City Name: City of Rialto Project Title: Annual Pavement Rehabilitation Project Project Lead: Art Cervantes
Dept. Contact Information: Engineering Services Average Network PCI & date/year of measurement:
335 W. Rialto Ave., Rialto, CA 92376
Phone: (909) 820-2531
Email: [email protected]
Estimated Project Schedule
Legislative Districts: State Assembly - District 47
State Senate - District 20 Supplementary Information:

Fiscal Year: 2021/22
Project Description:

Estimated Useful Life:

STREET NAME FROM TO

ACACIA AVE MERRILL AVE RIALTO AVE

ALICE AVE EASTON ST END

ALICE AVE CHAPARRAL ST EASTON ST

ALICE AVE VALLEY BLVD END

ALTHEA AVE MARIANA ST WALNUT AVE

ALTHEA AVE NORWOOD ST END

APPLE AVE COLUMBINE AVE CACTUS AVE

ARBETH ST OAKDALE AVE DATE AVE

ARBETH ST DATE AVE RIVERSIDE AVE OH

ARROWHEAD AVE VALENCIA ST IDYLLWILD AVE

BOHNERT AVE SPRUCE AVE CACTUS AVE

CAMPHOR AVE MESA DR BASELINE RD

CARPENTER ST END MAPLE AVE

CASCADE DR RIVERSIDE AVE PALM AVE

CEDAR AVE APPLE AVE RIVERSIDE AVE

CERRITOS ST MARCELLA AVE ACACIA AVE

CHAPARRAL ST OAKDALE AVE MARCELLA AVE

CHAPARRAL ST MARCELLA AVE ACACIA AVE

CHERRY AVE APPLE AVE RIVERSIDE AVE OH

CHESHIRE ST AYALA DR CEDAR AVE

CHESHIRE ST AYALA DR CHESHIRE ST

CHURCH AVE APPLE AVE PALM AVE

CHURCH AVE CHURCH AVE END

2. Technology and Material Recycling - Projects using in-place pulverization and cold in-place recycling will incorporate the existing pavement in the new street construction thereby reducing the cost and energy associated with hauling away existing materials and transporting new construction materials to the project location.

3. Climate Change - Pavement rehabilitation and repair/upgrade of curbs and gutters, cross gutters, and catch basins will better adapt the asset to withstand the negative effects of climate change including the increase in rainfall and stormwater flow.

4. Complete Streets - Projects will improve the quality of pedestrian facilities and improve safety by (a) adding new and/or repairing/upgrading ADA curb ramps; (b) adding new sidewalks and/or repairing/replacing damaged sidewalks; and (c) replacing/upgrading traffic striping and pavement markings.

For projects using full depth reconstruction the estimated useful life is 20 years.

1. Technology and Material Recycling - Asphalt mix designs will incorporate reclaimed asphalt pavement (RAP) thereby recycling this material and reducing the cost and energy required to process new mineral aggregates.

For projects using cold mill and AC surface course the estimated useful life is 7 to 10 years.

SB-1 Project List
Technology, Climate Change, and
Complete Streets Considerations:

3. Addition of new and/or repair/upgrade of ADA curb ramps; and addition of new sidewalks and/or repair/replacement of damaged sidewalks.

4. Replacing/Upgrading traffic striping and pavement markings.

2. Addition of new and/or repair/upgrade of curbs and gutters, cross gutters, catch basins, and culverts.

1. Pavement rehabilitation of the indicated existing street segments using one or more of the following methods: (1) Cold Milling and Asphalt Concrete (AC) Surface Course; (2) Full Depth AC removal and re-construction; (3) Full Depth Reclamation including in-place pulverization and mixing of the existing pavement to create a stablized base, followed by construction of AC Base and Surface Course; (4) Cold In-Place Recycling of existing pavement, followed by construction of an AC Surface Course.

Arterial/Collector road network average Pavement Condition Index (PCI) is 70.2 as of May 10, 2023.

Local road network average PCI is 67.5 as of May 10, 2023.

Engineering Design: 4th Quarter 2025
The City uses a Pavement Management Program to evaluate pavement condition and prioritize pavement rehabilitation projects. During the engineering design phase, the structural pavement section is evaluated and the most cost effective rehabilitation method is determined.

