Utility Commission Report
December 2024
Reporting period October 2024
RIALTO
CUSTOMER SERVICE & REVENUE
MONTHLY OPERATIONS REPORT
Reporting Period:
October 2024
Prepared for: Rialto Water Services
Prepared by: Veolia Water West Operating Services
1 RIALTO WATER
MONTHLY OPERATIONS REPORT
Reporting Period:
October 2024
Prepared for: Rialto Water Services
Prepared by: Veolia Water West Operating Services
2 RIALTO WATER
OPERATIONS AND MAINTENANCE REPORT
Contents
I. EXECUTIVE SUMMARY 3
A. Water Production Totals 4
B. Static Water Levels 6
II. REGULATORY 7
A. Regulatory Submittals 7
B. Sample Site Location Results 9
C. Violations 11
D. Source Water Total Dissolved Solids (TDS) 11
III. HEALTH AND SAFETY 11
A. Monthly Safety Program Overview 11
IV. CHEMICAL USE 11
V. ELECTRICAL USE 12
VI. WATER QUALITY COMPLAINTS 12
VII. OPERATIONS UPDATE 12
A. Operational Wells 13
B. Valve Activity 13
C. Hydrant Flushing 13
D. Sanitary Survey 14
VIII. ASSET MANAGEMENT 14
A. Main Breaks, Service Leaks, Adverse Water Quality and Health/Safety Issues 14 B. Major Equipment and/or Machinery Outages 14
IX. RAINFALL TOTALS 15
3 RIALTO WATER
MONTHLY OPERATIONS REPORT
I. EXECUTIVE SUMMARY
Highlights of this month’s Water O&M report include the following:
• The water distribution network achieved compliance with all permit requirements.
• No sample anomalies that require secondary sampling.
• No significant issues with water availability. The purchasing of water remained consistent and daily equalization tanks levels remained at anticipated volume for customer availability.
• The Preventative Maintenance Program, as well as Valve Exercising, continues to identify areas of focus for our Routine Repair and Replacement.
4 A. Water Production Totals
Total water delivered into the Rialto system this month was 969.67 acre-feet. 652.93 acre-feet was delivered into the system from the groundwater wells (City 4A production is included in the well total). 183.24 acre-feet was delivered via the BLF transmission system (City 4A production has been deducted). 133.50 acre-feet came from the OPRTP.
DATE Chino 2 City 2 Rialto 3 Rialto 5 Miro 3 EW-1 City 4A BOOSTER 6-9 Cactus 1 OPRTP 2 TOTAL3 10/1/24 0.00 4.59 0.00 0.00 4.69 8.07 8.41 2.92 8.84 0.30 29.41 10/2/24 0.00 4.46 0.00 0.00 4.33 6.33 2.57 6.06 1.32 4.28 26.78 10/3/24 0.00 4.38 0.00 0.00 4.05 5.79 0.00 7.53 4.48 4.42 30.65 10/4/24 0.00 6.01 0.00 0.00 4.60 5.61 7.74 5.05 4.59 4.22 30.08 10/5/24 5.28 1.50 0.00 0.00 4.15 4.64 5.18 8.59 7.99 5.12 37.28 10/6/24 5.21 0.00 0.00 0.00 4.96 7.17 0.87 5.49 3.88 4.64 31.35 10/7/24 4.64 0.82 0.00 0.00 3.77 6.25 3.30 6.13 5.74 4.13 31.48 10/8/24 4.36 2.69 0.00 0.00 4.51 5.56 0.00 4.84 4.98 4.42 31.35 10/9/24 5.21 3.63 0.00 0.00 4.47 6.08 0.44 4.11 4.71 4.53 32.75 10/10/24 4.96 1.52 0.00 0.00 4.59 5.98 2.16 4.61 5.72 4.65 32.03 10/11/24 5.46 2.91 0.00 0.00 4.08 6.08 0.85 0.64 6.38 3.94 29.49 10/12/24 4.96 2.53 0.00 0.00 4.45 5.63 8.47 8.91 5.88 5.68 38.04 10/13/24 5.76 1.26 0.00 0.00 4.57 6.04 5.60 8.86 0.46 3.86 30.82 10/14/24 4.82 2.48 0.00 0.00 4.55 6.10 0.00 6.36 1.08 4.27 29.66 10/15/24 5.03 7.95 0.00 0.00 3.92 6.19 0.00 0.02 4.52 4.43 32.06 10/16/24 4.96 0.52 0.00 0.00 4.39 5.29 0.23 3.31 3.81 4.45 26.74 10/17/24 4.43 4.24 0.00 0.00 4.64 5.88 0.22 0.00 5.28 4.62 29.10 10/18/24 5.39 1.01 0.00 0.00 2.67 7.89 8.43 10.51 4.84 5.12 37.43 10/19/24 5.83 0.00 0.00 0.00 3.81 4.12 7.11 0.00 7.16 0.00 20.92 10/20/24 5.74 0.00 0.00 0.00 4.16 5.73 7.90 11.59 4.22 9.01 40.45 10/21/24 4.50 1.50 0.00 0.00 3.71 6.23 6.75 6.86 6.04 4.13 32.97 10/22/24 4.66 0.00 0.00 0.00 3.94 5.57 9.36 7.46 4.68 5.05 31.35 10/23/24 4.82 0.00 0.00 0.00 4.32 5.83 6.91 8.93 5.58 3.41 32.89 10/24/24 4.87 0.32 0.00 0.00 3.89 6.34 8.49 7.14 5.37 4.65 32.57 10/25/24 5.49 5.47 0.00 0.00 3.90 5.81 0.00 0.00 4.06 4.23 28.96 10/26/24 5.67 5.18 0.00 0.00 3.88 5.76 0.00 0.00 5.65 4.74 30.89 10/27/24 4.64 5.28 0.00 0.00 4.18 5.79 0.00 1.12 4.04 5.47 30.52 10/28/24 5.51 4.15 0.00 0.00 3.71 6.10 1.72 2.43 4.68 3.20 29.78 10/29/24 4.80 4.91 0.00 0.00 3.14 7.00 3.34 3.98 3.03 3.45 30.31 10/30/24 4.77 5.42 0.00 0.00 4.41 4.58 0.00 0.00 3.54 5.77 28.49 10/31/24 4.72 6.30 0.00 0.00 3.63 11.82 0.00 0.00 3.30 3.31 33.08 TOTAL 136.49 91.03 0.00 0.00 128.07 191.29 106.05 143.45 145.85 133.50 969.67 MIN 0.00 0.00 0.00 0.00 2.67 4.12 0.00 0.00 0.46 0.00 20.92 MAX 5.83 7.95 0.00 0.00 4.96 11.82 9.36 11.59 8.84 9.01 40.45 AVE 4.40 2.94 0.00 0.00 4.13 6.17 3.42 4.63 4.70 4.31 31.28 OCTOBER 2024 DAILY PRODUCTION TOTALS IN ACRE FEET
