Riato Storm Drain - South Coast Air Basin, Summer
2.0 Emissions Summary
Table Name
Column Name
Default Value
New Value
tblConstructionPhase
NumDays
20.00 60.00
tblConstructionPhase
NumDays
10.00 60.00
tblConstructionPhase
PhaseEndDate
1/28/2021
3/25/2021
tblConstructionPhase
PhaseEndDate
11/26/2021
10/22/2021
tblConstructionPhase
PhaseStartDate
11/13/2021
8/1/2021
tblLandUse
LotAcreage
0.00 1.50
tblOffRoadEquipment
LoadFactor
0.37 0.37
tblOffRoadEquipment
LoadFactor
0.37 0.37
tblOffRoadEquipment
LoadFactor
0.50 0.50
tblOffRoadEquipment
LoadFactor
0.20 0.20
tblOffRoadEquipment
LoadFactor
0.29 0.29
tblOffRoadEquipment
LoadFactor
0.38 0.38
tblOffRoadEquipment
OffRoadEquipmentType
Skid Steer Loaders
tblOffRoadEquipment
OffRoadEquipmentType
Plate Compactors
tblOffRoadEquipment
OffRoadEquipmentType
Tractors/Loaders/Backhoes
tblOffRoadEquipment
OffRoadEquipmentType
Trenchers
tblOffRoadEquipment
OffRoadEquipmentType
Forklifts
tblOffRoadEquipment
OffRoadEquipmentType
Cranes
tblOffRoadEquipment
OffRoadEquipmentType
Excavators
tblOffRoadEquipment
OffRoadEquipmentUnitAmount
1.00 4.00
tblTripsAndVMT
VendorTripNumber
0.00 1.00
tblTripsAndVMT
WorkerTripNumber
18.00 60.00
tblTripsAndVMT
WorkerTripNumber
25.00 60.00
tblTripsAndVMT
WorkerTripNumber
15.00 60.00
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
I
I
I
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------I------------------------------~--------------------------
2.1 Overall Construction (Maximum Daily Emission)
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Year
lb/day
lb/day
2021
2.3945
21.8593
19.5140
0.0349
0.6771
1.1272
1.7979
0.1797
1.0509
1.2287
0.0000
3,385.629
5 3,385.629
5 0.7408
0.0000
3,404.150
1 Maximum
2.3945
21.8593
19.5140
0.0349
0.6771
1.1272
1.7979
0.1797
1.0509
1.2287
0.0000
3,385.629
5 3,385.629
5 0.7408
0.0000
3,404.150
1 Unmitigated Construction
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Year
lb/day
lb/day
2021
2.3945
21.8593
19.5140
0.0349
0.6771
1.1272
1.7979
0.1797
1.0509
1.2287
0.0000
3,385.629
5 3,385.629
5 0.7408
0.0000
3,404.150
1 Maximum
2.3945
21.8593
19.5140
0.0349
0.6771
1.1272
1.7979
0.1797
1.0509
1.2287
0.0000
3,385.629
5 3,385.629
5 0.7408
0.0000
3,404.150
1 Mitigated Construction
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
NBio-CO2
Total CO2
CH4
N20
CO2e
Percent
Reduction
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
.,
'
I
' ' ' '
I
' '
I
'
I
' '
'
.,
'
I
' ' ' '
I
' '
I
'
I
' '
'
.,
'
I
' ' ' '
I
' '
I
'
I
' '
'
.,
'
I
' ' ' '
I
' '
I
'
I
' ' '
.,
'
I
' ' ' '
I
' '
I
'
I
' ' '
.,
'
I
' ' ' '
I
' '
I
'
I
' ' '
.,
'
I
' ' ' '
I
' '
I
'
I
' ' '
.,
'
I
' ' ' '
I
' '
I
'
I
' '
'
I
I I I I I
I
I I I
I
I I I I I
I
2.2 Overall Operational
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Area
1.0000e-
005
0.0000
1.0000e-
004
0.0000
0.0000
0.0000
0.0000
0.0000
2.2000e-
004
2.2000e-
004
0.0000
2.3000e-
004
Energy
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Mobile
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Total
1.0000e-
005
0.0000
1.0000e-
004
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.2000e-
004
2.2000e-
004
0.0000
0.0000
2.3000e-
004
Unmitigated Operational
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Area
1.0000e-
005
0.0000
1.0000e-
004
0.0000
0.0000
0.0000
0.0000
0.0000
2.2000e-
004
2.2000e-
004
0.0000
2.3000e-
004
Energy
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Mobile
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Total
1.0000e-
005
0.0000
1.0000e-
004
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.2000e-
004
2.2000e-
004
0.0000
0.0000
2.3000e-
004
Mitigated Operational
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
&
&
&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••--------,-------,-------,-------,-------,-------,-------,-------,-------~-------~•••••••·-------,-------,-------,-------T••••••• &
&
&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••--------,-------,-------,-------,-------,-------,-------,-------,-------~-------~•••••••·-------,-------,-------,-------T••••••• -
-
&
&
i
&
&
&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------~••••••••-------,-------,-------,-------T••••••• &
&
&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------~••••••••-------,-------,-------,-------T••••••• &
&
&
&
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name
Phase Type
Start Date
End Date
Num Days
Week
Num Days
Phase Description
1 Prep and Concrete Removal
Demolition
1/1/2021
3/25/2021
5 60
2 Pipeline Install
Trenching
4/1/2021
7/21/2021
5 80
3 Cover and Fill
Paving
8/1/2021
10/22/2021
5 60
OffRoad Equipment
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
NBio-CO2
Total CO2
CH4
N20
CO2e
Percent
Reduction
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating
±
sqft)
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
I I I I I I I I I I I I I I I I
I
I
I
I
I
I
I
I
I
I
•····••l••····················••I-----------------------I------------~------------~--------~--------~---······················
I
I
I
I
I
I
I
I
I
I
-------1------------------------~-----------------------1-------------1-------------1---------~--------~-------------------------
.
.
3.1 Mitigation Measures Construction
Water Exposed Area
Phase Name
Offroad Equipment Type
Amount
Usage Hours
Horse Power
Load Factor
Cover and Fill
Plate Compactors
2 7.00
8 0.43
Cover and Fill
Cement and Mortar Mixers
4 6.00
9 0.56
Prep and Concrete Removal
Concrete/Industrial Saws
1 8.00
81 0.73
Prep and Concrete Removal
Skid Steer Loaders
2 8.00
65 0.37
Pipeline Install
Tractors/Loaders/Backhoes
1 8.00
97 0.37
Pipeline Install
Trenchers
2 8.00
78 0.50
Pipeline Install
Forklifts
1 8.00
89 0.20
Cover and Fill
Pavers
1 6.00
130
0.42 Cover and Fill
Rollers
1 7.00
80 0.38
Prep and Concrete Removal
Rubber Tired Dozers
1 8.00
247
0.40 Pipeline Install
Cranes
1 8.00
231
0.29 Pipeline Install
Excavators
1 8.00
158
0.38 Prep and Concrete Removal
Tractors/Loaders/Backhoes
3 8.00
97 0.37
Cover and Fill
Paving Equipment
1 8.00
132
0.36 Cover and Fill
Tractors/Loaders/Backhoes
1 8.00
97 0.37
Trips and VMT
Phase Name
Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Prep and Concrete
Removal
7 60.00
0.00 0.00
14.70 6.90
20.00 LD_Mix
HDT_Mix
HHDT
Pipeline Install
6 60.00
1.00 0.00
14.70 6.90
20.00 LD_Mix
HDT_Mix
HHDT
Cover and Fill
10 60.00
0.00 0.00
14.70 6.90
20.00 LD_Mix
HDT_Mix
HHDT
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
I
I
I
I
----------------------------=---------------------------~---------------- I
I
----------------------------=---------------------------~---------------- I
I
----------------------------=---------------------------~---------------- I
I
----------------------------=---------------------------~---------------- I
I
----------------------------=---------------------------~---------------- I
I
----------------------------=---------------------------~---------------- I
I
----------------------------=---------------------------~---------------- I
I
----------------------------=---------------------------~---------------- I
I
----------------------------=---------------------------~---------------- I
I
----------------------------=---------------------------~---------------- I
I
----------------------------=---------------------------~---------------- I
I
----------------------------=---------------------------~---------------- I
I
----------------------------=---------------------------~---------------- I I
i
I
-------------1---------T--------------
1 I
------------
:1---------T••------------
1 I
------------
•1---------T••••••••••••••
I
I
------------
.1---------T••------------
1 I
-------------1---------T--------------
1 I
------------
:1---------T••------------
1 I
------------
•1---------T••••••••••••••
I
I
------------
.1---------T••------------
1 I
-------------1---------T--------------
1 I
------------
:1---------T••------------
1 I
------------
•1---------T••••••••••••••
I
I
------------
.1---------T••------------
1 I
-------------1---------T--------------
1 I
I
I
I
----------------------------~---------------------------1----------------- ~
------------1--------------~--------------
•
I
I
I
I
I
I
I
I
I
•
I
I
I
I
I
I
I
I
I
----------------l---------------~----------1----------~----------l-----------t----------~----------1--------------1----------~---------- •
I
I
I
I
I
I
I
I
I
•
I
I
I
I
I
I
I
I
I
----------------~---------------l-----------~----------l----------~-----------l-----------~----------l---------------1-----------1-----------
3.2 Prep and Concrete Removal - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Off-Road
2.1434
21.6955
17.2612
0.0282
1.1222
1.1222
1.0463
1.0463
2,721.490
6 2,721.490
6 0.7229
2,739.563
6 Total
2.1434
21.6955
17.2612
0.0282
1.1222
1.1222
1.0463
1.0463
2,721.490
6 2,721.490
6 0.7229
2,739.563
6 Unmitigated Construction On-Site
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Hauling
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Vendor
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Worker
0.2511
0.1638
2.2528
6.6700e-
003
0.6707
4.9600e-
003
0.6756
0.1779
4.5700e-
003
0.1824
664.1390
664.1390
0.0179
664.5865
Total
0.2511
0.1638
2.2528
6.6700e-
003
0.6707
4.9600e-
003
0.6756
0.1779
4.5700e-
003
0.1824
664.1390
664.1390
0.0179
664.5865
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
.,
.,
.,
..
.,
..
'
'
'
'
' '
' '
' '
' '
' ' ' '
' ' ' '
' ' ' '
' ' ' '
' '
' '
' '
' '
I
I
I
I
I
I
I
'
'
'
'
' ' '
'
' ' '
'
' ' '
'
' ' ' '
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••·-------,-------,-------,-------T••••••• ••
I
••
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••·-------,-------,-------,-------T••••••• ••
I
••
I
I
I
3.2 Prep and Concrete Removal - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Off-Road
2.1434
21.6955
17.2612
0.0282
1.1222
1.1222
1.0463
1.0463
0.0000
2,721.490
6 2,721.490
6 0.7229
2,739.563
6 Total
2.1434
21.6955
17.2612
0.0282
1.1222
1.1222
1.0463
1.0463
0.0000
2,721.490
6 2,721.490
6 0.7229
2,739.563
6 Mitigated Construction On-Site
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Hauling
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Vendor
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Worker
0.2511
0.1638
2.2528
6.6700e-
003
0.6707
4.9600e-
003
0.6756
0.1779
4.5700e-
003
0.1824
664.1390
664.1390
0.0179
664.5865
Total
0.2511
0.1638
2.2528
6.6700e-
003
0.6707
4.9600e-
003
0.6756
0.1779
4.5700e-
003
0.1824
664.1390
664.1390
0.0179
664.5865
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
.,
.,
.,
..
.,
..
'
'
'
'
' '
' '
' '
' '
' ' ' '
' ' ' '
' ' ' '
' ' ' '
' '
' '
' '
' '
I
I
I
I
I
I
I
'
'
'
'
' ' '
'
' ' '
'
' ' '
'
' ' ' '
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••·-------,-------,-------,-------T••••••• ••
I
••
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••·-------,-------,-------,-------T••••••• ••
I
••
I
I
I
3.3 Pipeline Install - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Off-Road
1.7258
17.1142
13.9215
0.0223
1.0086
1.0086
0.9279
0.9279
2,163.336
4 2,163.336
4 0.6997
2,180.828
1 Total
1.7258
17.1142
13.9215
0.0223
1.0086
1.0086
0.9279
0.9279
2,163.336
4 2,163.336
4 0.6997
2,180.828
1 Unmitigated Construction On-Site
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Hauling
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Vendor
2.8100e-
003
0.0958
0.0233
2.5000e-
004
6.4000e-
003
2.0000e-
004
6.5900e-
003
1.8400e-
003
1.9000e-
004
2.0300e-
003
27.0744
27.0744
1.6700e-
003
27.1162
Worker
0.2511
0.1638
2.2528
6.6700e-
003
0.6707
4.9600e-
003
0.6756
0.1779
4.5700e-
003
0.1824
664.1390
664.1390
0.0179
664.5865
Total
0.2539
0.2596
2.2761
6.9200e-
003
0.6771
5.1600e-
003
0.6822
0.1797
4.7600e-
003
0.1845
691.2133
691.2133
0.0196
691.7027
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
.,
.,
.,
..
.,
..
'
'
'
'
' '
' '
' '
' '
' ' ' '
' ' ' '
' ' ' '
' ' ' '
' '
' '
' '
' '
I
I
I
I
I
I
I
'
'
'
'
' ' '
'
' ' '
'
' ' '
'
' ' ' '
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••·-------,-------,-------,-------T••••••• ••
I
••
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••·-------,-------,-------,-------T••••••• ••
I
••
I
I
I
3.3 Pipeline Install - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Off-Road
1.7258
17.1142
13.9215
0.0223
1.0086
1.0086
0.9279
0.9279
0.0000
2,163.336
4 2,163.336
4 0.6997
2,180.828
1 Total
1.7258
17.1142
13.9215
0.0223
1.0086
1.0086
0.9279
0.9279
0.0000
2,163.336
4 2,163.336
4 0.6997
2,180.828
1 Mitigated Construction On-Site
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Hauling
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Vendor
2.8100e-
003
0.0958
0.0233
2.5000e-
004
6.4000e-
003
2.0000e-
004
6.5900e-
003
1.8400e-
003
1.9000e-
004
2.0300e-
003
27.0744
27.0744
1.6700e-
003
27.1162
Worker
0.2511
0.1638
2.2528
6.6700e-
003
0.6707
4.9600e-
003
0.6756
0.1779
4.5700e-
003
0.1824
664.1390
664.1390
0.0179
664.5865
Total
0.2539
0.2596
2.2761
6.9200e-
003
0.6771
5.1600e-
003
0.6822
0.1797
4.7600e-
003
0.1845
691.2133
691.2133
0.0196
691.7027
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
.,
.,
.,
..
.,
..
'
'
'
'
' '
' '
' '
' '
' ' ' '
' ' ' '
' ' ' '
' ' ' '
' '
' '
' '
' '
I
I
I
I
I
I
I
'
'
'
'
' ' '
'
' ' '
'
' ' '
'
' ' ' '
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••·-------,-------,-------,-------T••••••• ••
I
••
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••·-------,-------,-------,-------T••••••• ••
I
••
I
I
I
3.4 Cover and Fill - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Off-Road
0.9763
9.0104
9.9190
0.0160
0.4646
0.4646
0.4322
0.4322
1,470.867
1 1,470.867
1 0.4292
1,481.596
5 Paving
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Total
0.9763
9.0104
9.9190
0.0160
0.4646
0.4646
0.4322
0.4322
1,470.867
1 1,470.867
1 0.4292
1,481.596
5 Unmitigated Construction On-Site
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Hauling
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Vendor
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Worker
0.2511
0.1638
2.2528
6.6700e-
003
0.6707
4.9600e-
003
0.6756
0.1779
4.5700e-
003
0.1824
664.1390
664.1390
0.0179
664.5865
Total
0.2511
0.1638
2.2528
6.6700e-
003
0.6707
4.9600e-
003
0.6756
0.1779
4.5700e-
003
0.1824
664.1390
664.1390
0.0179
664.5865
Unmitigated Construction Off-Site
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••1-------,-------,-------,-------T••••••• ..
..
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••1-------,-------,-------,-------T••••••• ••
I
••
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••1-------,-------,-------,-------T••••••• ••
I
••
I
I
I
4.0 Operational Detail - Mobile
3.4 Cover and Fill - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Off-Road
0.9763
9.0104
9.9190
0.0160
0.4646
0.4646
0.4322
0.4322
0.0000
1,470.867
1 1,470.867
1 0.4292
1,481.596
5 Paving
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Total
0.9763
9.0104
9.9190
0.0160
0.4646
0.4646
0.4322
0.4322
0.0000
1,470.867
1 1,470.867
1 0.4292
1,481.596
5 Mitigated Construction On-Site
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Hauling
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Vendor
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Worker
0.2511
0.1638
2.2528
6.6700e-
003
0.6707
4.9600e-
003
0.6756
0.1779
4.5700e-
003
0.1824
664.1390
664.1390
0.0179
664.5865
Total
0.2511
0.1638
2.2528
6.6700e-
003
0.6707
4.9600e-
003
0.6756
0.1779
4.5700e-
003
0.1824
664.1390
664.1390
0.0179
664.5865
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••1-------,-------,-------,-------T••••••• ..
..
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••1-------,-------,-------,-------T••••••• ••
I
••
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••1-------,-------,-------,-------T••••••• ••
I
••
I
I
I
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Mitigated
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Unmitigated
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
4.1 Mitigation Measures Mobile
4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate
Unmitigated
Mitigated
Land Use
Weekday
Saturday
Sunday
Annual VMT
Annual VMT
User Defined Industrial
0.00 0.00
0.00 Total
0.00 0.00
0.00 Miles
Trip %
Trip Purpose %
Land Use
H-W or C-W
H-S or C-C
H-O or C-NW
H-W or C-W
H-S or C-C
H-O or C-NW
Primary
Diverted
Pass-by
User Defined Industrial
16.60 8.40
6.90 0.00
0.00 0.00
0 0
0 4.4 Fleet Mix
Land Use
LDA
LDT1
LDT2
MDV
LHD1
LHD2
MHD
HHD
OBUS
UBUS
MCY
SBUS
MH
User Defined Industrial
0.551391
0.043400
0.201050
0.120272
0.016162
0.005864
0.021029
0.030512
0.002059
0.001866
0.004766
0.000706
0.000924
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
I I I I
I
I I I I I I I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
- - - - - - - - - - -
.r-------"'T"-------r--------r-------"'T"------"'T"-------r-------"'T"-------r--------r--------• - - - - - -
-,--------r--------r-------"'T"------"'T
- - - - - - -
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
5.0 Energy Detail
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
NaturalGas
Mitigated
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
NaturalGas
Unmitigated
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
I I I I
I
I I I I I I I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
- - - - - - - - - - -
.r-------"'T"-------r--------r-------"'T"------"'T"-------r-------"'T"-------r--------r--------• - - - - - -
-,--------r--------r-------"'T"------"'T
- - - - - - -
..
..
..
..
6.1 Mitigation Measures Area
6.0 Area Detail
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Land Use
kBTU/yr
lb/day
lb/day
User Defined
Industrial
0 0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Unmitigated
NaturalGa
s Use
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Land Use
kBTU/yr
lb/day
lb/day
User Defined
Industrial
0 0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Mitigated
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
'
1,
'
I
' ' ' ' ' ' '
I
'
I
' '
'
'
1,
'
I
' ' ' ' ' ' '
&
'
I
' '
'
'
1,
'
I
' ' ' ' ' ' '
&
'
I
' '
'
'
I,
'
I
' ' ' ' ' ' '
&
'
I
' ' '
'
I,
'
I
' ' ' ' ' ' '
&
'
I
' ' '
'
I,
'
I
' ' ' ' ' ' '
&
'
I
' ' '
'
I,
'
I
' ' ' ' ' ' '
&
'
I
' ' '
'
1,
'
I
' ' ' ' ' ' '
&
'
I
' '
'
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
lb/day
lb/day
Mitigated
1.0000e-
005
0.0000
1.0000e-
004
0.0000
0.0000
0.0000
0.0000
0.0000
2.2000e-
004
2.2000e-
004
0.0000
2.3000e-
004
Unmitigated
1.0000e-
005
0.0000
1.0000e-
004
0.0000
0.0000
0.0000
0.0000
0.0000
2.2000e-
004
2.2000e-
004
0.0000
2.3000e-
004
6.2 Area by SubCategory
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
SubCategory
lb/day
lb/day
Architectural
Coating
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Consumer
Products
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Landscaping
1.0000e-
005
0.0000
1.0000e-
004
0.0000
0.0000
0.0000
0.0000
0.0000
2.2000e-
004
2.2000e-
004
0.0000
2.3000e-
004
Total
1.0000e-
005
0.0000
1.0000e-
004
0.0000
0.0000
0.0000
0.0000
0.0000
2.2000e-
004
2.2000e-
004
0.0000
2.3000e-
004
Unmitigated
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
.,
.,
&
&
&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
- - - - - - - - - - -
.,..
______
"'T"
______
"'T"
______
"'T"
______
.,..
______
"'T"
______
"'T"
______
"'T"
______
"'T"
______
.,..
_______
,.
