TO: RWS/RUA
FROM: Soomodh Abraham, Project Manager
CC: Neil Clifton, Jignesh Ladhawala
Subject: S1.1 Digester No.1 Wall Cap and Coating Project – Cost Amendment Memo
Date: April 28, 2015
This memorandum serves as an amendment to the memorandum Veolia submitted to Rialto Water Services (RWS) and Rialto Utility Authority (RUA) dated February 5, 2015 for a change order that resulted from an Unknown Site Condition (Attachment 1).
In accordance with Section 8.9 – Adjustm ents, of the executed Concession Agreement (CA) and Operation and Maintenance Subcontract, compensation for project management services for Veolia is limited to 5% of the additional construction cost. As such, Veolia has reduced its project management fee and the total cost as per the amended cost sheet provided in Attachment 2 .
With this change, the final cost for the requested change order is reduced from $5589 to $4890 .
Sincerely,
Soomodh Abraham
Bob
M e mor andum
TO: RWS/RUA
FROM: Soomodh Abraham, Project Manager
CC: Jignesh Ladhawala, Clarence Mansell
Subject: S1.1 Digester No.1 Wall Cap and Coating Project Date: February 5, 2015
Introduction
This memorandum is to obtain approval from City of Rialto (City) and Rialto Water Services (RWS) for a change order that resulted from a change in site condition. Construction contractor, DN Tanks, currently is performing tasks at the Site; however, the contractor will require approval soon to proceed with the minor design changes resulting from the chang e in site condition.
While performing sand blasting of digester walls, the DN Tank’s construction crew noticed that the tendons (rebar) within digester walls were unevenly spaced, contrary to what was known from as‐built drawings obtained from the City. On January 16, 2015, DN Tanks provided a Request For Information (RFI) to Veolia (Appendix A). Based on consultation with West Yost, the team decided that be
cause of this uneven spacing of the tendons, minor design changes need to be made to properly allocate the wall cap anchors (steel rebar).
Change Order Request
Design changes require that additional number of anchors, from 190 to 224, will be needed to provide adequate strength to the wall cap that is being added. Moreover, these anchors need to be drilled seven (7) inches deeper into the digester wall than what was previously designed.
Based on the RFI response requiring minor des ign changes, DN Tanks provided a cost estimate for a change order so as to get compensated for the required changes. A breakdown of the costs provided by DN Tanks is shown in Appendix B. The total cost of the change order, including Veolia’s costs as stated in the contract for non‐recurring Facilit
y Improvement Projects, for these design changes are also provided in the Appendix
B,
Final
Construction
Work
Authorization
(FCWA)
Cost
Sheet
addendum.
This
cost
excludes
design
and
engineering
and
contingency
costs
as
these
are
not
applicable
for
this
project
and
for
this
change
order.
Veolia
requests
that
City
and
RWS
approve
and
process
this
change
order
so
that
the
construction
can
be
continued
without
delays,
thus
avoiding
any
contractor
stand
by
charges.
Conclusion
Veolia
and
its
construction
contractor,
DN
Tanks,
have
encountered
a
situation
that
meets
the
criteria
of
“Unknown
Site
Conditions”
as
specified
in
the
Concession
Agreement
(Appendix
C).
Because
of
this,
a
minor
design
change
will
need
to
be
implemented.
This
design
change
will
require
additional
labor,
and
additional
materials
such
as
anchors
and
equipment.
Therefore,
Veolia
is
requesting
a
change
order
in
the
amount
of
$
4890.00
and
has
provided
an
FCWA
Cost
Sheet
Addendum
in
the
Appendix
B.
Sincerely,
Soomodh
Abraham
Appendix A
Request for Information and Response
Veolia
437 North Riverside Ave.
REQUEST FOR INFORMATION
No. 00001
Phone: 619-270-4548
DN Tanks
351 Cypress Ln.
El Cajon, CA 92020 Fax: 619-440-8653
TITLE: Top of Wall Sandblasted 1/16/2015
1024-50 Digester Rehab, Rialto, CA JOB: 1024-50
Attn: Soomodh Abraham
Rialto, CA 92376
Phone: 909-820-3771 1/28/2015
PROJECT:
TO:
DATE:
REQUIRED:
After completion of the Top of Wall sandblasting our crews were able to investigate the locations of the vertical tendons and original roof anchor system. The vertical tendons are spaced at approximately 22” apart on average, the spacing is very inconsistent and are recessed into the top of the wall approximately 7”. The recesses appear to be filled with a non-shrink grout and may not have the structural support that the design engineer requires.
Further investigation into the original drawings, that were located in our archives,1 show the vertical tendons have a significantly larger anchor plate, this may impact where location of the required drilling for rebar imbeds.
The original roof support anchors are located approximately 13’ but also have a “foot print” of approximately
10.5”.