Delivered Via BLF
Purchased
1 Measured at point of connection at Cactus Reservoir site including production from City 4A. Amount may vary compared to billing. 2 Measured at point of connection at Cedar Reservoir site. Amount may vary as compared to billing. 3 City 4A is not included in total. It has been accounted for in the Purchased total. 5 OCTOBER 2024 DAILY BOOSTER TOTALS IN ACRE FEET
DATE
Booster
1 Booster 2 Booster 3 Booster 4 Booster 5 Booster 6-9 Booster 10 Booster 11 10/1/24 0.00 0.00 3.67 0.00 0.00 2.92 0.00 0.00
10/2/24 0.00 0.00 1.92 0.00 0.01 6.06 0.00 0.00
10/3/24 0.00 0.00 2.99 0.00 0.00 7.53 0.00 0.00
10/4/24 0.00 0.00 3.27 0.00 0.00 5.05 0.00 0.00
10/5/24 0.00 0.00 3.79 0.00 1.72 8.59 0.00 0.00
10/6/24 0.00 0.00 2.49 0.00 0.00 5.49 0.00 0.00
10/7/24 0.00 0.00 2.69 0.00 0.00 6.13 0.00 0.00
10/8/24 0.00 0.00 3.25 0.00 0.00 4.84 0.00 0.00
10/9/24 0.00 0.00 3.85 0.00 0.00 4.11 0.00 0.00
10/10/24 0.00 0.00 3.19 0.00 0.00 4.61 0.00 0.00
10/11/24 0.00 0.00 1.15 0.00 1.33 0.64 0.00 0.00
10/12/24 0.00 0.00 3.23 0.00 3.84 8.91 0.00 0.00
10/13/24 0.00 0.00 2.30 0.00 0.19 8.86 0.00 0.00
10/14/24 0.00 0.00 1.57 0.00 0.00 6.36 0.00 0.00
10/15/24 0.00 0.00 4.20 0.00 0.00 0.02 0.00 0.00
10/16/24 0.00 0.00 1.43 0.00 0.00 3.31 0.00 0.00
10/17/24 0.00 0.00 3.29 0.00 0.00 0.00 0.00 0.00
10/18/24 0.00 0.00 5.66 0.00 0.00 10.51 0.00 0.00
10/19/24 0.00 0.00 0.00 0.00 2.33 0.00 0.00 0.00
10/20/24 0.00 0.00 7.74 0.00 0.00 11.59 0.00 0.00
10/21/24 0.00 0.00 3.82 0.00 0.00 6.86 0.00 0.00
10/22/24 0.00 0.00 4.37 0.00 0.00 7.46 0.00 0.00
10/23/24 0.00 0.00 3.45 0.00 0.00 8.93 0.00 0.00
10/24/24 0.00 0.00 2.95 0.00 0.00 7.14 0.00 0.00
10/25/24 0.00 0.00 3.12 0.00 0.00 0.00 0.00 0.00
10/26/24 0.00 0.00 4.79 0.00 0.00 0.00 0.00 0.00
10/27/24 0.00 0.00 3.68 0.00 0.00 1.12 0.00 0.00
10/28/24 0.00 0.00 2.27 0.00 0.00 2.43 0.00 0.00
10/29/24 0.00 0.00 4.20 0.00 0.00 3.98 0.00 0.00
10/30/24 0.00 0.00 4.21 0.00 0.00 0.00 0.00 0.00
10/31/24 0.00 0.00 2.94 0.00 0.00 0.00 0.00 0.00
TOTAL 0.00 0.00 101.48 0.00 9.42 143.45 0.00 0.00
MIN 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
MAX 0.00 0.00 7.74 0.00 3.84 11.59 0.00 0.00
AVE 0.00 0.00 3.27 0.00 0.30 4.63 0.00 0.00
6 B. Static Water Levels
All City of Rialto wells are sounded each month, both active and inactive well sites.
Depth-to-water is measured from the well head to the static water surface.
Increases in depth-to-water represent a decrease in static water level.
Depth to Water
Wells Depth to
Pump
Historical Maximum
Depth to Water Oct Nov Dec Feb Mar Apr May Jun Jul Aug Sept Oct Chino # 1 (580 ft) In-
active well 429' 423' 416' 411' 411' 420' 417' 411' 414' 414' 412' 411' 411' Chino # 2 (550 ft) 369' 369' 344' 344' 345' 342' 346' 354' 347' 352' 347' 347' 343' City # 1 (260 ft) 392' 243' 247' 247' 247' 247' 164' 158' 158' 151' 150' 247' 247' City # 2 (480 ft) 402' 212' 212' 212' 210' 171' 182' 164' 164' 164' 171' 210' 137' City # 3 (525 ft) Out
of Service 505' 456' 456' 451' 429' 450' 423' 423' 423' 418 417' 416' 416' City # 4A (528 ft) 406' 368' 374' 375' 376' 361' 373' 373' 374' 380' 379' 380' 380' City # 5 (385 ft) In-
active well 364' 364' 360' 358' 340' 339' 340' 339' 335' 333' 334' 332' 322' Rialto # 1 (650 ft) In-
active well 588' 574' 574' 581' 553' 564' 569' 569' 571' 571' 571' 571' 553' Rialto # 2 (550 ft) In-
active well 502' 498' 500' 501' 499' 500' 500' 500' 501' 500' 501' 502' 501' Rialto # 3 (509 ft) 478' 474' 474' 474' 474' 475' 474' 475' 474' 477' 477' 473' 476' Rialto # 4 (450 ft) In-
active well 418' 414' 415' 415' 416' 415' 415' 415' 415' 416' 415' 418' 418' Rialto # 5 (560 ft) 386' 380' 382' 383' 385' 385' 386' 386' 386' 386' 385' 384' 384' Rialto Well # 7 In-
active well 362' 362' 362' 362' 362' 361' 362' 362' 361' 361' 362' 362' 362' Miro # 3 (563 ft) 492' 487' 489' 487' 485' 486' 487' 488' 487' 489' 487' 485' 485' EW-1 (780 ft) 476' 476' 476' 476' 474' 475' 476' 476' 473' 474' 475' 474' 473' January 2024 the sounder was out of service.
