Construction Management, Inspection,
Material Testing and Public Relations Services
DOWNTOWN PARKING LOT Improvements
CITY PROJECT NO. 230801
Due: March 1, 2024
Submitted by
Proposal for
The City of Rialto

7950 Cherry Avenue, Suite 103 | Fontana, California 92336 | 909.730.4913 | www.fountanheadcorp.com

March 1, 2024
Mr. Art Cervantes, PMP VIA Email: [email protected] Engineering Manager
Engineering Services Department
City of Rialto
150 South Palm Avenue
Rialto, California, 92376
Subject: Downtown Parking Lot Improvements Project | CITY PROJECT NO. 230801 Construction Management, Inspection, Materials Testing Services & Public Relations Mr. Cervantes,
Fountainhead Consulting Corporation is pleased to submit our proposal to provide construction management, inspection, materials testing and public relations services to the City of Rialto for City Project No. 230801 for the Downtown Parking Lot Improvements Project.

Technical Understanding
The City of Rialto has issued a request for proposals for staff augmentation for construction management, inspection services, materials testing, and public outreach for their Downtown Parking Lot Improvement project. The project site is located at the North East corner of the intersection of Southside Riverside Avenue and East Rialto Avenue and is approximately 35,000 SF. All work relating to this project shall be done in accordance with the City of Rialto Standard Drawings, Standard Special Provisions and the latest edition of the Standard Specifications for Public Works Construction.

The Rialto Downtown Parking Lot will be an asphalt paved public parking area with three ADA accessible parking stalls, thirty-six ordinary parking stalls, six facilities for future charging of electric vehicles, and two ADA accessible EV charging facilities, for a total of 47 parking stalls. Additionally, there will be eleven aluminum poles with 32 Watt-LED light fixtures and twelve planted trees post construction with irrigation lines to provide sufficient water.

The project is estimated to be 140 working days (which includes 90 calendar days for landscape maintenance) from the issue of the Notice to Proceed have been allotted to the contractor to complete the work. Currently the site serves as a public green with benches, trash facilities, and large trees, as well as a small parking lot of three stalls. Work will commence by the contractor to remove the trees and additional vegetation and excavate the site to begin the compaction process. All utilities shall be installed prior to paving the parking lot, including a 2” Schedule 80 PVC conduit with 1” PVC communication conduit terminating at the future EV location in a theft proof #5 pull box and 135 LF of 1” PVC Schedule 40 irrigation. The Engineer’s estimate is $850,000.

Compaction of the subgrade shall be compacted to 95% and confirmed by the soils engineer before the 4” of aggregate base, also compacted to 95%, is placed. The final surface layer of AC is not to be placed until all on-site improvement have been completed. Striping will commence upon the final 4” of AC, with a 90 degree parking layout of 9’ wide and 20’ deep parking stalls. Planting of trees and reestablishment of City of Rialto flags will complete this project. The contractor will also be responsible for 90 days of landscape maintenance after the final working day has been completed.

Mr. Art Cervantes, PMP, Engineering Manager / Engineering Services Department City of Rialto’s Downtown Parking Lot Improvements Project | City Project No. 230801

Page 2 ends

Public outreach throughout the duration of construction is essential to the success of the project. Notifications to local businesses who neighbor the project site and proper signage and traffic control will be maintained throughout all 140 working days.

Upon completion of the project, the City of Rialto will have a new public resource to its residents and offer a convenient option to park downtown. Residents will be able to patronize local businesses and access public transport while being able to safely and legally park their vehicles nearby.

Scope of Work to be Provided
Pre-Construction Services
Upon receipt of Notice to Proceed from the City of Rialto, our will determine the best method for quality assurance, specific to meet the needs and constraints of the project. This plan ensures adherence to the uniform quality assurance procedures. We include procedures and designated responsibilities for Project start-up, Project Organization, Defining Roles and Responsibilities, Risk Register, and establish lines of communications in a Communication Plan. During this stage, we discuss a Project–Specific Safety Plan for the Project Team.

Assist the City of Rialto in evaluation of bids received: The Fountainhead team assists the City during the bid process in conducting a pre-bid conference if required and with questions from bidders. The Team also performs complete evaluation of bids received including submitted unit prices with respect to the Engineer’s estimate and recommend award to the lowest responsible and responsive bidder.

Prepare construction award package: We assist the City staff in reviewing the construction bids for Responsiveness and Responsibility by making sure the contractor’s bids are complete and the summation of all bid items are correct. Once a low bidder is determined, Fountainhead staff checks the contractor’s State license, Insurances, Bonding, and prior construction work references. When all checks are cleared, we assist in preparing the Staff report to the City Council for recommendation to award the construction contract to the lowest responsible/responsive bidder.

Prepare project instructions and establish proposed contract administration and record-keeping procedures to be used during construction for review and approval by the City Project Manager: Fountainhead’s general record- keeping process follows Caltrans’ for construction with approximately 63 file categories. In coordination with the City, we modify the process as directed to meet internal the City contract administration procedures while maintaining compliance with Caltrans Local Assistance Manual .

Establish outline of dispute resolution with Contractor’s methodologies, policies, and procedures: Alternative dispute resolution helps resolve disputes and potential claims to mitigate damages and maintain project schedules. The alternative dispute resolution processes are partnering, dispute resolution ladders (DRL), dispute resolution advisors (DRA), and dispute resolution boards (DRB).

The Fountainhead has experience using several of the processes on previous construction projects to address potential claims. “Potential Claims and Dispute Resolution,” as described in the Caltrans Standard Specifications helps to determine which alternative dispute resolution process is appropriate for the contract. Alternative dispute resolution processes must be set up and used in accordance with the applicable provisions.

Pre-Construction Deliverables
• Bid Review & Award Assistance
• Construction Management Plan
• Pre-Construction Meetings
• RE Construction Schedule
• Project Protocol
• Electronic Filing System
• Environmental Survey Report
• Communications Matrix
• Bid Analysis Report
• Pre-Construction Photographs/ Videos

Mr. Art Cervantes, PMP, Engineering Manager / Engineering Services Department City of Rialto’s Downtown Parking Lot Improvements Project | City Project No. 230801

Page 3 ends

Weekly and/or Monthly Owners Meeting: At Fountainhead we use meetings as a tool to coordinate between consultants and key stakeholders. Monthly, weekly, or as often as deemed necessary focus meetings are conducted to discuss and resolve issues promptly. The goal of all our meetings is to identify and discuss objectives, schedules, contract terms, related risks, and risk action plans. Fountainhead distributes the meeting minutes of all such meetings within 48 hours. Our meeting minutes include the identification of the party responsible for action on any particular item.

These meetings are held throughout the project life cycle.

Management Services During Construction
This phase includes construction administration, scheduling, resident engineering, site and source observation / inspection, utility coordination, public notifications, design support coordination, and materials testing coordination just to name a few.

Our construction management services shall be in accordance with the Caltrans Local Assistance Procedures Manual, and the Construction Manual when applicable. During the Construction Management Services Phase, the Fountainhead Team provides:

Coordination of Contract Execution: Upon NTP to the Contractor, the Fountainhead Team coordinates with the City to mobilize the field staff that administers the contract. The field staff consists of the Resident Engineer, Construction Inspectors, and Office Engineer. The Fountainhead Team also includes an array of specialty inspectors that can be utilized on an on-call basis as the project requires. As part of this task, the field staff establishes the project file system, conduct ongoing collaboration efforts with the City's Design Consultant, and coordinate activities commensurate with the Contractor’s operations.

Communication: The Fountainhead Team, as an agent of the City, communicates directly with the Contractor and the City. The Fountainhead Team reports to the City regarding the progress of the project and provides information as requested by the City for the local community and other agencies as directed by the City.

This consists of a written report detailing the construction schedule, budgetary status, traffic impacts, etc…. Our staff is responsible for the day-to-day communication with the Contractor and represents the City at the project site. We proactively resolve project issues that impede progress, coordinating with the City's Design Consultant, responding to RFls and reviews and coordinates approval of submittals, and ensure that the Contractor is complying with the contract documents. If necessary, our staff can represent the City in presentations at public events on behalf of the City.

Project Coordination and Correspondence: Our Resident
Engineer, Arezo Ghiam, PE serves as the day-to-day project focal point for coordination between the City, local agencies, the public, Caltrans, the project Designer, the Contractor, utility companies, and all other stake holders, as necessary. On all project issues, Fountainhead is the point of contact for the Contractor. All correspondence relating to the project are discussed with the City.

We maintain close contact and confer with the City and Design Engineer prior to sending any significant or critical correspondence to the Contractor. Any coordination with other applicable parties are conducted, as necessary. Fountainhead conducts weekly meetings with the Contractor and any additional focus meetings as necessary to address the status of the project and resolve project issues. Our staff also evaluates and discusses with the City any Value Engineering Change Proposals (VECP) submitted by the Contractor. Fountainhead prepares and distributes agendas, minutes, and an issue list, as necessary.

Construction Phase Deliverables
• Survey Control Points, Staking & Cut
Sheets
• Daily Reports
• Monthly Pay Quantity Calculations
• Monthly Progress Reports
• Meeting Agendas and Minutes
• Materials / Acceptance Testing
• Certified QA Test Results
• Photographs / Videos
• Utility Coordination
• Contractor Employee EEO interviews
• Contractor DBE Utilization Report
• Punch List
• Quality Assurance
• Safety Requirements
• Daily and Weekly Reports
• CPM Scheduling
• Construction Change Order Review
• Construction Claims Mitigation
• Project Documentation Processing
• Communication / Interface with
Stakeholders
• Environmental Compliance / Mitigation
• Right-of-Way Compliance
• Monthly Progress Estimates & Invoices
• Labor Compliance

Mr. Art Cervantes, PMP, Engineering Manager / Engineering Services Department City of Rialto’s Downtown Parking Lot Improvements Project | City Project No. 230801

Page 4 ends

Document Control: Two components at the heart of a successful project are effective communication and comprehensive project documentation. Although some small and short duration projects may be best served through manual use of the spreadsheet-based document tracking systems that have been in use for many years by a large cross-section of the industry, larger projects, with durations exceeding several months benefit from an easy-to-use, and industry standard document control system. Fountainhead recommends the use of electronic document control software called “Procore” to assist with managing submittals, RFI’s and correspondence.

Fountainhead’s document management system allows for networking between the Contractor, designer, construction manager and owner. This Web-based Document Control collaboration tool allows all participants’ immediate access to project documents through a web browser and is easily customized to fit every client and every project. Fountainhead uses Procore to manage (log, track, store, and retrieve) project documents in a timely and organized fashion for decision making purposes during any phase of the project.

Submittals Management: The Fountainhead Team reviews project submittals, such as the Contractor’s baseline schedule, Storm Water Pollution Prevention Plan (SWPPP), falsework plans, shop drawings, materials suppliers, materials sites, etc. Fountainhead also approves or recommends approval, subject to delegation of authority from the City, other documents requiring review and approval. Some submittals are reviewed by multiple entities such as SWPPP. Submittal distribution list developed during pre-construction phase identifies the parties responsible for review and acceptance. All submittals shall be logged in as they are received and are routed to the reviewing party.

They are tracked, based on review times, and followed up as they progress through the review and approval process. We continuously maintain and update the submittal log established at the pre- construction phase.

