SANTA ANA
TRUCK TERMINAL PROJECT
Draft Environmental Impact Report
SCH No. 2023120143
CITY OF RIALTO
150 S. Palm Avenue
Rialto, California 92376
AUGUST 2024
MARCH 2025
Final Environmental Impact Report
SANTA ANA TRUCK TERMINAL PROJECT
FINAL ENVIRONMENTAL IMPACT REPORT
SCH NO. 2023120143
Prepared for City of Rialto
150 South Palm Avenue
Rialto, California 92376
Prepared by Kimley -Horn and Associates
401 B Street, Suite 600
San Diego , California 92101
Date March 2025
Santa Ana Truck Terminal Project
Final Environmental Impact Report Table of Contents
City of Rialto i
TABLE OF CONTENTS
SECTION PAGE
1.0 SUMMARY OF THE FINAL ENVIRONMENTAL IMPACT REPORT .................................................... 1-1
1.1 Introduction ..................................................................................................................... 1-1
1.2 Project Summary.............................................................................................................. 1-2
1.3 Project Objectives ............................................................................................................ 1-2
1.4 Required Actions and Permits ......................................................................................... 1-2
1.4.1 City of Rialto ........................................................................................................ 1-3
1.4.2 Responsible Agencies.......................................................................................... 1-3
2.0 RESPONSE TO COMMENTS ........................................................................................................... 2-1
2.1 Introduction to Response to Comments.......................................................................... 2-1
2.2 List of Respondents .......................................................................................................... 2-2
2.3 Responses to Environmental Comments ......................................................................... 2-3 Letter from Department of Toxic Substances .................................................................. 2-5
3.0 ERRATA TO THE DRAFT EIR ........................................................................................................... 3-1
3.1 Introduction to the Errata ................................................................................................ 3-1
3.2 Changes to the Draft EIR .................................................................................................. 3-1
4.0 MITIGATION MONITORING AND REPORTING PROGRAM ............................................................ 4-1
4.1 Purpose of Mitigation Monitoring and Reporting Program ............................................ 4-1
4.2 Organization ..................................................................................................................... 4-2
Santa Ana Truck Terminal Project
Final Environmental Impact Report Table of Contents
City of Rialto ii
This Page Intentionally Left Blank
Santa Ana Truck Terminal Project Section 1.0
Final Environmental Impact Report Summary of the Final Environmental Impact Report
City of Rialto 1-1
1.0 SUMMARY OF THE FINAL ENVIRONMENTAL IMPACT
REPORT
1.1 INTRODUCTION
The City of Rialto (City) has determined that a project-level environmental impact report (EIR) is required for the Santa Ana Truck Terminal Project (Project) pursuant to the requirements of the California Environmental Quality Act (CEQA). CEQA requires the preparation of an EIR prior to approving any project that may have a significant impact on the environment. For the purposes of CEQA, the term "proposed Project" refers to the whole of an action, which has the potential for resulting in a direct physical change or a reaso nably foreseeable indirect physical change in the environment (CEQA Guidelines Section 15378[a]).
A Project EIR is an EIR which examines the environmental impacts of a specific development project.
Project EIRs analyze changes in the environment that would result from the development project including planning, construction, and operation.
Pursuant to Section 15082 of the CEQA Guidelines, as amended, the City of Rialto prepared and circulated a Notice of Preparation (NOP) to affected agencies and interested parties for a public review period beginning on December 8, 2023. The City has elected to have an extended 45-day scoping period due to the holidays, and the deadline to submit comments on the NOP was January 22, 2024. A scoping meeting was held on January 18, 2024 at 6:00 PM at the Rialto City Hall, Council Chambers, located at 150 South Palm Avenue. Subsequently, a Draft EIR was prepared. The City published a public Notice of Availability (NOA) for the Draft EIR on August 26, 2024 , inviting comment from the general public, agencies, organizations, and other interested parties. The NOA was also mailed to various agencies, organizations, and individuals that had previously requested such notice. The NOA was filed with the State Clearinghouse (SCH# 2023120143) pursuant to the public noticing requirements of CEQA. The Draft EIR was released for public review and comment by the City of Rialto on August 26, 2024 for a 45-day review period ending on October 10, 2024.
The purpose of the Draft EIR is to pro vide a comprehensive analysis of the potential environmental impacts of the proposed Project. The Final EIR addresses public and agency comments received on the Draft EIR during the public review period. Acting as lead agency, the City has prepared a written response to the Draft EIR; textual changes to the Draft EIR were not warranted. The responses to the comments are set forth in Section 2.0, Response to Comments, in this Final EIR. Responses to comments received during the comment period do not require any new information to be added to the Draft EIR, thus the Final EIR does not contain any new significant impacts or “significant new information” that would require recirculation of the Draft EIR pursuant to CEQA Guidelines Section 15088.5. Section 3.0, Errata to the Draft EIR, includes the changes to the Draft EIR that were incorporated following the public review period. None of the changes included in the errata reflect a new significant environmental impact, a substantial increase in the severity of an environmental impact . The Mitigation Monitoring and Reporting Program (MMRP) is included i n Section 4.0, Mitigation Monitoring and Reporting Program , which includes the mitigation measures to be implemented as a part of Project approval. The MMRP includes time of implementation timing and monitoring responsibilities for each mitigation measure.
Santa Ana Truck Terminal Project Section 1.0
Final Environmental Impact Report Summary of the Final Environmental Impact Report
City of Rialto 1-2
1.2 PROJECT SUMMARY
The project site is located at 249 East Santa Ana Avenue, in the City of Rialto, County of San Bernardino, California. The approximately 45.7-acre property ranges in elevation from approximately 900 to 955 feet above mean sea level (amsl) and includes a 105 -foot California Electric Power Company pole line easement on the southern portion of the property. A 6 -foot SCE easem ent is located on the western portion of the project site and 10-foot and 105-foot SCE pole line easements are located on the southern portion of the project site, along with a 70 -foot Southern Sierras Power Company pole line easement.
The project site is an irregularly-shaped property generally bordered by existing industrial land uses.
As proposed, the Project would allow for the development of one truck terminal, one maintenance shop, and associated on -site improvements. The Project proposes an approximately 172,445 square foot (sf) truck terminal building with 292 bays and approximately 5,890 sf of office space and an approximately 18,700 sf maintenance shop with 8 bays and 890 sf of office space. The project site consists of Assessor’s Parcel Number (APN) 0258-141-18.
The project site has a Rialto General Plan (General Plan) land use designation of General Industrial. The General Industrial land use designation allows for a broad range of heavy industrial activities. The project site is within the Agua Mansa Industrial Corridor Specific Plan (Specific Plan). The project site is zoned Heavy Industrial (H IND) under the Specific Plan. Permitted uses within the H IND zone include transit, and transportation terminals, repairs, and storage facilities. As such, the proposed P roject is consistent with the existing General Plan land use designation and Specific Plan zoning. Although the Project is consistent with the existing land use designation and zoning designation, the Project would require a Conditional Use Permit (CUP) as development of a truck terminal is considered a conditionally permitted use within a industrial land use designation.
1.3 PROJECT OBJECTIVES
Section 15124(b) of the State CEQA Guidelines (14 CCR) requires "A statement of objectives sought by the proposed Project. The following objectives have been identified for the Project.
Objective 1: Develop the property consistent with the guidelines and policies of the City of Rialto General Plan and more specifically, the Agua Mansa Industrial Corridor Specific Plan.
Objective 2: Develop and industrial zoned site with land uses which meet current market demands.
Objective 3: Create revenue-generating uses that provide reliable employment for the long term.
Objective 4: Provide new buildings that are compatible with the surrounding industrial uses.
Objective 5: Develop an industrial use consistent with current zoning in proximity to designated truck routes and the State highway system to avoid or shorten truck -trips lengths on other roadways.
Objective 6: Redevelop an underutilized property in accordance with Rialto Plant Reclamation Plan.
1.4 REQUIRED ACTIONS AND PERMITS
Pursuant to Section 15121 of the State CEQA Guidelines, an EIR is primarily an informational document intended to inform the public agency decision-makers and the general public of the potentially significant Santa Ana Truck Terminal Project Section 1.0
Final Environmental Impact Report Summary of the Final Environmental Impact Report
City of Rialto 1-3
environmental effects of a project. Prior to taking action on the proposed Project, the City must consider the information in this EIR and certify the Final EIR.
The City of Rialto, as lead agency for the Project, has discretionary authority over the primary approvals.
The Applicant has requested the consideration of the following discretionary actions.
1.4.1 City of Rialto
▪ Certification of the Santa Ana Truck Terminal Project Final Environmental Impact Report. ▪ Precise Plan of Design (PPD) (PPD 2023-0006): The proposed Project includes the review of a PPD for one truck terminal and one maintenance shop totaling approximately 191,145 sf. The total site area is approximately 45.7 acres.
▪ Conditional Development Permit (CDP) (2023 -0007): The Project includes a CDP for the development of a truck terminal, which is considered a conditionally permitted use in industrial zones within the City.
▪ Development Agreement (DA) ( 2024-0001): Outlines the terms and conditions between the developer and the city to ensure the project complies with local regulations, addresses community needs, and facilitates the development process.
In addition to the approvals identified above, the Project would be subject to other discretionary and ministerial actions by the City as part of Project implementation. Additional City approvals include but are not limited to haul route permits, site deve lopment permits, grading permits, use permits, sign permits, and building permits.
1.4.2 Responsible Agencies
▪ Santa Ana Regional Water Quality Control Board (RWQCB): Issuance of a National Pollution Discharge Elimination System (NPDES) Permit and Construction General Permit.
Santa Ana Truck Terminal Project Section 1.0
Final Environmental Impact Report Summary of the Final Environmental Impact Report
City of Rialto 1-4
This Page Intentionally Left Blank
Santa Ana Truck Terminal Project Section 2.0
Final Environmental Impact Report Responses to Comments
City of Rialto 2-1
2.0 RESPONSE TO COMMENTS
2.1 INTRODUCTION TO RESPONSE TO COMMENTS
The purpose of this section is to present public comments and responses to comments received on the Draft Environmental Impact Report (EIR) (State Clearinghouse Number 2023120143) for the Santa Ana Truck Terminal Project located in the City of Rialto (City). The Draft EIR was released for public review and comment by the City of Rialto on August 26, 2024 for a 45-day review period ending on October 10, 2024.
In accordance with the California Environmental Quality Act (CEQA) Guidelines Section 15088, the City of Rialto, as the Lead Agency, has evaluated all substantive comments received on the Santa Ana Truck Terminal Project Draft EIR, and has prepared written responses to these comments. This document has been prepared in accordance with CEQA and represents the independent judgment of the Lead Agency.
The Final EIR for the Santa Ana Truck Terminal Project consists of the Draft EIR and its technical appendices; the Responses to Comments included herein; other written documentation prepared during the EIR process; and those documents which may be modified by the City Council at the time of consideration of certification of the Final EIR. The City Council will also consider adoption of a Mitigation Monitoring and Reporting Program (MMRP), a Statement of Findings of Fact, and a Statement of Overriding Considerations as part of the approval process for the Project.
