Bid Results for Project Fire Station 204 Generator Installation, 240202 (24‐033) Issued on 06/11/2024
Bid Due on July 23, 2024  3:00 PM (PDT)
Item
Number Description
Unit of
Measure Quantity MC Electric
Amtek
Construction
Metrocell
Construction, Inc.  ZECO Inc.  M. Brey, Inc. Issa  Electric, Inc. R2BUILD Metro Builders &
Engineers Group,
Ltd.
1 Mobilization LS 1 $10,000.0 0 $26,885.00 $89,260.00 $58,915.00 $48,337.33 $15,000.0 0 $26,000.00 $24,373.00 2 Water  Pollution Control LS 1 $7,500.0 0 $9,949.00 $6,500.00 $2,340.00 $11,044.83 $2,000.0 0 $4,000.00 $20,311.00 3 Traffic  Control LS 1 $4,000.0 0 $11,939.00 $3,000.00 $2,450.00 $10,224.06 $1,500.00 $5,000.00 $5,687.00 4 Clearing,  Grubbing, and Removals LS 1 $18,000.0 0 $4,872.00 $7,500.00 $10,700.00 $11,671.08 $7,350.00 $28,600.00 $8,124.00 5 Demo/Offhaul LS 1 $30,000.0 0 $19,751.00 $18,000.00 $48,385.00 $29,576.22 $12,040.00 $76,400.00 $21,182.00 6 Asphalt  Concrete LS 1 $25,000.0 0 $8,783.00 $25,400.00 $14,040.00 $28,570.42 $15,000.00 $22,000.00 $27,714.00 7 Trenching LF 80 $32,000.0 0 $38,400.00 $26,000.00 $33,930.40 $16,714.40 $15,280.00 $17,200.00 $26,000.00 8 Concrete  Pad CY 4 $12,800.0 0 $18,320.00 $4,600.00 $23,400.00 $18,835.04 $15,716.00 $12,000.00 $18,456.00 9 Curb,  Driveway, Sidewalk, and Gutter CY 2 $10,400.0 0 $4,448.00 $7,500.00 $12,870.00 $7,379.82 $3,598.0 0 $6,000.00 $2,990.00 10 Bollards EA 10 $8,500.0 0 $4,100.00 $8,500.00 $15,210.00 $24,068.00 $19,100.00 $22,500.00 $15,220.00 11 Traffic  Striping LS 1 $6,000.0 0 $3,914.00 $2,500.00 $3,510.00 $5,581.72 $2,940.0 0 $3,000.00 $4,410.00 12 Landscaping LS 1 $5,000.0 0 $9,949.00 $2,500.00 $4,095.00 $4,441.89 $7,490.0 0 $8,670.00 $5,687.00 13 Exterior  Generator, 130KW, 208/120V, Diesel Base Tank, 2‐Breaker EA 1 $65,000.0 0 $113,542.00 $108,785.00 $89,564.50 $108,732.00 $169,280.00 $116,030.00 $98,995.00 14 Manual  Transfer Switch, 400A, 208/120V, NEMA 3R EA 1 $10,000.0 0 $24,778.00 $7,500.00 $24,394.00 $12,818.02 $32,718.00 $20,000.00 $24,375.00 15 Automatic  Transfer Switch, 400A, 208/120V, NEMA 1 EA 1 $8,000.0 0 $24,778.00 $15,000.00 $14,566.00 $33,196.16 $38,318.00 $22,000.00 $6,175.00 16 Distribution  Panelboard, 400A, 208/120V, NEMA 1 EA 1 $10,000.0 0 $22,515.00 $11,000.00 $12,226.00 $18,262.16 $26,418.00 $18,000.00 $21,030.00 17 Electrical  Cabling and Duct Bank LS 1 $95,000.0 0 $43,195.00 $63,500.00 $85,610.00 $80,859.00 $92,852.00 $126,500.00 $179,515.00 18 Arc ‐Flash Study LS 1 $10,000.0 0 $13,266.00 $5,000.00 $5,148.00 $8,013.19 $4,900.0 0 $5,000.00 $12,999.00 19 Commissioning EA 1 $10,000.0 0 $9,949.00 $3,880.00 $15,550.00 $5,047.98 $3,500.00 $8,000.00 $24,295.00 20 Field  Orders LS 1 $20,000.0 0 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.00 $397,200.00 $433,333.00 $435,925.00 $496,903.90 $503,373.32 $505,000.00 $566,900.00 $567,538.00