City Name: City of Rialto Project Title: Annual Pavement Rehabilitation Project Project Lead: Art Cervantes
Dept. Contact Information: Engineering Services
335 W. Rialto Ave., Rialto, CA 92376
Phone: (909) 820-2531
Email: [email protected] Estimated Project Schedule Legislative Districts: State Assembly - District 47
State Senate - District 20 Supplementary Information:
Fiscal Year: 2022/23
Project Description:
Estimated Useful Life:
1. Technology and Material Recycling - Asphalt mix designs will incorporate reclaimed asphalt pavement (RAP) thereby recycling this material and reducing the cost and energy required to process new mineral aggregates.
STREET NAME FROM TO
BOHNERT AVE AYALA DR SPRUCE AVE
BOHNERT AVE CEDAR AVE AYALA DR
EASTON ST BRAMPTON AVE 125' E/ BRAMPTON AVE
EASTON ST PVMT CHNGE 160' W/ ARR BRAMPTON AVE
ETIWANDA AVE MAPLE AVE LINDEN AVE
ETIWANDA AVE CACTUS AVE LILAC AVE
ETIWANDA AVE LINDEN AVE CEDAR AVE
EUCALYPTUS AVE WALNUT AVE BASELINE RD
LILAC AVE FOOTHILL BLVD RIALTO AVE
RANDALL AVE RIVERSIDE AVE SYCAMORE AVE
SYCAMORE AVE WILSON ST MERRILL AVE
For projects using cold mill and AC surface course the estimated useful life is 7 to 10 years.
Technology, Climate Change, &
Complete Streets
Considerations:
2. Technology and Material Recycling - Projects using in-place pulverization and cold in-place recycling will incorporate the existing pavement in the new street construction thereby reducing the cost and energy associated with hauling away existing materials and transporting new construction materials to the project location.
3. Climate Change - Pavement rehabilitation and repair/upgrade of curbs and gutters, cross gutters, and catch basins will better adapt the asset to withstand the negative effects of climate change including the increase in rainfall and stormwater flow.
4. Complete Streets - Projects will improve the quality of pedestrian facilities and improve safety by (a) adding new and/or repairing/upgrading ADA curb ramps; (b) adding new sidewalks and/or repairing/replacing damaged sidewalks; and (c) replacing/upgrading traffic striping and pavement markings.
For projects using full depth reconstruction the estimated useful life is 20 years.
SB-1 Project List
3. Addition of new and/or repair/upgrade of ADA curb ramps; and addition of new sidewalks and/or repair/replacement of damaged sidewalks.
4. Replacing/Upgrading traffic striping and pavement markings.
2. Addition of new and/or repair/upgrade of curbs and gutters, cross gutters, catch basins, and culverts.
Arterial/Collector road network average Pavement Condition Index (PCI) is 70.2 as of May 10, 2023.
Local road network average PCI is 67.5 as of May 10, 2023.
Engineering Design: 3rd Quarter 2025
Construction: 4th Quarter 2025 to 4th Quarter 2026
The City uses a Pavement Management Program to evaluate pavement condition and prioritize pavement rehabilitation projects. During the engineering design phase, the structural pavement section is evaluated and the most cost effective rehabilitation method is determined.
Average Network PCI & date/year of
measurement:
1. Pavement rehabilitation of the indicated existing street segments using one or more of the following methods: (1) Cold Milling and Asphalt Concrete (AC) Surface Course; (2) Full Depth AC removal and re-construction; (3) Full Depth Reclamation including in-place pulverization and mixing of the existing pavement to create a stablized base, followed by construction of AC Base and Surface Course; (4) Cold In-Place Recycling of existing pavement, followed by construction of an AC Surface Course.