- - - - - -
-,-------"'T"------"'T"-------r-------"T
- - - - - - -
.,
.,
&
&
&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-------------------~-------~-------~-------~-------~-------~-------~-------~-------~-------~---------------~-------~-------~-------~------- &
&
&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-------------------~-------~-------~-------~-------~-------~-------~-------~-------~-------~---------------~-------~-------~-------~------- .,
.,
&
&
i
8.1 Mitigation Measures Waste
7.1 Mitigation Measures Water
7.0 Water Detail
8.0 Waste Detail
6.2 Area by SubCategory
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
SubCategory
lb/day
lb/day
Architectural
Coating
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Consumer
Products
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Landscaping
1.0000e-
005
0.0000
1.0000e-
004
0.0000
0.0000
0.0000
0.0000
0.0000
2.2000e-
004
2.2000e-
004
0.0000
2.3000e-
004
Total
1.0000e-
005
0.0000
1.0000e-
004
0.0000
0.0000
0.0000
0.0000
0.0000
2.2000e-
004
2.2000e-
004
0.0000
2.3000e-
004
Mitigated
9.0 Operational Offroad
Equipment Type
Number
Hours/Day
Days/Year
Horse Power
Load Factor
Fuel Type
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
I
I
I
I
I
I
I
I
I
I
I
I
I
&
I
I
I
I
I
•••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
&
I
I
I
I
I
•••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------~•••••••1-------,-------,-------,-------T••••••• I
I
I
&
11.0 Vegetation
Equipment Type
Number
Hours/Day
Hours/Year
Horse Power
Load Factor
Fuel Type
Boilers
Equipment Type
Number
Heat Input/Day
Heat Input/Year
Boiler Rating
Fuel Type
User Defined Equipment
Equipment Type
Number
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:15 PM
Riato Storm Drain - South Coast Air Basin, Summer
Project Characteristics -
Land Use - 11,000 lf x 72"
Construction Phase - Prep and Concrete Removal: 3 months, Trench and Install Pipe: 4 months, Cover and Fill: 3 months Off-road Equipment - Cover and Fill: 4 mixers, 1 paver, 1 roller, 1 loader/backhoe, 2 compactors Off-road Equipment - Prep and Concrete Removal: 1 concrete saw, 1 dozer, 3 loader/backhoes, 2 skid steer loaders Off-road Equipment - Pipeline Install: 1 loader/backhoe, 2 trenchers, 1 forklift, 1 crane, 1 excavator Trips and VMT - 30 workers-60 trips per day
Construction Off-road Equipment Mitigation -
1.1 Land Usage
Land Uses
Size
Metric
Lot Acreage
Floor Surface Area
Population
User Defined Industrial
1.00 User Defined Unit
1.50 0.00
0 1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
10 Wind Speed (m/s)
Precipitation Freq (Days)
2.2 31
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company
Southern California Edison
2021
Operational Year
CO2 Intensity
(lb/MWhr)
702.44
0.029
CH4 Intensity
(lb/MWhr)
0.006
N2O Intensity
(lb/MWhr)
Riato Storm Drain
South Coast Air Basin, Annual
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
2.0 Emissions Summary
Table Name
Column Name
Default Value
New Value
tblConstructionPhase
NumDays
20.00 60.00
tblConstructionPhase
NumDays
10.00 60.00
tblConstructionPhase
PhaseEndDate
1/28/2021
3/25/2021
tblConstructionPhase
PhaseEndDate
11/26/2021
10/22/2021
tblConstructionPhase
PhaseStartDate
11/13/2021
8/1/2021
tblLandUse
LotAcreage
0.00 1.50
tblOffRoadEquipment
LoadFactor
0.37 0.37
tblOffRoadEquipment
LoadFactor
0.37 0.37
tblOffRoadEquipment
LoadFactor
0.50 0.50
tblOffRoadEquipment
LoadFactor
0.20 0.20
tblOffRoadEquipment
LoadFactor
0.29 0.29
tblOffRoadEquipment
LoadFactor
0.38 0.38
tblOffRoadEquipment
OffRoadEquipmentType
Skid Steer Loaders
tblOffRoadEquipment
OffRoadEquipmentType
Plate Compactors
tblOffRoadEquipment
OffRoadEquipmentType
Tractors/Loaders/Backhoes
tblOffRoadEquipment
OffRoadEquipmentType
Trenchers
tblOffRoadEquipment
OffRoadEquipmentType
Forklifts
tblOffRoadEquipment
OffRoadEquipmentType
Cranes
tblOffRoadEquipment
OffRoadEquipmentType
Excavators
tblOffRoadEquipment
OffRoadEquipmentUnitAmount
1.00 4.00
tblTripsAndVMT
VendorTripNumber
0.00 1.00
tblTripsAndVMT
WorkerTripNumber
18.00 60.00
tblTripsAndVMT
WorkerTripNumber
25.00 60.00
tblTripsAndVMT
WorkerTripNumber
15.00 60.00
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I
I
I
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------l------------------------------t--------------------------
I
I
-----------------------------4------------------------------I------------------------------~--------------------------
2.1 Overall Construction
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Year
tons/yr
MT/yr
2021
0.1877
1.6281
1.5826
2.8600e-
003
0.0661
0.0885
0.1545
0.0176
0.0819
0.0995
0.0000
250.9695
250.9695
0.0584
0.0000
252.4283
Maximum
0.1877
1.6281
1.5826
2.8600e-
003
0.0661
0.0885
0.1545
0.0176
0.0819
0.0995
0.0000
250.9695
250.9695
0.0584
0.0000
252.4283
Unmitigated Construction
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Year
tons/yr
MT/yr
2021
0.1877
1.6281
1.5826
2.8600e-
003
0.0661
0.0885
0.1545
0.0176
0.0819
0.0995
0.0000
250.9692
250.9692
0.0584
0.0000
252.4280
Maximum
0.1877
1.6281
1.5826
2.8600e-
003
0.0661
0.0885
0.1545
0.0176
0.0819
0.0995
0.0000
250.9692
250.9692
0.0584
0.0000
252.4280
Mitigated Construction
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
NBio-CO2
Total CO2
CH4
N20
CO2e
Percent
Reduction
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
.,
'
I
' ' ' '
I
' '
I
'
I
' '
'
.,
'
I
' ' ' '
I
' '
I
'
I
' '
'
.,
'
I
' ' ' '
I
' '
I
'
I
' '
'
.,
'
I
' ' ' '
I
' '
I
'
I
' ' '
.,
'
I
' ' ' '
I
' '
I
'
I
' ' '
.,
'
I
' ' ' '
I
' '
I
'
I
' ' '
.,
'
I
' ' ' '
I
' '
I
'
I
' ' '
.,
'
I
' ' ' '
I
' '
I
'
I
' '
'
I
I I I I I
I
I I I
I
I I I I I
I
2.2 Overall Operational
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Area
0.0000
0.0000
1.0000e-
005
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.0000e-
005
2.0000e-
005
0.0000
0.0000
3.0000e-
005
Energy
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Mobile
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Waste
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Water
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Total
0.0000
0.0000
1.0000e-
005
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.0000e-
005
2.0000e-
005
0.0000
0.0000
3.0000e-
005
Unmitigated Operational
Quarter
Start Date
End Date
Maximum Unmitigated ROG + NOX (tons/quarter)
Maximum Mitigated ROG + NOX (tons/quarter)
1 1-1-2021
3-31-2021
0.7289
0.7289
2 4-1-2021
6-30-2021
0.6290
0.6290
3 7-1-2021
9-30-2021
0.3718
0.3718
Highest
0.7289
0.7289
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
&
&
&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-------------------~-------~-------~-------~-------~-------~-------~-------~-------~-------~---------------~-------~-------~-------~------- &
&
&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-------------------~-------~-------~-------~-------~-------~-------~-------~-------~-------~---------------~-------~-------~-------~------- &
&
&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-------------------~-------~-------~-------~-------~-------~-------~-------~-------~-------~---------------~-------~-------~-------~------- &
&
&
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-------------------~-------~-------~-------~-------~-------~-------~-------~-------~-------~---------------~-------~-------~-------~------- &
&
i
-
-
2.2 Overall Operational
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Area
0.0000
0.0000
1.0000e-
005
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.0000e-
005
2.0000e-
005
0.0000
0.0000
3.0000e-
005
Energy
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Mobile
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Waste
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Water
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Total
0.0000
0.0000
1.0000e-
005
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.0000e-
005
2.0000e-
005
0.0000
0.0000
3.0000e-
005
Mitigated Operational
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name
Phase Type
Start Date
End Date
Num Days
Week
Num Days
Phase Description
1 Prep and Concrete Removal
Demolition
1/1/2021
3/25/2021
5 60
2 Pipeline Install
Trenching
4/1/2021
7/21/2021
5 80
3 Cover and Fill
Paving
8/1/2021
10/22/2021
5 60
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
NBio-CO2
Total CO2
CH4
N20
CO2e
Percent
Reduction
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
&
I
I
I
I
I
•••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
&
I
I
I
I
I
•••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
&
I
I
I
I
I
•••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------~-------~•••••••1-------,-------,-------,-------T------- I
I
I
&
I I I I I I I I I I I I I I I I
I
I
-------l------------------------l-----------------------l------------~------------4--------4--------4-------------------------
1 I
I
I
I
1 I
I
I
I
-------l------------------------~-----------------------1-------------1-------------I---------~--------~-------------------------
.
.
'
.
OffRoad Equipment
Phase Name
Offroad Equipment Type
Amount
Usage Hours
Horse Power
Load Factor
Cover and Fill
Plate Compactors
2 7.00
8 0.43
Cover and Fill
Cement and Mortar Mixers
4 6.00
9 0.56
Prep and Concrete Removal
Concrete/Industrial Saws
1 8.00
81 0.73
Prep and Concrete Removal
Skid Steer Loaders
2 8.00
65 0.37
Pipeline Install
Tractors/Loaders/Backhoes
1 8.00
97 0.37
Pipeline Install
Trenchers
2 8.00
78 0.50
Pipeline Install
Forklifts
1 8.00
89 0.20
Cover and Fill
Pavers
1 6.00
130
0.42 Cover and Fill
Rollers
1 7.00
80 0.38
Prep and Concrete Removal
Rubber Tired Dozers
1 8.00
247
0.40 Pipeline Install
Cranes
1 8.00
231
0.29 Pipeline Install
Excavators
1 8.00
158
0.38 Prep and Concrete Removal
Tractors/Loaders/Backhoes
3 8.00
97 0.37
Cover and Fill
Paving Equipment
1 8.00
132
0.36 Cover and Fill
Tractors/Loaders/Backhoes
1 8.00
97 0.37
Trips and VMT
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating
±
sqft)
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I
I
I
I
----------------------------1---------------------------~---------------- I
I
----------------------------1---------------------------~---------------- I
I
----------------------------1---------------------------~---------------- I
I
----------------------------1---------------------------~---------------- I
I
----------------------------1---------------------------~---------------- I
I
----------------------------1---------------------------~---------------- I
I
----------------------------1---------------------------~---------------- I
I
----------------------------1---------------------------~---------------- I
I
----------------------------1---------------------------~---------------- I
I
----------------------------1---------------------------~---------------- I
I
----------------------------1---------------------------~---------------- I
I
----------------------------1---------------------------~---------------- I
I
----------------------------1---------------------------~---------------- I
I
----------------------------~---------------------------1----------------- I I
i
I
------------
:1---------+--------------
1 I
------------
·1---------+--------------
1 I
------------
.1---------+--------------
1 I
------------
.1---------+--------------
1 I
------------
:1---------+--------------
1 I
------------
·1---------+--------------
1 I
------------
.1---------+--------------
1 I
------------
.1---------+--------------
1 I
------------
:1---------+--------------
1 I
------------
·1---------+--------------
1 I
------------
.1---------+--------------
1 I
------------
.1---------+--------------
1 I
------------
:1---------+--------------
1 I
I
~
------------1--------------~--------------
3.2 Prep and Concrete Removal - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Off-Road
0.0643
0.6509
0.5178
8.5000e-
004
0.0337
0.0337
0.0314
0.0314
0.0000
74.0668
74.0668
0.0197
0.0000
74.5587
Total
0.0643
0.6509
0.5178
8.5000e-
004
0.0337
0.0337
0.0314
0.0314
0.0000
74.0668
74.0668
0.0197
0.0000
74.5587
Unmitigated Construction On-Site
3.1 Mitigation Measures Construction
Water Exposed Area
Phase Name
Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Prep and Concrete
Removal
7 60.00
0.00 0.00
14.70 6.90
20.00 LD_Mix
HDT_Mix
HHDT
Pipeline Install
6 60.00
1.00 0.00
14.70 6.90
20.00 LD_Mix
HDT_Mix
HHDT
Cover and Fill
10 60.00
0.00 0.00
14.70 6.90
20.00 LD_Mix
HDT_Mix
HHDT
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
•
I
I
I
I
I
I
I
I
I
•
I
I
I
I
I
I
I
I
I
----------------l---------------~----------1----------~----------l-----------t----------~----------1--------------1----------~---------- •
I
I
I
I
I
I
I
I
I
•
I
I
I
I
I
I
I
I
I
----------------~---------------l-----------~----------l----------~-----------l-----------~----------l---------------1-----------1----------- -
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
3.2 Prep and Concrete Removal - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Hauling
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Vendor
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Worker
7.4800e-
003
5.5500e-
003
0.0628
1.9000e-
004
0.0198
1.5000e-
004
0.0199
5.2400e-
003
1.4000e-
004
5.3800e-
003
0.0000
17.2197
17.2197
4.6000e-
004
0.0000
17.2313
Total
7.4800e-
003
5.5500e-
003
0.0628
1.9000e-
004
0.0198
1.5000e-
004
0.0199
5.2400e-
003
1.4000e-
004
5.3800e-
003
0.0000
17.2197
17.2197
4.6000e-
004
0.0000
17.2313
Unmitigated Construction Off-Site
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Off-Road
0.0643
0.6509
0.5178
8.5000e-
004
0.0337
0.0337
0.0314
0.0314
0.0000
74.0668
74.0668
0.0197
0.0000
74.5586
Total
0.0643
0.6509
0.5178
8.5000e-
004
0.0337
0.0337
0.0314
0.0314
0.0000
74.0668
74.0668
0.0197
0.0000
74.5586
Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------~•••••••1-------,-------,-------,-------T••••••• -
-
I
I
I
I
3.2 Prep and Concrete Removal - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Hauling
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Vendor
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Worker
7.4800e-
003
5.5500e-
003
0.0628
1.9000e-
004
0.0198
1.5000e-
004
0.0199
5.2400e-
003
1.4000e-
004
5.3800e-
003
0.0000
17.2197
17.2197
4.6000e-
004
0.0000
17.2313
Total
7.4800e-
003
5.5500e-
003
0.0628
1.9000e-
004
0.0198
1.5000e-
004
0.0199
5.2400e-
003
1.4000e-
004
5.3800e-
003
0.0000
17.2197
17.2197
4.6000e-
004
0.0000
17.2313
Mitigated Construction Off-Site
3.3 Pipeline Install - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Off-Road
0.0690
0.6846
0.5569
8.9000e-
004
0.0403
0.0403
0.0371
0.0371
0.0000
78.5018
78.5018
0.0254
0.0000
79.1366
Total
0.0690
0.6846
0.5569
8.9000e-
004
0.0403
0.0403
0.0371
0.0371
0.0000
78.5018
78.5018
0.0254
0.0000
79.1366
Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------~•••••••1-------,-------,-------,-------T••••••• -
-
I
I
I
I
3.3 Pipeline Install - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Hauling
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Vendor
1.1000e-
004
3.8900e-
003
9.8000e-
004
1.0000e-
005
2.5000e-
004
1.0000e-
005
2.6000e-
004
7.0000e-
005
1.0000e-
005
8.0000e-
005
0.0000
0.9712
0.9712
6.0000e-
005
0.0000
0.9728
Worker
9.9700e-
003
7.4000e-
003
0.0838
2.5000e-
004
0.0263
2.0000e-
004
0.0265
6.9900e-
003
1.8000e-
004
7.1800e-
003
0.0000
22.9597
22.9597
6.2000e-
004
0.0000
22.9751
Total
0.0101
0.0113
0.0847
2.6000e-
004
0.0266
2.1000e-
004
0.0268
7.0600e-
003
1.9000e-
004
7.2600e-
003
0.0000
23.9309
23.9309
6.8000e-
004
0.0000
23.9479
Unmitigated Construction Off-Site
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Off-Road
0.0690
0.6846
0.5569
8.9000e-
004
0.0403
0.0403
0.0371
0.0371
0.0000
78.5017
78.5017
0.0254
0.0000
79.1365
Total
0.0690
0.6846
0.5569
8.9000e-
004
0.0403
0.0403
0.0371
0.0371
0.0000
78.5017
78.5017
0.0254
0.0000
79.1365
Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------~•••••••1-------,-------,-------,-------T••••••• -
-
I
I
I
I
3.3 Pipeline Install - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Hauling
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Vendor
1.1000e-
004
3.8900e-
003
9.8000e-
004
1.0000e-
005
2.5000e-
004
1.0000e-
005
2.6000e-
004
7.0000e-
005
1.0000e-
005
8.0000e-
005
0.0000
0.9712
0.9712
6.0000e-
005
0.0000
0.9728
Worker
9.9700e-
003
7.4000e-
003
0.0838
2.5000e-
004
0.0263
2.0000e-
004
0.0265
6.9900e-
003
1.8000e-
004
7.1800e-
003
0.0000
22.9597
22.9597
6.2000e-
004
0.0000
22.9751
Total
0.0101
0.0113
0.0847
2.6000e-
004
0.0266
2.1000e-
004
0.0268
7.0600e-
003
1.9000e-
004
7.2600e-
003
0.0000
23.9309
23.9309
6.8000e-
004
0.0000
23.9479
Mitigated Construction Off-Site
3.4 Cover and Fill - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Off-Road
0.0293
0.2703
0.2976
4.8000e-
004
0.0139
0.0139
0.0130
0.0130
0.0000
40.0304
40.0304
0.0117
0.0000
40.3225
Paving
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Total
0.0293
0.2703
0.2976
4.8000e-
004
0.0139
0.0139
0.0130
0.0130
0.0000
40.0304
40.0304
0.0117
0.0000
40.3225
Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••1-------,-------,-------,-------T••••••• ..
..
I
I
I
I
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••1-------,-------,-------,-------T••••••• ::
I
I
I
3.4 Cover and Fill - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Hauling
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Vendor
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Worker
7.4800e-
003
5.5500e-
003
0.0628
1.9000e-
004
0.0198
1.5000e-
004
0.0199
5.2400e-
003
1.4000e-
004
5.3800e-
003
0.0000
17.2197
17.2197
4.6000e-
004
0.0000
17.2313
Total
7.4800e-
003
5.5500e-
003
0.0628
1.9000e-
004
0.0198
1.5000e-
004
0.0199
5.2400e-
003
1.4000e-
004
5.3800e-
003
0.0000
17.2197
17.2197
4.6000e-
004
0.0000
17.2313
Unmitigated Construction Off-Site
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Off-Road
0.0293
0.2703
0.2976
4.8000e-
004
0.0139
0.0139
0.0130
0.0130
0.0000
40.0304
40.0304
0.0117
0.0000
40.3224
Paving
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Total
0.0293
0.2703
0.2976
4.8000e-
004
0.0139
0.0139
0.0130
0.0130
0.0000
40.0304
40.0304
0.0117
0.0000
40.3224
Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••1-------,-------,-------,-------T••••••• ..
..
I
I
I
I
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------.,..-------~•••••••1-------,-------,-------,-------T••••••• ::
I
I
I
4.0 Operational Detail - Mobile
4.1 Mitigation Measures Mobile
3.4 Cover and Fill - 2021
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Hauling
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Vendor
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Worker
7.4800e-
003
5.5500e-
003
0.0628
1.9000e-
004
0.0198
1.5000e-
004
0.0199
5.2400e-
003
1.4000e-
004
5.3800e-
003
0.0000
17.2197
17.2197
4.6000e-
004
0.0000
17.2313
Total
7.4800e-
003
5.5500e-
003
0.0628
1.9000e-
004
0.0198
1.5000e-
004
0.0199
5.2400e-
003
1.4000e-
004
5.3800e-
003
0.0000
17.2197
17.2197
4.6000e-
004
0.0000
17.2313
Mitigated Construction Off-Site
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Mitigated
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Unmitigated
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate
Unmitigated
Mitigated
Land Use
Weekday
Saturday
Sunday
Annual VMT
Annual VMT
User Defined Industrial
0.00 0.00
0.00 Total
0.00 0.00
0.00 Miles
Trip %
Trip Purpose %
Land Use
H-W or C-W
H-S or C-C
H-O or C-NW
H-W or C-W
H-S or C-C
H-O or C-NW
Primary
Diverted
Pass-by
User Defined Industrial
16.60 8.40
6.90 0.00
0.00 0.00
0 0
0 5.0 Energy Detail
4.4 Fleet Mix
Land Use
LDA
LDT1
LDT2
MDV
LHD1
LHD2
MHD
HHD
OBUS
UBUS
MCY
SBUS
MH
User Defined Industrial
0.551391
0.043400
0.201050
0.120272
0.016162
0.005864
0.021029
0.030512
0.002059
0.001866
0.004766
0.000706
0.000924
Historical Energy Use: N
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I I I I
I
I I I I I I I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
- - - - - - - - - - -
.r-------"'T"-------r--------r-------"'T"------"'T"-------r-------"'T"-------r--------r--------· - - - - - -
-,--------r--------r-------"'T"------"'T
- - - - - - -
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Electricity
Mitigated
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Electricity
Unmitigated
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
NaturalGas
Mitigated
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
NaturalGas
Unmitigated
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Land Use
kBTU/yr
tons/yr
MT/yr
User Defined
Industrial
0 0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Unmitigated
5.1 Mitigation Measures Energy
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I I I I
I
I I I I
I
I
I
I I I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••n-------,-------,-------,-------,-------,-------,-------,-------,-------,--------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
- - - - - - - - - - -
..-------"'T"-------r--------r-------"'T"------"'T"-------r-------"'T"-------r--------r--------• - - - - - -
-,--------r--------r-------"'T"------"'T
- - - - - - -
'
1,
'
I
I
I
I
I
I
I
I
I
'
I
I
I
'
'
I,
'
I
' ' ' ' ' ' '
I
'
I
' ' '
'
I,
'
I
' ' ' ' ' ' '
I
'
I
' ' '
'
I,
'
I
' ' ' ' ' ' '
I
'
I
' ' '
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Land Use
kBTU/yr
tons/yr
MT/yr
User Defined
Industrial
0 0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Total
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Mitigated
5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2
CH4
N2O
CO2e
Land Use
kWh/yr
MT/yr
User Defined
Industrial
0 0.0000
0.0000
0.0000
0.0000
Total
0.0000
0.0000
0.0000
0.0000
Unmitigated
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
'
1,
'
I
' ' ' ' ' ' '
I
'
I
' '
'
'
1,
'
I
' ' ' ' ' ' '
&
'
I
' '
'
'
1,
'
I
' ' ' ' ' ' '
&
'
I
' '
'
'
I,
'
I
' ' ' ' ' ' '
&
'
I
' ' '
'
I,
'
I
'
'
I,
'
I
'
'
I,
'
I
'
'
1,
'
I
'
6.1 Mitigation Measures Area
6.0 Area Detail
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
Category
tons/yr
MT/yr
Mitigated
0.0000
0.0000
1.0000e-
005
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.0000e-
005
2.0000e-
005
0.0000
0.0000
3.0000e-
005
Unmitigated
0.0000
0.0000
1.0000e-
005
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.0000e-
005
2.0000e-
005
0.0000
0.0000
3.0000e-
005
5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2
CH4
N2O
CO2e
Land Use
kWh/yr
MT/yr
User Defined
Industrial
0 0.0000
0.0000
0.0000
0.0000
Total
0.0000
0.0000
0.0000
0.0000
Mitigated
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
'
1,
'
I
'
'
1,
'
I
'
'
1,
'
I
'
'
I,
'
I
'
I
I
I I I I
I
I I I
I
I I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-----------
...
-------.--------.--------.--------.--------.--------.--------.--------.--------.--------• ------
-.--------.--------.--------.--------.
