FINAL CONSTRUCTION WORK AUTHORIZATION RIALTO SYCAMORE AVE SEWER TRUNK LINE PROJECT Project History ● 2020 - project need identified through Master Plan by West Yost due to growth in the City

and

hydraulic

modeling

evaluations.
● 2021 - Meetings with the City and the City’s consultant (Dopudja Wells) were held to discuss

flow

capacity

and

a

three

phased

approach

for

addressing

this

part

of

the

sewer

system.

○ Phase 1: Baseline Road Sewer Trunk Line Project (completed in 2024) - The scope

of

work

involved

potholing

for

utility

location,

the

installation

of

approximately

1,600

linear

feet

(LF)

of

new

15-inch

sewer

trunk

line,

the

construction

of

seven

(7)

manholes,

and

complete

pavement

restoration

within

the

project

limits.
○ Phase 2: Current Project (2026) - This phase will involve the installation of approximately

5,200

LF

of

dedicated

15-inch

sewer

trunk

main

extending

south

from

the

Sycamore

Sewer

Lift

Station

down

Sycamore

Avenue

to

Baseline

Road,

where

it

will

connect

with

the

Phase

1 project.
○ Phase 3: Planned project - this future phase is planned to include the installation of

a

new,

dedicated

15-inch

sewer

pipe

along

Acacia

Avenue,

south

of

Victoria

Street,

to

maintain

pipe

size

consistency

with

the

15-inch

pipe

installed

during

Phase

1 and

Phase

2. ● 2023 - Baseline Rd & Sycamore Ave Sewer Trunk Line Project(s) design completed. ● 2024 - Baseline Rd Sewer Trunk Line Project construction completed (Phase 1). ● 2026 - Sycamore Ave Trunk Line (Phase 2) Request for Proposals issued through City’s Planet

Bids

website,

bids

evaluated,

Contractor

selected.

Project Goals and Objectives
The primary goal of this project is to upsize the City of Rialto's sewer main infrastructure along Sycamore

Avenue

between

Baseline

Road

and

the

Sycamore

Sewer

Lift

Station

to

accommodate

current

and

future

residential

development.

The

existing

8-inch

sewer

line

is

nearing

capacity

due

to

ongoing

construction

of

new

residential

developments

to

the

north,

necessitating

immediate

infrastructure

improvements

to

prevent

system

overload

and

ensure

adequate

wastewater

conveyance.

This

project

represents

Phase

2 of

a

comprehensive

three-phased

initiative

designed

to

systematically

upgrade

the

city's

sewer

trunk

line

system

and

maintain

consistent

pipe

sizing

throughout

the

network.

Bid Period
On February 20, 2026, Veolia requested sealed bids for the project through the City of Rialto’s Planet

Bids

portal.

12 bids

were

received

on

March

20,

2026.

Rialto Sycamore Ave Sewer Trunk Line Project
DRAFT

Bid Results from March 20, 2026:

Contractor Name Ferreira Construction $2,916,000.00 GRBCon, Inc. $3,283,851.00 Ramona Inc. $3,483,000.00 Valverde Construction $3,500,986.00 CP Construction $3,577,030.00 Stephen Doreck Equipment Rentals $3,589,225.00 Griffith Company $3,885,920.00 Riverside Construction $4,326,400.00 Leatherwood Construction $5,000,700.00 CEM Construction $5,188,250.00 Blois Construction $6,359,453.00 Mike Bubalo Construction $4,657,400.00 Comprehensive

bid

reviews

were

conducted

on

proposals

received

from

Contractors.

Veolia

recommends

the

selection

of

Ferreira

Construction

for

the

installation

of

the

sewer

trunk

line

on

Sycamore

Ave

as

they

were

the

lowest,

responsive

bidder.