7 II. REGULATORY
All State of California and public health agency regulatory requirements were met.
A. Regulatory Submittals
• Monthly Summary of Distribution System Coliform Monitoring • NPDES Discharge Letter
• Conservation SAFER Report
Sample Test Result Standards
Type of Sampling Units of
Measure
Detectable Limit for
Reporting
Maximum Contaminant
Level
Total Coliform A -- --
E. Coli A -- --
Nitrate as N mg/L 0.20 10
Perchlorate (CLO4) μg/L 1.0 6.0
Total Dissolved Solids mg/L -- 500
Perfluorooctanoic (PFOA) ng/L 2.0 4
Perfluorooctanesulfonic
(PFOS)
ng/L 2.0 4
1,2,3-TCP μg/L 0.0050 0.005
Hexavalent Chromium μg/L 0.10 10
P= Present
A= Absent
mg/L = parts per million
μg/L = parts per billion
ng/L = parts per trillion
Sample Date Sample Site Location Results
10/18/2024
Type of Sampling Chino
2 City 2 City
4A
Rialto
3 Rialto
5 Miro
3 EW-1
BLF
Cactus
BLF 6-
9 OPRT
P
Total Coliform A A A A A A A A A A
E. Coli A A A A A A A A A A
Nitrate as N 3.2
Perchlorate (CLO4) 1.6* 1.7* <1.0 9.2* 140*
Total Dissolved Solids 230 200 320 230 240 230 230 340 320 220 Perfluorooctanoic (PFOA) <2.0
Perfluorooctanesulfonic
(PFOS) <2.0
1,2,3-TCP <0.0050 <0.0050 <0.0050 <0.0050
Hexavalent Chromium 2.8 0.97 0.58 1.7 0.96 1.2 1.2 1.4 1.4 0.16 8 *Sample is from the well head so it is before disinfection & treatment. Treatment is performed before it goes into the distribution system. Water going into the distribution system is <1.0 (non-detect).
Sample Date
10/10/2024 Sample Site Location Results
Type of Sampling 749 E
Holly
978 N
Driftwood
1228 W
Merrill
101 E
Valley
BLF Cactus
Reservoir OPRTP
Trihalomethanes
Bromodichloromethane 2.3
Bromoform <1.0
Chloroform
(Trichloromethane) 2.6
Dibromochloromethane 1.8
Total Trihalomethanes
(TTHM) 6.7
Haloacetic Acid
Monochlorcetic Acid <1.0
Dichloracetic Acid 1.0
Trichloroacetic Acid <1.0
Monobromoacetic Acid <2.0
Dibromoacetic Acid <1.0
Total Haloacetic Acids
(HAA5) 1.0
9 B. Sample Site Location Results
Rialto Distribution Sample Results
October 2024
Sample Location Free Cl Res (Field) Total Coliform E. Coli Apparent Color Odor Threshold Turbidity CYCLE 1 - 10/08/24 mg/l P/A P/A Color Units TON NTU
335 W. Rialto 1.18 A A
1228 W. Merrill 1.13 A A
256 N. Fillmore 1.22 A A
987 W. Grove 1.25 A A
978 N. Driftwood 1.25 A A
1451 N. Linden 1.14 A A
469 W. Jackson 1.10 A A
935 E. Mariposa 1.12 A A
1000 N. Joyce 1.08 A A
766 N. Chestnut 1.12 A A
149 W. Victoria 1.11 A A
313 E. McKinley 1.10 A A
609 E. South 1.13 A A
273 E. Alru 1.05 A A
1161 S. Lilac 1.09 A A
101 E. Valley 1.02 A A
CYCLE 2 - 10/15/24 mg/l P/A P/A Color Units TON NTU
210 N. Park 1.10 A A
101 S. Larch 1.10 A A
320 N. Wisteria 1.20 A A
861 W. Grove 1.20 A A
1168 N. Glenwood 1.10 A A
1320 N. Fitzgerald 1.10 A A
860 N. Willow 1.30 A A
209 E. Cornell 1.30 A A
643 E. Margarita 1.20 A A
1170 N. Terrace Rd. 1.00 A A
681 E. Erwin 1.10 A A
402 E. Merrill 1.10 A A
261 W. Wilson 1.00 A A
532 S. Iris 0.90 A A
281 W. Hawthorne 1.00 A A
379 W. Valley 0.80 A A
10 Rialto Distribution Sample Results
October 2024
Sample Location
Free Cl Res
(Field)
Total
Coliform
E.
Coli
Apparent
Color
Odor
Threshold Turbidity
CYCLE 3 - 10/22/24 mg/l P/A P/A Color Units TON NTU
236 N. Willow 1.31 A A
775 E. Foothill 0.76 A A
878 N. Primrose 1.30 A A
369 E. Van Koevering 1.13 A A
274 W. Valencia 1.08 A A
1566 N. Fillmore 1.18 A A
932 N. Idyllwild 1.27 A A
644 N. Smoketree 1.27 A A
605 W. Rosewood 1.18 A A
1189 W. Second 1.33 A A
775 W. Rialto 1.23 A A
211 E. Wilson 1.04 A A
595 E. Huff 0.98 A A
1005 S. Riverside 1.06 A A
794 S. Verde 1.10 A A
1055 W. Bloomington 0.99 A A
CYCLE 4 - 10/30/24 mg/l P/A P/A Color Units TON NTU
375 S. Cactus 0.86 A A <3.0 1 <0.10
101 S. Linden 1.08 A A <3.0 1 0.44
234 N. Larch 1.06 A A <3.0 1 0.47
575 N. Driftwood 1.07 A A <3.0 1 0.14
1355 W. Shamrock 0.97 A A <3.0 1 <0.10
992 N. Yucca 1.16 A A <3.0 1 1.00
481 W. Cornell 1.00 A A <3.0 1 0.14
158. E. Shamrock 1.10 A A <3.0 1 <0.10
749 E. Holly 1.07 A A <3.0 1 <0.10
545 E. Victoria 1.10 A A <3.0 1 <0.10
200 N. Sycamore 0.88 A A <3.0 1 0.26
407 E. Allen 1.05 A A <3.0 1 0.16
399 E. Montrose 0.91 A A <3.0 1 <0.10
856 S. Orange 1.11 A A 5.0 1 <0.10
911 S. Cactus 0.90 A A <3.0 1 <0.10
220 W. Valley 0.98 A A <3.0 1 <0.10
P/A + Present or
Absent
11 C. Violations
No violations were received during this reporting period.