-------
.,
.,
.,
.,
7.0 Water Detail
6.2 Area by SubCategory
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
SubCategory
tons/yr
MT/yr
Architectural
Coating
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Consumer
Products
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Landscaping
0.0000
0.0000
1.0000e-
005
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.0000e-
005
2.0000e-
005
0.0000
0.0000
3.0000e-
005
Total
0.0000
0.0000
1.0000e-
005
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.0000e-
005
2.0000e-
005
0.0000
0.0000
3.0000e-
005
Unmitigated
ROG
NOx
CO
SO2
Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5 Total
Bio- CO2
NBio- CO2
Total CO2
CH4
N2O
CO2e
SubCategory
tons/yr
MT/yr
Architectural
Coating
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Consumer
Products
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
Landscaping
0.0000
0.0000
1.0000e-
005
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.0000e-
005
2.0000e-
005
0.0000
0.0000
3.0000e-
005
Total
0.0000
0.0000
1.0000e-
005
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
2.0000e-
005
2.0000e-
005
0.0000
0.0000
3.0000e-
005
Mitigated
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I
I
I
I
I
I
I
I
I
I
I
I
I
&
I
I
I
I
I
•••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------T-------~•••••••1-------,-------,-------,-------T••••••• I
I
I
I
I
I
I
I
I
I
I
I
I
&
I
I
I
I
I
•••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------T-------~•••••••1-------,-------,-------,-------T••••••• .,
.,
I
I
I
&
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------T-------~•••••••1-------,-------,-------,-------T••••••• ::
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
•••••••••••m-------,-------,-------,-------,-------,-------,-------,-------,-------T-------~•••••••1-------,-------,-------,-------T••••••• ::
i
I
I
7.1 Mitigation Measures Water
Total CO2
CH4
N2O
CO2e
Category
MT/yr
Mitigated
0.0000
0.0000
0.0000
0.0000
Unmitigated
0.0000
0.0000
0.0000
0.0000
7.2 Water by Land Use
Indoor/Out
door Use
Total CO2
CH4
N2O
CO2e
Land Use
Mgal
MT/yr
User Defined
Industrial
0 / 0
0.0000
0.0000
0.0000
0.0000
Total
0.0000
0.0000
0.0000
0.0000
Unmitigated
7.0 Water Detail
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
I
I
I
I
I
I
I
I
- - - - - - - - - - -
.,..
______
"'T"
______
"'T"
______
"T
- - - - - - -
'
I,
I
I
I
'
I,
' ' '
'
I,
' ' '
'
1,
' '
'
8.1 Mitigation Measures Waste
7.2 Water by Land Use
Indoor/Out
door Use
Total CO2
CH4
N2O
CO2e
Land Use
Mgal
MT/yr
User Defined
Industrial
0 / 0
0.0000
0.0000
0.0000
0.0000
Total
0.0000
0.0000
0.0000
0.0000
Mitigated
8.0 Waste Detail
Total CO2
CH4
N2O
CO2e
MT/yr
Mitigated
0.0000
0.0000
0.0000
0.0000
Unmitigated
0.0000
0.0000
0.0000
0.0000
Category/Year
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
'
1,
' '
'
'
1,
' '
'
'
1,
' '
'
'
I,
' ' '
I
I
I
.,
I
I
I
I
-----------
...
-------.--------.--------.
-------
.,
.,
8.2 Waste by Land Use
Waste
Disposed
Total CO2
CH4
N2O
CO2e
Land Use
tons
MT/yr
User Defined
Industrial
0 0.0000
0.0000
0.0000
0.0000
Total
0.0000
0.0000
0.0000
0.0000
Unmitigated
Waste
Disposed
Total CO2
CH4
N2O
CO2e
Land Use
tons
MT/yr
User Defined
Industrial
0 0.0000
0.0000
0.0000
0.0000
Total
0.0000
0.0000
0.0000
0.0000
Mitigated
9.0 Operational Offroad
Equipment Type
Number
Hours/Day
Days/Year
Horse Power
Load Factor
Fuel Type
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
'
1,
' '
'
'
1,
' '
'
'
1,
' '
'
'
I,
' ' '
'
I,
' ' '
'
I,
' ' '
'
I,
' ' '
'
1,
' '
'
11.0 Vegetation
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type
Number
Hours/Day
Hours/Year
Horse Power
Load Factor
Fuel Type
Boilers
Equipment Type
Number
Heat Input/Day
Heat Input/Year
Boiler Rating
Fuel Type
User Defined Equipment
Equipment Type
Number
CalEEMod Version: CalEEMod.2016.3.2
Date: 4/12/2019 12:17 PM
Riato Storm Drain - South Coast Air Basin, Annual
APPENDIX 3
May 20, 2019
Tom Dodson
Tom Dodson and Associates
2150 N Arrowhead Ave
San Bernardino, CA 92405
RE:
Biological Resources Assessment,
Jurisdictional Waters Delineation
Rialto Storm Drain, Rialto, CA
Dear Tom:
Jericho Systems, Inc. (Jericho) is pleased to provide this letter report that details the results of a general Biological Resources Assessment/Jurisdictional Waters Delineation (BRA/JD) for a proposed
storm
drainage system
located
in the City of Rialto.
J
ericho Systems, Inc. (Jericho) is pleased to provide this letter report that details the results of a general Biological Resources Assessment (BRA) that includes habitat suitability assessments for nesting birds, Burrowing owl (
Athene
cunicularia
) [BUOW],
Delhi sands flower
-
loving fly (
Rhaphiomidas terminatus
abdominalis
)
[DSF]
, small mammals such as the San Bernardino Kangaroo Rat ( Dipodomys merriami
parvus
) [SBKR] and Los Angeles Pocket mouse (
Perognathus longimembris brevinasus
) [LA
PM] and a
Jurisdictional Waters Delineation (JD) for the proposed construction and operation of the
Rialto Storm
Drain
Project (Project).
This report is designed to address potential effects of the proposed Project to designated Critical Habitats and/o
r any species currently listed or formally proposed for listing as endangered or threatened under the federal Endangered Species Act (ESA) and the California Endangered Species Act (CESA), or species designated as sensitive by the California Department of Fish and Wildlife (CDFW), or the California
Native Plant Society (CNPS). Attention was focused sensitive species known to occur locally. This report also addresses resources protected under the Migratory Bird Treaty Act, federal Clean Water Act (CWA) regu
lated by the U.S. Army Corps of Engineers (USACE) and Regional Water Quality Control Board (RWQCB) respectively; and Section 1602 of the California Fish and Game Code (FCG) administered by the CDFW.
PROJECT LOCATION
The proposed project is located at
Cactus Basin (just west of Cactus Avenue and Baseline Road) connecting to Baseline Road south of Cactus Basin and traveling west within Baseline Road to just west of Tamarind Avenue within the City of Rialto, CA
.
The Project is mostly located within existing
roadways, though Cactus Basin (which the proposed
p
roject will connect the new storm drain to) is
located on land designated for Open Space Resource Use.
The project is located in Section 34
Township
1 North
, R
ange
5 West
within the Fontana
USGS Topo 7.5
-
minute series maps
. The project is primarily
linear
with an approximate Lat/Long of
34.124043
,
-
117.388063
at the eastern portion of the project and
34.121298
,
-
117.422797
at the western portion of the project.
PROJECT UNDERSTANDING
The project consists of
installing an approximately
2 -
mile
or 11,000 lineal feet
(LF)
storm drain system
within Baseline Road that would
captur
e
flows north of Baseline Road. The storm drain line starts at the
Tamarind Avenue/Baseli
ne Road intersection and runs along Baseline Road to the outlet at Cactus Basin No. 3. The City of Rialto Master Plan of Drainage was used to size the storm drain system to improve drainage systems
I
n the City of Rialto.
The new storm drain will be develop
ed within a reinforced
concrete box (RCB) that will vary in size between 6’ x 12’, 7’ x 7’, and 3’ x 10’ depending on the location within the new storm drain alignment. The majority of the storm drain footprint (located within Baseline Road) will be constr
ucted as a 72” reinforced concrete pipe (RCP), though a portion of the easternmost section of the alignment, which leaves from Baseline Road to Cactus Basin, will vary in size as either a 72”, 84”, 48”, 36”, or 30” RCP.
The project site corresponds to th
e proposed storm drain “Line D” as described in the City of Rialto Master Plan of Drainage. The project area is located within the Renaissance Development ,
which consist
s
of the redevelopment of the Rialto
A
irport and the surrounding areas. The
Renaissance Specific Plan was
used to get additional information for Line D and meet drainage facility requirements. Subarea D is bounded by 210 freeway on the north, Baseline Road on the south, Cactus Avenue on the east, and Palmetto Avenue on the west. O
verland flow travels in southeastern direction in the southern portion of the Renaissance site before it is captured by Line D and outlets to Cactus Basin No. 3.
Flows leaving Basin No. 3 continue on to Basin 1 and 2 and Rialto Channel, which ultimatel y discharges
to the Santa Ana River. Outflow from the Cactus Basin System are limited due to the poor downstream channel capacities.
The proposed project will install one of three Alternative Alignments that will connect the new Baseline Road storm drain
alignment with Cactus Basin.
The project will retrofit an existing 36” RCP outlet to the larger structure. Energy dissipation measures (such as rip rap pad, baffle) may
be i
nstalled
at the outlet
, to
control erosive damage from the higher volume discharged
from the new pipeline.
SETTING
The City of
Rialto sits at the base of the Cajon Pass, where high winds are common
meteorological events
within the region.
The climate in the region is typically characterized as Mediterranean
. Typical rainfall
averages approximately 1
7 inches per year. Hydrologically, the
Project site
is within the
C
hino
Hydrologic Sub
-
Area (HSA 80
1 .
21 ) which comprises a
17,765
-
acre drainag
e area within the larger
Middle Santa Ana River
Watershed (HUC 1807020
30804
).
The subject parcel is situated in a
developing
area of the Inland Valleys ecoregion
.
Most of the project occurs along Baseline Road, and the stretch of road consists of residential and commercial development with ornamental vegetation that is regularly gardened. Plots of undeveloped land adjacent to Baseline Road consist primarily of
ripgu
t brome (
Bromus diandrus)
and wild oat (
Avena
fatua
)
.
Habitat
within
and adjacent to
the Cactus Basin portion
consists of degraded alluvial fan sage
scrub
.
The s
tretch that parallels the
northbound portion of
fence line consists of a
steep grade (~70 deg
ree) with
evidence of standing water. The northeast portion of the basin consists of a shallow grade (~10 degree).
METHODS
As stated above, the objective of this document is to determine whether the Project area supports special status or otherwise sensitive species and/ or their habitat, and to address the potential effects associated with the Proposed project on those resou
rces. The species and habitats addressed in this document are based on database information and field investigation.
These sources include:
•
U.S. Fish and Wildlife (USFWS) threatened and endangered species occurrence GIS overlay;
•
USFWS Information for
Planning and Consultation System (IPaC);
•
California Natural Diversity Database (CNDDB)
Rarefind 5
);
•
CNDDB
Biogeographic Information and Observation System (BIOS) ;
•
California Native Plant Society Electronic Inventory (CNPSEI) database;
•
Calflora Database;
•
USDA Natural Resources Conservation Service (NRCS) Web Soil Survey;
•
USFWS National Wetland Inventory;
•
Environmental Protection Agency (EPA) Water Program “My Waters” data layers
•
USFWS Designated Critical Habitat Maps
We also reviewed other
available technical information on the biological resources of the site, including
previous trapping surveys and discussed recent findings with researchers in the field.
Jericho biologist Christian Nordal conducted a general biological resources assessmen t on
March
1, 2019,
with an emphasis on special
-
status species known to occur in the area. Mr. Nordal has advanced degrees and multiple years of experience surveying biological resources within Southern California. Mr. Nordal conducted the systematic and comprehensi
ve survey during calm weather, between the hours of
77 a.m.
and 11 a.m. Weather conditions during the survey consisted of clear skies with temperatures ranging from 65 degrees Fahrenheit (° F) to 73° F and light wind <5 mph.
On
March 30
, 2019, Jericho
ecologist Shay Lawrey performed a follow up site assessment to evaluate the potential to support for
DSF, BUOW
and small mammals to occur on site, specifically the federally endangered SBKR and State species of special concern LAPM and federally threat ened CAGN. Ms.
Lawrey has advanced degrees in biology, is permitted to trap and handle SBKR and has two decades of experience with surveying for sensitive small mammals and birds.
Wildlife species were detected during field surveys by sight, calls, track s, scat, or other sign. In addition
to species observed, expected wildlife usage of the site was determined per known habitat preferences of regional wildlife species and knowledge of their relative distributions in the area. The focus of the faunal specie
s surveys was to identify potential habitat for special status wildlife within the project area.
Disturbance characteristics and all animal sign encountered on the site are recorded in the results section.
The
Project area
was also evaluated for the pre
sence of jurisdictional waters, i.e. waters of the U.S. as regulated by the USACE and RWQCB, and/or streambed and associated riparian habitat as regulated by the CDFW.
Evaluation of potential federal jurisdiction followed the regulations set forth in 33CF R part
328 and the USACE guidance documents and e
valuation of potential State jurisdiction followed guidance in the Fish and Game Code and A Review of Stream Processes and Forms in Dryland Watersheds (CDFW, 2010).
RESULTS
The project site is
primarily
a multi
-
use urban setting, with the Cactus Basin component holding the only vegetation not actively managed by landscaping. The habitat adjacent to the north -
bound fencing in
Cactus Basin is high disturbance new growth, whereas the habitat in the northeas t corner of the project
site is high disturbance alluvial fan sage scrub.
Habitat within
or adjacent to
the
north
-
bound
portion
on the easternmost part
of
the
P
roject
alignment at
Cactus Basin
consists primarily of
foxtail
(
Hordeum murinum
)
,
wild oat
(
Avena fatua
)
, stinging nettle
(
Urtica urens
), coastal heron’s bill (
Erodium cicutarium
)
and common fiddleneck (
Amsinckia
intermedia
)
.
Shrubs become increasingly numerous the further north into the basin. Those shrubs
are
primarily
California
buckwheat (
Eriogonum fasciculatum
)
and
California sagebrush
(
Artemesia
californica
)
.
Adjacent to the northernmost
portion of the basin
is
degraded
alluvial fan sage scrub that
consists of interspersed California sagebrush, California buckwheat, foxtail, ripgut ( Bromus diandrus
), a
single holly
-
leaf cherry (
Prunus ilicifolia
) shrub, and a single beavertail cactus (
Opuntia basilaris var.
basil
aris
).
Vegetation on or adjacent to all other
aspects
of the project are ornamental landscaped shrubs
or ruderal vegetation composed of ripgut and foxtail.
Common wildlife was observed during survey which included side
-
blotched lizard (
Uta
stansburiana
)
,
western meadowlark
(
Sturnella neglecta
), white
-
crowned sparrow (
Zonotrichia leucophrys
),
house finch
(
Haemorhous mexicanus
),
and
American crow
(
Corvus brachyrhynchos
)
.
The soil conditions within the Project are
composed of loam and are not
Delhi sands. The loamy soils
not
suitable to support Delhi sands flower
-
loving fly [DSF]
. F
urther investigation
in to DSF
is not warranted
or recommended.
Due to the
habitat
conditions at
the east end, northbound portion of the alignment that
approaches C
actus
Basin
,
and
due to
previous
records
of
SBKR
in Cactus Basins
,
there
remains a moderate
potential for
occurrence of
SBKR
and LAPM
.
Further the
Project site
at Cactus Basin is
potentially suitable for
BUOW
.
San Bernardino Kangaroo Rat
(SBKR)
The SBKR is one of several kangaroo rat species in its range. The Dulzura kangaroo rat ( Dipodomys
simulans
), the Pacific kangaroo rat (
Dipodomys agilis
) and the Stephens kangaroo rat (
Dipodomys
stephensi
) can occur in areas occupied by the SBKR, b
ut these other species have a wider habitat range.
The habitat of the SBKR is confined to primary and secondary alluvial fan scrub
habitats, with sandy soils deposited by fluvial (water) rather than aeolian (wind) processes. Burrows are
dug in loose soil,
usually near or beneath shrubs. SBKR, are confined to inland valley scrub communities, and more particularly, to scrub communities occurring along rivers, streams and drainage.
Most of these drainages have been historically altered as a result of flood co ntrol efforts and the resulting
increased use of river resources, including mining, off -
road vehicle uses and road and housing
development. This increased use of river resources has resulted in a reduction in both the amount and quality of habitat availabl
e for the SBKR. The past habitat losses and potential future losses prompted the emergency listing of the SBKR as an endangered species.
The Cactus Basin
aspect of the Project
area does c
ontain habitat elements typically associated with
SBKR. Further, small mammal burrows
were noted of
appropriate size, shape or aspect for SBKR
s.
There are documented occurrences of this species
within Cactus Basins.
For these
reasons absence
cannot be pr
esumed without a focused presence/absence survey.
Los Angeles Pocket Mouse (LAPM)
The LAPM is one of two pocket mice found in this area of San Bernardino County. Both the LAPM and the San Diego pocket mouse occupy similar habitats, but the San Diego poc ket mouse has a wider range
extending south into San Diego County. The habitat of the LAPM is confined to lower elevation grasslands and coast sage scrub habitats, in areas with soils composed of fine sands. The present known distribution of this species e
xtends from Rancho Cucamonga east to Morongo and south to the San Diego County border. LAPM forages in open ground and underneath shrubs. Pocket mice in general dig burrows in loose soil, although this has not been completely documented for this subspeci es. The LAPM
is listed as a Critical Species of Concern by the CDFW.
The Project site contains habitat marginally suitable habitat for LAPM and there are several documented occurrences of LAPM
in the near vicinity of the Cactus Basin
.
No protocol surveys
were conducted as
part of this assessment
, therefore presence or absence of LAPM was not determined, only their potential to occur. Potential of occurrence for LAPM is moderate. Presence or absence of LAPM cannot be presumed without a focused presence/ab
sence survey..
Burrowing owl (BUOW)
BUOW are known to occur locally within suitable habitat areas.
BUOW is a
ground
-
dwelling
owl
typically found in arid prairies, fields, and open areas where vegetation is sparse and low to the ground.
The BUOW depends on the presence of mammal burrows, i.e. ground squirrel burrows to provide shelter from predators, inclement weather and to pro
vide a nesting place. They are also known to make use of human
-
created structures, such as cement culverts and pipes, for burrows. They feed primarily on insects but will also take small rodents, birds, and reptiles. They are active during the day and nigh t, generally
observed in the early morning hours or at twilight. The breeding season for BUOW is February 1 through August 31. The BUOW is not listed under the State or Federal Endangered Species Act but is considered both a State and federal SSC. The BUO
W is a protected by the international treaty under the Migratory Bird Treaty Act
(MBTA)
of 1918 and by State law under the California Fish and Game Code (CDFG Code #3513 & #3503.5).
Per the definition provided in the
2012 CDFG Staff Report on
Burrowing Owl Mitigation
, “Burrowing
owl habitat generally includes, but is not limited to, short or sparse vegetation (at least at some time of year), presence of burrows, burrow surrogates or presence of fossorial mammal dens, well -
drained soils,
and abu
ndant and available prey.”
Therefore, the
Cactus Basin aspect of the P
roject
area
and immediate
vicinity contain
s
suitable habitat for this species
.
No evidence of BUOW was found in the survey area. No burrows of appropriate shape size or aspect for BUOW
or BUOW pellets, feathers or whitewash were found on site.
No BUOW individuals were
observed.
Therefore, BUOW are considered absent from the site at the time of surveys.
Nesting Birds and Raptors
The site is suitable for use by raptors for foraging purposes.
The project site and immediate surrounding
areas do contain habitat suitable for nesting birds in general, including the shrubs on site.
Nesting birds are protected under the MBTA
which pro
vides protection for nesting birds that are both
residents and migrants whether they are considered sensitive by resource agencies.
The MBTA makes it
unlawful to take, possess, buy, sell, purchase, or barter any migratory bird listed under 50 CFR 10, incl
uding feathers or other parts, nests, eggs, or products, except as allowed by implementing regulations (50 CFR 21). The direct injury or death of a migratory bird, due to construction activities or other construction
-
related disturbance that causes nest a
bandonment, nestling abandonment, or forced fledging
would be considered take under federal law. The USFWS, in coordination with the CDFW administers the MBTA. CDFW’s authoritative nexus to MBTA is provided in FGC Sections 3503.5 which protects all birds
of prey and their nests and FGC Section 3800 which protects all non -
game birds that occur
naturally in the State.
Jurisdiction Waters
Cactus Basin is a jurisdictional water subject to Sections 404 and 401 of the CWA and Section 1600 of the FGC. Modifi
cations within the basin will likely require permits from the USACE, RWQCB and CDFW.
CONCLUSIONS
S
everal occurrences of SBKR
and LAPM
are documented in the immediate vicinity of the
east end of the
Project
area
. Although the habitat conditions are
ma
rginal
for
these species,
absence
of either species
cannot be determined without focused survey.
Habitat suitability of BUOW is marginal along the alignment where there is vacant land. This species was not observed during survey and no sign of the
presence was found. Prior to construction a 30
-
day
survey is warranted and recommended.
.
The
vegetation on
site
does
have a potential to support nesting birds and
foraging
raptors such as red
-
tailed hawks.
Therefore, to reduce the potential impacts to
nesting birds, the following is recommended:
•
Bird nesting season generally extends from February 1 through September 15 in southern California and specifically, April 15 through August 31 for migratory passerine birds. To avoid impacts to nesting
birds (common and special status) during the nesting season, a qualified Avian Biologist will conduct pre‐construction Nesting Bird Surveys (NBS) prior to project‐related disturbance to nestable vegetation to identify any active nests. If no active nests a re found, no
further action will be required. If an active nest is found, the biologist will set appropriate no‐ work buffers around the nest which will be based upon the nesting species, its sensitivity to disturbance, nesting stage and expected types, int
ensity and duration of disturbance. The nests
and buffer zones shall be field checked weekly by a qualified biological monitor. The approved no‐work buffer zone shall be clearly marked in the field, within which no disturbance activity shall commence until
the qualified biologist has determined the young birds have successfully fledged and the nest is inactive.
Jericho appreciates the opportunity to continue to be of service.
If you have any questions or need any
clarifications, feel free to contact me at
(909) 915
-
5900 or at
shay@jericho
-
systems.com
Sincerely,
Shay Lawrey, President
Attachments:
Attachment 1
-
Figures
Attachment 2
–
Table of Potential to Occur
Attachment 3
–
Site Photos
Santa
Oarita
s,mi
Valley
xnard
Thousand
Oaks
Santa
Monica
Lancaster
Palmda
l
e
Victorvi
ll
e
Rancho
Cuca
...A.,..
a
Ontario
'
'),{
'1
Pomona
Riverside
Long
Anaheim
Beadi
San
ta
A
n
a
Corona
Murrieta
8ann
,
ng
Twen
t
ymne
Palms
C
altledra/
City
Pam
Ind
i
o
Deser
t
6 Service
Layer
Credi
ts
:
Copyright:
©
2013
National
Geographic
Society,
i
-cubed
0 0
.
75 1
.
5 3
4 .
5 Es
r
i
,
HERE
,
Delorme
,
Mapm
y
lnd
i
a
,
©
OpenS
t
ree
t
Map
contributors
,
a
nd
the
G
I
S
user
-•c:::::i-•c:::::i••••••=====:::
••••-
M
il
es
,------------------..:
c
=
o=
m
m::un:::it:!.y
__
1 _____________________
1 0
Figure
1 -
Regional
Overview
Site
Vicinity
Ria
l
to
Base
l
ine
Sto
r
m
Drain
C
i
ty
of
Rialto
0 0.175
0.35 0.7
~
&
1 inch
=
2,000
feet
1.05 1.4
Miles
Service
Layer
Credits
:
Esri,
HERE
,
Garmin
,©
OpenStreetMap
contributors
Imagery
Date:
1 1
/
9 /
2017
Source
:
Es
ri
,
D
i
gitalG
l
obe
,
GeoEye
,
Ea
rthstar
Geographies.