This Response to Comments is organized as follows:
Section 2.1 Provides a brief introduction to this section.
Section 2.2 Identifies the Draft EIR commenters.
Section 2.3 Provides responses to substantive comments received on the Draft EIR.
CEQA Guidelines Section 15204(a) directs persons and public agencies to focus their review of a Draft EIR be “on the sufficiency of the document in identifying and analyzing possible impacts on the environment and ways in which significant effects of the p roject might be avoided or mitigated. Comments are most helpful when they suggest additional specific alternatives or mitigation measures that would provide better ways to avoid or mitigate the significant environmental effects. At the same time, reviewers should be aware that the adequacy of an EIR is determined in terms of what is reasonably feasible. CEQA does not require a lead agency to conduct every test or perform all research, study, and experimentation recommended or demanded by commenters. When responding to comments, lead agencies need only respond to significant environmental issues and do not need to provide all information requested by reviewers, as long as a good faith effort at full disclosure is made in the EIR.” CEQA Guidelines Section 15204(c) further advises, “Reviewers should explain the basis for their comments, and should submit data or references offering facts, reasonable assumptions based on facts, or expert opinion supported by facts in support of the com ments. Pursuant to CEQA Guidelines Section 15064, an effect shall not be considered significant in the absence of substantial evidence.” Section 15204(d) states, “Each responsible agency and trustee agency shall focus its comments on environmental information germane to that agency’s statutory responsibility.” CEQA Guidelines Section 15204(e) states, “This section shall not be used to restrict the ability of reviewers to comment on the general adequacy of a document or of the lead agency to reject comments not focused as recommended by this section.” Santa Ana Truck Terminal Project Section 2.0
Final Environmental Impact Report Responses to Comments
City of Rialto 2-2
In accordance with CEQA, Public Resources Code Section 21092.5, copies of the written responses to public agencies will be forwarded to those agencies at least ten days prior to certifying the EIR.
2.2 LIST OF RESPONDENTS
In accordance with the State CEQA Guidelines Section 15132, Table 2-1: Comments from Public Agencies, Organizations, and Individuals , below, provides a list of public agencies, organizations, and individuals that submitted comments on the Draft EIR received as of close of the public review period on October 10, 2024. Copies of the written comments are provided in this Section and have been annotated with the assigned letter along with a number for each comment. Each comment is followed by a corresponding written response.
The City of Rialto received a comment letter from one agency. Responses are provided to the Department of Toxic Substances, below.
Table 2-1: Comments from Public Agencies, Organizations, and Individuals Commenter
Date of
Correspondence
Page
No.
Public Agencies
Department of Toxic Substances Control September 19, 2024 2-5
Santa Ana Truck Terminal Project Section 2.0
Final Environmental Impact Report Responses to Comments
City of Rialto 2-3
2.3 RESPONSES TO ENVIRONMENTAL COMMENTS
Santa Ana Truck Terminal Project Section 2.0
Final Environmental Impact Report Responses to Comments
City of Rialto 2-4
This Page Intentionally Left Blank
SENT VIA ELECTRONIC MAIL
September 19, 2024
Daniel Casey
Principal Planner
City of Rialto
150 South Palm Avenue
Rialto, CA 92376
[email protected]
RE: DRAFT ENVIRONMENTAL IMPACT REPORT FOR THE SANTA ANA TRUCK TERMINAL PROJECT DATED AUGUST 26, 2024, STATE CLEARINGHOUSE NUMBER 2023120143
Dear Daniel Casey,
The Department of Toxic Substances Control (DTSC) received a Draft Environmental Impact Report (DEIR) for the Santa Ana Truck Terminal Project (Project). The proposed Project would include the construction of one truck terminal warehouse and one truck repair shop on an approximately 45.7-acre site in the City of Rialto. After reviewing the Project, DTSC recommends and requests consideration of the following comments:
1. In the Phase II Environmental Site Assessment it was stated the following:
“There appear to be minor impacts to subsurface soils, likely as a result of former placement of artificial fill materials on the property or from discharges of process wastewater or impacted surface water to the property, including:
Concentrations of TPH compounds were reported in shallow soils (generally less than four feet deep, with the exception of Boring HS-3, which has reported concentrations to 13.5 feet below ground surface). Bis(2-ethylhexyl) 2-5
A-1-2
A-1-1
Daniel Casey
September 19, 2024
phthalate was reported at a low concentration in a single soil sample collected at 2.5 feet deep in Trench T-7”. Due to the historical use of the site and presence of TPH, DTSC recommends further investigation to determine any potential risk to human health. The investigation should be in accordance with the following Human Health Risk Assessment (HHRA) Note 12 Guidance.
2. DTSC recommends the City of Rialto enter into a voluntary agreement to address contamination at brownfields and other types of properties or receive oversight from a self-certified local agency, DTSC or Regional Water Quality Control Board. If entering into one of DTSC’s voluntary agreements, please note that DTSC uses a single standard Request for Lead Agency Oversight Application for all agreement types. Please apply for DTSC oversight using this link: Request for Agency Oversight Application. Submittal of the online application includes an agreement to pay costs incurred during agreement preparation. If you have any questions about the application portal, please contact your Regional Brownfield Coordinator.
3. DTSC recommends that all imported soil and fill material should be tested to assess any contaminants of concern meet screening levels as outlined in DTSC's Preliminary Endangerment Assessment (PEA) Guidance Manual.
Additionally, DTSC advises referencing the DTSC Information Advisory Clean Imported Fill Material Fact Sheet if importing fill is necessary. To minimize the possibility of introducing contaminated soil and fill material there should be documentation of the origins of the soil or fill material and, if applicable, sampling be conducted to ensure that the imported soil and fill material are suitable for the intended land use. The soil sampling should include analysis based on the source of the fill and knowledge of the prior land use. Additional information can be found by visiting DTSC’s Human and Ecological Risk Office (HERO) webpage.
4. If buildings or other structures are to be demolished on any project sites included in the proposed project, surveys should be conducted for the presence of lead-based paints or products, mercury, asbestos containing 2-6
A-1-2
cont.
A-1-3
A-1-4
A-1-5
Daniel Casey
September 19, 2024
materials, and polychlorinated biphenyl caulk. Removal, demolition, and disposal of any of the above-mentioned chemicals should be conducted in compliance with California environmental regulations and policies. In addition, sampling near current and/or former buildings should be conducted in accordance with DTSC’s PEA Guidance Manual.
DTSC appreciates the opportunity to comment on the DEIR for the Santa Ana Truck Terminal Project Thank you for your assistance in protecting California’s people and environment from the harmful effects of toxic substances. If you have any questions or would like clarification on DTSC’s comments, please respond to this letter or via email for additional guidance.
Sincerely,
Tamara Purvis
Associate Environmental Planner
HWMP - Permitting Division – CEQA Unit
Department of Toxic Substances Control
[email protected]
cc: (via email)
Governor’s Office of Planning and
Research State Clearinghouse
[email protected]
Dave Kereazis
Associate Environmental Planner
HWMP-Permitting Division – CEQA Unit
Department of Toxic Substances Control
[email protected]
Scott Wiley
Associate Governmental Program Analyst
HWMP - Permitting Division – CEQA Unit
Department of Toxic Substances Control
[email protected]
2-7
A-1-5
cont.
A-1-6
Santa Ana Truck Terminal Project Section 2.0
Final Environmental Impact Report Responses to Comments
2-9
Comment Number Comment Response
Comments from Public Agencies
Letter from California Department of Toxic Substances Control (DTSC), dated September 19, 2024 A-1-1 Dear Daniel Casey,
The Department of Toxic Substances Control (DTSC) received a Daft Environmental Impact Report (DEIR) for the Santa Ana Truck Terminal Project (Project). The proposed Project would include the construction of one truck terminal warehouse and one truck repair shop on an approximately 45.7 -acre site i n the City of Rialto. After reviewing the Project, DTSC recommends and requests consideration of the following comments:
This comment is an introduction to the comments included below and does not raise a substantive issue on the content of the Draft EIR, no further response is required.
A-1-2 In the Phase II Environmental Site Assessment it was stated the following:
“There appear to be minor impacts to subsurface soils, likely as a result of former placement of artificial fill materials on the property or from discharges of process wastewater or impacted surface water to the property, including: Concentrations of TPH compounds were reported in shallow soils (generally less than four feet deep, with the exception of Boring HS-3, which has reported concentrations to 13.5 feet below ground surface). Bis(2-ethylhexyl) phthalate was reported at a low concentration in a single soil sample collected at 2.5 feet deep in Trench T-7”. Due to the historical use of the site and presence of TPH, DTSC recommen ds further investigation to determine any potential risk to human health. The investigation should be in accordance with the following Human Health Risk Assessment (HHRA) Note 12 Guidance.
As identified in the Phase II Soil and Groundwater Investigation Report (Phase II Report) prepared by ENVIRON in October 2010 and discussed in EIR Section 4.8, Hazards and Hazardous Materials , soil samples obtained on the project site identified minor impacts to subsurface soils as a result of previously placed artificial fill or from wastewater. The Phase II Report states that considering the low reported concentrations of total petroleum hydrocarbons, bis (2 -ethylhexyphthalate), and metals, as well as the random distribution of metals concentrations above screening criteria and background concentrations, results from the soil samples are unlikely to result in risk of harm to public health or the environment. Groundwater sampling conducted for the Phase II Report identified minor impacts to groundwater below the project site. As a result of the low reported concentrations of extractable fuel hydrocarbons, chloroform, and metals, the Phase II Report found it to be unlikely that the results of the groundwater sampling would result in risk to public health or the environment. Accordingly, the Phase II Report concluded that no further investigation or testing is considered necessary for the site. Further, implementation of the Rialto Plant Reclamation Plan and mass grading will be complete prior to construction of the Project.
Santa Ana Truck Terminal Project Section 2.0
Final Environmental Impact Report Responses to Comments
2-10
Comment Number Comment Response
A-1-3 DTSC recommends the City of Rialto enter into a voluntary agreement to address contamination at brownfields and other types of properties or receive oversight from a self -certified local agency, DTSC or Regional Water Quality Control Board. If entering int o one of DTSC’s voluntary agreements, please note that DTSC uses a single standard Request for Lead Agency Oversight Application for all agreement types. Please apply for DTSC oversight using this link: Request for Agency Oversight Application.
Submittal o f the online application includes an agreement to pay costs incurred during agreement preparation. If you have any questions about the application portal, please contact your Regional Brownfield Coordinator.
Noted. In the event that a voluntary agreement to address contamination at brownfield or other similar property types is required, the City of Rialto may engage with a self-certified local agency, the DTSC or Regional Water Quality Control Board to enter into a voluntary agreement, as applicable.
A-1-4 DTSC recommends that all imported soil and fill material should be tested to assess any contaminants of concern meet screening levels as outlined in DTSC's Preliminary Endangerment Assessment (PEA) Guidance Manual.