D. Source Water Total Dissolved Solids (TDS)
Veolia has a goal of maintaining an acceptable blended TDS level between all its sources. This goal is achieved by shifting production to or from the lowest TDS wells or purchased low TDS water while adhering to the overall water supply strategy and meetin g system demands. The TDS was 2 56 mg/L for the month of October as compared to 2 39 mg/L in September . The TDS levels are below the secondary maximum contaminant level requirements.
III. HEALTH AND SAFETY
A. Monthly Safety Program Overview
Category Monthly Statistic
Safety Training Topics
Confined Space Authorized Entrant,
Attendant , Supervisor-Operations
Level Refresher
Work Zone Safety and Flagger-TTCZ
Fire Prevention Plan
Lost Time Incidents, count* 0
Recordable Incidents, count 0
Near Miss Incidents, count 15
Vehicle Incidents, count 0
*A lost time incident has not occurred in the past 4036 days.
IV. CHEMICAL USE
Sodium hypochlorite is the only chemical added to the water system. A total of 2822 gallons of sodium hypochlorite was used in October as compared to 3040 gallons used in September.
12 V. ELECTRICAL USE
Southern California Edison (SCE) has not provided all the data for October 2024. We will provide the data as it is received, thus will include yearly usage received to date.
SCE kWh
Year Month
Billed
Usage
2023 October 531,770
2023 November 564,667
2023 December 373,789
2024 January 208,007
2024 February 186,792
2024 March 421,268
2024 April 463,324
2024 May 428,050
2024 June 629,344
2024 July 550,202
2024 August 650,431
2024 September 562,739
VI. WATER QUALITY COMPLAINTS
No complaints were received during this reporting period.
VII. OPERATIONS UPDATE
The overall operational strategy is to meet the daily water demand. The City of Rialto water system has six operational wells, one of which is owned by the County of San Bernardino and operated by Veolia; Oliver P. Roemer Treatment Plant (OPRTP), which is jointly owned by the City (25%) and West Valley Water District (WVWD); purchased water through the Baseline Feeder (BLF) system from San Bernardino Valley Municipal Water District (SBVMWD); and, if required to meet demand, additional water can be supplied by the City of San Bernardino (CSB) through the BLF for emergency supply only with no guarantee of actual delivery. Water produced from City Well 4A discharges into the BLF and its production is included in deliveries from that shared transmission line when City Well 4A is in service.
13 The overall pumping strategy is based on adjudicated rights, well availability, remediation requirements, and quality of source, cost to operate, and varying weather conditions. TDS effluent concentrations for the City of Ria lto WWTP are taken into consideration when operating the facilities and water sources.
A. Operational Wells
All wells were operational.
B. Valve Activity
On the basis of information collected in 2019, Veolia now has a baseline assessment of all valves and has initiated a new cycle of valve exercising . 114 valves were exercised for the month of October.
Valve Turning Progress
Valves
Turned
2020 530
2021 340
2022 463
2023 750
2024 312
C. Hydrant Flushing
There are 63 hydrant/dead ends that are flushed annually to maintain water quality. Six flushings were performed in October.
Hydrant/Dead End Flushing
Progress
2024
January 0
February 3
March 9
April 0
May 5
June 0
July 5
August 20
September 0
October 6
Total 48
14 Progress % (76)
D. Sanitary Survey
The last sanitary survey was completed by the Department of Drinking Water (DDW) in 2015. Veolia has reviewed all the regulatory conditions required and is prepared for the sanitary survey. DDW performed field site visit s on May 22 and August 22, 2024. The results of the sanitary survey were received on September 19, 2024. Veolia will reach out to DDW regarding the minor deficiencies.
VIII. ASSET MANAGEMENT
The following work orders were completed for the month of October:
• Preventive Maintenance –10
• Corrective Maintenance –0
• Predictive Maintenance –0
124– PMs planned for November 2024
A. Main Breaks, Service Leaks, Adverse Water Quality and Health/Safety Issues
Corrective Work Order labor hours were dedicated to four pipe line repairs.
B. Major Equipment and/or Machinery Outages
All wells were operational.
15 IX. RAINFALL TOTALS
Table of Contents
I. CUSTOMER SERVICE SUMMARY............................................................................................. 3 II. CALL CENTER PERFORMANCE ................................................................................................. 3 III. AUTOMATED SERVICES ........................................................................................................... 3 IV. CONSUMPTION & BILLING ...................................................................................................... 4 A. Consumption .................................................................................................................... 4 B. Billing ................................................................................................................................ 4 V. REVENUE & AGING .................................................................................................................. 5 A. Revenue ........................................................................................................................... 5 B. Aging ................................................................................................................................ 6 C. Bad Debt........................................................................................................................... 6 VI. SERVICE ORDERS ..................................................................................................................... 7 VII. OTHER ACTIVITIES ................................................................................................................... 7 VIII. REVENUE REPORT ................................................................................................................... 7 A. Revenue Summary ........................................................................................................... 7 B. Non Rate Revenue - Extraterritorial Customers ............................................................. 7 C. Non-Rate Revenue – Other ............................................................................................. 8 D. Development Impact Fees ............................................................................................... 8 E. Rialto Basin Water Rights and Leasing ........................................................................... 8 F. Cash Collections by Payment Method – Rialto Water Services ..................................... 9 G. Payment Collection Method – Fiscal Year to Date ....................................................... 10 H. Cash Collections on Behalf of the City of Rialto-Prior Year Comparison ..................... 10 I. Non-Rate Revenue + Utility Revenue Collections Prior Year Comparison .................. 10 J. Non-Rate Revenue + Utility Revenue Collected Fiscal Year-to-Date ........................... 11 K. Increase in Cash Collections and Fund Distribution—Prior Year Comparison ............ 11 L. Non-Rate and Extraterritorial Customer Accounts Receivable Aging ......................... 12
3 I. CUSTOMER SERVICE SUMMARY
During this reporting month, the Customer Service team provided call service level of 91%.
