Cities Index.
Attachment No. 3 - ASG Development Presentation

Economic Development Committee
July 24, 2024

Document
Attachment No. 3 - ASG Development Presentation
Meeting
July 24, 2024
Body
Economic Development Committee
Original file
1.8 MB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

VINEYARD

INDUSTRIAL

VINEYARD INDUSTRIAL

VS BRIDGE PROJECT

VINEYARD INDUSTRIAL
 BULDING SIZE = 311,315 SF
 LANDSCAPE AREA = 104K SF
 INCLUDES LINEAR PARK ALONG MAPLE

ACCESSIBLE TO NEIGHBORS
 BUILDING SETBACK = 87 FEET
 IMPROVES MAPLE ST. NORTH TO BOHNERT
(CURRENTLY DIRT ROAD N. OF VINEYARD)
 CEQA DOCUMENT: EIR

ALLOWS FOR MORE COMMUNITY INPUT

BRIDGE PROJECT
 BUILDING SIZE = 382,018 SF
 LANDSCAPE AREA = 79K SF
 NO ACCESSIBLE PARK AREA FOR

NEIGHBORING RESIDENTS
 BUILDING SETBACK = 35 FEET
 CEQUA DOCUMENT: MND

BRIDGE SITE PLAN
PREVIOUS SUBMITTAL (2019)
Small Setback (35’)
311,315 sf
TRUCK AND VEHICULAR ACCESS ONLY FROM VINEYARD AVE.
100’ BUILDING SETBACK

FROM NEIGHBORING

PROPERTY LINE

EVA ACCESS ONLY
(NO VEHICULAR ACCESS ON MAPLE AVE.)

LINEAR OPEN SPACE AREA FOR RESIDENTS
Maple Ave.

Vineyard Ave.

VINEYARD INDUSTRIAL LANDSCAPE PLAN

VINEYARD INDUSTRIAL

SITE PLAN (CURRENT)
Vineyard Industrial

TRUCK ROUTES
Industrial
Zoned
Property

ONLY TRUCK

ENTRANCE
Proposed
Building
311k sf
NO
TRUCKS
Locust Ave.

Vineyard Ave.

Bohnert Ave.

Casmalia St.

Vineyard Ave.

Maple Ave.

Banyan St.

Linden Ave.

Norwood St. Norwood St.

Alder Ave.
210
210
Transition Property
Residential Dilemma

1. Truck Traffic Adjacent to Residential

2. No Buffers between Truck Traffic and Residential

3. Potential for Vineyard to Connect to Maple
1 2
2 1
3 Locust Ave.

Maple Ave.

Industrial Zoned Property
Maple Ave.

Current Condition
Maple Ave. Looking North from Vineyard Maple Ave. Looking South from Bohnert
Maple Ave. Accessible Open Space
DG Trail Perspective
Maple Ave. Elevation

← All documents from this meeting