Additionally, DTSC advises referencing the DTSC Information Advisory Clean Imported Fill Material Fact Sheet if importing fill is necessary. To minimize the possibility of introducing contaminated soil and fill material there should be documentation of the origins of the soil or fill material and, if applicable, sampling be conducted to ensure that the imported soil and fill material are suitable for the intended land use. The soil sampling should include analysis based on the source of the fill and knowledge of the prior land use. Additional information can be found by visiting DTSC’s Human and Ecological Risk Office (HERO) webpage.
Noted. T he Rialto Plant Reclamation Plan and mass grading will be complete prior to construction of the Project.
A-1-5 If buildings or other structures are to be demolished on any project sites included in the proposed project, surveys should be conducted for the presence of lead -based paints or products, mercury, asbestos containing materials, and polychlorinated biphenyl caulk. Removal, demolition, and disposal of any of the above-mentioned chemicals should be conducted in compliance with California environmental regulations and policies. In addition, sampling near current and/or for mer buildings should be conducted in accordance with DTSC’s PEA Guidance Manual.
Noted. The project site does not include existing buildings or structures and the Project does not propose demolition of buildings or structures.
Santa Ana Truck Terminal Project Section 2.0
Final Environmental Impact Report Responses to Comments
2-11
Comment Number Comment Response
A-1-6 DTSC appreciates the opportunity to comment on the Draft EIR for the Santa Ana Truck Terminal Project Thank you for your assistance In protecting California’s people and environment from the harmful effects of toxic substances. If you have any questions or would like clarification on DTSC’s comments, please respond to this letter or via email for additional guidance.
This comment is a conclusion to the comments included above and does not raise a substantive issue on the content of the Draft EIR, no further response is required.
Santa Ana Truck Terminal Project Section 2.0
Final Environmental Impact Report Responses to Comments
2-9
This Page Intentionally Left Blank
2-12
Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-1
3.0 ERRATA TO THE DRAFT EIR
3.1 INTRODUCTION TO THE ERRATA
The Draft EIR for the Santa Ana Truck Terminal Project dated August 2024, is hereby incorporated by reference as part of the Final EIR. Changes to the Draft EIR are further detailed below.
The changes to the Draft EIR do not affect the overall conclusions of the environmental document, and instead represent changes to the Draft EIR that provide clarification, amplification and/or insignificant modifications, as needed as a result of public comments on the Draft EIR, or due to additional information received during the public review period. These clarifications and corrections do not warrant Draft EIR recirculation pursuant to CEQA Guidelines Section 15088.5.
None of the changes or information provided in the comments reflect a new significant environmental impact, a substantial increase in the severity of an environmental impact for which mitigation is not proposed, or a new feasible alternative or mitigation measure that would clearly lessen significant environmental impacts but is not adopted. In addition, the changes do not reflect a fundamentally flawed or conclusory Draft EIR.
Changes to the Draft EIR are listed by Section, page, paragraph, etc. to best guide the reader to the revision. Changes are identified as follows:
• Deletions are indicated by strikeout text.
• Additions are indicated by underlined text.
3.2 CHANGES TO THE DRAFT EIR
Section 1.0, Executive Summary; Page 1-10; Table 1-1: Summary of Impacts and Mitigation Program
Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-2
Table 1-1: Summary of Impacts and Mitigation Program
Environmental Impacts
Significance Before
Mitigation Mitigation Measure
Significance With
Mitigation
4.3: Biological Resources
Impact 4.3 -1: Would the project have a
substantial adverse effect, either directly or
through habitat modifications, on any species
identified as a candidate, sensitive, or special -
status species in local or regional plans, policies,
or regulations, or by the CDFW or USFWS?
S Standard Conditions
No standard conditions are applicable.
Mitigation Measures
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures No mitigation measures are applicable.
Project Mitigation Measures
MM BIO-1A: No less than 14 days prior to the onset of Project construction activities, a qualified biologist shall survey the construction limits of the project site and a 500 -foot buffer for the presence of burrowing owls and/or occupied nest burrows. A second survey shall be conducted within 24 hours prior t o the onset of construction activities.
The surveys shall be conducted in accordance with the most current CDFW survey methods.
The Project applicant shall submit at least one burrowing owl preconstruction survey report to the satisfaction of the City and CDFW to document compliance with this mitigation measure. For the purposes of this measure, ‘qualified biologist’ is a biologist who meets the requirements set forth in the CDFW BUOW Guidelines.
MM BIO-1B: If BUOW are documented during pre -construction surveys, biological monitoring will be performed to ensure unauthorized impacts on burrowing owl do not occur as a result of the Project. The definitive frequency and duration of monitoring shall be dependent on Project and site conditions, such as the type of construction activity LS
Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-3
occurring, whether it is the breeding versus non -breeding season, if a burrowing owl has been recently documented on site, and the efficacy of the exclusion buffers, as determined by a qualified biologist and in coordination with CDFW.
MM BIO-1C: If burrowing owl is documented on site or within 500-feet of the site during either pre -construction surveys or biological monitoring, burrowing owl and occupied burrowing owl burrows shall not be disturbed. CDFW shall be contacted within 48 hours of the burrowing owl observation and disturbance avoidance buffers shall be set up immediately by a qualified biologist in accordance with the recommendations from CDFW. No work will occur within avoidance buffers until consultation with CDFW has occur red and/or applicable permits are issued, if required. If avoidance of burrowing owls is not possible, either directly or indirectly, an Incidental Take Permit (ITP) or a Burrowing Owl Relocation and Mitigation Plan (Plan) may be required.
The Plan may als o include a measure describing compensatory mitigation requirements as determined in coordination with CDFW. The Project proponent will adhere to the conditions of the ITP and/or measures outlined in the Plan. If burrowing owl is no longer a candidate or listed species under CESA at the time of project construction, then an ITP may not be required.
MM BIO-2A: Within one year prior to ground disturbing activities, a qualified biologist shall conduct active Crotch’s bumble bee nest surveys during the typical colony active period (April – August) following survey guidelines provided in the CDFW’s Survey Considerat ions for CESA Candidate Bumble Bee Species (CDFW 2023e). The qualified biologist shall be familiar with Crotch’s bumble bee identification and life history.
If suspected or active Crotch’s bumble bee nests are present, a qualified biologist shal l establish an appropriate non -disturbance buffer around each nest immediately prior to initiation of construction activities using stakes and/or brightly colored flagging to avoid disturbance or incidental take of the species. If avoidance buffers are not feasible during construction activities, then CDFW shall be consulted and an ITP may be required. If Crotch’s bumble bee is no longer a candidate or listed species Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-4
under CESA at the time of Project construction, then these mitigation measures may not be required.
MM BIO-2B: Within one year prior to ground disturbing activities, a qualified biologist shall survey suitable nectar plants for foraging Crotch’s bumble bee during the typical flight season (February – October) following survey guidelines provided in the CDFW’s Surve y Considerations for CESA Candidate Bumble Bee Species. The qualified biologist shall be familiar with Crotch’s bumble bee identification and life history. If occupied foraging habitat for Crotch’s bumble bee is present within project impact areas, a Revegetation Plan shall be prepared which includes native shrubs and native seed mixes that contain known nectar sources for Crotch’s bumble bee. The Revegetation Plan shall be developed in consultation with a qualified Crotch’s bumble bee biologist and implemented following project construction.
MM BIO-1A: Prior to the initiation of construction activities, a qualified biologist shall conduct pre -construction surveys for BUOW within suitable habitat to determine presence/absence of the species. The survey shall be conducted in accordance with the most current CDFW protocol within 30 days of site disturbance to determine whether th e burrowing owl is present at the site. Pre -construction surveys shall include suitable BUOW habitat within the Project footprint and within 500 feet of the Project footprint (or within an appropriate buffer as required in the most recent guidelines and where legal access to conduct the survey exists). If BUOW are not detected during the clearance survey, no additional mitigation is required.
If BUOW is located, occupied BUOW burrows shall not be disturbed during the nesting season (February 1 through August 31) unless a qualified biologist approved by CDFW verifies through non -invasive methods that either the birds have not begun egg laying an d incubation or the juveniles from the occurred burrows are foraging independently and capable of independent survival. A 500-foot non-disturbance buffer (where no work activities may be conducted) shall be maintained Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-5
between Project activities and nesting BUOW during the nesting season, unless otherwise authorized by CDFW.
If BUOW is detected during the non -breeding season (September 1 through January 31) or confirmed to not be nesting, a 160 -foot non - disturbance buffer shall be maintained between the Project activities and occupied burrow(s). Alternatively, a Burrowing Owl Relocation Plan may be prepared and submitted for approval by CDFW. Once approved, the Burrowing Owl Relocation Plan would be implemented to relocate non-breeding BUOW from the project site. The Burrowing Owl Relocation Plan shall detail methods and guidance for passive relocation of BUOW from the project site, provide monitoring and management of the replacement burrow sites reporting requirements, and ensure that a minimum of two suitable, unoccupied burrows are available off -site for every burrowing owl or pair of burrowing owls to be passively relocated.
Compensatory mitigation of habitat would be required if occupied burrows or territories occur within the permanent impact footprints.
Ratios typically include a minimum of 19.5 acres per nesting burrow lost; however, habitat compensation shall be approved by CDFW and detailed in the Burrowing Owl Relocation Plan.
MM BIO-1B: If avoidance is not possible, either directly or indirectly, a Burrowing Owl Relocation and Mitigation Plan shall be prepared and submitted for approval by CDFW. Once approved, the Burrowing Owl Relocation and Mitigation Plan would be implemented to reloca te non- breeding burrowing owls form the project site. the Burrowing Owl Relocation and Mitigation Plan shall detail methods for passive relocation of BUOW from the project site, provide guidance for the monitoring and management of the replaceme nt burrow sites and associated reporting requirements, and ensure that a minimum of two suitable, unoccupied burrows are available off -site for every Burrowing Owl of pair of burrowing owls to be passively relocated. Compensatory mitigation of habitat would be required if occupied burrows of territories occur within the permanent impact footprint. Habitat compensation shall be approved by CDFW and detailed in the Burrowing Owl Relocation and Mitigation Plan.
Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-6
MM BIO-23: To avoid direct impacts on raptors and/or
native/migratory birds, removal of habitat that supports active nests in the proposed area of disturbance should occur outside of the breeding season for these species (generally February 1 to September 15). If removal of habitat in the proposed area of disturbance must occur during the breeding season, a qualified biologist shall conduct a pre - construction survey to determine the presence or absence of nesting birds in the proposed area of disturbance. T he pre-construction survey shall be conducted within ten (10) calendar days prior to the start of construction activities (including removal of vegetation). If nesting birds are observed, a letter report or mitigation plan in conformance with applicable st ate and federal Law (i.e., appropriate follow up surveys, monitoring schedules, construction, and noise barriers/buffers, etc.) shall be prepared and include proposed measures to be implemented to ensure that take of birds or eggs or disturbance of breedin g activities is avoided. The report or mitigation plan shall be submitted to the CDFW and/or USFWS, as applicable, for review and approval and implemented to the satisfaction of those agencies. The project biologist shall verify and approve that all measures identified in the report or mitigation plan are in place prior to and/or during construction. If nesting birds are not detected during the pre -construction survey, no further mitigation is required.