Requests for Information (RFI): Fountainhead receives logs, processes, tracks, and documents Project Requests for Information (RFI) and responses. The RFI log is continuously maintained and updated. The RFI Log identifies the parties responsible for review and response. Fountainhead Staff prepares responses to RFI’s related to construction issues in a timely manner and in accordance with the requirements of the Contract. All responses prepared by Ivan are copied to the City Project Manager for concurrence. Design-related RFIs and other RFIs that are not Construction related are routed to the appropriate parties and the City is copied on all such RFIs. When necessary, Ivan coordinates and conducts meetings with the appropriate parties to discuss and resolve any complicated RFIs.

Inspections and Records: Our team reviews the contract
documents and monitors the work full time to record the Contractor’s progress for conformance to the contract and reasonable applications and practices. Our inspectors are qualified and familiar with the items of work in which they are involved. In addition to monitoring the work, our inspection team performs audits of the performance and effectiveness of the Contractor on site and source acceptance quality control staff and testers. We include the results of these audits along with identified concerns and corrective actions taken in our monthly report to the City. Our Daily Inspection Reports (DIRs) include information regarding date, day of the week, weather, Contractor work force, contract work being performed, unusual occurrences, visitors, utility information, conversations with stakeholders, accidents, encountered safety issues and resolution, digital photos, SWPPP inspection and inspection and testing audits performed. We immediately make the Contractor aware of any non-conforming work found during daily inspections.

Mr. Art Cervantes, PMP, Engineering Manager / Engineering Services Department City of Rialto’s Downtown Parking Lot Improvements Project | City Project No. 230801

Page 5 ends

Material Testing: Fountainhead’s subconsultants, Ninyo & Moore provides Material Testing and Inspection services with Caltrans certified personnel and equipment. Ninyo & Moore’s scope of services will include compaction testing and structural concrete testing. We understand that the project will generally consist of construction of a new parking lot area located at South Riverside Avenue and East Rialto Avenue. The improvements include construction of asphalt concrete pavement over aggregate base, concrete ADA curb ramps, curbs, and sidewalks, landscaping, irrigation and biofiltration system. Ninyo & Moore prepares daily reports to document items observed and submits materials certification memoranda. Ninyo & Moore will provide the following scope of services:
• Project coordination, management and technical support including review of the project geotechnical reports, plans and specifications, work scheduling and distribution of test data. • Attendance at pre-construction meetings and as-requested field meetings. • Field Technician services to provide observation, sampling and testing during subgrade preparation and aggregate base placement. Field density tests will be performed to evaluate the Contractor’s compaction efforts. • Field Technician services to provide observation, sampling at the batch plant and observation and density testing for asphalt concrete (AC) paving operations. Field density tests will be performed to evaluate the Contractor’s compaction efforts.
• ACI Field Technician services for observation, sampling and testing of concrete including checking mix design, elapsed time, temperature, slump and fabrication of compressive strength samples. • Laboratory testing, including but not limited to proctor density, sieve analysis, sand equivalent on subgrade, trench backfill materials and aggregate bases. Hveem stability, unit weight, percent asphalt content, sand equivalent and sieve analysis on the asphalt concrete materials. Compressive strength testing on concrete samples obtained in the field. • Preparation of daily reports and test data sheets to document the items inspected.

Schedule Management, Progress Meetings, and Reports: Fountainhead staff reviews and approves, subject to the City’s delegation of authority, the Contractor’s CPM schedule. The team reviews the Contractor’s planned schedule for conformance with the specifications and for reasonableness of the sequence and duration of the activities. The Contractor’s 3-week look-ahead schedule, which is submitted weekly, is reviewed against the CPM schedule and progress is evaluated. The Contractor is notified in writing of any identified schedule delay or slippage that may have an impact on the overall project completion date. In addition, monthly schedule updates are reviewed for progress of work and any critical activities or logic changes by the Contractor. All updates include a narrative report and any delays and change order time impacts. Reasonable and logical time extensions are negotiated with the Contractor and reviewed with the City prior to inclusion in the CPM schedule. Fountainhead staff prepares and submits to the City monthly progress reports that include status on budget, expenditure, schedule, change orders, key issues, and upcoming work activities.

Schedule Mitigation Strategies: Typically, Fountainhead team members are intimately familiar with the work plan and schedule and do not encounter situations where we have been the root cause of a project delivery delay, however if we are the cause or even if any team member is the cause of a delay, we work diligently to develop a mitigation plan to get the project back on track. As a general rule we identify activities that were originally scheduled to be performed in series and modify the finish-to- finish relationship with a lag so that the activities can be worked on concurrently instead, saving time without costing client any additional fees. Fountainhead strives to perform quick turnaround of submittal reviews and RFI responses.

Mr. Art Cervantes, PMP, Engineering Manager / Engineering Services Department City of Rialto’s Downtown Parking Lot Improvements Project | City Project No. 230801

Page 6 ends

Payment Recommendations: At the start of the construction contract, a progress payment cutoff date is established with the Contractor.

Fountainhead also reviews and approves Contractor’s cost breakdown and schedule of values for all lump sum items. On or around the established monthly cutoff date, Fountainhead meets with the Contractor to review, discuss, and approve quantities applicable to the progress payment for the month. Discussion is based on
measurements and quantities calculated in the field, subject to the City’s audit and delegation of approval. Once all quantities are negotiated, Fountainhead reviews and recommends approval of the Contractor’s invoice with the City. The document is submitted to the City for processing and payment to the Contractor.

Change Orders Coordination, Preparation and Management:

Fountainhead receives, processes, tracks, and documents Project requests for Contract Change Orders (CCO) from the Contractor. A CCO log is established at the beginning of the Project and is continuously maintained and updated by our assigned staff. To the delegated level of approval, and under the City’s direction, Fountainhead determines the need, merit, scope, estimated cost, and schedule impacts to the project as a result of potential contract change orders.

Fountainhead also negotiates change orders with the Contractor as directed by the City. Once merit is established, our staff prepares change orders based on the Contract Documents and in close coordination with the City.

All contract change orders include a transmittal memorandum that identify the issue, provide background information, determine merit, and provide financial and schedule impacts. This transmittal memorandum is generally for the City review only and is not shared with the Contractor. All contract change orders are reviewed with the City. Prior approval by the City is obtained on all contract change orders.

Construction Safety: Fountainhead understands that there is nothing more important than the safety during construction. The Contractor has sole responsibility for compliance with safety requirements on the construction contract, but the Construction Management staff has the responsibility of monitoring compliance with their safety program and advising the Contractor of observed deficiencies. Fountainhead reviews the Contractor’s Injury and Illness Prevention Program and field activities on continual basis. All project team members are required to review, sign, and adhere to the project code of safe practices. Fountainhead conducts safety reviews, night safety inspections, and attend weekly safety tailgate meetings. The Fountainhead team is knowledgeable of the CAL/OSHA Construction Safety Orders and monitors the Contractor's work to assure that the public, the Contractor, and the Inspection staff is working in a safe environment.

Claims: Fountainhead’s construction management team
members have successfully managed projects without
Contractor claims. Fountainhead ensures excellent
communications and working relationships exist during the life of the project among all project stakeholders. Our team focuses on resolving issues at the lowest possible levels.

All issues are properly documented in detail and
coordinated with the City. Our staff acts in a timely manner, to avoid the need for the Contractor to file claims. If claims become unavoidable, the Fountainhead team can tap into
expert resources to eliminate or minimize impacts to the project’s cost or schedule. Claims that are submitted are thoroughly reviewed by our team and responses prepared
and coordinated with the City. An itemized claims log is established and status of each “Notice of Potential Claim” received from the Contractor is monitored and tracked as needed.

Mr. Art Cervantes, PMP, Engineering Manager / Engineering Services Department City of Rialto’s Downtown Parking Lot Improvements Project | City Project No. 230801

Page 7 ends

Labor Compliance: Labor compliance is an important part of the Construction Manager’s effort to protect the wages, health benefits, and employee labor rights on County public works projects.

Fountainhead coordinates with the County Labor Compliance staff to verify compliance with Federal and State labor laws by ensuring contractor certified payroll records are submitted and that said payroll records match our field documentation of various project personnel working on the project. We also be performing contractor employee EEO interviews and provide copies to the City’s labor compliance officer for their records.

Public Relations: The Fountainhead Corporation Outreach team is excited to get the opportunity to be a part of the City of Rialto’s Downtown Parking Lot Improvements project and gladly bring, once more, all of its experience provided by Public Relations Representative, Claudia Mejia, who has had the pleasure of working on the City’s Riverside Avenue Central Reconstruction Project and the J&K Auto Body Demolition project.

Claudia is familiar with the City of Rialto’s public, community and residents, and understands that addressing communication, written and verbal, to a diverse community will require for the community outreach efforts to be tailored in language, that is, in English and Spanish (and any other language that the city requires). This will allow Claudia to establish direct relations with impacted stakeholders by developing a proactive community outreach approach to ensure it serves the project’s diverse yet focused community in this area.

The proactive community outreach plan will keep in mind the 140-day project duration timeframe, including plant the establishment phase, and will include a grass-roots approach consisting of:
• Leveraging Branding from previous City of Rialto projects (as approved by the City), for a cost-effective approach including (all of these could be tailored to create a unique identity for the new project):
o A project logo
o Header
o Footer
o A new project phone number (as needed) to keep a single point of contact for inquiry assistance.
• Project Database – develop and upkeep a project database consisting of contacts for the required 300’/2-block radius, as stated in the project specifications.
• Collateral Material
o Factsheet
o FAQ (as needed)
o Project Location Map (as needed)
• E-blast – weekly/as needed construction alert eblast including project activities, schedules and mitigation practices due to any project impacts such as:
o Closures/Detours
o Utility Disruptions, as needed.
o Dust
o Vibration
o Traffic Control
o Flaggers
Additionally, Claudia will attend the pre-construction meeting, all weekly/biweekly construction meetings, to help the CM team proactively identify any impacts to the community in and around the project area, attend two community meetings, and document all outreach activity in a City-approved tracking system.

Mr. Art Cervantes, PMP, Engineering Manager / Engineering Services Department City of Rialto’s Downtown Parking Lot Improvements Project | City Project No. 230801

Page 8 ends

Claudia has gained knowledge and experience of the City’s notification practices (no less than a 5-day advanced notification notice) and will ensure all information being provided to the public follows these for successful communication and outreach implementation
Post-Construction Services, Project Close-Out
Field Inspection and Punch List: As a project nears completion Fountainhead staff walks the project and document all items of work that have yet to be completed as required in the contract documents. An itemized punch list of outstanding items is developed and handed over to the Contractor to be addressed. After the Contractor has completed all the items on the punch list, a final walk-through of the project site is conducted. If the City is satisfied that all the items on the punch list have been addressed, then the Contractor is given a letter of acceptance, and final payment is authorized. Fountainhead staff coordinates with all project stakeholders during final inspections to obtain their acceptance of the improvements as required by the City. Our certified biologist documents as-built conditions and perform habitat and revegetation monitoring, complete and submit the final compliance report to CDFW.

As-Builts: The Fountainhead Team maintains a full-size set of the project plans for as-built purposes. These as-built plans are modified to reflect what was constructed and includes any authorized field modifications by the design engineer, as well as any modifications due to approved change orders. All modifications are noted in red and, upon acceptance of the contract, are submitted to the City's Design Consultant for incorporation into the final as-built plans.