CNES
/
Airbus
OS
,
USDA
,
USGS
,
Figure
2 Pro·
ect
Location
R
ialto
Baseline
Storm
Drain
Cit
of
Rialto
0 ProJect
Location
3 Mile
Radius
O
cc
urr
e
n
ces
•
Crolch
bumble
bee
0 Parry's
spineflower
•
Plummer's
manposa-li
l
y
0 Riversidian
Allu
v
ial
fan
Sage
Scrub
•
San
Bernardino
kangaroo
rat
0 San
Diego
black-tailed
jackrabbit
0 San
Diego
desert
wood
rat
•
Santa
Ana
River woollystar
•
burrowing
ow
l
•
coast
horned
lizard
0 coastal
Callforn1a
gnatcatche
r
0 mesa
horkeha
0 northwestern
San
Diego
pocket
mouse
•
s
ingl
ew
hor1
burrobrush
0 smooth
tarplant
•
soulhem
Cahfomia
leg
l
ess
hzard
0 western
yellow
bat
0 .
5 2
1 i
nch
=
5,417
f
ee
t
3 4
Mi
l
e
s
Im
a
gery
D
a
te:
1 1
/
9 /
201
7 Service
Layer
Credits
:
E
sri,
H
E
RE
,
G
a
rmin
,©
Op
e
nStr
ee
tMap
contributors
Source
:
E
sri
,
D
i
g
ita
l
G
l
o
b
e
,
G
eo
E
y
e
,
Ea
rthstar
Geogr
a
phies,
CN
E
S
/
Airbus
O
S
,
USDA
,
USGS
,
Figure
3 3
Mile
CNDDB
Occurrences
R
i
a
lt
o
Base
li
ne
S
t
o
rm
D
r
a
i
n
Ci
t
y o
f
Ria
lt
o
ProJect
Location
1 Mile
Radius
O
cc
urr
e
n
ces
•
R
iversidian
Alluvial
Fan
Sage
Scrub
0 0
burrowing
ow
l
•
coast
horned
lizard
0.175
0 .
35 ~
&
0 .
7 1
i
nch
=
1,948
feet
1 .
05 1.4
Miles
Se
rv
ice
La
y
er
Credits
:
Esri
, H
ERE
,
G
ar
min,
©
OpenStreetMap
contr
ib
u
tors
Imagery
Date:
1 1
/
9 /
2017
Source
:
Es
ri,
D
i
g
ita
lG
l
obe
,
GeoEye
,
Ea
rth
star
Geographies.
CNES
/
Airbus
OS
,
USDA
,
USGS
,
Figure
3.2 1
Mile
CNDDB
Occurrences
R
i
alto
Base
li
ne
Storm
D
r
a
i
n
City
of
Ria
lt
o
0 0.5
2 1
inch
=
5,399
feet
3 4
Mi
l
es
Imagery
Date:
1 1
/
9 /
2017
Legend
Projec
t L
ocation
3 M
il
e
R
ad
iu
s
Service
Layer
Credits
:
Esri
, H
ERE
,
Garmin
,©
OpenStreetMap
contr
ib
u
tors
Source
:
Es
ri
,
D
i
gitalG
l
obe
,
GeoEye
,
Ea
rthstar
Geographies,
CNES
/
Airbu
s
OS
,
USDA
,
USGS
,
Figure
4 M
Waters
Overla
Rial
t
o
B
aseline
Storm
Drain
C
it
y
of
Ria
l
to
0 0
.
3 0
.
6 1
.2
1 .8
~
&
1 inch
=
3,333
feet
2.4 Miles
Legend
Project
Location
~
Flood
Zone
3 Mile
Buffer
Service
La
y
er
Credits
:
Esri
, H
ERE
,
Garmin
,©
OpenStreetMap
contr
ib
u
tors
Imagery
Date:
1 1
/
9 /
2017
Source
:
Esri
,
D
i
gitalG
l
obe
,
GeoEye
,
Ea
rth
star
Geographies.
CNES
/
Airbus
OS
,
USDA
,
USGS
,
Figure
5 100-Year
FEMA
Flood
Zone
R
i
alto
Baseline
Storm
Drain
City
of
Rialto
Scientific Name
Common Name
State/Federal
Ranking
Habitat
Potential to Occur
Agelaius tricolor
tricolored blackbird
None/
Candidate
Endangered
Highly colonial species, most numerous in
Central Valley & vicinity. Largely endemic to
California.
Requires open water, protected
nesting substrate, and foraging area with insect
prey within a few km of the colony.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Ambrosia monogyra
singlewhorl
burrobrush
None/None
Chaparral, Sonoran desert scrub. Sandy soils.
5 -
475 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Anniella stebbinsi
southern California legless
lizard
None/None
Generally south of the Transverse Range,
extending to northwestern Baja California.
Occurs in sandy or loose loamy soils under
sparse vegetation. Disjunct populations in the
Tehachapi and Piute Mountains in Kern
County. Variety of habitats; generally in mo
ist,
loose soil. They prefer soils with a high
moisture content.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Arenaria paludicola
marsh sandwort
Endangered/
Endangered
Marshes and swamps. Growing up through
dense mats of
Typha, Juncus, Scirpus
, etc. in
freshwater marsh. Sandy soil. 3
-
170 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Arizona elegans
occidentalis
California glossy snake
None/None
Patchily distributed from the eastern portion of
San Francisco Bay, southern San Joaquin
Valley, and the Coast, Transverse, and
Peninsular ranges, south to Baja California.
Generalist reported from a range of scrub and
gra
ssland habitats, often with loose or sandy
soils.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Artemisiospiza belli
belli
Bell's sage sparrow
None/None
Nests in chaparral dominated by fairly dense
stands of
chamise. Found in coastal sage scrub
in south of range. Nest located on the ground
beneath a shrub or in a shrub 6
-
18 inches
above ground. Territories about 50 yds apart.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Athene cunicularia
burrowing owl
None/None
Open, dry annual or perennial grasslands,
deserts, and scrublands characterized by low
-
growing vegetation. Subterranean nester,
dependent upon burrowing mammals, most
notably, the California ground
squirrel.
Marginally suitable habitat to support
this species occurs within the Project
area at Cactus Basin and within the
vacant parcels bordering the
alignment. This species or sign of
BUOW was not observed during
survey. Potential to occur is
low to
m
oderate
.
Scientific Name
Common Name
State/Federal
Ranking
Habitat
Potential to Occur
Batrachoseps
gabrieli
San Gabriel slender
salamander
None/None
Known only from the San Gabriel Mountains.
Found under rocks, wood, and fern fronds, and
on soil at the base of talus slopes. Most active
on the surface in winter and early
spring.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Bombus crotchii
Crotch bumble bee
None/None
Coastal California east to the Sierra
-
Cascade
crest and south into Mexico. Food plant genera
include
Antirrhinum, Phacelia, Clarkia,
Dendromecon, Eschscholzia
, and
Eriogonum
.
Marginally suitable habitat to support
this species occurs within the Project
are
a at Cactus Basin. This species
was not observed during survey.
Potential to occur is
low to moderate
.
Calochortus
plummerae
Plummer's mariposa
-
lily
None/None
Coastal scrub, chaparral, valley and foothill
grassland, cismontane woodland, lower
montane coniferous forest. Occurs on rocky
and sandy sites, usually of granitic or alluvial
material. Can be very common after fire. 60
-
2500 m.
Marginally suitable habitat to support
this species occurs within the Project
area at Cactus Basin. This specie
s
was not observed during survey.
Potential to occur is
low to moderate
.
Catostomus
santaanae
Santa Ana sucker
Threatened/
None
Endemic to Los Angeles Basin south coastal
streams. Habitat generalists, but prefer sand
-
rubble
-
boulder bottoms, cool,
clear water, and
algae.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Chaetodipus fallax
fallax
northwestern San Diego
pocket mouse
None/None
Coastal scrub, chaparral, grasslands,
sagebrush, etc. in
western San Diego County.
Sandy, herbaceous areas, usually in association
with rocks or coarse gravel.
Suitable habitat to support this species
occurs within the Project area at
Cactus Basin. Potential to occur is
moderate
.
Chaetodipus fallax
pallidus
pallid San Diego pocket
mouse
None/None
Desert border areas in eastern San Diego
County in desert wash, desert scrub, desert
succulent scrub, pinyon
-
juniper, etc. Sandy,
herbaceous areas, usually in association with
rocks or coarse gravel.
Suitab
le habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Chloropyron
maritimum
ssp
.
maritimum
salt marsh bird's
-
beak
Endangered/
Endangered
Marshes and swamps, coastal dunes. Limited
to the higher zones of salt marsh
habitat. 0
-
10 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Chorizanthe parryi
var
. parryi
Parry's spineflower
None/None
Coastal scrub, chaparral, cismontane
woodland, valley and foothill
grassland. Dry
slopes and flats; sometimes at interface of 2
vegetation types, such as chaparral and oak
woodland. Dry, sandy soils. 90
-
1220 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Chorizanthe xanti
var.
leucotheca
white
-
bracted spineflower
None/None
Mojavean desert scrub, pinyon and juniper
woodland, coastal scrub (alluvial fans). Sandy
or gravelly places. 365
-
1830 m.
Suitable habitat to support this species
does not occur onsite. P
otential to
occur is
low
.
Scientific Name
Common Name
State/Federal
Ranking
Habitat
Potential to Occur
Cicindela
tranquebarica
viridissima
greenest tiger beetle
None/None
Inhabits the woodlands adjacent to the Santa
Ana River basin. Usually found in open spots
between trees.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Dipodomys
merriami parvus
San Bernardino kangaroo rat
Endangered
/
None
Alluvial scrub vegetation on sandy loam
substrates characteristic of alluvial fans and
flood plains. Needs early to intermediate seral
stages.
Marginally suitable habitat to support
this species occurs within the Project
area at Cactus Basin. Potential to
occur is
low to
moderate
.
Dodecahema
leptoceras
slender
-
horned spineflower
Endangered/
Endangered
Chaparral, cismontane woodland, coastal scrub
(alluvial fan sage scrub). Flood deposited
terraces and washes; associates include
Encelia, Dalea, Lepidospartum
, etc. Sandy
soils. 200
-
765 m.
Suitable habitat to support this species
doe
s not occur onsite. Potential to
occur is
low
.
Eriastrum
densifolium
ssp.
sanctorum
Santa Ana River woollystar
Endangered/
Endangered
Coastal scrub, chaparral. In sandy soils on
river floodplains or terraced fluvial deposits.
180
-
705 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Gila orcuttii
arroyo chub
None/None
Native to streams from Malibu Creek to San
Luis Rey River basin. Introduced into streams
in Santa Clara, Ventura, Santa
Ynez, Mojave
& San Diego river basins. Slow water stream
sections with mud or sand bottoms. Feeds
heavily on aquatic vegetation and associated
invertebrates.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Horkelia cuneata
var.
puberula
mesa horkelia
None/None
Chaparral, cismontane woodland, coastal
scrub. Sandy or gravelly sites. 15
-
1645 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Lasiurus
xanthinus
western yellow bat
None/None
Found in valley foothill riparian, desert
riparian, desert wash, and palm oasis habitats.
Roosts in trees, particularly palms. Forages
over water and among trees.
Suitable habitat to support this species
does not occu
r onsite. Potential to
occur is
low
.
Lepidium virginicum
var.
robinsonii
Robinson's pepper
-
grass
None/None
Chaparral, coastal scrub. Dry soils, shrubland.
4 -
1435 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Lepus californicus
bennettii
San Diego black
-
tailed
jackrabbit
None/None
Intermediate canopy stages of shrub habitats &
open shrub / herbaceous & tree /
herbaceous
edges. Coastal sage scrub habitats in Southern
California.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Lilium parryi
lemon lily
None/None
Lower montane coniferous forest, meadows
and seeps, riparian forest, upper montane
coniferous forest. Wet, mountainous terrain;
Suitable habitat to support t
his species
does not occur onsite. Potential to
occur is
low
.
Scientific Name
Common Name
State/Federal
Ranking
Habitat
Potential to Occur
generally in forested areas; on shady edges of
streams, in open boggy meadows & seeps.
625
-
2930 m.
Lycium parishii
Parish's desert
-
thorn
None/None
Coastal scrub, Sonoran desert scrub. 135
-
1000
m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Malacothamnus
parishii
Parish's bush
-
mallow
None/None
Chaparral, coastal sage scrub. In a wash. 305
-
455 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Monardella pringlei
Pringle's monardella
None/None
Coastal scrub. Sandy hills. 300
-
400 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Nyctinomops
femorosaccus
pocketed free
-
tailed bat
None/None
Variety of arid areas in Southern California;
pine
-
juniper woodlands, desert scrub, palm
oasis,
desert wash, desert riparian, etc. Rocky
areas with high cliffs.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Oncorhynchus
mykiss irideus
pop.
10 steelhead
-
southern
California DPS
Endangered/
None
Federal listing refers to populations from Santa
Maria River south to southern extent of range
(San Mateo Creek in San Diego County).
Southern steelhead likely have greater
physiological tolerances to warmer water and
more variable conditions.
Suitable hab
itat to support this species
does not occur onsite. Potential to
occur is
low
.
Opuntia basilaris
var.
brachyclada
short
-
joint beavertail
None/None
Chaparral, Joshua tree woodland, Mojavean
desert scrub, pinyon
-
juniper woodland. Sandy
soil or coarse, granitic loam. 425
-
1800 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Perognathus
longimembris
brevinasus
Los Angeles pocket mouse
None/None
Lower elevation grasslands and coastal sage
communities in and around the Los Angeles
Basin. Open ground with fine, sandy soils.
May not dig extensive burrows, hiding under
weeds and dead leaves instead.
Marginally suitable habitat to support
th
is species occurs within the Project
area at Cactus Basin. Potential to
occur is
low to
moderate
.
Phrynosoma
blainvillii
coast horned lizard
None/None
Frequents a wide variety of habitats, most
common in lowlands along sandy washes with
scattered low bushes. Open areas for sunning,
bushes for cover, patches of loose soil for
burial, and abundant supply of ants and other
insects.
Marginally suitable habitat to support
this species occurs within the Project
area at Cactus Basin. Potential
to
occur is
low to
moderate
.
Polioptila
californica
californica
coastal California
gnatcatcher
Threatened/
None
Obligate, permanent resident of coastal sage
scrub below 2500 ft in Southern California.
Low, coastal sage scrub in arid washes, on
Suitable habitat to support this species
does
not occur onsite. Potential to
occur is
low
.
Scientific Name
Common Name
State/Federal
Ranking
Habitat
Potential to Occur
mesas and slopes. Not all areas classified as
coastal sage scrub are occupied.
Rana muscosa
southern mountain yellow
-
legged frog
Endangered/
Endangered
Federal listing refers to populations in the San
Gabriel, San Jacinto and San Bernardino
mountains (southern DPS). Northern DPS was
determined to warrant listing as endangered,
Apr 2014, effective Jun 30, 2014. Always
encountered within a few feet of water.
Tadpoles may require 2
-
4 years to complete
their aquatic development.
Suitable habitat to support this species
does not occur on
site. Potential to
occur is
low
.
Rhaphiomidas
terminatus
abdominalis
Delhi Sands flower
-
loving
fly
Endangered/
None
Found only in areas of the Delhi Sands
formation in southwestern San Bernardino &
northwestern Riverside counties. Requires
fine,
sandy soils, often with wholly or partly
consolidated dunes & sparse vegetation.
Oviposition req. shade.
No Delhi sands or host plant species
on site. Suitable habitat to support this
species does not occur onsite.
Potential to occur is
low
.
Rhinichthys osculus
ssp. 3
Santa Ana speckled dace
None/None
Headwaters of the Santa Ana and San Gabriel
rivers. May be extirpated from the Los
Angeles River system. Requires permanent
flowing streams with summer water temps of
17 -
20 C. Usually inhabits sh
allow cobble and
gravel riffles.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Riversidian Alluvial Fan Sage Scrub
None/None
Habitat Type
Present within Cactus Basin.
Senecio aphanactis
chaparral
ragwort
None/None
Chaparral, cismontane woodland, coastal
scrub. Drying alkaline flats. 20
-
855 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Southern Riparian Forest
None/None
Habitat Type
Habitat type
does not occur
onsite.
Southern Sycamore Alder Riparian Woodland
None/None
Habitat Type
Habitat type
does not occur
onsite.
Sphenopholis
obtusata
prairie wedge grass
None/None
Cismontane woodland, meadows and seeps.
Open moist sites,
along rivers and springs,
alkaline desert seeps. 15
-
2625 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Streptanthus
bernardinus
Laguna Mountains
jewelflower
None/None
Chaparral, lower montane coniferous forest.
Clay or decomposed granite soils; sometimes
in disturbed areas such as streamsides or
roadcuts. 1440
-
2500 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Scientific Name
Common Name
State/Federal
Ranking
Habitat
Potential to Occur
Symphyotrichum
defoliatum
San Bernardino aster
None/None
Meadows and seeps, cismontane woodland,
coastal scrub, lower montane coniferous forest,
marshes and swamps, valley and foothill
grassland. Vernally mesic grassland or near
ditches, streams and spring
s; disturbed areas.
3 -
2045 m.
Suitable habitat to support this species
does not occur onsite. Potential to
occur is
low
.
Vireo bellii pusillus
least Bell's vireo
Endangered/
Endangered
Summer resident of Southern California in low
riparian in vicinity of water or in dry river
bottoms; below 2000 ft. Nests placed along
margins of bushes or on twigs projecting into
pathways, usually willow,
Baccharis
,
mesquite.
Suitable habitat to support
this species
does not occur onsite. Potential to
occur is
low
.
Source: USFWS/NMFS
-
2019
IPaC
species list; CNDDB 201
9 ; CNPS 2019.
Status Codes
:
E
= endangered;
T
= threatened;
P
= proposed for listing;
C
= candidate for listing; and
CH
=
designated critical habitat
C
P
= CA state proposed for listing;
FP
= CDFW fully protected
Photo 1
–
Vantage
point facing north into
Cactus Basin from
Baseline Rd
Photo 2
–
Photo
depicting the
conditions east at any
location within the
fence line stretch of
the project as well as
the levee that separates
the concrete wash
from adjacent land
Photo 3
–
Photo
taken facing
southwest from
the northeast
corner of the
project site
depicting the
alluvial fan sage
scrub
Photo 4
–
Photo taken
facing northeast from
the southwest corner
of the project site
depicting the alluvial
fan sage scrub
Photo 5
–
West
-
facing picture of
the vegetation of
the
hillside near
the entrance of the
project site from
Baseline Rd
Photo 6
–
West
-
facing picture of the
vegetation of the
hillside midway
between the alluvial
fan sage scrub and
Baseline Rd
Photo 7
–
West
-
facing picture of the
vegetation of the
hillside as the
community transitions
to alluvial fan sage
scrub
Photo
vantage
Points
APPENDIX 4
HISTORICAL/ARCHAEOLOGICAL RESOURCES SURVEY REPORT
R
IALTO
B
ASELINE
S
TORM
D
RAIN
P
ROJECT
City of
Rialto
San Bernardino County, California
For Submittal to:
City of Rialto
Public Works/Engineering Division
335 W. Rialto
Avenue
Rialto, CA 92376
Prepared for:
Tom Dodson & Associates
2150 N. Arrowhead Avenue
San Bernardino, CA 92405
Prepared by:
CRM TECH
1016 E
ast
Cooley Drive, Suite A/B
Colton, CA 92324
Bai
“
Tom
”
Tang, Principal Investigator
Michael Hogan, Principal Investi
gator
May
1 6
, 2
01 9
CRM TECH Contract No. 3
4 54
Title:
Historical/Archaeological Resources Survey Report:
Rialto Baseline
Storm Drain
Project
, City of Rialto
, San Bernardino County, California
Author(s):
Bai “Tom” Tang, Principal Investigator
/Historian
Ben Kerridge
,
Archaeologist
/Report Writer
Daniel Ballester, Archaeologist/Field Director
Nina Gallardo, Archaeologist/Native American Liaison
Consulting Firm:
CRM TECH
1016 E
ast
Cooley Drive, Suite A/B
Colton, CA 92324
(909) 824
-
6400
Date:
May
1 6
, 201
9 For Submit
tal to:
City of Rialto
Public Works/Engineering Division
335 W. Rialto Avenue
Rialto, CA 92376
(909) 421
-
7210
Prepared for:
Kaitlyn Dodson, Vice
President
Tom Dodson & Associates
2150 N. Arrowhead Avenue
San Bernardino, CA 92405
(909) 882
-
3612
USGS
Quadrangle:
Fontana
, Calif., 7.5
’
quadrangle (Section
s
32 -
34 ,
T1
N
R
5 W
,
and 3
-
5 ,
T1S
R5W,
San Bernardino Baseline and Meridian)
Project Size:
Approximately
2.25 l
inear
m
iles
Keywords:
Eastern
San Bernardino Valley; Phase I historical/archaeological reso
urces survey;
Site 36
-
015497
(
San Bernardino
Baseline
/Baseline
Road
);
no
“
historical
resources
”
under CEQA
MANAGEMENT
SUMMARY
Between
March and
May
2019, at the request of Tom Dodson & Associates, CRM TECH performed a cultural resources study
for the p
roposed
Rialto Baseline Storm Drain Project
in
the City of Rialto, San Bernardino County, California.
The project seeks
to upgrade
current
drainage in
frastructure
along
Baseline
Road
from
a retention basin known as
Cactus Basin
No.
3 west to
the intersect
ion
with
Tamarind Avenue
. The subject
property of the study consists
of
a
pproximately 2.25 linear miles
of
storm drain
right
-
of
-
way
lying mostly withi
n the existing
right
-
of
-
way of Baseline Road, in
Sections
3 2
-
3 4
of T1N R5W and Sections 3
-
5 of T1S R5W,
S
an Bernardino Baseline and Meridian.
The study is part of the environmental review process for the project
. The City of Rialto, as
the project sponsor and
the lead agency, required the study in compliance with the California Environmental Quality Act (C
EQA
)
. The purpose of the study is to p
rovide the City with the
necessary information and analysis to determine whether the proposed project would cause substantial adverse changes to any “historical resources,” as defined by CEQA, that may exist in or nea
r the project area. In order to identi
fy such resources, CRM TECH conducted a
historical/archaeological resources records search, pursued historical background research, consulted with the Native American representatives, and carried out a systematic
fiel
d survey.
The re
sults of the records
search
indicate that
five
historical/archaeological sites
were
previously recorded within or adjacent to the project area :
36 -
010659 (CA
-
SBR
-
10659H)
sparse
refuse scatter
36 -
010908 (CA
-
SBR
-
10908H)
structural
foundat
ion, standpipe, and refuse scatter
36 -
0 15497 (CPHI SBr
-
012)
San Bernardino Baseline (
Baseline Road
)
36 -
021612
three
early
20th
c
entury
bungalows
36 -
029057 (CA
-
SBR
-
29057H)
multi
-
origin
refuse
dumping site
T
he field survey and the historical background res
earch
reveal that
four of these
five sites
are
no longer extant today,
having
evidently
been
removed
during
subsequent residential and
commercial developments
at their former locations
.