Out of 1,310 inbound calls answered, 1,193 were answered within the first 30 seconds.
Water consumption has decreased by 30.1% when compared against previous month.
When compared against last year, consumption has increased by 10.5%.
Sewer revenue has decreased by 3.8% compared to the prior month and increased by 2.3% from last year.
II. CALL CENTER PERFORMANCE
During this reporting month, service level was 91% with 1,193 out of 1,310 being answered within the first 30 seconds. Overall average wait time was twenty-one (21) seconds.
III. AUTOMATED SERVICES
About 12,414 or 55% of the rate payers have created log-ins to access their accounts online. Of these customers, with online access, 47.1% have chosen the e-bill option. This e-bill participation is 8.7% increase from October of the prior year.
79.0% 78.6%
88.7%
80.1% 81.3% 80.0% 83.0% 80.0% 77.3%
82.3% 81.4%
87.6% 91.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
0 200
400
600
800
1,000
1,200
1,400
1,600
1,800
Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Answer in 30 Sec 1,243 1,167 1,182 1,286 1,128 1,148 1,343 1,327 1,267 1,275 1,146 1,030 1,193 Calls Answered 1,579 1,484 1,335 1,595 1,386 1,435 1,617 1,659 1,639 1,549 1,406 1,176 1,310 Service Level 79.0% 78.6% 88.7% 80.1% 81.3% 80.0% 83.0% 80.0% 77.3% 82.3% 81.4% 87.6% 91.0% Call Center Performance
Answer in 30 Sec Calls Answered Service Level
Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Number of Bills 22,062 22,106 22,161 22,204 22,246 22,202 22,369 22,331 22,372 22,410 22,425 22,470 22,541 Number of Bill Adjustments (during billing) 8 9 5 15 18 10 12 16 10 11 9 5 11 Automated Over the Phone Payments 2,809 2,597 2,340 2,700 2,539 2,539 2,592 2,382 2,058 2,250 2,310 2,050 2,483 Online Payment 9,615 8,624 7,466 10,027 8,553 7,756 9,888 9,126 7,457 9,828 9,302 7,538 9,302 E-bill Participants 5,383 5,896 5,451 5,497 5,534 5,564 5,610 5,654 5,683 5,731 5,770 5,814 5,855 Auto Pay Participants (New Portal) 3,863 3,896 3,927 3,984 4,007 4,054 4,082 4,129 4,165 4,221 4,273 4,278 4,305 PayNearMe 122 134 107 128 100 115 118 111 88 114 118 92 95
4 IV. CONSUMPTION & BILLING
A. Consumption
Water consumption has decreased by 30.1% when compared against previous month.
When compared against last year, consumption has increased by 10.5%. This decrease in water consumption is due to the number of days between the reads (27 versus 35 days).
Water consumption was high during the previous month.
B. Billing
A total of 22,541 bills were mailed or sent out electronically in October. Billing accuracy was 99.95% with eleven (11) requiring adjustments.
January Feburary March April May June July August September October November December 2022Water 241,287 223,032 223,207 297,841 288,124 276,657 403,710 311,061 350,061 359,392 236,515 202,786 2023 Water 228,173 155,716 166,787 182,460 204,254 261,868 356,836 339,778 378,728 282,726 276,127 306,012 2024 Water 206,431 180,655 200,494 182,612 212,666 337,500 324,399 361,294 446,508 312,312 0 50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
500,000
HCF
Billed Consumption Yearly Comparison Water
January February March April May June July August September October November December 2022 Sewer 59,626 56,153 56,754 63,960 62,590 60,787 71,216 63,689 64,640 72,132 61,563 56,435 2023 Sewer 58,591 49,302 49,159 63,252 52,718 57,019 65,743 60,617 68,539 65,798 63,762 66,131 2024 Sewer 55,865 50,136 60,877 55,837 54,976 64,339 64,897 68,143 79,931 67,254 0 10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
HCF (hundred cubic feet)
Billed Consumption Yearly Comparison Sewer
(Commercial Only)
5 V. REVENUE & AGING
A. Revenue
Water revenue has decreased 22.5% when compared against the prior month and increased 6.5% when compared against previous year. Sewer revenue has decreased by 3.8% compared to the prior month and increased by 2.3% from last year. Please consider that revenue from water consumption is smaller than monthly water base charges.
January Feburary March April May June July August September October November December 2022 Water Sales $977,094.0 $945,326.0 $941,885.0 $1,122,653 $1,097,343 $1,070,723 $1,386,351 $1,093,082 $1,263,192 $1,289,719 $978,498.0 $895,232.0 2023 Water Sales $962,367.0 $787,207.0 $813,577.0 $841,086.0 $901,604.0 $1,044,220 $1,266,316 $1,227,744 $1,331,376 $1,098,822 $1,081,741 $1,155,329 2024 Water Sales $912,498.0 $852,016.0 $881,079.0 $864,955.0 $930,910.0 $1,229,951 $1,194,468 $1,291,723 $1,510,717 $1,170,740 $-
$200,000.00
$400,000.00
$600,000.00
$800,000.00
$1,000,000.00
$1,200,000.00
$1,400,000.00
$1,600,000.00
Dollars ($)
Annual Water Sales Comparison
January Feburary March April May June July August September October November December 2022Sewer Sales $2,176,173. $2,152,801. $2,155,275. $2,210,259. $2,199,196. $2,185,623. $2,263,950. $2,207,417. $2,217,989. $2,277,957. $2,200,351. $2,154,640. 2023 Sewer Sales $2,184,085. $2,111,381. $2,110,125. $2,219,973. $2,142,863. $2,172,890. $2,243,741. $2,202,859. $2,264,521. $2,243,821. $2,233,990. $2,260,801. 2024 Sewer Sales $2,158,668. $2,147,783. $2,229,038. $2,190,195. $2,186,025. $2,260,077. $2,264,418. $2,288,863. $2,385,936. $2,295,859. $1,950,000.00
$2,000,000.00
$2,050,000.00
$2,100,000.00
$2,150,000.00
$2,200,000.00
$2,250,000.00
$2,300,000.00
$2,350,000.00
$2,400,000.00
$2,450,000.00
Dollars ($)
Annual Sewer Sales
6 B. Aging
The total aging balance has decreased by 7.9%, see first table below. For balances >30-days only, water has increased 25.9% and wastewater has increased by 19.1%.