Project Close-Out: Upon completion of the work and after all items on the punch list have been addressed, the Fountainhead Team issues a letter of acceptance and formally relieve the Contractor of any further responsibility for the project. The project close-out phase includes:
(1) Resolving any outstanding claims and providing supporting information (2) Recommending approval of the final payment to the Contractor to the City (3) Ensuring that all liens on the project by the Contractor or Subcontractors have been released (4) Archiving all project records, including final materials certification (5) Prepare project close out documents for Caltrans approval (6) Assist the City staff during any audit performed by state or federal agencies (7) Perform the 1-year warranty inspection one month before it is due and create a comprehensive punch list and follow up with contractor and Caltrans to ensure the punch list items are adequately addressed to the satisfaction of Caltrans and the City.

The Fountainhead Team prepares project close-out reports per City Standards and Caltrans Local Assistance Manual to meet all funding requirements. For the Fountainhead Team, project close-out is an important aspect of the contract and is implemented in a meticulous fashion. At this point our Account Manager ensures that the project is 100% complete from both a construction and construction management perspective. In closing project files, the Fountainhead Team makes sure that all original documents are in the project files, and we encase all records in clearly marked storage boxes per the City policy.

Post-Construction Deliverables
• As-built Plans
• Project Acceptance
• Final Project Completion Reports
• RE’s Material Certification
• Final Environmental Report
• Complete Set of Files

Mr. Art Cervantes, PMP, Engineering Manager / Engineering Services Department City of Rialto’s Downtown Parking Lot Improvements Project | City Project No. 230801

Page 9 ends

Qualified and Experienced Team
Our proposed staff has been carefully chosen for this project. We understand the technical challenges that this project may face and by reviewing the project plans, visiting the site and being part of many projects in the vicinity we have gained an understanding of the project and prepared a specific approach tailored to the needs of the City of Rialto. Our proposed team has the experience and expertise to address the project needs, challenges, goals and objectives within the scope of services.

Our Project Director, Ivan
Benavidez, PE, CCM, QSD/P has
over 28 years of construction
management, inspection
experience, and public relations
throughout Southern California for
Caltrans District 7, and 8, Orange
County Transportation Authority,
and various cities including, but not
limited to Newport Beach,
Anaheim, Murrieta, Loma Linda,
and Counties of Orange and Los
Angeles. Ivan has managed public
works projects similar to that of the
City of Rialto’s I-210 / Alder Avenue
Interchange Improvements Project
including the Rancho Mission Viejo
Development, Los Patrones
Parkway, County of Orange Public
Works, Cow Camp Road, City of
Anaheim, Gene Autry Way
(West)/Haster Street Widening, City
of Newport Beach, Park Avenue
Bridge over the Grand Canal,
Caltrans District 7, SR 101
Universal Studios Blvd., Bridge On
Ramp to name a few.

Arezo Ghiam, PE, Project
Manager / Resident Engineer has
12 years’ experience in
transportation construction projects
with various public agencies.

Arezo’s construction engineering experience includes Caltrans CPM scheduling analysis methods, practices, and procedures.

Her experience includes but is not limited to the City of Rialto’s Willow Avenue at San Bernardino Traffic Signal Project, Cactus Trail Improvements, Riverside Avenue Central Reconstruction, J&K Auto Body Demo and Cactus Trail Improvements Projects; City of Whittier’s Brookfield Residential Development, State Highway 72 / Whittier Blvd. Widening, Caltrans District 7 and 12’s On-Call Roadway Construction Inspection Services, City of Rialto’s Rancho Mission Viejo Development / Orange County Public Works (OCPW), LPP Roadway Improvements/Repairs, Cow Camp Road, 2B, and Los Patrones Parkway.

Kevin Austin, PE, Construction Inspector has over 12 years of professional engineering experience in coordination and managing various Capital Improvement construction projects for local agencies including Flood Control Facilities, Roadway and City Streets. His experience includes City of Rialto’s Willow Avenue at San Bernardino Traffic Signal, Riverside Avenue Central Reconstruction, J&K Auto Body Demo, Building 300 Inspection & Support Services, and Merrill Avenue Improvements; County of San Bernardino’s Redwood Avenue and Other Roads, Caltrans District 12’s On-Call Roadway Construction Inspection Services, and Orange County Public Works’ On-Call Roadway Construction Inspection Services to name a few.

Mr. Art Cervantes, PMP, Engineering Manager / Engineering Services Department City of Rialto’s Downtown Parking Lot Improvements Project | City Project No. 230801

Page 10 ends

Cost Proposal

Limitations & Conditions:
• Construction duration is estimated at 50 working days with 3 days for the preconstruction phase and 2 days for closeout phase.
• Inspectors will be fully equipped with vehicles, computers, tools, and equipment required to perform their tasks.
• Overtime and weekend work is not included. Overtime is to be charged at 1.5 the above rate for inspection work only.
• Cost proposal is subject to prevailing wage rates and prevailing wage rate changes for inspection.

I am authorized to bind Fountainhead Consulting Corporation to the City of Rialto’s contract. I look forward to further discussing our services in person. Please contact Arezo Ghiam, PE, Resident Engineer at 949.278.4124 or at [email protected] me at 909.512.2815 or at [email protected] if you have any questions or need any additional information.

Very truly yours,
Ivan Benavidez, PE
Director

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 1
IVAN BENAVIDEZ, JR., PE, QSD/QSP
Project Director
For over 28 years, Ivan has successfully provided staffing for over 100 on-call contracts through his career for various city, county, and state transportation organizations. Including private developers, USACE, and the Naval Civil Engineering Corps where he spent 10 years with a Naval Seabee Construction Battalion. Within the southern California region, he has successfully delivered over $1 billion in capital improvements in the transportation sector. He has been recognized by his award-winning projects as a project manager and as an RE for projects in Southern California and has received national recognition for two bridge projects by the Construction Management Association of America. His experience also includes program / project management, claim resolution, and scheduling expertise. Furthermore, he has an in-depth understanding of how the various stakeholders must work together to deliver each project. Ivan is a proactive manager who is driven by client satisfaction. He provides a cost-conscious approach combined with a strong technical expertise, management skills, and the ability to build consensus amongst stakeholders with competing interests to ensure project success.

RELEVANT PROJECT EXPERIENCE
Orange County Transportation Authority, I-405 Improvement, Design Build, Orange County, CA
Segment 1, Resident Engineer. Responsible for ensuring compliance with specifications and plans on all phases of construction improvements and contract administration including potential change orders. The project consists of the reconfiguration of interchanges and ramps comprised of 6 new interchanges containing 24 on and off ramps that are being reconstructed. Cost: $1.2 Billion.

Rancho Mission Viejo Development, Los Patrones Parkway, Rancho Mission Viejo, CA
Contract Manager. The is a 3.5 mile stretch of future 70 mph Orange County Express way. It is the continuation of State Route 241 Toll. Beginning at Oso Parkway in Rancho Santa Margarita it extends south through undeveloped land to connect to the Rancho Mission Viejo community at Cow Camp Road. The project required grading and storm drain improvements requiring roughly 4 million cubic yards of mass excavation, deep soil mixing, 2 wildlife crossing tunnel structures, nine 60" headwall and transition structures, two 72"headwall and transition structures, and many more ranging from 18" to 48". ASCE 2018 “Transportation Project of the Year”. Project Cost: $90 Million.

County of Orange Public Works, Cow Camp Road, Rancho Mission Viejo, CA Project Manager. Responsible for ensuring compliance with specifications and plans on all phases of construction improvements and contract administration including constructability review, construction engineering, construction documentation, CCO’s and scheduling analysis. This 1,400lf long, 8 eight span, cast in place concrete box girder bridge with two frames over Chiqueta Creek along the San Juan River had 9ft diameter 50ft deep CIDH piles, steel reinforcement, structure concrete. Project Cost $22 Million.

EDUCATION
MS, Civil Engineering, California
State University Long Beach
BS, Civil Engineering, New Mexico
State University

REGISTRATIONS
CA, Civil Engineer, No. 52076
CA, Qualified SWPPP Practitioner /
Developer
AWARDS
2018 ASCE “Transportation
Project of the Year”, Los
Patrones Parkway, Rancho
Mission Viejo
2014 ASCE “Bridge Project of the
Year”, Gene Autry Way West, City
of Anaheim
2009 – 2010, ASCE’s Improvement
Project of the Year, Mountain View
Avenue Bridge and Roadway
Widening, City of Loma Linda
2007, CMAA’s Best Infrastructure
Project of the Year in the United
States Under $10 Million, Alabama
& Orange Street Bridge
Replacement, City of Redlands
2004 APWA’s Award Winning
Project, Grove Avenue Grade
Separation, City of Ontario
2004, CMAA’s, Outstanding
Construction Manager, 5th Street
Bridge, City of Highland

AREAS OF EXPERTISE
 Project Management
 Construction Management
 Resident Engineering
 Contract Administration
 Traffic Control
 Project Controls
 Public Agency Coordination

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 2
Ivan Benavidez, Jr., PE, QSD/QSP

Page 2 ends

City of Anaheim, Gene Autry Way (West)/Haster Street Widening, Anaheim, CA PM / Resident Engineer. Responsible for a two span cast-in-place pre-stressed concrete box Girder Bridge, 335 feet in length and 108 feet wide. A single bent contained four columns, all foundations rested on 16inch diameter Steel pipe piles. Retaining walls consisted of a 654 feet MSE, a 503 MSE, and two 187 feet cantilever retaining walls.

Project won ASCE’s 2014 – Bridge Project of the Year. Project Cost: $16 Million.

City of Newport Beach, Park Avenue Bridge over the Grand Canal, Newport Beach, CA Project Manager / Resident Engineer. The Park Avenue Bridge over the Grand Canal connects Balboa Island and Little Balboa Island was reconstructed because the existing bridge has experienced advanced deterioration and has been determined to be functionally obsolete. A temporary steel bridge spanning across the Grand Canal will be installed at Balboa Avenue for the construction duration. The original structure was built in 1930 and is the only access to/from Little Balboa Island. Ivan is responsible for project / construction management, constructability review, construction engineering, CPM scheduling and public relations support on this new bridge project. Project Cost: $10 Million.

Caltrans District 7, SR 101 Universal Studios Blvd., Bridge On Ramp, Studio City, CA Project Manager. Project consisted of a 140 ft long, 6 eight span, cast in place concrete slab bridge with a direct access drop on-ramp onto WB 101 and ramp modification to Mulholland on ramp. Project contained Ramp metering, flashing beacons, controller cabinets, loop detectors, and traffic signalization. Project Cost $10 Million.

Orange County Public Works, Construction Management, Inspection & Material Testing, Orange County, CA Project Manager: Responsible for ensuring clear and accurate deliverables, managing 6 subconsultants, preparing and processing task orders, managing budgets, assigning qualified engineering, inspection, administration, and scheduling personnel, implementing and maintain quality assurance procedures, and ensuring contract compliance. Coordinating with client contract manager and various functional managers. $3 Million.

Caltrans District 7, On-Call Electrical Construction Engineering and Inspection (Contract No. 07A4568), Los Angeles and Ventura County, CA
Contract Manager. Responsible for clear and accurate deliverables, task orders, managing budgets, meetings, supervising, training and directing personnel, assigning qualified staff such as landscape, electrical, SWPPP inspectors, and CPM scheduling personnel, maintain quality control, managing sub-consultants, monitoring DBEs, and ensuring contract compliance. Monitored prevailing wage of consultant staff, prepared monthly expenditure reports, coordinated with contract manager and various functional managers. Project Cost: $10 Million.