The conditions referenced above leaves limited area to provide for 190 drilled anchors for the required new wall cap. Spacing of the rebar dowels would have to be spaced in an inconsistent manner and may not provide for a proper structural connection. Please provide direction on how you would like us to proceed.
Note: Please see attached Wall Cap Detail.
QUESTION:
Requested By:DYK Incorporated Date:
Signed:
Ron Kluth
Primavera ®
01/16/15
Ron Kluth
Response to RFI:
The 51" span shown on the RFI drawing forms a "pattern" with two tendons in 36" long 7" deep recess. The spacing of the dowels can vary to accommodate the tendon locations. Place two dowels between each tendon for a total of 4 dowels per "pattern". Adjust the dowel location based on the field condition not to exceed a maximum spacing of 20". This will result in a total of 224 dowels compared with 190 indicated on the plans.
Due to the presence of the tendon recesses and uncertain condition of the "ridges" all anchors should be extended to provide 15" of dowel depth below the base of the recess. This results in dowels which are 7" longer than submitted.
Momo Savovic PE
For Structural eng: Momo Savovic PE
1 MG DIGESTERRIALTO, CALIFORNIA
Appendix B
Total Cost for the Change Order
FCWA Amended Cost Sheet Addendum for S1.1 Digester No. 1 Wall Cap and Coating Project Prepared Date: April 28, 2015
Description Quantity Unit Unit Cost Total
DN Tanks Costs
Steel/Rebar 1 LS $975.00 $975.00
Hilti RE-500 1 LS $929.73 $929.73
Equipment 1 LS $200.00 $200.00
Labor 1 LS $1,945.00 $1,945.00
Mark Up 15% $607.46
Construction Cost $4,657.19
Veolia Compensation
Project Management Services 5% $232.86
Total Construction Cost* $4,890
* rounded cost
of Construction
Appendix C
Unknown Site Conditions
''Wastewater Master Account", the "Water Master Account", the "Wastewater Operating Account", the ''Water Operating Account", the "Wastewater Facility Authority Expense Account", the "Water Facility Authority Expense Account", the "Wastewater Capital Charges Account", the "Water Capital Charges Account", "Wastewater Interim Retention Account", "Water Interim Retention Account", the "Wastewater Siirplus Account'', the "Water Surplus Account", the "Wastewater Rate Stabilization Account", the "Water Rate Stabilization Account", the "Environmental Compliance Account", the "Excluded Account", the "Wastewater Loss Proceeds Account", th.e "Water Loss Proceeds Account", the "Wastewater Takings Account" and the "Water Takings Account".
"Trustee" has the meaning set forth in the definition of Trust Agreement. "Uncompleted Work" means any unfinished work or work in progress to be performed by any contractor or subcontractor of the City or the Authority with respect to the Utility Facilities as of the Effective Date, or any work ever performed .that has given rise to or will give rise to mechanics liens or any otl:ier claim against the Utilities Facilities. "Uncontrollable Circumstance" means any act, event, condition or circumstance beyond the reasonable control of a party (or the party's subcontractors) which prevents, delays or otherwise adversely affects the ability of that party to perform under this Agreement or adversely · affects the associated cost incurred by that party to perform any obligation under this Agreement (except payment obligations). Such acts, ·events, conditions or circumstances include, but are not limited to, Change of Law, strikes, lockouts, or other labor disturbances, earthquake, flood, hurricanes, or other natural disaster, acts of God, war, terrorism, civil insurrection, catastrophfo equipment failure, electricity or other utility interruption or unavailability, failure or interference with normal sources of supply of equipment and materials necessary to operate the Utllity Facilities in accordance with the terms of this Agreement, accident, any failure or delay in obtaining any Governmental Approval beyond a party's reasonable control, any failure, delay or interference by a party (other than a Party to this Agreement), issuance of a temporary restraining order ·or other form of injunction that prohibits prosecution of a material portion of the party's obligation under this Agreement, acts of third parties or other circumstances beyond a party's reasonable control. With respect to Concessionaire, "Uncontrollable Circumstance" includes, without limitation, receipt of Non-Specification Influent or the interference of use of or access to any portion of the Utility Facilities, the Wastewater Facility Site Easement, the Water Facility Site Easement, the Warehouse Building and Parking Area License, the Collection System License or the Water Delivery System License as a result of any existing title encumbrances that impede or make more difficult the Concessionaire's provision of the Services. "Underground Assets" means underground civil structures and underground assets that are part of the Utility Facilities including, but not limited to, pipes, lines, valves, valve stems, manholes, valve vaults, foundations, tanks and reservoirs. "Unknown Site Condition" means the discovery of historical or archeological or cultural finds, rare, endangered or threatened species, Regulated Substances, underground obstructions, underground utilities, geotechnical or soils issues or defects, faults, anomalies, or unknown features or conditions with respect to the Utility Facilities which were not actually known by Concessionaire as of the Contract Date.
#4827-2499-2007v46 29