Scope of Work
The project scope includes, but is not limited to the following:

1. Potholing existing utilities. 2. Installation of approximately 5,200 LF of 15-inch PVC sanitary sewer pipe within project limits. 3. Installation of approximately 54LF of 8-inch force main 4. Installation of (14) - 48-inch sewer manholes, 5. Dewatering, as needed. 6. Sheeting, shoring, and bracing. 7. Subcontractor shall complete and submit a post construction CCTV of the new sewer main, complete. This CCTV shall be from a NASSCO certified firm, with completed report and any recordings provided to Veolia. 8. Subcontractor shall be responsible for installing and maintaining temporary pavement (cold mix) during and after the work is complete . 9. Restoration and repair of existing pavement systems, and surface improvements affected

by

the

Work,

and

incidentals

for

complete

and

usable

sewer

system.

10. Replacement of traffic loops and restoration of striping, bike lanes, cross walks, and RRPM’s within the project limits, as necessary. 11. Subcontractor shall be responsible for preparing and obtaining approvals on engineered Traffic Control Plans, implementing traffic control throughout the duration of the work.

Rialto Sycamore Ave Sewer Trunk Line Project
DRAFT

12. Subcontractor shall be responsible for obtaining an encroachment permit from the City of Rialto. 13. Subcontractor shall be responsible to field fit pipes and appurtenances as required. 14. Subcontractor shall be responsible for pressure testing. 15. Subcontractor shall engage the services of a Geotechnical consultant to provide compaction testing of all backfill and pavement along with compression testing of concrete pours. 16. Contractor shall furnish a complete set of “as built” plans to Veolia at the completion of the Project. conditions discovered during construction.

Proposed Project Timeline & Schedule
● March 20, 2026 - Contractor bids received ● March 26, 2026 - Water Subcommittee approval ● April 14, 2026 - City Council approval ● May - Contractor mobilization and start of project. ● September 30, 2026 - Date for substantial & final completion **Subcontractor shall comply with the Project Schedule Requirement: Minimizing Disruption to Morgan

Elementary

School

detailed

within

the

Special

Conditions.

The

period

for

active

construction

near

the

school

campus

is

strictly

defined

as

June

8,

2026

through

August

7,

2026.

Attachments
Cost Estimate See Attachment 1 – Final Cost Sheet with total cost of $3,606,950 and breakdown costs. This includes

Veolia’s

20%

fee

for

design,

construction

management,

insurance,

O&M

(risk,

labor

and

compliance),

CPM

labor,

corporate

overhead

and

profit,

and

0%

owner

held

contingency.

PROJECT COST FOR SYCAMORE AVE SEWER TRUNK LINE PROJECT Q Unit Description Price Total Price 1 Lumpsum Subcontractor cost - Ferreira Construction $2,916,000 $2,916,000 2 NTE Engineering Services During Construction $89,800 $89,800 Total 3rd Party Project Cost $3,005,8005 Veolia fee (20%) $601,160 TOTAL FCWA COST $3,606,960 Notice of Inviting Bids, Request for Proposal (RFP) and Clarifications See Attachment 2 Contractor Firm Proposals Received on March 20, 2026 See Attachment 3 Rialto Sycamore Ave Sewer Trunk Line Project
DRAFT

Approved By Rialto City Council/Rialto Utility Authority: Date: Tab Item No. _____ Issued by: Received by: Rialto Utility Authority Rialto Water Services, LLC By: ______________________ By: ______________________ Name:

____________________

Name:

___________________

Title:

_____________________

Title:

____________________

Date:

_____________________

Date:

_____________________

Rialto Sycamore Ave Sewer Trunk Line Project
DRAFT

ATTACHMENT 1 – Cost Breakdown Sheet
FCWA Breakdown attached

Rialto Sycamore Ave Sewer Trunk Line Project
DRAFT

ATTACHMENT 2 – Request for Bids Package

Rialto Sycamore Ave Sewer Trunk Line Project
DRAFT

ATTACHMENT 3 – Contractor’s Bids Received

Rialto Sycamore Ave Sewer Trunk Line Project

← All documents from this meeting