Caltrans District 12 (12A1589, 12A1736 & 12A1887), On-Call Construction Inspection & Materials Testing, Orange, CA
Contract Manager. Responsible for clear and accurate deliverables, task orders, managing budgets, meetings, supervising, training and directing personnel, assigning qualified staff such as landscape, electrical, SWPPP inspectors, and CPM scheduling personnel, maintain quality control, managing sub-consultants, monitoring DBE’s, and ensuring contract compliance. Monitored prevailing wage of consultant staff, prepared monthly expenditure reports, coordinated with contract manager and various functional managers. Project Cost: Various.

County of San Bernardino Public Works, On-Call Construction Management, Construction Inspection & Materials Testing Services, San Bernardino, CA
Project Manager for the County’s solid waste disposal system which consists of five active landfills, one inactive landfill, thirteen transfer stations, and monitors and maintains several closed landfill and disposal sites for environmental mitigation systems, road paving, drainage structures, and other general civil structures. The five regional active landfills provide refuse disposal to the County’s Valley, Mountain, High Desert, and Low Desert Regions. Project Cost: Various.

City of Murrieta, SR-15 / Cal Oaks Interchange and Ramp Modifications, Murrieta, CA Resident Engineer / CPM Scheduler. Project consisted of bridge widening over I-15 and reconstruction of four on and off ramps. Project Cost $16 Million.

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 3

AREZO GHIAM, PE, QSD
Project Manager / Resident Engineer
Mrs. Ghiam has 12 years of experience in transportation construction projects with both private and public entities where she performed project management, construction inspection, claim resolution, scheduling, labor compliance, and project record keeping.

More specifically she has been cross trained to perform construction management services as a project manager, a resident engineer, an inspector, and an office engineer on freeway and structure construction projects. She has an in-depth understanding of how the various stakeholders must work together to deliver each project. Arezo is a proactive manager who is driven by client satisfaction. She provides a cost-conscious approach combined with a strong technical expertise, management skills and the ability to build consensus among stakeholders with competing interests to achieve project success.

RELEVANT PROJECT EXPERIENCE
City of Rialto, Willow Avenue at San Bernardino Traffic Signal Project (No. 230805), Rialto, CA
Resident Engineer. Project included installation of traffic signals, supporting cabinets, electrical connections, lighting and video detection systems. Roadway improvements consist of signage and striping updates to align with the new signals as well as the construction of two ADA compliant curb ramps. Provided technical and contract administrative expertise to enforce contract plans and specifications. Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and reviewed the CPM schedule. Processed and checked the monthly progress payments and oversaw field construction inspection.

Project Cost: $0.5 Million.

City of Rialto, Cactus Trail Improvements Project, Rialto, CA Resident Engineer. Provided technical and contract administrative expertise to enforce contract plans and specifications. Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and reviewed the CPM schedule. Processed and checked the monthly progress payments and oversaw field construction inspection. Project Cost: $2 Million.

City of Rialto, Riverside Avenue Central Reconstruction, Rialto, CA Resident Engineer. Provided technical and contract administrative expertise to enforce contract plans and specifications.

Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and reviewed the CPM schedule. Processed and checked the monthly progress payments and oversaw field construction inspection. The project included street improvements on Riverside Avenue in the southeastern portion of the City of Rialto, California. The project spans approximately 6780 feet (1.28 miles) from Metro tracks to the North and San Bernardino Street on the South. The limits of the project are 0.6 miles north of Route 10 and 2.8 miles south of Route 210. Riverside Avenue consists of two lanes in each direction and a median. Project Cost: $4.1 Million.

Brookfield Residential Development, State Highway 72 / Whittier Blvd. Widening, Whittier, CA Resident Engineer: Responsible for widening Whittier Blvd, including roadway section, traffic signals, and ADA ramps with Caltrans oversite. Responsible for all aspects of contract administration including review of concrete mix designs and various shop drawings, quantity calculations, materials sampling and control, source inspection, assuring compliance with project plans and specifications, and Contract Change Orders. Point of contact and coordination between Caltrans, City, and Developer. Project Cost $3 Million.

EDUCATION
BS, Civil Engineering, California
State Polytechnic University,
Pomona

REGISTRATION
CA, Professional Civil Engineer
No. C86359

RELEVANCE
 12 Years of Civil Engineering
Experience
 Project Management
 Construction Management
 Resident Engineering
 Construction Inspection
 Office Engineering
 Caltrans Experience
 Public Works Experience
 Plan Checking
 JPCP / HMA / RHMA
 Utility Relocations
 Agency Coordination
 Permit Reviews
 Constructability Reviews
 Monthly Activity Reports
 SWPPP Compliance

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 4
City of Rialto, J&K Auto Body Demo Project, Rialto, CA
Resident Engineer. Provided technical and contract administrative expertise to enforce contract plans and specifications.

Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and reviewed the CPM schedule. Processed and checked the monthly progress payments and oversaw field construction inspection. The project consist of demolition and grading improvement project on three separate parcel groups to the northwest of the Rialto Metrolink Station in the City of Rialto, California. The three locations are 241 South Palm Avenue, 238 South Orange Avenue, and 239 South Orange Avenue. Project Cost: $0.8 Million.

Orange County Public Works (OCPW), LPP Roadway Improvements, Rancho Mission Viejo, CA Resident Engineer: Responsible for all identifying and administering roadway improvements and repairs due to storm damage.

Repairs included: v-ditch, trapezoidal channel, storm drain, curb & gutter, sidewalk, ADA ramp, AC paving, and basins.

Performed quantity calculations and was the main point of contact between the developer and OCPW. Project Cost $5 Million.

Caltrans District 7, On-Call Roadway Construction Inspection Services, Ventura, CA Resident Engineer / Lead Roadway Inspector. Performs roadway construction inspection, quantity calculations, checking grade and alignment, labor compliance interviews, traffic control review, and assuring compliance with project plans and specifications. Duties include identifying actual and potential problems associated with the construction project work and recommending sound engineering solutions in a timely manner, maintaining awareness of safety and health requirements, and assuring compliance with applicable regulations and construction contract provisions for the protection of the public and construction project personnel. Project Cost: Various.

Rancho Mission Viejo Development, Cow Camp Road, 2B, Rancho Mission Viejo, CA Resident Engineer. The Cow Camp Road 2B Roadway & SMWD Improvements project is a new roadway construction that includes underground sewer, CMLC, and PVC waterlines, RCP storm drain and structures, dry utilities, concrete curb and sidewalk, street lighting, and asphalt paving. Arezo served as the main point of contact to verify the integrity of project elements. Arezo was responsible for verifying compliance with relevant specifications, codes, and regulations, ensuring monthly progress payments were accurate by performing quantity calculations, performed surveying critical elements of the project, and managed and preparing contract change orders. Project Cost: $37 Million.

Rancho Mission Viejo Development, Los Patrones Parkway, Rancho Mission Viejo, CA Resident Engineer. Provided technical and contract administrative expertise to enforce contract plans and specifications.

Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and reviewed the CPM schedule. Processed and checked the monthly progress payments and oversaw field construction inspection. Project Cost: $90 Million.

Orange County Transportation Authority (OCTA), I-5 HOV Improvement Project, San Juan Capistrano, CA Structures Inspector. Served as the main point of contact to verify the structural integrity of multiple elements including bridges, retaining walls, and sound walls per Caltrans standards and specifications. She was responsible for verifying compliance with relevant specifications, codes, and regulations, ensuring monthly progress payments were accurate by performing quantity calculations, performed surveying critical elements of the project, and managed and preparing contract change orders (CCO). Project Cost: $30 Million.

City of Riverside, Iowa Grade Separation, Riverside, CA Inspector provided technical and administrative support to make certain the work complied with relevant engineering standards, codes, specifications, and design instructions. Prepared, tracked, and managed change orders; documented project issues and conditions, maintained organized and detailed records; and obtained permits Processed and checked the monthly progress payments and performed field construction inspection. Project Cost: $24 Million.

City of Anaheim, I-5 / Gene Autry Way Project, Anaheim, CA Construction Inspector responsible for construction inspection duties of both road and structure (bridge) works. Inspected soil conditions, depth of footings and observed the pouring of foundations, and ensured monthly progress payments were accurate by performing quantity calculations. Collaborated with the Resident Engineer to prepare construction documents, calculations, project logs, meeting minutes, requests for information (RFIs). Project Cost: $66 Million.

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 5

KEVIN AUSTIN, PE, QSD
Construction Inspector
Mr. Austin has more than 12 years of experience as an inspector on various construction projects and as a result is cross trained to inspect numerous construction activities. Mr. Austin has significant experience with sidewalk, curb & gutter, ADA ramps, storm drains, manhole construction, traffic signals, street lighting, roadway construction, AC-HMA paving, and LCB/JPCP Pavement, roadway excavation, striping, drainage, underground utilities and grade separations. Mr.

Austin has extensive experience with LCB and JPCP Concrete pavement, Minor Concrete, HMA / RHMA Paving, Traffic Control, MBGR/ MGS, Drainage, Water and Sewer Lines, Landscape, Safety, and SWPPP. In addition to the noted construction activities, Mr. Austin has extensive working knowledge of hazardous materials management including but not limited to Asbestos Containing Materials (ACM) and otherwise contaminated debris. Responsibilities includes construction inspection and Quality Control, daily reports and quantities take-offs, review and monitor schedule of work, compliance with plans and specifications and certificates, shop drawings, change orders, submittals and RFI’s, safety compliance, NPDES compliance, preparing and reviewing as-built plans, and preparing final punch list.

Mr. Austin prepares routine daily diaries and checks to see the work is constructed to the lines and grades shown in the plans. He verifies materials incorporated into the work meet the contract requirements and checks quantities, size and dimensions upon arrival. He has extensive knowledge of the Caltrans Standard Plans and Specifications, Caltrans Construction Manual, OSHA Safety Manual, Traffic Control Manual, WATCH Manual, and Green Book. Mr. Austin has extensive experience with Office Engineering, office procedures; and project documentation. Mr. Austin has excellent work ethic, communication skills, and the ability to multitask.

RELEVANT PROJECT EXPERIENCE
City of Rialto, Willow Avenue at San Bernardino Traffic Signal Project (No. 230805), Rialto, CA
Construction Inspector. Project included installation of traffic signals, supporting cabinets, electrical connections, lighting and video detection systems. Roadway improvements consist of signage and striping updates to align with the new signals as well as the construction of two ADA compliant curb ramps. Responsible for roadway project per plans, specification, and special provisions in terms of managing, scheduling, and budgeting.

Performed site inspection duties, performing safety checks of the field personnel and construction tools and equipment. Submitted RFIs, Submittal, Change Orders, Inspection & Survey Requests. In addition, prepared daily construction visits to record daily/monthly construction reports & photos, executing purchase orders, tracking deliveries and logs, conducting safety meetings, submitting payrolls to accounting of field personnel.

Project Cost: $0.5 Million.