The remaining site,
36 -
015497
, represents
the
San Bernardino Baseline
, embodied by Bas
eline Road in the project vicinity
. As a part of
the basis for
all land surveys and titles in southern California since
1853,
the
San Bernardino
Baseline
was
officially
designated a California Point of Historical Interest (CPHI -
SBr
-
12) in
1973
.
As such,
Site
36 -
015497 meets the definition of a “historical resource” under CEQA provisions.
The historic value of
Site
36 -
015497
, however, is symbolic in nature and is derived from the conceptual line across the landscape instead of the exist ing roadway, a he
avily traveled major
thoroughfare of entirely modern character and appearance.
Therefore
,
the
current
configuration and physical features of
Baseline Road
do not contribute to the historic
significance of
the site
.
Since
Site
36 -
015497
e
xists in the proj
ect area largely on paper
only
,
this study concludes that the proposed project has no potential to affect the
significance or
integrity
of this “historical resource.”
During the course of the Native American
contacts
, the State of Califor
nia Native American
Heritage Commission
reported the presence of unspecified Native American cultural resource(s) in the project
vicinity
but
referred further
inqui
ries
to
the Gabrieleño Band of
Mission Indians
–
Kizh Nation.
In sub
sequent correspondence,
h
owever,
the Gabrieleño Band
of Mission Indians
–
Kizh Nation
did not provide any further information on such resources.
A
ccord
ing to
CEQA guidelines, the identification of potential “tribal cultural resources” is beyond the scope of
this study and needs to
be addressed through government
-
to
-
government
consultations
between the City of Rialto and the pertinent Native American groups pursuant to Assembly Bill 52.
Based on these findings, CRM TECH recommends to the City of Rialto a preliminary
conclusio
n
of
No Impact
on cultural resources, pending the completion of
the City
’s
government
-
to
-
government
consultation
process
with
local
Native American
tribes
. No
additional cultural resources investigation is recommended for the project unless construction
plans undergo such changes as to include areas not covered by this study. However, if buried cultural materials are encountered inadvertently during any e arth
-
moving operations
associated with the project, all work within 50 feet of the discovery should be halted or diverted until a qualified archaeologist can evaluate the nature and significance of the finds .
TABLE OF CONTENTS
MANAGEMENT SUMMARY
................................
................................
................................
.............
i
INTRODUCTION
................................
................................
................................
................................
1 SETTING
................................
................................
................................
................................
..............
4 Current Natural Setting
................................
................................
................................
.....................
4 Cultural Setting
................................
................................
................................
................................
.
5 Prehistoric Context
................................
................................
................................
........................
5 Ethnohistoric Context
................................
................................
................................
...................
5 Historic Context
................................
................................
................................
............................
6 RESEARCH METHODS
................................
................................
................................
.....................
7 Records Search
................................
................................
................................
................................
..
7 Historical Background Research
................................
................................
................................
.......
7 Native American Consultation
................................
................................
................................
..........
7 Field Survey
................................
................................
................................
................................
......
8 RESULTS AND FIND
INGS
................................
................................
................................
................
8 Records Search
................................
................................
................................
................................
..
8 Historical Background Research
................................
................................
................................
.....
10 Native American Consultation
................................
................................
................................
........
12 Field Survey
................................
................................
................................
................................
....
13 DISCUSSION
................................
................................
................................
................................
.....
13 CONCLUSION AND RECOMMENDATIONS
................................
................................
...............
14 REFERENCES
................................
................................
................................
................................
...
15 APPENDIX 1: Personnel Qualifications
................................
................................
............................
18 APPENDIX 2: Correspondence with Native American Representatives
................................
...........
22 LIST OF FIGURES
Figure 1. Project vicinity
................................
................................
................................
......................
1 Figure 2. Project location
................................
................................
................................
.....................
2 Figure 3.
Recent aerial
photograph of the project area
................................
................................
........
3 Figure 4. Typical landscape in the project area
................................
................................
...................
4 Figure 5. Previous cultural resources stu
dies
................................
................................
.......................
9 Figure 6. The project area and vicinity in 1852
-
1874
................................
................................
........
10 Figure 7. The project area and vicinity in 1893
-
1894
................................
................................
........
10 Figure 8. The
project area and vicinity in 1936
-
1938
................................
................................
........
11 Figure 9.
The project area and vicinity in 1952
-
1954
................................
................................
........
11 INTRODUCTION
Between
March and
May
2019, at the request of Tom Dod
son & Associates, CRM TECH performed
a cultural resources study
for the proposed
Rialto Baseline Storm Drain Project
in the City of Rialto,
San Bernardino County, California
(Figure 1)
.
The project seeks
to upgrade
current
drainage
infrastructure
along
Ba
seline
Road
from
a retention basin known as
Cactus Basin
No. 3
west to
the
intersection
with
Tamarind Avenue
. The subject
property of the study consists of
a
pproximately
2.25 linear miles
of
storm drain
right
-
of
-
way lying m
ostly within the existing right
-
of
-
way of
Baseline Road, in
Sections
3 2
-
3 4
of T1N R5W and Sections 3
-
5 of T1S R5W, San Bernardino
Baseline and Meridian
(Figures 2, 3)
.
The study is part of the environmental review process for the project
. The City of Ri
alto, as
the
project sponsor and
the lead agency, required the study in compliance with the California Environmental Quality Act (CEQA
; PRC §21000, et seq.
)
. The purpose of the study is to provide
the City with the necessary information and analysis to de termine whether the proposed pro
ject
would cause substantial adverse changes to any “historical resources,” as defined by CEQA, that may exist in or near the project area.
In order to identify such resources, CRM TECH conducted a historical/archaeological resources records search, pur
sued historical background research, consulted with the Native American representatives, and carried out a
systematic
field survey.
The follow
ing report is a complete account
of the methods, results, and final conclusion of the study.
Personnel who parti
cipated in the study are
named in the appropriate sections below, and their qualifications are provided in Appendix
1. Figure 1. Project v
icinity. (Based on USGS
San Bernardino, Calif.,
60’
x30’
quadrangle [USGS 1969])
Figure 2. Project location. (Based on USGS
Fontana
and
Devore
,
Calif.,
7.5’
quadrangle [USGS 1980
; 1988
])
Devore
Quad.
~.
,,
II
Fontana
Quad.
~----
•
\Ve
l~
32 ;.._
:
.
.
.
;
...
:~
•
1·
•
--
•
•
•
It
•
~
R
esec'VOtf
s
~
~~
~~=i
,,
Q
•
•
II
It
•
::
----~~
:::t,-
✓
.1<<>-
,-...
_
_
.::~
~
-
-
..::
.:~
0 SCALE
1 :24,000
1/2
HIGHLAND
1 mile
1000
0 1000
2000
3000
4000
feet
1 500
:
,
S
u
b
siat10n
Figure 3. Recent aerial photograph of the project area .
(Based on Google Earth imagery)
SETTING
CURRENT NATURAL SETT
ING
The
City of Rialto
is situated
in
the
east
ern
portion
of the San Bernardino Valley, a broad inland
valley defined by the San Gabriel a
nd San Berna
rdino Mountain Ranges on the north and a series
of low rocky hills on the south.
The environment of the region is characterized by its temperate Mediterranean climate, with the average maximum temperature in July reaching above 90
degrees
Fahr
enheit and t
he average minimum temperature in January hovering around 35
degrees
. Annual
rainfall is typically less than 20 inches, most of which occurs between November and March.
As mentioned above, most of the project alignment lies within the Baselin e Road
right
-
of
-
way
,
while the easterly end
of the project
, from Baseline Road to
the
Cactus Basin
s
,
follows the course
of an unpaved access road (Figure 3).
This segment of Baseline Road,
a heavily traveled
local
thoroughfare
, is lined
predominantly by
sub
urban
r
es
idential neighborhoods
on the south and by
recent
commercial and
warehouse
developments on the north
, with some vacant land and a few
older residences of rural character still present
(Figure
s
3 , 4
).
The terrain in the vici
nity is
relatively
level,
with
a
slight
incline to the west
, and the
elevation
s in
the project area range approximately from
1,360
feet
to 1,415 feet above
mean
sea level.
Virtually
the entire project area has been disturbed by past construction activitie s associated with
Baseline
Roa
d, the retention basins, the access road, underground utilities, nearby buildings, and other urban development. The existing
vegetation
in and around
the project area consisted
mainly
of
landscaping plants
with some
small gra
sses and shrubs
, and little ve
stige of the native landscape
remains
(Figure 4)
.
Figure 4.
Typical landscape in
the project area. Photograph taken
on March 22, 2019
,
along Baseline Road near the
intersection of Ayala
Drive; view to the west.
CULTURAL SETTING
Prehistoric Context
The earliest evidence of huma
n occupation in inland southern California was discovered below the surface of an alluvial fan in
the northern portion of the Lakeview Mountains, overlooking the Sa n
Jacinto Valley, with radiocarbon dates clustering around 9,500 B.P. (Horne and McDougall 2008).
Another site found near the shoreline of Lake Elsinore, close to the confluence of Temescal
Wash
and the San Jacinto River, yielded radiocarbon dates between
8,000 and 9,000 B.P. (Grenda 1997).
Additional sites with isolated Archaic dart points, bifaces, and other associated lithic artifacts from the same age range have been found in the nearby
Cajon Pass area, typically atop knolls with good
viewsheds (Basga
ll and True 1985; Goodman and McDonald 2001; Goodman 2002; Milburn et al. 2008).
The cultural history of southern California has been summarized into numerous chronologies, including the w
orks of Chartkoff and Chartkoff (1984), Warren (1984), and others.
The prehistory
of Riverside County specifically has been addressed by O’Connell et al. (1974), McDonald, et al. (1987), Keller and McCarthy (1989), Grenda (1993), Goldberg (2001), and Horn e and McDougall
(2008). Although the beginning and ending dates o
f different cultural horizons vary regionally, the
general framework of the prehistory of inland southern California can be divided into three primary periods:
•
Paleoindian Period (ca. 18,0
00 -
9,000 B.P.): Native peoples of this period created fluted spear
head bases designed to be hafted to wooden shafts. The distinctive method of thinning bifaces and spearhead preforms by removing long, linear flakes leaves diagnostic Paleoindian markers at
tool
-
making sites. Other artifacts associated with the Paleoindia n toolkit include
choppers, cutting tools, retouched flakes, and perforators. Sites from this period are very sparse across the landscape and most are deeply buried.
•
Archaic Period (ca. 9,
000
-
1,500 B.P.): Archaic sites are characterized by abundant lithi c scatters
of considerable size with many biface thinning flakes, bifacial preforms broken during manufacture, and well
-
made groundstone bowls and basin metates. As a consequence of making dart points, many biface thinning waste flakes were generated at i ndividual production stations,
which is a diagnostic feature of Archaic sites.
•
Late Prehistoric Period (ca. 1,500 B.P.
-
contact): Sites from this period typically contain small lithic scatt
ers from the manufacture of small arrow points, expedient groundst one tools such as
tabular metates and unshaped manos, wooden mortars with stone pestles, acorn or mesquite bean granaries, ceramic vessels, shell beads suggestive of extensive trading networ ks, and steatite
implements such as pipes and arrow shaft straight
eners.
Ethnohistoric Context
Ethnographically, the
present
-
day Rialto
area lies
between
the traditional territor
ies
of the Serrano
and the Gabrielino, which adjoined and overlapped with each other, at least during the Late Prehistoric and Protohistoric
Periods.
The homeland of the Gabrielinos, probably the most
influential Native American group in aboriginal southern California (Bean and Smith 1978a:538),
was centered in the Los Angeles Basin and reached as far east as the San Bernardino -
Riverside area
.
The homeland of the Serranos was centered in the San Bernardino Mountains but also included the slopes and lowlands
on the flanks of the mountain range and the southern portion of the Mojave Desert.
Whatever the linguistic affiliation, Native Americans
in and around the
Rialto
area exhibited similar
social organization and resource procurement strategies. Villages wer e based on clan or lineage
groups. Their home/base sites are marked by midden deposits, often with bedrock mortars. During their season
al rounds to exploit plant resources, small groups would migrate within their traditional territory in search of specif
ic plants and animals. Their gathering strategies often left behind signs of special use sites, usually grinding slicks on bedrock bould ers, at the locations of the resources.
As early as 1542, the Gabrielino were in contact with the Spanish during the h istoric expedition of
Juan Rodríguez Cabrillo, but it was not until 1769 that the Spaniards took steps to colonize Gabrielino territory.
Shortly afterwards, most of the Gabrielino people were incorporated into Mission San Gabriel and other missions in sou
thern California. The Serrano were brought into the
mission system during the 1810s, when an
asistencia
of Mission San Gabriel was estab
lished in
present
-
day Loma Linda. Due to introduced diseases, dietary deficiencies, and forceful reduction, Gabrielino
and Serrano population dwindled rapidly. By 1900, the Gabrielino had almost ceased to exist as a culturally identifiable group (Bean an
d Smith 1978a:540). The Serrano, meanwhile, were
mostly settled on the San Manuel and the Morongo Indian Reservations (Bean and Smith
1978b:573).
Historic Context
In 1772, three years after the beginning of Spanish colonization of Alta California, Pedro
Fages,
comandante
of the new province, and a small force of soldiers under his command became the first Europeans to s
et foot in the San Bernardino Valley
(Beck and Haase 1974:15)
. They were followed
in the next few years
by two other famed Spanish explo
rers, Juan Bautista de Anza and Francisco
Garcés, who traveled through the valley in the mid
-
1770s
(
ibid.
)
. Despite th
ese early visits, for the
next 40 years the inland valley received little impact from the Spanish colonization activities in Alta Califor
nia, which were concentrated predominantly in the coastal regions.
Following the establishment of Mission San Gabriel in 1771, the San Bernardino Valley became nominally a part of the landholdings of that mission.
The name “San Bernardino” was bestowed o
n
the region at least by 1819, when a mission
asistencia
and an asso
ciated rancho were officially
established under that name in the eastern end of the valley (Lerch and Haenszel 1981).
After
gaining independence from Spain in 1821, the Mexican government
began in 1834 the process of
secularizing the mission system in Alt
a California, which in practice meant the confiscation of the Franciscan missions’ vast land holdings, to be distributed later among prominent citizens of the province. During the 1830s a
nd 1840s, several large land grants were made around present -
day
Ria
lto
(Beck and Haase 1974:
38). However, most of what is now the City of Rialto, including the project area, was not included in any of these land grants, and thus remained unclaimed public
land
when California was annexed by the U.S. in 1848.
Used primari
ly as cattle ranches, the area around Rialto saw little development until the mid -
19th
century, when a group of Mormon settlers from Salt Lake City founded the town of San Bernardino in 18
51. After the completion of the Southern Pacific Railroad and the c ompeting Atchison, Topeka
and Santa Fe Railway in the 1870s
-
1880s, a phenomenal land boom swept through much of southern California, ushering in a number of new settlements in the San Bern ardino Valley. In 1887, the
Semi
-
Tropic Land and Water Company purc
hased a large tract of land near the mouth of Lytle
Creek, together with the necessary water rights to the creek, and laid out the townsites of Rialto, Bloomington, and Rosena (now Fontana
;
Ingersoll 1904:619; Brown and Boyd 1922:249
-
250
)
.
With the collap
se of the 1880s land boom, the Semi
-
Tropic Land and Water Company lost its
holdings to its creditors in 1896, and the entire enterprise was thrown into financial turmoil
(Schuiling 1984:90
, 102)
. The community of Rialto survived, thanks largely to the new ly
established citrus industry. Throughout the late 19th and early 20th centuries, Rialto grew steadily as one of San Bernardino Valley’s “citrus showcases,” with most of its residents de voted primarily
to the cultivation of the navel orange (Brown and Bo
yd 1922:249
-
250). Since the mid
-
20th century,
the Rialto area became increasingly urbanized
—
and its economic livelihood diversified
—
along with
the rest of southern California. Today, the
area’s once thriving citrus industry is more a part of its cultural
heritage than a force in the local economy.
RESEARCH METHODS
RECORDS SEARCH
On
March 20, 2019
,
CRM TECH archaeologist Ben Kerridge
completed
the
historical/
archaeological resources r
ecords search
at the South Central
Coastal Information Center (SCCIC),
California State University, Fullerton
.
During the records search, Kerridge examined maps, records, and electronic databases at the SCCIC
for previously identified cultural resources a
nd existing
cultural resources rep
orts within a one
-
mile radius of the project area.
Previously identified cultural
resources include properties designated as California Historical Landmarks, Points of Historical Interest, or San Bernardino County Histori
cal Landmarks, as well as those li
sted in the National
Register of Historic Places, the California Register of Historical Resources, or the California Historical Resources Inventory.
HISTORICAL BACKGROUN
D RESEARCH
Historical background research on the pr
oject area was conducted by CRM TE
CH
principal
investigator/historian Bai “Tom” Tang
on the basis of
p
ublished literature in local and regional
history
,
U.S. General Land Office (GLO) land survey plat maps dated 18 56 -
1875
,
U.S. Geological
Survey (USGS) top
ographic maps dated 1901
-
1988,
and
a
erial photographs taken in 1938
-
201
8. The historic maps are collected at the Science Library of the University of California, Riverside, and the California Desert District of the U.S. Bureau of Land Management, located in Moreno Valley.
The aerial phot
ographs are available at the Nationwide Environmental Title Research (NETR) Online website and through the Google Earth software.
NATIVE AMERICAN
CONSULTATION
On
March 14, 2019
, CRM TECH submitted a written request to t
he State of California Native
Amer
ican Heritage Commission (NAHC) for a records search in the commission’s Sacred Lands File.
Following the NAHC’s recommendations and previously established consultation protocol, CRM TECH further
contacted a total of
nine
nearby tribes
in writing on March
28 for additional
information on potential Native American cultural resources in the vicinity. Correspondence between CRM TECH and the Native American representatives is summarized below and
attached to
this report in Ap
pendix
2 .
FIELD SURVEY
On
March 22, 2019
, CRM TECH archaeologist Daniel Ballester
carried out the
field survey of the
project area
.
The portion of the project area along the
dirt access road
between
the
Cactus Basin
s
and
Baseline Road
was surveyed at an
intensive
level by walking two parallel transects placed on
either side of the alignment, and the rest of the project area, lying within the Baseline Road
right
-
of
-
way, was surveyed at a reconnaissance level from a
slow
-
moving
motor vehicle.
In this way,
the
ground
surface in the entire project area was systematically examined for any evidence of human activities dating to the prehistoric or historic period (i.e., 50 years or older).
V
isib
ility
of the native
ground surface
was poor within the
Baseline Ro
ad
right
-
of
-
way but
good (80 percent)
along
the dirt
access
road
.
RESULTS AND FINDINGS
RECORDS SEARCH
According to
SCC
IC records
,
five
previous cultural resources studies completed between
1995
and
2016 have
evidently included
various
portions of the
pro
ject area
(Figure 5)
. As a result of these
studies,
one
historical/archaeological site
, designated
36 -
015497
in the
California Historical
Resources Inventory
, was previously
recorded
as lying partially within the project
area
. The site
represents the
San Bernardino Baseline,
which is
embodied by Baseline Road in the project vicinity
,
and
was
officially
designated a California Point of Historical Interest (CPHI -
SBr
-
12) in 1973
(
OHP
1973)
.
In add
ition to
36 -
015497
,
four other sites were
previously
recorded on prop
erties adjacent to
the project area. The four adjacent sites are listed below:
36 -
010659 (CA
-
SBR
-
10659H)
sparse refuse scatter
36 -
010908 (CA
-
SBR
-
10908H)
structural foundation, standpipe
, and refuse scatter
36 -
021612
three early
20th century
bungalows
36 -
029057 (CA
-
SBR
-
29057H)
multi
-
origin refuse dumping site
Outside the project area but within
the
one
-
mile radius, SCCIC records show
more than 20
other
studies
on
various tracts of land
and linear features
,
including
at least four
studies
on
adjacent
prop
erties
(Fig
ure 5
)
.
In all, approximately
75 percent of the land within the scope of the records
search has been surveyed, result
ing
in the identification of
seven
addition
al sites.
Like the five sites
within or adjacent to the project boundaries, a
ll
of
the
se
sit
es
date
d
to the historic period
.
A
mong
them were
buildings,
structural foundations, water storage tanks,
refuse scatters,
and
the
former
Rialto Municipal Airport
.
None of these
seven
sites was found
in the immediate vicinity of
the
project area
.
Therefore,
none of them requires further c
onsideration during this study.
Figure 5. Previous cultural resources studies
in the vicinity of the project area, listed by SCCIC file number.
L
ocations of historical/archaeological sites are not
shown as a protective measure.
,
~----
-
~
~
Q@
J,
g
.
1 ,4
1063533
,,
1066914
<t
I.SOO
~
•
SubS!4tJOn
/
-
Project
area
CJ
:~eas
previously
rveyed
--
Linear
surveys
1000
SCALE
1 :24
,
000
_
2000
feet
~=
==
~o==~1goo~ok~~
HISTORICAL BACKGROUN
D RESEARCH
Historical maps demonstrate that
in the mid
-
19th century, when the U.S. government conducted the
earliest
systematic
land surveys in the San
Bernardino Valley, the only man
-
made features known to
be present in the project vicinity were a few winding roads (
Figure 6)
.
The most notable among
these was the forerunner of present
-
day Baseline Road, which was then a part of
a
main
thorou
gh
fare
betw
een San Bernardino and Los Angeles. The road was blazed by
the
Mormon
settlers
in San Bernardino in the mid
-
1850s and was
laid out generally along
the
San Bernardino
Baseline
(
Haenszel 1979:31
). In the vicinity of the project area, however, the actual ro ute of that
road was roughly a half
-
mile south of the b
aseline
and well outside the project area (
Figure 6)
.
By the late
19th century, the early roads had been replaced by a grid of widely spaced roads lined by scattered buildings, in a settlement pattern
that was typical of rural southern California at the time (
Figure
7 )
. The current alignments of Baseline Road and some o
f the intersecting streets across the
project area dated to that period.
Between the 1890s and the 1940s, a few
buildings,
presumably
farmsteads,
were noted along the segment of Baseline Road in the project area, but most of the land was used as agricultu
ral fields, including citrus groves or other types of orchards (Figure 8; NETR Online 1938;
1948).
In the early days of
the post
-
Wo
rld War II boom, the number of building
along
the project
route
began to
rise
, but the rural character of the area did not change until the 1966 -
1980 era, when the
first suburban residential tract developments occurred on the south side of Baseline Road (F igure 9;
NETR
Online 19
48 -
1980).
To
the east
of the
project area, a gravel
quarry
was in operation in
the
Figure 6. The project area and vicinity in 1852
-
1874
(Source: GLO
1856
; 1875)
Figure 7. The project area and vicinity in
1893
-
1894
(Source: USGS 1901)
<..-:
"·\
.,1
/(IQ
6'0
~
,·
~
'..
-----
----
,,,,,
,Zat
•.
·~V
hd~,.&""Jr._
..
..
~;,.).l
12. 78
.
,,..
/
H
-.,v.
~
:.<J.&!.-
.J'83":I
.,.,
~-
•
1,.·
~'1
-~~
...