CHURCH AVE GROVE ST END

CLIFFORD AVE TAHOE ST EASTON ST

COLUMBINE AVE MILOR AVE APPLE AVE

COLUMBINE AVE APPLE AVE RIVERSIDE AVE OH

COMPTON ST NORWOOD ST END

CONDOR DR CONDOR DR END

CONDOR DR SYCAMORE AVE RIVERSIDE AVE OH

CORNELL DR SYCAMORE AVE RIVERSIDE AVE

CRAIG ST BRIERWOOD AVE END

CROMWELL ST SYCAMORE AVE OAKDALE AVE

DATE AVE CHAPARRAL ST END

DATE AVE ROSEWOOD ST GROVE ST

DRIFTWOOD AVE ORANGE AVE APPLE AVE

ETIWANDA AVE SYCAMORE AVE ACACIA AVE

ETIWANDA AVE ACACIA AVE EUCALYPTUS AVE
ETIWANDA AVE. WILLOW AVE. LILAC AVE Moved from Exhibit C ETIWANDA AVE. ACACIA AVE. EUCALYPTUS AVE Moved from Exhibit C

EUCALYPTUS AVE RIALTO AVE MERRILL AVE

EUCALYPTUS AVE ETIWANDA AVE FOOTHILL BLVD

EUCALYPTUS AVE MERRILL AVE CITY LIMIT

FILLMORE AVE BOHNERT AVE FILLMORE AVE

FITZGERALD AVE AYALA DR BASELINE RD

GALWAY ST PARK AVE CASMALIA ST

GARDENA AVE LURELANE ST END

GROVE ST CEDAR AVE LARCH AVE

HEATHER ST SYCAMORE AVE END

HEATHER ST SYCAMORE AVE JOYCE AVE

HEATHER ST LILAC AVE VERDE AVE

HEATHER ST VERDE AVE VISTA AVE

HEATHER ST WILLOW AVE VISTA AVE

HEATHER ST WILLOW AVE ALICE AVE

HOLLY ST RIVERSIDE AVE DATE AVE

HOLLY ST PALM AVE RIVERSIDE AVE

HOME ST OLIVE AVE SYCAMORE AVE

IRIS AVE NORWOOD ST END

IRIS AVE MARIANA ST END

JOYCE AVE EASTON ST END

JOYCE AVE END VIRGINIA ST

JOYCE AVE MARIANA ST HEATHER ST

KOA AVE MEADOW LN END

LA GLORIA DR SPRUCE AVE ARROWHEAD AVE

LEISKE DR FITZGERALD AVE AYALA DR

LEWIS ST ASPEN AVE END

LILAC AVE SANTA ANA AVE MAYWOOD ST

LILAC AVE SLOVER AVE SANTA ANA AVE

LINDEN AVE RIVERSIDE AVE PERSIMMON AVE
LINDEN AVE (E 1/2) 150' N / NORWOOD ST CASMALIA ST

LOCUST AVE STONEHURST DR VINEYARD AVE

LOCUST AVE BUENA VISTA DR CASA GRANDE DR

LOCUST AVE VINEYARD AVE CASMALIA ST

LOCUST AVE RIVERSIDE AVE BUENA VISTA DR

LOCUST AVE CASA GRANDE DR TUDOR ST

LOCUST AVE TUDOR ST LOWELL ST

LOCUST AVE CASMALIA ST BRIDGE

LOWELL ST LOCUST AVE END

LURELANE ST LILAC AVE VISTA AVE

LURELANE ST ALICE AVE WILLOW AVE

MAGNOLIA AVE VIRGINIA ST HOME ST

MARCELLA AVE SCOTT ST CERRITOS ST

MARGARITA RD MARGARITA RD END

MARGARITA RD ROSALIND AVE TERRACE RD

MARIANA ST END SYCAMORE AVE

MARIANA ST OAKDALE AVE ACACIA AVE

MARTIN ST WEDGEWOOD CT DRIFTWOOD AVE

MESA DR ELMWOOD AVE OAKWOOD AVE

MILLARD AVE GROVE ST END