C. Bad Debt
18 (eighteen) accounts were sent to collections for a total amount of $3,845.55.
These collections arise when renter or property owner move out without paying their bills.
$0.00
$500,000.00
$1,000,000.00
$1,500,000.00
$2,000,000.00
$2,500,000.00
$3,000,000.00
$3,500,000.00
$4,000,000.00
Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Aging Balances in Dollars ($)
Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Water $1,627,857.7 $1,594,227.9 $1,918,367.4 $1,583,224.6 $1,512,983.1 $1,321,331.7 $1,211,293.3 $930,266.74 $1,300,485.7 $1,346,722.0 $1,087,642.2 $1,343,665.0 $1,143,400.0 $3,027,860.0 $3,077,678.7 $3,446,778.2 $3,110,425.9 $3,169,474.9 $3,439,882.8 $3,264,892.1 $2,773,989.3 $3,162,401.4 $2,151,944.5 $1,998,417.9 $2,352,406.8 $2,261,553.6 Historical Aging Totals
Water and Sewer
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
$1,800
Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Thousands
Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Water $801,136 $835,942 $902,711 $914,025 $904,091 $607,369 $578,885 $372,213 $397,106 $462,301 $336,164 $306,205 $385,519 Sewer $1,362,243 $1,528,013 $1,527,204 $1,544,321 $1,684,218 $1,657,300 $1,691,203 $1,393,952 $1,436,216 $496,224 $610,308 $638,310 $759,956 Aging Balances Over 30 Days Water and Sewer
(April 2021 forward contains both consumption and meter charges)
7 VI. SERVICE ORDERS
389 service orders were initiated by the customer service team during the reporting month. Of this total, 83 service orders or 21.3% were due to occupant changes. 205 service orders were initiated to accommodate water disconnection for non-payment and reconnection of water services when customer set up (or reinstate) a payment arrangement with down payment.
VII. OTHER ACTIVITIES
Number of physical disconnection has increased to about 20-30 accounts per week. This number is similar to quantities prior to Covid-19 pandemic.
VIII. REVENUE REPORT
A. Revenue Summary
Cash Revenue is compiled and reconciled to the merchant account on a daily basis. Cash receipts and deposits are made daily and internal controls are reviewed regularly to ensure safeguarding of assets and proper recording of all transactions. Total revenue collected in October 2024 is $4,332,000 Non-Rate Revenue is $ 262,000; Utility Reven ue is $ 3,787,000 and Tax / Ambulance Revenue at $283,000.
RWS collects Utility User Taxes and Ambulance Fees on behalf of the City of Rialto. The Utility User Tax (UUT) rates are based on the total billed amount, therefore the collection fluctuates as billed amounts change. The total UUT charges collected in October 2024 and October 2023 are $ 278,000 and $ 256,000 respectively. Ambulance Revenue is also collected on behalf of the City of Rialto totaling $ 5,000 in October 2024 and $5 ,000 in October 2023.
B. Non Rate Revenue - Extraterritorial Customers
RWS bills the City of Fontana $123,000 each month for extraterritorial sewer usage.
Colton Unified School District is in agreement with RWS to pay $5 ,000 monthly for sewage connections based on enrollment rates provided each school year.
An extraterritorial agreement to provide sewer service was executed between the City of Rialto and the County of San Bernardino —County Service Area 70, Zone BL (Bloomington).
This housing development project generates extrate rritorial sewer service revenue of $19,000 per month.
8 The City has an agreement with Social Science Services dba Cedar House Life Change Center to provide extraterritorial sewer service providing sewer revenue of about $8,000 each month.
C. Non-Rate Revenue – Other
Other revenue is generated by leasing space for cell towers to AT&T, which has two leases at $2,073 and $1,500. Sprint lease is at a currently contracted rate of $1,700 each month.
Vertical Bridge also provides $2,400 a month of cell tower generated Revenue.
Rialto Bioenergy Facilities subleased a City property for $10,500 a month.
The City and San Bernardino Valley Municipal Water District have entered into a Brine Line Capacity Agreement on October 23, 2021. This agreement pertains to the use of its interest in the SARI Line and discharge of certain brine waste to the SARI Line exclusively from the operation of Rialto Bioenergy Facilities within the City’s boundaries. The revenue generated in this agreement consists of quarterly rent of $37,500 along with the Fixed Pipeline Capacity Fee of $3,300 per month and Fixed Treatment Plant Capacity Fee of $3,300 per month. In addition, a variable fee of any discharge costs are also billed.
The San Bernardino Valley Water District (SBVWD) reimburses RWS for water conservation programs provided to customers. A quarterly bill is delivered directly by the City.
D. Development Impact Fees
Development Impact Fees (“DIF”) are paid to the City of Rialto as various developments are completed in the City. As such, the City of Rialto receives monies from the various developments, which is then distributed to RWS. There was no DIF payment received in October of 2024.
E. Rialto Basin Water Rights and Leasing
A Standby Water Lease Agreement between Fontana Union Water Company and City of Rialto is in effect. For the Water 202 3-2024 Water Year, San Bernardino County is to pay City of Rialto a total of $332,624 for Standby Charges and Production Charges.
In addition, the County is also billed annually for Rialto Well #3’s summertime electricity costs based on peak usage.
9 F. Cash Collections by Payment Method – Rialto Water Services
Transaction Counts for Carrier Deposits, Remote Deposits, UB Bill Conc Service (EBOX), and Lockbox Deposits reflect number of batches deposited to the bank. Transaction counts for credit card POS, IVR, and Pay- Near-Me transactions are per number of customer payments. IVR payments are received and process by Paymentus on the day the transactions are made. General ledger are posted and accounted for the following day the payments are processed.