Impact 4.3 -2: Would the project have a
substantial adverse effect on any riparian habitat
or other sensitive natural community identified in
local or regional plans, policies, and regulations or
by the CDFW or USFWS?
LS No standard conditions or mitigation measures are required. LS Impact 4.3 -3: Would the project have a
substantial adverse effect on State or federal
protected wetlands (including, but not limited to,
marsh, vernal pool, coastal, etc.) through direct
removal, filling, hydrological interruption, or
other means?
No Impact No standard conditions or mitigation measures are required. No Impact Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-7
Impact 4.3 -4: Would the project interfere
substantially with the movement of any native
resident or migratory fish or wildlife species or
with established native resident or migratory
wildlife corridors, or impede the use of native
wildlife nursery sites?
No Impact No standard conditions or mitigation measures are required. No Impact Impact 4.3-5: Would the project conflict with any
local policies or ordinances protecting biological
resources, such as a tree preservation policy or
ordinance?
LS No standard conditions or mitigation measures are required. LS
Santa Ana Truck Terminal
Project
Section
3 .0
Final Environmental Impact Report
Errata to the Draft EIR
City of Rialto
3 -
8 Section 2.0, Introduction; Page 2
-
7; List of Acronyms
CBB
Crotch’s bumble bee
ITP
Incidental Take Permit
Section 4.3, Biological Resources; Page 4.3-9;
First Paragraph
A list of the wildlife species observed in the survey area is presented in Appendix D
. Twilight/nighttime
surveys were not conducted, therefore crepuscular and nocturnal animals are likely under-represented in the
project
species
list;
however,
habitat
assessments
were
performed
for
all
special-status
species
to
ensure that any potentially
present rare species are adequately addressed.
On November 26, 2024, RBC
biologist Ian Hirschler visited the project site to conduct a habitat assessment for
Crotch’s bum
ble bee
(CBB)
based on the species’ 2022 state candidacy for listing.
Section 4.3, Biological Resources; Page 18;
Table 4.3-1: Special Status Plant and Wildlife Species
–
Potential
for Occurrence
Table 4.3
-
1 : Special Status Plant and Wildlife Species
–
Potential for Occurrence
Species
Status*
Habitat Description
Potential for Occurrence
on Project Site
PLANTS
Gambel’s water
cress
(
Nasturtium gambelii
)
FE, ST,
CRPR 1B.1
Perennial rhizomatous herb.
Blooms April
–
October.
Marshes and swamps.
Elevation 15
-
1,085 feet.
None.
No suitable habitat
present on
-
site.
Marsh sandwort (
Arenia
paludicola
)
FE, ST,
CRPR 1B.1
Perennial herb. Blooms May
–
August. Freshwater marsh.
None.
No suitable habitat
present on
-
site.
Mesa horkelia (
Horkelia
cuneata
var.
puberula
)
CRPR 1B.1
Perennial herb. Blooms
February
-
September. Maritime
chaparral, cismontane
woodland, and coastal scrub.
Elevation 230
-
2,657 feet.
None.
The Disturbed scrub
habitat and soils on
-
site
are not suitable for this
species.
Parish’s bush
-
mallow
(
Malacothamnus
parishii
)
CRPR 1A
Perennial deciduous shrub.
Blooms June
-
July. Chaparral
and coastal scrub. Elevation
1,000
-
1,495 feet.
None.
This perennial
shrub would have been
observed if present.
Parish’s gooseberry
(
Ribes divaricatum
var
.
parishii
)
CRPR 1A
Perennial deciduous shrub.
Blooms February
–
April.
Riparian woodland. Elevation
215
–
985 feet.
None.
No suitable habitat
present on
-
site.
Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-9
Table 4.3-1: Special Status Plant and Wildlife Species – Potential for Occurrence Species Status* Habitat Description
Potential for Occurrence
on Project Site
Peruvian dodder
(Cuscuta obtusiflora var.
glandulosa)
CRPR 2B.2 Parasitic annual vine. Blooms
July – October. Marshes and
swamps. Elevation 50-920
feet.
None. No suitable habitat
present on-site.
Pringle’s
monardella
(Monardella
pringlei)
CRPR 1A Annual herb. Blooms May-June.
Coastal scrub (sandy).
Elevation 985-1,310 feet.
Very low. Disturbed scrub
habitat on-site is
marginally suitable for this
species.
Salt marsh bird’s beak
(Chloropyron maritimum
ssp. maritimum)
FE, SE, 1B.2 Annual herb. Coastal dunes
and coastal salt marshes and
swamps. 0-98 feet. Blooming
period: May – October.
None. No suitable habitat
present on-site.
Santa Ana River
woolystar (Eriastrum
densifolium ssp.
sanctorum)
FE, SE, 1B.1 Perennial herb. Blooms April-September.
Chaparral and
coastal alluvial fan scrub.
Elevation 298-2,000 feet.
None. No suitable habitat
present on-site.
INVERTEBRATES
Delhi Sands flower-
loving fly (Rhaphiomidas
terminatus abdominalis)
FE Found in sandy areas composed of Delhi fine
sands, stabilized by sparse native vegetation.
None. No suitable Delhi
fine sands soils present on
site. Historically mapped
Delhi fine sands soils are
now eroded, compacted,
and over-vegetated.
Crotch’s bumble bee
(Bombus crotchii)
SC Arid shrublands and grasslands in coastal and
foothill areas of southern California. Nectar
plants include milkweeds, buckwheat, and
lupines.
Low to moderate.
Vegetation with suitable
nectar sources for foraging
occurs on site, though
small and isolated.
Minimal burrows for
nesting in undisturbed
areas.
FISH
Arroyo chub (Gila
orcuttii)
SSC Found in slow-flowing or backwater areas of
streams or rivers with mud or sand
substrates.
None. No suitable habitat
present on-site.
Santa Ana sucker
(Catostomus santaanae)
FT Found in small permanent streams. None. No suitable habitat present on-site.
Steelhead – Southern
California DPS
(Oncorhynchus mykiss
irideus pop. 10)
FE Inhabits small to moderately large, well-
oxygenated, shallow rivers with gravel
bottoms.
None. No suitable habitat
present on-site.
REPTILES
California glossy snake
(Arizona elegans
SSC Found in arid scrub, rocky washes,
grasslands, and chaparral habitats. Prefers
Low. Disturbed scrub
habitat on-site is
Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-10
Table 4.3-1: Special Status Plant and Wildlife Species – Potential for Occurrence Species Status* Habitat Description
Potential for Occurrence
on Project Site
occidentalis) habitats containing open areas and loose
soils for burrowing.
marginally suitable for this
species.
Coastal whiptail
(Aspidoscelis tigris
stejnegeri)
SSC A variety of rocky, sandy, dry, habitat
including sage scrub, chaparral, woodlands
on friable loose soil.
Low. Disturbed scrub
habitat on-site is
marginally suitable, and
species typically occurs
closer to the coast.
Southern California
legless lizard (Anniella
stebbinsi)
SSC Found in a variety of habitats including
coastal dunes, sandy washes, and alluvial
fans, containing moist, loose soils.
None. No suitable habitat
present on-site.
BIRDS
Burrowing owl (Athene
cunicularia)
SSCSC Found in grasslands and open scrub from
coast to foothills. Strongly associated with
California ground squirrel and other fossorial
mammal burrows.
Low-moderate. Very few
suitable burrows observed
on-site; however, this
species is known to occur
within the general area
and frequently inhabits
disturbed areas.
Coastal California
gnatcatcher (Polioptila
californica californica)
FT; SSC Found in sage scrub and adjacent chaparral
habitats often containing buckwheat or
sagebrush.
Low. Disturbed scrub
habitat on-site is relatively
small and isolated from
larger landscapes of
natural habitat.
Least Bell's vireo (Vireo
bellii pusillus)
FE (when
nesting);
SE (when
nesting)
Riparian woodland with understory of dense
young willows or mulefat and willow canopy.
Nests often places along internal or external
edges of riparian thickets.
None. No suitable habitat
present on-site.
Western yellow-billed
cuckoo (Coccyzus
americanus occidentalis)
FT; SE Exclusively inhabits large continuous riparian
areas, typically near streambeds or other
bodies of water.
None. No suitable habitat
present on-site.
MAMMALS
Los Angeles pocket
mouse (Perognathus
longimembris
brevinasus)
SSC Found in low elevation grassland, alluvial
sage scrub and coastal sage scrub on sandy
soils.
Low. Scrub habitat on site
does not occur on sandy
soils suitable for this
species.
Pocketed free-tailed bat
(Nyctinomops
femorosaccus)
SSC Rugged cliffs, rocky outcrops and slopes in
desert scrub and pinyon-juniper woodlands.
None. No suitable habitat
present on-site.
FE – Federally Endangered (USFWS); FT – Federally Threatened (USFWS); SE – State Endangered (CDFW); SC: Candidate for listing under CESA; SSC – Species of Special Concern (CDFW)
*CRPR – California Rare Plant Rank
1B – Plants rare, threatened, or endangered in California and elsewhere 2B – Plants rare, threatened, or endangered in California but more common elsewhere 3 – Review List: Plants about which more information is needed 4 – Plants of limited distribution
Threat Ranks
Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-11
Table 4.3-1: Special Status Plant and Wildlife Species – Potential for Occurrence Species Status* Habitat Description
Potential for Occurrence
on Project Site
0.1 – Seriously threatened in California (over 80 percent of occurrences threatened/high degree and immediacy of threat)
0.2 – Moderately threatened in California (20 to 80 percent of occurrences threatened/moderate degree and immediacy of threat)
0.3 – Not very threatened in California (less than 20 percent of occurrences threatened/low degree and immediacy of threat or no current threats known)
Source: Appendix D
Section 4.3, Biological Resources; Page 4.3-19; Following Paragraph 1 Threatened and Endangered Wildlife Species
Although no focused wildlife surveys were conducted, no federally or state -listed as threatened or endangered wildlife species were observed during the general field survey.
Crotch’s Bumble Bee
CBB has experienced a sharp population decline over the past decade and is a candidate for listing under CESA. Historically, CBB occurred from northern California south to Baja Mexico and from the coast to the central valley and southwestern desert, with s ome records as far as Nevada. However, since the early 2000’s a change in population ecology has been observed; CBB is found in approximately 75 percent of its historic range and has been extirpated from the northern extent of this range entirely. In addit ion, the species persistence within its extant range is estimated to be approximately 20 percent of its historic occupancy. Though CBB is relatively tolerant of fragmented and/or semi -urban environments, habitat loss, climate change, and pesticide use are considered imminent threats to populations.
Suitable habitat for this species includes a variety of open shrub and grassland vegetation communities that support significant stands of nectar sources, mostly in the form of flowering annuals. CBB’s primary nectar sources include Medicago spp., Lupinus spp., Chaenactis spp., Asclepias spp., Phacelia spp., and Salvia spp., which have easily accessible nectar that accommodates Crotch’s bumble bee’s relatively short tongue.
No Crotch’s bumble bee were documented in the survey area during the general biological survey or habitat assessment, though Crotch’s bumble bee has been documented within three miles of the project site. The project site supports small patches of native vegetation with suitable nectar sources. However, the available nectar sources on site are isolated and fragmented. Additionally, minimal small ma mmal burrows were documented during the 2024 habitat assessment, limiting the potential for CBB to nest on site; therefore, Crotch’s bumble bee has a low to moderate potential to occur on-site.