MILOR AVE NORWOOD ST COLUMBINE AVE

MILOR AVE COLUMBINE AVE END

MORGAN ST WILLOW AVE RIVERSIDE AVE

NORWOOD ST QUINCE AVE AYALA DR

NORWOOD ST ARROWHEAD AVE MESA ST

OAKDALE AVE END ARBETH ST

OAKDALE AVE MARIANA ST HEATHER ST

OAKDALE AVE CROMWELL ST CHAPARRAL ST

OAKDALE AVE RAMONA DR ROSEWOOD ST

OLIVE AVE CERRITOS ST WINCHESTER DR

OLIVE AVE HOME ST VIRGINIA ST

ORANGE AVE QUINCE AVE DRIFTWOOD AVE

ORANGE AVE CASMALIA ST WILLOW AVE

PALM AVE COLUMBINE AVE END

PALM AVE CHERRY AVE END

PALM AVE DALEWOOD AVE END

PALM AVE WILLOW AVE CASMALIA ST

PALM AVE CASCADE DR ALLEY

PRIMROSE AVE HOME ST END

QUINCE AVE CHESHIRE ST LA GLORIA DR

RAMONA DR RAMONA DR END

RAMONA DR OLIVE AVE SYCAMORE AVE

RAMONA DR SYCAMORE AVE SAGE AVE

RAMONA DR SAGE AVE ACACIA AVE

RAMONA DR LILAC AVE WILLOW AVE

RAMONA DR END RAMONA DR

RIVERSIDE AVE OH CHERRY AVE END

RIVERSIDE AVE OH END CHERRY AVE

RIVERSIDE AVE OH MEADOW LN POMEGRANATE AVE

RIVERSIDE AVE OH POMEGRANATE AVE ARBETH ST

RIVERSIDE AVE OH END MEADOW LN

ROSEWOOD ST ASPEN AVE CEDAR AVE

ROSEWOOD ST LARCH AVE END

ROSEWOOD ST DATE AVE SYCAMORE AVE

ROSEWOOD ST DATE AVE RIVERSIDE AVE

SAGE AVE CHAPARRAL ST END

SAGE AVE END ETIWANDA AVE

SANTA ANA AVE LILAC AVE WILLOW AVE

SANTA ANA AVE WILLOW AVE RIVERSIDE AVE

SANTA ANA AVE RIVERSIDE AVE EAST END

SCOTT ST ACACIA AVE PINE AVE

SCOTT ST SYCAMORE AVE END

SHAMROCK ST VERDE AVE LILAC AVE

SHAMROCK ST CLIFFORD AVE VISTA AVE

SHAMROCK ST VISTA AVE VERDE AVE

SHAMROCK ST WILLOW AVE CLIFFORD AVE
STONEHURST DR. LOCUST AVE END

SUMMIT AVE MAPLE AVE LINDEN AVE

SUMMIT AVE LINDEN AVE APPLE AVE

SYCAMORE AVE ARBETH ST CONDOR DR

SYCAMORE AVE END SYCAMORE AVE

TEAKWOOD AVE VALENCIA ST WEDGEWOOD CT

TEAKWOOD AVE WEDGEWOOD CT ETIWANDA

TIBBOT AVE SPRUCE AVE END

VALENCIA ST PALM AVE RIVERSIDE AVE

VAN KOEVERING ST WILLOW AVE RIVERSIDE AVE

VERDE AVE END HEATHER ST

VERDE AVE ETIWANDA AVE HOLLY ST

VICTORIA ST CORNELL AVE ACACIA AVE

VICTORIA ST WILLOW AVE RIVERSIDE AVE

VISTA AVE HEATHER ST END

VISTA AVE HEATHER ST END

WABASH ST IDYLLWILD AVE END

WABASH ST RIVERSIDE AVE PALM AVE

WEDGEWOOD CT IDYLLWILD AVE TEAKWOOD AVE

WINCHESTER AVE YUCCA AVE LILAC AVE

WINCHESTER DR SYCAMORE AVE OLIVE AVE

YUCCA AVE YUCCA AVE END

YUCCA AVE MILOR AVE NORWOOD ST

YUCCA AVE MARIANA ST END