Rialto Habitat Nature Center Update to theWater Subcommittee October 23, 2024

Community benefits and outdoor space
Community Benefits
Water Feature
Walking Trails
Education
Bird Watching (Pacific Flyway)
Potential Hydraulic & Habitat Benefits
Creation of Wetlands & Wildlife Habitat
Improve Water Quality
Removal of Invasive Fish Species
Reduce temperatures in the Rialto Channel
Proposed Restroom & Group Area
City of Rialto Wastewater Treatment Plant

Community Center & IEUA Pump Station Pad
Community Center Site
Pad is shared with IEUA Pump Station (grading and soil retention wall is cost shared) Pad is sized to its maximum to conform with site and grading constraints Community Center will have views and an overlook to the RHNC Outdoor Community Gathering/Meeting Space
Room for outdoor RHNC Signage and Photo Area
Space for school demonstration garden/planting area

Proposed rhnc Community building
Prefabricated building approx. 1,475 square-feet
Includes restrooms, staff office, storage space, and large community room.

In pre-design and vendor seeking City approval on building floorplan, features, colors and textiles.

Staff proposing to maintain current Building standards, colors, and security precautions.

Similar to Frisbie Park and Joe Sampson Park facilities

Community building Floor plan
Proposed Building Features:

Approximately 1,475 square-feet
Colors and textiles to match Frisbie Park facilities
Floors will be polished concrete
Ceiling will be vaulted with exposed HVAC ducting
Staff would like to maximize natural light and considering skylights/solar tubes

REQUESTING FEEDBACK AND QUESTIONS