City of Rialto, Riverside Avenue Central Reconstruction, Rialto, CA Construction Inspector / Office Engineer. Responsible for roadway project per plans, specification, and special provisions in terms of managing, scheduling, and budgeting. Performed site inspection duties, performing safety checks of the field personnel and construction tools and equipment. Submitted RFIs, Submittal, Change Orders, Inspection & Survey Requests. In addition, prepared daily construction visits to record daily/monthly construction reports & photos, executing purchase orders, tracking deliveries and logs, conducting safety meetings, submitting payrolls to accounting of field personnel. Project Cost: Various.

EDUCATION
BS, Civil Engineering, California
State Polytechnic University,
Pomona

LICENSE
CA, Profession Civil Engineer,
No. C83422
Qualified Stormwater Developer
(QSD), No: 83422
10-Hour CalOSHA: General
Construction Safety and Health

RELEVANCE
• 12 Years of Civil Engineering
Experience
• Construction Inspection
• Haz Waste Management
• Asbestos/Lead Paint/PCB
• GreenBook Experience
• Familiar with Caltrans & LAP
Manuals
• Roadway Improvements
• LCB & JPCP Concrete
Pavement Experience
• HMA & PHMA Paving
• Traffic Management / Closures

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 6
Kevin Austin, PE

Page 2 ends

City of Rialto, J&K Auto Body Demo Project, Rialto, CA
Construction Inspector. The project consist of demolition and grading improvement project on three separate parcel groups to the northwest of the Rialto Metrolink Station in the City of Rialto, California. The three locations are 241 South Palm Avenue, 238 South Orange Avenue, and 239 South Orange Avenue. Responsible for roadway project per plans, specification, and special provisions in terms of managing, scheduling, and budgeting. Performed site inspection duties, performing safety checks of the field personnel and construction tools and equipment. Submitted RFIs, Submittal, Change Orders, Inspection & Survey Requests. In addition, prepared daily construction visits to record daily/monthly construction reports & photos, executing purchase orders, tracking deliveries and logs, conducting safety meetings, submitting payrolls to accounting of field personnel. Project Cost: $0.8 Million.

County of San Bernardino, Redwood Avenue and Other Roads, Fontana, CA Construction Inspector. The project includes work to be performed on Redwood Avenue, Live Oak Avenue, Elm Avenue and 4 smaller nearby streets. The project included construction spans approximately 4.7 miles of Mill and Overlay with

1.64 miles of leveling course needed only on Redwood Ave. Responsible for grade checking, inspection of HMA pavement, removal and resurfacing, construction of concrete pavement, sidewalk, curb, curb & gutter, curb ramp, V- gutter, drainage and sewer system, grouted rock strip, landscaping, retaining wall, striping and verification of SWPPP implementation, traffic control, and safety. Project Cost: $4.5 Million.

City of Rialto, Building 300 Inspection & Support Services, Rialto, CA Construction Inspector responsible for inspection of The Community Center Rehab located at 214 North Palm Avenue in Rialto involved the rehabilitation of Building 300’s Day Care Center. The work included renovation, ceiling, flooring, lighting, and windows replacement. It was determined that asbestos containing materials (ACM) existed within the facility. Appropriate measures were required to remediate and dispose of the ACM, per Cal-OSHA and local NESHAPs (South Coast AQMD) regulations as well as other applicable local regulations. Project Cost: Various.

City of Rialto, Merrill Avenue Improvements, Rialto, CA Construction Inspector Responsible for roadway and sidewalk project per plans, specification, and special provisions in terms of managing, scheduling, and budgeting. Performed site inspection duties, performing safety checks of the field personnel and construction tools and equipment. Submitted RFIs, Submittal, Change Orders, Inspection & Survey Requests. In addition, prepared daily construction visits to record daily/monthly construction reports & photos, executing purchase orders, tracking deliveries and logs, conducting safety meetings, submitting payrolls to accounting of field personnel. Project Cost: Various.

Caltrans District 12, On-Call Roadway Construction Inspection Services, Orange County, CA Lead Roadway Inspector. Performs roadway construction inspection, quantity calculations, checking grade and alignment, traffic control review, lane closures, and assuring compliance with project plans and specifications. Duties includes identifying actual and potential problems associated with the construction project work and recommending sound engineering solutions in a timely manner; maintains awareness of safety and health requirements and assuring compliance with applicable regulations and construction contract provisions for the protection of the public and construction project personnel. Project Cost: Various.

Orange County Public Works, On-Call Roadway Construction Inspection Services, Orange County, CA Public Works Inspector. Responsible for various construction projects including cold milling and asphalt overlay (Rubber Hot Mix Asphalt (RHMA) and pedestrian/bicycle bridge. Coordinated material testing in accordance with project specifications and monitored asphalt temperatures during the paving operations. Daily monitoring of the Erosion Sediment and Chemical Control Plan (ESCCP) BMP’s including effective dust control. Also coordinated with utilities and the Contractor to perform utilities adjustments in a timely manner, and reestablishing traffic striping in accordance with project plans and Caltrans standards. Monitor daily traffic control to ensure safe vehicle and pedestrian passage through construction area. Documented daily construction activities and performed quantity calculations. Project Cost: Varies.

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 7

DANIEL ESTEVES
Electrical Inspector
Daniel have over 6 years of electrical / utility related experience and knowledge in comprehensive services. His experience includes public agencies, municipalities, and developers. His experience includes Electrical Construction; Fiber Optics; CCTV; changeable message signs, and traffic monitoring equipment Communication ADA compliance requirements; Utility Construction and Relocation; Power Application, Telephone Power Systems; Power Plants for Telecommunications; Photovoltaic Systems for Commercial and Residential Use; Audit for Telecom Plants; NEC and NFPA; Lighting and Power Distribution; and Power transmission lines. He is experienced with traffic control system compliance, and in assistance to the resident engineer by preparing CCO and force account analysis. His responsibilities included construction inspection and Quality Control, daily reports and quantities take-offs, review and monitor schedule of work, compliance with plans and specifications and certificates, shop drawings, change orders, submittals and RFI’s, safety compliance, SWPPP review and monitoring, preparing and reviewing as-built plans, and preparing final punch list. He meets all temperature and time restrictions requirements. His experience also includes Motor Control, Power Distribution, PLC (Programmable Logic Control), AC/DC Theory, Advanced Blueprints, Circuit Analysis, Variable Frequency Drives, National Electric Codes A/B/C, Relay Ladder Logic, Process Control & Communication, and Calculating Loading. He has the ability to interpret contract specifications and has extensive knowledge of the Caltrans Standard Plans and Specifications, Caltrans Construction Manual, OSHA Manual, Traffic Control Manual, and Green Book.

RELEVANT PROJECT EXPERIENCE
Caltrans District 7 (Contract 07A5257 – EA 07-312003), SR-110 Traffic Communication & Electrical Systems, Los Angeles, CA
Electrical Inspector responsible for inspection of traffic signal intersections with new sidewalk handicap ramps to be installed throughout the City. Responsibilities included performing daily construction inspection to ensure contractor compliance with the contract plans and specifications while recorded detailed daily inspection reports accurately reflecting construction progress, inspection of change order work, reviewed as-built drawings of actual construction and site conditions, inspection of both electrical and mechanical components. Work also includes coordination with contractor on all closures, traffic control, and all safety aspects. Project Cost: $1 Million.

Caltrans District 7 (Contract 07A5257 – EA 07-311903), SR-2 Electrical System Modification, Glendale, CA Electrical Inspector. Responsible for overseeing all electrical and communication systems which included closed circuit television system, ramp-metering system, fiber optic system testing and documentation, highway signal illumination system, changeable message sign system, bridge falsework lighting and all traffic signal modification systems. Inspection of roadway excavation, structure excavation-soundwall, concrete barrier soundwall, medium concrete barrier and metal beam guard railing installation systems. Work also includes coordination with contractor on all closures, traffic control, and all safety aspects. Project Cost: $2 Million.

EDUCATION
BS, Electrical Engineering, Southern
California Institute of Technology,
Anaheim

AREAS OF EXPERTISE
• Electrical Inspection
• Utility Relocation Coordination
• JPCP / HMA / RHMA
• ADA Ramps
• Traffic Control
• Caltrans Coordination
• Noise and Dust Control
• Sidewalk Improvements
• Progress Reports
• Health & Safety

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 8
Daniel Esteves

Page 2 ends

City of South Gate, Traffic Signal Modifications Project and ADA Ramps, South Gate, CA Electrical Inspector responsible for inspection of 10 traffic signal intersections with new sidewalk handicap ramps to be installed throughout the City. Responsible for overseeing electrical and communication systems which included closed circuit television system, ramp-metering system, fiber optic system testing and documentation, highway signal illumination system, changeable message sign system, and all traffic signal modification systems. Responsibilities included performing daily construction inspection to ensure contractor compliance with the contract plans and specifications while recorded detailed daily inspection reports accurately reflecting construction progress, inspection of change order work, reviewed as- built drawings of actual construction and site conditions, inspection of both electrical and mechanical components. Work also includes coordination with contractor on all closures, traffic control, and all safety aspects. Project Cost: $5 Million.

Ontario International Airport Authority, Runway 26R ILS Upgrade Project, Ontario, CA Field Inspector / Electrical Inspector. The project will upgrade and modernize existing CAT II lighting infrastructure to CAT Ill lighting infrastructure for the safe landing of passenger and cargo airplane landing during inclement and/or foggy weather conditions. The scope of work for this project consists of demolishing the existing approach light system and constructing a new ALSF2 system. Responsible for daily inspecting and witnessing testing of equipment connections and commissioning. Including but not limited to cables & communication wiring, CCTV, Fire Alarm Communication Equipment and Public PA systems for passenger safety. Prepared inspection reports, field engineering services and weekly progress presentations to the team and Port management. Project Cost: $3.5 Million.

Los Angeles World Airports, LAX Receiving Station / SAAP Enabling Project, Los Angeles, CA Electrical Inspector. Inspecting and monitoring of all fieldwork and progress of the contractor and subcontractor(s) as they installed and tested system equipment. Ensured all installations met contract documents and adhered to Federal, State and Local applicable codes, Standard Plans and Specifications. Work includes coordination with the contractor on all closures and all safety aspects. The site work consists of various types of work such as ADA required modifications, lighting, signing and stripping. Daniel performed daily inspections, submitted daily reports, quantity and pay estimate calculations, assisted in claim reviews and negotiations, and daily diaries documentation. Project Cost: $2 Million.

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 9

RICHARD SHIRLEY, RLA
Landscape Architect / Inspector
Mr. Shirley has 25 years of construction inspection and Architecture extensive for public works projects as a landscape architect inspector for local agencies, various cities and counties. In addition, he has extensive transportation and infrastructure project experience in the private and public sectors, including but not limited to roadway; storm drain systems; roadway and bridge widening, soil nailing, sound walls, highway planting and irrigation. He has managed project teams and serves as liaison between Clients, Contractors, and Stakeholders to meet the established quality, budget and scheduling goals; and to minimized or prevented claims. He has an in-depth understanding of transportation and related construction management requirements. Richard has been recognized by multiple client, including Caltrans & City of Moreno Valley.

RELEVANT PROJECT EXPERIENCE
La Cañada Flintridge, I-210 Freeway Soundwalls, Phase III, La Cañada Flintridge, CA
Landscape Architect / Inspector. The project will reduce exposure to traffic noise for the residents of the City of La Cañada Flintridge. The work includes approximately 1,500 linear feet of block soundwall on CIDH piles; 2,400 linear feet of block soundwall on barrier on CIDH piles; and 1,500 linear feet of block soundwall on new bridge barriers. Responsibilities for this work included observation of installation of irrigation systems including layout of future systems. Also inspected specimen plant materials at their sources and observed their installation. Planting portion of work included placement of specimen palms and complete mulching of surfaces. Project Cost: $8.5 Million.

