2675 $31,190.50 $5,350.00 $16,852.50 $12,786.50 $17,387.50 11 Furnish and Install Remote Control Valve EA $2,784.00 $4,000.00 $6,300.00 $4,182.55 $5,250.00 12 Furnish and Install Quick Coupling Valve EA $972.00 $1,300.00 $945.00 $1,084.46 $1,400.00 13 Furnish and Install Gate Valve EA $1,392.00 $1,040.00 $1,680.00 $1,248.90 $2,000.00 $3,000.00 14 Furnish and Install Master Valve EA $876.00 $930.00 $1,260.00 $1,102.85 $1,850.00 $3,000.00 15 Furnish and Install Flow Sensor EA 1 $846.00 $1,900.00 $1,260.00 $1,270.75 $1,700.00 $3,500.00 16 Furnish and Install Backflow Preventer EA $7,008.00 $6,500.00 $5,880.00 $7,159.90 $3,700.00 $15,000.00 17 Furnish and Install New Controller EA 1 $15,696.00 $16,400.00 $15,750.00 $22,002.95 $5,600.00 $25,000.00 18 Furnish and Install Schedule 40 PVC Lateral Pipe (all sizes) LF 970 $13,890.40 $5,820.00 $6,625.10 $4,510.50 $12,125.00 $63,050.00 19 Furnish and Install Schedule 40 PVC Mainline Pipe (all sizes) LF 134 $8,073.50 $938.00 $1,407.00 $1,511.52 $5,159.00 $8,710.00 20 Furnish and Install Schedule 40 PVC Conduit LF 150 $3,844.50 $1,500.00 $1,890.00 $2,323.50 $5,287.50 $9,750.00 21 Furnish and Install Schedule 40 PVC Sleeve LF 296 $7,568.72 $2,812.00 $5,594.40 $4,585.04 $3,034.00 $7,400.00 22 Furnish and Install Control Wiring LF 1000 $10,420.00 $1,650.00 $7,350.00 $560.00 $4,350.00 $10,000.00 23 Furnish and Install Finished Grading SF 2675 $7,730.75 $12,305.00 $20,731.25 $30,093.75 $4,547.50 $21,400.00 24 Furnish and Install Soil Preparation SF 2675 $9,549.75 $5,350.00 $6,313.00 $25,412.50 $7,623.75 $21,400.00 25 Furnish and Install Weed Abatement SF 2675 $7,008.50 $4,280.00 $7,035.25 $5,350.00 $8,693.75 $21,400.00 26 Furnish and Install 2" Layer Organic Mulch CY 17 $5,668.65 $1,700.00 $2,231.25 $3,225.75 $7,565.00 $5,100.00 27 Furnish and Install 36" box tree EA 10 $12,537.60 $11,000.00 $14,175.00 $16,232.50 $32,000.00 $45,000.00 28 Furnish and Install 48" box tree EA 1 $3,182.40 $2,735.00 $2,625.00 $3,786.38 $6,000.00 $5,000.00 29 Furnish and Install 5 Gal. Shrub EA 134 $8,819.88 $3,618.00 $6,331.50 $6,813.90 $6,633.00 $7,370.00 30 Furnish and Install 4" Pot Groundcover EA 506 $11,400.18 $4,048.00 $4,250.40 $2,676.74 $8,855.00 $7,590.00 31 Furnish and Install Crushed Rock Steambed Rubble TON 13 $6,868.81 $7,111.00 $8,736.00 $6,198.40 $16,900.00 $14,300.00 32 TON 2 $3,014.40 $1,148.00 $5,250.00 $17,135.00 $8,000.00 $4,000.00 33 Furnish 90-Day Post Installation Maintenance EA 1 $11,208.00 $4,925.00 $3,780.00 $2,361.00 $3,350.00 $10,000.00 34 Prepare As-Built Plans LS $1,344.00 $1,644.00 $1,625.00 $7,500.00 $3,000.00 $5,000.00 Construct Type 1-6" Concrete Curb Per Rialto Std. Plan SC-202 35 (DIM "A" = 6" Unless Specified on Plans) LF 1055 $42,516.50 $46,420.00 $37,009.40 $61,728.05 $31,650.00 $68,575.00 36 Construct 4" Sidewalk Per Rialto Std. Plan SC-203 SF 1350 $20,061.00 $21,600.00 $20,992.50| $28,080.00 $25,312.50 $18,900.00 37 Construct ADA Ramp Per Rialto Std. Plan SC-215 EA 3 $11,976.00 $8,700.00 $12,040.89 $31,200.00 $8,250.00 $25,500.00 38 Construct 4" Aggregate Base CY 279 $37,199.07 $64,170.00 $85,120.11 $34,997.76 $42,296.40 $34,484.40 39 TON 551 $83,999.95 $78,793.00 $31,699.03 $85,405.00 $101,025.85 $68,103.60 40 Construct Steel Railing Per SPPWC Std. Plan 606-5 LF 40 $9,720.00 $7,000.00 $9,240.00 $7,400.00 $7,000.00 $4,000.00 Construct Parkway Drain Per SPPWC Std. Plan 151-2 and Per Detail 41 EA $9,120.00 $12,358.00 $7,324.94 $200.00 $7,100.00 $5,000.00 42 Construct Curb Opening Per Detail 2 on Sheet 2 EA $1,848.00 $4,991.00 $1,922.13 $1,400.00 $2,100.00 $17,500.00 43 Construct 1.5' Wide Concrete Strip, 6" Thick LF 176 $4,512.64 $5,808.00 $5,320.48 $5,686.56 $3,872.00 $6,336.00 44 Construct 3' Wide Concrete Pad, 6" Thick SF 190 $3,744.90 $4,180.00 $4,795.60 $19,988.00 $3,325.00 $7,600.00 Construct 2" Schedule 80 PVC Conduit With 1" PVC
Communication Conduit Per Trenching Detail on Sheet 2.
45 Terminate at Future EV Location At Proposed #5 Pull Box With LF 400 $38,400.00 $48,800.00 $23,100.00 $50,600.00 $36,460.00 $32,000.00 46 Field Orders LS 1 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $1,036,983.40 $1,039,999.00 $1,068,831.85 $1,084,242.71| $1,189,912.75 $1,295,419.00