Section 4.3, Biological Resources; Page 4.3-20; Paragraph 2 Other Special-Status Wildlife Species
Burrowing owl (BUOW) is a candidate species for listing under CESA CDFW SSC at nesting sites and is federally protected by the MBTA. In California, suitable habitat for the burrowing owl is generally characterized by short, sparse vegetation with few shrubs, level to gentle topography, and well -drained Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-12
soils, such as naturally occurring grassland, shrub steppe, and desert habitats. BUOW may also occur within agricultural areas, ruderal grassy fields, vacant lows, and pastures containing suitable vegetation structure and useable burrows with foraging habi tat in proximity. BUOW usually use burrows dug by California ground squirrel and round-tailed ground squirrel and dens or holes dig by other fossorial species including badger and fox.
Section 4.3, Biological Resources; Page 4.3-21; Paragraph 10 Although the burrowing owl was not observed within the project site during the 2021 biological surveys, the species has the potential to occur on -site. As such, the Project would implement MM BIO-1A, and MM BIO-1B, and MM BIO-1C, which would require pre -construction surveys and implementation of a Burrowing Owl Relocation and Mitigation Plan or an Incidental Take Permit (ITP) in the event avoidance is not possible. Additionally, the Project would implement MM BIO-3 MM BIO-2, which would require the removal of habitat that support nests located within the project site, to occur outside of breeding season.
The project site has low to moderate potential to support Crotch’s bumble bee. Although Crotch’s bumble bee was not observed on -site, the Project could result in direct impacts on Crotch’s bumble bee in the form of death, injury, or harassment if Crotch’s bumble bee were to occur within the project site. Such impacts on foraging bees are not anticipated to be significant since adult Crotch’s bumble bee would likely flush during active construction acti vities. However, significant impacts on the species could occur as a result of direct impacts on nesting sites. Accordingly, the Project would implement MM BIO -2A and MM BIO-2B, which would require removal of suitable habitat and pre-construction surveys one year prior to ground disturbing activities to identify active nests and suitable nectar plants for foraging, on-site.
Section 4.3, Biological Resources; Page 4.3-22; Paragraph 1 With the implementation of mitigation measures MM BIO-1A through MM BIO-3 MM BIO-2 impacts to special status species would be less than significant.
Mitigation Program
Standard Conditions
No standard conditions are applicable.
Mitigation Measures
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures No mitigation measures are applicable.
Project Mitigation Measures
MM BIO-1A No less than 14 days prior to the onset of Project construction activities, a qualified biologist shall survey the construction limits of the project site and a 500 -foot buffer for the presence of burrowing owls and/or occupied nest burrows. A second survey shall be conducted within 24 hours prior to the onset of construction activities. The surveys shall be conducted in accordance with the most current CDFW survey methods.
Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-13
The Project applicant shall submit at least one burrowing owl preconstruction survey report to the satisfaction of the City and CDFW to document compliance with this mitigation measure. For the purposes of this measure, ‘qualified biologist’ is a biologist who meets the requirements set forth in the CDFW BUOW Guidelines.
Prior to the initiation of construction activities, a qualified biologist shall conduct pre - construction surveys for BUOW within suitable habitat to determine presence/absence of the species. The survey shall be conducted in accordance with the most current CDFW protocol within 30 days of site disturbance to determine whether the burrowing owl is present at the site. Pre -construction surveys shall include suitable BUOW habitat within the Project footprint and within 500 feet of the Project footprint (or within an appropriate buffer as required in the most recent guidelines and where legal access to conduct the survey exists). If BUOW are not detected during the clearance survey, no additional mitigation is required.
If BUOW is located, occupied BUOW burrows shall not be disturbed during the nesting season (February 1 through August 31) unless a qualified biologist approved by CDFW verifies through non-invasive methods that either the birds have not begun egg laying and incubation or the juveniles from the occurred burrows are foraging independently and capable of independent survival. A 500 -foot non -disturbance buffer (where no work activities may be conducted) shall be maintained between Project activities and nesting BUOW during the nesting season, unless otherwise authorized by CDFW.
If BUOW is detected during the non -breeding season (September 1 through January 31) or confirmed to not be nesting, a 160 -foot non-disturbance buffer shall be maintained between the Project activities and occupied burrow(s). Alternatively, a Burrowing Owl Relocation Plan may be prepared and submitted for approval by CDFW. Once approved, the Burrowing Owl Relocation Plan would be implemented to relocate non -breeding BUOW from the project site. The Burrowing Owl Relocation Plan shall detail methods and guidance for passive relocation of BUOW from the project site, provide monitoring and management of the replacement burrow sites reporting requirements, and ensure that a minimum of two suitable, unoccupied burrows are available off-site for every burrowing owl or pair of burrowing owls to be passively relocated. Compensatory mitigation of habitat would be required if occupied burrows or territories occur within the permanent impact footprints. Ratios typically include a minimum of 19.5 acres per nesting burrow lost; however, habitat compensation shall be approved by CDFW and detailed in the Burrowing Owl Relocation Plan.
MM BIO-1B If BUOW are documented during pre -construction surveys, biological monitoring will be performed to ensure unauthorized impacts on burrowing owl do not occur as a result of the Project. The definitive frequency and duration of monitoring shall be dependent on Project and project site conditions, such as the type of construction activity occurring, whether it is the breeding versus non -breeding season, if a burrowing owl has been recently documented on-site, and the efficacy of the exclusion buffers, as determined by a qualified biologist and in coordination with CDFW.
Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-14
If avoidance is not possible, either directly or indirectly, a Burrowing Owl Relocation and Mitigation Plan shall be prepared and submitted for approval by CDFW. Once approved, the Burrowing Owl Relocation and Mitigation Plan would be implemented to reloca te non-breeding burrowing owls form the project site. the Burrowing Owl Relocation and Mitigation Plan shall detail methods for passive relocation of BUOW from the project site, provide guidance for the monitoring and management of the replacement burrow s ites and associated reporting requirements, and ensure that a minimum of two suitable, unoccupied burrows are available off -site for every burrowing owl of pair of burrowing owls to be passively relocated. Compensatory mitigation of habitat would be requir ed if occupied burrows of territories occur within the permanent impact footprint. Habitat compensation shall be approved by CDFW and detailed in the Burrowing Owl Relocation and Mitigation Plan.
MM BIO-1C If burrowing owl is documented on-site or within 500-feet of the project site during either pre-construction surveys or biological monitoring, burrowing owl and occupied burrowing owl burrows shall not be disturbed. CDFW shall be contacted within 48 hours of the burrowing owl observation and disturbance avoidance buffers shall be set up immediately by a qualified biologist in accordance with the recommendations from CDFW. No work will occur within avoidance buffers until consultation with CDFW has occurred and/or applicable permits are issued, if required. If avoidance of burrowing owls is not possible, either directly or indirectly, an Incidental Take Permit (ITP) or a Burrowing Owl Relocation and Mitigation Plan (Plan) m ay be required. The Plan may also include a measure describing compensatory mitigation requirements as determined in coordination with CDFW. The project proponent will adhere to the conditions of the ITP and/or measures outlined in the Plan. If burrowing owl is no longer a candidate or listed species under CESA at the time of project construction, then an ITP may not be required.
MM BIO-2A Within one year prior to ground disturbing activities, a qualified biologist shall conduct active Crotch’s bumble bee nest surveys during the typical colony active period (April – August) following survey guidelines provided in the CDFW’s Survey Considerat ions for CESA Candidate Bumble Bee Species. The qualified biologist shall be familiar with Crotch’s bumble bee identification and life history. If suspected or active Crotch’s bumble bee nests are present, a qualified biologist shall establish an appropriate non -disturbance buffer around each nest immediately prior to initiation of construction activities using stakes and/or brightly colored flagging to avoid disturbance or incidental take of the species. If avoidance buffers are not feasible duri ng construction activities, then CDFW shall be consulted and an ITP may be required. If Crotch’s bumble bee is no longer a candidate or listed species under CESA at the time of project construction, then these mitigation measures may not be required.
MM BIO-2B Within one year prior to ground disturbing activities, a qualified biologist shall survey suitable nectar plants for foraging Crotch’s bumble bee during the typical flight season (February – October) following survey guidelines provided in the CDFW’s Surve y Considerations for CESA Candidate Bumble Bee Species . The qualified biologist shall be familiar with Crotch’s bumble bee identification and life history. If occupied foraging Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-15
habitat for Crotch’s bumble bee is present within project impact areas, a Revegetation Plan shall be prepared which includes native shrubs and native seed mixes that contain known nectar sources for Crotch’s bumble bee. The Revegetation Plan shall be developed in consultation with a qualified Crotch’s bumble bee biologist and implemented following project construction.
MM BIO-23 To avoid direct impacts on raptors and/or native/migratory birds, removal of habitat that supports active nests in the proposed area of disturbance should occur outside of the breeding season for these species (generally February 1 to September 15). If rem oval of habitat in the proposed area of disturbance must occur during the breeding season, a qualified biologist shall conduct a pre -construction survey to determine the presence or absence of nesting birds in the proposed area of disturbance. The pre-construction survey shall be conducted within ten (10) calendar days prior to the start of construction activities (including removal of vegetation). If nesting birds are observed, a letter report or mitigation plan in conformance with applicable state and federal Law (i.e., appropriate follow up surveys, monitoring schedules, construction, and noise barriers/buffers, etc.) shall be prepared and include proposed measures to be implemented to ensure that take of birds or eggs or disturbance of breeding activities is avoided. The report or mitigation plan shall be submitted to the CDFW and/or USFWS, as applicable, for review and approval and implemented to the satisfaction of those agencies. The Project biologist shall verify and approve that all measur es identified in the report or mitigation plan are in place prior to and/or during construction. If nesting birds are not detected during the pre-construction survey, no further mitigation is required.
Santa Ana Truck Terminal Project Section 3.0
Final Environmental Impact Report Errata to the Draft EIR
City of Rialto 3-16
This Page Intentionally Left Blank
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-1
4.0 MITIGATION MONITORING AND REPORTING PROGRAM
4.1 PURPOSE OF MITIGATION MONITORING AND REPORTING
PROGRAM
The California Environmental Quality Act (CEQA) requires that all public agencies establish monitoring and/or reporting procedures for mitigation adopted as conditions of approval to mitigate or avoid significant environmental impacts. This Mitigation Monitoring and Reporting Program (MMRP) has been developed to provide a vehicle by which to monitor the Mitigation Program outlined in the Santa Ana Truck Terminal Project EIR. The Santa Ana Truck Terminal Project MMRP has been prepared in conformance with Public Resources Code Section 21081.6 and City of Rialto Monitoring Requirements.