San Diego Association of Governments (SANDAG) / Caltrans District 11, Los Penasquitos Lagoon Bridge Replacement Project, North County San Diego, CA
Landscape Architect / Inspector. Responsible for daily inspection of certain work zone of the New Bridges, restoring the impacted lagoon sensitive environs. Inspected new bridge trestle locations through some very environmentally sensitive lagoons. Observed and documented the restoration of the native habitats / communities considering components such as Salinity, PH, Invasive Weeds and On-Site Plant Propagation, while construction activities took place within the railroad Right-of-Way with inherent restrictions.

Project Cost: $21 Million.

City of Fontana, Duncan Canyon Overcrossing, Fontana, CA Construction Inspector / Roadway & Landscape. Responsible for inspection of erosion control measures surrounding the slopes of a newly built interchange. Implemented the Storm Water Pollution Prevention Plan around the interchange. Inspected installation of temporary irrigation and landscaping within the perimeter of the project including installation of rock slope protection on all newly built ramps to I-15. The project filled the need for an intensive transportation connection between two portions of the City of Fontana. Cost: $25 Million.

SBCTA, I-10 Widening / Median Lane Addition, Redlands, CA Landscape Inspector. Oversaw removal and transplantation of more than 40 palm trees (50 feet tall) from the median to other onsite locations, landscaping of several ramps and replacement of critical irrigation systems. Coordinated placement of underground features with sound walls. Inspected on-site mechanical drainage. Project added lanes, median divider wall, sound walls and widened bridges to Interstate 10. Project Cost: $10 Million.

EDUCATION
BS, Landscape Architecture; Cal
Poly-Pomona, 1978 (honored)
AA, Pierce Community College, 1974
(honored)
Rapid Set Concrete Training; Excava
tion & Shoring Training; Storm Water
Pollution Prevention Plan
(SWPPP) Training

CERTIFICATIONS
CA, Registered Landscape Architect,
No. 2252
CA, Qualified SWPPP Practitioner,
No. 26369
Crane & Derrick Safety I Certificate

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 10
Richard Shirley, RLA

Page 2 ends

Caltrans District 7 (EA 07-312404), On-Call Services, Ventura, CA Construction Inspector. Inspected drainage systems, roadway modifications, and erosion control measures with water capture systems. Performed daily inspection of new onsite mechanical and passive drainage measures designed to capture water into local spreading/recharging basins within runoff of Route 126 in Santa Paula. Inspected the layout of each drainage system with a series of new catch basins replacing the existing structures. Observed and documented Contractor’s operation in demolishing the existing catch basins, and pipe trench – sometimes reached the depths of 8 to 12 feet. Inspected trenching and shoring of new reinforced concrete pipes (RCP) being laid in trenches complying with Cal- OSHA safety ordinances. Richard checked contractor’s evaluation of the existing soils per Cal-OSHA to cut slopes, where necessary. Inspected construction of catch basins that were composed of prefabricated elements and CIP segments.

Ensured that all Contractor’s operations were inspected thoroughly and documented in a timely manner especially ensuring that the completed drainage system was functioning. Ensured subsurface mechanical drainage structures directed the collected water through the concrete pipe to spreading recharge basins as designed. Inspected the newly constructed RCP outlets that placed the water onto a field of energy dissipating rock and into the spreading basins.

Observed and documented that these basins were carefully graded with positive fall and when flows or the percolation coefficient does not permit a reasonable recharge rate designed overflows provides controlled dispersion. Appreciation Letter by Project Resident Engineer, Hector Arroyo, PE dated May 20, 2019. Project Cost: $2 Million.

City of Agoura Hills, Agoura Road Widening Project, Agoura Hills, CA Construction Inspector / Roadway & Landscape. Responsible for inspection of various construction activities including reinforced concrete retaining walls, asphalt concrete paving, site construction amenities, erosion controls, drainage system facilities, installation of recycled water services, clearing, grubbing and grading, and installation of irrigation lines and landscaping. The scope of the project improvements included 2.5 miles of two-lane roadway into a vital 4- lane transportation corridor within a setting on the verge of the native environs and serving as the bypass to Highway 101. The roadway was enhanced by landscaped center medians, while existing massive oak trees were preserved during the construction. Project Cost: $7 Million.

San Bernardino Associated Governments, Hunts Lane Grade Separation, San Bernardino, CA Construction Inspector / Roadway. Responsible for traffic management and coordination of existing businesses and residents within the project site. Made sure that contractor installed the crossover water lines efficiently with no interruption to the public. Provided the Resident Engineer with information concerning resolution of various landscape planting issues.

Project Cost: $20 Million.

Caltrans District 8 & SBCTA, I-10 HOV Lanes, Mountain, Central and I-10 Freeway Widening, Upland / Ontario Landscape Inspector. Responsible for transplanting 150+ large specimen trees and massive Date Palms, and landscaping irrigation including capability for central computerized monitoring. Responded to emergency situations including shutdown, troubleshooting problems, recommending repairs and institute reactivation. Observed regular maintenance including weeding, herbicides, pruning, fertilizing, pest control, monitor irrigation and site cleaning. Observed the protection of remaining features in bridge control systems, project administration on behalf of R.E., contract and coordination with city agencies. The project required daily maintenance observation and familiarity with existing irrigation systems as well as adjustments as needed to maintain existing landscapes. Project Cost: $110 Million.

Corona, SR-91 / Main Street Landscape Improvements, Corona, CA Project Inspector / Representative. Responsible for on-site inspection, project administration and coordination with the adjacent Caltrans landscaped ramps for an important gateway freeway interface for the City of Corona at 91 freeway.

Project Cost: $1 Million.

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 11

CLAUDIA MEJIA
Public Relations
Ms. Mejia has more than 16 years of experience in developing and implementing community outreach services for construction management projects, with expertise in public relations, marketing, event planning, and graphics design.

Claudia has managed the logistics and execution of several outreach programs and public events for major transit projects in Southern California, as projects advance through planning, final design, pre-construction, and construction phases. She is an expert in providing proactive community outreach services and communicating program details to stakeholders, residents, and businesses as well as addressing questions and concerns. As a public relations consultant for construction management projects, Claudia has liaised with leading corporate clients and agencies in the Los Angeles, San Diego, and Inland Empire areas to develop and execute public relations and community outreach campaigns, marketing operations, business development, customer relations, event planning and execution, and graphic design services for projects. Claudia speaks and writes fluently in English and Spanish and has experience in translation and interpretation services.

RELEVANT PROJECT EXPERIENCE
City of Rialto, Willow Avenue at San Bernardino Traffic Signal Project (No. 230805), Rialto, CA
Public Relations Representative. Project included installation of traffic signals, supporting cabinets, electrical connections, lighting and video detection systems.

Roadway improvements consist of signage and striping updates to align with the new signals as well as the construction of two ADA compliant curb ramps. Claudia is responsible for providing proactive community outreach services during the project’s Construction Phase. The outreach services include communication with residents, businesses, schools, and emergency services, branding, developing and distributing collateral material (physical and electronic), database development, community inquiry assistance, community outreach, and business outreach. Project Cost: $0.5 Million.

City of La Canada Flintridge, Soundwall Construction on I-210 Freeway, La Canada Flintridge, CA Community Outreach Representative. Claudia is responsible for providing proactive community outreach services during the project’s Construction Phase. The outreach services include communication with residents, businesses, schools, and emergency services, branding, developing and distributing collateral material (physical and electronic), database development, community inquiry assistance, community outreach, and business outreach. Project Cost: $8.5 Million.

San Gabriel Valley Transit Feasibility Study – Phase 1 & 2 – SGVCOG, San Gabriel Valley, CA Project Manager. Claudia is responsible for facilitating and implementing a Community Engagement Program for the San Gabriel Valley Transit Study (Study); the Program is being tailored to the general public and it includes strategic planning and logistical support for all public outreach activities to support development of the Study, which encompasses over 15 cities in the San Gabriel Valley subregion, which are the cities and communities within the Study Area, and transportation planning methods. The outreach deliverables include Team Progress/Coordination Meetings and all applicable items such as meeting agenda and minutes; progress reports; facilitating and implementing key stakeholder briefings and Technical Advisory Committee (TAC) development; Community Workshops; Elected Official briefings; Community Pop-Up Events; branding; collateral material development; database development and upkeep; inquiry assistance; and translation and interpretation services.

EDUCATION
BS, Marketing, California State
University, Long Beach
Southern California School of
Interpretation, Santa Fe Springs,
CA

AWARDS / HONORS
2014 MarCom Honorable Mention
– Media Kit / Special Event, La
Pata Extension – Connecting
Communities Campaign, Hill & the
County of Orange
2014 Marcom Gold Award –
Magazine Special Edition: I-5 HOV
Gene Autry Way Project, Hill & the
City of Anaheim

RELEVANCE
• 16Years of Public Relations
Experience
• Community Outreach
• Public Relations Marketing
Events

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 12
Claudia Mejia

Page 2 ends

Orange County Transportation Authority, I-405 Improvement Design-Build Project, Orange County, CA Community Outreach Representative. Claudia is assisting with the implementation of an effective outreach plan for improvements along 16 miles of Interstate 405 (I-405) from I-605 to SR-73 in Orange County. She is providing coordination and support for inquiries from residents, businesses, cities, agencies, motorists, and all stakeholders affected by the project construction. The project improvements include replacing and widening 18 bridges, adding 11 new bike lanes for more cycling routes and 18 sidewalks for pedestrians, constructing general lanes and the 405 express lanes for motorists, improving arterial streets, and adding and replacing sound and retaining walls for residents. The outreach plan includes communicating with stakeholders, commuters, and residents / HOAs / complexes, and encompasses cities impacted by the 16 mile project, including Seal Beach, Fountain Valley, Huntington Beach, Costa Mesa, Westminster, and Los Angeles County line. Claudia is helping to make sure the outreach is performed in a proactive, timely, efficient, and effective manner for all construction activities and concerns/questions they may have. Project Cost: $1.9 Billion.

Orange County Transportation Authority (OCTA), I-5 Central County Improvement Project, Orange, CA Public Outreach Project Manager and Community Liaison. Claudia developed a public awareness and community outreach plan for the final design and construction phases of the I-5 Central Improvement Project, a three-mile segment of I-5 between State Route 55 and State Route 57. This $42 million project for the Orange County Transportation Agency (OCTA), in partnership with Caltrans, traversed the diverse communities of Santa Ana, Orange, and Tustin, California. The communications and outreach plan included proactively, efficiently, and effectively communicating construction activities that may have impacted commute and daily operations for local and regional stakeholders, such as businesses; residents/HOAs/complexes; retail malls; vacation destinations such as the Santa Ana Zoo, Disneyland, Honda Center, Discovery Cube, and the Angels Stadium; medical facilities and hospitals; and trucking companies. Project Cost: $42 Million.

