Bid Results for Project Baseline Storm Drain, 170700 (25‐042) Issued on 06/12/2025
Bid Due on July 31, 2025 2:00 PM (PDT)
Item
Number
Description Unit of
Measure Quantity
Mike Bubalo
Construction Co.,
Inc.
C.P. Construction
Co., Inc. Griffith Company Weka, Inc. Downing
Construction, Inc.
Leatherwood
Construction, Inc. Big Ben Inc.
Mladen Buntich
Construction
Company Inc.
Steve P. Rados, Inc.
1 Mobilization LS 1 $775,000.00 $500,000.00 $1,305,897.71 $643,719.00 $1,000,000.00 $1,200,000.00 $993,000.00 $1,100,000.00 $1,350,000.00 2 Temporary Traffic Control LS 1 $150,000.00 $400,000.00 $619,000.00 $250,000.00 $360,000.00 $864,000.00 $29,730.00 $700,000.00 $10,353,000.00 3 Water Pollution Control LS 1 $275,000.00 $30,000.00 $43,605.00 $140,000.00 $100,000.00 $10,000.00 $100,000.00 $250,000.00 $2,000,000.00 4 Mitigation Monitoring and Reporting Program LS 1 $100,000.00 $25,000.00 $16,903.00 $10,000.00 $90,000.00 $50,000.00 $40,000.00 $1.00 $10,000.00 5 Construction Surveying LS 1 $100,000.00 $85,000.00 $90,000.00 $50,000.00 $53,000.00 $235,000.00 $60,000.00 $150,000.00 $100,000.00 6 Traffic Striping, Signage & Markings LS 1 $100,000.00 $85,000.00 $168,000.00 $65,000.00 $56,413.00 $125,000.00 $100,000.00 $100,000.00 $200,000.00 7 Quality Control Materials Testing LS 1 $150,000.00 $250,000.00 $122,500.00 $325,000.00 $150,000.00 $500,000.00 $15,000.00 $500,000.00 $100,000.00 8 Clearing, Grubbing, and Removals LS 1 $250,000.00 $500,000.00 $92,300.00 $40,519.00 $200,000.00 $500,000.00 $15,000.00 $600,000.00 $500,000.00 9 Construct 6'X12' RCB per SPPWC STD Plan 390‐1 LF 3375 $7,425,000.00 $11,137,500.00 $7,911,000.00 $9,315,000.00 $7,023,375.00 $8,049,375.00 $12,588,750.00 $8,606,250.00 $6,750,000.00 10 Construct 7'X7' RCB per SPPWC STD Plan 390‐1 LF 1672 $2,340,800.00 $1,881,000.00 $2,407,680.00 $3,452,680.00 $2,273,920.00 $2,006,400.00 $3,962,640.00 $2,499,640.00 $2,508,000.00 11 Construct 3'X10' RCB with Joint Seals per SPPWC STD Plan 390‐1 LF 510 $867,000.00 $734,400.00 $2,266,950.00 $1,147,500.00 $928,200.00 $948,600.00 $1,677,900.00 $1,785,000.00 $867,000.00 12 Construct 72" RCP (Pipe Class per Plan) LF 1247 $748,200.00 $823,020.00 $1,059,950.00 $2,032,610.00 $1,306,856.00 $810,550.00 $2,057,550.00 $1,007,576.00 $1,808,150.00 13 Construct 84" RCP (Pipe Class per Plan) LF 4630 $3,704,000.00 $3,412,310.00 $5,093,000.00 $8,009,900.00 $5,301,350.00 $4,213,300.00 $9,584,100.00 $5,000,400.00 $6,945,000.00 14 Construct 48" RCP (Pipe Class per Plan) LF 91 $45,500.00 $33,233.20 $121,940.00 $100,100.00 $90,181.00 $72,345.00 $83,811.00 $73,528.00 $36,400.00 15 Construct 36" RCP (Pipe Class per Plan) LF 456 $182,400.00 $88,920.00 $232,560.00 $456,000.00 $342,456.00 $273,600.00 $362,976.00 $310,536.00 $171,000.00 16 Construct 30" RCP (Pipe Class per Plan) LF 299 $104,650.00 $67,275.00 $254,150.00 $299,000.00 $237,406.00 $212,290.00 $235,612.00 $170,131.00 $149,500.00 17 Construct Junction Structure Pipe to RCB per SPPWC STD Plan 333‐2 EA 8 $40,000.00 $40,000.00 $116,800.00 $42,400.00 $31,200.00 $57,600.00 $284,704.00 $96,000.00 $40,000.00 18 Construct Manhole Pipe to Pipe per SPPWC STD Plan 320‐2 with 24" Manhole Shaft EA 16 $320,000.00 $200,000.00 $384,000.00 $304,000.00 $298,880.00 $272,000.00 $641,392.00 $256,000.00 $160,000.00 19 Construct Curb Opening Catch Basin per SPPWC STD Plan 300‐4 (Width per Plan) Including Local Depression and Remove and Replace Paving as Necessary EA 14 $42,000.00 $392,000.00 $354,200.00 $224,000.00 $203,350.00 $212,800.00 $521,640.00 $350,000.00 $280,000.00 20 Construct Reinforced Concrete Bulkhead for 36" Reinforced Concrete Pipe (RCP) per Riverside County STD Detail M816. EA 1 $5,000.00 $1,000.00 $670.00 $2,000.00 $1,475.00 $7,800.00 $20,830.00 $2,000.00 $1,000.00 21 Construct Pressure Manhole Shaft and Pressure Plate per SPPWC STD Plan 329‐2 EA 15 $75,000.00 $120,000.00 $390,000.00 $390,000.00 $160,950.00 $189,000.00 $418,230.00 $300,000.00 $300,000.00 22 Construct Transition Structure Single RCB to Single RCB per SPPWC STD Plan 341‐2 EA 2 $100,000.00 $30,000.00 $144,800.00 $120,000.00 $144,000.00 $116,000.00 $117,140.00 $150,000.00 $80,000.00 23 Construct Transition Structure Pipe to RCB per SPPWC STD Plan 342‐2 EA 10 $500,000.00 $125,000.00 $469,000.00 $550,000.00 $520,000.00 $545,000.00 $423,530.00 $550,000.00 $200,000.00 24 Construct Manhole Concrete Box Storm Drain per SPPWC STD Plan 323‐2 with 36" Shaft EA 22 $132,000.00 $29,700.00 $770,000.00 $110,000.00 $134,200.00 $162,800.00 $798,248.00 $374,000.00 $88,000.00 25 Construct Concrete Collar Per SPPWC STD Plan 380‐4 EA 8 $16,000.00 $12,000.00 $31,200.00 $19,200.00 $19,000.00 $28,800.00 $163,720.00 $20,000.00 $8,000.00 26 Construct Grated Catch Basin per SPPWC STD Plan 303‐3 EA 3 $60,000.00 $75,000.00 $66,000.00 $45,000.00 $37,350.00 $52,800.00 $64,980.00 $66,000.00 $60,000.00 27 Construct Modified Local Depression and Modified Catch Basin per Detail 19‐1 and 19‐2 EA 11 $275,000.00 $330,000.00 $451,000.00 $264,000.00 $239,800.00 $286,000.00 $186,098.00 $209,000.00 $330,000.00 28 Construct Catch Basin Graded Inlet Insert Filter, Model per Plan per Detail 20 EA 3 $60,000.00 $12,000.00 $7,500.00 $15,000.00 $1,020.00 $26,700.00 $5,901.00 $60,000.00 $3,000.00 29 Construct Rubber Duckbill Valve per Detail 21 EA 4 $80,000.00 $300,000.00 $56,000.00 $48,000.00 $53,200.00 $51,200.00 $41,944.00 $48,000.00 $60,000.00 30 Construct Concrete Encasement per Detail 22 LF 70 $56,000.00 $175,000.00 $15,400.00 $21,000.00 $14,420.00 $70,000.00 $65,800.00 $105,000.00 $38,500.00 31 Construct Catch Basin Curb Inlet Insert Filter, Model per Plan per Detail 23 EA 14 $84,000.00 $350,000.00 $28,000.00 $44,800.00 $35,000.00 $71,400.00 $73,402.00 $70,000.00 $11,200.00 32 Construct Local Depression per SPPWC STD Plan 313‐4 EA 3 $15,000.00 $75,000.00 $11,790.00 $8,400.00 $9,150.00 $15,600.00 $20,922.00 $45,000.00 $9,000.00 33 Construct Outlet per Detail 25 on Sheet 4 and Caltrans STD D83 B EA 1 $10,000.00 $45,000.00 $22,800.00 $26,000.00 $37,000.00 $56,100.00 $39,241.00 $42,000.00 $15,000.00 34 Construct Type A Wingwalls per Caltrans STD D84 EA 2 $60,000.00 $90,000.00 $144,000.00 $80,000.00 $72,000.00 $136,400.00 $54,162.00 $100,000.00 $90,000.00 35 Construct Utility Opening‐Wall per Caltrans STD 82 EA 1 $10,000.00 $30,000.00 $14,500.00 $4,000.00 $6,000.00 $3,900.00 $13,948.00 $1.00 $5,000.00 36 Construct Riprap Apron, Per Detail 28 on Sheet 4 EA 1 $30,000.00 $25,000.00 $38,250.00 $8,000.00 $100,000.00 $36,800.00 $12,219.00 $6,000.00 $50,000.00 37 Trenching Excavation per City of Rialto STD SC‐231 CY 134168 $4,025,040.00 $2,683,360.00 $1,610,016.00 $1,341,680.00 $9,123,424.00 $14,087,640.00 $1,475,848.00 $12,745,960.00 $6,708,400.00 38 Install Flap Gate per Detail 30 EA 2 $90,000.00 $190,000.00 $118,000.00 $60,000.00 $124,000.00 $114,000.00 $28,838.00 $60,000.00 $130,000.00 39 Construct Grates per SPPWC STD Plan 311‐3 EA 36 $90,000.00 $342,000.00 $57,600.00 $32,400.00 $32,400.00 $32,400.00 $65,880.00 $36,000.00 $36,000.00 40 Construct Manhole Pipe to Pipe (Large Side Inlet) per SPPWC STD Plan 322‐2 with 24 Manhole Shaft EA 10 $200,000.00 $150,000.00 $264,350.00 $240,000.00 $255,000.00 $196,000.00 $173,530.00 $160,000.00 $150,000.00 41 Construct Junction Structure Pipe to Pipe per SPPWC STD Plan 331‐3 EA 11 $22,000.00 $27,500.00 $102,300.00 $44,000.00 $33,385.00 $17,600.00 $111,969.00 $22,000.00 $22,000.00 42 Construct 24 RCP (Pipe Class per Plan) LF 90 $27,000.00 $20,250.00 $72,900.00 $90,000.00 $69,210.00 $71,550.00 $77,040.00 $45,000.00 $18,000.00 43 Improve Existing Ramp to Maintain 40' Minimum Clearance from Rip Rap Pad LS 1 $25,000.00 $50,000.00 $42,000.00 $12,000.00 $8,135.00 $8,500.00 $21,816.00 $1.00 $10,000.00 44 Trench Repair per City of Rialto STD SC‐231 SF 204320 $1,021,600.00 $1,225,920.00 $2,247,520.00 $2,043,200.00 $1,624,344.00 $2,554,000.00 $1,838,880.00 $1,583,480.00 $2,451,840.00 45 Adjust Valve Cover to Grade per City of Rialto STD W‐719 EA 1 $1,000.00 $450.00 $1,900.00 $250.00 $300.00 $550.00 $1,574.00 $1,000.00 $1,500.00 46 Construct Asphalt Concrete Dike per City of Rialto STD No. SC‐233 LF 28 $2,800.00 $3,500.00 $14,980.00 $840.00 $9,800.00 $5,600.00 $896.00 $2,800.00 $12,600.00 47 Remove and Replace Existing Sidewalk per City of Rialto City STD SC 203 and SC 204 EA 14 $56,000.00 $35,000.00 $68,600.00 $42,000.00 $65,030.00 $84,000.00 $19,530.00 $84,000.00 $35,000.00 48 Sawcut and Remove Existing Cross Gutter and Fillet, Replace per City of Rialto STD SC‐216 LF 100 $10,000.00 $6,000.00 $45,000.00 $6,000.00 $53,500.00 $60,000.00 $15,400.00 $20,000.00 $8,000.00 49 Sawcut and Remove Existing Curb and Gutter EA 11 $22,000.00 $22,000.00 $2,607.00 $1,650.00 $4,169.00 $228,800.00 $33,792.00 $110,000.00 $22,000.00 50 Sawcut and Remove Conflicting Portion of Raised Median and Curb. Reconstruct Median and Curb to Match Existing per City of Rialto Std SC‐202 EA 6 $12,000.00 $30,000.00 $168,000.00 $18,000.00 $148,860.00 $112,200.00 $37,428.00 $36,000.00 $45,000.00 51 Cold Plane Existing Asphalt Concrete a Minimum 0.1' Depth and Reconstruct Asphalt Concrete to Match Existing per City of Rialto STD SC‐231 SF 205528 $273,352.24 $616,584.00 $369,950.40 $308,292.00 $271,296.96 $462,438.00 $411,056.00 $256,910.00 $308,292.00 52 Adjust Manhole Rim to Grade per City of Rialto STD SS‐201 EA 14 $14,000.00 $17,500.00 $52,640.00 $16,800.00 $11,900.00 $9,450.00 $22,036.00 $21,000.00 $21,000.00 53 Sawcut and Remove Existing Curb and Reconstruct per City of Rialto STD SC‐202 LF 5100 $153,000.00 $382,500.00 $1,392,300.00 $443,700.00 $255,000.00 $331,500.00 $657,900.00 $357,000.00 $408,000.00 54 Furnish and Install 4" of Decomposed Granite Per Detail on Sheet 25 SF 16590 $165,900.00 $331,800.00 $207,375.00 $24,885.00 $82,950.00 $91,245.00 $82,950.00 $132,720.00 $49,770.00 55 Install Concrete Mow Curb per Detail on Sheet 25 LF 2050 $30,750.00 $41,000.00 $434,600.00 $28,700.00 $51,250.00 $92,250.00 $190,650.00 $92,250.00 $61,500.00 56 Remove and Relocate Existing Fire Hydrant EA 1 $25,000.00 $20,000.00 $13,900.00 $8,500.00 $5,968.04 $16,000.00 $7,868.00 $5,000.00 $20,000.00 57 Construct Asphalt Concrete Dike per City of Rialto STD C‐233 LF 28 $2,240.00 $2,800.00 $12,264.00 $980.00 $9,800.00 $5,600.00 $5,740.00 $5,600.00 $12,600.00 58 Field Orders LS 1 $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00 $400,000.00 $25,956,232.24 $29,107,522.20 $33,020,148.11 $33,826,705.00 $34,270,874.00 $41,450,483.00 $41,554,741.00 $41,878,784.00 $46,608,252.00