~~~~~\L:1!~
t?.
~i~~NCnd
•
?.
'
Project
,\"'p,-
•
,1-4-
------.,----
area
6'
to
'\..
'
"§:
':f
cd;.
I
\
-,:·!/
ii!
,
.
:z:
~
..
:::
1)
'&
•
I
"'Ii
~
l
!
~
.
,:
"
~"
,o
1 •\~
::
...
~
hr~
-
r
~-
ii!
1 ,.,
,_,.,,
~
.
!
"'
'
.,,,,.,,,.
,.,
.,,,,.+,
'11.
.,{-41,_,,.
A-'N
.
fl
r~
✓
-,,,.7.v
.-1~,.)
.,/1.,J
.
']'~
,/-.,
.
✓
,~c
ii
•
-
'
~
~
)l•t
N°I
,.,..,
,i
.,
,,,
-
,
Jin,
~
i'o
,+
8•
.,4
J.,~
1,.
S.....,
A
1 ,
:JJ
e.
,rr1
-:tr
•
··
-
·
'-:
I),_
,)
,.;0
1 ••
•
•
··-
!>'O
r,
,
.,.,
i
....
_
.
...
...
·········
·
···{f
l<y'~······
-f6
IY;-'11r
.-:/.
1 t
&
,/
-
t&o
.,{1r.o
.,
4/l,d
.,f
/{;1
t
-
~
.,
~
..
,,
.,
~t.J
"
.
"
Y./:r"""r
0 2000
4000
feet
I
0 SCA
LE
1 :62
,
500
1 mi
l
e
Figure
8 . The project area and vicinity in 1936
-
1938. (Source: USGS 1941; 1943)
Figure
9 . The project area and vicinity in 1952
-
1954
. (Source: USGS 1953; 1954)
~::~
1 :
i
!
1 1
•
____
I
L
II
y
11 .
II
:
;:".:1
r······
·
_
J:.
.........
~
T
-
·
_
/
"
~
~
-
_
~
_
=---
-=---
-
-
"----'
~-
,._,._
____.
""'l
~
~
-
n<
---
-:::·-
•
/'
,.,.
--
M
I R
O·
F
==
A
ll\l\A
--~
Devore
Quad.
------
-
~---
-
-1/-
-=----
-::;;-L
---------
,
------
....
34 F
ontana
Quad.
••
:
__
•
J....!.
~X~
-
.
LL.
__
_
._
_
3 SCALE
1 :
24 ,
000
/31/-0
o
1 000
2000
feet
area
of
the
present
-
day Cactus Basins
during
the 1940s
-
19 7
0s (
Figure
9 ; NETR Online 1948
-
19 80
)
.
The retention basins adjacent to the project area today, namely Cactus Basins No. 3 and No. 3A, were
built sometime between 1980 and 1994
, after the quarry ceased operation
(
NETR Online
1980;
1994
)
.
By
the mid
-
19 9
0s
, most of the land along the south side of Baseline Road had been developed into residential neighborhoods
(
NETR Online
1994; Google Earth 1994; 1995). The final inf
ill
development, along Grove Place between Maple Avenue and Locus Avenue, was completed
between 2005 and 2009 (Google Earth 2002
-
2009).
On the north side of Baseline Road, the rural
land uses persisted
well
into the 1990s before the construction of two se
lf
-
storage facilities near the
eastern end of the project area began to transform the l andscape, followed by two
strip malls
at the
intersection of Ayala Road in 2004
-
2005 (Google Earth 1994
-
2005).
The large warehouses that dominate the land use on that
side of Baseline Road
is the most recent
development along the project route, dating o
nly to 2013
-
2018 (Google Earth 2005
-
2018).
With the
accelerated residential and commercial development along its course
since the 1980s,
the character
and configuration
of Baseline Road
itself
have
also
been significantly altered, most notably with the
ad
dition of curbs, sidewalks and,
during
the current decade, landscaped medians (
NETR Online
1968
-
1994; Google Earth 1994
-
2018
).
NATIVE AMERICAN
CONSULTATION
In
response to CRM TECH’s
request
, the NAHC
reported in
a letter dated March 26, 2019, that the
s
acred
Lands Record
File
indicated the
presence of
Native American cultural resource
(
s
)
in the
project
vicinity
but
referred further
inqui
ries
to
the Gabrieleño Band of Mission Indians
–
Kizh
Nation.
In the meantime, the
NAHC
also recommend
ed
that other loca
l Native American groups be
contacted for further information
and
provided a list of potential contacts in th
e region (see
App
endix
2).
Upon receiving the NAHC
’s reply
,
CRM TECH
sent written requests for comments to
all nine tribal
organizations on the
referral list
(see
Appendix 2
)
. For some of th
e tribes, the designated
spokespersons on
cultural resources
issues were contacted
i
n lieu of
the tribal political leaders
on
the
referral list, as recommended in the past by
the per
tinent
tribal government st
aff
.
The
nine
tribal
representatives contacted
during this s
tudy are listed below:
•
Andy Salas, Chairperson
,
Gabrieleño Band of Mission Indians
–
Kizh Nation
;
•
Sandonne Goad, Chairperson
,
Gabrielino/Tongva Nation
;
•
An
thony Morales, Chairperson
,
Gabrieleno/Tongv
a San Gabriel Band of Mission Indians
;
•
Robert Dorame, Chairperson
,
Gabrielino Tongva Indians of California Tribal Council
;
•
Charles Alvarez, Chairperson
,
Gabrielino Tongva Tribe
;
•
Travis Armstrong, Tribal Historic Pre
servation Officer
,
Morongo Band of Mission I
ndians
;
•
Donna Yocum, Chairperson
,
San Fernando Band of Mission Indians
;
•
Jessica Mauck, Cultural Resources Analyst
,
San Manuel Band of Mission Indians
;
•
Mark Cochrane, Chairperson, Serrano Nation of Mission Indians .
A
s of this
time, three of the nine
tribes
hav
e responded
in writing (
see
Appendix 2
)
.
Travis
Armstrong
of the
Morongo Band
and
Jessica Mauck
of the
San Manuel Band
stated that the
ir
respective
tribe
s
ha
ve
no
additional
information to provide
for
this st
udy
. Ms. Mauck
indicated
that
the San Manuel B
and
“
is unlikely to have concerns during formal consultation with the lead
agency
,
” while Mr.
A
rmstrong
indicated
that the
Morongo Band
“
may provide other information to
the lead agency during the AB 52 consultation process
.
”
On behalf of the
Gabrieleño
Band of Mission Indians
–
Kizh Nation
,
Brandy Salas
, Tribal
Admin
istrative
Specialist
, replied that
t
he tribe
would like
to
pursue
government
-
to
-
government
consultation with the
City of Rialto.
She did not, however, provide any
f
urther information o
n
Nativ
e American cultural resource
(
s
)
that may
exist
in the project
vicinity
.
FIELD SURVEY
The results of the
field
survey
indicate
that
all
four
of the
historical/archaeological
sites previously
recorded
on prope
rties
adjacent to
the project area
(
36 -
010659
,
36 -
010908
,
36 -
021612
,
and 36
-
029057
)
have been removed
.
Their former locations are now occupied by the residential neighborhood along Grove Place and
the wareh
o
uses
between Maple Avenue and Laurel Avenue,
which
were built in 2005
-
2009 and 2013
-
2018, respectively (Google Earth 2005
-
2018).
Baseline Road,
the
physical embo
d
iment
of Site
36 -
015497
(
San Bernardino Baseline
)
, remains in
heavy
use
today
as a
local
thoroughfare
.
As a result of
continuous alterations
in r
esponse to
the
gradual urb
aniza
tion
of the area
along its course, th
is segment of the road is now
entirely modern
in
appearance
and demonstrate
s
no historical characteristics despite its 19th century origin
(Figure 4)
.
No other poten
tial
“
historical resources
”
were encountered within the project a
rea throughout the
course of the survey.
DISCUSSION
The purpose of this study is to identify any cultural resources wit hin or adjacent to the project area
and assist the City of Rialto in determining whether such resources meet the official definition of
“historical resources” or as provided in the California Public Resources Code, in particular CEQA.
According to PRC §50
20.1(j), “‘historical resource’ includes, but is not limited to, any object, building, site, area, place, record, or manuscript which
is historically or archaeologically significant,
or is significant in the architectural, engineering, scientific, economic , agricultural, educational,
social, political, military, or cultural annals of California.”
More
specifically, CEQA guidelines state that the term
“
historical resources
”
applies to any
properties
listed in or determined to be eligible for listing in the California Register of
H
istorical
Resources, included in a local register of historical resources,
or determined to be historically
significant by the
l
ead
a
gency (Title 14 CCR §15064.5(a)(1)
-
(3)).
In other words, buildings,
structures, sites, or districts that belong to one or more of the following three categories are to be considered
“
historical re
sources
”
for the purposes of CEQA compliance (160 Cal. App. 4th 1051):
•
Mandatory historical resources: properties that are listed in or formally determined to be eligible for listing in the California Register of Historical Resources;
•
Presumptive historic
al resources: properties that are designated in an officially established local register, recognized by local ordinance, resolution, or general plan, or identified in a local survey prepared in accordance with PRC §5024.1(g), unless determined not to be hi storically or
culturally significant by the lead agency upon a preponderance of the evidence;
•
Discretionary historical resources: properties that are determined to be historically significant in the lead agency
’
s discretion, independent of any decision to
list or designate them in a national,
state, or local register of historical resources.
In summary of the research results presented
above,
five
historical/archaeological sites were
previously recorded within or adjacent to the project area , but four of them
,
36 -
010659
,
36 -
010908
,
36 -
021612
,
and 36
-
029057
,
are no longer extant today
.
The remaining site,
36 -
015497
, represents
the
San Bernardino B
aseline
, which is
embodied by Baseline Road in the project vicinity
. As a part
of the basis for
all land surveys and titles in southern California since
1853, the
San Bernardino
Baseline
h
as
been
designated a California Point of Historical Interest (CPHI -
SBr
-
12)
.
As
a property
included in a state
-
wide
register of
local
historical resources
,
Site
36 -
015497
clearly
meets the
definition of a “historical resource”
in the category of
“
p
resumptive
historical resour
ces
.
”
The historic value of
Site
36 -
015497, however, is symbolic in nature and is derived from the conceptual line across the landscape instead of th
e existing roadway
. The
current configuration and
physical features of
Baseline Road
, which are
modern
and in fact quite recent
in
origin,
do not
contribute to the historic significance of the site.
Since
Site
36 -
0 15497
exists in the project area
largely on paper only
,
CRM TECH
concludes that the proposed project has no potential to affect the
significance or integrity
of this “historical resource.”
As
n
o other
potential
“
historical resources
”
were
identified
within the project area
,
CRM TECH
further
concludes that no “historical resources”
will be impacted by
the
project.
CONCLUSION AND RECOM
MENDATIONS
CEQA establishes that a project that may cause a substantial adverse change in the significance of a “historical resource” or
a “tribal cultural resource”
is a project that may have a significant effect on
the environment
(PRC §21084.1
-
2)
.
“
Substantial adverse change,
”
according to PRC §5020.1(q),
“
means demolition, destruction, relocation, or alteration such that the significance of a historical resource would be impaired.
”
As stated above, the results of the present study indicate that no “historical resources” will be
impacted by
the
proposed
project
.
However,
the NAHC
reported the presence of unspecified Native
American cultural resource(s) in the project
vicinity
and
referred further
inquiries
to
the Gabrieleño
Band of Mission Indians
–
Kizh Nation
,
who
did not provide any
information on such resources
during this study
. A
ccord
ing to
CEQA guidelines, the identification of potential “tribal cultural resources” is beyond the scope of this study and ne
eds to be addressed through government
-
to
-
government consultations
between the City of Rialto and the pertinent Native American groups pursuant to Assembly Bill 52.
Based on these findings, CRM TECH presents the following recommendations to the City of Rialto:
•
A
preliminary
conclusio
n
of
No Impact
on
cultural resources appears to be appropriate for this
project,
pending the completion of
the City
’
s
government
-
to
-
government
consultation
process
with
local
Native American
tribes
to ensure the proper identification of potential “t
ribal cultural
resources.”
•
No additional cultural resources investigation will be necessary for the project unless construction plans undergo such changes as to include areas not covered by this study.
•
If buried cultural materials are
encountered inadvertently during any e
arth
-
moving operations
associated with the project, all work within 50 feet of the discovery should be halted or diverted until a qualified archaeologist can evaluate the nature and significance of the finds .
REFERENCES
Basgall, Mark E., and D.L. True
1985
Archaeological Investigations in Crowder Canyon, 1973
-
1984: Excavations at Sites SBR
-
421B, SBR
-
421C, SBR
-
421D, and SBR
-
713, San Bernardino County, California. On file, South Central Coastal Information
Center, California State University, Fullerton.
Bean, Lowell John, and Charles R. Smith
1978a
Gabrielino. In Robert F. Heizer (ed.):
Handbook of North American Indians
, Vol. 8:
California
; pp. 538
-
549. Smithsonian Institution, Washington, D.C.
1978
b
Serrano. In Robert F. Heizer (ed.):
Handbook of North American Indians
, Vol. 8:
California
; pp. 570
-
574. Smithsonian Institution, Washington, D.C.
Beck, Warren A., and Ynez D. Haase
1974
Historical Atlas of California
. University of Oklahoma Press,
Norman.
Brown, John, Jr., and James Boyd
1922
History of San Bernardino and Riverside Counties
. Lewis Publishing Company,
Chicago.
Chartkoff, Joseph L., and Kerry Kona Chartkoff
1984
The Archaeology of California
. Stanford University Press,
Palo Alto, California.
GLO (General Land Office, U.S. Department of the Interior)
18 56
Plat Map: Township No. 1 South Range No. 5 West,
SBBM
; surveyed in 1852
-
18 56
.
1875
Plat Map: Township No. 1 North Range No. 5 West,
SBBM
; surveyed in 1852
-
1874.
Go
ldberg, Susan K. (ed.)
2001
Metropolitan Water District of Southern California Eastside Reservoir Project: Final Report of Archaeological Investigations. On file, Eastern information Center, University of California, Riverside.
Goodman, John D., II
2002
Archaeological Survey of the Charter Communications Cable Project, Mountaintop Ranger District, San Bernardino National Forest, California. San Bernardino National Forest Technical Report 05
-
12 -
BB
-
102. San Bernardino.
Goodman, John D., II, and M. Mc
Donald
2001
Archaeological Survey of the Southern California Trials Association Event Area, Little Pine Flats, Mountaintop Ranger District, San Bernardino National Forest, California. San Bernardino National Forest Technical Report 05
-
12 -
BB
-
106. San B
ernardino.
Google Earth
1994
-
2018
Aerial photographs of the project vicinity; taken in 1994, 1995, 2002 -
2007, 2009,
2011
-
2014, 2016, and 2018.
Available through the Google Earth software.
Grenda, Donn
1993
Archaeological Treatment Plan for CA
-
RIV
-
27 98/H, Lake Elsinore, Riverside County,
California. On file, Eastern Information Center, University of California, Riverside.
1997
Continuity and Change: 8,500 Years of Lacustrine Adaptation on the Shores of Lake Elsinore. Statistical Research
Technical Series 59. Statistical Research, Inc., Tucson, Arizona.
Haenszel, Arda M.
1979
The Base Line Road.
Odyssey
I(4):29, 31. City of San Bernardino Historical Society, San Bernardino.
Horne, Melinda C., and Dennis P. McDougall
2008
CA
-
RIV
-
606
9: Early Archaic Settlement and Subsistence in the San Jacinto Valley, Western Riverside County, California. On file, Eastern Information Center, University of California, Riverside.
Ingersoll, L.A.
1904
Ingersoll’s Century Annals of San Bernardino Cou
nty, 1769 to 1904
. L.A. Ingersoll, Los
Angeles.
Keller, Jean S., and Daniel F. McCarthy
1989
Data Recovery at the Cole Canyon Site (CA
-
RIV
-
1139), Riverside County, California.
Pacific Coast Archeological Society Quarterly
25. Lerch, Michael K., and Ar
da M. Haenszel
1981
Life on Cottonwood Row.
Heritage Tales
1981:33
-
71. Fourth Annual Publication of the
City of San Bernardino Historical Society, San Bernardino.
McDonald, Meg, Philip J. Wilke, and Andrea Kauss
1987
McCue: An Elko Site in Riversi
de County.
Journal of California and Great Basin
Anthropology
9(1):46
-
73. Milburn, Doug, U.K. Doan, and John D. Goodman II
2008
Archaeological Investigation at Baldy Mesa
-
Cajon Divide for the Baldy Mesa Off
-
Highway
-
Vehicle Recreation Trails Project, S
an Bernardino National Forest, San Bernardino
County, California. San Bernardino National Forest Technical Report 05 -
12 -
53 -
091. San
Bernardino.
NETR Online
1938
-
199
4 Aerial photographs of the project vicinity; taken in 1938, 1948, 1959, 1966, 1980, and
1994. h
ttp://www.historicaerials.com
.
O’Connell, James F., Philip J. Wilke, Thomas F. King, and Carol L. Mix (eds.)
1974
Perris Reservoir Archaeology: Late Prehistor
ic Demographic Change in Southeastern
California. On file, Eastern Information Center, University of California, Riverside.
OHP (Office of Historic Preservation, State of California)
1973
California Point of Historical Interest designation form, CPHI -
S
Br
-
12 (36
-
015497). On
file, South Central Coastal Information Center, California State University, Fullerton.
Schuiling, Walter C.
1984
San Bernardino County: Land of Contrasts
. Windsor Publications, Woodland Hills,
California.
USGS (United States G
eological Survey, U.S. Department of the Interior)
1901
Map: San Bernardino, Calif. (15’, 1:62,500); surveyed in 1893 -
1894.
1941
Map: Devore, Calif. (1:31,680); surveyed in 1936.
1943
Map: Fontana, Calif. (1:31,680); surveyed in 1938.
1953
Map: Fontana, Calif. (7.5’, 1:24,000); aerial photographs taken in 1952, field -
checked in
1953.
1954
Map: Devore, Calif. (7.5’, 1:24,000); aerial photographs taken in 1952, field -
checked in
1954.
1969
Map: San Bernardino, Calif. (1:250,000);
1958 edition revised.
1980
Map: Fontana, Calif. (7.5’, 1:24,000); 1967 edition photorevised in 1978.
1988
Map: Devore, Calif. (7.5’, 1:24,000); 1966 edition photorevised in 1985.
Warren, Claude N.
1984
The Desert Region. In Michael J. Moratto (ed.):
California Archaeology
; pp. 339
-
430.
Academic Press, Orlando, Florida.
APPENDIX 1:
PERSONNEL QUALIFICATIONS
PRINCIPAL INVESTIGATOR/HISTORIAN
Bai
“
Tom
”
Tang, M.A.
Education
1988
-
1993
Graduate Program in Public
History/Historic Preservation, UC Riverside.
1987
M.A., American History, Yale Universi
ty, New Haven, Connecticut.
1982
B.A., History, Northwestern University, Xi
’
an, China.
2000
“
Introduction to Section 106 Review,
”
presented by the Advisory Council on Historic
Preservation and the University of Nevada, Reno.
1994
“
Assessing the Significan
ce of Historic Archaeological Sites,
”
presented by the
Historic Preservation Program, University of Nevada, Reno.
Professional Ex
perience
2002
-
Principal Investigator, CRM TECH, Riverside/Colton, California.
1993
-
2002
Project Historian/Architectural Hist
orian, CRM TECH, Riverside, California.
1993
-
1997
Project Historian, Greenwood and Associates, Pacific Palisades, California.
1991
-
1993
Project Historian, Archaeological Research Unit, UC Riverside.
1990
Intern Researcher, California State Office of Histor
ic Preservation, Sacramento.
1990
-
1992
Teaching Assistant, History of Modern World, UC Riverside.
1988
-
1993
Research Assistant, Am
erican Social History, UC Riverside.
1985
-
1988
Research Assistant, Modern Chinese History, Yale University.
1985
-
1986
Teaching
Assistant, Modern Chinese History, Yale University.
1982
-
1985
Lecturer, History, Xi
’
an Foreign Languages Institute, Xi
’
an, China.
Cultural Resources Management Reports
Preliminary Analyses and Recommendations Regarding California ’
s Cultural Resources In
ventory
System (with Special Reference to Condition 14 of NPS 1990 Program Review Report). California State Office of
Historic Preservation working paper, Sacramento, September 1990.
Numerous cultural resources management reports with the Archaeological Research Unit,
Greenwood and Associates, and CRM TECH, since October 1991.
PRINCIPAL INVESTIGATOR/ARCHAEOLOGIST
Mic
hael Hogan, Ph.D., RPA*
Education
1991
Ph.D., Anthropology, University of California, Riverside.
1981
B.S., Anthropology, University of
California, Riverside; with honors.
1980
-
1981
Education Abroad Program, Lima, Peru.
2002
Section 106
—
National Historic
Preservation Act: Federal Law at the Local Level.
UCLA Extension Course #888.
2002
“
Recognizing Historic Artifacts,
”
workshop presente
d by Richard Norwood,
Historical Archaeologist.
2002
“
Wending Your Way through the Regulatory Maze,
”
symposium presente
d by the
Association of Environmental Professionals.
1992
“
Southern California Ceramics Workshop,
”
presented by Jerry Schaefer.
1992
“
His
toric Artifact Workshop,
”
presented by Anne Duffield
-
Stoll.
Professional Experience
2002
-
Principal
Investigator, CRM TECH, Riverside/Colton, California.
1999
-
2002
Project Archaeologist/Field Director, CRM TECH, Riverside.
1996
-
1998
Project Director and
Ethnographer, Statistical Research, Inc., Redlands.
1992
-
1998
Assistant Research Anthropologist, Unive
rsity of California, Riverside
1992
-
1995
Project Director, Archaeological Research Unit, U. C. Riverside.
1993
-
1994
Adjunct Professor, Riverside Community
College, Mt. San Jacinto College, U.C.
Riverside, Chapman University, and San Bernardino Valley Colle ge.
1991
-
1992
Crew Chief, Archaeological Research Unit, U. C. Riverside.
1984
-
1998
Archaeological Technician, Field Director, and Project Director for var ious southern
California cultural resources management firms.
Research Interests
Cultural Resource M
anagement, Southern Californian Archaeology, Settlement and Exchange Patterns, Specialization and Stratification, Culture Change, Native American Culture,
Cultural
Diversity.
Cultural Resources Management Reports
Author and co
-
author of, contributor to, and principal investigator for numerous cultural resources management study reports since 1986.
Memberships
* Register
of Professional Archaeologists;
S
ociety for American Archaeology;
Soc
iety for California
Archaeology;
Pacif
ic Coast Archaeological Society;
Coachella Valley Archaeological Society.
PROJECT ARCHAEOLOGIST/FIELD DIRECTOR
Daniel Ballester, M.S.
Education
2013
M.S., Geographic Informatio
n
System (GIS), University of Redlands, California.
1998
B.A., Anthropology, California State University, San Bernardino.
1997
Archaeological Field School, University of Las Vegas and University of California, Riverside.