Payment Method Description
Transaction
Count OCTOBER 2024 %
Carrier Deposits Cash deposits prepared per day for transport to US Bank 23 121,951$ 2.90%
Remote Check
Deposits
Scanned batches of checks payments made at the
customer service counter 23 394,629 9.40% EBOX Batches of electronic customer payments posted to
customer accounts at US Bank. 22 349,088 8.32%
PAYMENTUS - IVR /
Paymentus / Walk-in
Credit Card payment
Customer payments by credit cards and ACH /
eCheck payments through an Interactive Voice
Response system using a touchtone phone.
Payments originated from Merchant online service 12,773 2,034,573 48.46% Lockbox Deposits Batches of customer payments mailed in to US Bank's lockbox. 22 1,285,860 30.63% Pay Near Me Cash payment service that allows customers to pay at a local 7-Eleven, CVS, or Family Dollar stores. 96 11,968 0.29% Total Revenue per
Bank 4,198,068$ 100%
Recon to RUA Recap:
Adj detailed in RUA 133,924
Prior mo. Correction
RUA increase in Cash 4,331,992$
10 G. Payment Collection Method – Fiscal Year to Date
H. Cash Collections on Behalf of the City of Rialto-Prior Year Comparison
I. Non-Rate Revenue + Utility Revenue Collections Prior Year Comparison
Jul 2024 Aug 2024 Sept 2024 Oct 2024 TOTAL %
Cash Deposits 122,310$ 116,600$ 111,287$ 121,951$ 472,148$ 2.95% Remote Check Deposits 227,143 953,011 383,642 394,629 1,958,424$ 12.22% EBOX 334,259 346,067 289,347 349,088 1,318,760$ 8.23% Paymentus, IVR, Credit Cards 1,827,817 1,855,221 1,688,345 2,034,573 7,405,956$ 46.21% Lockbox Deposits 1,169,619 1,273,243 1,089,604 1,285,860 4,818,326$ 30.07% Pay Near Me 14,561 14,530 10,989 11,968 52,048$ 0.32% Total Revenue to Bank 3,695,709$ 4,558,672$ 3,573,214$ 4,198,068$ 16,025,663$ 100.00% NSF (7,962) (4,947) (8,970) (8,950) (30,829)$ Net deposits 3,687,747$ 4,553,726$ 3,564,244$ 4,189,118$ 15,994,835$ Oct 2024 Oct 2023 Variance
UUT Water 95,599$ 94,230$ 1,369$
UUT Sewer 182,153 161,923 20,230
Ambulance 5,369 5,520 (151)
Total 283,121$ 261,673$ 21,448$
Oct 2024 Oct 2023 Variance
Non-Rate / Extra Territorial
Revenue 262,152$ 236,088$ 26,065$
Utility Revenue 3,786,719$ 3,877,054$ (90,336)$
Total 4,048,871$ 4,113,142$ (64,271)$
11 J. Non-Rate Revenue + Utility Revenue Collected Fiscal Year-to-Date
K. Increase in Cash Collections and Fund Distribution—Prior Year Comparison
Jul 2024 Aug 2024 Sept 2024 Oct 2024 TOTAL
Non-Rate Revenue
Cell Tower Rent, Lease 5,647 19,985 21,506 66,161 113,298 Interest Income 19,290 9,559 - - 28,850
NRR-FOG - - - - - Municipal Water Sales - - - - - Extra Terr- Sewage 31,463 252,123 161,340 185,039 629,965 Abatement of Expenses - - - - - Water Meter Lost/Damaged/Repl 1,419 710 2,129 5,171 9,429 Misc Fees - New Occ, Same Day Svc 5,877 4,453 4,939 5,629 20,897 Miscellaneous Revenue - Sewer - - - - - NSF - 342 - 152 494 DIF - Wastewater Connection - - - - - Sewer Bad Debt Collection Fees - - - - - Sewer Cash Over/Short - - - - - Total Non-Rate Revenue 63,697$ 287,171$ 189,913$ 262,152$ 802,933$ Utility Revenue
Water Penalty 3,154 15,321 10,183 5,903 34,560 Sewer Penalty 5,200 33,061 18,283 7,639 64,182 Turf Removal, Hi-Eff Rebate (1,000) (100) - - (1,100) Senior Disc - Water - - - - - Senior Disc - Sewer - - - - - Water Contract - - - - - Water Deposits Paid - - - - - Water Deposits Billed 17,289 8,629 9,906 8,629 44,454 Hydrant Deposits 574 - - - 574 Sewer Deposits Paid - - - - - Sewer Deposits Billed 11,760 12,823 9,518 10,900 45,002 Water 1,171,886 1,540,256 1,194,449 1,386,681 5,293,272 Sewer 2,327,246 2,418,456 1,959,890 2,448,917 9,154,508 Unapplied Credits (101,077) (54,176) (140,916) (81,949) (378,119) Bad Debt Sewer 12,029 9,909 - - 21,939 Bad Debt Water - - - - - Tax Roll - Sewer 15,596 2,790 - - 18,386 Collection Agency - Water - - - - - Collection Agency - Sewer - - - - - Collection Agency - Misc Water - - - - - Total Utility Revenue 3,462,656$ 3,986,969$ 3,061,313$ 3,786,719$ 14,297,657$ Total Non-Rate + Utility Rev. 3,526,353 4,274,141 3,251,226 4,048,871 15,100,590 Increase to
Cash per CIS
Adjustments
Required to GL
Cash
Fund 660-Sewer Fund 670-Water Total Cash Per
GL
Adjustments To
Match RUA to
Bank
Cash/CC/Cks
Deposit To Bank
October 2024 4,331,992 9,167 2,801,808 1,521,016 4,331,992 (133,924) 4,198,068 October 2023 4,374,815 12,599 2,746,879 1,615,337 4,374,815 (73,199) 4,301,616
12 L. Non-Rate and Extraterritorial Customer Accounts Receivable Aging
AT&T The credit indicates annual payment of cell tower rent.
Social Science Service (Cedar House) is current with its obligations.
City of Fontana is current with its obligations.
Colton Unified School District is current with its obligations.
County of San Bernardino is current with its obligations.
Rialto Bioenergy Facilities has been contacted for payment of outstanding Invoices.
San Bernardino Co Waste System Division has been billed for the annual Standby Water Lease Agreement.
Vertical Bridge Holdco, LLC and Sprint: Vertical Bridge and Sprint have been contacted for open Invoices as well.
