City of Rialto
Bid Results for Project Fire Station 203 Dormitory Improvements Project (RFB 25‐009) Issued on 09/03/2024
Bid Due on October 08, 2024  3:00 PM (PDT)
Item
Number Description
Unit of
Measure Quantity
Rodriguez
Corporation
AEC Moreno
Corporation
3M
Construction
Corporation
MLC
Constructors,
Inc.

EC
Construction YMC
Corner
Keystone
Construction
Corporation
R

DEPENDABLE
CONST INC
Global
Builders Inc
1 Mobilization,  Demolition, Insurance and Bonds LS 1 $17,775.0 0 $41,745.00 $27,930.00 $24,900.00 $63,000.00 $44,000.00 $78,000.00 $65,000.00 $45,900.00 2 Wood  Stud Framing & Miscellaneous Carpentry LS 1 $23,885.0 0 $40,000.00 $20,000.00 $21,450.00 $52,500.00 $18,000.00 $13,000.00 $19,930.00 $48,300.00 3 Beds,  Cabinets, and Lockers LS 1 $64,665.0 0 $32,500.00 $105,300.00 $67,600.00 $13,000.00 $120,000.00 $44,000.00 $115,000.00 $39,800.00 4R ‐13 Insulation LS 1 $8,425.0 0 $7,500.00 $18,000.00 $3,055.00 $15,000.00 $6,000.00 $8,000.00 $6,750.00 $8,300.00 5 Windows,  Doors and Door Frames with Hardware LS 1 $37,135.0 0 $36,000.00 $25,000.00 $56,550.00 $35,749.00 $38,000.00 $36,500.00 $75,880.00 $25,300.00 6 New  Gyp Board and Patching of Walls LS 1 $21,825.0 0 $17,200.00 $18,000.00 $32,175.00 $35,000.00 $12,000.00 $16,500.00 $45,340.00 $28,300.00 7 New  Acoustic Ceiling Tiles and Grid LS 1 $29,355.0 0 $19,481.00 $25,000.00 $9,100.00 $15,750.00 $15,000.00 $23,500.00 $26,500.00 $22,300.00 8 New  Interior Painting  of Building and Caulking LS 1 $9,925.0 0 $16,698.00 $20,000.00 $32,500.00 $17,500.00 $25,000.00 $15,000.00 $14,650.00 $27,800.00 9 Carpet  Tile Flooring LS 1 $7,245.0 0 $17,800.00 $35,000.00 $11,700.00 $20,000.00 $12,000.00 $12,000.00 $15,880.00 $13,545.00 10 Rubber  Base LS 1 $300.0 0 $3,900.00 $8,000.00 $3,250.00 $10,000.00 $6,000.00 $2,000.00 $4,450.00 $4,300.00 11 Window  Blinds/Shades LS 1 $8,625.0 0 $17,000.00 $1,500.00 $2,600.00 $8,750.00 $10,000.00 $5,000.00 $7,800.00 $8,700.00 12 Installation  of Furniture Provided by Owner LS 1 $4,585.0 0 $13,900.00 $7,000.00 $1,500.00 $5,000.00 $5,000.00 $8,700.00 $8,000.00 $8,970.00 13 All  Plumbing Fixtures and Required Back Supports, Venting Pipes, Supply Pipes, Sewer and Accessories LS 1 $21,225.0 0 $8,300.00 $12,000.00 $9,750.00 $17,500.00 $9,000.00 $10,000.00 $8,000.00 $12,300.00 14 HVAC'S  Package System, Exhaust Fan, Duct Work, Registers, Cleaning and Air Balancing LS 1 $55,752.0 0 $44,300.00 $45,000.00 $72,800.00 $43,750.00 $103,000.00 $114,000.00 $119,470.00 $65,700.00 15 Electrical Service, Electrical Panels, Power, Switching, Distribution, Occupancy  Sensors, Speakers, Interior Light Fixtures, Data and Communication Conduits LS 1 $38,820.00 $28,000.00 $25,000.00 $83,259.00 $52,500.00 $39,000.00 $51,000.00 $46,050.00 $45,300.00 16 Fire Alarm System, Sensors, Panel and Strobes LS 1 $12,850.0 0 $16,500.00 $10,000.00 $11,700.00 $25,000.00 $7,000.00 $73,600.00 $20,000.00 $10,800.00 17 New and Relocated Existing Fire Sprinklers LS 1 $13,650.0 0 $9,460.00 $25,000.00 $9,750.00 $20,000.00 $8,000.00 $14,000.00 $7,500.00 $198,000.00 18 Equipment Curb and Roof Patching LS 1 $8,265.0 0 $8,349.00 $10,000.00 $13,000.00 $10,000.00 $6,500.00 $1,200.00 $12,950.00 $50,203.00 19 Signage LS 1 $800.0 0 $7,235.00 $2,000.00 $2,600.00 $10,000.00 $5,500.00 $1,700.00 $10,800.00 $5,070.00 20 Field Orders LS 1 $30,000.0 0 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $415,107.00 $415,868.00 $469,730.00 $499,239.00 $499,999.00 $519,000.00 $557,700.00 $659,950.00 $698,888.00