1994
University of Puerto Rico,
Rio
Piedras, Puerto Rico.
2007
Certificate in Geographic Information Systems (GIS), California State University, San Bernardino.
2002
“
Historic Archaeology Workshop,
”
presented by Richard Norwood, Base
Archaeologist, Edwards Air Force Base; presented at C
RM
TECH, Riverside,
California
.
Professional Experience
2002
-
Field Director/GIS Specialist, CRM TECH, Riverside/Colton, California.
2011
-
2012
GIS Specialist for Caltrans District 8 Project, Garcia and Associates, San Anselmo, California.
2009
-
2010
Field
Cr
ew Chief, Garcia and Associates, San Anselmo, California.
2009
-
2010
Field Crew, ECorp, Redlands.
1999
-
2002
Project Archaeologist, CRM TECH, Riverside, California.
1998
-
1999
Field Crew, K.E.A. Environmental, San Diego, California.
1998
Field Crew, A.S.M
. A
ffiliates, Encinitas, California.
1998
Field Crew, Archaeological Research Unit, University of California, Riverside.
PROJECT ARCHAEOLOGIST
/NATIVE AMERICAN LIAISON
Nina Gallardo, B.A.
Education
2004
B.A., Anthropology/Law and Society,
University of Cal
ifornia, Riverside.
Professional Experience
2004
-
Project Archaeologist, CRM TECH, Riverside/Colton, California.
PROJECT ARCHAEOLOGIST/REPORT WRITER
Ben Kerridge, M.A.
Education
2014
Archaeological Field School, Institute for Field Research, Kephal lenia, Greece.
2010
M.A., Anthropology, California State University, Fullerton.
2009
Project Management Training, Project Management Institute/CH2M HILL , Santa
Ana, California
.
2004
B.A., Ant
hropology, California State University, Fullerton.
Professional
Experience
2015
-
Project Archaeologist/Report Writer, CRM TECH, Colton, California.
2015
Teaching Assistant
, Institute for Field Research, Kephallenia, Greece.
2009
-
2014
Publications Delivery Manager, CH2M HILL, Santa Ana, California.
2010
-
Naturalist, Ne
wport Bay Conservancy, Newport Beach, California.
2006
-
2009
Technical Publishing Specialist, CH2M HILL, Santa Ana, California.
2002
-
2006
English Composition/College Preparation Tutor,
various l
ocations, California.
Papers Presented
•
Geomorphol
ogical Surve
y of Tracts T126
–
T151 to Support Archaeological Shoreline Research
Project.
Institute for Field Research, Kephallenia, Greece, 2014.
•
The
Uncanny Valley of the Shadow of Modernity: A Re
-
examination of Anthropological
Approaches to Christianity.
Graduate T
hesis, California State University, Fullerton, 2010.
•
Ethnographic Endeavors into the World of Counterstrike.
74th Annual Conference of t
he
Southwestern Anthropological Association, 2003.
Cultural Resources Management Reports
Co
-
author and contributor t
o numerous cultural resources management reports since 2013.
Memberships
Society for California Archaeology; Pacific Coast Archaeologic al Society.
APPENDIX
2 C
ORRES
PONDENCE WITH
N
ATIVE
A
MERICAN
R
EPRESENTATIVES
*
*
Nine
local Native American representatives were contacted; a sample letter is included in this repo rt.
S
ACRED
L
ANDS
F
ILE
&
N
ATIVE
A
MERICAN
C
ONTACTS
L
IST
R
EQUEST
NATIVE
AMERICAN HERITAGE COMMISSION
1550 Harbor Boulevard, Suite 100
West Sacramento, CA 95691
(916)373
-
3710
(916)373
-
5471 (Fax)
Pr
oject:
Proposed Rialto Baseline Storm Drain Project (CRM
TECH No. 3454)
County:
San Bernardino
USGS Quadrangle
Name:
Devore
and Fontana, Calif.
Township
1 North
Range
5 West
SB
BM;
Section(s)
: 32
-
34 Township
1 South
Range
5 West
SB
BM;
Section(s)
: 3
-
5 Company/Firm/Agency:
CRM TECH
Contact Person:
Nina Gallardo
Street Address:
1016 E. Cooley Drive, Suite A/B
City:
Colton, CA
Zip:
92324
Phone:
(909) 824
-
6400
Fax:
(909) 824
-
6405
Email:
Proj
ect
Description:
The primary component of the
project is to install 2.25 linear miles of new
storm drain
system
that runs south from the existing Cactus Basin to Baseline Road
and
then
we
st
within the
Baseline Road
right
-
of way to Tamarind Avenue, in the
City of Rialto, Sa
n Bernardino
County, California.
March 14
, 2019
March
26 , 2019
Nina Gallardo
CRM Tech
VIA Email to:
[email protected]
RE:
Proposed Rialto Baseline Storm Drain Project, San Bernardino County
Dear
M
s.
Gallardo
:
A record search of the Native American Heritage Commission (NAHC) Sacred Lands File (SLF) was completed for the information you have submitted for the above referenced project. The results were
positive
.
Please contact the
Ga
brieleno Band of Mission Indians
–
Kizh
Nation
on
the attached list for
more information
.
Other sources of cultural resources should also be
contacted for information regarding known and recorded sites.
Attached is a list of Native American tribes who
may also have knowledge of cultural resources in
the project area. This list should provide a starting place in locating areas of potential adverse impact within the proposed project area. I suggest you contact all of those indicated; if they cannot supp
ly information, they might recommend others with specific knowledge. By contacting all those listed, your organization will be better able to respond to claims of failure to consult with the appropriate tribe. If a response has not been received within tw o weeks of notification, the
Commission requests that you follow
-
up with a telephone call or email to ensure that the project information has been received.
If you receive notification of change of addresses and phone numbers from tribes, please notify t
he NAHC.
With your assistance, we can assure that our lists contain current information. If you have any questions or need additional information, please contact me at my email address:
[email protected]
.
Sincerely,
Steven Quinn
Associate
Governmental Program Analyst
Attachment
Gabrieleno Band of Mission
Indians - Kizh Nation
Andrew Salas, Chairperson
P.O. Box 393
Covina, CA, 91723
Phone: (626) 926 - 4131
[email protected]
Gabrieleno
Gabrieleno/Tongva San Gabriel
Band of Mission Indians
Anthony Morales, Chairperson
P.O. Box 693
San Gabriel, CA, 91778
Phone: (626) 483 - 3564
Fax: (626) 286-1262
[email protected]
Gabrieleno
Gabrielino /Tongva Nation
Sandonne Goad, Chairperson
106 1/2 Judge John Aiso St.,
#231
Los Angeles, CA, 90012
Phone: (951) 807 - 0479
[email protected]
Gabrielino
Gabrielino Tongva Indians of
California Tribal Council
Robert Dorame, Chairperson
P.O. Box 490
Bellflower, CA, 90707
Phone: (562) 761 - 6417
Fax: (562) 761-6417
[email protected]
Gabrielino
Gabrielino-Tongva Tribe
Charles Alvarez,
23454 Vanowen Street
West Hills, CA, 91307
Phone: (310) 403 - 6048
[email protected]
Gabrielino
Morongo Band of Mission
Indians
Robert Martin, Chairperson
12700 Pumarra Rroad
Banning, CA, 92220
Phone: (951) 849 - 8807
Fax: (951) 922-8146
[email protected]
Cahuilla
Serrano
Morongo Band of Mission
Indians
Denisa Torres, Cultural Resources
Manager
12700 Pumarra Rroad
Banning, CA, 92220
Phone: (951) 849 - 8807
Fax: (951) 922-8146
[email protected]
Cahuilla
Serrano
San Fernando Band of Mission
Indians
Donna Yocum, Chairperson
P.O. Box 221838
Newhall, CA, 91322
Phone: (503) 539 - 0933
Fax: (503) 574-3308
[email protected]
Kitanemuk
Vanyume
Tataviam
San Manuel Band of Mission
Indians
Lee Clauss, Director of Cultural
Resources
26569 Community Center Drive
Highland, CA, 92346
Phone: (909) 864 - 8933
Fax: (909) 864-3370
[email protected]
Serrano
Serrano Nation of Mission
Indians
Goldie Walker, Chairperson
P.O. Box 343
Patton, CA, 92369
Phone: (909) 528 - 9027
Serrano
1 of 1
This list is current only as of the date of this document. Distribution of this list does not relieve any person of statutory responsibility as defined in Section 7050.5 of
the Health and Safety Code, Section 5097.94 of the Public Resource Section 5097.98 of the Public Resources Code.
This list is only applicable for contacting local Native Americans with regard to cultural resources assessment for the proposed Proposed Rialto Baseline Storm Drain Project, San Bernardino County.
PROJ-2019-
001874
03/26/2019 08:29 AM
Native American Heritage Commission
Native American Contact List
San Bernardino County
3/26/2019
From
:
Nina Gallardo <[email protected]>
Sent
:
Thursday, March 28, 2019 12:27 PM
To
:
Subject
:
NA Scoping Letter for the Proposed Rialto Baseline Storm Drain
Project in the City of
Rialto, San Bernardino County (CRM TECH #3454)
Hello Mr. Salas,
I’m emailing to inform you that CRM TECH will be conducting a cultural study for the p
roposed
Rialto Baseline Storm Drain Project in the City of Rialto, San Bern ardino
County (CRM TECH
#3454). We have received the Native American Heritage Commission (NAHC) SLF r
esponse and
NA
contact l
ist.
T
he NAHC reports that
SLF
indicate
s
the presence of
Native American cultural
resources in the project area and recommends th
at the
Gabrieleno Band of Mission Indians
-
Kizh
Nation be contacted for further information (see attached).
I’m contacting you to see if the Gabrieleno Band of Mission Indians
-
Kizh Nation has any specific
information regarding cultural sites located
in th
e project area.
I’m also attaching the NA
scoping
lett
er,
a copy of the
NAHC
response l
etter, and
a
project area map.
Thanks for your time and input on this project.
Nina Gallardo
Project Archaeologist/Native American liaison
CRM TECH
1016 E.
Cool
ey Drive Ste. A/B
Colton, CA 92324
(909) 824
-
6400
March 28, 2019
Sandonne
Goad
,
Chairperson
Gabrielino/Tongva Nation
P.O. Box 86908
Los Angeles
,
CA
90086
RE:
Proposed Rialto Baseline Storm Drain Project
2.25 Linear Miles of Pipeline Alignment in the
Cit
y of Rialto
San Bernardino County, California
CRM TECH Contract #3454
Dear
Ms.
Goad
:
I am writing to bring your attention to an ongoing CEQA -
compliance study for the proposed project
referenced above. The project entails the installation of approx imat
ely 2.25 linear miles of new
storm drain pipeline from the existing Cactus Basin
s
south to Baseline Road
and
then
we
st within
the
Baseline Road
right
-
of
-
way to Tamarind Avenue. The accompanying map, based on USGS Devore and Fontana, Calif., 7.5' quadrangl
es, depicts the location of the project area in Sections 32 -
34, T1N R5W
,
and Sections 3
-
5, T1S R5W, SBBM.
Records on file at the South Central Coastal Information Center (SCCIC) report that Baseline Road (Site 36
-
015497) is the only known historical/archa
eological site in the project area. However, the
Native American Heritage Commission
Sacred Lands
File
ind
icate
s
the presence of
Native
American cultural resources in the project area
, and
the commission
recommends that the Gabrieleno
Band of Mission Indi
ans
-
Kizh Nation and other local tribes be contacted for further information (see attached). Therefore, a
s part of the cultural resources study for this project, I am writing to request your input on potential Native American cultural resources in or nea r the project area.
Please respond at your earliest convenience if you have any specific knowledge of sacr ed/religious
sites or other sites of Native American traditional cultural value in or near the project area, or any other information to consider dur
ing the cultural resources investigations. Any information or concerns may be forwarded to CRM TECH by tel
ephone, e
-
mail, facsimile, or standard mail.
Requests for documentation or information we cannot provide will be forwarded to our client and/or the
lead agency, namely the City of Rialto.
We would also like to clarify that, as the cultural resources cons ultant for the project, CRM TECH is
not involved in the AB 52
-
compliance process or in government
-
to
-
government consultations. The
purpose of this l
etter is to seek any information that you may have to help us determine if there are cultural resources in
or near the project area that we should be aware of and to help us assess the sensitivity of the project area. Thank you for your time and effort in
addressing this important
matter.
Respectfully,
Nina Gallardo
Project Archaeologist/Native American li
aison
CRM TECH
Email: [email protected]
Encl.: NAHC response letter and project location map
From:
Tribal Historic Preservation Office <thpo@moro
ngo
-
nsn.gov>
Sent:
Thursday, March 28, 2019 3:44 PM
To:
Subject:
RE:
NA Scoping Lett
er for the Proposed Rialto Baseline Storm Drain Project in the City of Rialto, San Bernardino County (CRM TECH #3454)
Hello,
Regarding the above re
ferenced project, we have no additional information to provide at this time but may provide other informati
on to the lead agency during the AB 52 consultation process.
Thank you for reaching out to our office.
Sincerely,
Travis Armstrong
Tribal Historic
Preservation Officer
Morongo Band of Mission Indians
951
-
755
-
5259
Email:
thpo@morongo
-
nsn.gov
From:
Jessica Mauck <JMauck@sanmanuel
-
nsn.gov>
Sent:
Friday, March 29, 2019 4:08 PM
To:
Subject:
RE:
NA Scoping Letter for the Proposed Rial
to Baseline Storm Drain Project in the City
of Rialto, San Bernardino Coun
ty (CRM TECH #3454)
Hi Nina,
Thank you for contacting the San Manuel Band of Mission Indians (SMBMI) regarding the above referenced project. SMBMI appreciates the opportunity to re view the project documentation, which
was received by our Cultural Resourc
es Management Department on 28 March 2019. While SMBMI
consults on projects within the City of Rialto, this particular area has not historically been of major concern. Additionally,
based on recent information obtained by the Tribe, I am going to start pul ling
back on the nearby areas for which SMBMI previously expressed concern. As such, SMBMI does not have information to provide for the study and is unlikely to have concerns during formal
consultation with the lead agency.
Thank you,
Jessica Mauck
CUL
TURAL RESOURCES ANALYST
O: (909) 864
-
8933 x3249
M: (909) 725
-
9054
26569 Community Center Drive Highland California 92346
From:
Administration Gabrieleno <admin@gabrielenoindians.
org>
Sent:
Tuesday, April 2, 2019 1:34 PM
To:
Nina Gallardo
Subject:
Re:
NA Scoping Letter for the Proposed Rialto Baseline Storm Drain Project in the City of Rialto, San Bernardino County (CRM TECH #3454)
Hello Nina
Thank you for your letter dated Marc
h 28, 2018. If there will be any ground disturbance taking p lace
regarding the project our Tribal government would like to consult with the lead agency. Can you please provide us with the lead agency contact info.
Thank you
Sincerely,
Brandy Salas
A
dmin Specialist
Gabrieleno Band of Mission Indians
-
Kizh N
ation
PO Box 393
Covina, CA 91723
Office: 844
-
390
-
0787
website: www.gabrielenoindians.org
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 1
Mitigation Measure
Implementation Schedule
Verification
Air Quality
AIR-1 Dust Control. The following measures shall b
e incorporated into
Project plans and specifications for implementation
:
•
Apply soil stabilizers such as hay bales or aggreg
ate cover to
inactive areas.
•
Prepare a high wind dust control plan and implemen
t plan
elements and terminate soil disturbance when winds
exceed 25
mph.
•
Stabilize previously disturbed areas if subsequent
construction is
delayed.
•
Water exposed surfaces and haul roads 3 times/day.
•
Cover all stockpiles with tarps.
•
Replace ground cover in disturbed areas quickly.
•
Reduce speeds on unpaved roads to less than 15 mph
.
•
Trenches shall be left exposed for as short a time
as possible.
•
Implementation of erosion control Best Management
Practices
identified in the project Storm Water Pollution Pre
vention Plan
This measure shall be included in the con-
struction contract as a contract specification
and implemented by the contractor during
construction.
A copy of the construction contract including
this air mitigation measure shall be retained in
the project file. Verification of implementation
shall be based on field inspections by City
inspection personnel that verify the air quality
measures have been implemented as
required in these measures. Field notes
documenting verification shall be retained in
the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study / MMRP City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Air Quality
AIR-2 Exhaust Emissions Control. The following mea
sures shall be
incorporated into Project plans and specifications
for
implementation:
•
Utilize well-tuned off-road construction equipment
that has
met or exceeded the maker’s recommendations for
vehicle/equipment maintenance schedule.
•
Establish a preference for Contractors shall using
utilize
Tier 4 3 or better heavy equipment.
•
Enforce 5-minute idling limits for both on-road tru
cks and off-road
equipment.
This measure shall be included in the con-
struction contract as a contract specification
and implemented by the contractor during
construction.
A copy of the construction contract including
this air mitigation measure shall be retained in
the project file. Verification of implementation
shall be based on field inspections by City
inspection personnel that verify the air quality
measures have been implemented as
required in these measures. Field notes
documenting verification shall be retained in
the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 2
Mitigation Measure
Implementation Schedule
Verification
Biological Resources
BIO-1 Burrowing Owl. Preconstruction presence/absen
ce surveys for
burrowing owl shall be conducted within 30 no less
than 14 days prior
to any onsite ground disturbing activity by a quali
fied biologist. The
burrowing owl surveys shall be conducted pursuant t
o the
recommendations and guidelines established by the C
alifornia
Department of Fish and Wildlife in the “California
Department of Fish
and Wildlife 2012 Staff Report on Burrowing Owl Mit
igation.” In the
event this species is not identified within the Pro
ject limits, no further
mitigation is required, and a letter shall be prepa
red by the qualified
biologist documenting the results of the survey. Th
e letter shall be
submitted to CDFW prior to commencement of Project
activities. If
during the preconstruction survey, the burrowing ow
l if is found to
occupy the site, Mitigation Measure BIO- 2 shall be
required.
This measure shall be implemented no less
than 14 days prior to initiation of construction.
A copy of the preconstruction survey a shall
be documented and retained in the project file.
A notation stating whether the burrowing owl
is present or absent from the site shall be
included in the file.
Source
Responsible Party
Status / Date / Initials
Initial Study / Response to
Comments
City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Biological Resources
BIO-2 If burrowing owls are identified during the s
urvey period, the City shall
take the following actions to offset impacts prior
to ground disturbance:
Active nests within the areas scheduled for disturb
ance or degradation
shall be avoided from February 1 through August 31,
and a minimum of
250-foot buffer shall be provided until fledging ha
s occurred, as
confirmed by a qualified biologist. Following fledg
ing, owls may be
passively relocated by a qualified biologist, as de
scribed below.
If impacts on occupied burrows in the non-nesting p
eriod are
unavoidable, onsite passive relocation techniques m
ay be used if
approved by the CDFW to encourage owls to move to a
lternative
burrows provided by the City outside of the impact
area.
If relocation of the owls is approved for the site
by the CDFW, CDFW
shall require the City to hire a qualified biologis
t to prepare a plan for
relocating the owls to a suitable site and conduct
an impact
assessment. A qualified biologist shall prepare and
submit a passive
relocation program in accordance with Appendix E (i
.e., Example
Components for Burrowing Owl Artificial Burrow and
Exclusion Plans) of
the 2012 Staff Report on Burrowing Owl Mitigation (
CDFG 2012) to the
This measure shall be implemented during
construction and followed through until
construction is complete. This shall be
incorporated into the construction contract.
The City shall document that, if appropriate,
active nests are avoided during nesting
season; outside of nesting season, verification
that passive techniques are utilized to
encourage owl relocation shall be provided to
the City. The City shall retain the relocation
plan, if required, and the impact assessment
prepared in accordance with the Staff Report
on Burrowing Owl Mitigation prior to
commencing project construction. The final
letter report shall be retained in the project file
,
as shall documentation that the letter is
submitted to CDFW. All field notes generated
by the biologist shall be retained in the project
file. Documentation of any burrowing owls
located on site and any actions taken shall be
retained in the project file.
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 3
Mitigation Measure
Implementation Schedule
Verification
CDFW for review/approval prior to the commencement
of disturbance
activities onsite.
The relocation plan must include all of the followi
ng and as indicated in
Appendix E:
• The location of the nest and owls proposed for re
location.
• The location of the proposed relocation site.
• The number of owls involved and the time of year
when the
relocation is proposed to take place.
• The name and credentials of the biologist who wil
l be retained to
supervise the relocation.
• The proposed method of capture and transport for
the owls to the
new site.
• A description of site preparation at the relocati
on site (e.g.,
enhancement of existing burrows, creation of artifi
cial burrows,
one-time or long-term vegetation control).
The applicant shall conduct an impact assessment, i
n accordance with
the Staff Report on Burrowing Owl Mitigation prior
to commencing
Project activities to determine appropriate mitigat
ion, including the
acquisition and conservation of occupied replacemen
t habitat at no less
than a 2:1 ratio.
Prior to passive relocation, suitable replacement b
urrows site(s) shall be
provided at a ratio of 2:1 and permanent conservati
on and management
of burrowing owl habitat such that the habitat acre
age, number of
burrows and burrowing owl impacts are replaced cons
istent with the
Staff Report on Burrowing Owl Mitigation including
its Appendix A within
designated adjacent conserved lands identified thro
ugh coordination
with CDFW and the City of Rialto. A qualified biolo
gist shall confirm the
natural or artificial burrows on the conservation l
ands are suitable for
use by the owls. Monitoring and management of the r
eplacement
burrow site(s) shall be conducted and a reporting p
lan shall be
prepared. The objective shall be to manage the repl
acement burrow
sites for the benefit of burrowing owls (e.g., mini
mizing weed cover),
with the specific goal of maintaining the functiona
lity of the burrows for a
minimum of 2 years.
A final letter report shall be prepared by the qua
lified biologist
documenting the results of the passive relocation.
The letter shall be
submitted to CDFW.
Source
Responsible Party
Status / Date / Initials
Initial Study / Response to
Comments
City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 4
Mitigation Measure
Implementation Schedule
Verification
Biological Resources
BIO-3 Preconstruction presence/absence surveys for
San Bernardino
kangaroo rat (SBKR) shall be conducted within 45 36
5 days prior to
any onsite ground disturbing activity by a permitte
d biologist. SBKR
surveys shall be conducted pursuant to the recommen
dations and
guidelines established by the California Department
of Fish and
Wildlife and U.S. Fish and Wildlife Service (USFWS)
. If no presence
of SBKR is found during the survey, mitigation meas
ure BIO-34 need
not be enforced.
This measure shall be implemented within a
year prior to initiation of construction.
A copy of the preconstruction survey a shall
be documented and retained in the project file.
A notation stating whether the SBKR is
present or absent from the site shall be
included in the file.