Specifically, Public Resources Code Section 21081.6 states:
(a) When making findings required by paragraph (1) of subdivision (a) of Section 21081 or when adopting a mitigated negative declaration pursuant to paragraph (2) of subdivision (c) of Section 21080, the following requirements shall apply:
(1) The public agency shall adopt a reporting or monitoring program for the changes made to the project or conditions of project approval, adopted in order to mitigate or avoid significant effects on the environment. The reporting or monitoring program shall be designed to ensure compliance during project implementation. For those changes which have been required or incorpor ated into the project at the request of a responsible agency or a public agency having jurisdiction by law over natural resources affected by the project, that agency shall, if so requested by the lead or responsible agency, prepare and submit a proposed reporting or monitoring program.
(2) The lead agency shall specify the location and custodian of the documents or other material which constitute the record of proceedings upon which its decision is based.
(b) A public agency shall provide that measures to mitigate or avoid significant effects on the environment are fully enforceable through permit conditions, agreements, or other measures. Conditions of project approval may be set forth in referenced documents which address required mitigation measures or incase of the adoption of a plan, policy, regulation, or other public project, by incorporating the mitigation measures into the plan, policy, regulation, or project design. (c) Prior to the close of the public review period for a draft environmental impact report or mitigated negative declaration, a responsible agency, or a public agency having jurisdiction over natural resources affected by the project, shall either submit to the lead agency complete and detailed performance objectives for mitigation measures which would address the significant effects on the environment identified by the responsible agency or agency having jurisdiction over natural resources affected by the project, or refer the lead agency to appropriate, readily available guidelines or reference documents. Any mitigation measures submitted to a lead agency by a responsible agency or an agency having jurisdiction over natural resources affected Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-2
by the project shall be limited to measures which mitigate impacts to resources which are subject to the statutory authority of, and definitions applicable to, that agency.
Compliance or noncompliance by a responsible agency or agency having jurisdiction over natural resources affected by a project with that requirement shall not limit the authority of the responsible agency or an agency having jurisdiction over natural resources affected by a project, or the authority of the lead agency, to approve, condition, or deny projects as provided by this division or any other provision of law.
State CEQA Guidelines Section 15097 provides clarification of mitigation monitoring and reporting requirements and guidance to local lead agencies on implementing strategies. The reporting or monitoring program must be designed to ensure compliance during project implementation. The City of Rialto is the Lead Agency for the Santa Ana Truck Terminal Project and is therefore responsible for ensuring implementation of the MMRP. The MMRP has been drafted as a fully enforceable monitoring program to meet Public Resources Code Section 21081.6 requirements.
4.2 ORGANIZATION
The MMRP is comprised of the Mitigation Program and includes measures to implement and monitor the Mitigation Program. The MMRP defines the following for each MM:
▪ Definition of Mitigation. The Mitigation Measure contains the criteria for mitigation, either in the form of adherence to certain adopted regulations or identification of the steps to be taken in mitigation.
▪ Implementation Timing. In each case, a time frame is provided for performance of the mitigation or the review of evidence that mitigation has taken place. The performance points selected are designed to ensure that impact -related components of Project implementation do not proc eed without establishing that the mitigation is implemented or ensured. All activities are subject to the approval of all required permits from agencies with permitting authority over the specific activity.
▪ Monitoring and Reporting Methods. The monitoring phase of a project refers to the period when the mitigation measures are actively tracked. The monitoring frequency specifies how often these measures will be evaluated, and the compliance actions are those taken by the Enforcement or Monitoring Agency to confirm that the required mitigation measures have been prop erly implemented. The MMRP outlines the schedule and procedures for monitoring the mitigation actions, including who is responsible for implementing them, the frequency of checks, and how compliance will be confirmed and reported.
▪ Responsible for Approval/Monitoring. Unless otherwise indicated, an applicant would be the responsible party for implementing the mitigation, and the City of Rialto or designated representative is responsible for monitoring the performance and implementation of the mitigation measures. To gu arantee that the mitigation will not be inadvertently overlooked, a supervising public official acting as the Designated Representative is the official who grants the permit or authorization called for in the performance. Where more than one official is identified, permits or authorization from all officials shall be required.
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-3
The MM numbering system in the table corresponds with the MM numbering system in the EIR. The MMRP table’s last column will be used by the parties responsible for documenting when MM implementation has been completed. The ongoing documentation and monitori ng of mitigation compliance will be completed by the City of Rialto. The completed MMRP and supplemental documents will be kept on file at the City of Rialto Planning Division.
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-4
SANTA ANA TRUCK TERMINAL PROJECT
MITIGATION MONITORING AND REPORTING PROGRAM
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
Air Quality
MM AIR-1: Prior to the issuance of a tenant occupancy permit, the Planning Department shall confirm that the Project plans and specifications show the following:
▪ All outdoor cargo handling equipment (including yard trucks, hostlers, yard goats, pallet jacks, and forklifts) are zero emission/powered by electricity. Each building shall include the necessary charging stations for cargo handling equipment.
Note that SC AQMD Rule 2305 (Warehouse Indirect Source
Rule) Warehouse Actions and Investments to Reduce
Emissions (WAIRE) points may be earned for electric/zero emission yard truck/hostler usage. This mitigation measure applies only to tenant improvements and not the building shell approvals.
▪ All standard emergency generators shall meet California Air Resources Board Tier 4 Final emissions standards. A copy of each unit’s Best Available Control Technology (BACT)
documentation (certified tier specification) and CARB or SCAQMD operating permit (if applicable) shall be provided to the City.
Prior to Issuance of
Tenant Occupancy
Permit
Approval of Plans and
Specifications
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Agua Mansa Industrial Corridor Specific Plan EIR Mitigatio n Measures: Air Quality
Mitigation Measure 1: Local bus lines should be encouraged to extend service into the Study Area to discourage the use of private automobiles by employees. Bus shelters and bus stops should be constructed as dictated by ridership demand.
During Construction and
Operation
City to Oversee Bus
Line Extensions
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-5
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Air Quality
Mitigation Measure 2: Individual industrial users should take all reasonable steps to encourage employees to car-pool rather than utilizing one vehicle per employee. Typical measures which can be taken by employers include:
a. Designation of preferential parking areas which may be used only by employees engaged in car-pooling.
b. Employers should be encouraged to institute van -pooing programs to reduce the number of vehicles driven by
employees.
During Construction and
Operation
Site Inspections City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Project Tenant(s)
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Air Quality
Mitigation Measure 3: The local governmental entities should enforce emission standards on equipment used during the construction and operation of industrial facilities.
Prior to Construction
During Construction and
Operation
Verify Conformance
with Emission
Standards
South Coast Air
Quality Management
District
City of Rialto Building
and Safety Division
City of Rialto Planning
Division
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Air Quality
Mitigation Measure 4: To minimize dust during construction activities, periodic soil wetting should be utilized.
Prior to Construction
During Construction
Verify Construction
Requirements Prior to
Issuance of Grading
Permit
On-site inspections
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Project Contractor
Biological Resources
MM BIO -1A: No less than 14 days prior to the onset of Project construction activities, a qualified biologist shall survey the construction limits of the project site and a 500-foot buffer for the presence of burrowing owls and/or occupied nest burrows. A Prior to Construction
Activities
Verify Pre-Construction
Surveys Conducted
City of Rialto Planning
Division
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-6
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
second survey shall be conducted within 24 hours prior to the onset of construction activities. The surveys shall be conducted in accordance with the most current CDFW survey methods.
The Project applicant shall submit at least one burrowing owl preconstruction survey report to the satisfaction of the City and CDFW to document compliance with this mitigation measure. For the purposes of this measure, ‘qualified biologist’ is a biologist who meets the requirements set forth in the CDFW BUOW Guidelines.
Verify Completion of
Field Inspections
Compliance Report
Prepared by Qualified
Biologist
City of Rialto Building
and Safety Division
Qualified Biologist
MM BIO -1B: If BUOW are documented during pre -construction surveys, biological monitoring will be performed to ensure unauthorized impacts on burrowing owl do not occur as a result of the Project. The definitive frequency and duration of monitoring shall be dependent on Project and project site conditions, such as the type of construction activity occurring, whether it is the breeding versus non-breeding season, if a burrowing owl has been recently documented on -site, and the efficacy of the exclusion buffers, as determined by a qualified biologist and in coordination with CDFW.
During Construction Verify Implementation
of Biological
Monitoring
Verify Completion of
Field Inspections
Compliance Report
Prepared by Qualified
Biologist
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Qualified Biologist
MM BIO -1C: If burrowing owl is documented on -site or within 500-feet of the project site during either pre-construction surveys or biological monitoring, burrowing owl and occupied burrowing owl burrows shall not be disturbed. CDFW shall be contacted within 48 hours of the burrowing owl observation and disturbance avoidance buffers shall be set up immediately by a qualified biologist in accordance with the recommendations from CDFW.
No work will occur within avoidance buffers until consultation with CDFW h as occurred and/or applicable permits are issued, if required. If avoidance of burrowing owls is not possible, either directly or indirectly, an Incidental Take Permit (ITP) or a Burrowing Owl Relocation and Mitigation Plan (Plan) may be required. The Plan may also include a measure describing compensatory During Construction Verify contact of CDFW
Verify Completion of
Field Inspections
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Qualified Biologist
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-7
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
mitigation requirements as determined in coordination with CDFW. The project proponent will adhere to the conditions of the ITP and/or measures outlined in the Plan. If burrowing owl is no longer a candidate or listed species under CESA at the time of project construction, then an ITP may not be required.
MM BIO-2A: Within one year prior to ground disturbing activities, a qualified biologist shall conduct active Crotch’s bumble bee nest surveys during the typical colony active period (April – August) following survey guidelines provided in the CDFW’s Survey Considerations for CESA Candidate Bumble Bee Species. The qualified biologist shall be familiar with Crotch’ s bumble bee identification and life history. If suspected or active Crotch’s bumble bee nests are present, a qualified biologist shall establish an appropriate non -disturbance buffer around each nest immediately prior to initiation of construction activit ies using stakes and/or brightly colored flagging to avoid disturbance or incidental take of the species. If avoidance buffers are not feasible during construction activities, then CDFW shall be consulted and an ITP may be required. If Crotch’s bumble bee is no longer a candidate or listed species under CESA at the time of project construction, then these mitigation measures may not be required.
Prior to Issuance of
Grading Permit
Prior to Ground
Disturbing Activities
Verify Completion of
Surveys
Verify Completion of
Field Inspections
Compliance Report
Prepared by Qualified
Biologist
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Qualified Biologist
MM BIO-2B: Within one year prior to ground disturbing activities, a qualified biologist shall survey suitable nectar plants for foraging Crotch’s bumble bee during the typical flight season (February – October) following survey guidelines provided in the CDFW’s Survey Considerations for CESA Candidate Bumble Bee Species The qualified biologist shall be familiar with Crotch’s bumble bee identification and life history. If occupied foraging habitat for Crotch’s bumble bee is present within project impact areas, a Revegetation Plan shall be prepared which includes native shrubs Prior to Issuance of
Grading Permit
Prior to Ground
Disturbing Activities
Verify Completion of
Surveys
Verify Completion of
Field Inspections
Compliance Report
Prepared by Qualified
Biologist
City of Rialto Planning
Division
City of Rialto Building
and Safety
Department
Qualified Biologist
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-8
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
and native seed mixes that contain known nectar sources for Crotch’s bumble bee. The Revegetation Plan shall be developed in consultation with a qualified Crotch’s bumble bee biologist and implemented following project construction.