Name
Total as of
10/31/2024 Current 31-60 days 61-90 days >90 days
AT&T - Easton (9,794)$ (1,500) - - (8,294) Social Science Service - Cedar House - - - - - CITY OF FONTANA 123,847 123,847 - - - Colton Unified School District - - - - - County of San Bernardino-CSA 70 BL - - - - - Rialto BioEnergy Solutions 39,889 48,250 10,750 (1,179) (17,932) Sprint-Nextel SBA 2012 TC Assets 9,331 2,074 - - 7,258 San Bernardino Co Waste System Div. 332,624 332,624 - - - SB Valley Mun Water District - - - - - Vertical Bridge Holdco, LLC (CIG) 4,714 - - - 4,714 Grand Total 500,610$ 505,294$ 10,750$ (1,179)$ (14,256)$
RIALTO WASTEWATER
MONTHLY OPERATIONS REPORT
Reporting Period:
October 2024
Prepared for: - Rialto Water Services
Prepared by: - Veolia Water West Operating Services
RIALTO WASTEWATER
OPERATIONS AND MAINTENANCE REPORT
Contents
EXECUTIVE SUMMARY
1. Collection System / Customer Service Log
a. Collection System Activities
b. S.S.O. dates
c. Customer Service Call Outs
2. Wastewater Treatment Plant - Monthly Overview
a. Significant events during the month
3. Treatment Facility Performance / Laboratory Activities a. See attached Monthly Performance Summary
b. Summary of Notices and Laboratory Tests / Reports filed with government agencies c. Effluent Specifications Exceedance Discussion
4. Monthly Safety Program Overview
5. Biosolids, Chemicals, and Utilities
a. Monthly Biosolids Production
b. Monthly Chemical Consumption
c. Monthly Utilities Consumption
6. Odor Complaints / Actions Taken
7. Major Equipment and/or Machinery Outages
8. Outside Agency Activities during the Month
a. Government agency or property insurance inspections
b. Government agency environmental, health, or safety tests/monitoring c. Government agency notice of violation received
d. Government agency monitoring
e. Other matters of concern
9. Complaint Logs
TABLES
● Treatment Facility – Monthly Performance Summary
● Collection System- Monthly Pipe Cleaned
RIALTO WASTEWATER
MONTHLY OPERATIONS REPORT
EXECUTIVE SUMMARY
Highlights of this month’s Wastewater O&M report include the following:
● The treatment plant performed well and met all compliance parameters. ● There were zero residential calls for sewer collection issues.
1. Collection System/Customer Service Log
a. Collections group activities this month:
Category Current Month
Statistics
Prior Month Statistics 2024 Year to Date
Statistics
Sanitary sewers are cleaned using the
conventional method, including feet, which
includes “Hot spot cleaning.”
21,054 5,549 209,736
Sanitary sewers assessed using the SL-RAT
method, feet 11,876 375 23,908
CCTV Inspection, miles (26 is the annual goal)* 2.59 .67 23.78 Manhole Inspections 8 28 53
USA Dig Alert Markings, count 30 13 245
Residential call outs 0 2 30
Sanitary sewer overflows 0 0 6
b. S.S.O. dates: N/A
c. Customer Service Call Outs – See Item 9 for details.
2. Wastewater Treatment Plant – Monthly Overview
● NPDES discharge compliance parameters were achieved.
a. Significant events during the month were: None.
3. Treatment Facility Performance/Laboratory Activities
a. See the attached Table 1 Monthly Performance Summary.
b. Summary of Notices and Laboratory Tests/Reports filed with government agencies.
The monthly submittal of State/Federal discharge monitoring reports was completed promptly.
c. Effluent specification exceedance discussion
See Section 2 above. N/A
4. Monthly Safety Program Overview
Category Monthly Statistic
Safety Training Topics PPE, Hearing Conservation,
Respiratory Protection,
Excavation/Trenching,
Powered Industrial Truck
Lost Time Incidents count* 0
Recordable Incidents, count 0
Near Miss Incidents, count 9
Vehicle Incidents, count 0
*A lost time incident has not occurred since 9-3-2020, totaling 1,518 days.
5. Biosolids, Chemicals, and Utilities
a. Monthly Biosolids Production
Biosolids Current Month
Statistics
Prior Month Statistics 2024 Year-to-Date
Statistics
Wet Tons Produced 1,559.77 1,067.69 10,877.65
b. Monthly Chemical Consumption
Chemical Current Month
Gallons Used
Prior Month
Gallons Used
Sodium Hypochlorite, Tertiary Disinfection 25,215.3 26,573.7 Sodium Bisulfite, Discharge Dechlorination 10,408 9,408 Ferrous Chloride, Digester Gas Conditioning 3,458 3,885.5 Polymer, Gravity Belt Thickener 384 334
Polymer, Belt Filter Press 606 612
Alum, Tertiary Filters 2 1
c. Monthly Utilities Consumption
Utility Current Month Statistics Prior Month Statistics Electricity WWTP, KWH ** **
Electricity Lilac LS, KWH 707 870
Electricity Sycamore LS, KWH 492 513*
Electricity Ayala LS, KWH 7532 8038
Electricity Agua Mansa LS, KWH 4257 4389
Electricity Cactus LS, KWH 1310 1383
Electricity Ramrod LS, KWH 494 538
Frisbee Park LS, KWH 624 637
El Rancho Verde LS, KWH 1368 1370
Natural Gas WWTP, Therms 2684 2,818
* LS is in bypass mode, pending CIP completion
** SCE has not updated account access for the City.
6. Odor Complaints Received/Actions Taken
No odor complaints were received this month.
7. Major Equipment and/or Machinery Outages
● Sludge Holding Tank
● Aeration Basin #1 is currently offline.
● Gravity Belt Thickener #1
8. Outside Agency Activities during the Month
a. Government agency or property insurance inspections
None
b. Government agency environmental, health, or safety tests/monitoring Permit testing was completed for this month
c. Government agency notices of violation received
No notices were received.
d. Government agency monitoring
Routine monitoring reports were submitted.
e. Other matters of concern
None
9. Customer Service Callout Details Log
Date Address Comments Personnel Manhole To
Manhole
NA NA NA NA NA NA
Table 1 Summary
Table 2 Summary
Table 3 Summary
Monthly Sewer Line Cleaned