Source
Responsible Party
Status / Date / Initials
Initial Study / Response to
Comments
City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Biological Resources
BIO-4 In the event that the preconstruction survey
determines the
presence of SBKR, and complete avoidance is not pos
sible, the
Project proponent shall acquire a CESA Incidental T
ake Permit (ITP)
prior to any vegetation- or ground disturbing activ
ities. Any take of
SBKR without take authorization would be a violatio
n of Fish and
Game Code section 2050 et seq. the following action
s shall be
implemented:. The the City shall provide compensati
on for
temporary loss of habitat and individual to SBKR in
the following
manner: 1) the City shall obtain a 2081 Incidental
Take Permit (ITP)
from the CDFW; the City shall offset the loss of th
e temporarily
disturbed habitat to SBKR by purchase purchasing of
acceptable
suitable SBKR habitat at a minimum 3:1 1:1 ratio de
pending on the
habitat quality of the impact site and the location
and habitat quality
of the identified mitigation site; and any conserve
d habitat shall be
provided with an appropriate endowment to ensure pe
rmanent
protection and the conserved habitat shall be manag
ed in perpetuity
by an agency or party considered acceptable to the
CDFW. No
ground disturbance within potential SBKR habitat sh
all occur until an
ITP is obtained by the City from CDFW and USFWS. No
te that the
final compensation package contained in the permit
may differ from
the above compensation package, but the City finds
that this
compensation package shall at a minimum meet the re
quirements of
this measure.
This measure shall be included in the
construction contract as a contract specifica-
tion and implemented by the contractor during
construction. Prior to implementing
construction in an area with a population of
SBKR, the City shall obtain an Incidental Take
Permit (ITP) from the State Department of
Fish and Wildlife. All measures identified in
the ITP shall be completed in accordance with
the time schedule in this document.
A copy of both the SBKR survey and, if
required, the ITP shall be retained in the
project file. The City shall document shall
document specific compliance with each ITP
condition and retain the documented verifi-
cation in the project file. The City shall retain
documentation of any required compensation
for loss of habitat.
Source
Responsible Party
Status / Date / Initials
Initial Study / Response to
Comments
City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 5
Mitigation Measure
Implementation Schedule
Verification
Biological Resources
BIO-5 Preconstruction presence/absence surveys for
Los Angeles pocket
mouse (LAPM) shall be conducted in conjunction with
SBKR
trapping within 30 days prior to any onsite ground
disturbing activity.
LAPM survey shall be conducted pursuant to the reco
mmendations
and guidelines established by the California Depart
ment of Fish and
Wildlife. If no presence of LAPM is found during th
e survey,
mitigation measure BIO-56 need not be enforced.
This measure shall be implemented in
conjunction with SBKR trapping, prior to the
initiation of construction.
A copy of the preconstruction survey a shall
be documented and retained in the project file.
A notation stating whether the LAPM is
present or absent from the site shall be
included in the file.
Source
Responsible Party
Status / Date / Initials
Initial Study / Response to
Comments
City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Biological Resources
BIO-6 In the event that the preconstruction survey
determines the
presence of LAPM, the following actions shall be im
plemented: 1)
the City shall prepare and implement a set of avoid
ance and
minimization measures aimed at protecting special-s
tatus small
mammals from Project-related impacts. The proposed
avoidance
and minimization measures shall be provided to CDFW
for review
and approval no fewer than 30 days prior to the ini
tiation of Project
activities 2) the City shall provide compensation f
or temporary loss
of habitat to and individual LAPM in the following
manner: 1) the City
shall obtain a 2081 Incidental Take Permit (ITP) fr
om the CDFW; the
City shall offset the loss of the temporarily distu
rbed habitat by
purchase purchasing of acceptable suitable LAPM hab
itat at a 1:1
2:1 ratio; and any conserved habitat shall be provi
ded with an
appropriate endowment to ensure permanent protectio
n and the
conserved habitat shall be managed in perpetuity by
an agency or
party considered acceptable to the CDFW. No ground
disturbance
shall occur within potential LAPM habitat until CDF
W approves
appropriate mitigation and avoidance and minimizati
on measures an
ITP is obtained by the City. Note that the final co
mpensation
package contained in the permit may differ from the
above
compensation package, but the City finds that this
compensation
package shall at a minimum meet the requirements of
this measure.
This measure shall be included in the
construction contract as a contract specifica-
tion and implemented by the contractor during
construction. Prior to implementing
construction in an area with a population of
LAPM, the City shall obtain an Incidental Take
Permit (ITP) from the State Department of
Fish and Wildlife. All measures identified in
the ITP shall be completed in accordance with
the time schedule in this document.
A copy of both the LAPM survey and, if
required, the ITP shall be retained in the
project file. The City shall document shall
document specific compliance with each ITP
condition and retain the documented verifi-
cation in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study / Response to
Comments
City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 6
Mitigation Measure
Implementation Schedule
Verification
Biological Resources
BIO-7 The City shall prepare and submit a 1602 Stre
ambed Alteration
Agreement (SAA) to the California Department of Fis
h and Wildlife
(CDFW) a Section 401 Certification Permit to the Sa
nta Ana
Regional Water Quality Control Board; and, a Sectio
n 404
(Nationwide Permit No. 43) Permit to the USACE. No
ground
disturbance within jurisdictional waters shall occu
r until the City
obtains the above permits. Note that the final com
pensation
package contained in the permit shall be implemente
d by the City. If
the permit conditions are different than the mitiga
tion listed in this
Document to protect biological resources, the City
shall implement
the mitigation identified in the permits, which mus
t be equivalent or
more effective in mitigating or avoiding potential
significant effects
and the substitution of any mitigation measure will
not cause any
potentially significant effect on the environment.
If necessary, the Streambed Alteration
Agreement from the CDFW shall be obtained
prior to ground disturbance within the
jurisdictional area and the conditions of the
permits shall be implemented as defined
within the permits by each permit.
A copy of these permit—if required—shall be
retained in the project file, and verification that
all conditions have been implemented shall be
retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study / Response to
Comments
City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Biological Resources
BIO-8 The State of California prohibits the “take”
of active bird nests. To
avoid an illegal take of active bird nests, any gru
bbing, brushing or
tree removal should be conducted outside of the the
State identified
nesting season (generally, Rraptor nesting season i
s February 15
January 1 through July 31 September 15; and migrato
ry passerine
bird nesting season is March 15 February 1 through
September 1).
Alternatively Additionally, the site shall be evalu
ated surveyed by a
qualified biologist 3 days prior to the initiation
of ground disturbance
to determine the presence or absence of nesting bir
ds, at the
appropriate time of day/night, during appropriate w
eather conditions.
Active bird nests MUST be avoided during the nestin
g season. If an
active nest is located in the Project construction
area it will be flagged
and a 300-foot avoidance buffer placed around it fo
r passerines and
a 500-foot avoidance buffer for raptors. No activit
y shall occur within
the 300-foot or 500-foot buffer until the young hav
e fledged the nest,
as confirmed by a qualified biologist.
Construction shall occur outside of the nesting
season or a copy of the field survey docu-
menting no nesting birds shall be completed
prior to initiating construction within the
nesting season.
City personnel shall document the dates of
construction. If construction is proposed to
occur within the nesting season, a copy of the
field survey documenting the absence of
nesting birds shall be retained in the project
file.
Source
Responsible Party
Status / Date / Initials
Initial Study / Response to
Comments
City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 7
Mitigation Measure
Implementation Schedule
Verification
Biological Resources
BIO-9 Any impacts to RAFSS shall be mitigated at a
minimum 3:1 or
greater depending on the location and habitat quali
ty of the
mitigation site.
This measure shall be implemented by the
City upon any impacts to RAFSS as a result of
implementation of construction. It shall be
implemented prior to any impacts to this
species.
The City shall retain any documentation of
mitigation for RAFSS. All field notes generated
by the biologist shall be retained in the project
file. Documentation of any burrowing owls
located on site and any actions taken shall be
retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study / Response to
Comments
City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Biological Resources
BIO-10 The City shall work with SBCFCD to minimize
impacts to their
obligatory habitat mitigation within Cactus Basin N
o. 3. The City shall
work collaboratively with SBCFCD to avoid and minim
ize impacts to
the greatest extent feasible.
This measure shall occur prior to construction
within Cactus Basin No. 3.
The City shall retain documentation of
communication with the SBCFCD and shall
document habitat mitigation carried out in
collaboration. Documentation shall be retained
in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study / Response to
Comments
City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Cultural Resources
CUL-1 Should any cultural resources be encountered
during construction of
these facilities, earthmoving or grading activities
in the immediate
area of the finds shall be halted and an onsite ins
pection shall be
performed immediately by a qualified archaeologist.
Responsibility
for making this determination shall be with the Cit
y’s onsite inspector.
The archaeological professional shall assess the fi
nd, determine its
significance, and make recommendations for appropri
ate mitigation
measures within the guidelines of the California En
vironmental
Quality Act.
Any response to exposed resources shall
occur during construction. Any reports
documenting management and findings for
accidentally exposed resources shall be
completed within one year of the discovery.
A copy of the Program shall be retained in the
project file. Verification of implementation
shall be based on field inspections by City
inspection personnel that verify the archaeo-
logical monitoring program is being imple-
mented by the contractor as required in this
measure. Field notes documenting verifica-
tion shall be retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 8
Mitigation Measure
Implementation Schedule
Verification
Cultural Resources
CUL-2 Should human remains or funerary objects be e
ncountered during
any activities associated with the project, work in
the immediate
vicinity (within a 100-foot buffer of the find) sha
ll cease and the
County Coroner shall be contacted pursuant to State
Health and
Safety Code §7050.5 and that code enforced for the
duration of the
project.
This measure shall be implemented during
construction if human remains are exposed
during construction
The City shall retain all records of the
discovery and management actions taken in
regard to human remains in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Geology and Soils
GEO-1 Stored backfill material shall be covered wit
h water resistant material
during periods of heavy precipitation to reduce the
potential for
rainfall erosion of the material. If covering is n
ot feasible, then
measures such as the use of straw bales or sand bag
s shall be used
to capture and hold eroded material on the project
site for future
cleanup. Implementation of erosion control Best Man
agement
Practices identified in the project Storm Water Pol
lution Prevention
Plan
This measure shall be included in the
construction contract as a contract specifi-
cation and implemented by the contractor
during construction.
A copy of the construction contract including
this geology/soils mitigation measure shall be
retained in the project file. Verification of
implementation shall be based on field
inspections by City inspection personnel that
verify the geology/soils measures have been
implemented as required in these measures.
Field notes documenting verification shall be
retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study / MMRP City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Geology and Soils
GEO-2 Excavated areas shall be properly backfilled
and compacted such
that erosion does not occur. Paved areas disturbed
by this Project
will be repaved in such a manner that roadways and
other disturbed
areas are returned to as near the pre-Project condi
tions or better.
Implementation of erosion control Best Management P
ractices
identified in the project Storm Water Pollution Pre
vention Plan
This measure shall be included in the
construction contract as a contract specifi-
cation and implemented by the contractor
during construction.
A copy of the construction contract including
this geology/soils mitigation measure shall be
retained in the project file. Verification of
implementation shall be based on field
inspections by City inspection personnel that
verify the geology/soils measures have been
implemented as required in these measures.
Field notes documenting verification shall be
retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study / MMRP City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 9
Mitigation Measure
Implementation Schedule
Verification
Geology and Soils
GEO-3 All exposed, disturbed soil (trenches, store
d backfill, etc.) will be
sprayed with water or soil binders twice a day or m
ore frequently if
fugitive dust is observed migrating from the site w
ithin which the
water facilities are being installed. Implementatio
n of erosion control
Best Management Practices identified in the project
Storm Water
Pollution Prevention Plan.
This measure shall be included in the
construction contract as a contract specifi-
cation and implemented by the contractor
during construction.
A copy of the construction contract including
this geology/soils mitigation measure shall be
retained in the project file. Verification of
implementation shall be based on field
inspections by City inspection personnel that
verify the geology/soils measures have been
implemented as required in these measures.
Field notes documenting verification shall be
retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study / MMRP City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Geology and Soils
GEO-4 The length of trench which can be left open
at any given time will be
limited to that needed to reasonably perform constr
uction activities,
as dictated by the contractor. This will serve to
reduce the amount of
backfill stored onsite at any given time.
This measure shall be included in the
construction contract as a contract specifi-
cation and implemented by the contractor
during construction.
A copy of the construction contract including
this geology/soils mitigation measure shall be
retained in the project file. Verification of
implementation shall be based on field
inspections by City inspection personnel that
verify the geology/soils measures have been
implemented as required in these measures.
Field notes documenting verification shall be
retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study / Responses to
Comments
City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 10
Mitigation Measure
Implementation Schedule
Verification
Geology and Soils
GEO-5 Should any paleontological resources be encou
ntered during
construction of these facilities, earthmoving or gr
ading activities in the
immediate area of the finds shall be halted and an
onsite inspection
should be performed immediately by a qualified pale
ontologist.
Responsibility for making this determination shall
be with the City
onsite inspector. The paleontological professional
shall assess the
find, determine its significance, and make recommen
dations for
determine appropriate mitigation measures within th
e guidelines of
the California Environmental Quality Act that shall
be implemented to
minimize any impacts to a paleontological resource.
Any response to exposed resources shall
occur during construction. Any reports
documenting management and findings for
accidentally exposed resources shall be
completed within one year of the discovery.
The City shall be notified within 24-hours of
accidental exposure of any paleontological
resources. A copy of initial findings shall be
provided to the City and retained in the project
file. A copy of the final report shall be
retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study / Responses to
Comments
City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Hazards and Hazardous Materials
HAZ-1 All spills or leakage of petroleum products d
uring construction
activities will be remediated in compliance with ap
plicable state and
local regulations regarding cleanup and disposal of
the contaminant
released. The contaminated waste will be collected
and disposed of
at an appropriately licensed disposal or treatment
facility. This
measure will be incorporated into the SWPPP prepare
d for the
Project development.
These measures shall be identified in the
project Stormwater Pollution Prevention Plan
(SWPPP) and implemented during construc-
tion.
A copy of the SWPPP shall be retained in the
project file. Verification of implementation
shall be based on field inspections by City
inspection personnel that verify the SWPPP
BMPs have been implemented as required in
this measure. Field notes documenting
verification shall be retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 11
Mitigation Measure
Implementation Schedule
Verification
Hydrology and Water Quality
HYD-1 The City shall require that the construction
contractor prepare and
implement a Storm Water Pollution Prevention Plan (
SWPPP) which
specifies Best Management Practices (BMPs) that wil
l prevent all
construction pollutants from contacting stormwater
and with the
intent of keeping all products of erosion from movi
ng offsite into
receiving waters. The SWPPP shall include a Spill
Prevention and
Cleanup Plan that identifies the methods of contain
ing, cleanup,
transport and proper disposal of hazardous chemical
s or materials
released during construction activities that are co
mpatible with
applicable laws and regulations. BMPs to be implem
ented in the
SWPPP may include but not be limited to:
• The use of silt fences;
• The use of temporary stormwater desilting or rete
ntion basins;
• The use of water bars to reduce the velocity of s
tormwater runoff;
• The use of wheel washers on construction equipmen
t leaving the
site;
• The washing of silt from public roads at the acce
ss point to the site
to prevent the tracking of silt and other pollutant
s from the site onto
public roads;
• The storage of excavated material shall be kept t
o the minimum
necessary to efficiently perform the construction a
ctivities required.
Excavated or stockpiled material shall not be store
d in water
courses or other areas subject to the flow of surfa
ce water; and
• Where feasible, stockpiled material shall be cove
red with
waterproof material during rain events to control e
rosion of soil from
the stockpiles.
This measure shall be incorporated into the
SWPPP and construction contract and
implemented during construction.
A copy of the SWPPP and construction
contract shall be retained in the project file.
Verification of implementation shall be based
on field inspections by City inspection
personnel that verify the SWPPP BMPs have
been implemented as required in this
measure. Field notes documenting verifi-
cation shall be retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Noise
NOI-1 No construction activities shall occur during
the hours of 5:30 PM and
7 AM Monday – Friday, and between 5 PM and 8 AM on
Saturdays
from October to April, and between 7 PM and 6 AM Mo
nday – Friday
and 5 PM to 8 AM on Saturdays from May to September
; at no time
shall construction activities occur on Sundays or h
olidays, unless a
declared emergency exists.
This measure shall be implemented during
construction and included in the contract with
the construction contractor.
City personnel shall verify that construction
activities comply with this requirement. The
verification shall be retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 12
Mitigation Measure
Implementation Schedule
Verification
Noise
NOI-2 The City shall establish a noise complaint re
sponse program and
shall respond to any noise complaints received for
this Project by
measuring noise levels at the affected receptor sit
e. If the noise level
exceeds an Ldn of 60 dBA exterior or an Ldn of 45 d
BA interior at the
receptor, the City will implement adequate measures
(which may
include portable sound attenuation walls, use of qu
ieter equipment,
shift of construction schedule to avoid the presenc
e of sensitive
receptors, etc.) to reduce noise levels to the grea
test extent feasible.
This measure shall be implemented during
construction and included in the contract with
the construction contractor.
City personnel shall verify that construction
activities comply with this requirement. The
verification shall be retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
\
Mitigation Measure
Implementation Schedule
Verification
Noise
NOI-3 The City will require that all construction e
quipment be operated with
mandated noise control equipment (mufflers or silen
cers).
Enforcement will be accomplished by random field in
spections by City
personnel during construction activities.
This measure shall be implemented during
construction and included in the contract with
the construction contractor.
City personnel shall verify that construction
activities comply with this requirement. The
verification shall be retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Noise
NOI-4 Equipment not in use for five minutes shall b
e shut off.
This measure shall be implemented during
construction and included in the contract with
the construction contractor.
City personnel shall verify that construction
activities comply with this requirement. The
verification shall be retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
\
Mitigation Measure
Implementation Schedule
Verification
Noise
NOI-5 Equipment shall be maintained and operated su
ch that loads are
secured from rattling or banging.
This measure shall be implemented during
construction and included in the contract with
the construction contractor.
City personnel shall verify that construction
activities comply with this requirement. The
verification shall be retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 13
Mitigation Measure
Implementation Schedule
Verification
Noise
NOI-6 Construction employees shall be trained in th
e proper operation and
use of equipment consistent with these mitigation m
easures,
including no unnecessary revving of equipment.
This measure shall be implemented during
construction and included in the contract with
the construction contractor.
City personnel shall verify that construction
activities comply with this requirement. The
verification shall be retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Noise
NOI-7 No radios or other sound equipment shall be
used at this site unless
required for emergency response by the contractor.
This measure shall be implemented during
construction and included in the contract with
the construction contractor.
City personnel shall verify that construction
activities comply with this requirement. The
verification shall be retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Noise
NOI-8 The construction contractor shall provide sig
ns (2) along the roadway
identifying a phone number for adjacent property ow
ners to contact
regarding excessive vibration. The contractor shal
l respond within 24
hours to any complaint at this phone number; assess
the complaint;
and, if reasonable, adjust construction activities
(use different
construction methods, slow down construction activi
ty, or other
measures) to reduce vibration at the property from
where the
complaint was received.
This measure shall be implemented during
construction and included in the contract with
the construction contractor.
City personnel shall verify that construction
activities comply with this requirement. The
verification shall be retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 14
Mitigation Measure
Implementation Schedule
Verification
Transportation / Traffic
TRAF-1 The construction contractor will provide ade
quate traffic
management resources that meet the County of San Be
rnardino, the
City of Fontana, and the City of Rialto standards.
The City shall
require a construction traffic management plan for
work in public
roads that complies with the Work Area Traffic Cont
rol Handbook, or
other applicable standard, to provide adequate traf
fic control and
safety during excavation activities. The traffic ma
nagement plan shall
be prepared and approved by the City(s) and County
prior to
initiation of excavation or pipeline construction.
At a minimum this
plan shall include how to minimize the amount of ti
me spent on
construction activities; how to minimize disruption
of vehicle and
alternative modes of transport traffic at all times
, but particularly
during periods of high traffic volumes; how to main
tain safe traffic
flow on local streets affected by construction at a
ll times, including
through the use of adequate signage, protective dev
ices, flag
persons or police assistance to ensure that traffic
can flow
adequately during construction; the identification
of alternative routes
that can meet the traffic flow requirements of a sp
ecific area,
including communication (signs, webpages, etc.) wit
h drivers and
neighborhoods where construction activities will oc
cur; and at the
end of each construction day roadways shall be prep
ared for
continued utilization without any significant
roadway hazards
remaining.
The Construction Traffic Management Plan
shall be compiled and approved prior to the
initiation of construction.
A copy of the Plan shall be retained in the
project file. Verification of implementation
shall be based on field inspections by City
inspection personnel that verify the
construction traffic management plan is being
implemented by the contractor as required in
this measure. Field notes documenting
verification shall be retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study / Response to
Comments / MMRP
City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Transportation / Traffic
TRAF-2 The City shall require that all disturbances
to public roadways be
repaired in a manner that complies with the Standar
d Specifications
for Public Works Construction (green book) or other
applicable County
of San Bernardino, the City of Fontana, and the Cit
y of Rialto standard
design requirements.
This measure shall be implemented during
construction and included in the contract with
the construction contractor.
These measures shall be included in the
construction contract, and City staff shall
verify that construction activities comply with
this requirement. The verification shall be
retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study / MMRP City of Rialto
CITY OF RIALTO
RIALTO BASELINE STORM DRAIN PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
MMRP Table, Page 15
Mitigation Measure
Implementation Schedule
Verification
Tribal Cultural Resources
TRC-1 The Contractor shall be required to notify th
e Gabrieleño Band of
Mission Indians-Kizh Nation (Tribe) at least 2 week
s prior to the
commencement of any construction activities requiri
ng excavation
related to the proposed Project at (844) 390-0787.
The Contractor
shall document the date that the Tribe was notified
, and give the
Tribe two weeks to respond prior to commencement of
any
excavation required to develop the proposed Project
.
If the Tribe responds, the City shall negotiate wi
th the Tribe to
arrange any requests of the Tribe related to the ha
ndling of and
potential for Tribal Cultural Resources with the un
derstanding that
the City has no responsibility to fund any requests
of the City from
the Tribe.
If the Tribe does not respond with any formal requ
ests of the City
within the two week period, the Contractor shall pr
oceed with
construction with the understanding that the Tribe
does not wish to
provide further input on the proposed Project. This
shall conclude the
City’s effort to enable to the Tribe to provide inp
ut on this Project.
This measure shall be implemented during
construction and followed through until final
disposition of such resources has been
achieved.
The City shall document that the Tribe was
contacted in the Project File and any response
thereof. Any requests and actions take to
satisfy the Tribe’s interest in this Project shall
be documented and retained in the Project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto
Mitigation Measure
Implementation Schedule
Verification
Utilities and Service Systems
UTIL-1 The contract with demolition and constructio
n contractors shall
include the requirement that all materials that can
feasibly be recycled
shall be salvaged and recycled. This includes, but
is not limited to,
wood, metals, concrete, road base, and asphalt. Th
e contractor shall
submit a recycling plan to the City for review and
approval prior to the
start of demolition/construction activities to acco
mplish this objective.
This measure shall be included in the
construction contract and implemented during
construction.
Verification of implementation shall be based
on field inspections by City inspection
personnel that verify adequate traffic
management resources are being used by the
contractor as required in this measure. Field
notes documenting verification shall be
retained in the project file.
Source
Responsible Party
Status / Date / Initials
Initial Study City of Rialto