MM BIO -3: To avoid direct impacts on raptors and/or
native/migratory birds, removal of habitat that supports active nests in the proposed area of disturbance should occur outside of the breeding season for these species (generally February 1 to September 15). If removal of habitat in the proposed area of disturbance must occur during the bre eding season, a qualified biologist shall conduct a pre-construction survey to determine the presence or absence of nesting birds in the proposed area of disturbance. The pre -construction survey shall be conducted within ten (10) calendar days prior to the start of construction activities (including removal of vegetation). If nesting birds are observed, a letter report or mitigation plan in conformance with applicable state and federal Law (i.e., appropriate follow up surveys, monitoring schedules, construc tion, and noise barriers/buffers, etc.) shall be prepared and include proposed measures to be implemented to ensure that take of birds or eggs or disturbance of breeding activities is avoided. The report or mitigation plan shall be submitted to the CDFW and/or USFWS, as applicable, for review and approval and implemented to the satisfaction of those agencies. The project biologist shall verify and approve that all measures identified in the report or mitigation plan are in place prior to and/or during const ruction. If nesting birds are not detected during the pre -construction survey, no further mitigation is required.
Prior to Breeding Season Verify Removal of
Nesting Habitat
Outside of Breeding
Season
Verify Pre-Construction
Survey Conducted, if
Applicable
Verify Completion of
Field Inspections
Compliance Report
Prepared by Qualified
Biologist
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Qualified Biologist
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-9
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
Cultural Resources
SC CUL-1: California Health and Safety Code Section 7050.5, CEQA Section 15064.5, and Public Resources Code Section 5097.98 mandate the process to be followed in the event of an accidental discovery of any human remains in a location other than a dedicated cemetery. California Health and Safety Code Section 7050.5 requires that in the event that human remains are discovered within the project site, disturbance of the site shall be halted until the coroner has conducted an investigation into the circumstances, manner and cause of death , and the
recommendations concerning the treatment and disposition of the human remains have been made to the person responsible for the excavation, or to his or her authorized representative, in the manner provided in Section 5097.98 of the Public Resources Code.
If the coroner determines that the remains are not subject to his or her authority and if the coroner recognizes or has reason to believe the human remains to be those of a Native American, he or she shall contact, by telephone within 24 hours, th e Native American Heritage Commission (NAHC). The NAHC will then identify the most likely descendants (MLD) to be consulted regarding treatment and/or reburial of the remains. If an MLD cannot be identified, or the MLD fails to make a recommendation regarding the treatment of the remains within 48 hours after gaining access to the remains, the property owner shall rebury the Native American human remains and associated grave goods with appropriate dignity on the property in a location not subject to further subsurface disturbance.
During Construction Verify Compliance with
California Health and
Safety Code Section
7050.5, CEQA Section
15064.5, and Public
Resources Code
Section 5097.98
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
County Coroner
Project Contractor
MM CUL-1: Retain a Qualified Archaeologist. Prior to the issuance of any grading permits, or any permit authorizing ground disturbance, the Project applicant shall, meeting Secretary of Interior standards and to the satisfaction of the City Planning Director, demonstrate that a qualified archaeolog ist has been Prior to Issuance of any
Grading Permits /
During Construction
Verify Retainment of
Qualified Archaeologist
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-10
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
retained to respond on an as -needed basis to address
unanticipated archaeological discoveries. In the event that cultural resources are discovered during Project activities, all work in the immediate vicinity of the find (within a 60-foot buffer) shall cease and the archaeologist shall assess the find. Work on the other portions of the project outside of the buffered area may continue during this assessment period. Additionally, the Yuhaaviatam of San Manuel Nation Cultural Resources Department (YSMN) shall be contacted, as detailed within MM TCR-1 (refer to Section 4.16, Tribal Cultural Resource, of this EIR), regarding any pre -contact finds and be provided information after the archaeologist makes his/her initial assessment of the nature of the find, so as to provide Tribal input with regards to significance and treatment.
Halt all Work in
Immediate Vicinity of a
Find
Periodic Field
inspections During
Construction in the
Event Unknown
Resources are
encountered
Qualified Archeologist
Yuhaaviatam of San
Manuel Nation
MM CUL-2: If significant pre-contact cultural resources, as defined by CEQA, are discovered and avoidance cannot be ensured, the archaeologist shall develop a Monitoring and Treatment Plan, the draft of which shall be provided to YSMN for review and comment, as detailed within MM TCR-1 (Refer to Section 4.16, Tribal Cultural Resource, of this EIR). The archaeologist shall monitor the remainder of the Project and implement the Monitoring
Treatment Plan accordingly.
During Construction Verify Implementation
of Monitoring and
Treatment Plan
Verify Completion of
Field Inspections
Compliance Report
Prepared by Qualified
Biologist
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Project Contractor
Qualified
Archaeologist
Yuhaaviatam of San
Manuel Nation
MM CUL-3: If human remains of funerary object are encountered during any activities associated with the Project, work in the immediate vicinity (within a 100-foot buffer of the find) shall cease and the County Coroner shall be contacted pursuant to State Health and Safety Code §7050.5 and that code enforced for the duration of the Project.
Prior to Construction
During Construction
Activities
Contact County
Coroner, if Required
Periodic Field
Inspections Performed
by Qualified
Archaeologist, if
Applicable
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Project Contractor
Qualified
Archaeologist
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-11
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Archaeological/Historical Resources
Mitigation Measure 2: The San Bernardino County Museum Association recommends that at least some level of evaluation of potential impacts to cultural resources be undertaken by a qualified archaeologist for every proposed project within the Study Area due to the overall prehist oric and early historic significance of the region.
Prior to Construction Verify Evaluation of
Potential Impacts
Verify Completion of
Field Inspections
Compliance Report
Prepared by Qualified
Archaeologist
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Qualified
Archaeologist
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Archaeological/Historical Resources
Mitigation Measure 3: In instances where earth movement uncovers potentially significant artifacts or fossils, work should be curtailed until a qualified specialist is retained to evaluate the significance of any finds.
Prior to Construction
During Ground-
Disturbing Activities
Avoidance of Potential
Finds
Verify Completion of
Field Inspections
Compliance Report
Prepared by Qualified
Archaeologist
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Qualified
Archaeologist or
Historian
Energy
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Public Services and Utilities
Mitigation Measure 5: To assure adequate levels of water conservation, each specific development should be required to install water conservation measures, such as low -flow fixtures, drought resistant vegetation and drip irrigation systems.
Project Implementation Verify Installation of
Water Conservation
Measures
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Geology and Soils
SC GEO -1: The Applicant shall submit to the City of Rialto Community Development Department and Public Works
Department for review and approval, a site -specific, design-level geotechnical investigation prepared for the project site by a Prior to Construction Verify Completion of
Required Geotechnical
Investigation
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-12
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
registered geotechnical engineer. The investigation shall comply with all applicable State and local code requirements1 and:
a) Include an analysis of the expected ground motions at the site from known active faults using accepted methodologies;
b) Determine structural design requirements as prescribed by the most current version of the California Building Code, including applicable City from known active faults; and c) Determine the final design parameters for walls, foundations, foundation slabs, utilities, roadways, parking lots, sidewalks, and other surrounding related improvements.
Project plans for foundation design, earthwork, and site preparation shall incorporate all of the mitigation in the site - specific investigations. The structural engineer shall review the site-specific investigations, provide any additional necessary measures to meet Building Code requirements, and incorporate all applicable recommendations from the investigation in the structural design plans and shall ensure that all structural plans for the Project meet current Building Code requirements.
The City’s registered geotechnical engineer or third -party registered engineer retained to review the geotechnical reports shall review each site-specific geotechnical investigation, approve the final report, and require compliance with all geotechnical requirements contained in the investigation in the plans submitted for the grading, foundation, structural, infrastructure and all other relevant construction permits.
The City shall review all Project plans for grading, foundations, structural, infrastructure and all other relevant construction permits to ensure compliance with the applicable geotechnical investigation and other applicable Code requirements.
1 Rialto, CA Municipal Code Section 11.12.070 (Ord. 1234 (part), 1995: Ord. 649 §1 (part), 1973: 1965 Code Title XIII, Ch. 11, §7). Accessed August 2023.
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-13
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
MM GEO -1: Retain a Qualified Paleontologist. Prior to the issuance of any grading permits, or any permit authorizing ground disturbance, the Project Applicant shall, to the satisfaction of the City Planning Director, demonstrate that a qualified paleontologist has been retained to respond on an as -needed basis to address unanticipated paleontological discoveries. In the event that fossils or fo ssil-bearing deposits are discovered during construction, excavations within 50 feet of the find shall be temporarily halted or diverted. The paleontologist shall document the discovery as needed in accordance with Society of Vertebrate Paleontology standards, evaluate the potential resource, and assess the significance of the find under the criteria set forth in CEQA Guidelines Section 15064.5. The paleontologist shall notify the appropriate agencies to determine procedures that would be followed before construction is allowed to resume at the location of the find. If in consultation with the paleontologist, City staff and the Project Applicant determine that avoidance is not feasible, the paleontologist shall prepare an excavation plan for reducing the effect of the Project on the qualities that make the resource important. The plan shall be submitted to the City for review and approval and the Project Applicant shall implement the approval plan.
Prior to Issuance of
Grading Permit
Upon discovery of fossils
or fossil-bearing
deposits, if applicable
Verify Retainment of
Qualified
Paleontologist
Verify Documentation
of Potential Find
Verify Completion of
Field Inspections
Compliance Report
Prepared by Qualified
Paleontologist
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Qualified
Paleontologist
Greenhouse Gas Emissions
MM GHG-1: Prior to the issuance of a building permit, the Project shall install solar photovoltaic (PV) panels or other source of renewable energy generation on-site, or otherwise acquire energy from the local utility that has been generated by renewable sources, that would provide 100 percent of the anticipa ted electricity demand (i.e., the Title 24 electricity demand and the plug-load, anticipated to be approximately 4.62 kilowatt hours per year [kWh/year] per square foot for warehouse uses, 17.53 Prior to Issuance of
Building Permit
Confirm Installation of
Renewable Energy
Generation
Verify Completion of
Field Inspection
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-14
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
kWh/year/sf for office uses, 9.54 kWh/year/sf for automobile care centers, and 38.16 kWh/year/acre for parking lots2).
With anticipated energy consumption at approximately 2.3 million kWh per year, a PV panel array covering approximately one third of the proposed truck terminal roof space would provide sufficient on-site renewable energy generation to offset consumption.3 The final PV generation facility size requires approval by Southern California Edison (SCE). SCE’s Rule 21 governs operating and metering requirements for any facility connected to SCE’s distribution system. Should SCE limit the off -site export, the proposed Project may utilize a battery energy storage system (BESS) to lower off -site export while maintaining on -site renewable generation to off-set consumption.