County of Riverside/City of Jurupa Valley, Clay Street & UPRR Railroad Grade Separation Project, Riverside, CA Public Outreach Representative. Claudia performed community outreach services for extensive improvements to Clay Street and the UPRR Pacific Railroad (UPRR). The project improvements included construction of the lower grade elevation of Clay Street to pass under the existing UPRR railway, a railroad bridge for the existing UPRR railway, lower grade elevations of two streets, new 42” reinforced concrete pipe, and a new traffic signal. Several important stakeholders reside alongside or near the project, including local businesses, emergency services, utility companies, school and City transportation services, elected officials offices and residents. Claudia’s work included collateral material development; project website content maintenance and up keep; public notifications in the form of construction notices and electronic email blasts; database development; community inquiry assistance; outreach to City and County entities, local businesses, emergency services, utility companies, school and City transportation services, elected officials and residents; and project presentations to stakeholders and community groups. Project Cost: $16 Million.

Caltrans District 7, On-Call Public Awareness, Interstate 5 (I-5) North Segment from SR-134 to Kern County Line, Los Angeles County, CA
Community Outreach Representative. Claudia was responsible for executing a comprehensive community outreach plan for $1.3 billion in construction projects. Highway improvements were made to enhance safety, improve traffic flow, reduce congestion, encourage ridesharing, decrease surface street traffic, and improve air quality. The project comprised construction of high-occupancy vehicle (HOV) lanes and direct HOV connectors, interchange improvements including on- and off-ramps and bridge widening and reconstruction, pavement replacement, and grade separation.

Claudia’s responsibilities included developing a website (www.I-5info.com), event planning, business outreach, resident outreach, chamber of commerce outreach, neighborhood association presentations/outreach, branding, collateral material (design/distribution), coordinating a toll-free hotline number process/staff, presentations, construction notices (design/ distribution), graphics, photography, translation services, presentation boards, corridor brochures (design/distribution), closures list, and coordination with project managers. Project Cost: $1.3 Billion.

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 13

RAMON CARLOS
Labor Compliance Analyst
Mr. Ramon Carlos has been a labor compliance officer since 2003 with the public sector as well as private sector. He takes on highly challenging positions and projects, and with his energy, initiative and ability to implement and administer programs, delivers successful assignments that have built his reputation in our industry as one of the best labor compliance officers in the Inland Empire. Ramon utilizes Labor Compliance Software programs.

RELEVANT PROJECT EXPERIENCE
City of Rialto, Willow Avenue at San Bernardino Traffic Signal Project (No. 230805), Rialto, CA
Labor Compliance Analyst. Project included installation of traffic signals, supporting cabinets, electrical connections, lighting and video detection systems. Roadway improvements consist of signage and striping updates to align with the new signals as well as the construction of two ADA compliant curb ramps. responsible for conducting payroll analysis, recommending actions to enforce labor law, crosschecking dailies with certified payrolls, verifying apprenticeship ratios are correct, obtaining certifications for apprentices and owner operators, reviewing employee interviews, calculating restitution, sending out correspondence to contractors and communicating with contractors and agencies as needed. Reviews and audit Certified Payroll Reports, attends Preconstruction Meetings and informs Contractors of all Labor Provisions, enforces SB854 Laws, prepares Restitution Cases, and reconciles inspector’s Daily Work Reports to Certified Payroll Reports.

Project Cost: $0.5 Million.

City of Rialto, J&K Auto Body Demo Project, Rialto, CA
Labor Compliance Analyst. The project consist of demolition and grading improvement project on three separate parcel groups to the northwest of the Rialto Metrolink Station in the City of Rialto, California. The three locations are 241 South Palm Avenue, 238 South Orange Avenue, and 239 South Orange Avenue. Responsible for conducting payroll analysis, recommending actions to enforce labor law, crosschecking dailies with certified payrolls, verifying apprenticeship ratios are correct, obtaining certifications for apprentices and owner operators, reviewing employee interviews, calculating restitution, sending out correspondence to contractors and communicating with contractors and agencies as needed. Reviews and audit Certified Payroll Reports, attends Preconstruction Meetings and informs Contractors of all Labor Provisions, enforces SB854 Laws, prepares Restitution Cases, and reconciles inspector’s Daily Work Reports to Certified Payroll Reports.

Project Cost: $0.8 Million.

San Bernardino County, Arrowhead Regional Medical Center, Labor & Delivery Remodel, Colton, CA Labor Compliance Analyst responsible for conducting payroll analysis, recommending actions to enforce labor law, crosschecking dailies with certified payrolls, verifying apprenticeship ratios are correct, obtaining certifications for apprentices and owner operators, reviewing employee interviews, calculating restitution, sending out correspondence to contractors and communicating with contractors and agencies as needed. Reviews and audit Certified Payroll Reports, attends Preconstruction Meetings and informs Contractors of all Labor Provisions, enforces SB854 Laws, prepares Restitution Cases, and reconciles inspector’s Daily Work Reports to Certified Payroll Reports. Works with outside Labor Compliance Agencies, performs field audits / employee interviews, prepares Federal and/or State Audits for Labor Compliance, conducts in-house training, and maintains Labor Compliance Files. Project Cost: Various.

City of La Quinta, Complete Streets Project, La Quinta, CA Labor Compliance Officer. Mr. Carlos is currently serving as the labor compliance officer for this project. The project constructed five new roundabouts in the La Quinta Village where pedestrian, bicycle, golf cart, and automobile traffic coexists. The reduced travel lanes and crosswalks added mid-block provided pedestrians with safer access to Civic Center Park, Old Town La Quinta, and the Benjamin Franklin Elementary School. Improvements are being completed in three stages throughout The Village and Cove areas. Project Cost: $13.5 Million.

EDUCATION
Coursework

RELEVANCE
• 20 Years of Labor Compliance
Experience
• Contract Administration
Experience

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 14
Ramon Carlos

Page 2 ends

San Bernardino County Public Works, Board of Chambers, San Bernardino, CA Labor Compliance Analyst is responsible for conducting payroll analysis, recommending actions to enforce labor law, crosschecking dailies with certified payrolls, verifying apprenticeship ratios are correct, obtaining certifications for apprentices and owner operators, reviewing employee interviews, calculating restitution, sending out correspondence to contractors and communicating with contractors and agencies as needed. Ramon reviews and audit Certified Payroll Reports, attends Preconstruction Meetings and informs Contractors of all Labor Provisions, enforces SB854 Laws, prepares Restitution Cases, and reconciles inspector’s Daily Work Reports to Certified Payroll Reports. He works with outside Labor Compliance Agencies, performs field audits / employee interviews, prepares Federal and/or State Audits for Labor Compliance, conducts in-house training, and maintains Labor Compliance Files. Project Cost: Various.

San Bernardino County, Fuel Tank Infrastructure, Victorville, CA Labor Compliance Analyst responsible for conducting payroll analysis, recommending actions to enforce labor law, crosschecking dailies with certified payrolls, verifying apprenticeship ratios are correct, obtaining certifications for apprentices and owner operators, reviewing employee interviews, calculating restitution, sending out correspondence to contractors and communicating with contractors and agencies as needed. Reviews and audit Certified Payroll Reports, attends Preconstruction Meetings and informs Contractors of all Labor Provisions, enforces SB854 Laws, prepares Restitution Cases, and reconciles inspector’s Daily Work Reports to Certified Payroll Reports. Works with outside Labor Compliance Agencies, performs field audits / employee interviews, prepares Federal and/or State Audits for Labor Compliance, conducts in-house training, and maintains Labor Compliance Files. Project Cost: Various.

City of Palm Desert, San Pablo Avenue Phase I & II Streetscape Project, Palm Desert, CA Labor Compliance Officer. Mr. Carlos is currently serving as the labor compliance officer for this project. The San Pablo Avenue Streetscape Project transformed San Pablo Avenue into a key artery in a revitalized city center where walking, biking, and fun is the focus in the City of Palm Desert. Roadway lanes are being reduced to allow room for improved bikeways along San Pablo Avenue, enhanced pedestrian accommodations, new landscaping, beautification of existing community gardens, on-street parking, and a roundabout intersection at San Gorgonio Way. Project Cost: $17 Million.

City of Corona, I-15/Cajalco Road Interchange Project, Corona, CA Labor Compliance Officer. Mr. Carlos is currently serving as the labor compliance officer for this project. The project reconstructed the interchange located on Interstate 15 at Cajalco Road in the City of Corona. The proposed improvements increased the capacity of the overcrossing and ramps to reduce congestion and accommodate projected development and growth in the area. As the labor compliance officer, Ramon is responsible for reviewing contractor’s certified payroll records, performing worker interviews, DBE reports and EEO records. Cost: $50 Million.

I-10/Jefferson Street Interchange Project, Indio, CA
Labor Compliance Officer. Mr. Carlos served as the Labor Compliance Officer for this project that consisted of widening the existing structure for both west and east bound traffic. The project added a 5-foot bike lane and an 8-foot shoulder to improve pedestrian safety and tie in with the existing east and west bound approaches by widening the existing structures. The project also included the installation of a water main on Foothill. Throughout the construction duration, one-way traffic was maintained on Foothill Boulevard, continuous access to the businesses and residents was also maintained. Project Cost: $45 Million.

Foothill Boulevard Bridge Widening, San Dimas, CA
Labor Compliance Officer. Mr. Carlos served as the Labor Compliance Officer for this project that consisted of widening the existing structure for both west and east bound traffic. The project added a 5-foot bike lane and an 8 foot shoulder to improve pedestrian safety and tie in with the existing east and west bound approaches by widening the existing structures. The project also included the installation of a water main on Foothill. Throughout the construction duration, one-way traffic was maintained on Foothill Boulevard, continuous access to the businesses and residents was also maintained. Project Cost:
$2.3 Million.

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 15

GARRETH SAIKI, PE, GE
Materials Testing Project Manager
Mr. Saiki holds two master’s degrees, one in Geotechnical Engineering and the other in Business Administration and is a California licensed Civil and Geotechnical Engineer. In his over 35-year career, the past 23 years with Ninyo & Moore, Mr.

Saiki has provided contract management for many multi-million dollar, multi-year, on-call/task order based contracts for Ninyo & Moore, including a 5-year, $8 million dollar contract with John Wayne Airport and two contracts with the Los Angeles Unified School District totaling over $6 million dollars. He also brings extensive Caltrans experience, having managed Ninyo & Moore’s materials testing contracts for MOS 1, 2 and 3 of the I-405/SR-55 Interchange Improvement project. Mr. Saiki is responsible for overseeing our in-house and subconsultant personnel performance, as well as contract management, as it pertains to schedule, budget and documentation control, as well as our technical QA/QC controls.

RELEVANT PROJECT EXPERIENCE
SR-210 Lane Addition, Baseline Interchange and Pavement Rehabilitation Project, San Bernardino, CA
Principal Engineer providing oversight during inspection and materials testing of soils, aggregates, asphalt concrete and PCC concrete. Services included observation, sampling and testing during embankment construction (earthwork), structure backfill, trench backfill, subgrade preparation, aggregate base placement, lean concrete base placement, Portland cement concrete pavement, asphalt concrete pavement placement, structural concrete placement, and batch plant inspections. Testing was performed in accordance with Caltrans test methods and test frequencies as described in the Caltrans Construction Manual, Standard Specifications, and Special Provisions.

Services were provided during weekends and night work. Project Cost: $167 Million.

SBCTA, I-215 Segments 1 and 2, San Bernardino, CA
Principal Engineer. provided geotechnical oversight during construction of the I-215 Segments 1 & 2 project in San Bernardino, California. The project consisted of widening and realignment of approximately 2.4 miles of the existing I- 215. Andy’s responsibilities also included supervising and coordinating construction observation and intermittent field and laboratory testing of the construction materials used in the project. Testing was performed in accordance with CTM standards. Project Cost: $723 Million.