MM GHG-2: Prior to the issuance of a building permit, the Project Applicant or successor in interest shall provide documentation to the City demonstrating the following:
▪ The Project shall be designed to achieve Leadership in Energy and Environmental Design (LEED) certification to meet or exceed CALGreen Tier 2 standards in effect at the time of building permit application in order to exceed 2022 Title 24 energy efficiency standards.
▪ The Project shall provide facilities to support electric charging stations per the Tier 2 standards in Section A5.106.5.3 (Nonresidential Voluntary Measures) of the 2022 CALGreen Code.
Prior to Issuance of
Building Permit
Verify LEED
Certification
Verify Electric Charging
Stations
Implementation
Verify Completion of
Field Inspection
City of Rialto Planning
Division City of Rialto
Building and Safety
Division
MM GHG -3: The development shall divert a minimum of 75 percent of landfill waste. Prior to issuance of certificate of tenant occupancy permits, a recyclables collection and load area shall be constructed in compliance with City standards for recyclable Prior to Issuance of
Certificate of Occupancy
Permit(s)
Verify Diversion of 75%
of Project Landfill
Waste
City of Rialto Planning
Division City of Rialto
2 The expected electricity demand is based on CalEEMod; refer to Appendix B. 3 Estimated solar generation potential estimated using the National Renewable Energy Laboratory PVWatt Calculator: https://pvwatts.nrel.gov/pvwatts.php.
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-15
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
collection and loading areas. This mitigation measure applies only to tenant permits and not the building shell approvals. The diversion plan shall also comply with the established solid waste and recycling laws including AB 939 and AB 341.
During Project
Construction and
Operation
Building and Safety
Division
MM GHG -4: Prior to the issuance of an occupancy permit, the Project Applicant or successor in interest shall provide documentation to the City demonstrating that low water use landscaping and water -efficient (e.g., drip irrigation) systems would are installed.
Prior to Issuance of
Occupancy Permit
Documentation of Low
Water Use Landscaping
Verify Completion of
Field Inspections
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
City of Rialto Public
Works Department
Hazards and Hazardous Materials
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Land Use
Mitigation Measure 3: Any toxic or hazardous wastes which are transported, processed, generated or stored shall be handled consistent with the regulations of the Environmental Protection Agency, the State Department of Health Services, and the South Coast Air Quality Management District. The transportation of any toxic or hazardous substances through residential areas shall be prohibited.
During Project
Construction and
Operation
Verify Handling of
Hazardous Materials
Consistent with
Applicable Regulations
Periodic Field
Inspections During
Construction, if
Applicable
Verify Completion of
Field Inspection
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Hydrology and Water Quality
SC HYD -1: The Applicant or his/her designees shall obtain a General Permit for Stormwater Discharge Associated with Prior to Grading Permit
Issuance
Verify General Permit
for Stormwater
City of Rialto Public
Works Department
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-16
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
Construction Activity (Construction Activity General Permit). The Applicant or his/her designees shall provide a copy of this permit to the City Public Works Department prior to the issuance of the first grading permit.
Discharge Associated
with Construction
Activity Approval
Copy of General Permit
Provided to the
Building & Safety
Division
City of Rialto Building
and Safety Division
SC HYD -2: Prior to issuance of the first grading permit, the Applicant shall submit to the City Engineer for approval, a SWQMP specifically identifying BMPs that will be incorporated into the Project to control stormwater and non -stormwater pollutants during and aft er construction. To ensure compliance, a legal and fiduciary enforcement mechanism in the form of a Storm Water Quality Management Plan Agreement shall be executed with the City of Rialto. This agreement shall additionally be recorded in the office of the County Recorder for the County of San Bernardino.
The SWQMP shall specify best management practices specific to the project site, which shall be integrated into the stormwater conveyance plan. The plan shall identify specific strategies. (see Section 4.9, Hydrology and Water Quality , for entire text of the mitigation measure).
Prior to Grading Permit
Issuance
Verify Storm Water
Quality Management
Plan
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
City Engineer
SC HYD-3: An Erosion Control Plan shall be prepared, and included with the Project’s grading plan, and implemented for the Project that identifies specific measures to control on -site and off -site erosion from the time ground disturbing activities are initiated through completion of grading. The Erosion Control Plan shall include the following measures at a minimum: (a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in Southern California; and (b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on -site or off -site as a Prior to Grading Permit
Issuance
Verify Erosion Control
Plan on Project Grading
Plans
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-17
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
result of this Project will be corrected through a remediation or restoration program within a specified time frame.
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Hydrology and Flood Control
Mitigation Measure 2: Where feasible, the extent of impervious surfaces on individual industrial sites should be limited to minimize the quantity of storm run-off.
During Project
Construction
Verify Minimization of
Impervious Surfaces
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Land Use and Planning
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Land Use
Mitigation Measure 1: The site development standards and performance standards contained in Section 4.4.2 of the Specific Plan shall be adhered to in reviewing proposed specific developments. Adherence to these standards, especially the specific criteria for industrial uses in proximity to residential and other sensitive uses, will minimize any potential impacts.
During Project
Construction and
Operation
Verify Adherence to
Applicable
Development
Standards and
Performance Standards
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Noise and Vibration
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Environmental Health and Hazards
Mitigation Measure 2: Interior noise levels in residential and office structures shall not exceed 45 dBA.
During Operation Verify Project Noise
Does Not Exceed
Applicable Thresholds
Verify Completion of
Field Inspections
Compliance Report
Prepared by Qualified
Noise Consultant
City of Rialto Planning
Division
City of Building and
Safety Division
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-18
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Environmental Health and Hazards
Mitigation Measure 3: Where necessary noise retardant measures should be incorporated into the design of industrial structures.
Such measures include, but are not limited to, berms, noise attenuation walls, building insulation and the limitation of processing/manufacturing activities to enclosed buildings.
During Construction
Verify Incorporation of
Applicable Noise
Retardant Measures
Verify Completion of
Field Inspections
Compliance Report
Prepared by Qualified
Noise Consultant
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Environmental Health and Hazards
Mitigation Measure 4: The noise standards promulgated by the local jurisdictions shall be adhered to. Each proposed use shall be reviewed for noise generation potential prior to approval.
During Project
Construction and
Operation
Verify Compliance with
City Noise Standards
Verify Completion of
Field Inspections
Compliance Report
Prepared by Qualified
Noise Consultant
City of Rialto Planning
Division
City of Rialto Building
and Safety
Department
Qualified Noise
Consultant
Public Services
SC PS -1: Prior to issuance of building permits, the City of Rialto Police Department shall review development plans for the incorporation of defensible space concepts to reduce demands on police services. Public safety planning recommendations shall be incorporated into the Project plans. The Applicant shall prepare a list of Project features and design components that demonstrate responsiveness to defensible space design concepts. The Police Department shall review and approve a ll defensible space design features incorporated into the Project prior to initiating the building plan check process.
Prior to Building Permit
Issuance
Verify Required Public
Safety Information on
Development Plans
City of Rialto Planning
Division
City of Rialto Building
and Safety Department
City of Rialto Police
Department
SC PS-2: Prior to the issuance of the first grading permit and/or action that would permit site disturbance, the Applicant shall provide evidence to the City of Rialto Police Department that a Prior to Issuance of
Grading Permit
Verify Security Service
Plan
City of Rialto Planning
Division
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-19
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
construction security service or equivalent service shall be established at the construction site along with other measures, as identified by the Police Department and the Public Works Department, to be instituted during the grading and construction phase of the Project.
City of Rialto Building
and Safety Division
City of Rialto Public
Works Department
City of Rialto Police
Department
Agua Mansa Industrial Corridor Specific Plan EIR Mitigation Measures: Public Services and Utilities
Mitigation Measure 5: All Project specific site plans should be subject to review by the Fire Department in each jurisdiction to determine whether the Project design includes adequate site access provisions and does not exceed the protection abilities of the various departments.
Prior to Construction Review of Site Plans by
City of Rialto Fire
Department
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
City of Rialto Fire
Department
Transportation
MM TRF -1: Prior to issuance of building permits, the Project applicant shall develop a Transportation Demand Management (TDM) Plan with TDM measures in coordination with the City of Rialto staff. The TDM plan shall be approved by the City prior to the issuance of building permits.
Prior to Issuance of First
Building Permit
Verify Preparation of
Transportation
Demand Management
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
City of Rialto Public
Works Department
City Engineer
SC TRA-1A: South Riverside Avenue at I-10 Eastbound Ramps. The Project Applicant shall contribute on a fair -share basis to costs associated with the widening of South Riverside Avenue. These improvements would be consistent with recommendations set forth in Measure I of the 2018 Nexus Study Item “Widen Riverside Avenue from South City Limit to Slover Avenue from 4 lanes to 6 lanes”.
During Project
Implementation
Verify Payment City of Rialto Planning
Division
City of Rialto Building
and Safety Division
City of Rialto Public
Works Department
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-20
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
SC TRA-1B: South Riverside Avenue at Solver Avenue. The Project Applicant shall contribute on a fair-share basis to costs associated with the widening of South Riverside Avenue. These
improvements would be consistent with recommendations set forth in Measure I of the 2018 Nexus Study Item “Widen Riverside Avenue from South City Limit to Slover Avenue from 4 lanes to 6 lanes”.
During Project
Implementation
Verify Payment City of Rialto Planning
Division
City of Rialto Building
and Safety Division
City of Rialto Public
Works Department
Tribal Cultural Resources
MM TCR -1: The Yuhaaviatam of San Manuel Nation (YSMN)
Cultural Resources Management Department shall be contacted of any pre -contact cultural resources discovered during Project implementation and be provided information regarding the nature of the find, as to prov ide Tribal input with regards to significance and treatment. Should the find be deemed significant, as defined by CEQA, a Cultural Resources Monitoring and Treatment Plan shall be created by an archaeologist, in coordination with YSMN, and all subsequent finds shall be subject to this Plan. This Plan shall allow for a monitor to be present that represents YSMN for the remainder of the Project, should YSMN elect to place a monitor on-site.
During Project
Implementation
Contact of YSMN
Cultural Resources
Management
Department in the
Event of Find
Cultural Resources
Monitoring and
Treatment Plan, if
Applicable
Verify Completion of
Field Inspection
Completion of Report
Prepared by Certified
Archaeologist and
Native American
Monitor
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
YSMN Cultural
Resources
Management
Department
MM TCR-2: Any and all archaeological/cultural documents created as a part of the Project (isolate records, site records, survey reports, testing reports, etc.) shall be supplied to the Project applicant and the Lead Agency for dissemination to YSMN. The Prior to Construction
During Construction
Activities and Project
Implementation
Supply all
Archaeological/Cultural
Documents to Project
Applicant and Lead
Agency
City of Rialto Planning
Division
City of Rialto Building
and Safety Division
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-21
Mitigation Measures (MMs) Implementation Timing
Monitoring/Reporting
Methods
Responsible for
Approval/ Monitoring
Verification
Date Initials
Lead Agency and/or Project applicant shall, in good faith, consult with YSMN throughout the life of the Project.
Santa Ana Truck Terminal Project Section 4.0
Final Environmental Impact Report Mitigation Monitoring and Reporting Program
City of Rialto 4-22
This Page Intentionally Left Blank