I-15 / Duncan Canyon Interchange Project, Fontana, CA
Project Manager for the Duncan Canyon Interchange, realignment of Lytle Creek Road, and storm drain improvements.

The new interchange included widening the existing over-crossing bridge and new freeway access ramps. The Lytle Creek improvements included realignment and reconstruction of Lytle Creek Road from Duncan Canyon to the North.

The storm drain improvements included a new concrete box culvert from existing Hawker Crawford Channel, through the I-15 Freeway, to the east side of the I-15 Freeway. Services included project coordination, management and technical support. Field services included sampling and testing of structural concrete, asphalt concrete (AC), embankment fill, structural backfill and aggregate base (AB). Project Cost: $35 Million.

State Route 60 / Moreno Beach Drive, Moreno Valley, CA
Project Manager for the materials testing and geotechnical consulting services during construction of the SR- 60/Moreno Beach Drive Phase 1 Improvement Project. The project consisted of realigning the SR-60/Moreno Beach eastbound off- and-on-ramps, adding an eastbound auxiliary lane, installation of a new traffic signal at the new intersection of the eastbound ramps and Moreno Beach Drive, adding a retaining wall, adding ramp metering, extension of Eucalyptus Avenue to Moreno Beach Drive, modification of the traffic signals. Project Cost: $105 Million.

EDUCATION
MBA, University of California, Davis
MS, Geotechnical Engineering,
University of California Berkeley
BS, Civil Engineering, University of
California Berkeley

REGISTRATION
Ca, Professional Civil Engineer
No. 49665
CA, Geotechnical Engineer
No. 2509

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 16
Garreth Saiki, PE, GE

Page 2 ends

Caltrans District 12 (Contract No. 12A18879), Sampling and Testing Services, Orange County, CA Principal Engineer providing coordination to support the development and construction of state transportation projects in District 12. Field services included sampling and testing of concrete, asphalt concrete subgrade, and aggregate base. Laboratory testing services included California Impact Test, R-value, AC extraction, AC maximum density, durability, and flexural strength testing. Testing was performed in accordance with CTM standards. Project Cost: $6.8 Million.

City of Moreno Valley, On-Call Materials Testing and Geotechnical Engineering Services, Moreno Valley, CA Principal Engineer providing oversight to coordinate on-call materials testing and geotechnical engineering services for various projects for the City of Moreno Valley, including street widening and improvements at various locations, street widening and storm drain improvements. Services have included compacted fill and trench backfill observation and testing, subgrade, aggregate base, Portland cement concrete and asphalt concrete testing, materials sampling and similar services.

Testing was performed in general accordance with Greenbook Standard Specifications.

City of Rancho Cucamonga, Soils and Materials Annual Testing Services, Rancho Cucamonga, CA Principal Engineer providing oversight of project management for soils and materials testing services during various construction projects throughout the City of Rancho Cucamonga, to evaluate the construction materials conformance with the appropriate Caltrans and Greenbook Standard Specifications, including providing quality assurance testing in accordance with Caltrans specifications for asphalt pavement.

County of Los Angeles, Department of Public Works, As-Needed Geotechnical, Soils and Materials Testing & Inspection Services, Los Angeles, CA
Project Manager retained to provide services to the County of Los Angeles, Department of Public Works ranging from geotechnical design, geotechnical testing and inspection to special inspection services for welding, fireproofing, and reinforced concrete and masonry. Ninyo & Moore has also worked with the Public Works coordination staff in controlling each projects budget from a geotechnical, materials testing, and inspection services point of view. Ninyo & Moore has provided services on various types of projects from pipeline interior documentation to entire new building design and construction.

City of La Mirada On-Call Materials Testing, La Mirada, CA Project Manager retained to provide certified materials testing laboratory and inspection services for various projects within the City of La Mirada, California. The project includes geotechnical services including sampling, material testing, compaction testing, and other services requested. Responsibilities include project coordination and client liaison, on-site soil and materials testing and inspection during construction, field observation, documentation and testing, field sampling and in-place density testing, field sampling and testing of concrete structures and paving during construction and field inspection of the construction materials.

Orange County Sanitation District On-Call Materials Testing, Inspection and Other Geotechnical Testing Services Project Manager retained to provide on-call materials testing, inspection and other geotechnical testing services during the various construction, reconstruction and site repair type projects located within and outside their facilities. Our geotechnical and materials testing engineering, as well as field materials testing and deputy inspection personnel have worked closely with Orange County Sanitation District representatives, in order to assist in them in ensuring that each project is constructed and inspected in accordance with the approved documents.

City of Los Angeles, On-Call Geotechnical and Environmental Consulting Services, Los Angeles, CA Project Manager for the on-call geotechnical and environmental services contract with the City of Los Angeles Bureau of Engineering, Geotechnical Division. Our services include geotechnical design, environmental hazardous materials evaluation, and geotechnical construction support services.

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 17

JOE LAVARIO, ACI
Field T echnician
As a Senior Field Technician for Ninyo & Moore, Mr. Levario is responsible for performing quality control and quality assurance testing of soil, aggregate, asphalt, and concrete materials in accordance with applicable ASTM, AASHTO, ACI, and CALTRANS standards. As a senior technician, Mr. Levario has extensive experience providing both field and laboratory testing of soils and construction materials and maintains his current soils and materials testing certifications from ACI and Caltrans, as well as his nuclear gauge certification. He provides geotechnical observation and testing services during earthwork operations, including mass grading operations, trench and wall backfill, and roadway and building pad subgrade preparation, as well as providing inspection of asphalt and concrete batch plants. Mr. Levario also has extensive experience in the requirements and specifications in Greenbook for public works construction projects, as well as the requirements of Caltrans for testing frequencies, test methods, and record keeping as described in Caltrans Standard Specifications, Standard Special Provisions, and the Caltrans Construction Manual. He maintains a current Caltrans certification for both field and laboratory testing.

RELEVANT PROJECT EXPERIENCE
San Bernardino County Transportation Authority (formerly SANBAG) I-215 Segments 1 and 2 Project. San Bernardino County, CA
Senior Field Technician providing materials testing and inspection services during construction of the I-215 Segments 1 & 2 project in San Bernardino, California. The project consists of widening and realignment of approximately 2.4 miles of the existing I-215. Services provided included aggregate, soil, concrete testing and extensive work with asphalt placement and batch plant operations, as well as MSE wall placement observation testing. Testing was performed in accordance with CTM standards.

SR-60 at Moreno Beach Drive Phase I Improvements Project, Moreno Valley, CA Senior Field Technician providing materials testing services for the SR-60 at Moreno Beach Drive Phase 1 Improvement project in Moreno Valley, California. Improvements consisted of realigning the SR-60/Moreno Beach eastbound off-and-on-ramps, adding an eastbound auxiliary lane, installation of a new traffic signal at the new intersection of the eastbound ramps and Moreno Beach Drive, adding a retaining wall, ramp metering, extension of Eucalyptus Avenue to Moreno Beach Drive, modifications to traffic signals, utility relocations, irrigation, and related work. Field services included sampling and testing during embankment construction (earthwork), structure backfill, trench backfill, wall backfill, subgrade preparation, aggregate base placement, asphalt concrete pavement placement, structural concrete placement, and batch plant inspections. Source Inspections services were also provided during fabrication of pre-cast/pre-stressed concrete piles to evaluate the materials conformance with the project specifications.

I-15 at Duncan Canyon Interchange Project, Fontana, CA
Provided materials testing for the modification of the existing I-15 and Duncan Canyon Road Interchange, realignment of Lytle Creek Road, and storm drain improvements. Field services included sampling and testing of structural concrete, asphalt concrete, embankment fill, structural backfill, and aggregate base. Services also included bath plant inspection during production of asphalt concrete and structural concrete. Testing was performed in accordance with CTM standards.

CERTIFICATION
ACI Concrete Field Testing
Technician Grade I
Caltrans Soils and Aggregates Test
Methods 105, 125, 201, 202, 205,
216, 217, 226, 227
Radiation (Nuclear Gauge) User
Safety
OSHA Excavation Competent
Person
USDOT HAZMat Refresher Training
eRailSafe Contractor, No. 727113

CITY OF RIALTO
Construction Management, Inspection, Materials Testing and Public Relations Services for Downtown Parking Lot Improvements City Project No. 230801

Page | 18
Joe Levario

Page 2 ends

BNSF Rail Corridor Soundwall Construction, Anaheim, CA
Field Technician providing materials testing and inspection services during the construction of the proposed BNSF Rail Corridor Soundwall Project, which parallels Esperanza Road bordering the Cities of Anaheim and Yorba Linda.

The improvements include a new soundwall approximately 13,000 feet in length. The wall was supported by cast-in- drilled-hole (CIDH) piles and the wall panels will consist of prefabricated steel sheets.

Mountain View Avenue Bridge Project, Loma Linda, CA
Provided soils and materials testing for the construction of the Mountain View Avenue Bridge over Union Pacific Railroad and San Timoteo Channel project. Improvements consisted of constructing a new 119’ long by 37’ wide widening of the existing bridge over the Union Pacific Railroad (UPRR) and a 110’ long by 37’ wide widening of the existing bridge over the San Timoteo Creek Channel. Services included field observation, sampling, and testing during earthwork construction, aggregate base placement, asphalt concrete placement, batch plant inspections, and Portland cement concrete placements in order to evaluate the materials conformance with the project specifications, Testing was performed in accordance with CTM and ASTM standards.

Metro Regional Connector Project, Los Angeles, CA
Senior Field Technician providing inspection services during construction for the proposed Regional Connector tunnel project located in the business district of downtown Los Angeles, California.

Caltrans District 12, Orange County, CA
Senior Field Technical to provide materials testing services to support the development and construction of state transportation projects in District 12. Field services included sampling and testing of concrete, asphalt concrete subgrade, and aggregate base. Laboratory testing services included California Impact Test, R-Value, AC extraction, AC maximum density, durability, and flexural strength testing. Testing was performed in accordance with CTM standards.

I-5 Gateway Project, Orange County, CA
Inspector/ Technician retained to provide sampling and testing of structural concrete, asphalt concrete (AC), asphalt treated permeable base (ATPB), embankment fill, lean concrete base (LCB), cement treated base (CTB), aggregate base (AB) and polymer concrete overlay. Services included batch plant inspection during production of asphalt concrete and structural concrete. A mobile lab was set up on-site to help speed up the turn-around time on some of the lab tests.

I-10 at Archibald Avenue Interchange Landscape Project, Ontario, CA Senior Field Technician providing materials testing for the construction of the I -10 Archibald Avenue Interchange project in Ontario California. Project included construction of embankment, subgrade, aggregate base placement, foundations, retaining walls, pavement, landscape and other miscellaneous appurtenances. Materials testing services included embankment, subgrade, structure backfill, aggregate base and Portland cement concrete in order to evaluate the materials conformance with the project specifications.

SR-73 Widening, Orange County, CA
Senior Field Technician providing soils and materials testing services during the construction of the SR73 North Bound Widening and SR241 Windy Ridge FasTrak Lane Widening projects in Orange County, California. 7950 Cherry Avenue, Suite 103
Fontana, California 92336
909.730.4913
www.fountainheadcorp.com